O/O Deputy Director General A-Wing, 5Th Floor, Lok Nayak Bhavan, Lok Nayak Bhavan, New Delhi- 110003

Total Page:16

File Type:pdf, Size:1020Kb

O/O Deputy Director General A-Wing, 5Th Floor, Lok Nayak Bhavan, Lok Nayak Bhavan, New Delhi- 110003 MONTHLY STATISTICAL REPORT MINISTRY OF COAL MAY 2020 O/o Deputy Director General A-Wing, 5th Floor, Lok Nayak Bhavan, Lok Nayak Bhavan, New Delhi- 110003 MONTHLY STATISTICAL REPORT MINISTRY OF COAL MAY 2020 O/o Deputy Director General A-Wing, 5th Floor, Lok Nayak Bhavan Lok Nayak Bhavan, New Delhi- 110003 Preface The Monthly Coal Statistics for the month of May 2020 is placed below. Ministry of Coal gets various reports/returns from CIL along with its Subsidiaries, SCCL and NLCIL, Monthly DO Letters from CMDs of all Companies to the Secretary (Coal). Also the Captive Block Owners and Lignite Block Owners provide information on monthly basis regarding production and despatch. Based on these sources, compilation has been made for the use of various stakeholders. It is to disclose that all information provided are provisional in nature. Table of Contents Chapter Name Table Page Summary of Coal Production 2 Summary of Coal Despatch 2 Summary of Lignite Production 2 All India Summary Summary of Lignite Despatch 3 Sector-wise Coal Despatch 3 Coal Production By "Others" 4-7 Analysis of Top 75 Mines Production Analysis of Large Mines of CIL 9-21 OBR Analysis of Large Mines of CIL 22-35 Exploration Drilling Performance 37 Production Status 39-42 Productivity 43-44 OBR Status 45-46 Performance of Coal PSUs HEMM Performance 47-49 Mode-Wise Coal Despatch 50-52 Detailed Sector-Wise Coal Despatch 53-55 Vendible Stock Position 56 Lignite Production Status 58 Status of Power Production 58 Productivity in Lignite Mining and Power 58 Performance of NLCIL OBR Status 59 HEMM Performance 59 Power and Lignite Sales 59 Capital Expenditure Status 61 Manpower Position 62 Financial Performance Sundry Debtors Status 63 Age-wise Debtors 63 Auction Status of Coal in CIL 64 Status of Electricity Status of Electricity Generation 66 Generation Coal Consumption and Electricity 66 Generation Projects of PSUs Status Of Major Ongoing Projects of CIL 68-75 Status of Major Ongoing Projects of NLCIL 76-82 Status of Major Ongoing Projects of SCCL 83-108 Other Initiatives Status of Major Ongoing Projects of Coal 110-132 Vidhesh Initiatives All India Summary 1 Table 1.1 : Summary of Coal Production All Production Figures in MT Production During May Progressive Production Sl No Subs Annual Target Growth Growth FY 21 FY 20 M-O-M FY 21 FY 20 Y-O-Y 1 ECL 55.02 3.45 3.92 -11.99 6.84 7.94 -13.85 2 BCCL 37.13 1.56 2.12 -26.42 3.26 4.39 -25.74 3 CCL 86.00 2.91 4.13 -29.54 5.17 7.32 -29.37 4 NCL 113.25 9.20 8.86 3.84 17.93 17.59 1.93 5 WCL 62.00 3.94 4.10 -3.90 7.39 8.32 -11.18 6 SECL 183.00 9.15 11.90 -23.11 18.45 23.00 -19.78 7 MCL 173.00 11.22 11.64 -3.61 22.75 23.38 -2.69 8 NEC 0.60 0.02 0.02 0.00 0.04 0.05 -20.00 CIL 710.00 41.45 46.69 -11.22 81.83 91.99 -11.04 9 SCCL 67.50 3.23 5.87 -45.00 6.23 11.37 -45.22 10 Others 83.00 5.18 5.14 0.76 8.85 9.77 -9.42 Grand Total 860.50 49.86 57.70 -13.59 96.90 113.12 -14.34 Details of Coal Production from Others is in the Table 1.1 (A) in the Annex 1 Table 1.2 : Summary of Coal Despatch All Despatch Figures in MT Despatch During May Progressive Despatch Sl No Subs Annual Target Growth Growth FY 21 FY 20 M-O-M FY 21 FY 20 Y-O-Y 1 ECL 55.02 3.38 4.36 -22.48 7.07 8.89 -20.47 2 BCCL 37.13 1.21 2.56 -52.73 2.25 5.40 -58.33 3 CCL 86.00 3.99 5.74 -30.49 6.87 12.16 -43.50 4 NCL 113.25 8.16 8.83 -7.59 15.33 17.03 -9.98 5 WCL 62.00 3.06 4.64 -34.05 5.88 9.58 -38.62 6 SECL 183.00 9.88 13.13 -24.75 19.64 25.01 -21.47 7 MCL 173.00 10.25 12.82 -20.05 21.90 25.35 -13.61 8 NEC 0.60 0.03 0.03 0.00 0.08 0.10 -20.00 CIL 710.00 39.96 52.11 -23.32 79.02 103.52 -23.67 9 SCCL 67.50 2.55 5.76 -55.71 5.59 11.32 -50.63 10 Captives 83.00 5.58 5.24 6.45 9.79 9.82 -0.34 Grand Total 860.50 48.09 63.11 -23.80 94.40 124.66 -24.28 Details of Coal Despatch from Others is in the Table 1.2 (A) in the Annex 1 Table 1.3: Summary of Lignite Production All Production Figures in MT Production During May Progressive Production Sl No Company Annual Target Growth Growth FY 21 FY 20 M-O-M FY 21 FY 20 Y-O-Y 1 NLCIL 25.22 1.84 1.59 16.01 2.91 2.61 11.82 2 GMDCL 7.10 0.35 0.81 -56.45 0.70 1.65 -57.61 3 GIPCL 0.00 0.51 0.48 5.82 0.98 0.94 4.81 4 RSMML 12.00 0.04 0.11 -60.00 0.08 0.20 -60.89 5 BLMCL 7.00 0.39 0.50 -23.02 0.73 0.72 1.68 6 GHCL 0.40 0.00 0.01 -100.00 0.00 0.03 -100.00 7 VS Lignite 1.00 0.07 0.07 -2.86 0.15 0.14 7.86 Grand Total 52.72 3.201 3.567 -10.26 5.551 6.282 -11.64 2 Table 1.4: Summary of Lignite Despatch All Despatch Figures in MT Despatch During May Progressive Despatch Sl No Company Annual Target Growth Growth FY 21 FY 20 M-O-M FY 21 FY 20 Y-O-Y 1 NLCIL 25.22 2.02 2.09 -3.45 4.07 4.23 -3.90 2 GMDCL 7.10 0.35 0.81 -56.45 0.70 1.65 -57.61 3 GIPCL 0.00 0.51 0.48 5.82 0.98 0.94 4.81 4 RSMML 12.00 0.04 0.11 -60.00 0.08 0.20 -60.89 5 BLMCL 7.00 0.45 0.43 3.97 0.81 0.92 -11.45 6 GHCL 0.40 0.00 0.01 -50.00 0.00 0.01 -66.67 7 VS Lignite 1.00 0.07 0.09 -12.94 0.15 0.16 -5.52 Grand Total 52.72 3.441 4.003 -14.04 6.797 8.110 -16.19 Table 1.5: State-wise Coal Production Production During May Production Upto May State Growth Growth FY 21 FY 20 FY 21 FY 20 M-o-M Y-o-Y JH 7.816 8.894 -12.12 14.382 16.943 -15.11 OR 11.413 11.695 -2.41 23.076 23.534 -1.95 CG 9.329 12.160 -23.28 18.329 23.150 -20.83 MP 10.684 7.734 38.15 21.947 15.291 43.53 MH 3.673 3.903 -5.89 6.880 7.936 -13.31 UP 1.382 4.207 -67.15 2.638 8.353 -68.42 WB 2.106 2.911 -27.66 4.242 5.980 -29.06 AS 0.020 0.022 -9.09 0.040 0.052 -23.08 TL 3.410 6.033 -43.48 6.599 11.667 -43.44 JK 0.001 0.001 0.00 0.002 0.002 0.00 Total 49.834 57.560 -13.42 98.135 112.907 -13.08 Company-wise Production State-wise is given in Tables 1.5 (A) and 1.5 (B) in the Annex 2 Table 1.6: Coal Despatch to Different Sectors All Figures in MT Coal Despatch During May Coal Despatch Upto April Sectors Growth Growth FY 21 FY 20 M-o-M FY 21 FY 20 Y-o-Y Power 37.216 49.551 -24.89 75.251 98.880 -23.90 CPP 4.147 5.388 -23.03 8.070 10.137 -20.39 Steel 0.752 0.923 -18.53 1.620 1.886 -14.10 Cement 0.383 0.782 -50.99 0.477 1.596 -70.12 Sponge