Fourth Meeting of Nepal-India Joint Committee on Inundation and Flood

Total Page:16

File Type:pdf, Size:1020Kb

Fourth Meeting of Nepal-India Joint Committee on Inundation and Flood MINUTESOF THE FOURTHMEETING OF NEPAL.INDIAJOINT COMMITTEE ON INUNDATION AND FLOODMANAGEMENT IJCIFMI (January 10-,14, 201,1) The fourth meetingof Nepal-lndiaJoint Committeeon Inundationand Ftooo Management(JCIFM) was heldfrom January 10-14,2o11. The Indiandetegation was led by Mr' S. MasoodHusain, Member (Coordination), Ganga Flood Conircri Commission (GFCC),Government of lndiaand the Nepalesedelegation was lerj by Mr. K' R. Dahal,Director General of the Departmentof Water lnducedDrsaster Prevention(DWIDP), Government of Nepal.The Nepalesedelegation Wercon-r€i-. the Indiandelegation at Janakpur,Dhanusha on Januaryg,201j. The meetingof the Committeewas precededby joint fieldvisits to the compteteci ongoing and proposed embankmentsand flood protectionworks atong l-r.; Kamala,Bagmati and Lalbakeyarivers. The listof participantsof the meetrnqrs ;ri J Annex-1. EXTENSIONOF EMBANKMENTS A) FTELDVtStT OF ONGOTNGWORKS A-l Kamala River The Committeecarried out the fieldvisit of the Kamalariver on Januarytri 2011. The Committeevisited the rightbank startingfrom Ch. O.O0km 1,. the Nepal-lndiaborder and proceededupstream up to ch. 1g.g5km It was observedthat the embankmentwork along the right bank fro;r r.,;i 2'10 km to Ch' 5.50 km has beencompleted. The work from Ch 0 00 ir 2.10 km is also completed,except for 200 m lengthfrom the Nepat-inor;r border.The Committeeinstructed that this portionalong with Anti Fton,j J Sluice(AFS) be completedas per the contractschedule. The Comrnitr.. reiterated its earlierdecision that the constructionof embankmentshoriri be taken up on the Indian side to close the gap along both i).rr.,i:. appropriatelyby Governmentof lndia. In the package work from ch. 15.700to 16.000 km, AFS ancrsonri, revetment work remainto be completed.The Committeeinstructed that ilrc works be completedas per the contractschedule. lt also instructecjflrar remaining worksof dressingand turfingon the embankmentas per dFlsriril may be completed. Thereafter,the committeevisited the left bank from ch. 0 000 krn to ctr 10.550km. Approximately300 m partof the embankmentnear the Nrn,,, Indiaborder remains incomplete. The Committeeinstructed that ilre wor.: be completedas per contractschedule. lt also instructedthat remanrr-,: L works of dressingand turfingon the embankmentas per designmay be completed.The Committeeobserved that the slope of the embankmentat many locationswas not as per the designspecifications. lt was decided that the slope of the embankmentmay be rectifiedas per the destgn specification. A-ll Bagmati River The field visit to Bagmatitook place on January 11,2011' Duringthe (RBM) second meetingof JCIFM,GON had tenderedRiver Bed Material five work for nine work packagesout of which the Committeeapproved progress work packagestotaling 30.48 km, the work of which is piesentlyin to and near completion.During the third meeting,the Committeedecided 20 ?'2 approvethe remainingfour work packageson the rightbank totaling km of which GOI contributionis NRs 4.52 croresincluding contingencies on and excluding vAT. These work packages were to be initiated completionof the ongoing RBM work of 30'48 km approvedpreviously However,the Committeefound that RBM works of the four work packagcs approvedin the thirdmeeting had alreadybeen initiated. The Committee observedthat the slope of the embankmentat many locationswas not as per designspecification. lt was decidedthat the slope of the embankmentmay be rectifiedas per the design specification'The per Committeeinstructed that the differentwork packagesbe completedas contractschedule. A-lll LalbakeYaRiver The field visit to Lalbakeyaembankment works took place on January11. 2011. Some structuressuch as AFS at Ch. 0.40km from Nepal-lndta border,at NepalEastern Canal (NEC) breach point and at Ch' 5'075 knr from NEC and also ongoingwork of left bank Ch. 4.50km (PackageB) remainincomplete. lt was observedthat the slope of the embankmentat many locationswas not as per the design specification.The Committee directedthat the slope of the embankmentmay be rectifiedas per thc design specification.The Committee instructed that the different work packagesbe completedas per contractschedule' >V DECISIONSOF THE JOTNT COMMITTEEON INUNDATION& FLOOD MANAGEMENT(JCtFM) B) PROPOSEDWORKS AND RELEASEOF FUNDS B-l For Bagmati river Ongoing Works The Committeenoted that the initial50% of expenditureamount for three