SUPER THERMAL POWER PROJECT

STAGE-I (2X800 MW) Compliance status of Environmental Clearance Vide Letter No: J- 13012/125/2009-IA,II(T) Dt:22/03/16

SLNO MOEF STIPULATION STATUS AS ON 30.09.2016 A Specific Conditions: I The project proponent shall set up the Noted and will be complied. power project as a model plant demonstrating that ecology and development can co-exists in harmony and set examples for others to emulate similar practice. Ii Sulphur and ash contents in the coal to The said stipulation will be complied be use in the project shall not exceed during operation phase of the project. 0.5 % and 34 % respectively at any given time. In case of variation of coal quality at any point of time fresh reference shall be made to the Ministry for suitable amendments to environmental clearance condition wherever necessary. Iii Bi-flue stack of 275 m height with flue A bi-flue stack of 275 meters height gas velocity not less than 22 m/s shall has been designed to maintain velocity be installed and provided with of 22 m/sec. Continuous online stack continuous online monitoring monitoring facility for measurement of equipments for SO x, NO x and PM 2.5 & SO 2 and NO x and Particulate matter PM 10 . Mercury emissions from stack emissions from stack shall be may also be monitored on periodic provided. At present outer shell of bi- basis. flue stack completed. Iv No mine void filling or filling up of low There will be no mine void filling or lying areas with fly ash shall be filling up of low lying areas with fly undertaken. ash. V COC of 5.0 shall be adopted Closed cycle cooling system has been designed with COC of 5.0 for oplimization of water requirment. Vi Continuous monitoring of Narmada Continuous monitoring of water quality in its upstream and River water quality in its upstream downstream of water tapping point and downstream of water tapping shall be undertaken regularly and point will be undertaken regularly records maintained. during operation phase of the project.

Presently hydro-geology study by NIH Roorkee is being carried out. Field work completed and final report is under preparation. Final report will be submitted to Regional & Central office of MoEF &CC. vii The project proponent shall explore NTPC Gadarwara project is possibility for storage of excess constructing weir on Narmada river in monsoon water for use during lean consultation with Government of M.P season. The same could be by In addition to this, Hiran WRD, construction of barrage at appropriate (MP) has been approached location which could be carried out in and requested to suggest water close consultation with the WRD, Govt. storage scheme for Shakkar River & of . Sita Reva river which are tributaries of Narmada. viii The ash pond design shall be such that The structure of ash dykes will be no breach takes place even in the worst designed, constructed and operated as case of natural calamity. Since the per State of the Art engineering geology of the area indicates sandy practices for the design and loam and loamy soil, the ash pond need construction of earth dams with to be appropriately lined with adequate factor of safety. The design appropriate impermeable media. of ash dyke shall also take into consideration the seismic parameters.

Ix Ash pond for Stage-II (400 acres) can The said stipulation will be complied be considered only after the first ash during operation phase of the project. pond is dispensed with by filling up of bottom ash and demonstration of 100% fly ash utilization established within four years of commissioning of the plant. The 2 nd ash pond for Stage-II (400 acres) requirement should not arise and land earmarked can be converted for green belt and or water storage. X Long term study shall be carried to Aquatic ecology study has been assess impact on the ecology of the awarded to Annamalai university, river Narmada downstream of the Chennai vide LOA dated 17.03.2015 present project site at a different to study the impact on the Ecology of location especially at tapping points for river Narmada. drinking water supply and irrigation. The study shall be carried out by an Field work completed and final report institute of repute like IIT, Roorkee is under preparation. Final report preferably within six months and report shall be submitted to Concerned submitted to the Ministry. Thereafter Regional & Central office of MoEF the study shall be repeated after &CC. commissioning of both units of 2x800 MW and report subsequently submitted to the Ministry. Xi The project proponent shall explore Possibility will be explored for setting setting up of R.O System to treat up of R.O System to treat cooling cooling tower blow down discharge of tower blow down discharge of about 5 about 5 cusecs and the R.O system cusecs to take care of drinking water shall be so designed so as to take care supply for the nearest few villages. of drinking water supply for the nearest few villages. xii The village ponds / surface water Developing of village ponds / surface bodies located within 5 kms radius of water is being planned in the the project site shall be regenerated in Community Development works of the as part of its social welfare site. activities. xiii An amount of Rs 45.60 Crores as one A requisite fund has been earmarked time investment shall be earmarked for for implementing CSR-CD activities activities to be taken up under CSR for the project and shall be utilized in during construction phase of the accordance with the said stipulations. Project. A detailed CSR Action Plan be furnished to the Ministry within 3 Expenditure of Rs 13.30 crore towards months. Recurring expenditure for CSR Community Development carried out. thereafter shall be Rs 9.2Crores per Progress on CSR work is enclosed as annum till the life of the plant. Social Annexure-I Audit by a reputed University or an Institute shall be carried out annually and details to be submitted to MOEF besides putting it on Company's website. B. General Conditions (i) Vision document specifying prospective NTPC vide letter dated 08.04.2013 has plan for the site shall be formulated submitted a Project Vision Document and submitted to the Regional Office of to the Regional Office of the Ministry the Ministry within six months. of Environment and Forest & Climate Change (MoEF & CC), Bhopal.

(ii) Scheme for implementation for Projects as well as township are in harnessing solar power within the construction phase. Scheme for premises of the plant particularly at harnessing solar power within the available roof tops shall be formulated premises of the plant particularly at and status of implementation shall be available roof tops has been submitted periodically to the Regional formulated and incorporated in the Office of the Ministry. engineering layout of the project and same will be implemented on completion of building works at project.

(iii) Provision for installation of FGD shall Adequate space has been provided in be provided for future use. the layout for installation of FGD plant in future use, if necessary. (iv) Coal transportation to plant site shall The said stipulation will be be undertaken by rail and no road complied during operation phase transportation shall be permitted. of the project. (v) A long term study of radio activity and A detailed study on chemical heavy metals contents on coal to be composition of coal used particularly used shall be carried out through a heavy metal and radio activity reputed institute. Thereafter contents will be carried out through a mechanism for an in-built continuous reputed institute once the project monitoring for Radio activity and heavy starts receiving the coal during metals in coal and fly ash (including operation phase. bottom ash) be put in place. Award of contract for conducting natural background radiation monitoring to ‘BARC’ is in process.

