Approximate No Land plot location Possible ways of use Infrastructure area, ha Baranovichi town 1 Badaka str. 0.8 construction of operation three cable power lines (along the Badaka street), support facilities at an medium pressure gas pipeline ø219 mm, water industrial enterprise of the pipeline ø100 mm and ø200 mm, sanitary sewer fourth class (by sanitary system ø500 mm, distance to the Badaka street classification) is about 160 m 2 Badaka str. 0.8 construction of operation three cable power lines (along the Badaka street), support facilities at an medium pressure gas pipeline ø219 mm, water industrial enterprise of the pipeline ø100 mm and ø200 mm, sanitary sewer fourth class (by sanitary system ø500 mm, distance to the Badaka street classification) is about 100 m 3 Badaka str. 0.8 construction of operation three cable power lines (along the Badaka street), support facilities at an medium pressure gas pipeline ø219 mm, water industrial enterprise of the pipeline ø100 mm and ø200 mm, sanitary sewer fourth class (by sanitary system ø500 mm, distance to the Badaka street classification) is about 50 m 4 Badaka str. 0.8 construction of operation three cable power lines (along the Badaka street), support facilities at an medium pressure gas pipeline ø219 mm, water industrial enterprise of the pipeline ø100 mm and ø200 mm, sanitary sewer fifth class (by sanitary system ø500 mm, driveway classification) 5 Badaka str. 0.8 construction of operation three cable power lines (along the Badaka street), support facilities at an medium pressure gas pipeline ø219 mm, water industrial enterprise of the pipeline ø100 mm and ø200 mm, sanitary sewer fourth class (by sanitary system ø500 mm, distance to the Badaka street classification) is about 200 m 6 Badaka str. 2.4 construction of operation three cable power lines (along the Badaka street), support facilities at an medium pressure gas pipeline ø219 mm, water industrial enterprise of the pipeline ø100 mm and ø200 mm, sanitary sewer fourth class (by sanitary system ø500 mm, distance to the Badaka street classification) is about 150 m; there is a railway to the west of the plot, construction of new approach lines is possible

7 Vostochniy poselok str. 1.3 construction of a machine power transmission line; water pipeline ø200 mm building plant and high pressure gas pipeline ø500 mm (along the Frolenkova street); water pipeline ø500 mm (along the Kabushkina str.); driveway by the current road network, construciton of a driveway to the Churilina str. 450 m in length is possible

8 Slonimskoe Shosse str. 10 construction of operation official water pipeline ø300 mm - 400 m away; support facilities at an high pressure gas pipeline ø425 mm - 1000 m industrial enterprise of the away; driveway by the current road network; there fourth class (by sanitary is a railway to the south-east classification) 9 Voikova, Smolenskaya 1.9 construction of a sports electricity line; water pipeline ø150 mm (along the and Sverdlova streets and recreation center Voikova str.), water pipeline ø200 mm (along the (current low-rise Baranova str.), water pipeline ø150 mm and ø400 accommodations and mm (along the Smolenskaya str.), water pipeline administrative buildings are ø100 mm (along the Timiriazeva str.); sewer subject to removal; planting system ø1000 mm and ø500 mm (along the area is not less than 25% Baranova str.), medium pressure gas pipeline of the territory) ø300 mm; driveway 10 Voikova, Timiryazeva and 2.5 construction of a there is an electricity line (Voikova and Sverdlova Sverdlova streets multifunctional entertaining streets), 3 power lines on the plot; water pipeline center (current low-rise ø150 mm (along Voikova str.), water pipelines accommodations and ø150 mm and ø400 mm (along the Smolenskaya administrative buildings are str.), water pipeline ø100 mm (along the subject to removal; planting Timiriazeva str.); sewer system ø1000 mm and area is not less than 25% ø500 mm (along the Baranova str.); low pressure of the territory) gas pipeline ø114 mm (along the Timiriazeva str.); driveway 11 Sovetskiy ave. 0.5 culture and entertainment sewer system ø300 mm and water pipelines ø800 center (number of stories - mm (along the Sovetskogo ave.), low pressure up to 3, planting area is not gas pipeline ø108 mm at a distance of 200 m; less than 25%) cabel power line - eastern side of the plot, driveway 12 Sovetskiy ave. 1.5 (building construction of a sewer system ø200 mm, water pipeline ø20 mm, line is to be 5 multifunctional building for low pressure gas pipeline ø50 mm and ø114 mm; m from the red a business center (current low pressure (ø100 mm) and medium pressure line of low-rise accommodations (ø500) mm gas pipelines (along the Shevchenko Sovetskogo are subject to removal) str.); driveway ave.) 13 Sovetskiy ave. 1.15 (1 of construction of a hotel electricity line and low pressure gas pipeline ø114 which - for site complex (current low-rise mm (along the Dubrovskogo lane); driveway development) accommodations are subject to removal) 14 Sovetskaja, Mitskevicha 0.65 construction of a multi- electricity lines and low pressure gas pipeline and Gagarina streets purpose complex (hotel ø100 mm; low pressure gas pipelines ø89 mm complex, apartment house, (along the Gagarina str.); pipeline ø150 mm administrative and retail (along the Sovetskaya, gagarina and Mitskevicha facilities (low-value houses streets); sewer system ø150 mm (along the are subject to removal, Mitskevicha str,), ø200 mm (along the Gagarina dwellers' resettlement as str.); driveway required by law, reconstruction of the infrastructure are to be accomplished) 15 Sovetskaya, Baranova, 2.1 construction of an elite electricity line (along the Pushkina str.); sewer Dzerzhinskogo and house of enhanced comfort system ø250 mm, water pipeline ø200 mm and Pushkina streets and with public service medium pressure gas pipeline ø250 mm (along facilities (current the Sovetskaya str.); water pipeline ø150 mm accommodations, car fleet (along the Baranova str.); driveway buildings and constructions are subject to removal)