Iron 0.632 1.072 -41.05 1.075 2.065 -47.93 Others 4.953 5.383 -8.00 7.898 11.099 -28.84 Total 48.083 63.099 -23.80 94.391 125.664 -24.89 Company-wise Despatch is given in Table 1.6 (A) in the Annex 3 3 Annex 1 Table 1.1 (A): Details of Coal Production By "Others" All Fig in MT Production During May Production Upto May Name of Coal Growth Growth Block/Company FY 21 FY 20 FY 21 FY 20 M-o-M Y-o-Y JKML 0.001 0.001 0.00 0.002 0.002 0.00 IISCOCJ 0.016 0.038 -58.72 0.026 0.078 -67.07 IISCOR 0.008 0.034 -77.76 0.011 0.069 -84.62 JSMDCL 0.027 0.019 40.53 0.035 0.031 11.94 TATA 0.560 0.535 4.61 1.065 1.070 -0.50 NTPC/Pakri Barwadih 0.913 0.757 20.58 1.540 1.466 5.05 CESC / Sarshatali 0.190 0.186 2.15 0.358 0.422 -15.17 HIL-Gare Palma IV/5 0.000 0.042 -100.00 0.000 0.076 -100.00 BALCO / Chotia 0.000 0.063 -100.00 0.002 0.106 -98.17 HIL-Gare Palma IV/4 0.000 0.071 -100.00 0.034 0.128 -73.70 SIL / Belgaon 0.000 0.019 -100.00 0.000 0.032 -100.00 HIL/Kathautia 0.000 0.009 -100.00 0.018 0.009 100.30 SPL / Moher & Amlohori Extn.
Recommended publications
  • West Bengal State Colonies S.No Name of Colony Address District 1 Kalyanpur Colony, Gouripur, Gouripur, Bankura – Dt
    Association of People Affected by Leprosy List of West Bengal State Colonies S.No Name of Colony Address District 1 Kalyanpur Colony, Gouripur, Gouripur, Bankura – Dt. 2 Nabajibanpur Junbedia, Junbedia, Bankura – Dt. 3 Bishnupur colony, Bishnupur, Bishnupur, Bankura – Dt. 4 Peardoba Aftercare colony, Peardoba, Peardoba, Bankura – Dt. 5 Nimpura Colony, Rakhajangal, Rakhajangal, Bankura – Dt. 6 Garbeta Colony, Garbeta – Post, Garbeta – Post, Bankura – Dt. 7 Saltola Colony, Midnapur Post, Midnapur Post, Bankura – Dt. 8 Manikpara Colony, Manikpara – Post, Manikpara – Post, Bankura – Dt. 9 Bachhurdoba Colony, Jharagram – Post, Jharagram – Post, Bankura – Dt. 10 Tantigeria Colony, Midnapur – Post, Midnapur – Post, Bankura – Dt. 11 Gidhni Colony, Gidhni - Post, Gidhni - Post, Bankura – Dt. 12 Rahamatdanga colony, Burnpur – Post, Burnpur – Post, Burdwan – Dt. 13 Kankardanga Colony, Burnpur – Post, Burnpur – Post, Burdwan – Dt. 14 Chanda Colony, Chanda – Post, Chanda – Post, Burdwan – Dt. 15 Jamuria Colony, Jamuria – Post, Jamuria – Post, Burdwan – Dt. 16 Mohan Das Karamchand Kustha Pally, Durgapur, Durgapur, Burdwan – Dt. 17 Ukhra Colony, Ukhra, Ukhra, Burdwan – Dt. 18 Kajora Colony, Kajora, Kajora, Burdwan – Dt. 19 Pandaveswar colony, Pandaveswar, Pandaveswar, Burdwan – Dt. 20 Bohula colony, Bohula – Post, Bohula – Post, Burdwan – Dt. 21 Chakdola Colony, Chakdola – Post, Chakdola – Post, Burdwan – Dt. 22 J.K. Nagar colony, J.K. Nagar, J.K. Nagar, Burdwan – Dt. 23 Barakar Leprosy colony, Barakar, Barakar, Burdwan – Dt. 24 Lachhipur Mahatma Gandhi Kustha pally Sitarampur, Sitarampur, Burdwan – Dt. 25 Sahebganj Colony, Ranigunge, Ranigunge, Burdwan – Dt. 26 Manipur Colony, Adra – Post, Adra – Post, Purulia Dt. 27 Simonpur colony, Baligara, Baligara, Purulia Dt 28 Jamunabandh Colony, Purulia Purulia Purulia – Dt. 29 Matigora Colony, Siliguri -Post, Siliguri -Post, Jalpaiguri.
    [Show full text]