(vi) Utilization of 100% Fly Ash generated Ash Utilization Plan has been shall be made from 4th year of prepared and shall be implemented in operation. Status of implementation compliance to fly ash gazette shall be reported to the Regional Office notification dated 03.11.2009 and its of the Ministry from time to time. amendment dt Jan’2016 during the operation phase of the project. Further, its status of implementation will be also submitted to the Regional Office, MoEF&CC at Bhopal regular interval.

(vii) High Efficiency Electrostatic The High Efficiency Electrostatic Precipitators (ESPs) shall be installed to Precipitators (ESPs) are designed for a ensure that particulate emission does guaranteed efficiency of 99.93 %. The not exceed 50 mg/Nm 3. particulate emission shall not exceed 50 mg/Nm 3.

(viii) Adequate dust extraction system such Adequate no. of dust suppression as cyclones / bag filters and water and extraction system will be provided spray system in dusty areas such as in in coal handling area including coal coal handling and ash handling points, stock yard area, ash handling points, transfer areas and other vulnerable transfer areas and other vulnerable dusty areas shall be provided. dusty areas for control of fugitive dust emissions. Dry fog dust suppression system is being provided at all transfer points.

(ix) Fly ash shall be collected in dry form An ash management scheme will be and storage facility (silos) shall be implemented consisting of dry ash provided. Unutilized fly ash shall be extraction system (DAES) for dry disposed off in the ash pond in the form collection of fly ash with storage of slurry form. Mercury and other facility (silos), supply of ash to heavy metals (As,Hg,Cr,Pb etc.) will be entrepreneurs for utilization and monitored in the bottom ash as also in promoting ash utilization to maximum the effluents emanating from the extent and safe disposal of unused existing ash pond. No ash shall be ash in the ash pond area. disposed off in low lying area. The plant shall have two different systems for ash disposal – conventional wet slurry disposal with ash water re-circulation for bottom ash and High Concentration Slurry Disposal (HCSD) for fly ash.

Periodic monitoring for mercury & heavy metals in the bottom ash and water emanating from ash pond will be done during the operation phase of the project.

No ash will be disposed off in low lying area.

(x) Ash pond shall be lined with To avoid the ground water HDPE/LDPE lining or any other contamination from bottom ash suitable impermeable media such that slurry, one of the bottom ash lagoons no leachate takes place at any point of is separated by a small temporary time. Adequate safety measures shall bund and the small area will be lined also be implemented to protect the ash with impervious liner of 300MM dyke from getting breached. Ash pond thickness. water shall be re- circulated and utilized. Ash pond shall be lined with suitable impermeable material like Bentonite blended clay OR HCSD layer.

The structure of ash dykes will be designed, constructed and operated as per State of the Art engineering practices for the design and construction of earth dams with adequate factor of Safety. The design of ash dyke shall also take into consideration the seismic parameters. AWRS system has been also envisaged.

(xi) Fugitive emissions shall be controlled Fugitive emission of fly ash & dust will to prevent impact on such that no be controlled up to the maximum agricultural/non-agricultural land. extent with the of suitable pollution Impact to any land shall be mitigated control basics i.e. ESP & dust and suitable compensation provided in extraction system etc. Extensive consultation with the local Panchayat. plantation will be undertake in all available selectively with Air Pollution Tolerant Index (APTI) plant spices. (xii) Hydrogeology of the area shall be The Hydrogeology of the area will be reviewed annually from an institute / reviewed annually from an institute/ organization of repute to assess impact organization of repute to assess of surface water and ground regime impact of surface water and ground (especially around ash dyke). In case regime (especially around ash dyke) any deterioration is observed specific and reports of water quality monitored mitigation measures shall be will be submitted to the Regional undertaken and reports / data of water Office of the Ministry. quality monitored regularly and Presently consulting for hydro-geology maintained shall be submitted to the study by NIH Roorkee is being carried Regional Office of the Ministry. out. Field work completed and final report is under preparation. Final report shall be submitted to regional & central office of MoEF & CC at Bhopal. (xiii) No ground water shall be extracted for The said stipulation will be complied use in operation of the power plant during operation phase of the project. even in lean season. (xiv) No water bodies (including natural Will be complied. drainage system) in the area shall be disturbed due to activities associated with the setting up/operation of the power plant. (xv) Regular monitoring of ground water Adequate nos. of piezometers will be level shall be carried out by installed for regular monitoring of establishing a network of existing wells ground water level in and around ash and constructing new piezometers. pond area as per stipulation and Monitoring around the ash pond area report will be submitted to Regional shall be carried out particularly for Office of MoEF&CC at Bhopal. heavy metals (Hg, Cr, As, Pb) and Presently, hydro-geology study is records maintained and submitted to being carried out by NIH Roorkee. the Regional Office of this Ministry. The Final report shall be submitted to data so obtained should be compared Regional office of MoEF& CC at with the baseline data so as to ensure Bhopal. that the ground water quality is not adversely affected due to the project. (xvi) Monitoring surface water quality in the Monitoring of Surface water quality area shall also be regularly conducted will be carried out regularly as per and records maintained. The monitored stipulations and reports will be data shall be submitted to the Ministry submitted to Regional Office of MoEF regularly. Further, monitoring points & CC at Bhopal. Presently, hydro- shall be located between the plant and geology study is being carried out by drainage in the direction of flow of NIH Roorkee. Final report will be ground water and records maintained. submitted to MoEF&CC. Monitoring for heavy metals in ground water shall be undertaken. (xvii) Minimum required environmental flow Will be complied. suggested by the Competent Authority of the state Govt. shall be maintained in the Channel/ Rivers (as applicable) even in lean season. (xviii) The treated effluents conforming to the The project will have an integrated prescribed standards only shall be re- scheme for treatment, re-cycle and re circulated and reused within the plant. use of effluents. Provision is being Arrangements shall be made that kept to recirculate cooling water and effluents and storm water do not get ash pond effluent. The cooling tower mixed. blow down shall be used fully/partially for ash handling, service water system, coal handling & firefighting etc. Provision is being kept for treatment, recirculation & reuse of entire quantity of coal handling plant effluents & service water effluents.

