Adriyala Shaft Project

Total Page:16

File Type:pdf, Size:1020Kb

Adriyala Shaft Project ADDENDUM TO EIA/EMP FOR THE PROPOSED ADRIYALA SHAFT PROJECT (One time capacity expansion for 50% in the existing operations under the provisions of MoEF Office Memorandum J-11015/30/2004.IA.II (M), dated 07.01.2014) DEPARTMENT OF ENVIRONMENT (QCI / NABET Accredited EIA Consultant Organization) THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company) KOTHAGUDEM COLLIERIES – 507 101 TELANGANA STATE OCTOBER 2014 1 PRE FEASIBILITY REPORT OF ADRIYAL SHAFT PROJECT. 1. Executive Summary: 1. Name of the Mine : Adriyala Shaft Project 2. Geological Block : Shaft Block II & III of Ramagundam coal belt 3. Name of the Coal Field : Godavari Valley Coal Field 4. Location Village : Adriyala village Revenue Mandal : Manthani Mandal District : Karimnagar State : Telangana Latitude : North : 18039'03" to 180'40'34" 0 0 Longitude East : 79 34'28" to 79 35'55" N Survey of India Topo sheet 56 10 5. Name of the Organization : Singareni Collieries Company Limited. Non- Forest Land Diverted forest 6. SCCL acquired land (Ha) : 300.60 39.40 7. Mine Take area ( Ha) : 340.00Ha 8. Geological Reserves (MT) : 109.594 9. Extractable reserves(MT) 43.3823 Balance extractable reserves (MT) 10. 41.84 (As on 1-4-2014) Borehole Density ( Bore Holes per 11. : 12.65 Sq.Km) 12. Seams Present : 1A,I,II,IIIB,IIIA,III,IV 13. Seams Assessed : 1A,I,II,IIIB,IIIA,III,IV 14. Workable seams : I,II,III,IV 15. Gradient of Seams : 1 in 6 to 1 in 7.8 Thickness (m) Seam Min Max. Working thickness 0.25 2.81 Not considered for 1A mining I 4.01 7.81 3.5 II 1.20 4.23 3.0 16. Thickness of Seams : 0.30 2.50 Not considered for IIIB mining 0.35 2.05 Not considered for IIIA mining 6.47 11.27 3.5 Top III 3.5 Bottom IV 1.65 4.23 3.5 17. Depth of working seams (m) : Seam Min Max 2 I Seam 293.95 528.93 II Seam 319.68 555.06 IIISeam 394.20 625.00 IV Seam 406.24 644.00 I seam - G9 II Seam - G9 18. Average Grade of Working seams : III Seam(Top) - G7 III Seam(Bot) - G7 IV seam - G5 Road Headers, Continuous Miner and two sets of Present Technology : Longwall. 19. Road Headers and High capacity Longwall Proposed Technology Equipment. 20. Present Capacity (MTPA) : 2.144 21. Proposed Capacity ( MTPA) : 3.14 Life of the Project : Prodn. Capacity Life 22. At present capacity : 2.144 31 At proposed capacity : 3.14 22 23. Manpower Requirement : 836 Yes. 750 PDFs are involved and Rs136.25 Crores are envisaged. The R&R is taken up under RG 24. R & R involved : OC-II expansion project as the external OB dumps of the project are planned over this land. 25. Capital Requirement : Rs 779.26 Crores 26. Constraints : Nil 2. Introduction of the project / Background information: (i) Identification of project and project proponent: Background: There is a need to enhance power generation in the country from the present level of 148,000 MW to 380,000 MW by the year 2030 to achieve an economic growth rate of 8% to 9%. The major share of growth in power generation is through thermal i.e., coal based. Hence country’s coal requirement will have to be enhanced to 1300 MT. To compensate the decrease in production from the closing mines and to meet the demand of coal in this region, the project proponent, Singareni Collieries Company Limited (SCCL), a Government Company is planning to open new mines in the new blocks. Adriyala Shaft Project was started in the year 2008. Environmental clearance was obtained for Adriyala Shaft Project for a production capacity of 2.144 MTPA vide letter No. J- 11016/258/2004-IA. II(M) dated 11-10-2004. In Feasibility report it is envisaged to deploy two Longwall units in this project. Due to drastic development in Longwall technology worldwide, it is proposed to deploy one high capacity Longwall unit instead of two and to produce 3.14 MTPA from the same mine. Identification of the project: Adriyala Shaft Project is an underground mine located in Adriyalla Project area(APA) of SCCL. Rated production capacity of the project is 2.144 MTPA. The grade of the coal varies from G5 to G9 over the life of the project. 