Private Solutions for Infrastructure in Rwanda A

Total Page:16

File Type:pdf, Size:1020Kb

Private Solutions for Infrastructure in Rwanda A 34417 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A COUNTRY FRAMEWORK REPORT ADVISORY ADVISORY FACILITY INFRASTRUCTURE PUBLIC-PRIVATE THE WORLD BANK Private Solutions for Infrastructure in Rwanda Private Solutions for Infrastructure in Rwanda A Country Framework Report The Public-Private Infrastructure Advisory Facility and the World Bank Group © 2005 The findings, interpretations, and conclusions expressed herein are those of The International Bank for Reconstruction the author(s) and do not necessarily reflect the views of the Board of Execu- and Development/ THE WORLD BANK tive Directors of the World Bank or the governments they represent. 1818 H Street, NW The World Bank does not guarantee the accuracy of the data included in Washington, DC 20433 this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of Telephone:202-473-1000 the World Bank concerning the legal status of any territory or the endorse- Internet: www.worldbank.org E-mail: [email protected] ment or acceptance of such boundaries. All rights reserved. Rights and Permissions Manufactured in the United States of America. The material in this work is copyrighted. Copying and/or transmitting por- tions or all of this work without permission may be a violation of applicable 1 2 3 4 07 06 05 04 law. The World Bank encourages dissemination of its work and will normally grant permission promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center, Inc., 222 Rosewood Drive, Danvers, MA 01923, USA, telephone 978-750- 8400, fax 978-750-4470, www.copyright.com. All other queries on rights and licenses, including subsidiary rights, should be addressed to the Office of the Publisher, World Bank, 1818 H Street, NW, Washington, DC 20433, USA, fax 202-522-2422, e-mail [email protected] ISBN 0-8213-5965-7 Library of Congress Cataloging-in-Publication Data Private solutions for infrastructure in Rwanda. p. cm. “Published jointly by the Public-Private Infrastructure Advisory Facility and the World Bank”—Preface. Includes bibliographical references. ISBN 0-8213-5965-7 1. Infrastructure (Economics)—Rwanda. 2. Public-private sector cooperation— Rwanda. I. Public-Private Infrastructure Advisory Facility. II.World Bank. HC875.Z9C374 2004 363.6'0967571—dc22 2004053502 Contents Preface ix Abbreviations and Acronyms xi Executive Summary 1 The Context for Reform 1 Infrastructure Reform in Rwanda 1 The Country Framework Report 2 Summary of the Sector Reviews 2 Cross-Cutting Issues 6 Prioritized Recommendations 10 1. Introduction: Policies, Objectives, and the Role of the Private Sector 11 Background 11 Objectives and Scope of the Country Framework Report 12 Principles of Private Sector Participation 13 2. The Transport Sector 16 Roads 16 Airports 26 Rail 28 Water Transport 29 Notes 31 3. The Energy Sector 32 Sector Structure, Roles, and Responsibilities 32 Policymaking, Planning, and Regulation 32 Electricity 34 The Gas Sector 35 Investment Needs and Priorities 37 Potential Sources of Investment Financing 38 Opportunities for Private Sector Participation 38 Issues 39 Recommendations 40 Notes 41 v Contents 4. The Water and Sanitation Sector 42 Sector Structure, Roles, and Responsibilities 42 Policymaking, Planning, and Regulation 42 Sector Performance 45 Opportunities for Private Sector Participation 50 Issues 53 Recommendations 55 Note 56 5. Common Issues in the Electricity and Water Sectors 57 Management and Human Resources 57 Commercial and Financial Management 57 Management Contract 57 Recommendations 58 6. The Telecommunications Sector 59 Sector Structure, Roles, and Responsibilities 59 Policymaking, Planning, and