National Highways Authority of India

Total Page:16

File Type:pdf, Size:1020Kb

National Highways Authority of India NATIONALHIGHWAYS AUTHORITY OFINDIA Nor#wmThnk Rode in Anciar* trda X (~~ M&M4uryan) Public Disclosure Authorized Grand Trunk Road Improvement Project ConsolidatedResetdement Action Plan *XTrt*%4 * 4 -~ Nrem TwunkRou~E432 ~~_,< ~~inM.~vl IndP A2 Volume 16 Public Disclosure Authorized oitt nflThunk Road (G.IReoUd) i wip. ~~~~PATAP 1,<vwkA` P Y Public Disclosure Authorized -t+_FILRDV (G.f -~~~~~AD FINALREPORtT ~WI-,-- . Public Disclosure Authorized so atesSouth Asia 'Pvt. Ltd. w Northern Trunk Route in NATIONALHIGHWAYS AUTHORITY OFINDIA Ancient India (Raja Marg-Mauryan) 7*t = ^ Trunk-GrandRoad ImprovementProject ConsolidatedResettlement Action Plan Northem Irunk Routes in Mediaeval India ; (Sarak-e-Azam) Northern Trunk Road i9th Century (G T Road) N~~~~~~~~~~~ 71.a - Proposed Trunk Roadi, Network t~~~~~~~~~~t 207 A.D.) TABLE OF CONTENTS 1. EXEXECUTIVE SUMMARY 1-1 1.1 THE GRANDTRUNK ROAD IMPROVEMENTPROJECT 1-1 1.2 Indian and the World Bank's Requirements 1-2 1.3 Resettlementin the Project 1-2 1.3.1 Need for Land Acquisition 1-2 1.3.2 Context of Resettlementin GTRIP 1-3 1.3.3 MinimisingResettlement 1-3 * The Definitionand Delineationof the Corridorof Impact 1-3 1.4 IMPACTSOF THE PROJECT 1-4 1.4.1 Estimatesof Land Requiredfor the Project 1-4 1.4.2 Displacementand Other Impacts 1-4 1.4.3 Vulnerable Groups 1-4 1.4.4 Livelihood 1-5 1.5 SUPPORT PRINCIPLESFOR DIFFERENTCATEGORIES OF IMPACTS 1-5 1.5.1 Entitlementsfor Project-AffectedFamilies 1-5 1.5.2 *Entitlementsfor Project-AffectedPersons 1-8 1.5.3 Entitlementsfor Project-AffectedGroups 1-8 1.5.4 TargetedSupport to Vulnerable Groups 1-9 1.5.5 Options and Choices 1-10 1.6 RESETTLEMENTPLANNING AND IMPLEMENTATION 1-10 1.6.1 Social Assessment,Census and Surveys 1-10 * SocialAssessment 1-10 * Censusand Baseline Socio-Economic Surveys 1-10 * Cut-OffDate 1-10 1.6.2 Resolutl'onof Disputes& Grievances 1-11 1.6.3 Co-OrdinationBetween Civil Works and Resettlement 1-11 1.6.4 Community Participationand Public Consultation 1-12 1.6.5 Non-GovernmentOrganisations 1-12 1.7 INSTITUTIONALARRANGEMENTS 1-13 1.7.1 The Delivery System 1-13 1.7.2 Capacity Building 1-14 1.7.3 Training 1-15 . AwarenessCampaign 1-15 1.7.4 DatabaseManagement & Documentation 1-15 1.7.5 Transparencyand Accountability 1-16 1.8 COSTS AND BUDGETS 1-16 1.9 MONITORINGAND EVALUATION 1-17 LeaAssociates z 7D 1.10 EVALUATIONSTUDIES RECOMMENDED 1-17 2. OBJECTIVES AND BENEFITSOF THE PROJECT 2-1 2.1 OVERVIEW 2-1 2.2 THE GRAND TRUNK ROAD IMPROVEMENTPROJECT 2-1 2.2.1 Overall Scope of ProjectWorks 2-3 2.2.2 Proposed Improvementof the Project Highway 2-3 2.2.3 Resettlementin the Project 2-4 2.3 PROJECT PREPARATIONOBJECTIVES OF GTRIP 2-4 2.3.1 