Argada Area Void REPORT ON FILLING UP OF VOIDS OF OLD ABANDONED MINES IN ARGADA AREA OF CCL Submitted to : Central Coalfields Limited Ranchi, Jharkhand SEPTEMBER - 2012 Central Mine Planning & Design Institute Ltd. Gondwana Place, Kanke Road, Ranchi, Jharkhand 834 008 CONTENTS SECTION TITLE PAGE NO. TEXT Executive Summary (i) – (iv) 1.0 INTRODUCTION 1-3 1.1 Background 1.2 Previous Studies 1.3 Scope of Work 2.0 METHODOLOGY 3-10 2.1 General 2.2 Mapping of Voids & Dumps by Remote Sensing Analysis 2.3 Assessment of Land cover/ use within the Study area 2.4 Estimation of Volume of the voids & dumps 2.4.1 Field Survey 2.4.2 Preparation of Plans & Cross Sections 2.4.3 Calculation of Volume 3.0 QUANTITATIVE ESTIMATES FOR THE IDENTIFIED 11-22 VOIDS AND DUMPS 3.1 General 3.2 Details of colliery wise voids & dumps 3.2.1 Gidi-A Colliery 3.2.1.1 Details of Voids 3.2.1.2 Details of Dump Job No. 60308090 3.2.2 Gidi-C Colliery 3.2.2.1 Details of Voids 3.2.2.2 Details of Dump 3.2.3 Argada Colliery 3.2.3.1 Datails of Voids 3.2.4 Religara Colliery 3.2.4.1 Details of Voids 3.2.4.2 Details of Dumps 3.2.5 Sirka Colliery 3.2.5.1 Details of Voids 3.2.5.2 Details of Dumps 4.0 COLLIERYWISE DATA OF VEGETATION COVER AND 23-28 LANDUSE 4.1 General TABLE NO. LIST OF TABLES PAGE NO. TABLE-1 Status of preliminary assessment/information of the 4-5 voids of different mines of Argada area. TABLE-2 Particulars of plans of Voids & Dumps of different mines 8 of Argada area & it’s sources. TABLE-3 Quantitative estimates of the Voids & OB Dumps 10-11 TABLE-4A Land Use/Cover Class identification of Gidi-A Colliery 23 TABLE-4B Land Use/Cover Class identification of Religara Colliery 24 TABLE-4C Land Use/Cover class identification of Gidi-C Colliery 25 TABLE-4D Land Use/Cover class identification of Argada Colliery 26 TABLE-4E Land Use/Cover class identification of Sirka Colliery 27 Job No. 60308090 ANNEXURE LIST OF ANNEXURES No. I Record Note of Quarterly Review meeting of CIL, Aug.,2007 I/A Copy of the Minutes of Meeting of the Committee on Monitoring, Rehabilitation of Mines and Afforestation Work (MOC) dated 23.07.2003. I/B Salient features of mined out voids in different areas of CCL (CMPDI Report, 2004) II Enquiry letter of Director (T/O), CCL dated 25.03.2008 II/A CMPDI’s Offer dated 06.06.2008 & 13.06.2008 II/B CCl’s Work Order dated 12.09.2008 II/C CCL’s Note dated 30.06.08 showing area-wise priority for job II/D Letter of CGM(P&P), CCL dated 16.04.2012 PLATE LIST OF PLATES (DRAWINGS) SCALE No. I Land Use/ Cover map of Gidi-A, Religara & Gidi-C Colliery II Land Use/ Cover map of Argada & Sirka Colliery III A Plan showing Abandoned Voids & Dumps of Gidi-A 1:2000 Colliery. (GAV1 to GAV4, GAD1 & GAD2) III B Plan showing Abandoned Voids & Dumps of Gidi-A 1:2000 Colliery. (GAV5) III C Representative cross sections through voids and dumps of 1:2000 Gidi-A Colliery. IV A Plan showing Abandoned Voids & Dumps of Gidi-C Colliery 1:2000 (GCV1 to GCV3 & GCD1 to GCD5) IV B Representative cross sections through voids and dumps of 1:2000 Gidi-C Colliery. V A Plan showing Abandoned Voids & Dumps of Argada 1:2000 Colliery. (ARV1 & ARV2) Job No. 60308090 V B Representative cross sections through Voids and Dumps of 1:2000 Argada Colliery VI A Plan showing Abandoned Voids & Dumps of Religara 1:2000 Colliery. (RLV1 & RLD1) VI B Representative cross sections through Voids and Dumps of 1:2000 Religara Colliery VII A Plan showing Abandoned Voids & Dumps of Sirka Colliery. 