INTEGRAL COACH FACTORY (ICF) Chennai (Tamil Nadu)

Total Page:16

File Type:pdf, Size:1020Kb

INTEGRAL COACH FACTORY (ICF) Chennai (Tamil Nadu) First Prize Railway s Workshop s INTEGRAL COACH FACTORY (ICF) Chennai (Tamil Nadu) Unit Profile ICF, a premier production unit under the Ministry of Railways, was established in the year 1955 to manufacture passenger coaches. Spread over a sprawling 475 Acre complex, ICF employs 12,000 strong work force and manufactures over 1,700 coaches every year. The annual turnover of ICF for the year 2013-14 was about Rs. 2200 Crores. ICF is located in Chennai, Tamil Nadu, India. ICF is the first of its kind to be established after Independence for the manufacture of light weight, all steel and all welded “Integral” railway passenger coaches. The factory was set up in 1955 with Swiss collaboration. PRODUCTION ICF’s initial plan was to produce 350 Broad Gauge Third Class shells (unfurnished body of the Railway Coaches) only, which were to be furnished by the Zonal Railway workshops. Later, in view of the severe limitation of capacity of the Railway workshops and also to take advantage of mass production, a separate Furnishing Division was added on 2nd October, 1962. The capacity was progressively expanded during 1973-74 from 350 shells to 750 fully furnished coaches per annum with additional inputs. This was enhanced progressively from 850 coaches during 1986- 87 to 1000 coaches in 1990-91. Capacity augmentation project works from 1000 to 1250 & 1250 to 1500 were taken up in phases and completed in 2011-12. Capacity augmentation works upto 1700 were taken up in the year 2012-13 and completed. DESIGN FEATURES The design concept of the coach stipulates that the roof, side wall, end wall and the under frame are joined together by welding, to form a fully ‘integral’ coach shell. The end-wall construction has been made especially strong to make it anti- telescopic to ensure maximum safety to passengers. Further, crashworthy features are provided with CBC design to minimize impact on passengers during accidents/derailments. From the basic design handed down by the collaborators, ICF has diversified having established its expertise and skill in this field, to design and manufacture more than 350 different types of coaches for Indian Railways and export market. Every time a new type of coach is launched, emphasis is laid on improving passenger comfort, passenger safety and higher speeds. ICF follows standard inspection procedures to ensure quality from raw material stage to the finished coach. 246 ICF has been meeting the needs of the Indian Railways for varied types of coaches, however sophisticated the type may be. Some of the important types are: I. SELF PROPELLED COACHES • Electric Multiple Units for suburban services in Metropolitan cities • Diesel Rail Cars • Metro Coaches for Kolkata Metro Railways • Diesel Electric Multiple Units & Diesel Hydraulic Multiple Units for non- electrified routes and Mainline Electric Multiple Units for long distance inter- city travel • Accident Relief Trains / Medical Vans • OHE Inspection Cars II. AIR-CONDITIONED & NON-AIRCONDITIONED PASSENGER COACHES • Air-conditioned Sleeper Coaches of first & second class • Air-conditioned Chair Cars of first and second class • Double Decker Coaches with seating capacity for 148 passengers as against the conventional 90 passengers • Non Air-conditioned Sleeper coaches and General second class coaches III. SPECIAL COACHES • Air-conditioned & Non-air-conditioned Pantry Cars • High Capacity Power Cars for Shatabdi & Rajdhani Express Trains • Air-conditioned Military Ward and Saloon Cars for Indian Army. • Air-conditioned Saloon Cars, Dining Cars, Bar & Restaurant Cars, luxury suites for luxury tourist trains like Palace on Wheels (WR), Deccan Odyssey (CR), The Golden Chariot (SWR), Royal Rajasthan on Wheels (NWR) and Maharajas’ Express of IRCTC • Lifeline Express for operation of hospital on wheels • Jet Deflector Crane Cars, Inter Communication Coaches for DRDO IV. DESIGN & DEVLOPMENT EFFORTS Complementing the existing design capacities and facilities, a fully computerised Design & Development Cell has been set up with sophisticated state-of-the-art computer designing facilities and testing equipment both for coach components and raw materials. D&D Centre uses 3-D modelling on Solid Works platform for generating 3-D drawings and IDEAS software for Finite Element Analysis. Strain gauge testing and squeeze test are done on prototypes before commencement of series production. V. PRODUCTION WITH INNOVATION ICF has carved a niche in the Indian Railway system by constantly improving the ‘quality of travel’ through its passenger coach design which has undergone a sea- change from the days of bye-gone era of mere ‘transport of passengers’. There has been a steady growth both in the quality and quantity of its production. Over the years ICF has endeavoured to meet passengers’ expectations through innovations like 247 • Cushioned seats in General Second Class