Regulation 60 Sector Performance 64 Opportunities for Private Sector Participation 66 Issues 67 Recommendations 69 Note 69 7. Cross-Cutting Issues 70 Institutional Capacity 70 Local Financial Markets 72 Regulation 72 Accounting System 74 Taxation System 74 Legal System 75 Bid Evaluation Process 79 Project Selection, Prioritization, and Planning 79 Government Policy Communication with the General Public 80 Environmental Issues 80 Other Cross-Cutting Issues 82 Proposed Implementation Schedule for the Recommendations 82 Appendix A The Environment 89 Existing Environmental Institutions, Policies, and Legislation 89 Environmental Issues in the Transport Sector 92 Environmental Issues in the Energy Sector 92 Environmental Issues in the Water Supply and Sanitation Sector 95 Environmental Issues in the Telecommunications Sector 96 Ecotourism in Rwanda 97 Appendix B The Legal System 98 Rwandan Land Law 98 Customary Law 98 Land Law Reform 98 Rights of Ownership 99 Appendix C Road Maintenance, Rehabilitation, and Reconstruction Costs 100 vi Contents References 103 Boxes A.1 Requirements under European Commission Directive 97/11/EC for the Completion of Environmental Impact Assessments for Transport-Related Infrastructure Projects 92 A.2 Requirements under European Commission Directive 97/11/EC for the Completion of Environmental Impact Assessments with Respect to Infrastructure Projects in the Energy Sector 93 A.3 Requirements under European Commission Directive 97/11/EC for the Completion of Environmental Impact Assessments with Respect to Infrastructure Projects in the Water and Sanitation Sectors 95 Figures 2.1 Roads: Roles and Responsibilities 17 2.2 Airports: Roles and Responsibilities 26 3.1 Energy: Existing and Future Key Roles and Responsibilities 33 3.2 Benchmarking Data in Electricity 36 4.1 Urban Water Supply: Roles and Responsibilities 43 4.2 Rural Water Supply: Roles and Responsibilities 44 4.3 Unaccounted-for Water in African Water Utilities 46 4.4 Number of Connections of African Water Utilities 46 4.5 Average Price of Water Supplied by African Water Utilities 47 6.1 Telecommunications: Roles and Responsibilities 60 6.2 Telecommunications Networks in Rwanda 62 6.3 National Teledensity 64 6.4 Fixed-Line Waiting Lists 65 6.5 Fixed-Line Tariffs 65 6.6 Teledensity and Per Capita Gross Domestic Product 66 A.1 The Vicious and Virtuous Cycles Relating Deforestation to the Quality of Water 94 Tables ES.1 Sector-Specific Opportunities 7 ES.2 Cross-Cutting Constraints 8 1.1 Foreign Direct Investment in Rwanda 14 2.1 Extent of the Classified Road Network 18 2.2 Condition of the Classified Road Network 19 2.3 Air Cargo Rates for General Cargo 27 2.4 Commercial Traffic 30 2.5 Annual Traffic from Gisenyi to Cyangugu, 1985 30 2.6 Estimated Traffic, Gisenyi to Cyangugu, 1990 30 3.1 Electricity Provision in Rwanda 34 3.2 Rehabilitation of Assets in the Energy Sector 37 3.3 Proposals for New Generation Investment 37 3.4 Sources of Investment Financing 38 4.1 Electrogaz Water Tariffs 47 7.1 Implementation Schedule for Action Plan 83 C.1 Expenditure and Investments Associated with Road Building, Rehabilitation, and Maintenance of Various Types of Roads in Rwanda 100 vii Contents C.2 Expenditure and Investment Required to Rehabilitate the Paved Road Network in Rwanda 101 C.3 Expenditure and Investment Required to Rehabilitate the Unpaved Main Road Network in Rwanda 101 C.4 Expenditure and Investment Required to Rehabilitate the Unpaved Secondary Road Network in Rwanda 101 C.5 Investment Projects: Base Scenario 102 C.6 Investment Projects: Alternative Scenario 102 C.7 Annual Road Maintenance Projects: Cost Summary 102 viii Preface This Country Framework Report for Rwanda is one the World Bank and other development