Scope of the ConsolidatedRAP Report 2-5 2.3.2 Objectivesof the ResettlementAction Pjan 2-6 2.4 BENEFITS OF THE PROJECT 2-6 2.4.1 Macro-EconomicBenefits 2-7 2.4.2 Local Level Benefits 2-7 • AccidentReduction Benefits 2-8 * LocalFacilities 2-8 * EmploymentOpportunities for LocalCommunity 2-9 * ImprovedAccess to Amenities 2-9 * Compensationand Mitigation of the NegativeImpacts 2-9 * EquitableDistribution of Benefits 2-9 3. METHODSAND SURVEYS 3-1 3.1 OUTLINE 3-1 3.2 RECONNAISSANCE 3-1 3.3 DATA FROM SECONDARYSOURCES 3-1 3.4 VERIFICATIONEXERCISE 3-1 3.5 THE CENSUS 3-2 3.6 SOCIO-ECONOMICBASELINE SURVEY 3-2 3.7 CONSULTATIONS 3-3 4. MEASURES TO MINIMISE RESETTLEMENT 4-1 4.1 THE NEED FOR RESETTLEMENTIN THE GTRIP 4-1 4.2 MINIMISINGRESETTLEMENT 4-2 4.2.1 The Definition and Delineationof the Corridor of Impact 4-2 4.3 EVALUATIONOF MEASURESTO MINIMISE RESETTLEMENT 4-3 4.3.1 ConcentricWidening and Raised Carriageways 4-4 4.3.2 Concentric/Eccentric Expansion 4-4 4.3.3 Bypass/ Realignment 4-4 4.3.4 Safety Oriented Designs 4-5 4.4 SPECIFIC DESIGNSFOR AVOIDANCEI MITIGATION 4-5 Lea Assoes ii 5. SOCIO-ECONOMICPROFILE OF THE PROJECT AREA 5-1 5.1 PROFILE OF THE AREA 5-1 5.1.1 Demography 5-2 5.1.2 PopulationGrowth 5-3 5.1.3 PopulationDensity and Urbanisation 5-4 5.1.4 PopulationComposition 5-4 5.1.5 Literacy 5-5 5.1.6 OccupationalPattern and Work Force ParticipationRates 5-6 5.2 ANALYSIS OF THE CENSUSDATA 5-7 5.2.1 Profile of the Affected People 5-8 5.2.2 Profile of the Displaced People 5-12 6. COMMUNITYPARTICIPATION AND CONSULTATION 6-1 6.1 PARTICIPATIONOF STAKEHOLDERS 6-1 6.1.1 Identificationof the Stakeholders 6-1 6.1.2 Participantsat Different Levels 6-2 6.2 LOCAL LEVEL CONSULTATIONS 6-2 6.2.1 Objectives and Contents 6-2 6.2.2 Key Findings 6-8 6.3 DISTRICT-LEVELCONSULTATIONS 6-10 6.3.1 Objectivesand Contents 6-10 6.3.2 Key Findings 6-13 6.4 STATE-LEVELCONSULTATIVE WORKSHOPS 6-15 6.4.1 Contents 6-15 6.4.2 Key Findings 6-16 6.5 PLAN FOR CONTINUEDPARTICIPATION 6-18 6.5.1 InformationDisclosure 6-18 * PublicDisclosure of the RAPReport 6-18 * PublicInformation Sharing and Transparency 6-19 * CommunityParticipation 6-19 7. THE ENTITLEMENT FRAMEWORK 7-1 7.1 DEFINITION OF PAPS AND THE ELIGIBILITYCRITERIA 7-1 7.2 CUT-OFF DATES 7-3 7.3 CRITERIAFOR ELIGIBILITYFOR COMPENSATION 7-3 7 4 NHAI FRAMEWORKFOR RESETTLEMENT& REHABILITATION 7-4 Abbreviationsand Terms 7-5 Text of the ENTITLEMENTFRAMEWORK 7-7 ANNEXI: BROADENTITLEMENT FRAMEWORK 7-14 ANNEXII: DETAILEDENTITLEMENT MATRIX 7-15 LeaAs5 tes iii 8. IMPACTSAND RESETTLEMENT/ REHABILITATION 8-1 8.1 ACQUISITIONOF LAND AND ASSETS 8-1 8.1.1 Requirementof Land 8-1 * Estimatesof LandRequired for the Project 8-2 * SpecificPurposes of the LandRequired 8-3 * LandCategories 8-4 8.2 IMPACT ON PEOPLEDUE TO LAND ACQUISITION 8-4 8.2.1 Families