and SLR coaches. • Provision of Controlled Discharge Toilet Systems. • Anti-injury features in the passenger areas of A/C 2-tier and Sleeper coaches. • Enhanced carrying capacity in A/C 2-tier, First A/C & Garib Rath Chair Car. • Provision of forced ventilation, PIS/PAS in AC/DC EMUs for WR and CR. • UIC vestibules in mainline coaches. • Disabled friendly features in SLRD/SRD coaches. • Modular toilets in passenger coaches. • Stainless steel panelling, handholds in EMUs. • Provision of laptop and cell phone charging points in passenger coaches. • Use of stainless steel in Pantry Cars including interiors and the equipment. ICF goes about its motto, ‘for better travel’, with single-minded devotion. Comfort, speed and safety are the hallmarks of ICF built coaches. Every coach produced at ICF stands proof of ICF’s commitment to live up to its motto and its pursuit of excellence. In simple words, the coaches at ICF are custom-built to delight the individual. ICF’s major customers in India are the Zonal Railways of IR, Mumbai Rail Vikas Corporation, Metro Railway, Kolkata, Military and Tourism Development Authorities. After assessing the requirements of various zonal railways, the Ministry of Railways prepares the annual production programme and coaches are manufactured according to the production programme and dispatched to zonal railways. ICF has also bagged sizable export orders for various Asian countries. Against stiff international competition from more advanced countries like Japan, etc., ICF secured several export orders, most of which are repeat orders. So far, 359 bogies, 11 stainless steel coach shells and 565 coaches including air-conditioned coaches have been exported to 13 Afro-Asian countries. ICF has exported 110 self-propelled coaches to Srilankan Railways during 2011 - 13. Green Energy: Wind Mill (10.5 MW installed capacity) ICF is the first organization amongst all Government production units to entirely source its electrical energy requirement from a renewable source of energy. Seven wind mills of 1.5 MVA capacity each, which ICF has put up in the Tirunelveli District of the Tamil Nadu, generate enough electricity to meet the entire requirement. Year wise Windmill generation & Revenue earned are shown below. Year Wind Mill Revenue Earned Generation (in Crores) (in Million Units) 2009-10 23.79 7.85 2010-11 20.17 7.66 2011-12 18.64 7.22 2012-13 22.41 10.52 2013-14 16.31 7.08 Total 101.32 40.33 248 Energy & Specific Energy Consumption Electrical Energy Consumption of Factory Specific Energy Consumption 20 18.2 300 272 15.3 250 218 15 14.49 208 200 10 150 100 5 50 0 0 2011-12 2012-13 2013-14 2010 -11 2011 -12 2012 -13 ICF Factory Consumption ( in Million ICF Specific Energy Consumption units) Energy Conservation Measures Implemented during 2013-14 1. Energy efficient package AC units of total capacity 100HP (73.5Kw) of VRF type replacing 2.0 Ton old split & package A/C units of total capacity 100kw. 2. Air Circulator control box with timers where installed. 3. Provision of Energy savers in ARC welding set 4. Turbine type Air ventilators where used in place of Energy driven Roof Exhaust fans. 5. LED street lights have been provided in place of conventional MH/HPSV/MV luminaries. 6. T-5 fitting of type 4x14W, 2x28 & 4x54 have been provided for lighting applications. 7. Induction Lights have been provided for lighting applications in place of conventional lamps such as MH, HPSV etc,. Environment & Safety In general, there is no environmental sensitive target identified in and around ICF. As ICF is a Zero discharge factory, the effluents generated both at Shell & Furnishing factory are being treated and the same is reused for gardening purposes. The effluents of Paint Booth at Furnishing factory are treated first by Reverse Osmosis method and on second stage by Effluent Treatment Plant process which is also used for gardening purposes. With respect to Ambient Air & Stack Gases emissions, the samples are regularly monitored and the test results are well within the prescribed limits of Tamil Nadu Pollution Control Board. These results are also submitted periodically to Tamil Nadu Pollution Control Board. 249 Second Prize Railways Workshops DIESEL LOCO SHED SOUTH CENTRAL RAILWAY Vijayawada (Andhra Pradesh) Unit Profile Diesel Loco Shed, Vijayawada was established in the year 1979 at the cost of about Rs. 170 lakhs to maintain 20 WDS4 locomotives. With the reduction of WDS4 locomotives and increase in Electric traction in BZA Division, DEMU services started in Vijayawada from the year 1996 with 5 consists placed under Diesel Loco Shed, Vijayawada to ease severe traffic constraints both in passenger/express services and also in suburban traffic of BZA, GNT, GTL and SC divisions. In March 2007, 2 RAIL BUSES were received from NED division to run between COA-KLPH section of BZA division. Holding Locos of the DLS/BZA Holding 2012-13 2013-14 DEMU 31 31 WDP 1 17 17 WDM2 14 14 WDM2 M/L 05 07 Total holding 67 69 250 Infrastructure in the Shed i.
