Transport Sector Policy

Total Page:16

File Type:pdf, Size:1020Kb

Transport Sector Policy REPUBLIC OF RWANDA MINISTRY OF INFRASTRUCTURE TRANSPORT SECTOR POLICY December 2008 1 TRANSPORT SECTOR POLICY I. INTRODUCTION 1. The transport sector is a strategic sector for Rwanda, and the situation of being landlocked has a negative impact on economic growth and development of the country. The exceptionally high cost of transport at national as well as international levels, as well as insufficient affordable and accessible modes of transport for people in both urban and rural areas, constitute a major constraint which must be taken into account with the sector policy to achieve the short medium and long-term development goals that Rwanda has mandated. 2. The present sectoral policy defines the vision of the Government for the sector as well as its strategic orientations, which will guide its actions during the next five years. These are summarized in the Transport Sector Policy Matrix (Appendix 1). The implementation of the sector policy is ensured through medium term programmes such as the Medium Term Expenditure Framework (MTEF) for the period 2009-2012 as annexed in Appendix 2. 3. The transport sector policy is inspired by the planning tools available in Rwanda, such as the Vision 2020, the Economic Development and Poverty Reduction Strategy (EDPRS), the National Investment Strategy and the Medium Term Expenditure Framework. It takes into account other tools of reference such as the Millennium Development Objectives and the action plan of the Sub-Saharan Africa Transport Policy (SSATP). It also takes into account cross-cutting issues such as HIV/AIDS and environmental protection. I.1. Definition of the Transport Sector 4. Transport infrastructure in Rwanda is comprised of the following: (i) Road transport, which until now is the main form of passenger and goods transportation, with a network of about 14,000 km corresponding to a road density of 0.53 km/km², (ii) Air transport with, two international airports and five aerodromes spread across the country, and (iii) lake transport, which is limited mainly to Lake Kivu. Rwanda does not have a rail transportation system, but the rail road systems of the neighbouring countries (Tanzania, Uganda and Kenya) which are used as transit routes, contribute in a small way for goods originating or destined for Rwanda in a multi-modal railway- road combination. The planned railway connecting Rwanda to the Tanzanian port of Dar es Salaam will provide a direct link to international transit routes. 5. Over and above physical infrastructure, the sector is also comprised of transport services, which are provided by the public and private sector alike and includes bus, taxi and airline services. 2 6. The transport sector contributes considerably towards poverty reduction and economic growth, and serves as support to other economic sectors. It plays a fundamental role in the economy of Rwanda as it contributes about 7% to the GDP, and represents about 15% of total service delivery. Most of the transport infrastructure in the National Economy has been continuously growing since 1995, and is expected to grow further with the putting in place of the proposed policy. 7. There has been a steady increase in the allocation of resources to the transport sector both from internal and external sources of finance, which is a clear demonstration of the importance that the Government of Rwanda places in the development of the sector. I.2. Context I.2.1. National Context 8. Rwanda is a landlocked country in the heart of Africa and far from the maritime ports on the Indian Ocean, with the distance to the nearest port of Dar es Salaam being around 1.400km. This poses a major limitation in her national development efforts. 9. The current state of transport infrastructure in Rwanda may be attributed to the war and the genocide of 1994, which destroyed the economic infrastructure of the country considerably. 10. This situation was aggravated by other institutional problems, such as the absence of a clear vision for the sector, institutional weaknesses, as well as the absence of a strategy for maintenance of transport infrastructure. 11. With the end of the war, the Rwandan Government, with the support from development partners, has committed itself to the reconstruction of the country. Specific importance has been attached to the rehabilitation of transport infrastructure and road infrastructure in particular, which are vital for a country whose internal and external economic dealings are essentially accomplished over the road transportation system. 12. After the emergency phase that immediately followed the war and genocide, the Government undertook a Development phase, which undertook the reconstruction of the main axes roads of national and international importance, the urban road network, as well as Kanombe International airport. 13. A multi-annual programme with considerable capital investment for the transport sector and with a guarantee of the necessary resources has been established with the participation of partners of the sector. This investment framework is based on the priorities of the Economic Development and Poverty Reduction Strategy and the Vision 2020. 