Taylor Park Reservoir and Taylor/Gunnison River Local Users Group Process1
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
Cogjm.Bure Reclam Dev Co.Pdf (160.6Kb)
. -~ BUREAU OF RECLAMATION DEVELOPMENT IN COLORADO Colorado's Centennial Year finds 10 Bureau of Reclamation water and land resource development projects in the state completed or under construction. The developments are the Uncompahgre, Grand Valley, Fruitgrowers Dam, Colorado-Big Thompson, Pine River, Mancos, San Luis Valley, Paonia, and Collbran Projects, and the St. Francis Unit of the Missouri River Basin Project. Eight of the projects made available in 1957 full water supplies to 97, 694 acres and supplemental supplies to 781, 647 acres. (Data on the San Luis Valley Project are not available and the1 Collbran Project is under con struction.) The gross value of the crops produced on the eight projects in 1957 totaled $81, 495, 163. In the same year, more than 12, 000 farms and 282, 000 persons were served with water from the projects. Seven powerplants on the projects have a total in stalled capacity of 186, 9 50 kilowatts. The following are summary descriptions of the projects. Uncompahgre Project (Gunnison, Delta, and Montrose Counties)--This is the earliest project constructed by the Bureau in Colorado. Construction began in .July 1904, and first water for irrigation was made available during the season of 1908. Project lands, which obtain water dive rted from the Uncompahgre and Gunnison Rivers, surround the town of Montrose, and extend along both sides of the Uncompahgre River to Delta, a dis tance of 34 miles. Features include the Taylor Park Dam and Reservoir, the 5. 8-mile long Gunnison Tunnel, 7 diversion dams, 143 miles of main canals, 425 miles of later als, and 215 miles of drains. -
UCRC Annual Report for Water Year 2019
SEVENTY-SECOND ANNUAL REPORT OF THE UPPER COLORADO RIVER COMMISSION SALT LAKE CITY, UTAH SEPTEMBER 30, 2020 2 UPPER COLORADO RIVER COMMISSION 355 South 400 East • Salt Lake City, UT 84111 • 801-531-1150 • www.ucrcommission.com June 1, 2021 President Joseph R. Biden, Jr. The White House Washington, D.C. 20500 Dear President Biden: The Seventy-Second Annual Report of the Upper Colorado River Commission, as required by Article VIII(d)(13) of the Upper Colorado River Basin Compact of 1948 (“Compact”), is enclosed. The report also has been transmitted to the Governors of each state signatory to the Compact, which include Colorado, New Mexico, Utah, Wyoming and Arizona. The budget of the Commission for Fiscal Year 2021 (July 1, 2020 – June 30, 2021) is included in this report as Appendix B. Respectfully yours, Amy I. Haas Executive Director and Secretary Enclosure 3 TABLE OF CONTENTS PREFACE .................................................................................................. 8 COMMISSIONERS .................................................................................... 9 ALTERNATE COMMISSIONERS ........................................................... 10 OFFICERS OF THE COMMISSION ....................................................... 10 COMMISSION STAFF ............................................................................. 10 COMMITTEES ......................................................................................... 11 LEGAL COMMITTEE ................................................................................ -
Uncompahgre Project
Uncompahgre Project David Clark Wm. Joe Simonds, ed. Bureau of Reclamation 1994 Table of Contents Uncompahgre Project...........................................................2 Project Location.........................................................2 Historic Setting .........................................................2 Project Authorization.....................................................5 Construction History .....................................................5 Post-Construction History................................................10 Settlement of the Project .................................................13 Uses of Project Water ...................................................14 Conclusion............................................................15 Bibliography ................................................................16 Government Documents .................................................16 Books ................................................................16 Articles...............................................................16 Index ......................................................................18 1 Uncompahgre Project Uncompahgre is a Ute word meaning as follows; Unca-=hot; pah=water, gre=spring. One of the oldest Reclamation projects, the Uncompahgre Project contains one storage dam, several diversion dams, 128 miles of canals, 438 miles of laterals and 216 miles of drains. The project includes mesa and valley land on the western slope of the Rocky Mountains in Colorado at an elevation -
Gunnison River