Recommended publications
  • GOLDEN CHARIOT Bangalore - Mysore - Hassan - Hospet - Hampi - Gadag - Badami - Goa - Bangalore
    DURATION 07N/08D GOLDEN CHARIOT Bangalore - Mysore - Hassan - Hospet - Hampi - Gadag - Badami - Goa - Bangalore WWW.RAZDANHOLIDAYS.COM About The Golden Chariot train journey is the best way to experience the major and also offbeat tourism destinations of South India. It has recently been awarded the ‘Asia’s leading luxury train’ award at the World Travel Awards, 2013. Page !2 of ! 2 ! Brief Itinerary Day 1 Monday, Bangalore 1800 hrs - Reporting Time 1900 hrs - Departure from Bangalore Day 2 Tuesday, Mysore 0830 hrs - Sight seeing trip of Mysore 0100 hrs - Return to Golden Chariot. Day 4 Thursday, Hassan - Halebid / Belur - Sravanbelagola 0600 hrs - Departure from Mysore 0840 hrs - Arrival at Hassan 0930 hrs - Drive down to Halebid / Belur 1300 hrs - Come back to the train and have lunch onboard. 1600 hrs - Drive down to Sravanbelagola to visit Jain Temple 1900 hrs - Return to train again 1940 hrs - Depart for TB DAM. Day 5 Friday, TB DAM - Hospet / Hampi 0530 hrs - Arrival at TB DAM 0830 hrs - Drive up the hill for breakfast. 0930 hrs - Train to Hospet / Hampi 1300 hrs - Lunch on train 1530 hrs - Hampi 1900 hrs - Dinner on train. 2000 hrs - Departure from TB DAM Day 6 - Saturday - Gadag - Aihole & Pattadakal - Badami 0530 hrs - Arrival at Gadag 0830 hrs - Drive to Aihole & Pattadakal 1300-1600 hrs - Lunch at Badami Court. 1600-1800 hrs - Exploring Badami 1900 hrs - Dinner onboard 2000 hrs - Departure for Goa Day 7 - Sunday, Goa 0530 hrs - Arrival at Goa 0900 hrs - Drive to Mapple Viva. 1200-1600 hrs - Lunch and then outing at the Calangute Beach 1800 hrs - Return to Train.