agencies, as of the first in a series of country reviews aimed at im- well as discussions with representatives of the private proving the environment for private sector involve- sector. ment in infrastructure. Prepared at the request of the The Country Framework Report process was sup- Rwandan government, the report has three main ob- ported by a working group comprising representatives jectives: of the government, private sector, and bilateral donor • To describe and assess the current status and per- agencies. Members of the working group from the formance of key infrastructure sectors Rwandan government include Jean Demacene • To describe and assess the policy,regulatory,and in- Ntawukuriryayo, Minister of Infrastructure; Sam stitutional environment for involving the private Nkusi, State Minister of Energy and Communications; sector in those sectors Munyanganizi Bikoro, State Minister of Water; • To assist,through the above processes, policymakers Antoine Munyakazi-Juru, Ministry of Finance and in framing future reform and development strate- Economic Planning; Joseph Akilimali and Marlene gies and potential private sector investors in assess- Nyirubutama, Privatization Secretariat; François ing investment opportunities. Xavier Havugimana, Makuza Kanamugire, Abraham This report was begun under the auspices of the Makuza, Bruno Mwanzafunzi, J. Baptiste Ngwijabanzi, World Bank Group’s Infrastructure Action Program, Straton Nzeyimana, Felicien Rukiriza, and Silas with funding from the World Bank and the Japanese Ruligana, Ministry of Infrastructure;Eugène Kivunan- government. It is being published jointly by the World goma, Multisector Regulatory Agency; Jean Kanya- Bank and the Public-Private Infrastructure Advisory muhanda, Central Public Investments and External Facility, the multidonor technical assistance facility es- Finance Bureau; Patrick Rugumire, Ministry of Trans- tablished in July 1999, which is carrying forward
Recommended publications
  • Virunga & Rwenzoris
    Secret Compass Theres Always A Way https://secretcompass.com VIRUNGA & RWENZORIS This Handbook contains everything you need to know about this Secret Compass epic expedition to the Democratic Republic of Congo and Uganda. Read on to discover our ethos and team-centred approach and for the nitty gritty like flight and visa advice, insurance requirements and kit recommendations. Use the buttons below to ask questions or if this handbook answers all of your questions you can request a space on the ?team by completing the booking form and submitting a deposit (bound by our T&Cs). We will then be in touch by phone or email? ?to hopefully approve your place on the team! Upcoming Expedition Dates 2 July to 16 July 2022. Key Facts Arrive: by 1800 on Day 1 into the team hotel in Kigali, Rwanda. Depart: leave Kigali any time on Day 15 onwards. Insurance: Ensure you have comprehensive cover. Docs: send your flight, insurance and passport copy in. Balance due: 90 days before departure. Find FAQ and Testimonials online. Overview Aim Climb the volcanically active Mount Nyiragongo, home to the world’s largest lava lake, before searching for mountain gorillas in Virunga National Park. Then trek into the little-visited Rwenzori mountains from the Ugandan side. Summary This expedition aims to climb volcanic Mount Nyiragongo within Virunga National Park, sleeping on the crater rim before heading into the forests of the national park in search of the critically endangered mountain gorillas in the company of the dedicated rangers who protect them. The expedition’s secondary aim is to trek into the Rwenzori mountains, famed in history as the Mountain of the Moon and one of the sources of the Nile due to its rapidly retreating equatorial glaciers.