final environmental statement wild and scenic river study september 1979 GUNNISON RIVER COLORADO SPECIAL NOTE This environmental statement was initiated by the Bureau of Outdoor Recreation (BOR) and the Colorado Department of Natural Resources in January, 1976. On January 30, 1978, a reorganization within the U.S. Department of the Interior resulted in BOR being restructured and renamed the Heritage Conservation and Recreation Service (HCRS). On March 27, 1978, study responsibility was transferred from HCRS to the National Park Service. The draft environmental statement was prepared by HCRS and cleared by the U.S. Department of the Interior prior to March 27, 1978. Final revisions and publication of both the draft environmental statement, as well as this document have been the responstbility of the National Park Service. FINAL ENVIRONMENTAL STATEMENT GUNNISON WILD AND SCENIC RIVER STUDY Prepared by United States Department of the Interior I National Park Service in cooperation with the Colorado Department of Natural Resources represented by the Water Conservation Board staff Director National Par!< Service SUMMARY ( ) Draft (X) Final Environmental Statement Department of the Interior, National Park Service 1. Type of action: ( ) Administrative (X) Legislative 2. Brief description of action: The Gunnison Wild and Scenic River Study recommends inclusion of a 26-mile (41.8-km) segment of the Gunnison River, Colorado, and 12,900 acres (S,200 ha) of adjacent land to be classified as wild in the National Wild and Scenic Rivers System under the administration of the National Park Service and the Bureau of Land Management, U.S. D. I. This river segment extends from the upstream boundary of the Black Canyon of the Gunnison National Monument to approximately 1 mile (1.6 km) below the confluence with the Smith Fork. -
The Colorado River a NATURAL MENACE BECOMES a NATIONAL RESOURCE ' '
The Colorado River A NATURAL MENACE BECOMES A NATIONAL RESOURCE ' ' I Comprehensive Report on the Development of ze Water Resources of the Colorado River Basin for rrigation, Power Production, and Other Beneficial Ises in Arizona, California, Colorado, Nevada, New Mexico, Utah, and Wyoming By THE UNITED STATES DEPARTMENT OF THE INTERIOR J . A . Krug, Secretary SPONSORED BY AND PREPARED UNDER THE GENERAL SUPERVISION OF THE BUREAU OF RECLAMATION Michael W. Straus, Commissioner E. A. Morit-, Director, Region 3 ; E. O. Larson, Director, Region 4 MARCH 1 946 1P 'A m 4„ M 1i'leming Library Grand Canyon Colleg P . )x 11097 Contents Page PROPOSED REPORT OF THE SECRETARY OF THE Explorations 46 INTERIOR Settlement 48 Page Population 49 Letter of June 6,1946, from the Acting Commissioner, Chapter III . DIVIDING THE WATER 53 3 Bureau of Reclamation Virgin Conditions 55 REGIONAL DIRECTORS' REPORT Early Development of the River 56 Summary of Conditions in the Early 1920's . 59 Map of Colorado River Basin Facing 9 Between the Upper and Lower Basins 59 Scope and Purpose 9 Between United States and Mexico . 66 Authority for the Report 9 DEVELOPING THE BASIN Cooperation and Acknowledgments 9 Chapter IV. 69 Description of Area 10 Upper Basin 72 Problems of the Basin 11 Labor Force 72 Water Supply 12 Land Ownership and Use 73 Division of Water 13 Soils 73 Future Development of Water Resources 13 Agriculture 73 Table I, Present and Potential Stream Depletions in Minerals and Mining 80 the Colorado River Basin 14 Lumbering 85 Potential Projects 14 Manufacturing 86 Table II, Potential Projects in the Colorado River Transportation and Markets . -
THE GUNNISON RIVER BASIN a HANDBOOK for INHABITANTS from the Gunnison Basin Roundtable 2013-14
THE GUNNISON RIVER BASIN A HANDBOOK FOR INHABITANTS from the Gunnison Basin Roundtable 2013-14 hen someone says ‘water problems,’ do you tend to say, ‘Oh, that’s too complicated; I’ll leave that to the experts’? Members of the Gunnison Basin WRoundtable - citizens like you - say you can no longer afford that excuse. Colorado is launching into a multi-generational water planning process; this is a challenge with many technical aspects, but the heart of it is a ‘problem in democracy’: given the primacy of water to all life, will we help shape our own future? Those of us who love our Gunnison River Basin - the river that runs through us all - need to give this our attention. Please read on.... Photo by Luke Reschke 1 -- George Sibley, Handbook Editor People are going to continue to move to Colorado - demographers project between 3 and 5 million new people by 2050, a 60 to 100 percent increase over today’s population. They will all need water, in a state whose water resources are already stressed. So the governor this year has asked for a State Water Plan. Virtually all of the new people will move into existing urban and suburban Projected Growth areas and adjacent new developments - by River Basins and four-fifths of them are expected to <DPSDYampa-White %DVLQ Basin move to the “Front Range” metropolis Southwest Basin now stretching almost unbroken from 6RXWKZHVW %DVLQ South Platte Basin Fort Collins through the Denver region 6RXWK 3ODWWH %DVLQ Rio Grande Basin to Pueblo, along the base of the moun- 5LR *UDQGH %DVLQ tains. -
Case Studies for Those Considering Agricultural Water Conservation in the Colorado River Basin