    [Show full text]
  • Mmf Unpaid Consolidated In
    MAHINDRA & MAHINDRA FINANCIAL SERVICES LTD :- UNPAID DIVIDEND DATA AS ON 24-07-2014 Father/ Father/ Husban Father/ Husband d Husban Proposed Date of FirstNa Middle d Last Amount Due in transfer to IEPF (DD- SLNO First Name Middle Name Last Name me Name Name Address Country State District Pincode Folio No of Securities Investment Type Rs. MON-YYYY) RAMESH SING NA STAR AUTOMOBILES MUKHTIYAR GANJ SATNA (M INDIA MADHYA SATNA 485001 MMF0000881 Amount for unclaimed and unpaid 114,284.00 22-AUG-2014 1 P) PRADESH dividend SATYANARAYANA REDDY LINGAMPALLY NA R. NO. 2-5-33, NAKKALAGUTTA, HANAMKONDA, INDIA ANDHRA WARANGAL 506001 MMF0000070 Amount for unclaimed and unpaid 5,000.00 22-AUG-2014 2 WARANGAL PRADESH dividend S G JAYARAJ INV LEASING NA NO. 4 & 5, NORTH VELLI STREET MADURAI INDIA TAMIL NADU MADURAI 625001 MMF0000079 Amount for unclaimed and unpaid 5,000.00 22-AUG-2014 3 dividend SHOP 2 SHATRUGHAN CAM SECTOR 18, NR. MAHARASHT NAVI Amount for unclaimed and unpaid 4 AMARNATH BHATIA NA MAFCO NEW BOMBAY BOMBAH INDIA RA MUMBAI 400705 MMF0000526 dividend 2,500.00 22-AUG-2014 132/1 PARK VIEW OPP. KAMALA NEHRU PARK MAHARASHT Amount for unclaimed and unpaid 5 ASHOK BHATIA NA POONA INDIA RA PUNE 411004 MMF0000587 dividend 3,800.00 22-AUG-2014 MADHYA Amount for unclaimed and unpaid 6 PREET INDER SINGH NA E1/31, AREA COLONY BHOPAL INDIA PRADESH BHOPAL MMF0000398 dividend 500.00 22-AUG-2014 MAHARASHT Amount for unclaimed and unpaid 7 JEETENDRA PAWAR NA C/O RAGHAVAN IYENGAR M M F S L BOMBAY INDIA RA MUMBAI MMF0000722 dividend 1,000.00 22-AUG-2014 W/O.
    [Show full text]
  • The Golden Chariot Train Tour
    The Golden Chariot Train Tour [rev_slider chariot] This South India Version of Palace On Wheels, was launched in March 2008 & has been rated by The Vanity Fair, U.K. amongst the top seven train journeys in the world. Built & operated on same concept of it’s more famous North India counterpart ,The Golden Chariot Train is a joint collaboration between Indian Railways & State Govt. Of Karnataka; & the onboard hospitality is managed by Maple Group of Hotels. Since Nov 2010,The Golden Chariot is operating on two different train circuits, Ex. Bangalore viz. 7 Nights Pride Of South Golden Chariot from Bangalore to Goa covering Tiger reserve of Kabini, ,Mysore Palace, Goa beaches; besidesUNESCO World Heritage Sites of Hampi, Pattadakal, Badami & Old Goa Golden Chariot Train Tour Cost Includes: on board stay in Sleeping Chambers with private washrooms (except Day 2 in Kabini forest Lodge) Daily Three Meals; Excursion & sightseeing arrangements with English Speaking Guides Bottled drinking water monument entrance fees Jungle Safari in Kabini Cultural program in Mysore OUR PROGRAM Day 01 : MON : Bangalore Depart : Self Report by 4.00 pm (1600 hrs) at Hotel Taj West End ,Bangalore for check in formalities of Golden Chariot Tour, followed by Hi-Tea & brief tour presentation. At 530 p.m. board A/C buses & proceed to Chitrakala Parishad to enjoy cultural program & later be escorted to Yashwantpura Railway Station (Bangalore) to board The Golden Chariot Train by 8 p.m.; after traditional welcome. The train departs from Bangalore by 9 p.m. Dinner on board. Day 02 : TUE : Drive From Mysore / Kabini – Overnight Stay Train arrives early morning at Mysore Station.
    [Show full text]
  • ANSWERED ON:19.07.2017 CCTV Cameras Mahto Dr
    GOVERNMENT OF INDIA RAILWAYS LOK SABHA UNSTARRED QUESTION NO:532 ANSWERED ON:19.07.2017 CCTV Cameras Mahto Dr. Banshilal;Rathore Shri Hariom Singh Will the Minister of RAILWAYS be pleased to state: (a) the number of CCTV cameras installed at railway stations during the last three years and the current year, zone and station-wise; (b) the number of CCTV cameras likely to be installed by the Railways during the next financial year along with the funds allocated for the same; (c) whether the crime rate at railway stations had dropped during the last three years and if so, the details thereof; (d) whether in view of providing adequate security to passengers including women passengers and checking theft cases, the Government proposes to install CCTV cameras in trains also and if so, the details thereof; and (e) the number of trains in which CCTV cameras have already been installed? Answer MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI RAJEN GOHAIN) (a): Details of the number of Close Circuit Television (CCTV) cameras installed at railway stations during the last three years and the current year are appended. (b): It has been decided to provide nearly 35,000 cameras with allocation of fund to the tune of ?500 crore under Nirbhaya Fund over 983 railway stations in next two years. ...2/- -2- (c): The crime rate at railway stations over Indian Railways has not shown declining trend during the last three years. Further, prevention of crime, registration of cases, their investigation and maintenance of law and order in Railway premises as well as on running trains are the statutory responsibility of the State Governments, which they discharge through Government Railway Police.