LosingAgriculture Land 8-5 8.2.2 Families LoosingResidence 8-6 8.2.3 Families LoosingCommercial Structure 8-6 8.2.4 Families LoosingResidential-Cum-Commercial Structures 8-7 8.3 COMMUNITYRESOURCES AFFECTED 8-7 8.4 SQUATTERSAND ENCROACHERSIMPACTED 8-7 8.5 OVERALLDISPLACEMENT AND OTHER IMPACTS 8-10 8.5.1 Displaced Families 8-11 8.5.2 Vulnerable Group Families 8-11 - 8.5.3 Livelihoodof the Project Affected/DisplacedFamilies 8-15 8.6 RESETTLEMENT 8-16 8.6.1 Displaced Families 8-16 , TitleholderDisplaced Families 8-17 Non-TitleholderDisplaced Families 8-17 VulnerableDisplaced Families 8-18 * OptionsPreferred by the DisplacedFamilies 8-18 8.6.2 Host Community 8-18 Replacementof Amenities 8-19 GConservation and Enhancementof the CommonProperty Resources 8-19 * RoadsideFacilities 8-19 * Safetyof the Communities 8-19 * Evaluationof Impactson the HostCommunity 8-20 8.6.3 Income Restorationof the Affected and the DisplacedPersonslFamilies 8-20 * Livelihoodof the AffectedFamilies 8-20 * FreeAssets to the VulnerableGroup Displaced Families -8-21 * OtherIncome Restoration Measures 8-21 8.6.4 Inter-AgencyLinkages for Income Restoration 8-22 * AgriculturalExtension Facilities 8-23 * IncomeRestoration Schemes 8-23 9. ESTIMATE OF R&R COST 9-1 9.1 UNIT COSTS 9-1 * Valueof Land 9-1 • Valueof BuildingStructures 9-1 Lea Asstes iv * Assistancefor Structure (Squatters& Encroachers) 9-l * Transitional Allowance 9-1 * EconomicRehabilitation Grant 9-2 * ShiftingAllowance 9-2 * RentalAllowance 9-2 * ResettlementSites 9-2 9-2 BUDGET 9-3 10. IMPLEMENTATION ARRANGEMENTS 10-1 10.1 EXISTING INSTITUTIONAL CAPACITY 10-1 10.1.1 The Project Implementation Units 10-1 10.1.2 Organisation at the NHAI Headquarters 10-2 10.1.3 Institutional Delivery System 10-2 • District LevelCommittees for RecommendingReplacement Values of Land 10-2 * GrievanceRedressal Committees 10-3 10.1.4 Roles and Responsibilities 10-4 10.1.5 Community Participation in the Implementation of the RAP 10-6 10.2 ADDITIONAL INSTITUTIONAL CAPACITY BUILDING IN GTRIP 10-6 10.2.1 Need for Additional Capacity 10-6 10.2.2 Land Acquisition 10-7 10.2.3 Women's Participation 10-7 * PossibleAreas of Women Involvement 10-8 * Womenas Managersin the NGOs 10-9 * Women as Membersof the Consultants'Teams 10-9 * Women as Managersin the Contractors'Team 10-10 10.2.4 Database Management & Documentation of the R&R Process 10-11 10.2.6 Amenities and Facilities 10-11 . Website 10-11 * Transportationand CommunicationFacilities 10-12 10.3 TRAINING 10-12 10.3.1 Training for the NGO Personnel 10-12 10.3.2 Training for the Beneficiaries of the Project 10-12 10.3.3 Training forthe NHAI Staff 10-12 10.3.4 Awareness Campaign 10-13 10.3.5 Overall Training Plan for NHAI Staff 10-13 10.4 EVALUATION STUDIES 10-14 10.4.1 Evaluation of the