1:2000 (SRV1 & SRD1) VII B Representative cross sections through Voids and Dumps of 1:2000 Sirka Colliery Job No. 60308090 EXECUTIVE SUMMARY 1. Study Area : Argada Area, CCL 2. Total Area covered : 2277Ha. (22.77Sq.Km.) 3. Total No. of Voids Assessed : 12 (Twelve) 4.Volume Estimated( no.) : 12 Voids and 12 Dumps 6. Summary Of Overall Assessment : (A) Voids VOLUME LEAD QUARRY SURFACE VOLUME OF THE DIST. NAME AREA OF OF THE COLLIERY DUMP FROM REMARKS (VOID THE VOID VOID (Cu.m.) DUMP CODE) (Sq.m.) (Cu.m.) (Km.) (1) (2) (3) (4) (5) (6) (7) Gidi-A Quarry 185631 4484730 GAD1- GAD1- 0.6 The void is No.4 1869582 GAD2- 1.0 completely filled (GAV1) GAD2- up with water & 612745 not being used for any purpose. Available dumps are not sufficient to fill up the quarry. No other dump available nearby. Quarry 145657 5478812 -Do- GAD1- 1.0 The void is no.5 GAD2- 0.8 completely filled (GAV2) up with water & not being used for any purpose. Available dumps are not sufficient to fill up the quarry. No other dump available nearby. Bansgada 18701 155976 -Do- GAD1- 1.2 Partial water mine GAD2- 0.9 accumulation in (GAV3) the void & not being used for any purpose. (1) (2) (3) (4) (5) (6) (7) Job No. 60308090 Quarry 52539 492332 GAD1- GAD1- 0.8 The void is no.2 1869582 GAD2- 0.8 completely filled (GAV4) GAD2- up with the slurry 612745 of nearby Gidi Washery and the complete surface is filthy. It is unsafe for human & animals. Quarry 428202 12708780 -Do- GAD1- 2.0 The void is No.1 GAD2- 1.8 completely filled (GAV5) up with water. The water is being used for water supply in the colony and also being used by nearby villagers. Available dumps are not sufficient to fill up the quarry. No other dump available nearby. Gidi-C Quarry 362455 13605428 GCD1- GCD1- 0.6 The void is no.5 350511 GCD2- 3.5 completely filled (GCV1) GCD2- GCD3- 2.6 up with water. 1131299 GCD4- 3.5 The water is GCD3- GCD5- 3.7 being used for 695839 water supply in GCD4- 20858 the colony and GCD5- also being used 86477 by nearby villagers. Available dumps are not sufficient to fill up the quarry. No other dump available nearby. (1) (2) (3) (4) (5) (6) (7) Quarry 148308 4463077 GCD1- GCD1- 3.5 The void is Job No. 60308090 no.6 350511 GCD2- 1.5 completely filled (GCV2) GCD2- GCD3- 0.5 up with water. 1131299 GCD4- 1.5 The water is GCD3- GCD5- 1.8 being used for 695839 water supply in GCD4- the colony. 20858 GCD5- Available dumps 86477 are not sufficient to fill up the quarry. No other dump available nearby. Quarry 156459 5070755 -Do- GCD1- 4.7 The void is No.1 GCD2- 0.5 completely filled (GCV3) GCD3- 0.7 up with water & GCD4- 0.8 not being used for GCD5- 1.2 any purpose. Available dumps are not sufficient to fill up the quarry. No other dump available nearby. ARGADA Quarry 189777 6369132 Dump not available The void surface No.2 nearby is marshy and (ARV1) grasses have grown all along. It is totally unsafe for human & animals Quarry 143545 7322823 Dump not available The void is no.1 nearby completely filled (ARV2) up with water. The water is being used for water supply in the colony and also being used by nearby villagers. (1) (2) (3) (4) (5) (6) (7) RELIGARA Quarry 157869 9838656 RLD1- 0.6 The void is no. 6, 6A 2831975 partially filled with Job No. 60308090 &7 water. The water (RLV1) is being used by nearby villagers. Some U/G openings were also visible There are chances of illegal mining. Available dump is not sufficient to fill up the quarry. No other dump available nearby. SIRKA Quarry 227102 7537544 SRD1- SRD1- 3.2 The void is No.1 785909 SRD2- 3.0 completely filled (SRV1) SRD2- SRD3- 0.7 up with water. 