  • Geographic Information System (GIS) Representation of Coal-Bearing Areas in India and Bangladesh
    Geographic Information System (GIS) Representation of Coal-Bearing Areas in India and Bangladesh Compiled by Michael H. Trippi and Susan J. Tewalt Open-File Report 2011–1296 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior KEN SALAZAR, Secretary U.S. Geological Survey Marcia K. McNutt, Director U.S. Geological Survey, Reston, Virginia 2011 For product and ordering information: World Wide Web: http://www.usgs.gov/pubprod Telephone: 1-888-ASK-USGS For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment: World Wide Web: http://www.usgs.gov Telephone: 1-888-ASK-USGS Suggested citation: Trippi, M.H., and Tewalt, S.J., comps., 2011, Geographic information system (GIS) representation of coal-bearing areas in India and Bangladesh: U.S. Geological Survey Open-File Report 2011–1296, 27 p., available only at http:// pubs.usgs.gov/of/2011/1296. Any use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this report is in the public domain, permission must be secured from the individual copyright owners to reproduce any copyrighted material contained within this report. Contents Overview ........................................................................................................................................................................ 1 India ..............................................................................................................................................................................
    [Show full text]
  • PUBLIC HEARING DOCUMENT of EIA/EMP for BATURA OPENCAST PROJECT (Sohagpur Area)
    (PUBLIC HEARING DOCUMENT) Summary of EIA/EMP for Batura OC 3.0 MTPA PUBLIC HEARING DOCUMENT OF EIA/EMP FOR BATURA OPENCAST PROJECT (Sohagpur Area) Village:Rampur, Belia&Kanda;Tahsil: Annuppur&jaitahri District: Annuppur & Shahdol; State: Madhya Pradesh; Capacity: 2.0 MTY Normative & 3.0 MTY Peak Project area: 967.473Ha. South Eastern Coalfields Limited (A Mini Ratna Company) APRIL -2018 Central Mine Planning & Design Institute Limited Regional Institute – V SECL Complex, Post Box No. 22, BILASPUR (C.G.) Page - 1 (PUBLIC HEARING DOCUMENT) Summary of EIA/EMP for Batura OC 3.0 MTPA 1.0 INTRODUCTION: 1.1 Purpose of the project: Batura OC is a green field coal mining project for a normative production capacity of 2.00 Mty. SECL board approved the project for a normative capacity of 2.00 Mty and a peak production capacity of 3.00 Mty on 09/09/2008 with an initial capital of Rs.203.82 Crores. The proposed new project falls under the administrative control of Sohagpur Area of SECL.The Project Report is based on the “Geological Report on Batura Block” prepared by CMPDI in Feb 2007. Total four coal horizons with average thickness varying from 0.1m to 4.63m have been considered in the Project report. Total extractable reserves have been estimated as 33.44 Mty and OB as 307.09 Mty. The average stripping ratio works out to 9.18 Cum/tonne. To fulfil the countries need of power generation, CIL has to produce coal of 1 BT in 2019-20 in which the contribution of SECL has been planned as 239 Mte.
