Gadarwara Super Thermal Power Project GADARWARA SUPER THERMAL POWER PROJECT STAGE-I (2X800 MW) Compliance status of Environmental Clearance Vide Letter No: J- 13012/125/2009-IA,II(T) Dt:22/03/16 SLNO MOEF STIPULATION STATUS AS ON 30.09.2016 A Specific Conditions: I The project proponent shall set up the Noted and will be complied. power project as a model plant demonstrating that ecology and development can co-exists in harmony and set examples for others to emulate similar practice. Ii Sulphur and ash contents in the coal to The said stipulation will be complied be use in the project shall not exceed during operation phase of the project. 0.5 % and 34 % respectively at any given time. In case of variation of coal quality at any point of time fresh reference shall be made to the Ministry for suitable amendments to environmental clearance condition wherever necessary. Iii Bi-flue stack of 275 m height with flue A bi-flue stack of 275 meters height gas velocity not less than 22 m/s shall has been designed to maintain velocity be installed and provided with of 22 m/sec. Continuous online stack continuous online monitoring monitoring facility for measurement of equipments for SO x, NO x and PM 2.5 & SO 2 and NO x and Particulate matter PM 10 . Mercury emissions from stack emissions from stack shall be may also be monitored on periodic provided. At present outer shell of bi- basis. flue stack completed. Iv No mine void filling or filling up of low There will be no mine void filling or lying areas with fly ash shall be filling up of low lying areas with fly undertaken. ash. V COC of 5.0 shall be adopted Closed cycle cooling system has been designed with COC of 5.0 for oplimization of water requirment. Vi Continuous monitoring of Narmada Continuous monitoring of Narmada River water quality in its upstream and River water quality in its upstream downstream of water tapping point and downstream of water tapping shall be undertaken regularly and point will be undertaken regularly records maintained. during operation phase of the project. Presently hydro-geology study by NIH Roorkee is being carried out. Field work completed and final report is under preparation. Final report will be submitted to Regional & Central office of MoEF &CC. vii The project proponent shall explore NTPC Gadarwara project is possibility for storage of excess constructing weir on Narmada river in monsoon water for use during lean consultation with Government of M.P season. The same could be by In addition to this, Hiran WRD, construction of barrage at appropriate Jabalpur (MP) has been approached location which could be carried out in and requested to suggest water close consultation with the WRD, Govt. storage scheme for Shakkar River & of Madhya Pradesh. Sita Reva river which are tributaries of Narmada. viii The ash pond design shall be such that The structure of ash dykes will be no breach takes place even in the worst designed, constructed and operated as case of natural calamity. Since the per State of the Art engineering geology of the area indicates sandy practices for the design and loam and loamy soil, the ash pond need construction of earth dams with to be appropriately lined with adequate factor of safety. The design appropriate impermeable media. of ash dyke shall also take into consideration the seismic parameters. Ix Ash pond for Stage-II (400 acres) can The said stipulation will be complied be considered only after the first ash during operation phase of the project. pond is dispensed with by filling up of bottom ash and demonstration of 100% fly ash utilization established within four years of commissioning of the plant. The 2 nd ash pond for Stage-II (400 acres) requirement should not arise and land earmarked can be converted for green belt and or water storage. X Long term study shall be carried to Aquatic ecology study has been assess impact on the ecology of the awarded to Annamalai university, river Narmada downstream of the Chennai vide LOA dated 17.03.2015 present project site at a different to study the impact on the Ecology of location especially at tapping points for river Narmada. drinking water supply and irrigation. The study shall be carried out by an Field work completed and final report institute of repute like IIT, Roorkee is under preparation. Final report preferably within six months and report shall be submitted to Concerned submitted to the Ministry. Thereafter Regional & Central office of MoEF the study shall be repeated after &CC. commissioning of both units of 2x800 MW and report subsequently submitted to the Ministry. Xi The project proponent shall explore Possibility will be explored for setting setting up of R.O System to treat up of R.O System to treat cooling cooling tower blow down discharge of tower blow