3 Project Proponent: The Singareni Collieries Company Limited (SCCL) has been exploiting coal for more than 122 years in the 350 km stretch of Pranahita Godavari Valley Coal Field spread in four districts of Telangana viz. Adilabad, Karimnagar, Warangal and Khammam with man power of 62805 and is the second largest public sector under taking in the state. It is the only coal mining company in South India catering the needs of coal based industries in the region. SCCL is currently operating 16 open cast projects and 32 underground mines and has achieved coal production of 50.47 MT in the year 2013-14 and target for the year 2014-15is 55.00 MT. Address of Project Proponent: Project Officer Adriyala Longwall Project P.O 8 incline colony Karimnagar dist Telangana PIN 505211 Email [email protected] Fax No 08728-259843 Address of Owner: Director (Operations) The Singareni Collieries Company Limited Po:Kothagudem, PIN. 507 101 Dist: Khammam, Telangana E-Mail id: [email protected] Ph.No. 08744 - 242602; Fax No. 08744 - 242305 Details of the Mining Lease: The entire project area is covered in Pandullapalli Mining Lease valid upto 18-7-2021 and South Godavari Mining Lease Valid upto:31.12.2014 (ii) Brief description of nature of the project: Adriyal Shaft Project is an underground coal mine producing G-5 to G-9 grade coal with a capacity of 2.144 MTPA. Present proposal envisaged for expansion project: The project was granted environment clearance for a production capacity of 2.144 MTPA with two Longwall sets and 150m face length. Keeping in view of the changes in Longwall Technology globally, SCCL has decided to deploy high capacity Longwall Technology which is capable of producing more than 3.0 MTPA in the same minetake area by redesigning the Longwall face length with 250m. Hence it is proposed to increase the production capacity of the mine from 2.144 MTPA to 3.14 MTPA and to obtain environmental clearance for this production capacity under MoEF memorandum J-11015/30/2004-IA- II(M) dated 7/1/2014. 4 The following is the state of art equipment configuration of the proposed Longwall equipment. i) SL ii) Description iii) Technical details NO iv) CHOCK SHIELDS v) 1 vi) Support capacity vii) 1152 Tonnes (2 legged DTDA version) viii) 2 ix) Support Density x) 120 Tonnes per Sq.Mt (before cut xi) 104 Tonnes (after cut) xii) 3 xiii) Operating xiv) 2.8 to 3.6 m Range xv) 4 xvi) Support width xvii) 1.75 m xviii) 5 xix) Rapid Yielding xx) Gas operated rapid yielding valves of 1500 lpm and rock burst valve (DN 40 U) of flow rate of about 6000 lpm for each leg. xxi) 6 xxii) Controls xxiii) Batch controls of 5 to 10 + SIRSA for advancing the supports as per the movement of shearer automatically. xxiv) SHEARER xxv) 7 xxvi) Make xxvii) BUCYRUS DBT xxviii) 8 xxix) Type / Model xxx) EL 3000 xxxi) 9 xxxii) Haulage xxxiii) Jumbo track 2000 System-Track xxxiv) 10 xxxv) Electrical xxxvi) i). 2 X 860 KW for cutter drums motors xxxvii) ii). 2 X 125 KW for haulage xxxviii) iii). 200 KW for in built crusher xxxix) iv). 1 X 75 KW for hydraulics xl) 11 xli) Cutting height xlii) 2.8 m to 3.6 m xliii) 12 xliv) Operating xlv) 3.3 KV, 3-Phase, 50 Cycles voltage xlvi) 13 xlvii) Cutting capacity xlviii) 3000 TPH (while travelling up the hill at a gradient of 1 in 4 (about 14 dgrees) xlix) AFC l) 14 li) Face length lii) 260m long face + 10.5m spare liii) 15 liv) Capacity lv) 3X855 KW, 3.3 KV, 3-Phase, 50 Cycles, 1142 mm wide, high wear-resistant, PF6 Deck plate with minimum thickness of 30+25mm, 48X144/160 mm twin inboard chain of suitable speed and a minimum capacity to convey of 3100 TPH. lvi) BSL lvii) 16 lviii) Length lix) 29.5m with suitable overlap system lx) 17 lxi) Capacity lxii) 400KW, 3.3 KV, 3-Phase, 50Cycles/ sec. 1342mm lxiii) wide, high wear resistant, PF6 Deck plate with lxiv) minimum thickness of 30+25mm, 42X146mm twin lxv) in board chain, 2.06 m/sec speed, and a minimum lxvi) capacity to convey of 3200 TPH 5 The Adriyala Shaft Project is demarcated within the following boundaries: 1 North Proved fault F4-F4 2 South Straightened Bokkala