Impacts of Alternative Livelihood Systems in GTRIP 10-14 10.4.2 Evaluation of the Impacts on the Indigenous People 10-15 10.4.3 Evaluation of the Impacts on the Quality of Life 10-16 * SpecificScope of Work for the Host Community Study 10-16 LeaAssociates v 10.5 INVOLVEMENTOF THE NON-GOVERNMENTORGANISATIONS 10-17 * APPENDIX"A":TERMSOFREFERENCE FORTHE NGOS 10-18 * APPENDIX"B": Formatfor EntitlementPhoto Identity Card 10-28 11. MONITORING, EVALUATION AND REPORTING 11-1 11.1 TYPE OF MONITORING& SCHEDULE 11-1 11.2 INTERNAL MONITORINGAND REPORTING 11-1 11.2.1 Organisationof the InternalMonitoring 11-1 11.2.2 Monitoring Indicators 11-2 11.2.3 Monitoringthe ProjectInputs & Outputs 11-4 11.2.4 Reporting 11-4 11.3 EXTERNALEVALUATION & REPORTING 11-5 11.3.1 Monitoringthe ProjectObjectives 11-5 11.3.2 MeasuringChanges in the Quality of Life 11-6 11.3.3 Indicatorsfor Overall Evaluation 11-8 * PhysicalIndicators 11-8 * FinancialIndicators 11-8 * EconomicIndicators 11-9 * SocialIndicators 11-9 11.3.4 Evaluation Studiesby the M&E Consultants 11-9 11.3.5 Reporting 11-10 APPENDD"C": FORMATS FOR REPORTING 11-14 12.
Recommended publications
  • ANSWERED ON:23.08.2007 HISTORICAL PLACES in up Verma Shri Bhanu Pratap Singh
    GOVERNMENT OF INDIA CULTURE LOK SABHA UNSTARRED QUESTION NO:1586 ANSWERED ON:23.08.2007 HISTORICAL PLACES IN UP Verma Shri Bhanu Pratap Singh Will the Minister of CULTURE be pleased to state: (a) the details of Centrally protected monuments in Uttar Pradesh (UP) at present; (b) the agency responsible for the maintenance of these places; (c) the amount spent on the maintenance of these monuments during the last three years; and (d) the details of revenue earned from these monuments during each of the last three years? Answer MINISTER FOR TOURISM AND CULTURE (SHRIMATI AMBIKA SONI) (a)&(b) There are 742 monuments/sites declared as of national importance in the Uttar Pradesh (U.P.) as per list at Annexure. Archaeological Survey of India looks after their proper upkeep, maintenance, conservation and preservation. (c) The expenditure incurred on conservation, preservation, maintenance and environmental development of these centrally protected monuments during the last three years is as under: Rupees in Lakhs Year Total 2004-05 1392.48 2005-06 331.14 2006-07 1300.36 (d) The details of revenue earned from these monuments during the last three years are as under: Rupees in Lakhs Year Total 2004-05 2526.33 2005-06 2619.92 2006-07 2956.46 ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a)&(b) OF THE LOK SABHA UNSTARRED QUESTIO NO.1586 FOR 23.8.2007 LIST OF CENTRALLY PROTECTED MONUMENTS IN UTTAR PRADESH Agra Circle Name of monument/site Locality District 1. Agra Fort Including Akbari Mahal Agra Agra Anguri Bagh Baoli of the Diwan-i-Am Quadrangle.