48638 SRD4- 1.3 The water is SRD3- being used by 2070157 nearby villagers. SRD4- 23657 Available dumps are not sufficient to fill up the quarry. No other dump available nearby. Job No. 60308090 FOR RESTRICTED USE ONLY REPORT ON FILLING UP OF VOIDS OF ABANDONDED MINES IN ARGADA AREA OF CCL Job No. 60308090 1.0 INTRODUCTION 1.1 Background : Chairman, Coal India in a “Quarterly Review meeting” held in August, 2007 suggested that CMPDI should take up study for reclamation of the old abandoned voids in CCL command areas (Annexure-I). Director (T/P&P), CCL requested CMPDI to take up study for filling up of old abandoned voids for land reclamation in CCL command areas through his letter dated 16.8.2007. CCL had proposed to identify at least 5 voids initially in the first phase and also to identify available overburden dumps for filling up the voids immediately. Accordingly CMPDI had carried out the 1st phase of work & submitted its report to CCL on 22.11.2007. Further to the above Director (T/O), CCL requested CMPDI to identify the voids in other areas of CCL command areas vide his letter no. GM(E&F)/08/360 dated 25.03.2008 (Annexure-II). On the basis of discussion with CCL, CMPDI submitted the offer along with scope of work vide letter no. CMPDI/B.D./B(Survey)/363 dated 06.06.2008 (Annexure-IIA), on the basis of which CCL placed work order vide letter no. CGM/P&P/08/1333-35 dated 12.09.08 (Annexure-IIB). On the basis of time schedule submitted by CMPDI in it’s offer dtd.
Recommended publications
  • Hazaribagh, District Census Handbook, Bihar
    ~ i ~ € :I ':~ k f ~ it ~ f !' ... (;) ,; S2 ~'" VI i ~ ~ ~ ~ -I fI-~;'~ci'o ;lO 0 ~~i~~s. R m J:: Ov c V\ ~ -I Z VI I ~ =i <; » -< HUm N 3: ~: ;;; » ...< . ~ » ~ :0: OJ ;: . » " ~" ;;; C'l ;!; I if G' l C!l » I I .il" '" (- l' C. Z (5 < ..,0 :a -1 -I ~ o 3 D {If J<' > o - g- .,. ., ! ~ ~ J /y ~ ::.,. '"o " c z '"0 3 .,.::t .. .. • -1 .,. ... ~ '" '"c ~ 0 '!. s~ 0 c "v -; '"z ~ a 11 ¥ -'I ~~ 11 CENSUS 1961 BIHAR DISTRICT CENSUS HANDBOOK 14 HAZARIBAGH PART I-INTRODUCTORY NOTE, CENSUS TABLES AND OFFICIAL STATISTICS -::-_'" ---..... ..)t:' ,'t" -r;~ '\ ....,.-. --~--~ - .... .._,. , . /" • <":'?¥~" ' \ ........ ~ '-.. "III' ,_ _ _. ~ ~~!_~--- w , '::_- '~'~. s. D. PRASAD 0 .. THE IlQ)IAJr AD:uJlIfISTBA'X'lVB SEBVlOE Supwtnundent 01 Oen.ua Operatio1N, B'h4r 1961 CENSUS PUBLICATIONS, BIHAR (All the Census Publications of this State will bear Vol. no. IV) Central Government Publications PART I-A General Report PART I-B Report on Vital Statistics of Bihar, 1951-60 PART I-C Subsidiary Tables of 1961. PART II-A General Population Tables· PART II-B(i) Economic Tables (B-1 to B-IV and B-VU)· PAR't II-B(ii) Economic Tables (B-V, B-VI, B-VIII and B-IX)* PART II-C Social and Cultural Tables* PART II-D Migration Tables· PART III (i) Household Economic Tables (B-X to B-XIV)* PART III (ii) Household Economic Tables (B-XV to B-XVII)* PART IV-A Report on Housing and Establishments· PART IV-B Housing and Establishment Table:,* PART V-A Special Tables for Scheduled Castes and Scheduled Tribe&* PART V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes PART VI Village Surveys •• (Monoglaphs on 37 selected villages) PART VII-A Selected Crafts of Bihar PART VII-B Fairs and Festivals of Bihar PART VIII-A Administration Report on Enumeration * } (Not for sale) PART VIII-B Administration Report on Tabulation PART IX Census Atlas of Bihar.