    [Show full text]
  • LOK SABHA DEBATES (English Version)
    Thirteenth Series, Vol. XXVII, No. 19 Thursda)', August 8, 2002 Sranna 17, 1924 (Saka) LOK SABHA DEBATES (English Version) Tenth Session (Thirteenth Lok Sabha) (Vol. XXVII contains Nos. / / to 2/) LOK SABHA SECRETARIAT NEW DELHI Price: Rs. 50.00 EDITORIAL BOARD G.C. Malhotra Secretary-General Lok Sabha Dr. P.K. Sandhu Joint Secretary P.C. Chaudhary Principal Chief Editor Sharda Prasad Chief Editor Vandn. Trivedi Senior Editor Manlsha Tewarl Assistant Editor (Origtnal English Proceedings included in English Version and Original Hindi proceedings included in Hindi Version will be treated as authoritative and not the translation thereof.) CONTENTS Thlrtheenth Series, Vol. XXVII, Tenth Session, 200211924 (S.k.) No. 19, Thursday, August 8, 2002lSravana 17, 1924 (Saka) SUBJECT COLUMNS REFERENCES BY THE SPEAKER 1,2 (i) Terrorist Attack on Amamath Pilgrims (ii) Congratulation to Indian Sports Persons on their 2 Achievements at Commonwealth Games (iii) Homage to Mahatma Gandhi 2 WELCOME TO PARliAMENTARY DELEGATION FROM SURINAM 1-2 ORAL ANSWER TO QUESTIONS 3-5 ·Starred Question Nos. 361-362 WRITTEN ANSWER TO QUESTIONS 5-260 ·Starred Question Nos. 363-380 5-54 Unstarred Question Nos. 3683-3912 55-260 SHORT NOTICE QUESTION NO.1 260-262 • The Sign + marJ<ed above the name of a Member Indicates that the Question was actually asked on the floor of the House by that member. LOK SABHA DEBATES LOKSABHA The Delegation amved In India on 7th August, 2002. They are now seated In the Special Box. We wish them a happy and fruitful stay in out country. Through them. we convey our greetings and best wishes to the President, the Parliament Thursday, August 8, 2002lSravana 17, 1924 (Saka) and the friendly people of Surinam.
    [Show full text]
  • Purchase of ACEMU, DEMU & MEMU Coaches from Non-Railway
    INDIAN RAILWAYS TECHNICAL SUPERVISORS ASSOCIATION (Estd. 1965, Regd. No.1329, Website http://www.irtsa.net ) M. Shanmugam, Harchandan Singh, Central President, IRTSA General Secretary, IRTSA, # 4, Sixth Street, TVS Nagar, Padi, C.Hq. 32, Phase 6, Mohali, Chennai - 600050. Chandigarh-160055. Email- [email protected] [email protected] Mob: 09443140817 (Ph:0172-2228306, 9316131598) Purchase of ACEMU, DEMU & MEMU Coaches from non‐Railway companies by sparing Intellectual properties of ICF/RCF free of Cost Preliminary report by K.V.RAMESH, JGS/IRTSA & Staff Council Member/Supervisory – Shell/ICF 1 Part‐A Anticipated requirement of rolling stock during XII th Five Year Plan & Production units of Indian Railways. 2 Measurers to upgrade the requirement & quality of passenger services during the 12th Plan (2012‐13 to 2016‐17) Enhancing accommodation in trains: Augmenting the load of existing services with popular timings and on popular routes to 24/26 coaches would help generating additional capacity and availability of additional berths/seats for the travelling public. Enhancing speed of trains: At present, speed of trains of Mail/Express trains is below 55 kmph. These are low as per international standards. Segregation of freight and passenger traffic, enhancing the sectional speeds, and rationalization of stoppages are important measures for speed enhancement. The speed of especially the passenger trains is quite low at present primarily because of the coaching stock in use and due to multiplicity of stoppages enroute. There is scope for speeding up of these services by replacing trains with conventional stock by fast moving EMUs/MEMUs/DEMUs. Enhancing the sectional speeds is another enabling factor in speeding them.
