Houlton Are Scaling New Heights At

Total Page:16

File Type:pdf, Size:1020Kb

Houlton Are Scaling New Heights At Site Summer 2013 line This issue Feature Story 02 CASE 03 New house to Houlton are scaling new meet high levels of sustainability heights at HRI 04 New £6m Art and Design Centre Work is currently being leaving the tower block A total of £7m will be spent by at the Grimsby undertaken on the South, boasting a sleek, dark grey the Health Trust on extending Institute West and East elevations of finish with blue glass and the department space to the tower block on Anlaby a complimentary lighting double its current size and 05 Hull Trinity House Road, Hull. scheme. allowing for 18 treatment areas instead of 5. Academy Hull and East Yorkshire As well as giving Hull Royal Hospitals NHS Trust are this much needed facelift, the There will be separate areas 05 Hull University investing over £8 million to works have also boosted the for children and people with 06 Refurbishment and provide new windows and an local economy, with over 90% minor and major injuries, external façade for the160ft local labour employed by meaning patients can be Rebranding for tower block on the Hull Royal Houlton on site. treated more efficiently. Ernst & Young’s Infirmary site. This will not Meanwhile, on the inside The hospital was originally only improve the look of the Hull Office of the building, work has built to treat about 50,000 building, but, it will also make recently completed on the patients each year, yet staff 07 Technikraft it more energy efficient and £2m second phase of a currently cope with 120,000 structurally safe. 08 Houlton Win major reconfiguration project a year. If you would like this or future 2012/13 Health & The scaffolding will be to improve the accident and issues to be emailed as a pdf please removed by March 2014, emergency department. contact [email protected] Safety Award 02 Siteline CASE The Social Enterprise Investment Fund provided CASE with funding which has allowed them to completely renovate the interior and exterior of the building with new room layouts, a lift and full disabled access. CASE’s aim is to create a better access for disabled ‘Learning Disability Centre people and more flexible of Excellence’ by making the rooms, accommodating building larger with better more people in modern facilities and to incorporate the surroundings. NRS building next to CASE. All of the windows have been CASE was founded in 1985 by replaced, making the building parents and carers of adults look better from the outside, with learning disabilities and is whilst the inside has a modern, dedicated to the improvement welcoming feel to it. of life choices for these people through the provision of high CASE has improved the quality training, support and refurbished building further employment opportunities. with a completely new layout, United Siteline 03 Biscuits Stand Tall The United Biscuits main UK distribution centre at Ashby-de- la-Zouch is tasked with ensuring the right products go to the right customers in the right place, every time. With this in mind, the centre has greatly benefitted from its extension to the existing highbay warehouse and associated external works completed by Houlton. - United Biscuits main UK distribution centre hub is at Ashby-de-la-Zouch where it provides around 2,000 jobs. - The biscuit, cake and snack manufacturer makes brands including McVities, Jacobs and McCoys. - Pallets are stored 12 high with run lengths of 100m, which are being extended into the 38m long extension. - One of the tallest distribution centres in the UK with the top pallet at 18.5m. New House to Meet High Levels of Sustainability Houlton are proud to be working on a new house designed by Native Chartered Architects of York. The house is a traditional 4 bed with a modern, minimal impact on the environment. The current owners wanted to live in a comfortable and sustainable home for the foreseeable future, whilst minimising their carbon footprint. The high specification of renewable energy sources is designed to meet the client’s wishes for the environment and their own comfort. Kevin McCloud visiting another Houlton sustainable project The Junction at Goole with Charlie Studdy the Centre Manager and Chris Carline our Project Manager 04 Siteline New £6m Art and Design Centre at the Grimsby Institute Building work has Keith Gilson commenced on a Houlton Commercial Director new state of the “ We have a great deal of experience working on art £6m Art and educational premises, including Design Centre at the busy college and University Grimsby Institute, environments. We have 40 staff featuring a theatre, on the build, and the exterior of the old Block C building recording studios will be transformed with new and a dance studio. cladding. The block is empty so we won’t disturb teaching. Claire Foster We will give the block new The Grimsby Institute’s Block Head of Arts and Media windows, plumbing, electrics, Sue Middlehurst C building is set to receive carpets, ceilings and walls. We Principal “ It will ensure students will train a full refurbishment with a in 21st Century surroundings to have taken down some trees 1,600 square foot extension to “ We are really excited about it. make them fit for employment on the former staff car park to accommodate the new facility. The state of the art building will and self-employment. It will make way for the extension be used by around 200 of our better reflect the industry with and then we will construct the The current Art and Design art and design students. Block a brand new theatre, special foundations and piling.’ building on Westwood Ho will C, which is being refurbished effects and craft-based rooms. change its focus to animal in the build, was in the former It will be great because the care studies, even incorporating Grimsby Institute building and is students will be in the main a cattery. empty at the moment because campus, too.” they have all moved into the new University building.” Houlton have been trading for The School Girl Mums Unit Esteem BSF more than 130 years in the City is based in Boulevard, West of Hull and we were proud to Hull which was a seven week School Girls be asked by the Hull Esteem scheme undertaken during Consortium to deliver our the summer holiday period Mum’s Unit first BSF project - a £360,000 of July – September 2012. renovation of a specialist centre providing support and education Once the facility was completed, for young Mothers aged Houlton were invited to start between 13 and 18. work on the relocation of Hull Trinity House Academy. Hull Trinity John Leggot Siteline 05 House Academy College Canteen Extension After the great success of The decision for the school Houlton’s first foray into the to move to Derek Crothall BSF programme, Hull Esteem Building was made after careful John Leggot is a Sixth Consortium wanted the family deliberation. The building, Form College with over company to also deliver the acquired by Hull City Council, is 40 courses on offer to over £10m relocation of Hull Trinity set to be remodelled internally, 2000 students ageing from House Academy. enabling the doubling of the 16-19 years. current number of students to Although Hull Trinity House 600. The outside of the building Houlton has recently successfully Academy is proud of its rich will be reclad to create an energy completed its first project with history and excellent track efficient structure. The work, the College. A total overhaul of the work such as electrical and record, it became apparent the which began in September previous canteen and surrounding mechanical installations, existing buildings simply were not 2012, will be completed in time areas has seen the removal of replacement of windows in the adequate to cater for students. for Hull Trinity House Academy paths and flowerbeds. Sheet kitchen, replacement of the to relocate at the start of term piles and a concrete raft have suspended ceiling, opening up September 2013. been installed to support and of the area between the new and reinforce the foundations of existing canteen, plastering and the existing canteen and work decoration. has also seen the erection of a superstructure steel framework The work completed with new and block work structure.The paving, lighting and an external college half term allowed builders rendering canopy in the College the chance to complete interior corporate colours. Holderness Hull University Calie Pistorius University Vice-Chancellor Learning Centre – Houlton’s teams had “ This is a very exciting Withernsea School another busy summer development as health-related at the University of Hull’s research is such an important Houlton have added a area for the University. The main campus on new vocational learning building, and the associated Cottingham Road, Hull. centre facility to Withernsea developments both on campus School for East Riding of Six lecture theatres were and at the local hospitals, Yorkshire Council. completely stripped and will create a unique research infrastructure, strengthening refurbished ready to The Chairman of East Riding of Hull’s position as a world- Yorkshire Council, Councillor commence the new leading institution in biomedical Chad Chadwick officially term in October 2012. research.” opened the The Holderness This successful relationship leading Hull businessman Dr. Learning Centre which was between Houlton and Assem Allam has made the followed by a Service of the University of Hull Allam building a possibility Paul Dickerson Dedication by the Archbishop of York, The Most Reverend continues to flourish with and will significantly Managing Sirector the construction of the new strengthen the University’s and Rt. Hon. Dr. John Sentamu £4.1m Allam building.
Recommended publications
  • Housing Land Supply Position Statement 2020/21 to 2024/25
    www.eastriding.gov.uk www.eastriding.gov.uk ff YouYouTubeTube East Riding Local Plan 2012 - 2029 Housing Land Supply Position Statement For the period 2020/21 to 2024/25 December 2020 Contents 1 Introduction ............................................................................................................ 1 Background ........................................................................................................................ 1 National Policy .................................................................................................................. 1 Performance ...................................................................................................................... 3 Residual housing requirement ......................................................................................... 5 2 Methodology ........................................................................................................... 7 Developing the Methodology ........................................................................................... 7 Covid-19 ............................................................................................................................. 8 Calculating the Potential Capacity of Sites .................................................................... 9 Pre-build lead-in times ................................................................................................... 10 Build rates for large sites ..............................................................................................