3 I.2.2. Socio-economic Context 14. Socio-economic context of transport in Rwanda is linked to stimulating economic growth by increasing internal production and facilitating access to domestic and international markets on one hand, while ensuring favourable conditions for provision and distribution of imported products within the country on the other. In addition, stimulating economic growth is linked to improving mobility for the population via passenger transport throughout Rwanda. 15. The planning of infrastructure and transport services will be made by taking into account the socio-economic activities, and end-products to be transported between producers and consumers and other areas of growth. 16. With respect to the infrastructure to be built, or the transportation systems to be implemented, it is necessary to identify the principal social and economic activities that define transport services. 17. Socio-economic studies will enable the identification of categorization of the principal products of the country, such as their geographical distribution within the territory, and in particular the channels of growth and products of export (tea, coffee, potatoes, flowers, fruit, industries, mining resources and tourist areas, animal husbandry, etc.). The studies must also identify the means to improve passenger transport in urban and rural areas utilising all available modes of transport, including: road, rail, air and water. 18. Efforts will be made to improve the state of infrastructure and the quality of transport services in order to reduce the constraints that limit the population in mobility and with accessing essential services and markets for their products. Particular attention will be given to improving trunk and rural roads so that they are motorable throughout the year. Efforts will also be made to increasing urban public transport services to reduce congestion and pollution and enable the expansion of rural services. 19. In parallel, the economic development of Rwanda suffers from the lack of effectiveness of international transport services, which increases cost of exports of the country and reduce their competitiveness in the world market. The Rwandan consumer feels the impact of the high cost of international transport on imported products, which contribute significantly to the increased cost of living. 20. Transportation costs are estimated to contribute to more than 40% of the total value of imported or exported goods respectively as compared to between 6.5 and 11% in developed countries. 21. The present transport policy will be oriented towards making it possible for the sector to contribute appreciably towards the growth and economic development of Rwanda, with direct consequences leading to improvement of the standard of living of the population and poverty reduction. 4 I.2.3. Socio-political Context 22. The socio-political context of Rwanda is characterized by the political and administrative reforms that took place during the past few years at the level of administrative re-organization of the territory, central and decentralized public administration, and economic management systems for the country, driven by the need to find the best conditions for good political and economic governance. 23. The socio-political orientation of transport refers to the objectives of economic development aimed at poverty reduction as defined by the EDPRS. Sector planning at central and decentralized level must be aimed towards developing infrastructure and transport services likely to support the development of other socio-economic sectors, and to stimulate the expected growth during the medium and long term as projected in the Vision 2020. 24. The decentralization policy defines responsibilities for entities in the management and the maintenance of the community infrastructure, particularly in sections of the road network for which they are responsible. The priority will be given to the strengthening of technical and financial capabilities of the districts so that they are able to assume this role effectively. The financial transfers from a central to decentralized level will have to be carried out gradually as management capacity is improved. 25. The new policy is based on a participatory approach of the communities towards the maintenance of road infrastructure in rural and urban areas; the execution of routine maintenance works on the trunk roads will be carried out by the associations formed by population bordering these roads. Routine maintenance requires mainly the use of the small hand tools that are in everyday use. 26. This approach will support job creation and generate supplementary income for the local communities and enhance their disposable income levels while ensuring the security of the road infrastructure due to the economic interest which they represent in terms of employment and related benefits. 27. The present policy shall enable the development of regional integration models aimed at diversifying the modes of transportation for both good and passengers and the conveyance of supplies in and out of the country.