    [Show full text]
  • S.No Description of the Work & Contract No CAPACITY Contract
    LIST OF PURCHASE ORDER S.No Description of the work & Contract No CAPACITY Contract awarded by STATUS 1MW Solar system, materials, accessories, Erection, commissioning with performance warranty Civil, 1 1 MW Grid Tie NanoPV Solar Inc, USA COMMISSIONED Mechanical, Erection, Testing & Commissioning Purchase Order to install 25.76kWp Solar off grid Abhinav Hi-Tech College of 2 25.76kWp Off Grid COMMISSIONED Power plant with 6 hours battery backup Engineering,Hyderabad TNPCB-Administartion-Supply,Erection and Installation of 2KVA solar photo voltaic power plant in the proposed TNPCV pavilion at 41st India Tourist TamilNadu Pollution Control Board,Chennai- 3 and industrial fair in the island ground,chennai 2KVA & 4KVA Grid Tie COMMISSIONED 600032 along with2KVA solar power plant available at croporate office and reinstallation of 4KVAsolar power plant in the TNPCB Corporate office Provision of Solar Rooftop Photo voltaic Power 4 3X5kWp Grid Tie Integral coach Factory,chennai-600038 COMMISSIONED Plant 5kw(on grid)-3Nos in ICF 5 EQPT SPY,Plant,5KW Off Grid Solar invrtr 5kWp Off Grid JSW STEEL LTD, SALEM . COMMISSIONED Design,Supply,installation and Commissioning of 6 20KWp SPV power plant Grid connected system at 20KWp Grid Tie Institute of Mathematical Science,Chennai COMMISSIONED IMSC,Chennai-113 Purchase order for 1.5kW Rooftop Solar Power Techright Engineering Solutions Pvt. 7 1.5kWp Off Grid COMMISSIONED System Ltd.Tirunelveli. Supply and Istallation order for 10kWp Grid D.A.V Public School , 19,Sitaram Nagar, 8 10kWp Grid Tie COMMISSIONED Connected Solar Power Generating System Velachery,Chennai-42 Supply and installaiton of 2X5 kWp Grid connected 9 2X5 kWp Grid Tie Arulmigu Kabaleeswarar Temple COMMISSIONED Solar power plant Arulmigu Kabaleeswarar Temple Purchase order to install 5 kWp On Grid Solar Roof Arulmigu Muthumariamman Top power plant without Battery Back up at 10 5 kWp Grid Tie ,Temple,Konnaiyur 622401.Pudukkottai COMMISSIONED Arulmigu Muthumariamman ,Temple,Konnaiyur District.
    [Show full text]
  • Indian Railways Facts & Figures 2016-17
    INDIAN RAILWAYS FACTS & FIGURES 2016-17 BHARAT SARKAR GOVERNMENT OF INDIA RAIL MANTRALAYA MINISTRY OF RAILWAYS (RAILWAY BOARD) KEY STATISTICS 2016-17 1. Route Length (Kms.) - Broad Gauge (1.676 M.) 61,680 - Metre Gauge (1.000 M.) 3,479 - Narrow Gauge 2,209 (0.762 M. and 0.610 M.) Total 67,368 2. Double and Multiple Track - Broad Gauge 22,021 (Route Kms.) - Metre Gauge - Total 22,021 3. Electrified Track (Route Kms.) - Broad Gauge 25,367 - Metre Gauge - Total 25,367 4. Number of Railway Stations 7,349 5. Number of Railway Bridges 1,44,698 6. Traffic Volume Passengers Originating (Millions) 8,116 Passenger Kms. 1,149,835 Tonnes Originating (Rev. Traffic) (Millions Tonnes) 1,106.15 Tonne Kms. (Millions) 620,175 7. Number of Employees (Thousands) 1308 8. Revenue (` in Millions) 1,65,292.20 9. Expenses (` in Millions) 1,59,029.61 10. Rolling Stock - Locomotives: - Steam 39 - Diesel 6,023 - Electric 5,399 Total 11,461 - Passenger Carriages 64,223 - Freight Cars/Wagons 2,77,987 Note : All the figures, unless otherwise stated, are as at the end of the fiscal year i.e. March 31, 2017. CONTENTS Review of the year 5 Originating Passengers & Average Lead 6 Passenger Kilometres 7 Passenger Services 8 Passenger Revenue 9 Freight Operations — Originating Tonnage 10 — Net Tonne Kms. 11 — Freight Train & Wagon Kms. 12 — Commodity wise Loading 13 — Commodity wise NTKms. 14 — Average Lead 15 — Revenue 16 — Commodity wise Earnings 17 Rolling Stock — Locomotives 18 — Passenger Coaches 19 — Freight Cars/Wagons 20 Track/Route Kilometres 21 Gross Tonne Kilometres 22 Electrification 23 Signalling 24 Telecommunication 25 Personnel 26 Revenue 27 Expenses 28 Net Revenue & Excess/Shortfall 29 Assets 30 Asset Utilisation 31 Engine Kms.