    [Show full text]
  • Male Female Trans Gender Total DISTRICT
    DISTRICT - HAZARIBAG CRS Online Death Registration Report in month of Febuary-2021 Sl. Sub District Registration Unit Name RU Type Registered Events No. Male Female Trans Total gender 1 Barkatha COMMUNITY HEALTH CENTERS BARKATTA Health 0 1 0 1 2 Hazaribag HAZARIBAGH SADAR HOSPITAL Health 8 14 0 22 3 Keredari COMMUNITY HEALTH CENTERS KEREDARI Health 1 0 0 1 4 Chauparan GRAMA PANCHAYAT BEHRA Panchyat 1 3 0 4 5 Chauparan GRAMA PANCHAYAT PANDEYBARA Panchyat 2 1 0 3 6 Chauparan GRAMA PANCHAYAT BASARIYA Panchyat 0 1 0 1 7 Chauparan GRAMA PANCHAYAT BELA Panchyat 1 1 0 2 8 Chauparan GRAMA PANCHAYAT JHAPA Panchyat 5 1 0 6 9 Chauparan GRAMA PANCHAYAT BARAHMAURIYA Panchyat 2 0 0 2 10 Chauparan GRAMA PANCHAYAT CHAITHI Panchyat 2 1 0 3 11 Chauparan GRAMA PANCHAYAT CHAUPARAN Panchyat 1 0 0 1 12 Chauparan GRAMA PANCHAYAT CHORDAHA Panchyat 1 1 0 2 13 Chauparan GRAMA PANCHAYAT DADPUR Panchyat 2 0 0 2 14 Chauparan GRAMA PANCHAYAT DAIHAR Panchyat 3 0 0 3 15 Chauparan GRAMA PANCHAYAT JAGDISHPUR Panchyat 3 0 0 3 16 Chauparan GRAMA PANCHAYAT GOVINDPUR Panchyat 2 1 0 3 17 Chauparan GRAMA PANCHAYAT JABANPUR Panchyat 1 0 0 1 18 Chauparan GRAMA PANCHAYAT KARMA Panchyat 1 1 0 2 19 Chauparan GRAMA PANCHAYAT SINGHRAWAN Panchyat 2 1 0 3 20 Chauparan GRAMA PANCHAYAT MANGARH Panchyat 1 0 0 1 21 Chauparan GRAMA PANCHAYAT TAJPUR Panchyat 1 0 0 1 22 Barhi GRAMA PANCHAYAT BHANDARO Panchyat 1 0 0 1 23 Barhi GRAMA PANCHAYAT DHANWAR Panchyat 1 2 0 3 24 Barhi GRAMA PANCHAYAT BARHI EAST Panchyat 0 1 0 1 25 Barhi GRAMA PANCHAYAT KOLHUKALA Panchyat 2 0 0 2 26 Barhi GRAMA PANCHAYAT
    [Show full text]
  • Soil Erosion and Preventive Measures
    SCIENTIFIC STUDY OF SOIL EROSION AND PREVENTIVE MEASURES FOR GIDI ‘C’ OPENCAST PROJECT (0.6 MTY) OF CENTRAL COALFIELDS LIMITED SEPTEMBER, 2012 SLOPE STABILITY CELL ENVIRONMENT DIVISION CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD. (A Subsidiary of Coal India Ltd.) GONDWANA PLACE RANCHI – 834008 SCIENTIFIC STUDY OF SOIL EROSION AND PREVENTIVE MEASURES FOR KARMA OPENCAST PROJECT (0.6 MTY) OF CENTRAL COALFIELDS LIMITED SEPTEMBER, 2012 SLOPE STABILITY CELL ENVIRONMENT DIVISION CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD. (A Subsidiary of Coal India Ltd.) GONDWANA PLACE RANCHI – 834008 INDEX Chapter Name of Chapter Page No 1 Background 1 - 2 2 Project Profile 4 - 11 3 Soil Erosion 12 - 27 4 Control Measures 28- 38 5 Cost & conclusion 39- 41 CMPDI Prevention of soil erosion CHAPTER - I Background 1.0 Purpose CCL had submitted a proposal to concern department for the release of 237.300Ha. of forest land for the Gidi ‘c’ open-cast project to MoEF, GoI through DFO, East Division, Hazaribagh. Stage – II clearance has been accorded by MoEF vide letters no. 8 -114/2003 -FC- dated 30.10.08 of Sr. Assistant Inspector General of forest MoEF, Govt. of India with certain conditions. As per clause no. 3 (I, II, III, IV & V) of the said letter the user agency has to comply with;- Preparation of a scheme for the proper mitigation measures to minimize soil erosion and choking of stream and shall be implemented; Planting of adequate drought hardy plant species and sowing of seeds to arrest soil erosion; The area shall be reclaimed keeping in view of the international practice or stabilizing the dump grading/benching so that the angle of repose (normally less than 280 at any given point) are maintained; The top soil management plan should be strictly adhered; The study of soil erosion/soil flow from the overburden area with the help of GIS in consultation of forest department.