vagu 3 East Dip side proved limit i.e. 670m depth of IV seam 4 West Existing GDK10/ GDK10A dip side boundary The total area of the project is 3.4 km2 covering 2.75 Km in strike direction and 1.25 Km in dip direction. Long wall technologiy is deployed in this mine. Trunk roadways of GDK10A incline are utilized for transport of coal and material. Details of Entries SL NO Mine Shafts Inclines Existing propo /section sed 1 GDK10A 1 2 Return air shaft (6.0m dia, 38m depth) Inclines for Men and Material transport Manway incline 418m length,4.2mX3.0m Main Incline 461m Length, 4.2mX3.0m. 2 Adriyala 2 - Return air shaft (7.5m dia, 468m depth) Intake air shaft (7.5 dia, 470m depth) (iii) Need for the project and its importance to the country and or region: Coal is the most important and abundant fossil fuel in India.
Recommended publications
  • Office Name Pincode Delivery
    Delivery/ Office Office Name Pincode Circle Region Division Non Delivery Type Gandhi Bhawan S.O 500001 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Moazzampura S.O 500001 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Seetharampet S.O 500001 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division State Bank Of Hyderabad S.O 500001 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Khairatabad H.O 500004 Delivery HO Telangana Circle Hyderabad City Region Hyderabad City Division Anandnagar S.O 500004 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Bazarghat S.O 500004 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division A.Gs Office S.O 500004 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Parishram Bhawan S.O 500004 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Vidhan Sabha S.O 500004 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Karwan Sahu S.O 500006 Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Kulsumpura S.O 500006 Non-Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Golconda S.O 500008 Delivery PO Telangana Circle Hyderabad City Region Hyderabad City Division Nanakramguda B.O 500008 Delivery BO Telangana Circle Hyderabad City Region Hyderabad City Division Kakatiya Nagar S.O 500008 Non-Delivery PO Telangana Circle
    [Show full text]
  • The Singareni Collieries Company Limited ( a Government Company) Ramagundam-III Area
    The Singareni Collieries Company Limited ( A Government Company) Ramagundam-III Area. Tel No. 08728-258116 Fax No. 08728-259843 Pin: 505212 Email: [email protected] [email protected] Ref.No.RG-III/ENV/3/121 Dt. 29.11.2017 To The Director Ministry of Environment, Forests &Climate Change (MoEF&CC) Regional Office, 1st and 2nd floor, HEPC Building, No.34, Cathedral Garden Road, Nungambakkam, Chennai - 600034. Dear Sir, Sub: Half yearly Environmental Monitoring Report of Ramagundam Opencast-II (RG OC-II) Coal Mine Extension Project for the period from April 2017 to September 2017 –Reg. Ref.No.: J-11015/355/2007-IA.II(M), Dt.27.04..2010. ****** With reference to the above subject, please find enclosed here with the Half Yearly Environmental Monitoring Report (Hard and Soft copies) of Ramagundam Opencast-II (RG OC-II) Coal Mine Extension Project for the period from April 2017 to September 2017 for your kind perusal. The report consists of part-I, which indicates the status of the implementation of environmental clearance conditions, and part-II indicates various environment control measures being taken. Thanking you, Yours faithfully, General Manager, Ramagundam-III Area. Enclosed :a/a with soft copy CC : Member Secretary, TSPCB,Hyd. EE, TSPCB.RO, NTPC, RGM, GM (ENV), Kgm, PO OC-II M.F 1 HALF-YEARLY MONITORING REPORT (In compliance with EIA notification 2006 under Environment (Protection) Act ) FOR RAMAGUNDAM OPEN CAST PROJECT-II COAL MINE PROJECT EXPANSION PHASE-II (RAMAGUNDAM-III AREA) (For the period April 2017 To September 2017) THE SINGARENI COLLIERIES COMPANY LIMITED (A GOVERNMENT COMPANY) ENVIRONMENT DEPARTMENT RAMAGUNDAM-III AREA 2 CONTENTS Sl.No Page No 1 PART-I 4-13 • Salient features of the project • Compliance status of the EC conditions 2 PART-II 14-23 1.