    [Show full text]
  • Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______
    LOK SABHA ___ SYNOPSIS OF DEBATES* (Proceedings other than Questions & Answers) ______ Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______ SUBMISSION BY MEMBERS Re: Farmers facing severe distress in Kerala. THE MINISTER OF DEFENCE (SHRI RAJ NATH SINGH) responding to the issue raised by several hon. Members, said: It is not that the farmers have been pushed to the pitiable condition over the past four to five years alone. The miserable condition of the farmers is largely attributed to those who have been in power for long. I, however, want to place on record that our Government has been making every effort to double the farmers' income. We have enhanced the Minimum Support Price and did take a decision to provide an amount of Rs.6000/- to each and every farmer under Kisan Maan Dhan Yojana irrespective of the parcel of land under his possession and have brought it into force. This * Hon. Members may kindly let us know immediately the choice of language (Hindi or English) for obtaining Synopsis of Lok Sabha Debates. initiative has led to increase in farmers' income by 20 to 25 per cent. The incidence of farmers' suicide has come down during the last five years. _____ *MATTERS UNDER RULE 377 1. SHRI JUGAL KISHORE SHARMA laid a statement regarding need to establish Kendriya Vidyalayas in Jammu parliamentary constituency, J&K. 2. DR. SANJAY JAISWAL laid a statement regarding need to set up extension centre of Mahatma Gandhi Central University, Motihari (Bihar) at Bettiah in West Champaran district of the State. 3. SHRI JAGDAMBIKA PAL laid a statement regarding need to include Bhojpuri language in Eighth Schedule to the Constitution.
    [Show full text]
  • Linkages -3.7.2
    3.7.2 Number of linkages with institutions/industries for internship, on-the-job training, project work, sharing of research facilities etc. during the 2014-20 Name of the partnering institution/ industry /research lab with Duration (From- S. No Title of the linkage Year of commencement Nature of linkage Name of the participant Link to document contact details to) Ernst&young LLP 07 January 437, Manapakkam, Chennai, 1 Internship 2018 to 2019 2019 to Student Internship Mr. N. Krishna Sagar http://bit.ly/2TQ3tEX Tamil Nadu 600125 05 April 2019 Phone: 044 6654 8100 Peritus solutions private limited/No.2, 1st Floor, Third Street, Sri 02 January 2 Internship Sakthi Vijaylakshmi Nagar, Off 100 Feet Bypass Road, Velachery 2018 to 2019 2019 to Student Internship Mr.MOHAMMED ZIYYAD A http://bit.ly/3ayUNZr - Chennai - 600 042, Tamil Nadu, Phone: +91 44 48608788 02 April 2019 National Payments Corporation of India 1001A, B wing, 10 Floor, 04 June 2018 3 Summer Internship The Capital, Bandra-Kurla Complex, Bandra (East), Mumbai - 400 2018 to 2019 to Student Internship C.Pooja Priyadarshini http://bit.ly/2vhcM6E 051 Phone - 022 4000 9100 04 August 2018 SIDSYNC Technologies Pvt Ltd/Spaces.Express Avenue EA 24 January Chambers tower II, No. 49/50L,, Whites Road, Royapettah, 4 Internship 2018 to 2019 2019 to Student Internship Mr.JOSHUA J http://bit.ly/2TPUDqI Chennai, Tamil Nadu 600002 24 April 2019 Phone: 098948 19871 TAP Turbo Engineers Private Limited, Ambattur, 20 Jan 2019 5 Internship Chennai 600 58 2018 to 2019 to Student Internship Ms. Sai Gayathri Mahajan http://bit.ly/2uollMu Contact: 0442625 7234 20 March 2019 Trail Cloud Innovation Services Pvt Ltd, 187, Square Space 19 Nov 2018 Business Center, 188, Thiruvalluvar Rd, Block 10, Panneer Mr.