    [Show full text]
  • The International Response to Conflict and Genocide:Lessom from the Rwanda Experience
    The International Response to Conflict and Genocide: Lessons from the Rwanda Experience March 1996 Published by: Steering Committee of the Joint Evaluation of Emergency Assistance to Rwanda Editor: David Millwood Cover illustrations: Kiure F. Msangi Graphic design: Designgrafik, Copenhagen Prepress: Dansk Klich‚, Copenhagen Printing: Strandberg Grafisk, Odense ISBN: 87-7265-335-3 (Synthesis Report) ISBN: 87-7265-331-0 (1. Historical Perspective: Some Explanatory Factors) ISBN: 87-7265-332-9 (2. Early Warning and Conflict Management) ISBN: 87-7265-333-7 (3. Humanitarian Aid and Effects) ISBN: 87-7265-334-5 (4. Rebuilding Post-War Rwanda) This publication may be reproduced for free distribution and may be quoted provided the source - Joint Evaluation of Emergency Assistance to Rwanda - is mentioned. The report is printed on G-print Matt, a wood-free, medium-coated paper. G-print is manufactured without the use of chlorine and marked with the Nordic Swan, licence-no. 304 022. 2 The International Response to Conflict and Genocide: Lessons from the Rwanda Experience Study 2 Early Warning and Conflict Management by Howard Adelman York University Toronto, Canada Astri Suhrke Chr. Michelsen Institute Bergen, Norway with contributions by Bruce Jones London School of Economics, U.K. Joint Evaluation of Emergency Assistance to Rwanda 3 Contents Preface 5 Executive Summary 8 Acknowledgements 11 Introduction 12 Chapter 1: The Festering Refugee Problem 17 Chapter 2: Civil War, Civil Violence and International Response 20 (1 October 1990 - 4 August
    [Show full text]
  • Afr 47/19/98 Dealing with the Truth
    AI I INDEX: AFR 47/19/98 DEALING WITH THE TRUTH Amnesty International’s concerns in Rwanda Rwanda is still caught in a cycle of violence. Four years on from a genocide in which as many as one million people lost their lives, the bloodshed has not stopped. Whole families are being wiped out. Civilians, both Tutsi and Hutu, are being ruthlessly killed. This violence is not inevitable. People inside and outside Rwanda can make a difference. The Rwandese Government can do more to protect human rights. Leaders of armed opposition groups can prevent the killing of unarmed civilians. Governments and people around the world can ensure that the international community does not turn its back on Rwanda again. As an international non-governmental human rights organization, Amnesty International campaigns for the respect of the same internationally recognized standards in all countries. This leaflet seeks to explain Amnesty International’s concerns in Rwanda, to summarize the main human rights issues and to address some of the ongoing debates: What could the international community have done to stop the genocide? Will justice ever be done? How can human rights be protected in Rwanda today? In answering these questions, this leaflet also responds to some of the criticisms made regarding Amnesty International’s work on Rwanda. The genocide in 1994 Between April and July 1994, as many as one million people were killed in a genocide organized by extremist elements within the Hutu-dominated government and armed forces, the Forces armées rwandaises (FAR). Many of these killings were carried out by the militia known as interahamwe.
    [Show full text]
  • Mogondo Julius Wondero EOEIYE
    d/ TELEPHONES: 04L434OLO0l4340LL2 Minister of State for East E.MAIL: [email protected] African Community Affairs TELEFAX: o4t4-348r7t 1't Floor, Postal Building Yusuf Lule Road ln any correspondence on this subject P.O. Box 7343, Kampala please quote No: ADM 542/583/01 UGANDA rHE REPUBLIC OF UGANDA 22"4 August,2Ol9 FTHES P ( L \-, 4 Hon. Oumo George Abott U Choirperson, Committee for 2019 * 2 3 AUG s Eost Africon Community Affoirs Porlioment of Ugondo EOEIYE L t4 raE \, \, KAMPATA NT OF CLOSURE OF UGANDA.RWANDA BORDERS Reference is mode to letter AB: I 171287 /01 doted l5rn August,20l9 oddressed to the Minister of Eost Africon Community Affoirs ond copied to the Permonent Secretory, Ministry of Eost Africon Community Affoirs regording the obove subject motter. ln the letter, you invited the Ministry to updote the EAC Committee on the progress mode to hondle the Closure of Ugondo-Rwondo Borders on Ihursdoy,29r,August, 2019 at 10.00om. As stoted this discussion would help ensure thot the Eost Africon Common Morket Protocol is effectively implemented for the benefit of Ugondo ond other Portner Stofes. The Purpose of this letter therefore, is to forword to you o Report on the Stotus of the obove issue for further guidonce during our interoction with the committee ond to re-offirm our ottendonce os per the stipuloted dote ond time Mogondo Julius Wondero MINISTER OF STATE FOR EAST AFRICAN COMMUNITY AFFAIRS C.C. The Speoker, Porlioment of Ugondo, Kompolo The Clerk to Porlioment, Porlioment of Ugondo, Kompolo Permonent Secretory, Ministry of Eost Africon Community Affoirs MINISTRY OF EAST AFRICAN COMMUNITY AFFAIRS REPORT ON THE CLOSURE OF UGANDA.