    [Show full text]
  • Crl MP No 106 of 2020 in Crime NO 292 of 2020 PS Manthani Dated 14
    1 IN THE COURT OF VI ADDL. SESSIONS JUDGE : GODAVARIKHANI. Present :- SMT. G.V.N.BHARATHA LAXMI, VI Addl. Sessions Judge, Godavarikhani. Monday, the 14th day of December, 2020 CRL. MISC. PETITION NO. 106 OF 2020 IN CRIME NO. 292 OF 2020 (P.S. MANTHANI). Between:- Koutam Raju S/o Prabhakar, age: 30 years, caste: M-kapu, Occup: Farmer, r/o Vilochavaram village of Manthani Mandal, Peddapalli district ... Petitioner/ Accused A N D The State represented by S.H.O., P.S. Manthani ¼Respondent/complainant PETITION FILED UNDER SECTION 439 OF Cr.P.C. OFFENCE UNDER SECTION 294 (b), 323, 506, 306 of IPC This petition is coming on before me on 11-12-2020 for hearing in the presence of Sri M.M. Baig, Advocate for the petitioner/accused and Addl. Public Prosecutor for State, upon perusing the material papers on record, upon hearing the arguments and having stood over for consideration to this day, this Court made the following :- :: O R D E R :: This is a bail petition filed under Section 439 Cr.P.C by the petitioner/accused in Crime No. 292/2020 of Manthani Police Station for the offence punishable under Sections 294(b), 323, 506, 306 of I.P.C for grant of bail. 2. The brief facts of the petition are as follows: That Police Station Manthani of Peddapalli District has registered a case in Crime No. 292 of 2020 dated 14-11-2020 u/sec. 2 294(b), 323, 506 IPC against the petitioner/accused basing on the complaint of Koravena Vishnuvardhan alleging that on 9-11-2020 at 1900 hours at Bhoolaxmi Gadde, Vilochavaram village the accused abused his father namely Koravena Balaiah in filthy language, beat him with his hands, kicked with legs and threatened with dire consequences to kill him by keeping the previous enmity.
    [Show full text]
  • List Police Station Under the District (Comma Separated) Printable District
    Passport District Name DPHQ Name List of Pincode Under the District (Comma Separated) List Police Station Under the District (comma Separated) Printable District Saifabad, Ramgopalpet, Nampally, Abids , Begum Bazar , Narayanaguda, Chikkadpally, Musheerabad , Gandhi Nagar , Market, Marredpally, 500001, 500002, 500003, 500004, 500005, 500006, 500007, 500008, Trimulghery, Bollarum, Mahankali, Gopalapuram, Lallaguda, Chilkalguda, 500012, 500013, 500015, 500016, 500017, 500018, 500020, 500022, Bowenpally, Karkhana, Begumpet, Tukaramgate, Sulthan Bazar, 500023, 500024, 500025, 500026, 500027, 500028, 500029, 500030, Afzalgunj, Chaderghat, Malakpet, Saidabad, Amberpet, Kachiguda, 500031, 500033, 500034, 500035, 500036, 500038, 500039, 500040, Nallakunta, Osmania University, Golconda, Langarhouse, Asifnagar, Hyderabad Commissioner of Police, Hyderabad 500041, 500044, 500045, 500048, 500051, 500052, 500053, 500057, Hyderabad Tappachabutra, Habeebnagar, Kulsumpura, Mangalhat, Shahinayathgunj, 500058, 500059, 500060, 500061, 500062, 500063, 500064, 500065, Humayun Nagar, Panjagutta, Jubilee Hills, SR Nagar, Banjarahills, 500066, 500067, 500068, 500069, 500070, 500071, 500073, 500074, Charminar , Hussainialam, Kamatipura, Kalapather, Bahadurpura, 500076, 500077, 500079, 500080, 500082, 500085 ,500081, 500095, Chandrayangutta, Chatrinaka, Shalibanda, Falaknuma, Dabeerpura, 500011, 500096, 500009 Mirchowk, Reinbazar, Moghalpura, Santoshnagar, Madannapet , Bhavaninagar, Kanchanbagh 500005, 500008, 500018, 500019, 500030, 500032, 500033, 500046, Madhapur,
    [Show full text]
  • GODAVARI 8 INCLINE – 505 211 DISTRICT: KARIMNAGAR, TELANGANA STATE, INDIA E-Mail: Pd [email protected]; Telephone No: 08728 – 250028; Fax: 08728-250110 ______