    [Show full text]
  • LIST of REPORTS SENT to the SPONSORER from 1St JANUARY, 2016 to MARCH, 2021
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO MARCH, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • Land Use/Vegetation Cover Mapping of North and South Karanpura Coalfields Based on Satellite Data for the Year- 2012
    Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 CMPDI A Miniratna Company Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi CMPDI Restricted Report on Vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data of the Year‐ 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi RSC-561410027 [ Page i of iv] CMPDI Document Control Sheet (1) Job No. RSC/561410027 (2) Publication Date March 2013 (3) Number of Pages 28 (4) Number of Figures 7 (5) Number of Tables 7 (6) Number of Plates 1 (7) Title of Report Land use /vegetation cover mapping of North & South Karanpura Coalfield based on satellite data of the year 2012. (8) Aim of the Report To prepare Land use / vegetation cover map of North & South Karanpura Coalfield on 1:50000 scale based on IRS R-2 L4FMX satellite data for assessing the impact of coal mining on land use pattern and vegetation cover (9) Executing Unit Remote Sensing Cell, Geomatics Division Central Mine Planning & Design Institute Limited, Gondwana Place, Kanke Road, Ranchi 834008 (10) User Agency Central Coalfields Ltd. (11) Authors Mr A. K. Singh Chief Manager (Remote Sensing) Mr. N.P.Singh, General Manager(Geomatics) (12) Security Restriction Restricted Circulation (13) No. of Copies 8 (14) Distribution Statement Official RSC-561410027 [ Page ii of iv] CMPDI Contents Page No. Document
    [Show full text]
  • S No Atm Id Atm Location Atm Address Pincode Bank
    S NO ATM ID ATM LOCATION ATM ADDRESS PINCODE BANK ZONE STATE Bank Of India, Church Lane, Phoenix Bay, Near Carmel School, ANDAMAN & ACE9022 PORT BLAIR 744 101 CHENNAI 1 Ward No.6, Port Blair - 744101 NICOBAR ISLANDS DOLYGUNJ,PORTBL ATR ROAD, PHARGOAN, DOLYGUNJ POST,OPP TO ANDAMAN & CCE8137 744103 CHENNAI 2 AIR AIRPORT, SOUTH ANDAMAN NICOBAR ISLANDS Shop No :2, Near Sai Xerox, Beside Medinova, Rajiv Road, AAX8001 ANANTHAPURA 515 001 ANDHRA PRADESH ANDHRA PRADESH 3 Anathapur, Andhra Pradesh - 5155 Shop No 2, Ammanna Setty Building, Kothavur Junction, ACV8001 CHODAVARAM 531 036 ANDHRA PRADESH ANDHRA PRADESH 4 Chodavaram, Andhra Pradesh - 53136 kiranashop 5 road junction ,opp. Sudarshana mandiram, ACV8002 NARSIPATNAM 531 116 ANDHRA PRADESH ANDHRA PRADESH 5 Narsipatnam 531116 visakhapatnam (dist)-531116 DO.NO 11-183,GOPALA PATNAM, MAIN ROAD NEAR ACV8003 GOPALA PATNAM 530 047 ANDHRA PRADESH ANDHRA PRADESH 6 NOOKALAMMA TEMPLE, VISAKHAPATNAM-530047 4-493, Near Bharat Petroliam Pump, Koti Reddy Street, Near Old ACY8001 CUDDAPPA 516 001 ANDHRA PRADESH ANDHRA PRADESH 7 Bus stand Cudappa, Andhra Pradesh- 5161 Bank of India, Guntur Branch, Door No.5-25-521, Main Rd, AGN9001 KOTHAPET GUNTUR 522 001 ANDHRA PRADESH ANDHRA PRADESH Kothapeta, P.B.No.66, Guntur (P), Dist.Guntur, AP - 522001. 8 Bank of India Branch,DOOR NO. 9-8-64,Sri Ram Nivas, AGW8001 GAJUWAKA BRANCH 530 026 ANDHRA PRADESH ANDHRA PRADESH 9 Gajuwaka, Anakapalle Main Road-530026 GAJUWAKA BRANCH Bank of India Branch,DOOR NO. 9-8-64,Sri Ram Nivas, AGW9002 530 026 ANDHRA PRADESH ANDHRA PRADESH
    [Show full text]
  • Annual Report & Accounts 2017-2018