    [Show full text]
  • House Number Address Line 1 Address Line 2 Town/Area County
    House Number Address Line 1 Address Line 2 Town/Area County Postcode 64 Abbey Grove Well Lane Willerby East Riding of Yorkshire HU10 6HE 70 Abbey Grove Well Lane Willerby East Riding of Yorkshire HU10 6HE 72 Abbey Grove Well Lane Willerby East Riding of Yorkshire HU10 6HE 74 Abbey Grove Well Lane Willerby East Riding of Yorkshire HU10 6HE 80 Abbey Grove Well Lane Willerby East Riding of Yorkshire HU10 6HE 82 Abbey Grove Well Lane Willerby East Riding of Yorkshire HU10 6HE 84 Abbey Grove Well Lane Willerby East Riding of Yorkshire HU10 6HE 1 Abbey Road Bridlington East Riding of Yorkshire YO16 4TU 2 Abbey Road Bridlington East Riding of Yorkshire YO16 4TU 3 Abbey Road Bridlington East Riding of Yorkshire YO16 4TU 4 Abbey Road Bridlington East Riding of Yorkshire YO16 4TU 1 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 3 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 5 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 7 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 9 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 11 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 13 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 15 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 17 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 19 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 21 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 23 Abbotts Way Bridlington East Riding of Yorkshire YO16 7NA 25 Abbotts Way Bridlington East Riding of Yorkshire YO16
    [Show full text]
  • Roads Turnpike Trusts Eastern Yorkshire
    E.Y. LOCAL HISTORY SERIES: No. 18 ROADS TURNPIKE TRUSTS IN EASTERN YORKSHIRE br K. A. MAC.\\AHO.' EAST YORKSHIRE LOCAL HISTORY SOCIETY 1964 Ffve Shillings Further topies of this pamphlet (pnce ss. to members, 5s. to wm­ members) and of others in the series may be obtained from the Secretary.East Yorkshire Local History Society, 2, St. Martin's Lane, Mitklegate, York. ROADS AND TURNPIKE TRUSTS IN EASTERN YORKSHIRE by K. A. MACMAHON, Senior Staff Tutor in Local History, The University of Hull © East YQrk.;hiT~ Local History Society '96' ROADS AND TURNPIKE TRUSTS IN EASTERN YORKSHIRE A major purpose of this survey is to discuss the ongms, evolution and eventual decline of the turnpike trusts in eastern Yorkshire. The turnpike trust was essentially an ad hoc device to ensure the conservation, construction and repair of regionaIly important sections of public highway and its activities were cornple­ menrary and ancillary to the recognised contemporary methods of road maintenance which were based on the parish as the adminis­ trative unit. As a necessary introduction to this theme, therefore, this essay will review, with appropriate local and regional illustration, certain major features ofroad history from medieval times onwards, and against this background will then proceed to consider the history of the trusts in East Yorkshire and the roads they controlled. Based substantially on extant record material, notice will be taken of various aspects of administration and finance and of the problems ofthe trusts after c. 1840 when evidence oftheir decline and inevit­ able extinction was beginning to be apparent. .. * * * Like the Romans two thousand years ago, we ofthe twentieth century tend to regard a road primarily as a continuous strip ofwel1 prepared surface designed for the easy and speedy movement ofman and his transport vehicles.
    [Show full text]
  • East Riding Primitive Methodist Chapels Recorded in 1977
    East Riding Primitive Methodist chapels recorded in 1977 - 1990 Taken from the list published in East Riding chapels and meeting houses by David and Susan Neave, published by the East Yorkshire Local History Society in 1990. The “recorded” column shows the date when the building was recorded or last seen by members of the Non-Conformist Building Group “On site” and “picture” refer to whether the chapel is on the My Primitive Methodist Ancestors website (as at November 2016). built/ enlarged/ chapel on site picture closed demolished use recorded notes acquired rebuilt Bubwith no date 1862 yes hall 1977 architect T Pratt (Hull) Melbourne 1821 1859 1930s hall 1977 