retenderedand one gap closingcontracted work packagesin Bagmatiriver of NRs. 2.43 crore has already been released. Since the utilization certificatesrelated to these works have been submitted,the balance50% i.e.NRs. 2.43 croreis recommendedfor release. The River Bed Material(RBM) work of 30.48 km approvedpreviousty rs ongoing. The works were inspectedby the Committee.The utilization certificateof 75o/oof funds may be submittedafter which the balance paymentof NRs.4.45 crorewill be released. Since the four work packagesfor RBM works on the.right bank totating 20.32 km have already been initiated,the Committeerecommends ilre releaseof 50% of Gol contributionfor theseworks i.e. NRs.2.26 crore.The bafancepayment would be made on receiptof utilizationcertificate of 7So/n I of fundsreleased and inspectionof the worksby the committee. The emergentworks carriedout duringthe monsoonfloods of 201Owere i inspected.The utilizationcertificates of the emergentworks amountingto NRs' 0.45 crorewere submittedto the Committee.The summaryof works is al Annex'll. The Committeeapproves the reimbursementof NRs 0 45 crorespent on the emergentworks of 2010 monsoonfloods. Further,the Committeerecommended taking up emergent anti-erosiori worksalong both banksof the riveras per detailsgiven at Annex-lllbefore, the monsoonof 2011. The GON will submit a report in respectof these emergentworks to GFCC for examination.After the approvalof reportbv GFCC, competentauthority of GON will invite tenders as per Financiat Regulationsof GON. The summary of tender evaluation along with recommendationof award of contracts shall be submitted to EOl, Kathmandufor the endorsementof the Indianside. Thereafter 50% of Gol contributionwill be released. New Works Duringthe thirdmeeting, the committeehad directedthe concernedficld officersto carryout the necessaryfield investigation including inundatror-r area and to collectinformation of damagesto see the necessitvoi (V ilD proposed embankmenton the leftbank from ch. 31.250to 42.sookm.The investigation reportsubmitted to GFCC was examinedby it and approved. Accordingly 5 work packages(Package nos. LE1 to LE 5) were tendered. the summary of which is at Annex-tV.The Committeeendorsed the tenders as approved by GON. The total Gol contributionfor these pacKages including contingenciesis NRs. 3.114 crore.The Committeerecommends the releaseof 50% of this amounti.e. NRs. 1.ss7 crore.The balance payment would be made on receiptof utilizationcertificate of 7S"hof funcjs releasedand inspectionof the works by the committee. Tenderswere also invitedby the Govt. of Nepal for the constructionof embankmentworks alongthe Jhanj river,a tributaryof Bagmatiriver. The Committee decidedto keep the endorsementof the tender on hold anct considerthe issueat the nextmeeting of JCIFM. B-ff Work along the Lalbakeyariver Ongoing Works As decidedin the secondmeeting of JCIFMthe embankmentworks of 12.2 km along both banks and Anti FloodSluice (AFS) along the rigiit bank of Lalbakeya are being undertaken.50% of the total Gol contributionr e NRs' 9.615 crore has alreadybeen releasedto GON. The utilizatron certificates for these works have been submitted,hence the balance amountof NRs.9.61s crore is recommendedfor release. The emergent works carriedout during the monsoonfloods of 2010were inspected'The utilizationcertificates of the emergentworks amountingfo NRs. 0'42 crore were submittedto the Committee.The summary of works is at Annex-V. The Committeeapproves the reimbursementof NRs. 0.42 crore spent on the emergentworks of 2010monsoon floods. Further, the Committeerecommended taking up emergent anti-erosion works on both banks as summarizedin Annex-Vlbefore the monsoonoi 2011' The GoN will submita reportin respectof these emergentworks rc GFcc for examination.After the approvalof reportby GFCC, competeni authority of GON will invitetenders as per FinancialRegulations of GoN The summary of tenderevaluation along with recommendationof awardof contractsshall be submittedto EOl, Kathmandufor the endorsementof the Indianside. Thereafter 50% of Gol contributionwill be released. New works Duringthe third meetingof JCIFM,it was decidedthat embankmentworks may be extended by 10.50 km on each bank and RBM works may bc carried out for a rengthof 6.40 km (0+000to 6+400 from NEC, Fatuwa Bridge) on both banks.Following tl'1e re-examination of the abovepr6posai y,v_l^ in consultation of GFCC,it was decidedto extendembankment works by 9.5 km on left bankand 11.5km on rightbank. Accordingry, 9 works packages(Package nos.18 to 25 and GRVI) weretendered p",.GoN financialregulations ", and approvedby the competentauthority of the Government of Nepar.Furthermore, 6 work packages were proposed to bc awardedto usergroups. The summary of worksis at Annex-vil. The Committee g endorsedthe tenderedwork packages.The totalGol contribution includingcontingencies for theseworks is Nns. 14.7gscrore. The Committee recommendsthe releaseof 50% of this amounti.e. NRs. 7 '397crore to GoN. The balancepayment would be madeon receiptof utilizationcertificate of 75% of fundsreleased and inspectionof the works bythe Committee. The Committeefurther decided that the 6 workpackages
