Adriyala Shaft Project
Total Page:16
File Type:pdf, Size:1020Kb
ADDENDUM TO EIA/EMP FOR THE PROPOSED ADRIYALA SHAFT PROJECT (One time capacity expansion for 50% in the existing operations under the provisions of MoEF Office Memorandum J-11015/30/2004.IA.II (M), dated 07.01.2014) DEPARTMENT OF ENVIRONMENT (QCI / NABET Accredited EIA Consultant Organization) THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company) KOTHAGUDEM COLLIERIES – 507 101 TELANGANA STATE OCTOBER 2014 1 PRE FEASIBILITY REPORT OF ADRIYAL SHAFT PROJECT. 1. Executive Summary: 1. Name of the Mine : Adriyala Shaft Project 2. Geological Block : Shaft Block II & III of Ramagundam coal belt 3. Name of the Coal Field : Godavari Valley Coal Field 4. Location Village : Adriyala village Revenue Mandal : Manthani Mandal District : Karimnagar State : Telangana Latitude : North : 18039'03" to 180'40'34" 0 0 Longitude East : 79 34'28" to 79 35'55" N Survey of India Topo sheet 56 10 5. Name of the Organization : Singareni Collieries Company Limited. Non- Forest Land Diverted forest 6. SCCL acquired land (Ha) : 300.60 39.40 7. Mine Take area ( Ha) : 340.00Ha 8. Geological Reserves (MT) : 109.594 9. Extractable reserves(MT) 43.3823 Balance extractable reserves (MT) 10. 41.84 (As on 1-4-2014) Borehole Density ( Bore Holes per 11. : 12.65 Sq.Km) 12. Seams Present : 1A,I,II,IIIB,IIIA,III,IV 13. Seams Assessed : 1A,I,II,IIIB,IIIA,III,IV 14. Workable seams : I,II,III,IV 15. Gradient of Seams : 1 in 6 to 1 in 7.8 Thickness (m) Seam Min Max. Working thickness 0.25 2.81 Not considered for 1A mining I 4.01 7.81 3.5 II 1.20 4.23 3.0 16. Thickness of Seams : 0.30 2.50 Not considered for IIIB mining 0.35 2.05 Not considered for IIIA mining 6.47 11.27 3.5 Top III 3.5 Bottom IV 1.65 4.23 3.5 17. Depth of working seams (m) : Seam Min Max 2 I Seam 293.95 528.93 II Seam 319.68 555.06 IIISeam 394.20 625.00 IV Seam 406.24 644.00 I seam - G9 II Seam - G9 18. Average Grade of Working seams : III Seam(Top) - G7 III Seam(Bot) - G7 IV seam - G5 Road Headers, Continuous Miner and two sets of Present Technology : Longwall. 19. Road Headers and High capacity Longwall Proposed Technology Equipment. 20. Present Capacity (MTPA) : 2.144 21. Proposed Capacity ( MTPA) : 3.14 Life of the Project : Prodn. Capacity Life 22. At present capacity : 2.144 31 At proposed capacity : 3.14 22 23. Manpower Requirement : 836 Yes. 750 PDFs are involved and Rs136.25 Crores are envisaged. The R&R is taken up under RG 24. R & R involved : OC-II expansion project as the external OB dumps of the project are planned over this land. 25. Capital Requirement : Rs 779.26 Crores 26. Constraints : Nil 2. Introduction of the project / Background information: (i) Identification of project and project proponent: Background: There is a need to enhance power generation in the country from the present level of 148,000 MW to 380,000 MW by the year 2030 to achieve an economic growth rate of 8% to 9%. The major share of growth in power generation is through thermal i.e., coal based. Hence country’s coal requirement will have to be enhanced to 1300 MT. To compensate the decrease in production from the closing mines and to meet the demand of coal in this region, the project proponent, Singareni Collieries Company Limited (SCCL), a Government Company is planning to open new mines in the new blocks. Adriyala Shaft Project was started in the year 2008. Environmental clearance was obtained for Adriyala Shaft Project for a production capacity of 2.144 MTPA vide letter No. J- 11016/258/2004-IA. II(M) dated 11-10-2004. In Feasibility report it is envisaged to deploy two Longwall units in this project. Due to drastic development in Longwall technology worldwide, it is proposed to deploy one high capacity Longwall unit instead of two and to produce 3.14 MTPA from the same mine. Identification of the project: Adriyala Shaft Project is an underground mine located in Adriyalla Project area(APA) of SCCL. Rated production capacity of the project is 2.144 MTPA. The grade of the coal varies from G5 to G9 over the life of the project. 