16 Slonimskoe Shosse str. 5.0 construction of operation At a distance of about 20m is pressurized sewer support facilities at an ø200 (south-eastern side of the plot), a distance industrial enterprise of the of about 30m and 70m is heating main ø100 and fourth class (by sanitary plumbing ø150 (west side of the plot), along the classification) western side of the plot takes place 10 kV power network (100m - TA), a distance of about 110 m diameter water pipe network passes. Entrance to property provided by the existing street network ul.Slonimskoe highway

17 41, Francisk Skaryna str. 4 construction of operation Requirements: to install two cells 10 KV support facilities at an switchgear at substation 110 KV Zapadnaya, to industrial enterprise of the lay two CL-10 KV, to construct SPM (about 3.6 fourth class (by sanitary km); to pave the water network length (2 km) classification) along the designed Fr.Skaryna (from the water supply Ø200 in Professionalnaya str. to the water supply Ø150 in 295, Brestskaya str.); connection to the sewerage system OS, construction of CND, pressure and gravity sewers (1.4 km). Medium pressure gas pipeline Ø63 mm in 1st and 2nd Suburban lane, medium pressure gas pipeline Ø133 and 108 for boiler water treatment facilities 18 315, Brestskaya str. 7.1 construction of operation necessary to instole two cells 10 KV switchgear at support facilities at an substation 110 KV Zapadnaya, lay two CL-10 KV industrial enterprise of the and construct SPM (range about 3.6 km.). To fourth class (by sanitary pave the water network length of about 2 km classification) along the designed Francysk Skaryna (from the water supply Ø200 in Professionalnaya str. to the water supply Ø150 in 295, Brestskaya str.) is obliged. Range is about 2 km. Connection to the sewerage system OS, construction of CND, pressure and gravity sewers the length of 1.4 km is necessary. Medium pressure gas pipeline Ø63 mm in 1st and 2nd Suburban lane, medium pressure gas pipeline Ø159 on-site OPS-115

19 Fabrichnaya str. 6.7 construction of operation To negotiate a connection to the networks 10 kV support facilities at an 0.4 kV with RUE BCPA if from the power system industrial enterprise of the needed to make 2CL-10 kV from substation 110 fourth class (by sanitary kV KBC with the construction of the TA is obliged. classification) It is necessary to pave the section of the water network length of about 470 m of the water supply Ø200 in Gaevoy str. to the water supply Ø200 in Masherova Avenue (about 470 meters from land). To project and pave the area of sewerage system length of about 700 m from the site to the collector Ø200 in Gaeva str. is obliged. Medium pressure gas pipeline diam 159 mm (105 meters 20 Communisticheskaya str. 0.25 construction of the facility Therefrom the are land). water pipe with diameter 200 mm at a to provide services to the distance of 30m, household sewerage system population with diametr 200mm at a distance of 30m, medium pressure gas pipeline at a distance of 30m (connection to heating requiered) in Communisticheskaya str. There is heating main, to make the removal of two steel pipes with diametr from under the building footprint is obliged. 21 7, Zelenaja str. 0.37 construction of a building (2-Building of a 10/0.4 kW transformer substation is 4 storied hotel); plots are needed with laying of 10 kW cable lines & sudject to seizure in carrying out the electricity network from under the accordance with spot of construction. established order with the Low pressure (0.003 MPa) ø89 mm gas pipeline removal of individual goes along the plot, low pressure (0.003 MPa) appartments in 5 & 9 ø57 mm gas pipeline goes through the ploton. Zelenaja str. Not far from the plot there is a ø150 mm water line & a ø150 mm sewege line? which is in the the books of individual developer entity. The plot can be accessed by the existing driveway.