down discharge of about 5 about 5 cusecs and the R.O system cusecs to take care of drinking water shall be so designed so as to take care supply for the nearest few villages. of drinking water supply for the nearest few villages. xii The village ponds / surface water Developing of village ponds / surface bodies located within 5 kms radius of water is being planned in the the project site shall be regenerated in Community Development works of the as part of its social welfare site. activities. xiii An amount of Rs 45.60 Crores as one A requisite fund has been earmarked time investment shall be earmarked for for implementing CSR-CD activities activities to be taken up under CSR for the project and shall be utilized in during construction phase of the accordance with the said stipulations. Project. A detailed CSR Action Plan be furnished to the Ministry within 3 Expenditure of Rs 13.30 crore towards months. Recurring expenditure for CSR Community Development carried out. thereafter shall be Rs 9.2Crores per Progress on CSR work is enclosed as annum till the life of the plant. Social Annexure-I Audit by a reputed University or an Institute shall be carried out annually and details to be submitted to MOEF besides putting it on Company's website. B. General Conditions (i) Vision document specifying prospective NTPC vide letter dated 08.04.2013 has plan for the site shall be formulated submitted a Project Vision Document and submitted to the Regional Office of to the Regional Office of the Ministry the Ministry within six months. of Environment and Forest & Climate Change (MoEF & CC), Bhopal. (ii) Scheme for implementation for Projects as well as township are in harnessing solar power within the construction phase. Scheme for premises of the plant particularly at harnessing solar power within the available roof tops shall be formulated premises of the plant particularly at and status of implementation shall be available roof tops has been submitted periodically to the Regional formulated and incorporated in the Office of the Ministry. engineering layout of the project and same will be implemented on completion of building works at project. (iii) Provision for installation of FGD shall Adequate space has been provided in be provided for future use. the layout for installation of FGD plant in future use, if necessary. (iv) Coal transportation to plant site shall The said stipulation will be be undertaken by rail and no road complied during operation phase transportation shall be permitted. of the project. (v) A long term study of radio activity and A detailed study on chemical heavy metals contents on coal to be composition of coal used particularly used shall be carried out through a heavy metal and radio activity reputed institute. Thereafter contents will be carried out through a mechanism for an in-built continuous reputed institute once the project monitoring for Radio activity and heavy starts receiving the coal during metals in coal and fly ash (including operation phase. bottom ash) be put in place. Award of contract for conducting natural background radiation monitoring to ‘BARC’ is in process. (vi) Utilization of 100% Fly Ash generated Ash Utilization Plan has been shall be made from 4th year of prepared and shall be implemented in operation. Status of implementation compliance to fly ash gazette shall be reported to the Regional Office notification dated 03.11.2009 and its of the Ministry from time to time. amendment dt Jan’2016 during the operation phase of the project. Further, its status of implementation will be also submitted to the Regional Office, MoEF&CC at Bhopal regular interval. (vii) High Efficiency Electrostatic The High Efficiency Electrostatic Precipitators (ESPs) shall be installed to Precipitators (ESPs) are designed for a ensure that particulate emission does guaranteed efficiency of 99.93 %. The not exceed 50 mg/Nm 3. particulate emission shall not exceed 50 mg/Nm 3. (viii) Adequate dust extraction system such Adequate no. of dust suppression as cyclones / bag filters and water and extraction system will be provided spray system in dusty areas such as in in coal handling area including coal coal handling and ash handling points, stock yard area, ash handling points, transfer areas and other vulnerable transfer areas and other vulnerable dusty areas shall be provided. dusty areas for control of fugitive dust emissions. Dry fog dust suppression system is being provided at all transfer points. (ix) Fly ash shall be collected in dry form An ash management scheme will be and storage facility (silos) shall be implemented consisting of dry ash provided. Unutilized fly ash shall be extraction system (DAES) for dry disposed off in the ash pond in the form collection of fly ash with storage of slurry form.