    [Show full text]
  • Coalmine Methane Under Indian Mining Scenario
    Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations.
    [Show full text]
  • Pre-Feasibility Report for Sahapur East Underground
    PRE-FEASIBILITY REPORT FOR SAHAPUR EAST UNDERGROUND COAL MINE PROJECT PROPOSED CAPACITY – 0.70 MTPA 1. INTRODUCTION Sahapur East Underground Coal Mine Project is a part of Sohagpur Coalfield. Sohagpur coalfield is the main coal bearing area of South Rewa. It is located in the northern belt of Son-Mahanadi basin. It is a part of the large sediments filled Gondwana trough, in the drainage basin of the Son. The coalfield extends over a total area of about 3,000 sq km. It is about 100 km. long in the east - west direction and has a maximum width of 50 km. The coal belt stretches from near Ghunghuti in the west up to Hasia nala in the east. The coal bearing area of Sohagpur coal field is bounded by latitudes 23°05’ – 23°30’ and longitudes 81°30’ – 82°12’. This area falls mainly in Shahdol District of Madhya Pradesh, while a small area is included in Umaria and Surguja Districts. Shahpur East Coal Block area falls under administrative control of Shahdol district, in Madhya Pradesh state. It lies in the north western part of Sohagpur coalfield, about 12 km. South- West of Shahdol town, the district headquarters. The block is located at a distance of 75 km. from Umaria town Block area is 659 Ha as the per the vesting order dated 3rd March 2021. The high-quality coal (G8 grade) produced through eco-friendly fully mechanized underground mining method will be used. Continuous miner with shuttle car combination has been envisaged for extraction of coal. Pre-Feasibility Report – Sahapur East Coal Mine, Page - 1 2.
    [Show full text]
  • Megaspores and Other Plant Remains from Lower Gondwana of Singrauli Coalfield, District Mirzapur, U.P
    MEGASPORES AND OTHER PLANT REMAINS FROM LOWER GONDWANA OF SINGRAULI COALFIELD, DISTRICT MIRZAPUR, U.P. By B. s . Trivew Botany Department, Luckmtw Unifersity (Received for publication on October 10, 1952) I ntroduction M icro sto res (Ghosh and Sen, 1948 ; Mehta, 1942 and 1943; Sitholey, 1943; and Virkki, 1945) and pollen grains (Bose, 1950; Rao, 1936; and Rao and Vimai, 1950) have received far larger attention in this country than the megaspores; there arc very few studies of the latter. Mehta (1942) in his investigations on the microspores from shales of M irzapur mentions, “ Three megaspores (319-388(*) with triradiate marks and warty or granular surface”, but these have been neither figured nor fully described. Later, Mehta (1943) published a photo­ graph of a megaspore, but the description was very meagre. The spore is given no name, and no relationship has been established. Sitholey (1943 and 1943 d) discovered a large number of megaspore casts from the Triassic of Salt Range, Punjab, which he named as Triletes Safmii. Saxena (M/S) has recorded a few megaspores probably from the Lower Gondwana of South Rewah, Central India, but the details of his studies have not been published so far. From the Dbekiajuli beds of Assam (7 Upper Miocene or ? Lower Pliocene) Sahni eta l. (1947) figure with­ out any description a single megaspore (265 n). Ghosh and Sen (1948) have figured a few bodies about whose affinities (p. 85) they are doubt­ ful (pi. 13, figs. 128, 129, pi. 14, figs. 130, 131, 132, 136; etc.) but from the figures some of them appear to me to be megaspores.