CASE STUDIES FOR THOSE CONSIDERING AGRICULTURAL WATER CONSERVATION IN THE COLORADO RIVER BASIN • Arizona • California • Colorado • Nevada • New Mexico • Utah • Wyoming • Multi-state Projects within the Colorado River Basin • Projects outside the Colorado River Basin INTRODUCTION • Moving Forward on Agricultural Water Conservation in the Colorado River Basin is a USDA-NIFA funded project of the Colorado Water Institute at Colorado State University • These case studies have been compiled to demonstrate where and how water has been developed in the Colorado River Basin to meet agricultural needs, what changes have been made (or proposed) in those uses to meet different challenges, and how obstacles were addressed. • To help those considering such changes visualize what can be done, some case studies from outside the Colorado River Basin are included. INTRODUCTION • Through a comprehensive literature review, we have produced 78 case studies across the western United States, as well as one international case study, that shed light on various ways water has been diverted for agricultural use and how that water has been managed and its use changed over time to meet both agricultural and other objectives. • We have categorized the case studies into three general types: • Original water resources development projects: The original projects that made it possible to use river water for agriculture through such means as diversion and storage. • Programs and regulations: The local, regional, statewide, and basin-wide processes and programs that have been instituted to better manage the water for purposes such as improving agricultural productivity, meeting endangered species and water quality goals, and conjunctively using groundwater and surface water. -
The Continental Compact
The Continental Compact IAN CAINE EMILY CHEN University of Texas at San Antonio TIFFIN THOMPSON DEREK HOEFERLIN Washington University in St. Louis PABLO CHAVEZ The drought crisis in California is first and fore- 3 types of hydro-urbanisms leverage existing price tag associated with infrastructural most a political crisis. Decades of public policy water resources to create a conurbation at the obligations. have created a system of massive water con- scale of the river basin. Locally, each responds veyance, fostering and maintaining a funda- to the specific characteristics of its riverine, Current 2050 growth projections in the U.S. mental misalignment between the supply and geographic and landscape environment. The don’t factor what will likely become the most demand of water. The untenable status quo in hydro-urbanisms are capable of accommodat- critical determinant of successful urban- California is maintained through an elaborate ing diverse programs including agriculture, ism: water supply. The Continental Compact slew of public policies, designed to support residential, ecology, industry, recreation and re-directs growth from Mega-regions to a system of water-trading between western tourism. Hydro-regions, investing in water-rich urban states in areas like the Colorado River Basin. conurbations built around dams, rivers and The Continental Compact replaces hydraulic deltas. The Compact re-invests the massive The Continental Compact proposes to funda- urbanism with hydrological urbanism. Simply resources that currently support the con- mentally alter the culture of water-trading: re- put, the Continental Compact stops moving struction and operation of aqueducts into the legislating water distribution, first in California water to the people and starts moving people construction of new infrastructure to support and ultimately throughout the United States, to the water. -
The Collegiate Range Project July 1986
THE COLLEGIATE RANGE PROJECT JULY 1986 I. Introduction The Gunnison River Basin has long been considered one of the finest water resources in the State of Colorado. To date, development of this resource has been undertaken by the United States government. The primary purposes of this development have been to regulate streamflow for: 1) hydropower generation for Colorado River Storage Project participants and 2) diversion to the Uncompahgre River Basin for agricultural uses. The City of Aurora has applied for conditional water rights on tributaries to the Gunnison River for a water supply development entitled the "Collegiate Range Project." The plans for this project were initially prepared by Marvin J. Greer, the general partner for Sierra Madre Lode, Ltd. Mr. Greer is a retired engineer formerly with the U.S. Bureau of Reclamation. The City of Aurora has reviewed these plans as well as other Gunnison River water supply reports. 1) "Water and Related Land Resources, Gunnison River Basin" - Colorado; Colorado Water Conservation Board, U. S. Department of Agriculture; 1962, 2) "The Collegiate Ran~~ Project - A Water Supply Development''; Sierra Madre Lode, Ltd.; Undated, 3) "Water Rights Evaluation in the Gunnison River Basin, Collegiate Range Project", The David E. Fleming Company; 1985. The latter report was commissioned by the City of Aurora. The Collegiate Range Project is proposed as a transmountain water diversion project. Essentially, water is to be diverted from the Taylor River and one of its tributaries, Texas Creek, and stored in Pieplant Reservoir. Water would be conveyed via the Taylor Platte aqueduct from Pieplant Reservoir to the South Platte River Basin. -