Recommended publications
  • Clmp52016.Pdf
    Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter - District Wise Abstract State : Madhya Pradesh Sanction Year : 2016-2017 Batch : 1 Collaboration : Regular PMGSY Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9 Road Proposals 1 Ashok Nagar 23 59.600 1,624.35 1,155.12 2,779.47 133.07 (0 , 23 , 0 , 0 , 23) 2 Betul 7 18.800 547.15 378.76 925.91 41.97 (0 , 7 , 0 , 0 , 7) 3 Chhatarpur 12 46.400 1,052.73 736.54 1,789.27 103.61 (0 , 12 , 0 , 1 , 13) 4 Chhindwara 30 125.890 2,054.98 1,503.70 3,558.68 284.69 (0 , 1 , 24 , 3 , 28) 5 Dewas 28 94.820 3,053.88 2,140.00 5,193.88 209.41 (1 , 30 , 1 , 0 , 32) 6 Dindori 7 35.180 580.67 426.12 1,006.79 97.36 (0 , 0 , 0 , 0 , 0) 7 Guna 19 77.900 2,314.73 1,669.85 3,984.58 173.96 (0 , 19 , 3 , 1 , 23) 8 Jabalpur 7 29.120 756.12 535.36 1,291.48 65.03 (0 , 7 , 0 , 0 , 7) 9 Katni 19 24.750 601.26 434.68 1,035.94 56.50 (0 , 19 , 0 , 0 , 19) 10 Mandla 8 39.720 573.68 425.65 999.33 100.50 (0 , 0 , 0 , 0 , 0) 11 Narsighpur 8 18.230 497.66 350.77 848.43 40.73 (0 , 8 , 0 , 0 , 8) 12 Panna 15 80.400 2,300.90 1,590.20 3,891.10 179.54 (0 , 15 , 3 , 0 , 18) 13 Raisen 13 41.880 1,145.70 797.69 1,943.39 93.50 (0 , 13 , 0 , 0 , 13) 14 Rewa 13 38.600 1,108.12 791.96 1,900.08 86.21 (0 , 13 , 1 , 3 , 17) 15 Sagar 100 270.855 8,163.19 5,773.70 13,936.89 602.80 (0 , 100 , 5 , 4 , 109) 16 Seoni 33 68.115 1,367.46 996.35 2,363.81 167.50 (0
    [Show full text]
  • Final Population Totals, Series-24
    Census of India 2001 Series 24 : Madhya Pradesh FINAL POPULATION TOTALS (State, District, Tehsil and Town) Prabhal(ar Bansod Of the Indian Administrative Service Director of Census Operations, Madhya Pradesh Bhopal Websltl:: http://www.censlJsmdia.net/ © All rights reserved wIth Government of India Data Product Number 23-006-Cen-Book Preface The final population data presented in this publication IS based on the processing and tabulation of actual data captured from each and every 202 million household schedules. In the past censuses the final population totals and their basIc characteristics at the lowest geographical levels popularly known as the Village/town Primary Census Abstract was compiled manually. The generation of Primary Census Abstract for the Census 2001 is a fully computerized exercise starting from the automatic capture of data from the Household Schedule through scanning to the compilation of Primary Census Abstract. ThiS publication titled "Final Population Totals" is only a prelude to the Primary Census Abstract. The publication, which has only one table, presents data on the total population, the Scheduled Castes population and the Scheduled Tribes population by sex at the state, district, tehsll and town levels. The vitlage-wise data IS being made available In electronic format It is expected to be a useful ready reference document for data users who are only Interested to know the basic population totals. ThiS publrcatlon IS brought out by Office of the Registrar General, India (ORGI) centrally, I am happy to acknowledge the dedicated efforts of Mr Prabhakar Bansod, Director of Census Operations, Madhya Pradesh and his team and my colleagues in the ORG! in bringing out thiS publication.