Recommended publications
  • River Culture in Nepal
    Nepalese Culture Vol. XIV : 1-12, 2021 Central Department of NeHCA, Tribhuvan University, Kathmandu, Nepal DOI: https://doi.org/10.3126/nc.v14i0.35187 River Culture in Nepal Kamala Dahal- Ph.D Associate Professor, Patan Multipal Campus, T.U. E-mail: [email protected] Abstract Most of the world civilizations are developed in the river basins. However, we do not have too big rivers in Nepal, though Nepalese culture is closely related with water and rivers. All the sacraments from birth to the death event in Nepalese society are related with river. Rivers and ponds are the living places of Nepali gods and goddesses. Jalkanya and Jaladevi are known as the goddesses of rivers. In the same way, most of the sacred places are located at the river banks in Nepal. Varahakshetra, Bishnupaduka, Devaghat, Triveni, Muktinath and other big Tirthas lay at the riverside. Most of the people of Nepal despose their death bodies in river banks. Death sacrement is also done in the tirthas of such localities. In this way, rivers of Nepal bear the great cultural value. Most of the sacramental, religious and cultural activities are done in such centers. Religious fairs and festivals are also organized in such a places. Therefore, river is the main centre of Nepalese culture. Key words: sacred, sacraments, purity, specialities, bath. Introduction The geography of any localities play an influencing role for the development of culture of a society. It affects a society directly and indirectly. In the beginning the nomads passed their lives for thousands of year in the jungle.
    [Show full text]
  • Abbreviation and Acronyms
    Assessment of Hydropower Potential of Nepal Final Report Abbreviation and Acronyms AHEP : Available Gross Hydroelectricity Potential ASTER : Advance Spaceborne Thermal Emission and Reflection Radiometer AMF : Average Monthly Flow APHRODITE : Asian Precipitation Highly Resolved Observational Data Integration Towards Evaluation B : Breadth BCDP : Building Code Development Project B/C : Benefit-Cost Ratio BoQ : Bill of Quantities CAR : Catchment Area Ratio CCT : Central Churia Thrust CFRD : Concrete Faced Rock Fill Dam COD : Commercial Operation Date DCF : Discounted Cash Flow DEM : Digital Elevation Model DHM : Department of Hydrology & Meteorology DMG : Department of Mines & Geology DoED : Department of Electricity Development d/s : Downstream E : East EIA : Environmental Impact Assessment EMI : Equal Monthly Installment ESA : European Space Agency ESRI : Environmental System Research Institute EU-DEM : European Union Digital Elevation Model FDC : Flow Duration Curve WECS i Assessment of Hydropower Potential of Nepal Final Report GHEP : Gross Hydroelectricity Potential GIS : Geographic Information System GLOF : Glacial Lake Outburst Flood GoN : Government of Nepal GPS : Global Positioning System GWh : Giga Watt-Hour H : Height ha : Hectares HEC-HMS : Hydrologic Engineering Center-Hydrologic Modeling System HFL : High Flood Level HFT : Himalayan Frontal Thrust HPP : Hydropower Project HRU : Hydrological Response Unit ICOLD : International Commission on Large Dams ICIMOD : International Center for Integrated Mountain Development IDC : Interest
    [Show full text]
  • Beyond Hydropower: Towards an Integrated Solution for Water, Energy and Food Security in South Asia