    The Singareni Collieries Company Limited (A Government Company) Area Purchase Cell – RG.II AREA PO: GODAVARI 8 INCLINE – 505 211 DISTRICT: KARIMNAGAR, TELANGANA STATE, INDIA E-mail: [email protected]; Telephone No: 08728 – 250028; Fax: 08728-250110 _________________________________________________________________ EXTENSION - NOTICE INVITING TENDER Dear Sirs, Sub : Procurement of items required for Manriding System, Steel cord Belt and Belt Conveyors at VKP Mine and GDK-7LEP Mine, RG2. *** We shall be obliged if you kindly quote your lowest price for the subject material as per list attachment herewith. Enquiry Number : R2114O0223 Enquiry Date : 06.10.2014 Extended Last date for receipt of tender : 08.01.2015 Time: 12.00 NOON Extended Date of Opening tender : 08.01.2015 Time: 04.00 PM Type of Quotation : Three part Offer Validity : 120 days from the date of opening of tender 1. Only SCCL Registered Vendors are eligible to participate in the tender. Tenderers are requested to furnish their Vendor code in the offer without fail. 2. Tenderers are requested to submit their offers as indicated hereunder : Part A – Technical offer (in one cover) : 1. Technical parameters of the equipment. 2. The machinery installed by the manufacturers. 3. Technical Competence of the manufacturers. 4. Order Copies for supplies made to reputed concerns or Govt. Undertakings. 5. Performance reports if any. 6. NSIC or SSI, ISO certificates along with other documents drawings & Specifications. 7. Guarantee / Warranty. 8. Service support, Spares Depot. Part B – Commercial terms (in one cover) : 1. Validity, delivery period, applicability of taxes and duties, LD Penalty, warranty/guarantee. 2. Specimen copy of Part C without prices.
    [Show full text]
  • Tank, Temple and Town Policy - Construction of Water Tanks (Water Conservation Structures) Resulting in Prosperity of Towns
    Component-I (A) – Personal details: Prof. P. Bhaskar Reddy Sri Venkateswara University, Tirupati. Dr. Ravi Korisettar, UGC Emeritus Fellow Karnatak University, Dharwad. Onkar Tendulkar Virasat E Hind Foundation. Bombay. Dr. Ravi Korisettar Karnatak University, Dharwad. 1 Component-I (B) – Description of module: Subject Name Indian Culture Paper Name Art and Architecture of India Module Name/Title Art and Architecture under Kakatiya dynasty Module Id IC / AAI / 01 Pre requisites Understanding the evolution and salient features of Objectives Kakatiya Dynasty art and architecture Dravida School of temple architecture, Warangal, Keywords Ramappa temple, Hanamkonda, Telangana E-text (Quadrant-I) : 1. Introduction Kakatiyas- an indigenous Telugu dynasty ruled over the Andhradesa consisting of modern states of Telangana and Andhra Pradesh from 10th century AD to the first quarter of 14th century AD. The name ‘Kakatiya’ is derived from goddess Kakati- a mother goddess Durga, venerated by the dynasty. Gunadya Rashtrakuta was the first known personality of the Kakatiya clan. He was the commander of the Rashtrakuta Krishna II who died in the battlefield while fighting with the Eastern Chalukyas. King Krishna II, very pleased with Gundaya’s loyal service towards him, rewarded Ereya, Gunadya’s son with the governorship of the Korivi region. Kakatiyas were the feudatories of Rashtrakuta kings upto 10th century AD after which they were overthrown by the Kalyana Chalukyas. Kakatiyas then became the feudatories or samanthas of Kalyana Chalukyans. The Kakatiya rulers Beta I (AD 996–1051), Prola I (AD 1052–1076), Beta II (AD 1076–1108), Durgaraja (AD 1108–1116) and Prola II (AD 1116– 1157) served the Kalyana Chalukyas until the collapse of Chalukya empire during Tailapa III’s reign.