    [Show full text]
  • Final Electoral Roll
    FINAL ELECTORAL ROLL - 2021 STATE - (S12) MADHYA PRADESH No., Name and Reservation Status of Assembly Constituency: 121- Last Part GADARWARA(GEN) No., Name and Reservation Status of Parliamentary Service Constituency in which the Assembly Constituency is located: 17- Electors HOSHANGABAD(GEN) 1. DETAILS OF REVISION Year of Revision : 2021 Type of Revision : Special Summary Revision Qualifying Date :01/01/2021 Date of Final Publication: 15/01/2021 2. SUMMARY OF SERVICE ELECTORS A) NUMBER OF ELECTORS 1. Classified by Type of Service Name of Service No. of Electors Members Wives Total A) Defence Services 143 6 149 B) Armed Police Force 0 0 0 C) Foreign Service 0 0 0 Total in Part (A+B+C) 143 6 149 2. Classified by Type of Roll Roll Type Roll Identification No. of Electors Members Wives Total I Original Mother roll Integrated Basic roll of revision 143 6 149 2021 II Additions Supplement 1 After Draft publication, 2021 0 0 0 List Sub Total: 0 0 0 III Deletions Supplement 1 After Draft publication, 2021 0 0 0 List Sub Total: 0 0 0 Net Electors in the Roll after (I + II - III) 143 6 149 B) NUMBER OF CORRECTIONS/MODIFICATION Roll Type Roll Identification No. of Electors Supplement 1 After Draft publication, 2021 0 Total: 0 Elector Type: M = Member, W = Wife Page 1 Final Electoral Roll, 2021 of Assembly Constituency 121-GADARWARA (GEN), (S12) MADHYA PRADESH A . Defence Services Sl.No Name of Elector Elector Rank Husband's Address of Record House Address Type Sl.No. Officer/Commanding Officer for despatch of Ballot Paper (1) (2) (3) (4) (5) (6)
    [Show full text]
  • Initial Environmental Examination (Draft)
    Initial Environmental Examination (Draft) November 2013 IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Prepared by the Madhya Pradesh Power Transmission Corporation Ltd. (MP Transco), Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company (DISCOM-C), Madhya Pradesh Poorva Kshetra Vidyut Vitaran Company (DISCOM-E), and Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company (DISCOM-W) for the Asian Development Bank The initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. TABLE OF CONTENTS Page No. EXECUTIVE SUMMARY 1.0 INTRODUCTION 1 1.1 Overview of the Project 4 1.2 The Need for an Initial Environmental Examination 6 1.3 Structure of the Report 6 2.0 POLICY, LEGAL, AND ADMINISTRATIVE FRAMEWORK 8 2.1 ADB Safeguard Policy Statement 2009 8 2.2 Applicable National and State Legislation 8 2.3 National and State Environmental Assessment Requirements 9 2.4 Applicable International Environmental Agreements 12 2.5 Other Applicable Laws and Policies 13 3.0 DESCRIPTION OF THE ENVIRONMENT 14 3.1 Physical Resources 14 3.2 Biological Resources 19 3.3 Socioeconomic Profile 22 4.0 POWER TRANSMISSION SYSTEM IMPROVEMENT 25 4.1 Project Description 25 4.2 Analysis of Alternatives 28 4.3 Anticipated Environmental Impacts and Mitigation Measures 30 4.4 Information Disclosure, Consultation, and Participation 39 4.5 Grievance Redress Mechanism 40 4.6 Environmental
    [Show full text]
  • HS and HSS Guest 4Th List As Per NIC Format.Xlsx
    वमश पोटल पर दज जानकार के आधार पर अतथ शक हेतु वषयवार सूची – HSS एवं HS (प . - 188/ 21.1.2021) Sn District Block DISE School Designation Subject Vacancy Remark HSS 1 AGAR MALWA AGAR 23510804309 GOVT. HS. EXCELL. AGAR Varg-1 Hindi 1 2 AGAR MALWA NALKHEDA 23510202128 GOVT. H.S.S. EXCEL. NALKHEDA Varg-1 Hindi 1 3 ASHOKNAGAR CHANDERI 23460520302 GOVT. HSS EXCELLENCE, CHANDERI Varg-1 Biology 1 4 ASHOKNAGAR CHANDERI 23460520302 GOVT. HSS EXCELLENCE, CHANDERI Varg-1 Maths 1 5 ASHOKNAGAR CHANDERI 23460520302 GOVT. HSS EXCELLENCE, CHANDERI Varg-1 Biology 1 6 ASHOKNAGAR CHANDERI 23460520302 GOVT. HSS EXCELLENCE, CHANDERI Varg-1 Maths 1 7 ASHOKNAGAR ISAGARH 23460700709 GOVT. HSS KADAVAYA Varg-1 Agriculture 1 8 ASHOKNAGAR ISAGARH 23460722502 GOVT. HSS EXCELLENCE, ESHAGARH Varg-1 Hindi 1 9 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Biology 1 10 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Chemistry 1 11 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Commerce 1 12 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Economics 1 13 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 English 1 14 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Hindi 1 15 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 History 1 16 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Maths 1 17 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Physics 1 18 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Political Science 1 19 ASHOKNAGAR MUNGAOLI 23460804609 GOVT. HSS SEHRAI Varg-1 Sanskrit 1 20 BALAGHAT BALAGHAT 23450101421 GOVT.