22 5А, Slonimskoye shosse 3,7 placement of a production the plot is divided into two parts: 2.6 ha and 1.1 str. site and warehouses of a ha logistics center

Brest town 23 at the intersection of up to 1.5 construction and connection to the operating utilities (gas, water Moskovskaya and maintenance of a group of and electricity supply, asphalt driveway) is Pionerskaya streets buildings for accomodation, possible retail and leisure, administrative and office purposes, and the use as a hotel 24 the quarter within the 3 construction and connection to the operating utilities (gas, water confines of Kizhevatova, maintenance of a group of and electricity supply, asphalt driveway) is Sportivnaya and buildings for accomodation, possible Respublikanskaya streets retail and leisure, administrative and office purposes, and the use as a hotel 25 the district within the up to 1 construction and connection to the operating utilities (gas, water confines of Masherova maintenance of a and electricity supply, asphalt driveway) is ave., 48, 50, Ostrovskogo multifunctional center possible and Sovetskaya streets

26 39, Dzerzhinskogo str.; 0.5 construction of a building connection to the operating utilities (gas, water 96,98,100,102/1, for administrative and retail and electricity supply, asphalt driveway) is Sovetskaya str. purposes, with possibility of possible developing residential accomodation 27 Lutskaya str. up to 1 construction and connection to the operating utilities (gas, water maintenance of a bathing and electricity supply, asphalt driveway) is center (Russian bath) possible 28 Gavrilova str. up to 2 reconstruction of the connection to the operating utilities (gas, water operating sports and and electricity supply, asphalt driveway) is recreation center (leisure possible component are to be constructed) 29 at the intersection of 6 сonstruction of the Gas supply: medium pressure gasmain (steel) Smirnova str. & the roadside service facilities Ø219 in Pisatel Smirnov str. (150 m) M1/E30 Highway and logistics center Water supplly (Ø500) and sewerage (Ø300) in Pisatel Smirnov str.

Electricity supply: construction of transformer substation and electricity mains 10 kV are required

Utilities networks subject to relocation from the construction footprint: KPUP Brestvodokanal: 10 kV 30 in the territory of the 2,70 construction and "Severny" water intake maintenance of a logistics center 31 Respubliki ave. up to 25 construction and - maintenance of a multifunctional facility 32 within streets Mitskevicha, 0,7175 construction and - Komsomolskaya, maintenance of an Sovetskaya and administrative and Pushkinskaya business center, retail and residential estate town 33 Zoi Kosmodemyanskoy 3.5 total reconstruction of a connection to the operating utilities (gas, water str. playground, construction of and electricity supply, sewerage, driveway to the a children entertainment plot) is possible center and public catering and commerce facilities

34 69, Zholtovskogo ave. 2.1 construction of a connection to the operating utilities (gas, water supermarket with an area and electricity supply, driveway to the plot) is of up to 5000 m2 possible 35 8, Korzha str. 0.14 construction of a connection to the operating utilities (gas, water multifunctional business and electricity supply, sewerage, driveway to the center with retail facilities plot) is possible and a hotel 36 within Chernyakhovskogo, 0.64 construction of a connection to the operating utilities (gas, water Zheleznodorozhnaya and multifunctional business and electricity supply, sewerage, driveway to the Medovaya streets center with retail facilities plot) is possible and a hotel 37 within Belova, Gorkogo 0.3 construction of a social and connection to the operating utilities (gas, water and Korzha streets business center with a and electricity supply, sewerage, driveway to the hotel plot) is possible 38 Korbouta str. 3 construction of a car park connection to the operating utilities (gas, water with a car service center and electricity supply, driveway to the plot) is and commerce facilities possible 39 Dostoevskogo str. 16.2 construction of a transport connection to the operating utilities (gas, water and logistics center and electricity supply, driveway to the plot) is possible 40 "Radouzhniy" building 0.2 construction of a connection to the operating utilities (gas, water estate multistorey car park with a and electricity supply, sewerage, driveway to the service station and plot) is possible commerce facilities; removal of the residential houses is intended 41 70, Pervomajskaya str. 0.4 construction and possibility of connection to existing engineering maintenance of a networks of gaz, water and power supply, multifunctional complex for driveway to the plot is possible through the trade, cultural, and operating road network entertainment use (without the right of allocation of gambling objects) 42 61, Pervomajskaya str. 0.75 construction and possibility of connection to existing engineering maintenance of a complex networks of gaz, water, power supply, driveway to for administrative, business the plot is possible through the operating road cultural and entertainment network use, incl. trade and service enterprises, public catering area (without the right of allocation of gambling business)