    [Show full text]
  • Indian Archaeology 1959-60 a Review
    INDIAN ARCHAEOLOGY 1959-60 —A REVIEW EDITED BY A. GHOSH Director General of Archaeology in India PUBLISHED BY THE DIRECTOR GENERAL ARCHAEOLOGY SURVEY OF INDIA JANPATH, NEW DELHI 1996 First edition 1960 Reprint 1996 1996 ARCHAEOLOGICAL SURVEY OF INDIA GOVERNMENT OF INDIA Price :Rs. 320.00 PRINTED AT BENGAL OFFSET WORKS, 335, KHAJOOR RAOD, NEW DELHI – 110005 ACKNOWLEDGEMENTS The present number of Indian Archaeology—A Review incorporates, as did the previous numbers, all the available information on the varied activities in the field of archaeology in the country during the preceding official year. My grateful thanks are due to all—heads of the archaeological organizations in States and Universities, of Museums and of Research Institutes, my colleagues in the Union Department of Archaeology and a few individuals—who supplied the material embodied in the following pages. I also thank those colleagues of mine who helped me in editing the Review and in seeing it through the press. Considerations of space and others factors do not always permit the printing of the reports in the form in which they are received. All care has been taken to see that the essential facts and views contained in these reports are not affected in the process of abridging, and in some cases rewriting, them; this ensures that the responsibility for the facts and their interpretation remains with those who supplied them. Nevertheless, editorial slips may have crept in here and there in spite of my endeavours to avoid them. For such slips I express my regret. New Delhi : The 11th October 1960 A.
    [Show full text]
  • Page 1 of 32 MINUTES of the ENVIRONMENTAL PUBLIC
    MINUTES OF THE ENVIRONMENTAL PUBLIC HEARING HELD ON 06.08.2014 AT 11.00 A.M. IN THE PREMISES OF GODAVARIKHANI-8 INCLINE (MINES RESCUE STATION), RG - II AREA, GODAVARIKHANI, KARIMNAGAR DISTRICT FOR THE PROPOSED RAMAGUNDAM OPENCAST-III EXPANSION PHASE-II COAL MINING PROJECT OF THE SINGARENI COLLIERIES COMPANY LIMITED, RAMAGUNDAM - II AREA, KARIMNAGAR DISTRICT THE FOLLOWING PANEL MEMBERS, REPRESENTATIVES OF THE PUBLIC AND INDUSTRY WERE PRESENT: A. PANEL MEMBERS Sl. No. Name of the Panel Member 1) Shri T.Nambaiah. Addl. Joint Collector & Addl. Dist. Chairman, Magistrate, Karimnagar (Nominated by District Collector) 2) Shri S. Shankar Naik, Environmental Engineer, Member. Telangana Pollution Control Board, Regional Office, Ramagundam B. OTHER DISTRICT OFFICICALS/REPRESENTATIVES OF THE PUBLIC PRESENT Sl. No. Name & Designation 1) Shri. P.Srinivasa Reddy Revenue Divisional Officer, Manthani, Karimnagar Dist. 2) Shri. PuttaMadhuker, Hon’ble MLA, Manthani Constituency, Karimnager, District 3) Shri. Somarapu Satyanarayana, Hon’ble MLA, Ramagundam Constituency, Karimnagar District 4) Shri. B.Venkat Rao, Hon’ble MLC C. REPRESENTATIVES OF THE INDUSTRY Sl. No. Name & Designation 1) Shri Sd. M. Subhani, General Manager, RG - II Area 2) Shri M. Vasanth Kumar, General Manager (Environment) 3) Shri. Antony Raja, General Manager, Estates 4) Shri. K.Ravinder, Project Officer, RG OC-III Expansion Phase-II 5) Shri. T.Srinivasa Rao, Project Officer, RG OC-III Expansion Phase-I 6) Shri P. Sharath Kumar, Addl. Manager(Env), Corporate Shri K. Raghu Kumar, SE (Env), Corporate 7) Page 1 of 32 8) Shri P. Raja Reddy, SE(Env), RG-II Area II. ABOUT 1000 PEOPLE ATTENDED THE PUBLIC HEARING FROM THE SURROUNDING VILLAGES.