    [Show full text]
  • 42486-018: Madhya Pradesh Urban Services Improvement Project
    Involuntary Resettlement Due Diligence Report Document stage: Draft for consultation Project Number: 42486-018 August 2018 INDIA: Madhya Pradesh Urban Services Improvement Program – Additional Financing – Subproject Group Water Supply Scheme of Town Saikheda, Salichauka and Chichli, District Narsinghpur Package No: MPUSIP-5F Prepared by Urban Development and Environment Department, Bhopal, Madhya Pradesh for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 18 August 2018) Currency unit = Indian rupee (₹) ₹1.00 = $0.014 1.00 = ₹69.80 ABBREVIATIONS ADB - Asian Development Bank FGD - Focus group discussion GOI - Government of India KL - Kilo Liter GOMP - Government of Madhya Pradesh KM - Kilometer LARR - Land Acquisition, Rehabilitation and Resettlement LPCD - Liter per Capita per Day MDPE - Medium Density Polyethylene pipes MFI - multilateral financial institutions MLD - Million Liter per Day MPUDC - Madhya Pradesh Urban Development Company MPUSIP - Madhya Pradesh Urban Services Improvement NOC - No Objection Certificate OHT - Over Head Tank O&M - operation and maintenance PMU - Program Management Unit PWD - Public works Department R&R - Resettlement and Rehabilitation RF - Resettlement Framework RP - Resettlement Plan ROW - Right of Way RWGM - Raw water gravity main SPS - Safeguard Policy Statement SPU - safeguard policy update ULBs - Urban Local Bodies WRD - Water Resource Department WSS - Water Supply Scheme WTP - Water Treatment Plant NOTE In this report, "$" refers to United States dollars. This draft Involuntary Resettlement Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of the use” section of this website.
    [Show full text]
  • Action Plan for Municipal Solid Waste Management in Madhya Pradesh
    l3J MADHYA PRAI)ESII POLLTJ'I'ION CONTIIOL BoARI) -462016 # PatyqworaspaMaL E:5-4!9ra lE'o lonl Uhopal \l7t (0755)246,1428. 24661 9l lrax: (0755)2'161742 E-mailiit'mppcb'rlrcdillinail'com l6aj Bhopcl. Ddlcd 17,08 /lli l8 No i II()/MSWi N4PPCI}/]OI X lo. l'hc Membcr Secrelxn'. (-cntral Pollulion Conlrol Board. Parivash Bhawan. CBD curr oltice Cornplex' llast Ariun Nagar..l)clhi Ll00l2 ol'Solid Wasle Managomcnl Rrrlo\' ]0 I ()' Subi /\nnual liepofl 1br )car 20 I 7- I 8 on Implementrlion Sir. Managcrncnt Rulcs l0l6' ,\s per the provision of thc rulc 24 (ll) ol'Solid Wastc year 2017-18 on Solid Wa\lu Mltna':ctrcnr in PI,-'0sc find cnclosed herc\\ith the Annual lleport Ibr liom (\') tbr your inlbrmation & neccssary action plcase' subrrission ol Anrlual llenons- l he d'iir 'l hc report is dcla)'cd as TJADD is nol regular in O{llccs ol'M l']'lL( prcsenlsd irr the report have bccn galhered through Regional 'll' lrncl i As abole i\h ral S((rrlx r t tl7Y Bh,'Fal. l)atcd l7 /U8 'l(rl 8 I)rdl.No. n ro/MSW/MPPClli 2018 Cop\ to :- Itousing & Dcptl- C(}vl. {l1' \1 l' t. Prir(ipcl \((r.lar\. I rhdn D(\LIrplnurll \tintraldlc. Bh,\pll lbr inll'rmallon plca'(' 1br upload thc sanrc on Wch Si{c ()1. 2. tl M.P. PollLrtion Conlrol Board llhopal M PPf] B. |nc| | r\s ahovc olc \9( Form - V lsco rulc 2,1(.3)l Annurl rcport ol Municipal Solicl Wdste i\lxnaiacmcnt oflladhla I,radcsh PART - A l'o, The Chairman Central Pollution Control Bo{rd Parivesh Bhawan, llast Arjun Nagar Dr.].HI- I100032 .