The effluent treatment system comprising of neutralization pit for DM plant regeneration waste, oil separator/skimmers for oily waste, coal slurry settling pond for coal handling plant effluents, lamella clarifier for service water effluents and cooling towers for hot water etc are being provided.

The effluents will be treated adequately conforming to the stipulated regulatory standards. An independent plant effluent drainage system will be constructed to ensure that plant effluents do not mix with storm water drainage.

(xix) Waste water generated from the plant An effluent management scheme will be shall be treated before discharge to implemented with the objective to treat the comply limits prescribed by the waste water as per the prescribed SPCB/CPCB. statutory standards of MP PCB/CPCB before final discharge/use. (xx) A sewage treatment plant shall be All domestic sewage emanating from provided (as applicable) and the treated plant and township will be treated in a sewage shall be used for raising green sewage treatment plant. The treated belt/plantation. sewage conforming to prescribed standards shall be utilized for plantation & raising greenbelt to the extent possible. (xxi) The project proponent shall undertake Rain water harvesting shall be rain water harvesting measures and practiced as per shall develop water storage for use in recommendation/stipulations of operation of the plant. Rain water Central Groundwater harvesting system shall be put in place Authority/Board. which shall comprise of rain water Action plan for implementation will be collection from the built up and open submitted to the Regional Office of the area in the plant premises. Action plan Ministry soon after incorporation of for implementation shall be submitted the same in various buildings. to the Regional Office of the Ministry. Building construction work is under progress. (xxii) Additional soil for leveling of the Soil obtained from within the site is proposed site shall be generated within being used for leveling of the site. the sited (to the extent possible) so that natural drainage system of the area is protected and improved. (xxiii) Common property resource falling in There is no common property resource the vicinity of the project area shall be falling within the plant area. identified and if any common property resource (such as grazing lad, pond etc.) is falling within the plant area and is developed and handed over to the community. (xxiv) Adequate safety measures shall be Hydrant system for covering the entire provided in the plant area to power station including all the check/minimize spontaneous fires in auxiliaries and buildings in the plant coal yard, especially during summer area shall be implemented. The season. Copy of these measures with system will be complete with piping, full details along with location plant hydrants, valves, instrumentation, layout shall be submitted to the hoses, nozzles, hose boxes/stations Ministry as well as to the Regional etc. Office of the Ministry. (xxv) Well designed acoustic enclosures for Latest norms being followed. Will be the DG sets and noise emitting complied. equipments to achieve the desirable insertion loss viz. 25 dB(A) should be provided. (xxvi) Storage facilities for auxiliary liquid fuel A detailed Disaster Management Plan such as LDO/HFO/LSHS shall be & Risk assessment including fire and made in the plant area in consultation explosion issues will be prepared and with department of Explosives, Nagpur; finalized in consultation with Sulphur content in the liquid fuel will Department of Explosives, Nagpur and not exceed 0.5%. Disaster Management regular mock drills shall be conducted Plan shall be prepared to meet any as per plan in order to address any eventuality in case of an accident eventuality in case of an accident. taking place due to storage of oil. (xxvii) First Aid and sanitation arrangements All arrangements related to first aid, shall be made for the drivers and other health & safety and sanitation for contract workers during construction workers during construction phase of phase. the project have been kept under the scope of EPC contractor. However, NTPC will ensure effective compliance of the said stipulations.

Various measures implemented during construction phase through contractor are;

• Adequate infrastructure facilities, such as sanitation, fuel, restroom, medical facilities, safety, and suitable water supply are being provided at various stages of project construction to the labor colonies housing the work force during construction phase of the project. The sanitary waste from these areas will be accorded suitable treatment.

Safety equipment such as earplugs and earmuffs, helmets, face shields, safety goggles etc. is being provided to workers engaged in high risk areas.

• A first aid center & ambulance have been established to provide immediate medical aid to the workers and their family members. An ambulance service is available at site to transport injured workers to nearby hospitals. (xxviii) Noise levels emanating from turbines Design specification for the equipments shall be limited to 85 dB (A) from has been made to comply with the source. For people working in the high stipulation. Personal protective equipment noise area, shall be provided. Workers has been arranged through contractors engaged in noisy areas such as turbine during construction phase. Periodic area, air compressors etc shall be examination of workers during operation periodically examined to maintain phase shall be done as stipulated. audiometric record and for treatment for any hearing loss including shifting The workers of generator halls and to non noisy/less noisy areas. other high noise area will be provided with appropriate ear protection devices. (xxix) Regular monitoring of ambient air Regular monitoring of AAQ will be ground level concentration of SO2, done during the operation of the NOx, PM2.5 & PM10 and Hg shall be plant. The four locations of AAQMS carried out in the impact zone and have been finalized in consultation record maintained. If at any stage these with MPSPCB. Four (4) no. of AAQMS levels are found to exceed the equipments will be installed at site prescribed limits, necessary control and the infra structure requirements measures shall be provide immediately. for the stations are being established. The location of the monitoring stations Data will be submitted to the Regional and frequency of monitoring shall be Office of the Ministry for each Quarter. decided in consultation with SPCB. The data shall also be put up on the Periodic reports shall be submitted to website of the company. the Regional office of this Ministry. The data shall also be put on the website of the company. (xxx) Green Belt consisting of 3 tiers of • Green Belt around the Main Plant plantations of native species around area except transmission corridor plant not less than 100m width shall be shall be planted. raised (except in areas not feasible). • Around 150 acres of land has The density of trees shall not less than been envisaged for the green belt 2500per ha with survival rate not less development of 100 m width. than 80%. • Green Belt around the Township area shall be planted. • Extensive afforestation will be undertaken at all available spaces in and around project, after construction is complete. • Avenue Plantation along the Road shall be done. • The density of trees shall not less than 2500per ha with all efforts to maintain the survival rate not less than 80%. • Under development of green belt work 20,000 tree have been planted at project in this monsoon. (xxxi) An Environmental Cell comprising of An Environment Management Group at-least one expert in environmental (EMG) shall be set up at Gadarwara science / engineering, occupational STPP. The EMG will be responsible for health and a social scientist, shall be implementing and monitoring the created preferably at the project site stipulations. EMG shall have itself and shall be headed by an officer sufficient trained manpower and of appropriate superiority and equipment for environmental qualification. It shall be ensured that monitoring and other environmental the Head of the Cell shall directly report related activities to ensure compliance to the head of the organization who with statutory requirements. It will would be accountable for interact regularly with the State implementation of environmental Pollution Control Board. A laboratory regulations and social impact at Gadarwara STPP will be well improvement / mitigation measures. equipped for monitoring of ambient air quality, stack emission water/effluent quality, etc. (xxxii) The project proponent shall also Total budget for Community adequately contribute in the Development (CSR work during development of the neighbouring construction of plant) works of villages. Special package with Gadarwara project is Rs 45.60 implementation schedule for providing Crore. Expenditure of Rs 13.30 potable drinking water supply in the crore towards Community nearby villages and schools shall be Development works was carried out. undertaken in a time bound manner. List of CD works executed in PAVs enclosed. Payment disbursed for scheme of drinking water supply to each household in PAVs. Hand pumps installed in all 7 PAVs.