43 10, Lenin sq. 0.95 construction of a possibility of connection to existing engineering multifunctional shopping- networks, driveway to the plot is possible through household cultural complex the operating road network 44 Gorkogo str., Z. 0.54 construcrion of housing possibility of connection to existing engineering Cosmodemianskoy str., networks, driveway to the plot is possible through Lenin sq. the operating road network 45 Brestskaya str. 4 construction of housing possibility of connection to existing engineering networks, driveway to the plot is possible through the operating road network 46 60 let Octyabrya str. 32.12 accommodation of possibility of connection to existing engineering residential buildings networks, driveway to the plot is possible through the operating road network 47 Novoselov str. 0,84 construction and possibility of connection to existing engineering maintenance of an networks, driveway to the plot is possible through automobile center with the operating road network services 48 Brestskaya str. 0,54 construction and possibility of connection to existing engineering maintenance of a retail networks, driveway to the plot is possible through facility the operating road network 49 Velikoloukskiy village 0.32 a retail facility construction road, electricity transmission line, all the utilities council, Rusino agro-town, are in close proximity 7, Solnechniy lane Bereza district 50 located in the territory of 15 construction of a tourist power transmission line 0.4 kV at a distance of the state forestry camp 1.5 km to the north-west from the plot organisation "Ivatsevichi forestry", to the west from the lake Beloe 51 0.1 km to the east of 0.5 for construction of electricity line 10 kV, unsurfaced road Leplevka village operation support facilities 52 0.5 km to the north-east of 1 for construction of public electricity line 10 kV, unsurfaced road the township Domachevo and business facilities

53 1 km to the west from the 2 construction of a 3rd class asphalt motor road village Bolshye Kosichi roadside service facility

Gantsevichi district 54 Gantsevichi town, 0.4 manufacturing facility paved street, water supply, electricity and gas 65R, Matrosova str. supply

55 Gantsevichi town, 0.44 manufacturing facility paved street, water supply, electricity and gas 65C, Matrosova str. supply

56 Gantsevichi town, 0.2 manufacturing facility paved street, water supply, electricity and gas 8, Promyshlennaya str. supply

57 Gantsevichi town, 0.2 manufacturing facility paved street, water supply, electricity and gas 10, Promyshlennaya str. supply

58 Gantsevichi town, 0.2 manufacturing facility paved street, water supply, electricity and gas 12, Promyshlennaya str. supply

59 Gantsevichi town, 1.1 manufacturing facility paved street, water supply, electricity and gas 14, Promyshlennaya str. supply