    [Show full text]
  • GAIL Sustainability Report 2020-21 We Have to Move Towards ‘Zero-Defect and Zero Effect’
    GAIL Sustainability Report 2020-21 We have to move towards ‘zero-defect and zero effect’. Zero defect in production with no adverse effect on the environment. Shri Narendra Modi Prime Minister of India Energizing Growth We as a Business grow when the air around is fresh, when the flora is abundant, when the local community is empowered, when the avian soar high in the sky, when the sound of cicadas and birds hum along with the sound of development, and when the water is clean and blue. Biodiversity is a very important element of sustainable development. It impacts the quality of human life and is an essential part to the sustainability of all human activity, including business. Sustainable development is all about meeting the needs of present generations while safeguarding the ecosystems, species, and genetic components that make up biodiversity, a crucial factor in meeting the needs of future generations. We at GAIL, believe Biodiversity is everyone’s responsibility; definitely ours as a responsible corporate entity. The theme of the report is “Energizing Growth” because we are the catalyst to sustainable growth and believe growth is achieved when various ecosystems are in harmony with each-other. This report carries images of various Flora, Fauna and Avian species shot at our facilities at Pata, Gandhar, Vijaypur, and Hazira showcasing GAIL’s commitment to coexist and grow along with its rich ecosystem. thos’kq d#.kk pkfi eS=h rs’kq fo/kh;rke~A Be compassionate and friendly to all living beings Buddhacharitam 23.53 GAIL Sustainability
    [Show full text]
  • District Ground Water Brochure of Auraiya District, U.P
    DISTRICT GROUND WATER BROCHURE OF AURAIYA DISTRICT, U.P. By Dr. B.C. Joshi Scientist 'B' CONTENTS Chapter Title Page No. AURAIYA DISTRICT AT A GLANCE ..................2 1.0 INTRODUCTION ..................5 2.0 RAINFALL & CLIMATE ..................6 3.0 GEOMORPHOLOGY & SOIL TYPES ..................7 4.0 GROUND WATER SCENARIO ..................8 5.0 GROUND WATER MANAGEMENT STRATEGY ..................12 6.0 GROUND WATER RELATED ISSUES AND PROBLEMS ..................12 7.0 AWARENESS & TRAINING ACTIVITY ..................13 8.0 AREA NOTIFIED BY CGWA / SGWA ..................13 9.0 RECOMMENDATIONS ..................14 PLATES: I. LOCATION MAP OF AURAIYA DISTRICT, U.P. II. GEOMORPHOLOGICAL MAP, AURAIYA DISTRICT, U.P. III. HYDROGEOLOGICAL MAP, AURAIYA DISTRICT, U.P. IV. DEPTH TO WATER MAP (PREMONSOON), AURAIYA DISTRICT, U.P. V. DEPTH TO WATER MAP (POSTMONSOON), AURAIYA DISTRICT, U.P. VI. CATEGORIZATION OF BLOCKS, AURAIYA DISTRICT, U.P. DISTRICT AT A GLANCE (AURAIYA) 1. GENERAL INFORMATION i. Geographical Area (Sq. Km.) : 2015 ii. Administrative Divisions (as on 31.3.2005) Number of Tehsil / Block : 2/7 Number of Panchayats /Villages : -/841 iii. Population (As on 2001 census) : 1179993 iv. Average Annual Rainfall (mm) : 807.35 2. GEOMORPHOLOGY Major physiograpic units : Ganga-Yamuna Doab sub divided in Lowland area (Active & Old flood plain) and Upland area (Varanasi & Banda alluvial plain) Major Drainages : Yamuna, Chambal, Sengar, & Rind rivers. 3. LAND USE (Sq. Km.) a) Forest area : 102.83 b) Net area sown : 1438.82 c) Cultivable area : 1667.15 4. MAJOR SOIL TYPES : Sandy loam and clay, locally classified as Bhur, Matiyar, Dumat and Pilia. 5. AREA UNDER PRINCIPAL CROPS (As on 2005-06) : 1342.03 6.