Recommended publications
  • Virunga & Rwenzoris
    Secret Compass Theres Always A Way https://secretcompass.com VIRUNGA & RWENZORIS This Handbook contains everything you need to know about this Secret Compass epic expedition to the Democratic Republic of Congo and Uganda. Read on to discover our ethos and team-centred approach and for the nitty gritty like flight and visa advice, insurance requirements and kit recommendations. Use the buttons below to ask questions or if this handbook answers all of your questions you can request a space on the ?team by completing the booking form and submitting a deposit (bound by our T&Cs). We will then be in touch by phone or email? ?to hopefully approve your place on the team! Upcoming Expedition Dates 2 July to 16 July 2022. Key Facts Arrive: by 1800 on Day 1 into the team hotel in Kigali, Rwanda. Depart: leave Kigali any time on Day 15 onwards. Insurance: Ensure you have comprehensive cover. Docs: send your flight, insurance and passport copy in. Balance due: 90 days before departure. Find FAQ and Testimonials online. Overview Aim Climb the volcanically active Mount Nyiragongo, home to the world’s largest lava lake, before searching for mountain gorillas in Virunga National Park. Then trek into the little-visited Rwenzori mountains from the Ugandan side. Summary This expedition aims to climb volcanic Mount Nyiragongo within Virunga National Park, sleeping on the crater rim before heading into the forests of the national park in search of the critically endangered mountain gorillas in the company of the dedicated rangers who protect them. The expedition’s secondary aim is to trek into the Rwenzori mountains, famed in history as the Mountain of the Moon and one of the sources of the Nile due to its rapidly retreating equatorial glaciers.
    [Show full text]
  • Study Abroad Program Guide
    South Africa | Rwanda | Kenya Summer 2018 Study Abroad Program Guide Office of Study Abroad Programs University at Buffalo 201 Talbert Hall Buffalo, New York 14260 Tel: 716 645-3912 Fax: 716 645 6197 [email protected] www.buffalo.edu/studyabroad Study Abroad Program Guide South Africa & Rwanda Summer 2018 DESTINATION: SOUTH AFRICA 28 MAY – 13 JUNE http://www.acsu.buffalo.edu/~irlam/ubafrica.html Location The new "rainbow nation" of South Africa occupies the base of the African continent and lies south of the Tropic of Capricorn. It is surrounded by the Indian and Atlantic Oceans. On its northern borders (moving west to east) lie Namibia (formerly South West Africa), Botswana (formerly Bechuanaland), Zimbabwe (Rhodesia until 1980) and Mozambique, a Portuguese colony until 1975. Swaziland also occupies South Africa’s eastern border, and the tiny kingdom of Lesotho is surrounded by South Africa, east of center. South Africa is a vibrant, young country, emerging from three centuries of European colonialism and white domination. In 2015 the nation marks its second decade free of apartheid. This is therefore a truly revolutionary era for South Africa as it continues to evolve from its European past into an African future. You will have a unique opportunity to experience a new and vibrant nation as it strives to harmonize peoples of diverse African, Indian and European heritage into one community with a common culture after centuries of division. Part of South Africa, the Cape Colony, was once a colonial possession of the Netherlands and, since the early nineteenth century, Britain. This dual colonial legacy is reflected in the two European languages still spoken widely: English and Afrikaans.
    [Show full text]
  • RWANDA Gb 06
    Rwanda Kigali key figures • Land area, thousands of km2 26 • Population, thousands (2005) 9 038 • GDP per capita, $ PPP valuation (2005) 1 594 • Life expectancy (2000-2005) 43.6 • Illiteracy rate (2005) 27.3 African Economic Outlook 2005-2006 www.oecd.org/dev/publications/africanoutlook All tables and graphs in this section are available in Excel format at: http://dx.doi.org/10.1787/067115816684 Rwanda ELEVEN YEARS AFTER THE GENOCIDE that devastated reducing income poverty, especially in rural areas. A the country and left nearly one million people dead, variety of social indicators have been improving, Rwanda continues to implement its programme for however, largely due to targeted Economic recovery is economic, structural and social reform. The programme interventions. Following the reflected in improvements has already met a number of major milestones. After 2005 Group of 8 (G8) agreement in social indicators experiencing low growth in 2003 due to poor weather on multilateral debt relief, but poverty remains conditions, real GDP growth recovered to 4 per cent Rwanda’s external debt widespread. in 2004 and was estimated to reach 4.2 per cent in 2005. sustainability is expected to The economy remains essentially based on subsistence improve significantly. Nonetheless, Rwanda’s high aid agriculture and progress in Rwanda’s structural dependency remains a concern. There has also been little transformation remains slow, as indicated by a stagnating progress made in increasing exports, and continuous share of manufacturing in GDP. Rwanda remains one electricity shortages and high oil prices imply major of the poorest countries in the world in terms of income challenges for future economic development.