    [Show full text]
  • SOUTH EASTERN COALFIELDS LIMITED (A Mini Ratna PSU)
    SOUTH EASTERN COALFIELDS LIMITED (A Mini Ratna PSU) 34th ANNUAL REPORT 2019-20 Empowering India Enabling Life CONTENTS CORPORATE OVERVIEW Vision & Mission 2 SECL at a Glance 3 Corporate Information 4 Board of Directors 5 The Year at a Glance 6 Performance Trend 7 Chairman’s Letter 10 Awards and Accolades 14 Operational Statistics 15 Directors’ Profile 21 Our Management Team 32 Our Presence 36 STATUATORY REPORTS Board’s Report 37 Report on Performance of Subsidiaries 99 Annual Report on CSR 105 Secretarial Audit Report 114 Information u/s 134(3) (m) of the Companies Act, 2013 118 Report on Corporate Governance 121 Certificate on Corporate Governance 139 Management Discussion and Analysis Report 140 FINANCIAL STATEMENTS Comments of C&AG of India 155 Auditors’ Report 156 Balance Sheet 172 Statement of Profit & Loss 174 Statement of Changes in Equity 176 Cash Flow Statement 178 Notes to Financial Statements 180 Comments of C&AG of India (on Consolidated Financial Statements) 256 Auditors’ Report (on Consolidated Financial Statements) 257 Balance Sheet (Consolidated) 268 Statement of Profit & Loss (Consolidated) 270 Statement of Changes in Equity (Consolidated) 272 Cash Flow Statement (Consolidated) 274 Notes to Financial Statements (Consolidated) 276 Statement containing salient features of Financials of Subsidiaries (AOC-1) 354 Annexure-I & IX under Regulation 33 of SEBI (LODR) Regulations 355 CEO & CFO Certification 359 Notice of 34th Annual General Meeting 360 VISION To be one of the leading energy suppliers in the MISSION country, by adopting the To produce and market the best practices and leading planned quantity of coal technology from mine to and coal products efficiently market.
    [Show full text]
  • How Coal Mining Is Trashing Tigerland
    Author Contact Ashish Fernandes Ashish Fernandes [email protected] Research coordination & North Karanpura case study Nandikesh Sivalingam Kanchi Kohli [email protected] Research Photo Editor Aishwarya Madineni, Vikal Samdariya, Arundhati Sudhanshu Malhotra Muthu and Preethi Herman Design GIS Analysis Aditi Bahri Ecoinformatics Lab, ATREE (Kiran M.C., Madhura Cover image Niphadkar, Aneesh A., Pranita Sambhus) © Harshad Barve / Greenpeace Acknowledgments Image Sudiep Shrivastava for detailed inputs on the Forests of Sanjay Dubri Tiger Hasdeo-Arand and Mandraigarh sections, Kishor Reserve near Singrauli coalfield Rithe for inputs on the Wardha and Kamptee © Dhritiman Mukherjee / Greenpeace sections, Bulu Imam and Justin Imam for their expertise on the North Karanpura section, Biswajit Printed on 100% recycled paper. Mohanty for feedback on the Talcher and Ib Valley sections and Belinda Wright for feedback on the Sohagpur and Singrauli sections. CONTENTS Executive Summary 01 9. Hasdeo-Arand (Chhattisgarh) 51 10. West Bokaro (Jharkhand) 55 Introduction 09 Central India,Tigers, Corridors and Coal 11. North Karanpura (Jharkhand) 60 How Coal is Trashing Tigerland 17 Case Study I 63 The North Karanpura Valley - On the edge Methodology 21 12. Wardha (Maharashtra) 00 Coalfield Analysis 25 13. Kamptee (Maharashtra) 00 1. Singrauli (Madhya Pradesh - Chhattisgarh) 27 Case Study II 87 2. Sohagpur (Madhya Pradesh - Chhattisgarh) 33 Chandrapur’s tigers - Encircled by coal 3. Sonhat (Chhattisgarh) 35 4. Tatapani (Chhattisgarh) 37 Alternatives: Efficiency and Renewables 101 5. Auranga (Jharkhand) 39 References 109 6. Talcher (Odisha) 41 Glossary 7. Ib Valley (Odisha) 47 110 8. Mandraigarh (Chhattisgarh) 49 Endnotes 111 EXECUTIVE SUMMARY As India’s national animal, the Royal Bengal Tiger Panthera tigris has ostensibly been a conservation priority for current and past governments.