    [Show full text]
  • Supporting Affordable and Green Buildings in Kigali/Rwanda
    Kafunzo Merama Kagitumba Lake Mutanda Lake Bunyonyi Rwempasha Lubirizi Rutshuru Kisoro Nyagatare Cyanika Kabale a K b ag BIRUNGA m era u Butaro t NAT'L PARK Muvumba i g Kidaho Lac a Katuna K Lac Burera Rwanyakizinga Ruhengeri Mulindi Gatunda Lac Kirambo Cyamba Busogo Ruhondo Gabiro AKAGERA Byumba Ngarama Lac Kora NORRE NATIONAL Mikindi Mutura NORD PARK Lake Kagali Kinihira Lac Hago Mujunju Goma Nemba Gisenyi Rushashi Kinyami EST Muhura Nyundo Kabaya N Lac y Rutare Ngaru a Mbogo Murambi Kivumba ba Lac Rukara GISHWATI ro ng Shyorongi Muhazi NATURAL Ngororero Lac Ile Ihema Bugarura RESERVE Kiyumba KIGALI OUEST Kigali Rwamagana Ile Wahu Runda Gikoro Bulinga Kayonza Lac Lac Kicukiro Bicumbi Nasho Kivu Mabanza Lac SUPPORTING AFFORDABLE AND Gitarama Butamwa Kigarama Mugesera Lac Lake Ile Kibuye Mpanga Bisongou Birambo Lac Idjwi Mugesera Kibungo Cyambwe Gishyita Bwakira SUD Rilima Rukira Rwamatamu Masango Ruhango Sake Gashora Rusumo Gatagara Bare Nemba Kirehe Kaduha K Nyanza Ngenda ag Ile er Gombo Rwesero a Karaba Lac Lac Rusatira Cyohoha Rweru Kamembe Gisakura Gikongoro Sud Karama Bukavu Cyangugu Rwumba Kitabi Cyimbogo Karengera GREEN BUILDINGS IN KIGALI/RWANDA NYUNGWE Nyakabuye Bugumya NAT'L PARK Butare Ruramba Gisagara u r Busoro a y Bugarama n Munini ka A The boundaries and names shown and the designations used Runyombyi on this map do not imply official endorsement or acceptance by the United Nations. Map No. 3717 Rev. 11 UNITED NATIONS Department of Field Support July 2015 Geospatial Information Section (formerly Cartographic Section) Rwanda’s housing challenge Building materials and their environmental Impact analysis by building material type Rwanda’s National Housing Policy which was rolled out in impacts The impacts of exterior wall construction using nine locally available materials were compared and assessed relative to their share March 2015 aims at fast-tracking affordable housing projects The choice of building materials during the upgrading of of the city-wide flows in 2015.