    ANNUAL REPORT & ACCOUNTS 2017-2018 CENTRAL COALFIELDS LIMITED A Miniratna Company www.centralcoalfields.in Annual Report & Accounts 2017-18 CENTRAL COALFIELDS LIMITED A Miniratna Company (A Subsidiary of Coal India Limited) (CIN: U10200JH1956GOI000581) Regd. Office : Darbhanga House, Ranchi - 834 029 JHARKHAND CENTRAL COALFIELDS LIMITED ANNUAL REPORT 2017-18 VISION/MISSION & OBJECTIVES 1.1 VISION To emerge as a National player in the Primary Energy Sector, committed to provide energy security to the Country, by attaining environmentally and Socially Sustainable Growth , through best practices from Mine to Market. MISSION The Mission of Central Coalfields Limited (CCL) is to produce and market the planned quantity of Coal and Coal products efficiently and economically in Eco-Friendly manner, with due regard to Safety, Conservation and Quality. 1.2 OBJECTIVES The major objectives of Central Coalfields Limited (CCL) are — 1. To optimize generation of internal resources by improving productivity of resources, prevent wastage and to mobilize adequate external resources to meet investment need. 2. To maintain high standards of Safety and strive for an accident free mining of Coal. 3. To lay emphasis on afforestation, protection of Environment and control of Pollution. 4. To undertake detailed exploration and plan for new Projects to meet the future Coal demand. 5. To modernize existing Mines. 6. To Develop technical know-how and organizational capability of Coal mining as well as Coal beneficiation and undertake, wherever necessary, applied research and development work related to Scientific exploration for greater extraction of Coal. 7. To improve the quality of life of employees and to discharge the corporate obligations to Society at large and the community around the Coalfields in particular.
    [Show full text]
  • CRS Online Death Registration Report in Month of December-2020 Sl
    DISTRICT - HAZARIBAG CRS Online Death Registration Report in month of December-2020 Sl. No. Sub District Registration Unit Name RU Type Registered Events Male Female Transgender Total 1 Barhi GRAMA PANCHAYAT BARSOT Panchyat 1 0 0 1 2 Barhi GRAMA PANCHAYAT BASARIYA-PANCHMADHAW Panchyat 3 0 0 3 3 Barhi GRAMA PANCHAYAT BENDGI Panchyat 1 0 0 1 4 Barhi GRAMA PANCHAYAT BIJAIYA Panchyat 1 2 0 3 5 Barhi GRAMA PANCHAYAT DAPOK Panchyat 1 0 0 1 6 Barhi GRAMA PANCHAYAT KARIYATPUR Panchyat 0 1 0 1 7 Barhi GRAMA PANCHAYAT KEDARUT Panchyat 1 0 0 1 8 Barhi GRAMA PANCHAYAT MALKOKO Panchyat 1 0 0 1 9 Barhi GRAMA PANCHAYAT RASOIYA DHAMNA Panchyat 1 2 0 3 10 Barhi GRAMA PANCHAYAT BARHI EAST Panchyat 0 2 0 2 11 Barhi GRAMA PANCHAYAT BHANDARO Panchyat 0 0 0 0 12 Barhi GRAMA PANCHAYAT DHANWAR Panchyat 0 0 0 0 13 Barhi GRAMA PANCHAYAT DULMAHA Panchyat 0 0 0 0 14 Barhi GRAMA PANCHAYAT GAURIYAKARMA Panchyat 0 0 0 0 15 Barhi GRAMA PANCHAYAT KARSO Panchyat 0 0 0 0 16 Barhi GRAMA PANCHAYAT KHODAHAR Panchyat 0 0 0 0 17 Barhi GRAMA PANCHAYAT KOLHUKALA Panchyat 0 0 0 0 18 Barhi GRAMA PANCHAYAT KONRA Panchyat 0 0 0 0 19 Barhi GRAMA PANCHAYAT RANICHUWAN Panchyat 0 0 0 0 20 Barhi GRAMA PANCHAYAT BARHI WEAST Panchyat 0 0 0 0 21 Barhi BSF CAMP MERU Other 0 0 0 0 22 Barhi PRIMARY HEALTH CENTRES GOURIYA KARMA Health 0 0 0 0 23 Barhi SUB DIVISIONAL HOSPITAL, BARHI Health 0 0 0 0 24 Barhi HEALTH SUB CENTER BUNDU Health 0 0 0 0 25 Barhi HEALTH SUB CENTRE KARIATPUR Health 0 0 0 0 26 Barhi HEALTH SUB CENTRE KENDUA Health 0 0 0 0 27 Barhi HEALTH SUB CENTRE GURIO Health 0 0 0 0 28
    [Show full text]
  • (Gidi-A Colliery), Argada Area Po: Gidi-A, Dist.: Hazaribagh, Pin-829108
    CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER (GIDI-A COLLIERY), ARGADA AREA PO: GIDI-A, DIST.: HAZARIBAGH, PIN-829108 Ref No.: CCL/ Argada /GDA/E&M/NIQ/20-21/ 190 Date: 25/10/2020 NOTICE INVITING QUOTATION (NIQ) 01. Sealed Quotation in one part is invited from eligible contractors for the following work:- Sl. Description of work Estimated Earnest Money Period of No. Cost of (Rs.) Completion work (Rs.) @1.25% of (in days) ESTIMATED COST. 1 Maintenance & Repairing of 93,633.00 1170.00 07(Seven days) 400Amp,3.3Kv,L&C make OCB at substation of Gidi-A Colliery. 2 Supply & Fixing of pole mounting kits 1,21,096.32 1514.00 05(Five days) at different points of Gidi-A main substation ,CHP, Quarry & Colony of Gidi-A colliery. 3 Complete rewinding /repairing of 2nos 41,032.64 513.00 07(Seven days) LT motors of durga mandap pani tanki & filter plant of Gidi-A Colliery. 4 Repairing & rewinding of 63Kva 51,389.19 642.00 10(Ten days) transformer ,Make: synergy power equipment of Gidi-A Colliery 03. “Earnest money can be deposited in the form of bank draft drawn in favour of “CCL ARGADA AREA” on any Nationalized Bank payable at RAMAGRH. The Earnest Money can also be deposited through RTGS/NEFT mode in CCL Argada Area Account as detailed below: Title of Account CC LTD A/C AREA Name of Bank and Branch SBI, Branch : SIRKA,P.O-ARGADA, P.S -RAMGARH DIST:HAZARIBAGH, JHARKHAND Payee’s Account Number 11447812016 IFSC Code SBIN0004896 The date of issuance of Demand Draft and /or Payment receipt(Through RTGS/NEFT mode) should be on or after the date of issue of quotation Notice .
    [Show full text]
  • Mine Closure Report for Bhurkunda Open Cast Project
    MINE CLOSURE REPORT FOR BHURKUNDA OPEN CAST PROJECT (CENTRAL COALFIELDS LIMITED) AUGUST 2012 Regional Institute – III Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Gondwana Place, Kanke Road Ranchi-834008, Jharkhand 1 INTRODUCTION 1.1 About the Mine Bhurkunda Colliery, also called as Sangam OCP, having an area of about 10.0 sq.km. faliing in the South Karanpura Coalfields (Barkakana area of CCL) is under active exploitation since 1929. Initially it belonged to Railways, in 1956, NCDC took over it. It was reconstructed with a view to exploit thick quarriable Argada seam. There has been repetition of Argada and other seams due to several strike faults traversing in the property. Between two subsequent faults, Argada seam, the thickest seam of the area, has been worked out by opencast method in quarry no. 5, quarry no. 1, quarry no. 3 & quarry no.4 and quarry no. 2 (Sangam Project) is now being worked. 1.1.1 Name of mine owner / company Project--------- Bhurkunda OCP Area------------ Barka Sayal Area Company------Central Coalfields Limited Mine Owner---Director (Technical)(Operation), CCL 1.1.2 Address for Communication Project-------- Bhurkunda OCP Nearest Railway station ----- The nearest Railway heads is Bhurkunda on Barkakana Dehri-on-sone-Gomoh broad gauge loop of Eastern Railways, about 4 km south from southern end of Bhurkunda block. District--------- Hazaribagh. State-----------Jharkhand. 1.1.3 Location of mine: Project--------- Bhurkunda opencast project is situated in the south eastern part of the south Karanpura Coalfields and is in Barka Sayal area of Central Coalfields Limited. The proposed Bhurkunda East OCP lies in the eastern part of Bhurkunda Colliery lease hold and is being planned to work the older four seams, which was not intended to be worked in the PR of Bhurkunda OCP sanctioned earlier, viz, Argada-A to Argada B seams.