3 Project Proponent: The Singareni Collieries Company Limited (SCCL) has been exploiting coal for more than 122 years in the 350 km stretch of Pranahita Godavari Valley Coal Field spread in four districts of Telangana viz. Adilabad, Karimnagar, Warangal and Khammam with man power of 62805 and is the second largest public sector under taking in the state. It is the only coal mining company in South India catering the needs of coal based industries in the region. SCCL is currently operating 16 open cast projects and 32 underground mines and has achieved coal production of 50.47 MT in the year 2013-14 and target for the year 2014-15is 55.00 MT. Address of Project Proponent: Project Officer Adriyala Longwall Project P.O 8 incline colony Karimnagar dist Telangana PIN 505211 Email [email protected] Fax No 08728-259843 Address of Owner: Director (Operations) The Singareni Collieries Company Limited Po:Kothagudem, PIN. 507 101 Dist: Khammam, Telangana E-Mail id: [email protected] Ph.No. 08744 - 242602; Fax No. 08744 - 242305 Details of the Mining Lease: The entire project area is covered in Pandullapalli Mining Lease valid upto 18-7-2021 and South Godavari Mining Lease Valid upto:31.12.2014 (ii) Brief description of nature of the project: Adriyal Shaft Project is an underground coal mine producing G-5 to G-9 grade coal with a capacity of 2.144 MTPA. Present proposal envisaged for expansion project: The project was granted environment clearance for a production capacity of 2.144 MTPA with two Longwall sets and 150m face length. Keeping in view of the changes in Longwall Technology globally, SCCL has decided to deploy high capacity Longwall Technology which is capable of producing more than 3.0 MTPA in the same minetake area by redesigning the Longwall face length with 250m. Hence it is proposed to increase the production capacity of the mine from 2.144 MTPA to 3.14 MTPA and to obtain environmental clearance for this production capacity under MoEF memorandum J-11015/30/2004-IA- II(M) dated 7/1/2014. 4 The following is the state of art equipment configuration of the proposed Longwall equipment. i) SL ii) Description iii) Technical details NO iv) CHOCK SHIELDS v) 1 vi) Support capacity vii) 1152 Tonnes (2 legged DTDA version) viii) 2 ix) Support Density x) 120 Tonnes per Sq.Mt (before cut xi) 104 Tonnes (after cut) xii) 3 xiii) Operating xiv) 2.8 to 3.6 m Range xv) 4 xvi) Support width xvii) 1.75 m xviii) 5 xix) Rapid Yielding xx) Gas operated rapid yielding valves of 1500 lpm and rock burst valve (DN 40 U) of flow rate of about 6000 lpm for each leg. xxi) 6 xxii) Controls xxiii) Batch controls of 5 to 10 + SIRSA for advancing the supports as per the movement of shearer automatically. xxiv) SHEARER xxv) 7 xxvi) Make xxvii) BUCYRUS DBT xxviii) 8 xxix) Type / Model xxx) EL 3000 xxxi) 9 xxxii) Haulage xxxiii) Jumbo track 2000 System-Track xxxiv) 10 xxxv) Electrical xxxvi) i). 2 X 860 KW for cutter drums motors xxxvii) ii). 2 X 125 KW for haulage xxxviii) iii). 200 KW for in built crusher xxxix) iv). 1 X 75 KW for hydraulics xl) 11 xli) Cutting height xlii) 2.8 m to 3.6 m xliii) 12 xliv) Operating xlv) 3.3 KV, 3-Phase, 50 Cycles voltage xlvi) 13 xlvii) Cutting capacity xlviii) 3000 TPH (while travelling up the hill at a gradient of 1 in 4 (about 14 dgrees) xlix) AFC l) 14 li) Face length lii) 260m long face + 10.5m spare liii) 15 liv) Capacity lv) 3X855 KW, 3.3 KV, 3-Phase, 50 Cycles, 1142 mm wide, high wear-resistant, PF6 Deck plate with minimum thickness of 30+25mm, 48X144/160 mm twin inboard chain of suitable speed and a minimum capacity to convey of 3100 TPH. lvi) BSL lvii) 16 lviii) Length lix) 29.5m with suitable overlap system lx) 17 lxi) Capacity lxii) 400KW, 3.3 KV, 3-Phase, 50Cycles/ sec. 1342mm lxiii) wide, high wear resistant, PF6 Deck plate with lxiv) minimum thickness of 30+25mm, 42X146mm twin lxv) in board chain, 2.06 m/sec speed, and a minimum lxvi) capacity to convey of 3200 TPH 5 The Adriyala Shaft Project is demarcated within the following boundaries: 1 North Proved fault F4-F4 2 South Straightened Bokkala vagu 3 East Dip side proved limit i.e. 670m depth of IV seam 4 West Existing GDK10/ GDK10A dip side boundary The total area of the project is 3.4 km2 covering 2.75 Km in strike direction and 1.25 Km in dip direction. Long wall technologiy is deployed in this mine. Trunk roadways of GDK10A incline are utilized for transport of coal and material. Details of Entries SL NO Mine Shafts Inclines Existing propo /section sed 1 GDK10A 1 2 Return air shaft (6.0m dia, 38m depth) Inclines for Men and Material transport Manway incline 418m length,4.2mX3.0m Main Incline 461m Length, 4.2mX3.0m. 2 Adriyala 2 - Return air shaft (7.5m dia, 468m depth) Intake air shaft (7.5 dia, 470m depth) (iii) Need for the project and its importance to the country and or region: Coal is the most important and abundant fossil fuel in India.