    [Show full text]
  • Transport Sector Policy
    REPUBLIC OF RWANDA MINISTRY OF INFRASTRUCTURE TRANSPORT SECTOR POLICY December 2008 1 TRANSPORT SECTOR POLICY I. INTRODUCTION 1. The transport sector is a strategic sector for Rwanda, and the situation of being landlocked has a negative impact on economic growth and development of the country. The exceptionally high cost of transport at national as well as international levels, as well as insufficient affordable and accessible modes of transport for people in both urban and rural areas, constitute a major constraint which must be taken into account with the sector policy to achieve the short medium and long-term development goals that Rwanda has mandated. 2. The present sectoral policy defines the vision of the Government for the sector as well as its strategic orientations, which will guide its actions during the next five years. These are summarized in the Transport Sector Policy Matrix (Appendix 1). The implementation of the sector policy is ensured through medium term programmes such as the Medium Term Expenditure Framework (MTEF) for the period 2009-2012 as annexed in Appendix 2. 3. The transport sector policy is inspired by the planning tools available in Rwanda, such as the Vision 2020, the Economic Development and Poverty Reduction Strategy (EDPRS), the National Investment Strategy and the Medium Term Expenditure Framework. It takes into account other tools of reference such as the Millennium Development Objectives and the action plan of the Sub-Saharan Africa Transport Policy (SSATP). It also takes into account cross-cutting issues such as HIV/AIDS and environmental protection. I.1. Definition of the Transport Sector 4.
    [Show full text]
  • Kivuye in Burera District Final
    REPUBLIC OF RWANDA Ministry of Infrastructure ENERGY WATER AND SANITATION AUTHORITY (EWSA) Electricity Access Rollout Programme (EARP) Head Office: Avenue de l’ Ihema, P.O.Box 537, Kigali-Rwanda Tel: +(250)252573666 Fax: +(250)(0)252573802 E-mail: [email protected] Website: www.ewsa.rw PROJECT BRIEF FOR THE INSTALLATION OF LOW VOLTAGE AND MEDIUM VOLTAGE LINES AND SERVICE CONNECTIONS IN BUNGWE – KIVUYE - GATEBE AREA IN BURERA DISTRICT December 2011 1 LIST OF ACRONYMS ............................................................................................................ 5 0. BACKGROUND .................................................................................................................. 6 I. DESCRIPTION OF THE PROJECT ................................................................................. 8 I.1. INTRODUCTION ........................................................................................................................... 8 I.2. OBJECTIVES OF THE PROJECT ............................................................................................... 8 I.3. PROJECT ACTIVITIES ................................................................................................................ 9 I.4. CONSTRUCTION PROGRAMME ..............................................................................................10 I.5. TECHNICAL DESCRIPTION ......................................................................................................10 Description of Works ....................................................................................................
    [Show full text]
  • Backparkers-Brochure.Pdf
    Accommodation Prices 2018. Accomodation rates in $(USD) Per person per night I N D I Accomodation type Bed only Bed & Breakfast Half Board Full Board B W Self Camping $10PP $15PP $25PP $35PP Min Dormitory (4 Beds) $20PP $25PP $35PP $45PP Big Dormitory (6 Beds and above) $15PP $20PP $30PP $40PP Rent a mobile tent with beddings $15PP $20PP $30PP $40PP B Rent a mobile tent without beddings (pp) $12PP $17PP $27PP $35PP a e ck dg Twin Bed/Double Rooms with shared Bathroom $25PP $30PP $40PP $50PP packers Lo Single Bed room with shared Bathroom $30PP $35PP $45PP $55PP Twin Bed/Double Rooms self contained $40PP $45PP $55PP $65PP Single Bed Room self contained $45PP $50PP $60PP $70PP BWINDI BACKPACKERS LODGE Twin/Double Bedroom cottage $50PP $55PP $65PP $75PP Single Bedroom cottage $60PP $65PP $75PP $85PP LAST MINUTE GORILLA TRACKING PERMITS AND 3 Bedroom cottage $45PP $50PP $60PP $70PP ACTIVE NYIRAGONGO VOLCANO TREKKING/HIKING PERMITS AVAILABLE We accept payment by the following cards at no extra cost or by Mobile money on any of the following telephone numbers; To all clients paying for bed +256772661854, +256752661854, +256774883710 and breakfast, half board and full board, we serve full continental breakfast & for meals they are 3 course meals. Alcarte menu available for single course meals. Note:Prices can change without prio notice Note: half board includes Bed, You can pay by card on our website at no extra fees or Breakfast and Lunch or Dinner request for a card payment link by e-mail.. while full board includes Breakfast, Lunch & Dinner, It Half the price double the Fun!! excludes drinks Lodge shuttle: Departs from Kabale at 10:30am & 4:00pm.