    [Show full text]
  • Mogondo Julius Wondero EOEIYE
    d/ TELEPHONES: 04L434OLO0l4340LL2 Minister of State for East E.MAIL: [email protected] African Community Affairs TELEFAX: o4t4-348r7t 1't Floor, Postal Building Yusuf Lule Road ln any correspondence on this subject P.O. Box 7343, Kampala please quote No: ADM 542/583/01 UGANDA rHE REPUBLIC OF UGANDA 22"4 August,2Ol9 FTHES P ( L \-, 4 Hon. Oumo George Abott U Choirperson, Committee for 2019 * 2 3 AUG s Eost Africon Community Affoirs Porlioment of Ugondo EOEIYE L t4 raE \, \, KAMPATA NT OF CLOSURE OF UGANDA.RWANDA BORDERS Reference is mode to letter AB: I 171287 /01 doted l5rn August,20l9 oddressed to the Minister of Eost Africon Community Affoirs ond copied to the Permonent Secretory, Ministry of Eost Africon Community Affoirs regording the obove subject motter. ln the letter, you invited the Ministry to updote the EAC Committee on the progress mode to hondle the Closure of Ugondo-Rwondo Borders on Ihursdoy,29r,August, 2019 at 10.00om. As stoted this discussion would help ensure thot the Eost Africon Common Morket Protocol is effectively implemented for the benefit of Ugondo ond other Portner Stofes. The Purpose of this letter therefore, is to forword to you o Report on the Stotus of the obove issue for further guidonce during our interoction with the committee ond to re-offirm our ottendonce os per the stipuloted dote ond time Mogondo Julius Wondero MINISTER OF STATE FOR EAST AFRICAN COMMUNITY AFFAIRS C.C. The Speoker, Porlioment of Ugondo, Kompolo The Clerk to Porlioment, Porlioment of Ugondo, Kompolo Permonent Secretory, Ministry of Eost Africon Community Affoirs MINISTRY OF EAST AFRICAN COMMUNITY AFFAIRS REPORT ON THE CLOSURE OF UGANDA.
    [Show full text]
  • Supporting Affordable and Green Buildings in Kigali/Rwanda
    Kafunzo Merama Kagitumba Lake Mutanda Lake Bunyonyi Rwempasha Lubirizi Rutshuru Kisoro Nyagatare Cyanika Kabale a K b ag BIRUNGA m era u Butaro t NAT'L PARK Muvumba i g Kidaho Lac a Katuna K Lac Burera Rwanyakizinga Ruhengeri Mulindi Gatunda Lac Kirambo Cyamba Busogo Ruhondo Gabiro AKAGERA Byumba Ngarama Lac Kora NORRE NATIONAL Mikindi Mutura NORD PARK Lake Kagali Kinihira Lac Hago Mujunju Goma Nemba Gisenyi Rushashi Kinyami EST Muhura Nyundo Kabaya N Lac y Rutare Ngaru a Mbogo Murambi Kivumba ba Lac Rukara GISHWATI ro ng Shyorongi Muhazi NATURAL Ngororero Lac Ile Ihema Bugarura RESERVE Kiyumba KIGALI OUEST Kigali Rwamagana Ile Wahu Runda Gikoro Bulinga Kayonza Lac Lac Kicukiro Bicumbi Nasho Kivu Mabanza Lac SUPPORTING AFFORDABLE AND Gitarama Butamwa Kigarama Mugesera Lac Lake Ile Kibuye Mpanga Bisongou Birambo Lac Idjwi Mugesera Kibungo Cyambwe Gishyita Bwakira SUD Rilima Rukira Rwamatamu Masango Ruhango Sake Gashora Rusumo Gatagara Bare Nemba Kirehe Kaduha K Nyanza Ngenda ag Ile er Gombo Rwesero a Karaba Lac Lac Rusatira Cyohoha Rweru Kamembe Gisakura Gikongoro Sud Karama Bukavu Cyangugu Rwumba Kitabi Cyimbogo Karengera GREEN BUILDINGS IN KIGALI/RWANDA NYUNGWE Nyakabuye Bugumya NAT'L PARK Butare Ruramba Gisagara u r Busoro a y Bugarama n Munini ka A The boundaries and names shown and the designations used Runyombyi on this map do not imply official endorsement or acceptance by the United Nations. Map No. 3717 Rev. 11 UNITED NATIONS Department of Field Support July 2015 Geospatial Information Section (formerly Cartographic Section) Rwanda’s housing challenge Building materials and their environmental Impact analysis by building material type Rwanda’s National Housing Policy which was rolled out in impacts The impacts of exterior wall construction using nine locally available materials were compared and assessed relative to their share March 2015 aims at fast-tracking affordable housing projects The choice of building materials during the upgrading of of the city-wide flows in 2015.