(xxxiii) CSR scheme shall be undertaken based Infrastructure works in Project on need based assessment in and Affected Villages (PAVs): around the villages within 5 km of the • CC road constructed in Village site and in constant consultation with Dongargaon. • Road side plantation was done in all the village Panchayat and the District PAVs. Administration. As part of CSR • CC road construction in Village employment of local youth after Chorbarheta. imparting relevant training as may be Drinking water: necessary shall be undertaken as • Hand pumps installed in all 7 PAVs. committed. • Payment disbursed for supply of water to each household in PAVs. Sanitation: • Ghat Pipariya is now open defecation free. • Payment disbursed for toilet construction in each house for Gangai & Umaria villages. • Toilets worth 29 lacs constructed in Village Chorbarheta. Education: . Boundary wall of schools under construction in all PAVs. • Scholarship distributed to meritorious students of Government schools of class V,VIII & X. Health: • 6 medical camps and one family planning camp organized for PAVs. • Upgradation of District hospital was done. • Upgradation of Red Cross hospital was done. Other welfare measures: • Contribution made towards 2 camps for upliftment of weaker sections and one cultural program. Infrastructure works in Vicinities: • Two CC road constructed in . • Solar system installed in remotely located Village Badgaon. • Community Centres constructed in various villages, Gadarwara & villages, Gadarwara & Narsinghpur. (xxxiv) It shall be ensured that an in-built The said stipulation will be complied monitoring mechanism for the CSR during operation phase of the project. schemes identified is in place and annual social audit shall be got done from the nearest government institute of repute in the region. The project proponent shall also submit the status of implementation of the scheme from time to time. The achievements should be put on company's website.