    [Show full text]
  • Government of Andhra Pradesh
    TELANGANA STATE INFORMATION COMMISSION (Under Right to Information Act, 2005) Samachara Hakku Bhavan, D.No.5-4-399, ‘4’ Storied Commercial Complex, Housing Board Building, Mojam Jahi Market, Hyderabad – 500 001. Phone Nos: 040-24740107 (o); 040-24740592(f) Complaint No. 33111/CIC/2016 Dated: 29-01-2018 Complainant : Smt :M. Radhamma, Karimnagar District. Respondent : The Public: Information Officer (U/RTI Act, 2005) / O/o The Tahsildar, Manthani Mandal, Karimnagar-505184. O R D E R 1. Smt M. Radhamma, Karimnagar District has filed a Complaint dated Nil which was received by this Commission on 15-10-2016 for not getting the information sought by her from the PIO / O/o The Tahsildar, Manthani Mandal, Karimnagar-505184. 2. The brief facts of the case as per the Complaint and other records received along with it are that the Complainant herein filed an application dated 25-07-2016 before the PIO requesting to furnish the information under Sec.6(1) of the RTI Act, 2005, on the following points mentioned in her application annexed. 3. The Public Information Officer has not furnished the information to the Complainant. 4. As the Complainant did not receive the required information from the PIO even after 30 days of filing her application, she preferred this Complaint before the Commission requesting to arrange to furnish the information sought by her u/s 18(1) of the RTI Act, 2005. The Complaint was taken on file and notices were issued to both the parties for hearing on 29-01-2018. The case is called on 29-01-2018.
    [Show full text]
  • Crl MP No 256 of 2020 in Crime No 82 of 2020 Kamanpur
    1 IN THE COURT OF THE Spl. SESSIONS JUDGE FOR ATROCITIES AGAINST WOMEN -cum- VII ADDL. DISTRICT AND SESSIONS JUDGE, KARIMNAGAR PRESENT:SMT. D. MADHAVI KRISHNA, IV Additional Sessions Judge, Karimnagar. FAC: VII Addl. Sessions Judge, Karimnagar TUESDAY, the 18 th day of AUGUST, 2020 CRIMINAL MISCELLANEOUS PETITION No. 256/2020 IN CRIME NO. 82 of 2020 OF Kamanpur P.S Between: 1. Merugu Srikanth, S/o.Machaiah, Aged:24 years, Padmashali, Occ: Motor Winding, R/o. H.No.3-59/2, Sabbitham village, Peddapalli Mandal. 2. Merugu Srinivas, S/o. Machaiah, Aged:26 years, Padmashali, Occ: Sub Station Operator, Kataram, R/o. H.No.3-59/2, Sabbitham village, Peddapalli Mandal. 3. Midivelli Raghu, S/o. Shankaraiah, Aged:28 years, Munnurukapu, Occ: Builder, R/o. H.No.2-60/2, Rompikunta village, Kamanpur mandal. ….Petitioner/A1 to A3. And The state through the S.H.O, P.S, Kamanpur. ….Respondent/Complainant. PETITION FILED UNDER SECTION 439 OF CR.P.C. This petition is coming before me today for hearing in the presence of Sri E. Madhusudhan Rao, Advocate for the Petitioners/A1 to A3 and the learned Additional Public Prosecutor for the State, upon consideration of the material on record, having been heard and stood over for consideration to this day, the Court made the following: :: O R D E R :: This petition is filed by the Petitioners/accused no.1 to 3 under Section 439 of Cr.P.C., in Crime No. 82 of 2020 of Kamanpur P.S., for the offences punishable under Sections 376(2)(n), 417, 420, 354(A) (ii) and 505 (i) of IPC for grant of bail to them.