    International Journal of Water Resources Development ISSN: 0790-0627 (Print) 1360-0648 (Online) Journal homepage: https://www.tandfonline.com/loi/cijw20 Beyond hydropower: towards an integrated solution for water, energy and food security in South Asia Golam Rasul, Nilhari Neupane, Abid Hussain & Binaya Pasakhala To cite this article: Golam Rasul, Nilhari Neupane, Abid Hussain & Binaya Pasakhala (2019): Beyond hydropower: towards an integrated solution for water, energy and food security in South Asia, International Journal of Water Resources Development To link to this article: https://doi.org/10.1080/07900627.2019.1579705 © 2019 The Author(s). Published by Informa UK Limited, trading as Taylor & Francis Group. Published online: 19 Mar 2019. Submit your article to this journal View Crossmark data Full Terms & Conditions of access and use can be found at https://www.tandfonline.com/action/journalInformation?journalCode=cijw20 INTERNATIONAL JOURNAL OF WATER RESOURCES DEVELOPMENT https://doi.org/10.1080/07900627.2019.1579705 Beyond hydropower: towards an integrated solution for water, energy and food security in South Asia Golam Rasul, Nilhari Neupane, Abid Hussain and Binaya Pasakhala International Centre for Integrated Mountain Development, Kathmandu, Nepal ABSTRACT ARTICLE HISTORY South Asia is energy-poor, water-stressed, and food-deficient, and Received 31 August 2018 these problems are expected to intensify with high population Accepted 31 January 2019 growth, rapid economic growth and industrialization, urbanization, KEYWORDS and changing climate. Although the water, energy, and food security Water-energy-food nexus; challenges are interconnected, they are dealt with in isolation, which South Asia; Himalayan rivers; fails to address the challenge of trade-offsandexacerbatesthe hydropower; integrated river problems.
    [Show full text]
  • Ganges Strategic Basin Assessment
    Public Disclosure Authorized Report No. 67668-SAS Report No. 67668-SAS Ganges Strategic Basin Assessment A Discussion of Regional Opportunities and Risks Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GANGES STRATEGIC BASIN ASSESSMENT: A Discussion of Regional Opportunities and Risks b Report No. 67668-SAS Ganges Strategic Basin Assessment A Discussion of Regional Opportunities and Risks Ganges Strategic Basin Assessment A Discussion of Regional Opportunities and Risks World Bank South Asia Regional Report The World Bank Washington, DC iii GANGES STRATEGIC BASIN ASSESSMENT: A Discussion of Regional Opportunities and Risks Disclaimer: © 2014 The International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington, DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org All rights reserved 1 2 3 4 14 13 12 11 This volume is a product of the staff of the International Bank for Reconstruction and Development / The World Bank. The findings, interpretations, and conclusions expressed in this volume do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law.
    [Show full text]
  • Town Wise Revised Action Plan for Polluted River Stretches in the State of Bihar Original Application No: 200/2014 (Matter : M.C
    INDEX Town wise Revised Action Plan for polluted River Stretches in the State of Bihar Original application No: 200/2014 (Matter : M.C. Mehta Vs Union of India & Orgs) S.No. Particulars Page No 1 Synopsis 1-7 Maps showing ongoing /Proposed Sewerage Scheme in 2 8 Towns under Polluted Stretch & Tributaries Map showing Patna town division into zones for Sewerage 3 9 Schemes Compliance report in terms of progress in Quarter related to 4 10-15 STPs in the state of Bihar Report related to Polluted Stretches and Lying of sewage 5 network, collection and disposal of sewage, interception and 16-33 diversion of drains carrying sewage to STP. 6 Ganga River Tributary Towns 34-35 7 SWM Status & Action Plan for Ganga & its Tributaries 36-38 8 ODF Status & Action Plan of Ganga & its tributaries 39 9 Status of Plastic Waste Management 40 10 Annexures Status of Ongoing / Tendered / Tender to be floated of Schemes under Namami Gange Program i. and 41-48 Status of Screening with Sewerage Schemes : Annexure- i Solid Waste Management Status Report in Ganga Towns and ii. Status of different Components of SWM and allied Works at 49-52 Ghats: Annexure- ii Report of Plastic Carry Bags Since coming into effect of iii. Plastic Waste Management Byelaws till date: 53-56 Annexure- iii Toilet Status of Ganga Town ULBs and Status of ODF ULBs iv. Certified by QCI: 57-59 Annexure- iv 60-68 and 69 11 Status on Utilization of treated sewage (Column- 1) 12 Flood Plain regulation 69 (Column-2) 13 E Flow in river Ganga & tributaries 70 (Column-4) 14 Assessment of E Flow 70 (Column-5) 70 (Column- 3) 15 Adopting good irrigation practices to Conserve water and 71-76 16 Details of Inundated area along Ganga river with Maps 77-90 17 Rain water harvesting system in river Ganga & tributaries 91-96 18 Letter related to regulation of Ground water 97 Compliance report to the prohibit dumping of bio-medical 19 98-99 waste Securing compliance to ensuring that water quality at every 20 100 (Column- 5) point meets the standards.