(xxxv) Provision shall be made for the housing All construction agencies working at of construction labor (as applicable) NTPC Gadarwara Project are providing within the site with all necessary temporary accommodation for their infrastructures and facilities such as workers near to work site. The fuel for cooking ,mobile toilets, mobile engaged contractors are responsible STP, safe drinking water, medical for providing facilities for housing of health care , crèche etc. The housing construction labor (as applicable) may be in the form of temporary within the site with all necessary structure to be removed after the infrastructures and facilities such as completion of the project. fuel for cooking, mobile toilets, safe drinking water, medical health care etc. (xxxvi) The project proponent shall advertise in The information of Environmental at least two local news papers widely Clearance was published in Two circulated in the region around the newspapers widely circulated in project, one of which shall be in the the region; vernacular language of the locality 1. Dainik Bhaskar on 27.03.2013 concerned within seven days from the (Hindi) date of this clearance letter, informing 2. Nayi Duniya on 23.10.2013 that the project has been accorded (Hindi) environmental clearance and copies of clearance letter are available with the State Pollution Control Board/Committee and may seen at Website of the Ministry of Environment and Forests at http://envfor.nic.in . (xxxvii) A copy of the clearance letter shall be The copy Environmental Clearance sent by the proponent to concerned has been submitted to the following Panchayat, Zila parishad/ Municipal concerned offices. Corporation, urban local body and the (1) Collector, Narsinghpur. Local NGO, if any, from whom (2) General Manager, District Trade & suggestions/representations, if any, Industries Centre, Narsinghpur. received while processing the proposal. (3) CEO, Zila Panchayat The clearance letter shall also be put (4) Secretary, Gram Panchayat on the website of the Company by the Gangai. proponent. (5) Secretary, Gram Panchayat Kudari. (6) Secretary, Gram Panchayat Chor Barheta. The environmental Clearance has been also uploaded on the NTPC website. (xxxviii) The proponent shall upload the status Online continuous Stack Emission of compliance of the stipulated Monitoring System (CSEMS) for the environmental clearance conditions, parameters like particulate matter including results of monitored data on (PM) NOX, SO2, Fluoride, Ammonia their website and shall update the will be installed. Once the pollution same periodically. It shall control equipment are in operation the simultaneously be sent to the Regional data will be uploaded to the online Office of MOEF, the respective Zonal emission to MPPCB and CPCB server Office of CPCB and the SPCB. The during operation phase of the project. criteria pollutant levels namely; SPM,RSPM (PM2.5&PM10), SO2, NOx (ambient levels as well as stack emissions) shall be displayed at a convenient location near the main gate of the company in the public domain (xxxix) The environment statement for each The environment statement for each financial year ending 31 st March in financial year ending 31 st March in Form-V as is mandated to be submitted Form-V shall be submitted once the by the project proponent to the plant becomes operational by the concerned State Pollution Control project proponent to the concerned Board as prescribed under the State Pollution Control Board. Environment (protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental clearance conditions and shall also be sent to the respective Regional Offices of the Ministry by e- mail. (xl) The project proponent shall submit six Six monthly reports on the status of monthly reports on the status of the the implementations of the stipulated implementations of the stipulated environmental safeguards to the environmental safeguards to the Ministry of Environment and Forests, Ministry of Environment and Forests, its Regional Office. its Regional Office, Central Pollution Control Board and State Pollution Control Board. The project proponent shall upload the status of compliance of the environment of the environmental clearance conditions on their website and update the same periodically and simultaneously send the same by email to Regional office, Ministry of Environment and Forests. (xli) Regional office of the Environment & A complete set of documents including Forests will monitor the Environmental Impact Assessment implementation of the stipulated (EIA) Report and Environment conditions. A complete set of Management Plan (EMP) along with documents including Environmental the additional information / Impact Assessment Report and clarifications were forwarded on Environment Management plan along 10.03.2014 to the Regional Office of with the additional information MOEF at Bhopal. submitted from time to time shall be forwarded to the Regional Office for their use during monitoring. Project proponent will up-load the compliance status in their website and up-date the same from time to time at least six monthly basis. Criteria pollutants levels including NOx (from stack & ambient air) shall be displayed at the main gate of the power plant. (xlii) Separate funds shall be allocated for The requisite funds for environmental implementation of environmental mitigation measures have been protection measures along with item – included in the project cost. Financial wise break –up. These cost shall be provision stipulated towards included as part of the project cost. The environmental mitigate measures funds earmarked for the environment shall not be diverted for other protection measures shall not be purposes. diverted for other purpose and year- wise expenditure should be reported to the ministry. (xliii) The project authorities shall inform the Will be complied. Regional Office as well as the Ministry regarding the date of financial closure and final approval of the project by the concerned authorities and the dates of start of land development work and commissioning of plant. (xliv) Full cooperation shall be extended to Full cooperation shall be extended to the Scientists/officers from the the Scientists / officers from the Ministry / Regional Office of the Ministry / Regional Office of the Ministry/ CPCB /SPCB who would be Ministry at Bangalore / the CPCB / monitoring the compliance of the SPCB during monitoring of the environmental status. project. (xlv) The Ministry of Environment and Noted. Forests reserves the right to revoke the clearance if conditions stipulated are not implemented to the satisfaction of the Ministry. The Ministry may also impose additional environmental conditions of modify the existing ones, if necessary. (xlvi) The environmental clearance accorded Noted. shall be valid for a period of 5 years to start operations by the power plant (xlvii) Concealing factual data or submission Noted. of false/fabricated data and failure to comply with any of the conditions mentioned above may result in withdrawal of this clearance and attract action under the provisions of Environment (Protection) Act, 1986. (xlviii) In case of any deviation or alteration in Noted. the project proposed including coal transportation system from those submitted to this Ministry for clearance, a fresh reference should be made to the Ministry to assess the adequacy of the condition(s) imposed and to add additional environmental protection measures required, if any.

Annexure-I

List of NTPC CD works with detail and status

Bud Cheques status as get Locatio Sub Amoun disbursed on head n location Subject t in lacs to 31.08.16 Cultural Program 0.51 B.1.6 PAV Chorbarheta Chorbarehta NTPC Completed Upliftment of weaker section (legal awareness 4.00 CEO jila B.1.6 PAV Chorbarheta camp)(Chorbarhata) panchayat Completed Construction of toilets in premises of Uchit Mulya 4.19 B.1.1 PAV Gangai Dukan Gangai RES Completed Construction of shed for 3.40 B.1.1 PAV Gangai Uchit Mulya Dukan Gangai RES Completed Installation of Hand 2.52 pumps in PAVs(out of B.1.2 PAV Chorbarheta 16.14lacs) PHE Completed Installation of Hand 2.52 pumps in PAVs(out of B.1.2 PAV Dongargaon 16.14lacs) PHE Completed Installation of Hand 2.52 pumps in PAVs(out of B.1.2 PAV Gangai 16.14lacs) PHE Completed Installation of Hand 2.52 Ghat pumps in PAVs(out of B.1.2 PAV pipariya 16.14lacs) PHE Completed Installation of Hand 2.52 pumps in PAVs(out of B.1.2 PAV Kudari 16.14lacs) PHE Completed Installation of Hand 2.52 pumps in PAVs(out of B.1.2 PAV Mehrakheda 16.14lacs) PHE Completed Installation of Hand 1.02 pumps in PAVs(out of B.1.2 PAV Umaria 16.14lacs) PHE Completed Construction of Cement 23.13 Concrete Road /Pathway B.1.1 PAV Dongargaon in Dongargaon Village NTPC Completed Plantation in PAV's(out of 17.69lacs) 1.97 CEO jila B.1.1 PAV Kudari panchayat Completed Ghat Toilets in Every house hold 62.50 Pipariya in PAVs(out of 125 lacs) ( CEO jila B.1.3 PAV Demand 162) panchayat Completed Boundary Walls in PAV Schools(out of 18.65lacs) 4.06 CEO jila B.1.4 PAV Dongargaon panchayat Completed Boundary Walls in PAV Schools(out of 18.65lacs) 2.44 CEO jila B.1.4 PAV Gangai panchayat Completed Boundary Walls in PAV Schools(out of 18.65lacs) 8.09 CEO jila B.1.4 PAV Kudari panchayat Completed Legal awareness camp at Chichli (out of 0.51 CEO jila B.1.6 PAV Chorbarheta 3.54817lacs) panchayat Completed Legal awareness camp at Chichli (out of 0.51 CEO jila B.1.6 PAV Dongargaon 3.54817lacs) panchayat Completed Legal awareness camp at Chichli (out of 0.51 CEO jila B.1.6 PAV Gangai 3.54817lacs) panchayat Completed Legal awareness camp at Ghat Chichli (out of 0.51 CEO jila B.1.6 PAV Pipariya 3.54817lacs) panchayat Completed Legal awareness camp at Chichli (out of 0.51 CEO jila B.1.6 PAV Kudari 3.54817lacs) panchayat Completed Legal awareness camp at Chichli (out of 0.51 CEO jila B.1.6 PAV Mehrakheda 3.54817lacs) panchayat Completed Legal awareness camp at Chichli (out of 0.51 CEO jila B.1.6 PAV Umaria 3.54817lacs) panchayat Completed Family planning incentive to PAPs(out of 0.2787 0.04 B.1.5 PAV Chorbarheta lacs) NTPC Completed Family planning incentive to PAPs(out of 0.2787 0.04 B.1.5 PAV Dongargaon lacs) NTPC Completed Family planning incentive to PAPs(out of 0.2787 0.04 B.1.5 PAV Gangai lacs) NTPC Completed Family planning incentive Ghat to PAPs(out of 0.2787 0.04 B.1.5 PAV pipariya lacs) NTPC Completed Family planning incentive to PAPs(out of 0.2787 0.04 B.1.5 PAV Kudari lacs) NTPC Completed Family planning incentive to PAPs(out of 0.2787 0.04 B.1.5 PAV Mehrakheda lacs) NTPC Completed Family planning incentive to PAPs(out of 0.2787 0.04 B.1.5 PAV Umaria lacs) NTPC Completed