    [Show full text]
  • Acknowledgments
    MGNP General Management Plan 2014-2024 ACKNOWLEDGMENTS Uganda Wildlife Authority (UWA) prepared this General Management Plan with total funding from Uganda Wildlife Authority. Consultations were held with all relevant stakeholders both at Resource use level, Subcounty level, District level and at National Level. Furthermore an analysis of stakeholders was done which gave guidance on the consultations made. Uganda Wildlife Authority highly acknowledges the Local Communities and the entire Kisoro district leadership, who contributed to the proposals during the Planning process. Prepared by: Uganda Wildlife Authority Input from: BMCA field staff, Senior UWA staff and stakeholders Guidance from: Uganda Wildlife Authority Top Management staff Drafted by: The Planning team Edited by: Edgar Buhanga and Richard Kapere as a secretariat of the planning team i MGNP General Management Plan 2014-2024 FOREWORD Mgahinga Gorilla National Park (33.7 km2) is contiguous with Parc National des Virunga (240 km2) in the DRC, and Parc National des Volcans (160 km2) in Rwanda, all forming the proposed transbound- ary PA known as the Virunga Conservation Area covering an area of 434 km2. The park includes three of the Virunga volcanoes - Mt Muhabura (4,127 m), Mt Gahinga (3,474 m) from which the park derives its name, and Mt Sabinyo (3,645 m). This park forms part of the home of the world’s Moun- tain Gorilla population and the Golden Monkey species. This document presents a ten-year management plan for Mgahinga Gorilla National Park (MGNP). Uganda Wildlife Authority (UWA) is committed to the continued sustainable management of the Park ecosystem. This can only be achieved through proper long term planning which government has already identified and provided for in the Uganda Wildlife Act (Cap 200).
    [Show full text]
  • Uganda and Communiqué on the Women's Economic Empow
    Eastern African Sub Regional Support Initiative for Advancement of Women February 27, 2020 Press Statement on the One Year Anniversary of the Closure of the Rwanda- Uganda and Communiqué on the Women’s Economic Empowerment Convening held in Kampala, Uganda, February 25 to 26, 2020 Today, February 27, 2020 is exactly one year since the Government of Rwanda arbitrarily closed the border posts of Gatuna-Katuna, Buhita in Rubaya County and Kamwezi border post in Kabale District and Cyanika border post in Kisoro district. Gatuna-Katuna and Cyanika border posts have historically been the major crossing point for cargo trucks and cross border trade, both formal and informal, heading to Rwanda, Burundi and the Democratic Republic of Congo. The closure of the border between the two countries is in contravention of the Treaty for the establishment of the East African Community (EAC) (as amended) and the Common Market Protocol. It is extremely absurd that the EAC, which is now celebrating 20 years of its existence, with a mission to “widen and deepen economic, political, social and cultural integration in order to improve the quality of life of the people of East Africa through increased competitiveness, value added production, trade and investments” has remained silent to the suffering and humiliation of the East African peoples living and depending on trade at the borders of the two countries. The United Nations, donors and the international community, promoting the observance of human rights and sustainable development has equally stood at a safe distance, watching the “unproductive and sham” negotiations between Presidents, Yoweri Kaguta Museveni and Paul Kagame, which are said to be aimed at re-opening the border.