North Duffield 1821 1926-7 house 1977 Thornholme 1892 yes 1986 1977 Balkholme 1870 c. 1950 house 1979 Eastrington 1871 1923 part house 1979 Gilberdyke 1846 1899 house 1979 house (Hodge Kilnsea 1885 by 1820 1979 Villa) corrugated iron Newport Walmsley Memorial 1891 yes 1984 1979 Aldbrough 1850 1907 1960 store 1980 Burstwick 1898 in use 1980 architect TB Thompson Easington 1851 1855 1964 1980 Elstronwick 1853 in use 1980 Halsham 1873 in use 1980 architect W Freeman Hollym 1860 1979 store 1980 Wesleyan built 1820 Holmpton 1906 1932 house 1980 (1878) Humbleton 1860 in use 1980 1909/197 architect 1909 TB Keyingham Ings Lane 1846 in use 1980 3 Atkinson/1973 B CH 11/16 page 1 of 6 E Riding Primitive Methodist chapels recorded dates.docx built/ enlarged/ chapel on site picture closed demolished use recorded notes acquired rebuilt Blanchard Keyingham Main Street 1823 1846 house 1980 Patrington
    [Show full text]
  • Withernsea Town Council, Municipal Buildings, 243 Queen Street, Withernsea, HU19 2HH Tel/Fax: 01964 614984
    Withernsea Town Council, Municipal Buildings, 243 Queen Street, Withernsea, HU19 2HH Tel/Fax: 01964 614984. Email: [email protected] Web: www.withernseatowncouncil.co.uk Dear Councillor, You are hereby summoned to a meeting of the Withernsea Town Council, on Monday 12th January 2015 at 7pm, in the Council Chamber, Municipal Buildings, Queen Street, Withernsea. Please note Council meetings will finish promptly at 9.30pm. The agenda is specified below. Yours sincerely JMoxon Mrs. J. Moxon MILCM, Clerk to the Council - 6.1.15 Members of the public may speak on any item(s) appearing on the public agenda, (or on any other matter that falls within the Council’s terms of reference) during the public participation session or at the discretion of the Chair. Audio and video recording of this meeting may take place with certain restrictions. Presentation by Mr R. Williman, Head of Withernsea High School regarding the school development. AGENDA. Part 1. Public session. 1. Apologies: To receive and approve any apologies for absence. 2. Declarations of Interest: a. To record declarations of pecuniary / non pecuniary interests by any member of the Council in respect of the agenda items listed below. Members declaring interests should identify the agenda item and type of interest being declared. b. To note dispensations given to any member of the council in respect of the agenda items below. 3. Resignation: To receive the resignation of Cllr Graham Gibson. 4. Election of Deputy Mayor: To elect a new Deputy Mayor. 5. Minutes: To confirm that the minutes of the following meeting(s) are a true and correct record of that which took place.
    [Show full text]
  • Alan Saxon Plumbers
    YORKSHIRE This weeks Yorkshire middle route Route MIDDLE Combine race from BILLERICAY May 4th President P Edmond Vel Secretary 2013 is sponsored by: Alan Saxon S.Skelton RACE BILLERICAY Plumbers. Expert and reliable plumbing WEST SOUTH WEST POINT Time of Lib 12-00pm services for East Yorkshire serving both Domestic and Commercial Customers Birdage CN 857 CS 954 CNT 996 WT 1,134 TOTAL 3,941 OP SEC Club Name Ring No Velocity 1 1CS Withernsea H. Society D. Beadle 12P12750 1618.12 2 2CS Patrington Haven Leisure Walker & Sparkes BG6158589 1612.98 3 3CS Patrington Haven Leisure Nicholls & White 12S11088 1612.37 4 4CS Patrington Haven Leisure Beadle & Sparkes 12S11599 1595.37 5 5CS Patrington Haven Leisure Beadle & Sparkes 12S11663 1594.37 6 6CS Patrington Haven Leisure Walker & Sparkes 12S12071 1594.30 7 7CS Patrington Haven Leisure Beadle & Sparkes 12S11860 1589.73 8 8CS Patrington Haven Leisure Walker & Sparkes 11R04879 1584.39 9 9CS Hedon Flying Club J. Wadsworth 12S14308 1583.87 10 10CS Hedon Flying Club J. Wadsworth 12S14309 1583.72 11 11CS Withernsea H. Society M. Dawson 12P12933 1578.63 12 12CS Withernsea H. Society D. Adamson 10X37002 1576.81 13 1CN Filey Homing Society Mr & Mrs Hotham 11Z13440 1575.86 14 2CN Filey Homing Society Mr & Mrs Hotham 11Z13510 1575.86 15 13CS Patrington Haven Leisure Walker & Sparkes 12S11615 1574.92 16 14CS Withernsea H. Society M. Dawson 10X08095 1566.62 17 15CS Withernsea H. Society D. Adamson 10X37088 1565.76 18 16CS Patrington Haven Leisure Walker & Sparkes 12S11756 1565.72 19 17CS Withernsea H. Society D.