    [Show full text]
  • ERMC Brochure
    ERMC (Environment & Resource Management Consultant) (An ISO 9001:2008 Certified Company) COMPANY PROFILE 2018 CONTENTS Board of Directors | 01 Message from the Managing Director | 01 Company Background | 02 • Corporate Information • Vision • Mission • Objectives • Services • Sectors Location Map of International Projects | 04 Location Map of Domestic Projects in Nepal | 05 Transportation | 06 Hydropower/Energy | 07 Water Supply, Sanitation and Urban Development | 09 Water Resources, Irrigation and Natural Resource Management | 10 Clients | 12 Associated Organizations | 12 Corporate Social Responsibility | 13 MESSAGE FROM THE MANAGING DIRECTOR ERMC has successfully completed a large number of development Board of Directors projects in Nepal since its inception in the year 1986 A.D. At present, ERMC is the largest multidisciplinary consulting firm in Nepal and the only ISO Certified Nepalese consulting firm working in different countries of Asia and Africa. The Main field of activities of our firm is planning, feasibility studies, survey, design, supervision and management of the projects within all fields of social, environmental, physical engineering and related sciences. The main sectors we work in are Transportation, Hydropower/Energy, Water Supply and Sanitation, Urban Development, Irrigation & Agriculture, Water Resources Planning and Development, GIS Mapping, Project Management, Capacity Building and Training. From the outset, our primary concern has always been to render professional services of the highest quality to our clients who include donors, governments, semi-governments, and private enterprises. ERMC has successfully implemented numerous donor funded projects in the Asian and African countries since a long time and has been able Er. Uddab Raj Chaulagain to the gain highest level of client satisfaction. The interests of our Clients Managing Director are of paramount importance in every project we undertake.
    [Show full text]
  • Climatic Variability and Land Use Change in Kamala Watershed, Sindhuli District, Nepal
    climate Article Climatic Variability and Land Use Change in Kamala Watershed, Sindhuli District, Nepal Muna Neupane 1 and Subodh Dhakal 2,* 1 Central Department of Environmental Science, Tribhuvan University, Kathmandu 44600, Nepal; [email protected] 2 Department of Geology, Tri-Chandra Campus, Tribhuvan University, Kathmandu 44600, Nepal * Correspondence: [email protected] Academic Editor: Maoyi Huang Received: 21 December 2016; Accepted: 10 February 2017; Published: 18 February 2017 Abstract: This study focuses on the land use change and climatic variability assessment around Kamala watershed, Sindhuli district, Nepal. The study area covers two municipalities and eight Village Development Committees (VDCs). In this paper, land use change and the climatic variability are examined. The study was focused on analyzing the changes in land use area within the period of 1995 to 2014 and how the climatic data have evolved in different meteorological stations around the watershed. The topographic maps, Google Earth images and ArcGIS 10.1 for four successive years, 1995, 2005, 2010, and 2014 were used to prepare the land use map. The trend analysis of temperature and precipitation data was conducted using Mann Kendall trend analysis and Sen’s slope method using R (3.1.2 version) software. It was found that from 1995 to 2014, the forest area, river terrace, pond, and landslide area decreased while the cropland, settlement, and orchard area increased. The temperature and precipitation trend analysis shows variability in annual, maximum, and seasonal rainfall at different stations. The maximum and minimum temperature increased in all the respective stations, but the changes are statistically insignificant. The Sen’s slope for annual rainfall at ten different stations varied between −38.9 to 4.8 mm per year.