    [Show full text]
  • 5003290315.Pdf
    CONTENTS Directors Profi le .................................................02 Notice to the Shareholders ................................03 Directors’ Report & Management Discussion and Analysis Report...........................................09 Report on Corporate Governance .....................31 Independent Auditor’s Report ............................44 Balance Sheet ...................................................48 Statement of Profi t & Loss Account ...................49 Notes Forming Part of Financial Statements .....51 Attendance and Proxy Form ..............................67 BOARD OF DIRECTORS COMPANY SECRETARY & AUDITORS BANKERS COMPLIANCE OFFICER Mr.V.Chandrasekaran - Managing Director Mr. T.S. Srinivasan M/s. Babu Peram & Associates Oriental Bank of Commerce Mrs.Sumathi Sridharan - Director Chartered Accountants State Bank of India Mr.S.D.Viswanathan - Director Firm Registration No.012721S Mr. R. Kalyanaraman - Director No.6, 2nd Street, V.O.C. Nagar, Mr. R. Swaminathan - Director Kodambakkam, Chennai - 600 024 Email: [email protected] REGISTERED OFFICE REGISTRAR & TRANSFER AGENT No. 25, “Taurus”, 1st Main Road, U.I.Colony, M/s. Cameo Corporate Services Limited Kodambakkam, Chennai-600024 Unit : “Pentamedia Graphics Ltd.” “Subramaniam Building”, Tel.: 044-24833067, Fax:044-24726042, No.1 Club House Road, Anna Salai, Chennai - 600 002. Email : [email protected] / [email protected], Tel.: 044-2846 0390 (5 Lines), Fax : 044-28460129, www.pentamedia.in Email: [email protected] www.cameoindia.com DIRECTORS – A BRIEF PROFILE Mr . V. Chandrasekaran - Managing Director Mr. V. Chandrasekaran aged about 64 years is an M.E. in computer science from the Regional Engineering College, Trichy. He has worked in the fi eld of computer software for well over two decades and held positions both in India and abroad. He began his career with Bharath Heavy Electricals Ltd (BHEL) and served company for over 10 years in various capacities and had managed the design, development and maintenance of software and systems.
    [Show full text]
  • Commonly Used Business and Economic Abbreviations
    COMMONLY USED BUSINESS AND ECONOMIC ABBREVIATIONS AAGR Average Annual Growth Rate AAR Average Annual Return ABB Asean Braun Boveri ADAG Anil Dhirubhai Ambani Group ADB Asian Development Bank ADR American Depository Receipts AGM Annual General Meeting APEC Asia Pacific Economic Cooperation APM Administered Price Mechanism ASCII American Standard Code for Information Interchange ASSOCHAM Associated Chambers of Commerce and Industry B2B Business to Business B2C Business to Consumer BIS Bank for International Settlements, Bureau of Indian Standards BOP Balance of Payment BPO Business Process Outsourcing BRIC Brazil India Russia China BSE Bombay Stock Exchange CAGR Compounded Annual Growth Rate CEO Chief Executive Officer CFO Chief Financial Officer CII Confederation of Indian Industries CIS Commonwealth of Independent States CMIE Centre for Monitoring Indian Economy CPI Consumer Price Index CRISIL Credit Rating Information Services of India Ltd. CRR Cash Reserve Ratio CSO Central Static’s organization DIAL Delhi International Airport Ltd. EMI Equated Monthly Installment EPS Earnings Per Share EPZ Export Processing Zone ESOP Employee Stock Ownership Plan EXIM Bank Export and Import Bank FDI Foreign Direct Investment FEMA Foreign Exchange Management Act FERA Foreign Exchange Regulation Act FICCI Federation of Indian Chambers of Commerce and Industry FII Foreign Institutional Investor FIPB Foreign Investment Promotion Board GATT General Agreement on Tariffs and Trade GDP Gross Domestic Product GDR Global Depository Receipt GNP Gross National
    [Show full text]