    [Show full text]
  • Lower Ganga Canal Command Area and Haidergarh Branch Environmental Setting & Environmental Baseline 118
    Draft Final Report of Lower Ganga Canal System and Public Disclosure Authorized Haidergarh Branch Public Disclosure Authorized REVISED Public Disclosure Authorized Submitted to: Project Activity Core Team (PACT) WALMI Bhawan, Utrethia, Telibagh, Lucknow – 226026 Submitted by: IRG Systems South Asia Pvt. Ltd. Lower Ground Floor, AADI Building, 2-Balbir Saxena Marg, Hauz Khas, Public Disclosure Authorized New Delhi – 110 016, INDIA Tel: +91-11-4597 4500 / 4597 Fax: +91-11-4175 9514 www.irgssa.com In association with Page | 1 Tetra Tech India Ltd. IRG Systems South Asia Pvt. Ltd. Table of Contents CHAPTER 1: INTRODUCTION 16 1.0 Introduction & Background 16 1.1 Water Resource Development in Uttar Pradesh 16 1.2 Study Area & Project Activities 20 1.3 Need for the Social & Environmental Framework 24 1.4 Objectives 24 1.5 Scope of Work (SoW) 25 1.6 Approach & Methodology 25 1.7 Work Plan 28 1.8 Structure of the Report 29 CHAPTER 2: REGULATORY REVIEW AND GAP ANALYSIS 31 2.0 Introduction 31 2.1 Policy and regulatory framework to deal with water management, social and environmental safeguards 31 2.1.2 Regulatory framework to deal with water, environment and social Safeguards 31 2.1.3 Legislative Framework to Deal with Social Safeguards 32 2.2 Applicable Policy, Rules & Regulation to project interventions / activities 33 2.2.1 EIA Notification 33 2.3 Institutional Framework to deal with water, social and environmental safeguards 37 2.4 Institutional Gaps 39 CHAPTER 3: SOCIO-ECONOMIC BASELINE STATUS 40 3.0 Introduction 40 3.1 Socio-Economic Baseline
    [Show full text]
  • District Census Handbook, Auraiya, Part-XII-A & B, Series-10, Uttar
    CENSUS OF INDIA 2001 ~3ERIES-10 UTTAR PRADeSH DISTRICT CENSUS HANDBOOK Part - A & B AURAIYA VILLAGE & TOWN DIRECTORY VILLAGE AND TOWNWISE PRIMARY CENSUS ABSTRACT {_ -~. I ( ! ) I F·~ ~ ~ _~. ~: ~ i I'i (\I'i!. (11(11 NIIII Dlr~ECTORATE OF Cf-':l\ISUS OPERATIONS, UTTAR PF~!\DESH LUCKNOW UTTAR PRADESH DISTRICT AURAIY A KILOMETRES , ,. 5 5 10 15 20 25 N A Area(sq.km.) . 2,015 (:::, Pepu) a tion .. ... 1,1'79,993 Number of Tahsils .. Number of Vikas Khand. ... ~ I· Number of Towns. Q; Number of Villages .. ·•• sj A L A DISTRICT AURAIYA-i S - PART OF VIKAS KHAND SAHAR (NEWL Y CREATED) CHANGE IN JURISDICTION 1991 - 2001 KILOMET~ :'".~~ '.~ . BOUNDARY DISTRICT -----: ! TAHSIL VIKAS KHAND .~ HEADQUARTERS DISTRICT, TAHSIL VIKAS KHAND @ @ NATJONAL HIGHWAY NH 2 STATE HIGHWAY SH 21 IMPORTANT METALLED ROAD RAILWAY LINE BROAD GAUGE. RIVER AND STREAM VILLAGE HAVING 5000 AND ABOVE POPULATJON WITH NAME • Kasba Khanpur TOWNS WITH POPULATION SIZE AND CLASS II JIl , IV , V ~.~.-.~" . DEGREE COLLEGE ~ AREA GAINED- FROM ~ DISTRICT ETAWAH MOTIF JAMUNAPARI GOATS The main centre of availability of Jamunapari Goats is considered in the surroundings of the village Pachnada in the district Auraiya at the banks of the rivers Yamuna, Chambal, Kunwari, Rind and Pahunj. Though these goats are extended from Chakarnagar to the either of the banks of river Yamuna, their height is much more than other goats with the backbone lying downwards likewise came and having two long ears in addition to two amazing short ears below their necks. There is a variety of species which are bit different from each other, but among them ~Alwari goats' are the best one, which give about 3 to4 kg.