    [Show full text]
  • Total - 467 Fathers/ Pump Details of Solar Name of Installation Company S
    Total - 467 Fathers/ Pump Details of Solar Name Of Installation Company S. No. Husband Village Block Tahshil District Capacity (in Type of Beneficiary Capacity Date Name Name Wp) Pump 1 2 3 4 5 6 7 8 9 10 11 12 Dynamech Budhha Tendukhe Tendukhe 1 Nikhil Patel Gutori Narsinghpur 3000 Wp DC Sub. 3 HP DC 14/12/2017 Electropower Singh Patel da da Pvt.Ltd. Dynamech Balram Tendukhe Tendukhe 2 Sanjay Sahu Umarpani Narsinghpur 3000 Wp DC Sub. 3 HP DC 13/12/2017 Electropower Sahu da da Pvt.Ltd. Basant Dynamech Nanheveer Tendukhe Tendukhe 3 Kumar Tendukheda Narsinghpur 3000 Wp DC Sub. 3 HP DC 14/12/2017 Electropower Kirar da da Kirar Pvt.Ltd. Dynamech Jitendra Basant Tendukhe Tendukhe 4 Tendukheda Narsinghpur 3000 Wp DC Sub. 3 HP DC 07/12/2017 Electropower Kirar Kirar da da Pvt.Ltd. Dynamech Butha Tendukhe Tendukhe 5 Komal Kukwara Narsinghpur 3000 Wp DC Sub. 3 HP DC 12/12/2017 Electropower Ghoshi da da Pvt.Ltd. Sudama Dynamech Bahwan Lal Mahguwa Gadarwar 6 Prasad Chichli Narsinghpur 3000 Wp DC Sub. 3 HP DC 23/03/2018 Electropower Patel Khur a patel Pvt.Ltd. VILL. SHRAVAN Dynamech RAKESH DIGHORI/M 7 KUMAR Chichli Chichli Narsinghpur 3000 Wp DC Sub. 3 HP DC 15/03/2018 Electropower SHARMA AGARMUH SHARMA Pvt.Ltd. AN VILL - NETRAJ Dynamech SUSHEELA THUTI Tendukhe Tendukhe 8 SINGH Narsinghpur 3000 Wp DC Sub. 3 HP DC 22/03/2018 Electropower BAI POST - da da KAURAV Pvt.Ltd. HARRAI LAXMAN MUKESH Dynamech SINGH CHHINDOR 9 CHOUDH Gotegaon Gotegaon Narsinghpur 3000 Wp DC Sub.
    [Show full text]
  • Alphabetical List of Towns and Their Population
    ALPHABETICAL LIST OF TOWNS AND THEIR POPULATION MADHYA PRADESH 1. Agar (M) [ MP, Population: 31207, Class - III ] 2. Ajaygarh (NP) [ MP, Population: 13997, Class - IV ] 3. Akoda (NP) [ MP, Population: 11035, Class - IV ] 4. Akodia (NP) [ MP, Population: 10421, Class - IV ] 5. Alampur (NP) [ MP, Population: 9350, Class - V ] 6. Alirajpur (M) [ MP, Population: 25164, Class - III ] 7. Alot (NP) [ MP, Population: 21513, Class - III ] 8. Amanganj (NP) [ MP, Population: 11609, Class - IV ] 9. Amarkantak (NP) [ MP, Population: 7082, Class - V ] 10. Amarpatan (NP) [ MP, Population: 16371, Class - IV ] 11. Amarwara (NP) [ MP, Population: 12096, Class - IV ] 12. Ambada (CT) [ MP, Population: 6892, Class - V ] 13. Ambah (M) [ MP, Population: 36435, Class - III ] 14. Amla (M) [ MP, Population: 29553, Class - III ] 15. Anjad (NP) [ MP, Population: 22882, Class - III ] 16. Antari (NP) [ MP, Population: 9535, Class - V ] 17. Anuppur (NP) [ MP, Population: 16403, Class - IV ] 18. Aron (NP) [ MP, Population: 21178, Class - III ] 19. Ashoknagar (M) [ MP, Population: 57705, Class - II ] 20. Ashta UA [ MP, Population: 40628, Class - III ] 21. Babai (NP) [ MP, Population: 14591, Class - IV ] 22. Bada -Malhera (NP) [ MP, Population: 15044, Class - IV ] 23. Badagaon (NP) [ MP, Population: 7723, Class - V ] 24. Badagoan (NP) [ MP, Population: 6561, Class - V ] 25. Badarwas (NP) [ MP, Population: 10409, Class - IV ] 26. Badawada (NP) [ MP, Population: 7655, Class - V ] 27. Badi (NP) [ MP, Population: 16094, Class - IV ] 28. Badnagar UA [ MP, Population: 34088, Class - III ] List of towns: Census of India 2001 Madhya Pradesh – Page 1 of 14 MADHYA PRADESH (Continued): 29. Badnawar (NP) [ MP, Population: 17746, Class - IV ] 30. Badod (NP) [ MP, Population: 11764, Class - IV ] 31.