Ghat Boundary wall at Ghat 2.03 CEO jila B.1.4 PAV Pipariya Pipariya panchayat Completed

CC road and drain at 10.00 CEO jila B.1.1 PAV Gangai Gangai panchayat Completed CC road and drain at 10.00 CEO jila B.1.1 PAV Umaria Umaria panchayat Completed Medical screening Camp 0.03 in Gangai & Mehhrakheda(out of B.1.6 PAV Dongargaon 0.23lacs=0.184+0.044) NTPC Completed Medical screening Camp 0.03 in Gangai & Mehhrakheda(out of B.1.6 PAV Chorbarheta 0.23lacs=0.184+0.044) NTPC Completed Medical screening Camp 0.03 in Gangai & Mehhrakheda(out of B.1.6 PAV Gangai 0.23lacs=0.184+0.044) NTPC Completed Medical screening Camp 0.03 in Gangai & Ghat Mehhrakheda(out of B.1.6 PAV pipariya 0.23lacs=0.184+0.044) NTPC Completed Medical screening Camp 0.03 in Gangai & Mehhrakheda(out of B.1.6 PAV Kudari 0.23lacs=0.184+0.044) NTPC Completed Medical screening Camp 0.03 in Gangai & Mehhrakheda(out of B.1.6 PAV Mehrakheda 0.23lacs=0.184+0.044) NTPC Completed Medical screening Camp 0.03 in Gangai & Mehhrakheda(out of B.1.6 PAV Umaria 0.23lacs=0.184+0.044) NTPC Completed Contribution towards 0.25 B.1.6 PAV Mehrakheda cultural program NTPC Completed