    [Show full text]
  • (TOR) for Media Engagement at Local and National Level to Strengthen And
    Terms of Reference (TOR) For Media engagement at local and national level to strengthen and mainstream flood early warning system and preparedness for community resilience Circulation date: 30 January 2020 Closing date: 07 February 2020 Practical Action Panipokhari, Lazimpat, Kathmandu PHONE: +977-1-4413452/4423639/640 FAX: +977-1-4423632 E-mail: [email protected] January 2020 1. BACKGROUND Practical Action is a global change-making group that consists of a UK registered charity with community projects in Africa, Asia and Latin America, an independent publishing company and a technical consulting service. It combines these specialisms to multiply its impact and help shape a world that works better for everyone. In Nepal, Practical Action is focused on putting ingenious ideas into work to contribute to poverty reduction and sustainable wellbeing through working in three expertise change areas: Energy that transforms; Farming that works and Resilience that protects. Under the change area Resilience that Protects Practical Action Nepal with funding support of USAID/OFDA is implementing “Strengthening end to end flood Early Warning System (EWS) and preparedness for effective disaster reduction and resilience in Nepal project” in the following river basins for two years since September 2018: Kankai River Basin - Ilam and Jhapa Kamala River Basin - Sindhuli, Dhanusa and Siraha Upper catchment of West Rapti Babai River Basin in Dang Sotkhola in Surkhet 1.1 Experiences from the past Practical Action completed the Flood EWS project in Kankai and Kamala river basins with the funding support of USAID/OFDA that lasted from September 2014 to August 2018 in collaboration with its implementing partners Nepal Red Cross Society.
    [Show full text]
  • Managing Nepal's Dudh Koshi River System for a Fair and Sustainable
    Managing Nepal’s Dudh Koshi River System for a Fair and Sustainable Future This publication provides research insights to help develop more equitable and efficient management of water resources in the Dudh Koshi river system in Nepal. It sets out a strategic and holistic planning framework for integrated water resources management and development of the river system. This considers economic and environmental sustainability and the challenges of climate change; technical and social issues; and the potential and combined impacts of multiple projects including hydropower, irrigation, and flood control. The report contributes to basin-wide strategic planning. About the Asian Development Bank ADB is committed to achieving a prosperous, inclusive, resilient, and sustainable Asia and the Pacific, while sustaining its efforts to eradicate extreme poverty. Established in 1966, it is owned by 68 members —49 from the region. Its main instruments for helping its developing member countries are policy dialogue, loans, equity investments, guarantees, grants, and technical assistance. MANAGING NEPAL’S DUDH KOSHI RIVER SYSTEM FOR A FAIR AND SUSTAINABLE FUTURE SEPTEMBER 2019 ASIAN DEVELOPMENT BANK 6 ADB Avenue, Mandaluyong City 1550 Metro Manila. Philippines ASIAN DEVELOPMENT BANK www.adb.org MANAGING NEPAL’S DUDH KOSHI RIVER SYSTEM FOR A FAIR AND SUSTAINABLE FUTURE SEPTEMBER 2019 ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2019 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved. Published in 2019. ISBN 978-92-9261-550-5 (print), 978-92-9261-551-2 (electronic) Publication Stock No.
    [Show full text]
  • The Governance of Nepal's Flood Early Warning System
    THE GOVERNANCE OF NEPAL’S FLOOD EARLY WARNING SYSTEM OPPORTUNITIES UNDER FEDERALISM Chinaporn Meechaiya, Emily Wilkinson, Emma Lovell, Sarah Brown and Mirianna Budimir Working paper ABOUT THE AUTHORS Chinaporn Meechaiya works as Senior Project Coordinator/Hydrologist in Climate Resilience and SERVIR-Mekong programmes at the Asian Disaster Preparedness Center (ADPC). Chinaporn has experience in hydrology and urban design/urban planning and specialises in hydrology, early warning system, and flood risk management. She has worked on projects with consultancies in Thailand, Nepal, Cambodia, Hong Kong, Myanmar, Vietnam, Laos, Bangladesh, Sri Lanka and the Netherlands. Emily Wilkinson is a Senior Research Fellow in the ODI Risk and Resilience Programme, leading the Financing 4 Resilience team. Her current research focuses on risk governance and financing, accountability mechanisms and measurement frameworks for resilient development. Emma Lovell is a Research Fellow in the ODI Risk and Resilience Programme, and leads the strategy on equity and social inclusion in multi-hazard contexts. Her research focuses on disaster risk management, climate change and building resilience for all. Before ODI, Emma worked in Bangkok, Thailand, for the United Nations Economic and Social Commission for Asia and the Pacific and the Asian Disaster Preparedness Center. Sarah Brown is Thematic Lead for Disaster Risk Reduction for Practical Action. Her work at Practical Action focuses on disaster risk, early warning, improving decision making under complexity, end-mile communication, gender and inclusion. She is a Co-Investigator on the NERC/DFID Landslip Project (research into practice on landslide early warning). She heads the Knowledge Broker (joint with Red Cross Climate Centre) for the NERC/DFID Science for Humanitarian Emergencies and Resilience (SHEAR) Programme.