    [Show full text]
  • Outstrays to Skeffling Managed Realignment Environmental Statement – Non-Technical Summary
    Outstrays to Skeffling Managed Realignment Environmental Statement – Non-Technical Summary Outstrays to Skeffling Managed Realignment Scheme Environmental Statement: Non-Technical Summary Pre-Planning consultation draft 14th December 2018 Outstrays to Skeffling Managed Realignment Scheme – NTS i Outstrays to Skeffling Managed Realignment Environmental Statement – Non-Technical Summary We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife. We operate at the place where environmental change has its greatest impact on people’s lives. We reduce the risks to people and properties from flooding; we make sure there is enough water for people and wildlife; protect and improve air, land and water quality and apply the environmental standards within which industry can operate. Acting to reduce climate change and helping people and wildlife adapt to its consequences are at the heart of all that we do. We cannot do this alone. We work closely with a wide range of partners including government, business, local authorities, other agencies, civil society groups and the communities we serve. Published by: Environment Agency Horizon house, Deanery Road Bristol BS1 5AH Email: enquiries@environment- agency.gov.uk Further copies of this report are available www.environment-agency.gov.uk from our publications catalogue: http://publications.environment- © Environment Agency 2011 agency.gov.uk or our National Customer Contact Centre: T: 03708 506506 All rights reserved. This document may be
    [Show full text]
  • The Humber Flood Risk Management Strategy 1 Contents (Continued) Aims and Objectives
    Would you like to find out more about us, or about your environment? Then call us on planning for 08708 506 506 (Mon-Fri 8-6) email [email protected] the rising tides The Humber Flood Risk or visit our website Management Strategy www.environment-agency.gov.uk March 2008 incident hotline 0800 80 70 60 (24hrs) floodline 0845 988 1188 Environment first: This publication is printed on paper made from 100 per cent previously used waste. By-products from making the pulp and paper are used for composting and fertiliser, for making cement and for generating energy. GENE0308BNRL-E-P Contents Aims and objectives 3 Foreword 4 We are the Environment Agency. It’s our job to look after your Introduction 6 environment and make it a better place – for you, and for Section 1 How we developed the strategy 8 future generations. Strategy objectives 8 Drawing up the strategy 8 Your environment is the air you breathe, the water you drink Keeping people informed 8 and the ground you walk on. Working with business, Section 2 What’s happened since the consultation draft 9 The public’s reaction 9 Government and society as a whole, we are making your What we have done 11 Local and regional initiatives 12 environment cleaner and healthier. National guidance and government policy 14 The Environment Agency. Out there, making your environment Section 3 The Humber Strategy 16 Overall approach 16 a better place. Managing the defences 16 Links with the planning system 16 Controlling development on the floodplain 16 Responding to emergencies 17 Planning
    [Show full text]
  • East Riding Local Plan Strategy Document - Adopted April 2016 Contents
    East Riding Local Plan 2012 - 2029 Strategy Document Adopted April 2016 DRAFT “Making It Happen” Contents FOREWORD v 1 INTRODUCTION 2 2 KEY SPATIAL ISSUES 8 3 VISION, PLACE STATEMENTS, OBJECTIVES & KEY DIAGRAM 18 THE SPATIAL STRATEGY 4 PROMOTING SUSTAINABLE DEVELOPMENT 36 Promoting sustainable development 36 Addressing climate change 38 Focusing development 40 Supporting development in Villages and the Countryside 46 5 MANAGING THE SCALE AND DISTRIBUTION OF NEW DEVELOPMENT 52 Delivering housing development 52 Delivering employment land 60 Delivering retail development 65 Connecting people and places 68 DEVELOPMENT POLICIES 6 A HEALTHY AND BALANCED HOUSING MARKET 74 Creating a mix of housing 74 Providing affordable housing 78 Providing for the needs of Gypsies and Travellers 83 Making the most efficient use of land 85 7 A PROSPEROUS ECONOMY 90 Supporting the growth and diversification of the East Riding economy 90 Developing and diversifying the visitor economy 95 Supporting the vitality and viability of centres 100 Enhancing sustainable transport 105 Supporting the energy sector 108 Protecting mineral resources 116 East Riding Local Plan Strategy Document - Adopted April 2016 Contents 8 A HIGH QUALITY ENVIRONMENT 122 Integrating high quality design 122 Promoting a high quality landscape 127 Valuing our heritage 132 Conserving and enhancing biodiversity and geodiversity 136 Strengthening green infrastructure 143 Managing environmental hazards 147 9 A STRONG AND HEALTHY COMMUNITY 160 Providing infrastructure and facilities 160 Supporting
    [Show full text]
  • Pocklington Canal ConservaOn Management Plan November 2015 Pocklington Canal – Conservation Management Plan