    [Show full text]
  • Welcome to the East Africa Interhash 2011 Destination Nyungwe
    Welcome to the East Africa Interhash 2011 Destination Nyungwe - Where the Congo and Nile Rivers Begin Event Summary: This is a three-day two-night event hosted by the Kigali Hash House Harriers (KH3), 11-13 November 2011. The event is brought to you by an event Mis-Management team of three: Rambo Big Pussy Fake Black Ass They may be assisted by other members of KH3 Mis-Management The "main event" is a jungle hash, in tough, uncharted territory, partly off of any trail, in the most remote forest in Rwanda. Nyungwe Forest is a high-altitude, mountainous rainforest in southern Rwanda established as a forest reserve in 1933. The conservation area consists of 970 square kilometers. The forest is located in the Albertine Rift, a series of mountain ranges beginning at the Rwenzori mountains in western Uganda and Congo, and continuing south. Nyungwe is the largest mountainous rainforests remaining in Africa. Nyungwe is one of the most endemic species-rich areas in all of Africa. 2,500 mm of rain on average fall per year. It is known for its rugged terrain and complex mosaic of dense vegetation types from tall dense forests to open, flower filled marshes. You may run into: 13 different primate species (25% of Africa's total), 275 bird species, 1068 plant species, 85 mammal species, 32 amphibian and 38 reptile species. The "headquarters" is the hotel "La Petite Colline" [tel: 250+(0)788412210] in Cyangugu, in southwesternmost Rwanda. Cyangugu is the twin city of Bukavu, Democratic Republic of Congo. They are, in many ways, one town.
    [Show full text]
  • Kivuye in Burera District Final
    REPUBLIC OF RWANDA Ministry of Infrastructure ENERGY WATER AND SANITATION AUTHORITY (EWSA) Electricity Access Rollout Programme (EARP) Head Office: Avenue de l’ Ihema, P.O.Box 537, Kigali-Rwanda Tel: +(250)252573666 Fax: +(250)(0)252573802 E-mail: [email protected] Website: www.ewsa.rw PROJECT BRIEF FOR THE INSTALLATION OF LOW VOLTAGE AND MEDIUM VOLTAGE LINES AND SERVICE CONNECTIONS IN BUNGWE – KIVUYE - GATEBE AREA IN BURERA DISTRICT December 2011 1 LIST OF ACRONYMS ............................................................................................................ 5 0. BACKGROUND .................................................................................................................. 6 I. DESCRIPTION OF THE PROJECT ................................................................................. 8 I.1. INTRODUCTION ........................................................................................................................... 8 I.2. OBJECTIVES OF THE PROJECT ............................................................................................... 8 I.3. PROJECT ACTIVITIES ................................................................................................................ 9 I.4. CONSTRUCTION PROGRAMME ..............................................................................................10 I.5. TECHNICAL DESCRIPTION ......................................................................................................10 Description of Works ....................................................................................................