    [Show full text]
  • Directory Establishment
    DIRECTORY ESTABLISHMENT SECTOR :RURAL STATE : JHARKHAND DISTRICT : Bokaro Year of start of Employment Sl No Name of Establishment Address / Telephone / Fax / E-mail Operation Class (1) (2) (3) (4) (5) NIC 2004 : 1010-Mining and agglomeration of hard coal 1 PROJECT OFFICE POST OFFICE DISTRICT BOKARO, JHARKHAND , PIN CODE: 829144, STD CODE: NA , TEL NO: NA , FAX 1975 51 - 100 MAKOLI NO: NA, E-MAIL : N.A. 2 CENTRAL COAL FIELD LIMITED AMLO BERMO BOKARO , PIN CODE: 829104, STD CODE: NA , TEL NO: NA , FAX NO: NA, 1972 101 - 500 E-MAIL : N.A. 3 PROJECT OFFICER KHASMAHAL PROJECT VILL. KURPANIA POST SUNDAY BAZAR DISTRICT BOKARO PIN 1972 101 - 500 CODE: 829127, STD CODE: NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A. 4 SRI I. D. PANDEY A T KARGAL POST . BERMO DISTRICT BOKARO STATE JHARKHAND , PIN CODE: NA , STD CODE: 06549, TEL NO: 1960 > 500 221580, FAX NO: NA, E-MAIL : N.A. 5 SRI S K. BALTHARE AT TARMI DAH DISTRICT BOKARO STATE - JHARKHAND , PIN CODE: NA , STD CODE: NA , TEL NO: NA 1973 > 500 P.O.BHANDARI , FAX NO: NA, E-MAIL : N.A. 6 PROJECT OFFICER CCL MAKOLI POST CE MAKOLI DISTRICT BOKARO STATE JAHARKHAND PIN CODE: 829144, STD CODE: NA , TEL 1975 > 500 OFFFI NO: NA , FAX NO: NA, E-MAIL : N.A. NIC 2004 : 1410-Quarrying of stone, sand and clay 7 SANJAY SINGH VILL KHUTR PO ANTR PS JARIDIH DIST BOKARO JHARKHANDI PIN CODE: 829138, STD CODE: 1989 10 - 50 NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A.
    [Show full text]
  • ANSWERED ON:22.08.2005 FOREST AREA UNDER MINING QUARRYING Bishnoi Shri Jaswant Singh;Gandhi Smt
    GOVERNMENT OF INDIA ENVIRONMENT AND FORESTS LOK SABHA UNSTARRED QUESTION NO:3908 ANSWERED ON:22.08.2005 FOREST AREA UNDER MINING QUARRYING Bishnoi Shri Jaswant Singh;Gandhi Smt. Maneka;Joshi Shri Pralhad Venkatesh Will the Minister of ENVIRONMENT AND FORESTS be pleased to state: (a) the details of the prime forest area in the country wherein the mining and quarrying operations were permitted by the Government during 2004-2005; (b) the details of the area in such forest land where the mining and quarrying is being carried out causing deforestation, State-wise as on date; (c) whether the Government has adopted any strategy to discourage the mining operations in the prime forest lands and National Parks; (d) if so, the details thereof; and (e) the State-wise details of the National Parks which are facing the onslaughts of mining and quarrying by which the Bio-Diversity and Wildlife of such National parks in endangered? Answer MINISTER OF STATE IN THE MINISTRY OF ENVIRONMENT AND FORESTS (SHRI NAMO NARAIN MEENA) (a) During 2004-2005, 201 proposals from various States for mining and quarrying operations, involving 15753.704 ha of forest land, have been granted approval under Forest (Conservation) Act, 1980. The details are given in Annexure-I. (b) So far, 95002.86 ha of forest land has been allowed to be diverted for 1,198 number of mining and quarrying proposals of various States, since the enactment of the Forest (Conservation) Act, 1980. The State-wise forest land diverted for mining proposals is given in Annexure-II. It is a fact that most of the mines are located in forest areas, which lead to some de-forestation.
    [Show full text]