    Pocklington Canal Conservaon Management Plan November 2015 Pocklington Canal – Conservation Management Plan ECUS Ltd Report to: Canal & River Trust Report Title: Pocklington Canal – Conservation Management Plan Revision: v1.1 Issue Date: 02/12/15 Report Ref: 5481_PCCMP_v1.1 Reviewed By: James Thomson Heritage Consultant Date: 02/12/15 Approved By: Paul White Heritage Technical Director Date: 02/12/15 Prepared by: ECUS Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 2669292 The report and the site assessments carried out by ECUS on behalf of the client in accordance with the agreed terms of contract and/or written agreement form the agreed Services. The Services were performed by ECUS with the skill and care ordinarily exercised by a reasonable Environmental Consultant at the time the Services were performed. Further, and in particular, the Services were performed by ECUS taking into account the limits of the scope of works required by the client, the time scale involved and the resources, including financial and manpower resources, agreed between ECUS and the client. Other than that expressly contained in the paragraph above, ECUS provides no other representation or warranty whether express or implied, in relation to the services. This report is produced exclusively for the purposes of the client. ECUS is not aware of any interest of or reliance by any party other than the client in or on the services. Unless expressly provided in writing, ECUS does not authorise, consent or condone any party other than the client relying upon the services provided. Any reliance on the services or any part of the services by any party other than the client is made wholly at that party’s own and sole risk and ECUS disclaims any liability to such parties.
    [Show full text]
  • On Reclaiming Land from Seas and Estuaries.” ’ by JAMESOLDHAM, M
    No. 1,055.--“ On Reclaiming Land from Seas and Estuaries.” ’ By JAMESOLDHAM, M. Inst. C.E. THE practical operation towhich the Author intends moreespecially todraw attention, and in which he was professionally engaged, is that of the reclamation of a portion of Sunk Island, on the River Humber. But before describing the details of the works, he will make some general observations on thatriver and its tributaries ; and on the large amount of matter held in sus$ension, as well as thedegradation going on, not onlyto the foreshores of the Humber, but also along the whole of the Holderness coast, from Bridlington to the Spurn. The Humber, from the confluence of the rivers Trent and Ouse to the sea, is 40 miles in length. For about the first 10 miles from the sea it has an average width of nearly 6 miles, the remaining portion being upwards of 2 miles in average width. The total areais equalto 80,000 acres. (Plate 18, Fig. 1.) With some triflingexceptions, the shores of the Humber consist of alluvialformation, and the neighbouring districts of richagricultural land, generally speaking, tolerably well drained, having an averagefall of tide, below the surface of the land, of about 17 feet. The foreshore, between high and low water marks, varies from ten chains to twenty chains in width, but in some localities, as for instance, between Sunk Island and the Spurn, it is considerably more. In some parts, extensive tracts of ‘ outstrays ’ existbeyond the banks, which are only submerged at average spring tides. These level tracts are covered with marine grasses, which are exceedin$y valuable for young horses and sheep in the summer season.
    [Show full text]
  • Durham E-Theses
    Durham E-Theses The constitution and the clergy op Beverley minster in the middle ages McDermid, R. T. W. How to cite: McDermid, R. T. W. (1980) The constitution and the clergy op Beverley minster in the middle ages, Durham theses, Durham University. Available at Durham E-Theses Online: http://etheses.dur.ac.uk/7616/ Use policy The full-text may be used and/or reproduced, and given to third parties in any format or medium, without prior permission or charge, for personal research or study, educational, or not-for-prot purposes provided that: • a full bibliographic reference is made to the original source • a link is made to the metadata record in Durham E-Theses • the full-text is not changed in any way The full-text must not be sold in any format or medium without the formal permission of the copyright holders. Please consult the full Durham E-Theses policy for further details. Academic Support Oce, Durham University, University Oce, Old Elvet, Durham DH1 3HP e-mail: [email protected] Tel: +44 0191 334 6107 http://etheses.dur.ac.uk II BEVERIEY MINSTER FROM THE SOUTH Three main phases of building are visible: from the East End up to, and including, the main transepts, thirteenth century (commenced c.1230); the nave, fourteenth century (commenced 1308); the West Front, first half of the fifteenth century. The whole was thus complete by 1450. iPBE CONSTIOOTION AED THE CLERGY OP BEVERLEY MINSTER IN THE MIDDLE AGES. The copyright of this thesis rests with the author. No quotation from it should be pubHshed without his prior written consent and information derived from it should be acknowledged.
    [Show full text]