    [Show full text]
  • Backparkers-Brochure.Pdf
    Accommodation Prices 2018. Accomodation rates in $(USD) Per person per night I N D I Accomodation type Bed only Bed & Breakfast Half Board Full Board B W Self Camping $10PP $15PP $25PP $35PP Min Dormitory (4 Beds) $20PP $25PP $35PP $45PP Big Dormitory (6 Beds and above) $15PP $20PP $30PP $40PP Rent a mobile tent with beddings $15PP $20PP $30PP $40PP B Rent a mobile tent without beddings (pp) $12PP $17PP $27PP $35PP a e ck dg Twin Bed/Double Rooms with shared Bathroom $25PP $30PP $40PP $50PP packers Lo Single Bed room with shared Bathroom $30PP $35PP $45PP $55PP Twin Bed/Double Rooms self contained $40PP $45PP $55PP $65PP Single Bed Room self contained $45PP $50PP $60PP $70PP BWINDI BACKPACKERS LODGE Twin/Double Bedroom cottage $50PP $55PP $65PP $75PP Single Bedroom cottage $60PP $65PP $75PP $85PP LAST MINUTE GORILLA TRACKING PERMITS AND 3 Bedroom cottage $45PP $50PP $60PP $70PP ACTIVE NYIRAGONGO VOLCANO TREKKING/HIKING PERMITS AVAILABLE We accept payment by the following cards at no extra cost or by Mobile money on any of the following telephone numbers; To all clients paying for bed +256772661854, +256752661854, +256774883710 and breakfast, half board and full board, we serve full continental breakfast & for meals they are 3 course meals. Alcarte menu available for single course meals. Note:Prices can change without prio notice Note: half board includes Bed, You can pay by card on our website at no extra fees or Breakfast and Lunch or Dinner request for a card payment link by e-mail.. while full board includes Breakfast, Lunch & Dinner, It Half the price double the Fun!! excludes drinks Lodge shuttle: Departs from Kabale at 10:30am & 4:00pm.
    [Show full text]
  • MSF Cyangugu Cholera Prevention
    WATER, HYGIENE AND SANITATION ACTIVITIES FOR CHOLERA PREVENTION IN COMMUNITIES LIVING ADJACENT TO LAKE KIVU OR RUSIZI RIVER. CYANGUGU PROVINCE, RWANDA Presented by Peter Maes WHO & UNICEF CHOLERA CONFERENCE, DAKAR 2008 Cholera in Rwanda SINCE 1994: • Cholera became endemic in communities surrounding Lake Kivu • Outbreak mainly in Cyangugu but also Kibuye, Gisenyi and Ruhengeri Annual numbers of cholera cases in Rwanda and Cyangugu province: 1996-2003 3.000 s e s a c f 2.000 o r e b m u N 1.000 0 1996 1997 1998 1999 2000 2001 2002 2003 Rwanda Cyangugu 70 % of all cholera cases in Rwanda have occurred in Cyangugu province Cholera in Cyangugu (1) EPIDEMIOLOGICAL CURVE Monthly cholera cases in Cyangugu Province: 1998-2003 600 1998 1999 2000 2001 2002 2003 500 s e s 400 a c First Well f o First HP-session r 300 e b m u 200 N 15 months 15 months 100 0 r l r l r l r l r l r l y i y y i y y i y y i y y i y y i y l l l l l l e r r e r r e r r e r r e r r e r r u u u u u u b p a b p a b p a b p a b p a b p a J J J J J J o u o u o u o u o u o u A A A A A A t t t t t t n n n n n n c c c c c c a a a a a a O J O J O J O J O J O J 3150 1300 800 Expect yearly sporadic cholera cases with outbreaks every 2-3 years depending on herd immunity and environmental factors Cholera in Cyangugu (2) TARGET IN TIME: METEREOLOGICAL FACTORS Monthly cholera cases in Cyangugu Province: 1998-2003 600 250 1998 1999 2000 2001 2002 2003 500 200 s ) e s 400 m a c 150 m ( f l o l 300 r a f e n i b 100 a m 200 R u N 50 100 0 0 l r l r l r l r l r l r y i y y i y y i y y i y
    [Show full text]
  • Acknowledgments
    MGNP General Management Plan 2014-2024 ACKNOWLEDGMENTS Uganda Wildlife Authority (UWA) prepared this General Management Plan with total funding from Uganda Wildlife Authority. Consultations were held with all relevant stakeholders both at Resource use level, Subcounty level, District level and at National Level. Furthermore an analysis of stakeholders was done which gave guidance on the consultations made. Uganda Wildlife Authority highly acknowledges the Local Communities and the entire Kisoro district leadership, who contributed to the proposals during the Planning process. Prepared by: Uganda Wildlife Authority Input from: BMCA field staff, Senior UWA staff and stakeholders Guidance from: Uganda Wildlife Authority Top Management staff Drafted by: The Planning team Edited by: Edgar Buhanga and Richard Kapere as a secretariat of the planning team i MGNP General Management Plan 2014-2024 FOREWORD Mgahinga Gorilla National Park (33.7 km2) is contiguous with Parc National des Virunga (240 km2) in the DRC, and Parc National des Volcans (160 km2) in Rwanda, all forming the proposed transbound- ary PA known as the Virunga Conservation Area covering an area of 434 km2. The park includes three of the Virunga volcanoes - Mt Muhabura (4,127 m), Mt Gahinga (3,474 m) from which the park derives its name, and Mt Sabinyo (3,645 m). This park forms part of the home of the world’s Moun- tain Gorilla population and the Golden Monkey species. This document presents a ten-year management plan for Mgahinga Gorilla National Park (MGNP). Uganda Wildlife Authority (UWA) is committed to the continued sustainable management of the Park ecosystem. This can only be achieved through proper long term planning which government has already identified and provided for in the Uganda Wildlife Act (Cap 200).