    [Show full text]
  • Dispersed Permian Megaspores from Rajmahal Basin, Jharkhand
    REPORT Vol. 21, Issue 68, 2020 REPORT ARTICLE ISSN 2319–5746 EISSN 2319–5754 Species Dispersed Permian megaspores from Rajmahal Basin, Jharkhand Arun Joshi1,2 1. Council of Scientific and Industrial Research (CSIR), India 2. S.G.R.R. (P.G.) College, Dehradun, India Corresponding Author: Dr Arun Joshi; Email: [email protected] Article History Received: 04 July 2020 Accepted: 13 August 2020 Published: August 2020 Citation Arun Joshi. Dispersed Permian megaspores from Rajmahal Basin, Jharkhand. Species, 2020, 21(68), 281-285 Publication License This work is licensed under a Creative Commons Attribution 4.0 International License. General Note Article is recommended to print as color digital version in recycled paper. ABSTRACT The present communication deals with the study of some dispersed megaspores from the Barakar Formation, Rajmahal Open Cast Mine, Coal Mine Zone- 54. The spores mainly belong to genus Biharisporites. Since they are meagre and in dispersed condition therefore, identification at species level is not documented here. The present find reflects the existence of pteridophytes mainly lycopsids in the area and spines on their exosporium represent aquatic fresh water condition during their deposition. Keywords: Dispersed, Megaspores, Rajmahal Basin, Lycopsids, Deposition 1. INTRODUCTION 281 Presence of both micro and megaspores in the life history of plant termed as heterospory (Bateman & Dimichele, 1994). Page Microspores usually occur in abundance in comparison with megaspores and megaspores gives rise to the female gametophyte in © 2020 Discovery Publication. All Rights Reserved. www.discoveryjournals.org OPEN ACCESS REPORT ARTICLE the early land plants mainly lycopsids. Here in the present study some dispersed megaspores mainly belong to Biharisporites sp.
    [Show full text]
  • Inventory of Geological Resource of Indian Coal I/ 1
    Table-1 INVENTORY OF GEOLOGICAL RESOURCE OF INDIAN COAL (As on 01.04.2010) (Resource in million tonne) State/ Coalfield/ Type of coal Depth Proved Indicated Inferred Inferred Total (Exploration) (Mapping) 1 2 3 4 5 6 7 WEST BENGAL 1.RANIGANJ COALFIELD MEDIUM COKING 0-300 194.70 1.60 0.00 196.30 300-600 15.30 16.90 0.00 32.20 MEDIUM COKING Total 210.00 18.50 0.00 228.50 SEMI-COKING 0-300 45.75 14.19 0.00 59.94 300-600 109.51 113.23 23.48 246.22 600-1200 32.79 305.07 144.75 482.61 SEMI-COKING Total 188.05 432.49 168.23 788.77 NON-COKING COAL 0-300 9544.54 1865.79 260.99 11671.32 300-600 1682.46 3444.57 2345.87 7472.90 600-1200 13.22 1887.28 1668.82 3569.32 NON-COKING Total 11240.22 7197.64 4275.68 22713.54 TOTAL FOR RANIGANJ 11638.27 7648.63 4443.91 23730.81 2.BARJORA COALFIELD NON-COKING COAL 0-300 114.27 0.00 0.00 114.27 NON-COKING Total 114.27 0.00 0.00 114.27 TOTAL FOR BARJORA 114.27 0.00 0.00 114.27 3.BIRBHUM COALFIELD NON-COKING COAL 0-300 0.00 609.96 40.01 649.97 300-600 0.00 3597.38 523.19 4120.57 600-1200 0.00 1173.64 48.58 1222.22 NON-COKING Total 0.00 5380.98 611.78 5992.76 TOTAL FOR BIRBHUM 0.00 5380.98 611.78 5992.76 4.DARJEELING COALFIELD NON-COKING COAL 0-300 0.00 0.00 15.00 15.00 NON-COKING Total 0.00 0.00 15.00 15.00 TOTAL FOR DARJEELING 0.00 0.00 15.00 15.00 TOTAL FOR WEST BENGAL 11752.54 13029.61 5070.69 29852.84 JHARKHAND 5.RANIGANJ COALFIELD MEDIUM COKING 0-300 220.00 8.87 0.00 228.87 300-600 49.23 8.30 0.00 57.53 MEDIUM COKING Total 269.23 17.17 0.00 286.40 SEMI-COKING 0-300 51.40 0.00 0.00 51.40 300-600 0.00 40.00
