Campus Masterplan Phase One 1. Graphene 3. The National 4. Simon 6. AV Hill 7. Biomedical 17. Engineering Graphene Innovation Building Building Research Cancer Institute Project cost: £12m Project cost: £3m Building Research Centre Project cost: £61m Completion date: Completed 1. Graphene Engineering 7. Biomedical Research 13. Samuel Alexander and Centre Project cost: £24m Completion date: 2015 2015/16 Project cost: £38m Innovation Centre Building Mansfield Cooper Buildings Project cost: £60m Completion date: 2018 Completion date: 2015 Completion date: 2017 Project cost: £60m Project cost: £21m Project cost: £14m Completion date: 2017 Completion date: 2018 Completion date: 2016 The Graphene Engineering Innovation Centre (GEIC) A dedicated research building adjacent to the Significant investment in the Samuel Alexander and will be critical in the development of commercial to meet the need for this type of Mansfield Cooper buildings will see major applications and in maintaining the UK’s world- accommodation in attracting world-class researchers remodelling of office and teaching space for the leading position in graphene and related 2D to the University. School of Arts, Languages and Cultures and the materials. It will be built on the site of the Faraday creation of breakout areas where students can mix undergraduate block which is to be demolished. and carry out group work. 5. Quad 8. Vaughan House 11. Brunswick St 8. Vaughan Refurbishment Conservation 2. Manchester Engineering 14. Students’ Union Project Public Realm House Project cost: £2.4m Project cost: £3m Campus Development Completed Project cost: £3m Project cost: £11.3m Refurbishment Completion date: 2018 Completion date: 2015 Project cost: £300m The project comprises a full refurbishment of the Completion date: 2016 Project cost: £2.4m Completion date: 2019-2020 Grade II Listed Vaughan House, the former presbytery In addition to around £1m being invested in Completed A significant part of the Estates Strategy is to relocate of the Holy Name Church. The refurbishment refurbishing existing accommodation over a three- all academic accommodation from the North provides a for the Manchester based hub of the year period, the building will be extended to provide Campus to the South, so we need to create the Health eResearch Centre for the North of England. much-needed additional accommodation for staff Manchester Engineering Campus Development near The accommodation comprises a high quality dry moving from the North Campus Students’ Union. Oxford Road. This will incorporate a teaching block. research space with supporting accommodation including, a teaching and education facility, break out lounges, offices, and meeting rooms. 15. Whitworth Art Gallery 2. Manchester 3. The National Project cost: £17m Completion date: February 2015 Engineering Graphene Institute 9. Manchester This new development, partly funded by the Campus Project cost: £61m Business School Heritage Lottery Fund, has extensively refurbished Completion date: 2015 the existing gallery and re-connected the 19th Development Project cost: £54m century building with through an Project cost: £300m The National Graphene Institute will provide a state- Completion date: 2018 of-the-art research facility which builds upon the elegant contemporary extension. Two new wings will Completion date: 2019-2020 Public highly acclaimed work of Nobel Laureates Professor The exciting Manchester Business School embrace the park, creating an art garden between, Sir Andre Geim and Professor Sir Kostya Novoselov Redevelopment Project will create a new hotel, housing a landscape gallery, a café in the trees, a Realm 1 Executive Education Centre and redeveloped School of The . study centre and learning studio. Exhibition galleries Brunswick buildings to enable MBS to co-locate on one side of will be restored, a collections access zone created Street Oxford Road in the strategically important Oxford and the original 19th century grand hall will be 4. Simon Building Road Corridor. reinstated to public use. Fallowfield Project cost: £12m Proposed student Completion date: 2015/16 10. The University of 16. Jodrell Bank, Cheshire residences development The Simon Building has seen recent investment in a Project cost: £175m new Computer Cluster, a new shared services facility Manchester Library Project cost: £14m for Human Resources and conversion of the Project cost: £33m Completion date: 2018 basements into new lecture theatres. This Completion date: 2019 Following investment into a new home for the Single investment will continue with a £12m programme of The Library will be significantly remodelled and Kilometre Array Project, the University’s investment long-term maintenance works and the creation of refurbished to relocate the Joule Library from the will continue with a number of key projects. We will additional teaching spaces. North Campus, and provide enhanced and modern embark on a programme of maintenance and repair library facilities. This project will span Phases One works to the Lovell Telescope, remove redundant and Two of the Campus Masterplan. structures and buildings around the site and 9. Manchester 5. Quad Conservation significantly refurbish the telescope control building. Project Business School 11. Brunswick St Project cost: £54m Project cost: £11.3m 17. Manchester Cancer Completion date: 2018 Completion date: 2016 Project cost: £3m Completion date: 2015 Research Centre Conservation of the quad buildings including John Owens, Christie, Beyer and the Manchester This project will see the closure of Brunswick St to Project cost: £38m Museum. Upgrading the single glazed windows to mainstream traffic and transformed into a Public Completion date: 2015 incorporate double glazing will assist in reducing the Realm area seeing the surrounding buildings whilst This new development, partly funded by Cancer carbon emissions associated with heating the providing a gateway into the University from Research UK and The Christie NHS Foundation Trust, building and improve comfort. neighbouring Ardwick. will provide state-of-the-art facilities for the expansion of cancer research activities; accommodating scientists alongside clinical trials 6. AV Hill Building 12. Coupland 3 support staff. The integrated partnership approach is (including Burlington Rooms/ essential to turn research findings in the laboratory Project cost: £3m into better treatments for cancer patients. Completed Schunck Building) When originally built the AV Hill Building included Project cost: £33m some shell accommodation for future use. This Completion date: 2016 project, together with other internal remodelling Coupland 3 is a listed building located on the Rear 15. Whitworth works, fits out this space to provide much-needed Quadrangle of the University’s cluster of historic laboratory, write up and office accommodation. 12. Coupland 3 Art Gallery buildings. It was the original home of the School of 16. Jodrell Bank, Project cost: £17m Medicine and large parts of the building have been (including Burlington 10. The University Completion date: 2015 vacant for some time. The building will be the new Cheshire of Manchester home for the School of Law, the Directorate of the Project cost: £14m Rooms/ Schunck 13. Samuel Alexander and 14. Students’ Student Experience, Faculty of Humanities Completion date: 2018 Building) Library Mansfield Cooper Buildings Union Administration and the Post Graduate Hub. Project cost: £33m Project cost: £33m Project cost: £14m Project cost: £3m Completion date: 2016 Completion date: 2019 Completion date: 2016 Completion date: 2018