Drogichin district 60 intersection of roads: 0.2 roadside service facility possibility of connection to power transmission border with Russia – line; asphalt driveway is available; proximity of Gomel – Kobrin (М10) and international and republican subordinance roads motor road Drogichin–Bereza (R84) 61 Drogichin town, 204, 3.15 industrial facility possibility of connection to power transmission Lenina str. (Republican line, water pipeline, gas pipeline, sewerage Unitary Enterprise "Ekzon- Glyukoza" area) 62 Nagornoe village, 1.1 industrial facility possibility of connection to power transmission Zheleznodorozhnaya str. line, water pipeline, gas pipeline, sewerage 63 Drogochin town, 9th of May 0.99 construction and possibility of connection to the operating utilities str. maintenance of a building (gas, heat, water and electricity supply, sewerage, for services provision and driveway to the plot) trade in non-food group of district goods 64 to the south of Dyatly 3.9 production facility asphalt motor road, electricity and gas village, Rakitnitskiy village council 65 to the west of Yezhyki 2.5 production facility gravel motor road, 1.5 km to the highway М- village, Leninskiy village 1/Е30, electricity supply council 66 Zhabinka town, 1.58 production facility paved street, railway, electricity supply and gas Korotkina str. 67 0.3 km to the west of 3.5 production facility gravel motor road, railway, electricity and gas Zhabinka town, along the supply road Zhabinka-Rachki 68 103, Kirova str. 0,208 retail facility with different gravel motor road, railway, electricity and gas range of goods supply, heat and water supply, sewerage Ivanovo district 69 Ivanovo town, Polevaya 2 for allocation of industrial connection to electricity and water supply is str. (adjoins the OJSC and service provision possible; adjoins the asphalt road "Belsolod" area) facilities Ivatsevichi district 70 Ivatsevichi town, 1 construction of a medium pressure gas pipeline (along the 1, Zagorodnaya str. manufacturing facility Zagorodnaya str.), water pipeline Ø160 mm (sanitary protection zone, (polyethylene); cabel and overhead power 50 m) transmission lines 10 kV (at a distance of 100 m); railway line adjoins the plot; driveway 71 Ivatsevichi town, 1.5 construction of a cabe power lines 10 kV, overhead power Zagorodnaya str. manufacturing facility transmission line 10 kV; medium pressure gas (sanitary protection zone, pipeline; water pipeline Ø160 mm (polyethylene); 50 m) water pipeline and sewerage of "Ivatsevichdrev" OJSC are located in close proximity; driveway 72 Ivatsevichi town, 1 construction of a cabel power line 10 kV, low and medium pressure Zavodskaya str. manufacturing facility gas pipeline, water pipeline Ø160 mm (sanitary protection zone, (polyethylene (along the Zagorodnaya str.); water 50 m) pipeline and sewerage of "Ekran" OJSC are located in close proximity; driveway 73 southeast outskirts of 5 construction of an industrial 500 m to the northeast of Dzerzhinskogo street; Kamenets town facility road, power transmission line 74 to the southwest of Melniki 8.4 agri-eco-tourist center 50 m; road, power transmission line village 75 to the northeast of 3 construction of an industrial 50 m; road, power transmission line Vysokoe town facility Kobrin district 76 to the west of mobile 3 construction of a possibility of installing electricity, water and gas mechanical division No. 57 manufacturing facility supply, asphalt driveway, railway Brest-Gomel is at Proletarskaya str., in close proximity Kobrin town 77 Kobrin town, 6 construction of a possibility of installing electricity, water and gas Severnaya str. manufacturing facility supply, asphalt driveway, railway Brest-Gomel is in close proximity 78 Kobrin town, Kalinina str. 0.8 construction of a possibility of installing electricity, water and gas manufacturing facility supply, asphalt driveway 79 1.5 km to the south of 10 construction and possibility of installing electricity, gas supply, Borisovo village maintenance of a logistics asphalt driveway, motor road Kobrin-Divin-border center with Ukraine is in close proximity Louninets district 80 Mikashevichi town, 0.08 construction of a touch-free connection to the operating utilities (gas, water 14, Sadovaya str. car wash and electricity supply, asphalt driveway) is possible Lyakhovichi district 81 Lyakhovichi town, 0.4 a retail facility construction utilities under construction (electricity, water 1, Vishnevaya str. pipeline, gas), asphalt driveway (building estate "Potapovichi") 82 Lyakhovichi town, 2.5 allocation of a electricity; driveway by the existent road network 15, Trudovaya str. (behind manufacturing facility (asphalt and unsurfaced road); 0.2 km from the the production facilities of railway State Unitary Manufacturing Enterprise "Lyakhovichskoe PMS" (PMS - plant for reclamation works) 83 Lyakhovichi town, 2 allocation of a electricity; driveway by the existent road network 144, Oktyabrskaya str. manufacturing facility (asphalt and unsurfaced road); 0.3 km from the (behind the territory of railway CJSC "Lyakhovichskiy Plastic-to-Metal Seal Plant") 84 Rusinovichi agro-town 3 allocation of a logistics electricity; asphalt driveway; 0.1 km from the center, a manufacturing railway facility Malorita district 85 50 m to the south of 3.2 allocation of a water supply from the township, possibility of Zburazh village (former manufacturing facility making a well; gas supply from Zburazh village; brick plant) electricity is to be supplied from the Zburazh village; driveway to the plot – asphalt road of the village, 150 m – construction of a driveway 86 70 m to the west of 7.5 allocation of a water supply – not available, making a well is Antonovo village manufacturing facility necessary; gas supply – not available, electricity (former farm) is to be supplied from the Antonovo village; driveway to the plot – gravel motor road