    [Show full text]
  • 138 Coal India Limited
    CONTENT Member of the Board 05 Management During 2017-2018 06 Banker, Auditors and Corporate Office 07 Chairman’s Statement 08 Performance of CIL at a glance 12 (Graphical Representation) Operation Statistics 17 Brief Profile of Directors 32 Director’s Report 38 Comments of the Comptroller & Auditor General of India on Standalone Accounts of Coal India Limited 86 Auditor Report on the Standalone Financial Statements for the year ended 31st March 2018 88 Comments of the Comptroller & Auditor General of India on Consolidated Accounts of Coal India Limited 94 Auditor Report on the Consolidated Financial Statements for the year ended 31st March 2018 96 Observation of Auditor on Standalone Financial Statements and Management Explanation 103 Observation of Auditor on Consolidated Financial Statements and Management Explanation 106 Secretarial Auditor Report 145 Report on Corporate Governance 163 Sustainable Development Report 181 Management Discussion and Analysis Report 182 Standalone Accounts of CIL 205 Consolidated Accounts of CIL & its Subsidiaries 269 GREEN INITIATIVE IN CORPORATE GOVERNANCE Dear Shareholder, Pursuant to the initiatives undertaken by the Ministry of Corporate Affairs, encouraging the companies to reduce the carbon footprint by enabling them to send the Annual Report etc to the Shareholders through electronic mode, your company has already taken the following steps:- Emails have been sent to all shareholders who have not exercised the option to receive the Annual Report 2017-18 in physical mode. They have been provided with a link (URL) to the website of COAL INDIA LIMITED for downloading the Annual Report 2017-18. For members who have not registered their email addresses, physical copy of Annual Report 2017-18 is being sent by the permitted mode.
    [Show full text]
  • Mining the Forests August 18, 2020
    Mining the forests August 18, 2020 Ishan Kukreti Correspondent Down To Earth Laying the ground 1. On June 18, Prime Minister Narendra Modi put 41 new coal blocks for auction. 2. This was in line with a long list of amendments to the mining sector being undertaken by the government- MMDR amendment, 100 % FDI. 3. This time, there’d be no end-use restriction. : More on this in the upcoming presentations 4. Investment of Rs. 20,000 crore in coal gasification: More on this in the upcoming presentations 5. “To bring coal sector out of lockdown.” But there is a problem: Coal is where the forests are. Opening up new frontiers 1. Jharkhand has already approached the court. 2. Bander block in Bander coalfield in Maharashtra has been removed, Chhattisgarh has asked the removal of five blocks in ecologically sensitive area 3. Moreover, these blocks don’t come with prior environmental and forest clearances and will lead to displacement. 1. The signal that the government is sending by putting up these blocks without getting FC first is that it has no regard for the Provisions of the Panchayats (Extension to Schedule Areas) Act or the Gram Sabha consent under the Schedule Tribe and Other Forest Dweller (Recognition of Forest Rights) Act. But the question is: How many coal mines does a nation need? Especially when majority of the mines already auctioned or allotted are not operational Brief History of SC Coal Case 1. In 2014, the SC cancelled 204 coal mines allotted between 1993 and 2011 2. In 2015, the government enacted the Coal Mines (Special Provisions) Act, 2015 to auction these mines.
    [Show full text]