    [Show full text]
  • Terms of References for Environmental Impact Assessment
    Terms of References for Environmental Impact Assessment Studies for Development of Command Area and Canal System in North Bihar proposed to be brought under irrigation through Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage-cum-Diversion Scheme, Nepal 1.0 INTRODUCTION As per EIA Notification of 1994 and its subsequent amendments, it has been made mandatory to get environmental clearance for river valley and hydro electric projects. The objective of this study is to prepare comprehensive Environmental Impact Assessment to get environmental and other mandatory clearances from Ministry of Environment and Forests and any other concerned Authorities of Government of India. 2.0 SCOPE OF WORK The broad scope of the work is to carry out Environment Impact Assessment for Development of Command Area and Canal System in North Bihar proposed to be brought under irrigation through Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage-cum-Diversion Scheme in Nepal and making assessment of positive impacts with its economic evaluation and prepare Environmental Management Plan (EMP) to mitigate the adverse effects, including the socio- economic aspects and Rehabilitation & Resettlement (R&R) Plan for project affected people. The scope also includes preparation of monitoring plan for implementation of EMP. 3.0 BRIEF DESCRIPTION OF THE PROJECT As per the understanding reached between India and Nepal during the visit of Honorable Prime Minister of Nepal to India in December, 1991, it was agreed by two countries to prepare jointly the
    [Show full text]
  • Sixth Meeting of Nepal-India Joint Committee on Inundation and Flood
    I t I I MINUTESOF THE SIXTH MEETING OF NEPAL-INDIAJOINT COMMITTEE oN TNUNDATTONAND FLOOD MANAGEMENT UCTFMI (January16-21,20121 The sixth meetingof Nepal-lndiaJoint Committeeon Inundationand Flood Management(JclFM) was held duringJanuary 16-21, 2012. The lndian delegationwas led by Mr,S. MasoodHusain, Member (coordination), Ganga FloodControl Commissioh (GFCC), Government of lndiaand the Nepalese delegationwas led by Mr, K. P. Regmi,Director General of the Departmentof Waterlnduced Disaster Prevention (DWIDP), Government of Nepal.The Team Leaderof the Nepalesedelegation welcomed the lndiandelegation at Kamala riverembankment site. The meetingof the Committeeat Kathmanduwas precededby jointfield visits to the completed,ongoing and proposedembankments and flood protection '-Fz worksalong the Kamala,Bagmati and Lalbakeyarivers. The listof participants of the meetingis at Annex-\. EXTENSIONOF EMBANKMENTS A) F|ELDVtStT OF ONGOTNG WORKS A-l KamalaRiver The Committeecarried out the fieldvisit of the Kamalariver on January 17,2012.The Committee visited the right bank starting from Ch. 0.00 km to 5.50km fromthe Nepal-lndiaborder and tlren proceeded to the ieft bankfrom the borderto the pointwhere the embankmentmeets the highland(East-West Highway). The Committee concluded the site visit to Kamalaby visiting the rightbank at thepoint where the embarikment isto meetthe highland on that side. rt The Committeeinspected the completediongoing works and the proposedwork locations. The recently carried out emergent works during the 2011floods were also inspected. The main channel flow of the river was seento be flowingalong the rightembankrnent from Ch. 5.50 km to aroundCh. 2.5 km. During the fifth meeting the Committee had desired to directthe mainflow of the riverat thislocation by the appropriateuse of porcupines.The detailsof workdone and utilizationcertificates for this work may be submittedto GFCCfor payment.The Committeedesired thatefforts should be madeto channelizethe mainchannel of the river away from the rightbank.
    [Show full text]