CC road and drain at 10.00 CEO jila B.1.1 PAV Kudari Kudari panchayat Completed

0.52 CEO jila B.1.1 PAV Mehrakheda LED bulbs in Mehrakheda panchayat Completed

Toilet construction in each 28.05 CEO jila B.1.3 PAV Kudari house in Kudari panchayat Completed 0.07 B.1.4 PAV Chorbarheta Sports kit(0.49815 lacs) NTPC Completed 0.07 B.1.4 PAV Dongargaon Sports kit(0.49815 lacs) NTPC Completed 0.07 B.1.4 PAV Gangai Sports kit(0.49815 lacs) NTPC Completed Ghat 0.07 B.1.4 PAV pipariya Sports kit(0.49815 lacs) NTPC Completed 0.07 B.1.4 PAV Kudari Sports kit(0.49815 lacs) NTPC Completed 0.07 B.1.4 PAV Mehrakheda Sports kit(0.49815 lacs) NTPC Completed 0.07 B.1.4 PAV Umaria Sports kit(0.49815 lacs) NTPC Completed Stationery to students of Govt schools of 0.14 B.1.4 PAV Chorbarheta PAVs(0.99598 lacs) NTPC Completed Merit scholarship to 0.29 B.1.4 PAV Chorbarheta students(2.05lacs) NTPC Completed Stationery to students of Govt schools of 0.14 B.1.4 PAV Dongargaon PAVs(0.99598 lacs) NTPC Completed Merit scholarship to 0.29 B.1.4 PAV Dongargaon students(2.05lacs) NTPC Completed Stationery to students of Govt schools of 0.14 B.1.4 PAV Gangai PAVs(0.99598 lacs) NTPC Completed Merit scholarship to 0.29 B.1.4 PAV Gangai students(2.05lacs) NTPC Completed Stationery to students of Ghat Govt schools of 0.14 B.1.4 PAV pipariya PAVs(0.99598 lacs) NTPC Completed Ghat Merit scholarship to 0.29 B.1.4 PAV pipariya students(2.05lacs) NTPC Completed Stationery to students of Govt schools of 0.14 B.1.4 PAV Kudari PAVs(0.99598 lacs) NTPC Completed Merit scholarship to 0.29 B.1.4 PAV Kudari students(2.05 lacs/2016) NTPC Completed Stationery to students of Govt schools of 0.14 B.1.4 PAV Mehrakheda PAVs(0.99598 lacs) NTPC Completed Merit scholarship to 0.29 B.1.4 PAV Mehrakheda students(2.05lacs) NTPC Completed Stationery to students of Govt schools of 0.14 B.1.4 PAV Umaria PAVs(0.99598 lacs) NTPC Completed Merit scholarship to 0.29 B.1.4 PAV Umaria students(2.05lacs) NTPC Completed Construction of Cement 19.34 Concrete Road /Pathway B.1.1 PAV Chorbarheta in Chorbarehta village NTPC Completed Raising of Road Chowk at 1.91 B.1.1 PAV Chorbarheta Chorbarehta NTPC Completed Repair of Road 2.45 Chorbarheta to B.1.1 PAV Mehrakheda Mehrakheda NTPC Completed temporary road across 0.37 B.1.1 PAV Mehrakheda Shakkar NTPC Completed Chorbarheta Scholarship to Students in 0.27 B.1.4 PAV PAVs (out of 1.9 lacs) NTPC Completed Dongargaon Scholarship to Students in 0.27 B.1.4 PAV PAVs (out of 1.9 lacs) NTPC Completed Gangai Scholarship to Students in 0.27 B.1.4 PAV PAVs (out of 1.9 lacs) NTPC Completed Ghat Scholarship to Students in 0.27 B.1.4 PAV pipariya PAVs (out of 1.9 lacs) NTPC Completed Kudari Scholarship to Students in 0.27 PAVs (out of 1.9 B.1.4 PAV lacs/2015) NTPC Completed Mehrakheda Scholarship to Students in 0.27 B.1.4 PAV PAVs (out of 1.9 lacs) NTPC Completed Umaria Scholarship to Students in 0.27 B.1.4 PAV PAVs (out of 1.9 lacs) NTPC Completed Chorbarheta Medical Camps (out of 3 0.43 B.1.5 PAV lacs) NTPC Completed Dongargaon Medical Camps (out of 3 0.43 B.1.5 PAV lacs) NTPC Completed Gangai Medical Camps (out of 3 0.43 B.1.5 PAV lacs) NTPC Completed Ghat Medical Camps (out of 3 0.43 B.1.5 PAV pipariya lacs) NTPC Completed Kudari Medical Camps (out of 3 0.43 B.1.5 PAV lacs) NTPC Completed Mehrakheda Medical Camps (out of 3 0.43 B.1.5 PAV lacs) NTPC Completed Umaria Medical Camps (out of 3 0.43 B.1.5 PAV lacs) NTPC Completed 0.78 B.1.6 PAV Dongargaon Water tanker NTPC Completed 0.78 B.1.6 PAV Mehrakheda Water tanker NTPC Completed Upgradation and renovation of District 32.32 B.2.4 Vicinity Narsinghpur hospital Narsinghpur PWD Completed Construction of drain in Govt Hospital at 18.60 B.2.1 Vicinity Gadarwara Gadarwara RES Completed Construction of Community Hall, Dining 10.00 B.2.1 Vicinity Gadarwara Hall in BTI, Gadarwara RES Completed Fixing of Paver block in Govt Excellent School, B.2.1 Vicinity Narsinghpur Narsinghpur 7.98 RES Completed False ceiling in Govt PG 3.81 B.2.1 Vicinity Narsinghpur College, Narsinghpur RES Completed Construction of C. C Road in front of Auditorium at 2.50 B.2.1 Vicinity Narsinghpur PG College Narsinghpur RES Completed False ceiling in Govt Excellent School, 1.18 B.2.1 Vicinity Narsinghpur Narsinghpur RES Completed Construction of Cement concrete road in PG 0.62 B.2.1 Vicinity Narsinghpur College, Narsinghpur RES Completed Sulabh toilet in Court 7.85 B.2.1 Vicinity Narsinghpur Narsinghpur RES Completed Construction of Public toilets in various villages 115.25 CEO jila B.2.1 Vicinity Narsinghpur in Narsinghpur panchayat Completed Furnitures in Auditorium at PG college , 20.00 B.2.1 Vicinity Narsinghpur Narsinghpur RES Completed Construction of Town Hall 25.00 B.2.1 Vicinity Gadarwara near Ambedkar Bhawan at RES Completed Gadarwara

144.75 CEO jila B.2.1 Vicinity Narsinghpur Sanitation in Narsinghpur panchayat Completed Providing Health Facilities 14.90 B.2.4 Vicinity Narsinghpur at Narsinghpur Collector Completed

Dist Renew. 3.50 Solar system in Badagaon Energy B.2.1 Vicinity Gadarwara tah Gadarwara officer Completed Contribution to ODF in 2.00 Villages(cooker) CEO jila B.2.1 Vicinity Gadarwara panchayat Completed 0.50 B.1.6 Vicinity Gadarwara Blanket distribution NTPC Completed Renovation Barman old B.2.1 Vicinity Barman age home 3.00 Collector Completed

1.50 CEO jila B.2.1 Vicinity Barman Fair at Barman Ghat panchayat Completed Financial assisstance to Sh Vivek Kaurav for kidney 1.50 B.2.4 Vicinity Narsinghpur transplant Collector Completed Providing Multi para monitor at Gadarwara 2.10 B.2.4 Vicinity Gadarwara Hosp NTPC Completed Renovation works at Govt headquarters at 2.45 B.2.1 Vicinity Narsinghpur Narsinghpur-fencing NTPC Completed School Chalo Abhiyan 1.88 Vicinity Gadarwara Completed Construction of Road- 60.64 Plant Boundary to B.1.1 PAV Mehrakheda Mehrakheda RES In progress Plantation in PAV's (out of 17.69 lacs) 3.15 CEO jila B.1.1 PAV Chorbarheta panchayat In progress Plantation in PAV's (out of 17.69 lacs) 1.97 CEO jila B.1.1 PAV Dongargaon panchayat In progress Plantation in PAV's (out of 17.69 lacs) 4.72 CEO jila B.1.1 PAV Gangai panchayat In progress Plantation in PAV's (out of Ghat 17.69 lacs) 1.97 CEO jila B.1.1 PAV Pipariya panchayat In progress Plantation in PAV's (out of 17.69 lacs) 2.75 CEO jila B.1.1 PAV Mehrakheda panchayat In progress Plantation in PAV's (out of 17.69 lacs) 1.18 CEO jila B.1.1 PAV Umaria panchayat In progress Boundary Walls in PAV Schools(out of 18.65lacs) 4.06 CEO jila B.1.4 PAV Umaria panchayat In progress Construction of Community Halls ( 50% of 12.42 Estimate) part of 74.52 B.1.1 PAV Chorbarheta lacs RES In progress Construction of Community Halls ( 50% of 12.42 Estimate) part of 74.52 B.1.1 PAV Dongargaon lacs RES In progress Construction of Community Halls ( 50% of 12.42 Ghat Estimate) part of 74.52 B.1.1 PAV Pipariya lacs RES In progress Construction of Community Halls ( 50% of 12.42 Estimate) part of 74.52 B.1.1 PAV Kudari lacs RES In progress Construction of Community Halls ( 50% of 12.42 Estimate) part of 74.52 B.1.1 PAV Mehrakheda lacs RES In progress Construction of Community Halls ( 50% of 12.42 Estimate) part of 74.52 B.1.1 PAV Umaria lacs RES In progress