    [Show full text]
  • 69Th OCC Meeting Minutes
    MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/1767 Jabalpur, dated:03.07.2019 To As per distribution list Sub: Minutes of 69th meeting of Operation and Coordination Committee of MP. … th The Minutes of 69 meeting of the Operation and Coordination Committee of MP th scheduled on 25 April 2019 at Hotel Kalchuri, MP Tourism , South Civil Lines, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8.
    [Show full text]
  • Social Monitoring Report IND: Madhya
    Social Monitoring Report Project Number: 47100-004 October 2017 Period: January 2017 – June 2017 IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Submitted by Madhya Pradesh Power Transmission Company Limited, Government of Madhya Pradesh This report has been submitted to ADB Madhya Pradesh Power Transmission Co. Ltd., Government of Madhya Pradesh and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Social Monitoring Report Reporting Period: January 2017 to June 2017 IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Loan no. 3066 IND Prepared by, Government of Madhya Pradesh through MP Transco Madhya Pradesh, India Reporting Period: January 2017 to June 2017 i ABBREVIATIONS ADB – Asian Development Bank EA – Executing Agency AP – Affected People ESMU – Environmental and Social Management Unit GHG – Greenhouse Gas GoMP – Government of Madhya Pradesh GoI – Government of India GRC – Grievance
    [Show full text]
  • Pradhan Mantri Gram Sadak Yojana Technology-Wise Details
    Pradhan Mantri Gram Sadak Yojana Technology-Wise Details State: All States District: All Districts Block: All Blocks Year: All Years Batch:All Batches Collaboration: All Collaborations Collaboration : Waste Plastics Note : All Costs are in Lakhs and All Lengths are in Kms. Sr. State Name District Block Name Sanctioned Batch Package ID Road Road Name Total Sanctioned Length Sanctioned Length Technology Current Status Name Year Sr.No. Sanctioned Cost under (R & D) Completed Cost Length under (R & D) 1 Jammu And Poonch Mendhar 2016-2017 1 JK11123 1 L036-Dharana To Gohlad Upper 5.000 287.30 5.000 0.000 127.03 In Progress Kashmir Total for Poonch District : 5.000 287.30 5.000 0.000 127.03 Total for Jammu And Kashmir State : 5.000 287.30 5.000 0.000 127.03 Jharkhand Ramgarh Patratu 2016-2017 2 JH23HEC029 2 L059-oriyatu to Bahera tungti 1.700 86.08 1.005 0.000 86.09 In Progress (VR50) Total for Ramgarh District : 1.700 86.08 1.005 0.000 86.09 Ranchi Chanho 2016-2017 2 JH18AEC045 3 L055-NH75 to karmatoli 1.000 48.17 0.800 0.000 4.48 In Progress JH18AEC082 4 L073-T02 TO CHALIO 1.820 95.80 1.470 0.000 8.19 In Progress Total for Ranchi District : 2.820 143.97 2.270 0.000 12.67 Total for Jharkhand State : 4.520 230.05 3.275 0.000 98.76 Kerala Idukki Adimaly 2013-2014 2 KR0334 5 L077 - Kurangatty Nellithanam 4.750 386.38 4.750 0.000 33.20 In Progress Devikulam 2013-2014 2 KR0338 6 Kundala - Sandoz Colony 1.130 99.24 1.130 1.130 8.75 Completed (31/03/2016) Elemdesam 2013-2014 2 KR0341 7 Pallikkamuny - Missionkunnu 2.325 199.43 2.325 2.325 14.90 Completed
    [Show full text]