87 2 km to the east of 11.6 allocation of a water, gas and electricity supply are not available Soushitnitsa village manufacturing facility – input from the Soushitnitsa village is possible; (former manufacturing driveway to the plot – a motor road with asphalt area) and gravel covering 88 0.6 km to the south-west 2.8 industrial facility water, gas and electricity supply are not available from the agri-village – input from the Soushitnitsa village is possible; Velikorita driveway to the plot – a motor road with asphalt and gravel covering 89 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No. 2 90 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No. 3

91 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No. 4

92 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.5

93 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.6

94 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.7

95 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.8

96 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.9

97 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.10 98 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.11

99 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.12

100 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.13

101 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.14

102 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.17

103 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.18

104 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.19

105 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.21

106 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.22

107 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.23

108 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.24

109 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.25

110 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.26

111 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.27

112 to the north-east 1 manufacturing facility possibility of connection to power transmission of Zhabchitsy village, line, asphalt driveway is available plot No.28 Prouzhany district 113 Prouzhany town, 3 a manufacturing facility sanitary sewer system Ø300, water pipeline Ø200 Internatsionalnaya str. (along the Internatsionalnaya str.); high and medium pressure (Ø159, 152) gas pipelines (along the Zavodskaya str.); distance to the motor road R-85 is about 200 m, to the railway station Oranchitsy - about 12 km, to the Internatsionalnaya street - 80 m; power line 10 kV 114 Prouzhany town, 2.5 a manufacturing facility sanitary sewer system Ø300, water pipeline Ø300 Internatsionalnaya str. (along the Internatsionalnaya str.); high and medium pressure (Ø159, 152) gas pipelines (along the Zavodskaya str.); distance to the motor road R-85 is about 200 m, to the railway station Oranchitsy - about 12 km, to the Pushkina street - 30 m; power line 10 kV

115 Prouzhany town, 0.5 services sanitary sewer system Ø200, water pipeline Ø100 Makarenko str. (along the Makarenko str.); medium pressure (Ø114) gas pipeline (50 m away); distance to the Makarenko street is 330 m, to the railway station Oranchitsy - about 12 km; power line 10 kV 116 Prouzhany town, 1.8 a manufacturing facility sanitary sewer system Ø200, water pipeline Ø100 Makarenko str. (along the Makarenko str.); medium pressure (Ø114) gas pipeline (50 m away); distance to the Makarenko street is 220 m, to the railway station Oranchitsy - about 12 km; power line 10 kV 117 Prouzhany town, 0.7 services sanitary sewer system Ø200, water pipeline Ø100 Makarenko str. (along the Makarenko str.); medium pressure (Ø114) gas pipeline (180 m away); distance to the Makarenko street is 220 m, to the railway station Oranchitsy - about 12 km; power line 10 kV

Stolin district 118 town, 4 for construction of an there are water pipeline ø150 mm, sewerage Tereshkovoy str. (within industrial facility system ø150 mm, electricity line 10 kV along the the forestry area) Mira ave., high pressure (ø219) and medium pressure (ø32) gas pipelines (20 m away); driveway 119 Stolin town, 1 for construction of an water pipeline ø150 mm (along Mira ave.), Tereshkovoy str. (within industrial facility sewerage system ø150 mm, electricity line 10 kV, the road servicing high pressure (ø219) and medium pressure (ø32) department No.26) gas pipelines (20 m away), driveway

120 Stolin town, 1 for construction of an water pipeline ø150 mm (along R.Zorge str.), Tereshkovoy str. (within industrial facility sewerage system ø150 mm, electricity line 10 kV, the area of the automobile high pressure ø108 and medium pressure, ø225 park No.12) and ø273, gas pipelines (10 m away); driveway

121 Stolin town, Mira ave. 0.2 for construction of a service sewerage system ø150 mm, water pipeline ø100 provision facility mm, electricity line 10 kV, medium pressure ø63 and low pressure ø89 gas pipelines (20 m away); driveway 122 township Retchitsa, Goryn 0.5 for construction of a service water pipeline ø150; transforner substation area provision facility nearby and cable power line 10 kV, low pressure ø89 gas pipeline (20 m away); driveway

123 0,5 km to the south-east 0.5 for construction of an unsurfaced road, transformer station from Radchitsk village, industrial facility Radchitsk village council 124 village council, 1 retail facility with different water pipeline ø150; transforner substation 48, Gagarina str. range of goods nearby and cable power line 10 kV, low pressure ø89 gas pipeline (20 m away); driveway