    [Show full text]
  • 20 Sep 2017 1412077273ER4
    Table of Contents 1. INTRODUCTION ................................................................................................... 1 1.1 Background ....................................................................................................................................................... 1 1.2 Introduction ...................................................................................................................................................... 1 1.3 Project Location and Accessibility .............................................................................................................. 2 1.4 Project Area ...................................................................................................................................................... 2 1.5 Vision statement .............................................................................................................................................. 2 1.6 Scope of the Project ........................................................................................................................................ 3 2. Preliminary Appreciation of project site w.r.t surroundings and Master Paln 2021 .. 4 2.1 Introduction ...................................................................................................................................................... 4 2.2 Factor Considered for Site Selection in New Sikandrbad ..................................................................... 4 2.3 Regional Setting...............................................................................................................................................
    [Show full text]
  • Uttar Pradesh Major Achievements
    Uttar Pradesh State Industrial Corporation Ltd Shelf of projects ready for investment in Uttar Pradesh. New Initiatives of Uttar Pradesh State Industrial Development Corporation (UPSIDC) Ready for investment in UPSIDC 1. Trans-Ganga Project, Kanpur-Unnao 2. Saraswati Hi-Tech City, Allahaba 3. Plastic City, Auraiya 4. Trans Delhi Signature City, Tronica Ghaziabad 5. Agro Parks, Lucknow & Varanasi 6. Export Promotion Industrial Park (EPIP) 7. Greater Mathura (Kosi-Kotwan Extension) Project 8. Mega Leather Cluster (MLC) project 9. Leather Park, Agra 10. Leather Technology Park, Unnao 11. Moradabad Special Economic Zone (SEZ) 12. Apparel Parks, Ghaziabad & Kanpur 13. Shaktiman Mega food Park, Jagdishpur Trans Ganga Project, Unnao Overview ❒ Trans Ganga Project spreads over 1,151 Acre near Kanpur in Unnao district ❒ Expected investment in the project is INR 1,300 Crore ❒ It is being developed as an Industrial Model Township with industrial, residential and commercial sectors ❒ Situated within burgeoning belt of Kanpur and Lucknow zone Location ❒ 70 KM from Lucknow Airport ❒ On the bank of river Ganga in Unnao district Features ❒ Automobile hub, planned with modern Auto Expo-mart ❒ Project to be equipped with state-of-the- art infrastructure ❒ It will have exhibition centers, multiplexes, mega malls, parks, & group housing societies ❒ The township will be well-connected by Lucknow-Kanpur Highway. ❒ A Cable Bridge from Kanpur to Trans Ganga City over ganga river have proposed. Current Status ❒ Residential & Industrial Plots are available for allotment. Source: UPSIDC | 3 Saraswati Hi-Tech City, Allahabad Overview ❒ Saraswati Hi-Tech City Project spreads over 1,115 Acre near Naini Kanpur in Allahabad district Expected investment in the project is INR 1,300 Crore.