Upper Colorado River and Its Utilization
UNITED STATES DEPARTMENT OF THE INTERIOR Ray Lyman Wilbur, Secretary GEOLOGICAL SURVEY George Otts Smith, Director Water-Supply Paper 617 UPPER COLORADO RIVER AND ITS UTILIZATION BY ROBERT FOLLANSBEE f UNITED STATES GOVERNMENT PRINTING OFFICE WASHINGTON : 1929 For sale by the Superintendent of Documents, Washington, D. C. - * ' Price 85 cents CONTENTS Preface, by Nathan C. Grover______________________ ____ vn .Synopsis of report.-____________________________________ xi Introduction_________________________________________ 1 Scope of report--------__---__-_____--___--___________f__ 1 Index system____________________________________ _ ______ 2 Acknowledgments.._______-________________________ __-______ 3 Bibliography _ _________ ________________________________ 3 Physical features of basin________________-________________-_____-__ 5 Location and accessibility______--_________-__________-__-_--___ 5 Topography________________________________________________ 6 Plateaus and mountains__________________________________ 6 The main riyer_________________________________________ 7 Tributaries above Gunnison River_._______________-_-__--__- 8 Gunnison River_----_---_----____-_-__--__--____--_-_----_ IS Dolores Eiver____________________._______________________ 17 Forestation__________________ ______._.____________________ 19 Scenic and recreational features_-__-__--_____-__^--_-__________ 20 General features________________________.______--__-_--_ 20 Mountain peaks_________--_.__.________________________ 20 Lakes....__._______________________________ -
Assessing Streamflow Needs for Whitewater Recreation in the Gunnison River Basin
Assessing Streamflow Needs for Whitewater Recreation in the Gunnison River basin. Applying Overall Flow-Comparisons and Single-Flow Judgments to Define the Range of Flows that Support Whitewater Recreation Chris Menges Nathan Fey American Whitewater Evan Stafford CK Consulting Abstract Streamflow, or the amount of water in a river, affects the quality, quantity, and timing of river-related recreation, such as whitewater boating. This report describes flows that provide whitewater boating opportunities for various craft- types on targeted river segments in the Gunnison River Basin in western Colorado. American Whitewater conducted the Gunnison Basin Flow Study during the summer of 2013, with the goals of 1) informing the deliberations and Basin Implementation Plan of the Gunnison Basin Roundtable and 2) adding to the dataset supplied to the Bureau of Reclamation (BOR) to inform the Colorado River Basin Supply and Demand Study. Two approaches were used in this assessment to collect information on the relationship between streamflows and recreation quality for each targeted river segment. An online survey collected information from 331 respondents who evaluated flows for whitewater boating on 17 river and stream segments in the Basin. Respondent data was organized to identify minimum, acceptable and optimal flows for whitewater boating, summarized by Flow- Evaluation curves describing the quality of boating opportunities for each measured stream-flow. Respondents also reported specific flows that provide certain recreation experiences or “niches”, from technical low water to challenging high water trips. This report provides baseline information on streamflows and whitewater recreation in the Gunnison River Basin that can be applied to evaluating how future water management actions or risk management strategies may impact whitewater recreation. -
East River Basin
Chapter 6 The East River Basin Basin Characteristics The East River is made up of a diverse community of water users including ranchers that irrigate pasture grass, popular tourist towns, an important trout fishery, boating enthusiasts, and a major ski area. It is host to multiple municipal water providers that serve the towns of Mt. Crested Butte, Crested Butte and Crested Butte South as well as a number of smaller providers. Crested Butte Mountain Resort is a major economic driver in the valley and draws water from the East River for snowmaking. Wildlife, watershed views, and ecosystem services are sustained by water flowing in creeks and support vibrant angling and stand-up paddle board businesses. In addition to hosting a range of uses, the East River Basin faces diverse challenges presented by a legacy of mining and impaired streams, a growing population, and competing water uses. Finding collaborative ways to protect these uses while improving watershed health is the goal of the Upper Gunnison River Water Conservancy District’s watershed management planning process. The primary objective of this section is to provide a summary of existing water use within the East River Basin, including irrigation, municipal, industrial, instream flow, and recreational water uses. A major task for the WMPC was to review and assess the available information; update and refine the information; identify data gaps; and recommend future data collection efforts. The information collected as part of the data inventory process served as a key component to both identify needs in the East River Basin and to improve modeling tools being used to assess these needs.