    [Show full text]
  • Goma Gisenyi
    Cameroon South Sudan Democratic R utshuru Republic of Activation ID: EMSN-047 R epublic the Congo U ganda Glide Number: N/A P roduct N.: 01NY IR AGO NGO , v1, English Legend of Congo Gabon Democratic Republic R wanda Populated places Points Of Interest of the Congo Kinshasa Nyiragongo - Democratic Republic of the Congo Burundi City Country Boundary H ospital W ater infrastructure Tanzania Volcanic Risk Assessment V illage P olice H y dropower infrastructure Masisi Angola Reference Map - Overview Zambia Physiography Transportation Education P lace of worship P roduction date: 30/03/2018 Spot heights P rimary Sports Industrial facilities 300 P rimary Secondary Goma Cartographic Information Secondary Military Government Facilities Tertiary 1000 Full color A1, high resolution (300dpi) Hydrography U N Border Crossing Station 1:50.000 Airport R iver U nicef P ort W aste treatment infrastructure 0 0,5 1 2 3 4 Canal GV O Km Bus station Kalehe Rwanda Grid: W GS 84 / U TM zone 35S map coordinate sy stem Tick mark s: W GS 84 geographical coordinate sy stem 735000 740000 745000 750000 755000 29°5'0"E 29°10'0"E 29°15'0"E 0 0 0 0 0 0 5 5 3 3 8 8 9 9 S S " 2810 " 0 0 ' ' 0 0 3 3 ° ° 1 1 2476 3123 Mount Nyiragongo 3 00 400 34 3447 0 0 0 4 0 3 2 3 3180 3 4 33 0 0 0 3300 32 0 0 3 0 10 0 30 0 0 2 0 23 9 0 2 0 8 0 0 2 0 0 7 0 0 0 0 0 0 0 0 2 0 6 3 0 3 8 0 8 9 2 9 5 0 2 0 4 0 0 23 00 2819 2 2620 2 0 0 2 1 0 0 2 0 0 0 2400 1 9 0 0 Kibati 1876 Rusayo 0 0 0 0 S 1 0 0 7 S " " 5 0 5 0 0 0 ' 2 2 ' 5 8 8 5 3 9 9 3 ° ° 1 1 Kanyanza 1 6 0 1631 0 18 Bulengo-Mugunga
    [Show full text]
  • The Evolution of an Armed Movement in Eastern Congo Rift Valley Institute | Usalama Project
    RIFT VALLEY INSTITUTE | USALAMA PROJECT UNDERSTANDING CONGOLESE ARMED GROUPS FROM CNDP TO M23 THE EVOLUTION OF AN ARMED MOVEMENT IN EASTERN CONGO rift valley institute | usalama project From CNDP to M23 The evolution of an armed movement in eastern Congo jason stearns Published in 2012 by the Rift Valley Institute 1 St Luke’s Mews, London W11 1Df, United Kingdom. PO Box 30710 GPO, 0100 Nairobi, Kenya. tHe usalama project The Rift Valley Institute’s Usalama Project documents armed groups in the Democratic Republic of the Congo. The project is supported by Humanity United and Open Square and undertaken in collaboration with the Catholic University of Bukavu. tHe rift VALLEY institute (RVI) The Rift Valley Institute (www.riftvalley.net) works in Eastern and Central Africa to bring local knowledge to bear on social, political and economic development. tHe AUTHor Jason Stearns, author of Dancing in the Glory of Monsters: The Collapse of the Congo and the Great War of Africa, was formerly the Coordinator of the UN Group of Experts on the DRC. He is Director of the RVI Usalama Project. RVI executive Director: John Ryle RVI programme Director: Christopher Kidner RVI usalama project Director: Jason Stearns RVI usalama Deputy project Director: Willy Mikenye RVI great lakes project officer: Michel Thill RVI report eDitor: Fergus Nicoll report Design: Lindsay Nash maps: Jillian Luff printing: Intype Libra Ltd., 3 /4 Elm Grove Industrial Estate, London sW19 4He isBn 978-1-907431-05-0 cover: M23 soldiers on patrol near Mabenga, North Kivu (2012). Photograph by Phil Moore. rigHts: Copyright © The Rift Valley Institute 2012 Cover image © Phil Moore 2012 Text and maps published under Creative Commons license Attribution-Noncommercial-No Derivative www.creativecommons.org/licenses/by/nc-nd/3.0.
    [Show full text]