    [Show full text]
  • Road Transport Management Systems on Customers’ Satisfaction in Rwanda
    East African Journal of Science and Technology, Vol.9 Issue1, 2019 Clement Habimana (P.41-58) ROAD TRANSPORT MANAGEMENT SYSTEMS ON CUSTOMERS’ SATISFACTION IN RWANDA Author: Clement HABIMANA SH Affiliation: University of Lay Adventists of Kigali Corresponding author Email: [email protected] Abstract The present publication has as objectives to assess the ways in which passenger road transport management systems affect the passengers ‘satisfaction in public transport and to find out the extent to which road transport passengers are satisfied with the services provided by the public transport companies in Rwanda. To achieve the results, respondents were asked about the commonly used management systems, how the management systems affect passengers’ satisfaction and the extent to which they are satisfied with the services provided by the road transport companies. Using SPSS, qualitative and quantitative analyses were conducted to understand the patterns of responses and the relationships between the dependent and independent variables. The findings revealed that the different management systems have differently affected customers’ satisfaction in the passenger road transport companies majorly through enhancing passenger comfort, timely departures and arrivals, facilitating passengers to appropriately plan for the journeys, and enhancing safety of passengers. Majority of the respondents were satisfied with the services provided by the road transport companies, with only a relatively smaller number indicating that they are not satisfied with the services of the companies. Pearson’s chi-square test of significance was conducted across the different socio- demographic variables and the results showed that passenger satisfaction does not significantly differ among the different demographic variables especially age, occupation, education levels and marital status (P>0.05).
    [Show full text]
  • 1 Victims and Survivors from Cyangugu, Rwanda: the Politics Of
    Victims and survivors from Cyangugu, Rwanda: the politics of testimony after genocide Rachel Ibreck ‘When I went back, I discovered that my home was not there anymore. It was totally destroyed. I was the only Tutsi who had not died; there were hardly any left in the whole sector or commune. I felt isolated. I also felt afraid that I too would be killed.’ Claude, a Tutsi from Cyangugu, Rwanda, 1994.1 ‘I asked them why they had come to see me. They said: ‘because we know you collaborate with the Tutsis. But this time you have to show your commitment and help to kill the Tutsis.’ I told them: ‘firstly, I am not prepared to kill anyone. Secondly there should be an investigation to establish the truth about what has happened. And then whoever is responsible, Tutsi or Hutu or someone else, should be punished by the law.’ Félicien, a Hutu from Cyangugu, Rwanda, 1994.2 Victim testimony is foundational to the pursuit of justice and social repair after mass atrocities and should be recognised as an expression of courage and transformative political agency. After the 1994 genocide in Rwanda, survivors recounted horrors that could hardly be communicated, creating precious records of human suffering and loss. Since then, other victims of injustice and abuse have also given testimony to human rights organisations, despite fears of repression. Taken on their own terms, these harrowing individual testimonies are profound critiques of atrocities and political violence. Collectively, they form a powerful legacy and a counterpoint to narrow political framings of Rwanda’s history.
    [Show full text]