    [Show full text]
  • SCCL, GDK 5 Janagaon, Vithalnagar
    Annexure-1A F.No.23-78/2018-IA-III (V) Government of India Ministry of Environment Forest and Climate Change Impact Assessment Division **** Indira Paryavaran Bhavan, Jor Bagh Road, New Delhi-I I 0 003 Email: [email protected] Tel: 0 I I -2469530 I Dated: 13111 November, 2020 To, The Director (Planning & Projects) M/s The Singareni Collieries Company Ltd (SCCL), Kothagudam Collieries (PO) Bhadradri- 507101 (Telangana) Email: [email protected] Sub: Cluster of Godavarikhaui No. 1&3 Inclines (0.486 MTPA in 541.66 ha), Godavarikhani No. 2&2A Inclines (0.648 MTPA in 282.76 h;t) and Godavarikhani No.5 Incline (0.6 MTPA in 532.43 Ita) with overall production capacity of 1.734 MTPA in total mine lease area of 1356.85 Ita by M/s Singareui Collieries Company Ltd. located in villages Janagaon, Musthyala, Jallaram, Sundilla, Mandai Ramagundam, District Peddapalli (Telangana)- For Environmental Clearance- reg. Sir, This has reference to your online proposal No. F.No.23-78/2018-IAIII(V) dated 19111 December, 2019 for grant of Environmental Clearance to the above project. 2. The Ministry of Environment, Forest and Climate Change has considered the application. It is noted that the proposal is for grant of Environmental Clearance to the project Cluster of Godavarikhani No. 1&3 Inclines (0.486 MTPA in 541.66 ha), Godavarikhani No. 2&2A Inclines (0.648 MTPA in 282.76 ha) and Godavarikhani No.5 Incline (0.6 MTPA in 532.43 ha) with overall production capacity of 1.734 MTPA in total mine lease area of 1356.85 ha of M/s Singareni Collieries Company Ltd.
    [Show full text]
  • TELANGANA STATE INFORMATION COMMISSION (Under Right To
    TELANGANA STATE INFORMATION COMMISSION (Under Right to Information Act, 2005) Samachara Hakku Bhavan, D.No.5-4-399, ‘4’ Storied Commercial Complex, Housing Board Building, Mojam Jahi Market, Hyderabad – 500 001. Phone Nos: 040-24743399 (O); 040-24740592(F) Appeal No.11318 & 11319/SIC-BM-1/2019, Order dated:02-03-2020 Appellant : Sri E. Sadanandam, S/o Rayamallu, H.No. 4-177, Gunjapadugu Village, Manthani Mandal, Peddappali District-505184. Respondents : The Public Information Officer (U/RTI Act,2005) / The Mandal Educational Officer, Manthani Mandal, Peddapalli District- 505184. : The First Appellate Authority (U/RTI Act, 2005) / O/o the District Educational Officer, Peddapalli District, Peddapalli-505172. ORDER Sri E. Sadanandam has filed 2nd appeal dated 25-09-2019 which was received by this Commission on 25-09-2019 for not getting the information sought by him from the Public Information Officer/ The Mandal Educational Officer, Manthani Mandal, Peddapalli District and the First Appellate Authority/ the District Educational Officer, Peddapalli District. The brief facts of the case as per the appeal and other records received along with it are that the appellant herein filed an application dated 24-06-2019 before the Public Information Officer requesting to furnish the information under Sec. 6(1) of the RTI Act, 2005TSIC on the following points mentioned: Stating that the appellant did not get any response from the Public Information Officer, he filed 1st appeal dated 22-07-2019 before the First Appellate Authority requesting him to furnish the information sought by him u/s 19(1) of the RTI Act, 2005. Stating that the appellant did not get any response from the First Appellate Authority, he preferred this 2nd appeal before this Commission requesting to arrange to furnish the information sought by him u/s 19(3) of the RTI Act, 2005.
    [Show full text]