Entrance gate in 3 villages 2.60 CEO jila B.1.1 PAV Gangai (out of 7.8lacs)) panchayat In Progress

Entrance gate in 3 villages 2.60 CEO jila B.1.1 PAV Kudari (out of 7.8lacs)) panchayat In Progress

Entrance gate in 3 villages 2.60 CEO jila B.1.1 PAV Umaria (out of 7.8lacs)) panchayat In Progress Water supply pipeline (out 20.00 B.1.2 PAV Chorbarheta of 119.61 lacs) PHE In progress Water supply pipeline (out 18.55 B.1.2 PAV Dongargaon of 119.61 lacs) PHE In progress Water supply pipeline (out 20.00 B.1.2 PAV Gangai of 119.61 lacs) PHE In progress Ghat Water supply pipeline (out 9.62 B.1.2 PAV pipariya of 119.61 lacs) PHE In progress Water supply pipeline (out 19.62 B.1.2 PAV Kudari of 119.61 lacs) PHE In progress Water supply pipeline (out 16.20 B.1.2 PAV Mehrakheda of 119.61 lacs) PHE In progress Water supply pipeline (out 15.62 B.1.2 PAV Umaria of 119.61 lacs) PHE In progress

Ghat 4.44 CEO jila B.1.1 PAV Pipariya cemetery at Ghat Pipariya panchayat In Progress

Ghat Entrance gate at Ghat 2.60 CEO jila B.1.1 PAV Pipariya pipariya panchayat In Progress 1.71 CEO jila B.1.1 PAV Kudari Cemetery in villages panchayat In Progress

Toilet in each house 4.68 CEO jila B.1.3 PAV Umaria Umaria panchayat In Progress

Toilets in each 15.30 CEO jila B.1.3 PAV Dongargaon house(Dongargaon102) panchayat In progress

Construction of passenger 2.00 CEO jila B.1.1 PAV Kudari shed panchayat In Progress

Construction of ghat 5.00 CEO jila B.1.2 PAV Kudari /steps panchayat In Progress

Ghat 10.00 CEO jila B.1.1 PAV pipariya Construction of CC road panchayat In Progress Construction of Community Halls ( 50% of Umaria 12.42 Estimate) part of 74.52 B.1.1 PAV lacs RES In progress 1.00 B.1.6 PAV Chorbarheta Water tanker to PAVs NTPC In progress

2.00 CEO jila B.1.1 PAV Dongargaon Passenger shed panchayat In Progress

Construction of Entrance 2.60 CEO jila B.1.1 PAV Dongargaon gate panchayat In Progress

Construction of Entrance 2.60 CEO jila B.1.1 PAV Chorbarheta gate panchayat In progress

Construction of Entrance 2.60 CEO jila B.1.1 PAV Mehrakheda gate panchayat In progress Deepening and widening 5.00 B.1.1 PAV Dongargaon of existing pond NTPC In progress Construction of drain on In both side of road at 2.85 progress B.1.1 PAV Gangai Gangai turning NTPC Construction of public chabutra in Villages(out of 0.35 CEO jila B.1.1 PAV Gangai 1.4lacs) panchayat In progress Construction of public Ghat chabutra in Villages(out of 0.35 CEO jila B.1.1 PAV Pipariya 1.4lacs) panchayat In progress Construction of Ghat Ghat /steps,passenger shed & 12.00 CEO jila B.1.1 PAV Pipariya pond panchayat In progress Construction of public chabutra in Villages(out of 0.35 CEO jila B.1.1 PAV Kudari 1.4lacs) panchayat In progress Construction of CC 13.50 B.1.1 PAV Mehrakheda road/pathway NTPC In progress Mehrakheda

Toilets in Every house hold 28.34 B.1.3 PAV Chorbarheta in PAVs(1 Chorbarheta) RES In progress Gangai Toilets in Every house hold 62.50 in PAVs(out of 125 lacs) ( CEO jila B.1.3 PAV Demand 162) panchayat In progress Electrical works in 8.00 B.1.1 PAV Dongargaon PAVs`(out of 40 lacs) NTPC In progress Electrical works in 8.00 B.1.1 PAV Kudari PAVs`(out of 40 lacs) NTPC In progress Electrical works in 8.00 B.1.1 PAV Mehrakheda PAVs`(out of 40 lacs) NTPC In progress Electrical works in 8.00 B.1.1 PAV Chorbarheta PAVs`(out of 40 lacs) NTPC In progress Construction of public chabutra in Villages(out of 0.35 CEO jila B.1.1 PAV Umaria 1.4lacs) panchayat In progress Electrical works in 8.00 B.1.1 PAV Umaria PAVs`(out of 40 lacs) NTPC In progress Construction of Community Mess in Govt. 10.00 B.2.3 Vicinity Narsinghpur MLB School Narsinghpur RES In progress Construction of SDM Court Building at 26.05 B.2.1 Vicinity Gadarwara Gadarwara RES In progress Petrol engine for fibre 3.75 B.2.1 Vicinity Narsinghpur boat Collector In progress

list forwarded by Collector 25.00 CEO jila B.2.1 Vicinity Vicinity (Mangal bhavan) panchayat In progress MLA list forwarded by Collector (Boundary wall 31.00 B.2.3 Vicinity Vicinity in High schools) Collector In progress

list forwarded by Collector 33.00 CEO jila B.2.1 Vicinity Vicinity (Mangal bhavan) panchayat In progress Addl wards in Hospital at 31.00 B.2.4 Vicinity Gadarwara Gadarwara NTPC In progress Total (Rs in Lacs) 1,329.27

...... x....x.....x...... End of report