    [Show full text]
  • Auraiya District
    lR;eso t;rs Government of India Ministry of MSME Brief Industrial Profile of Auraiya District MSME-Development Institute (Ministry of MSME, Govt. of India,) Phone: 0512-2295070-73 Fax: 0512-2240143 E-mail: [email protected] Web: msmedikanpur.gov.in FOREWORD District Industrial Potentiality Survey Report of District Auraiya is a key report which not only contains current industrial scenario of the district but also other useful information about the district. This report provides valuable inputs which may be useful for existing & prospective entrepreneurs of the District. It is the only source which provides the latest data on infrastructure, banking and industry of the district. It also provides information on potentials areas in manufacturing and service sector of the district. I sincerely hope that District Industrial Potentiality Survey Report of District Auraiya will facilitate easier dissemination of information about the district to policy makers and also to the professionals working in the MSME sector. I appreciate the efforts made by Shri Sushil Kumar Gangal, Investigator (Glass/Ceramics) in preparing the District Industrial Potentiality Survey Report of Auraiya District. June, 2016 ( U. C. Shukla ) Kanpur Director 2 CONTENTS S. No. Topic Page No. 1. General Characteristics of the District 03 1.1 Location & Geographical Area 03 1.2 Topography 03 1.3 Availability of Minerals. 04 1.4 Forest 04 1.5 Administrative set up 04 2. District at a glance 05-07 2.1 Existing Status of Industrial Area in the District Auraiya 08 3. Industrial Scenario of Auraiya 08 3.1 Industry at a Glance 09 3.2 Year Wise Trend Of Units Registered 10 3.3 Details Of Existing Micro & Small Enterprises & Artisan 10 Units in The District 3.4 Large Scale Industries / Public Sector undertakings 11 3.5 Major Exportable Item 11 3.6 Growth Trend 11 3.7 Vendorisation / Ancillarisation of the Industry 12 3.8.2 Major Exportable Item 12 3.9 Service Enterprises 12 3.9.2 Potentials areas for service industry 12 3.10 Potential for new MSMEs 12-13 4.
    [Show full text]
  • Roads Routes and Canal Systems
    ROADS AND CANALS OF ANCIENT WORLD. ROADS From the earliest times, one of the strongest indicators of a society's level of development has been its road system-or lack of one. Increasing populations and the advent of towns and cities brought with it the need for communication and commerce between those growing population centers. A road built in Egypt by the Pharaoh Cheops around 2500 BC is believed to be the earliest paved road on record-a construction road 1,000 yards long and 60 feet wide that led to the site of the Great Pyramid. Since it was used only for this one job and was never used for travel, Cheops's road was not truly a road in the same sense that the later trade routes, royal highways, and impressively paved Roman roads were. The various trade routes, of course, developed where goods were transported from their source to a market outlet and were often named after the goods which traveled upon them. For example, the Amber Route traveled from Afghanistan through Persia and Arabia to Egypt, and the Silk Route stretched 8,000 miles from China, across Asia, and then through Spain to the Atlantic Ocean. However, carrying bulky goods with slow animals over rough, unpaved roads was a time consuming and expensive proposition. As a general rule, the price of the goods doubled for every 100 miles they had to travel. Some other ancient roads were established by rulers and their armies. The Old Testament contains references to ancient roads like the King's Highway, dating back to 2000 BC.
    [Show full text]
  • Discussions on Current Social and Political Issues*
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Siberian Federal University Digital Repository DISCUSSIONS ON CURRENT SOCIAL AND POLITICAL ISSUES* All researchers interested in this subject are encouraged to continue the substantive discussion * Opinions of the authors of articles and commentaries in this column may not reflect the view of the publisher. Journal of Siberian Federal University. Humanities & Social Sciences 8 (2012 5) 1200-1217 ~ ~ ~ УДК 009 China’s Grand Strategy, Kashmir and Pakistan: Transformation of Islamabad from a Spoiler State to Frontline State for Beijing Dr. Suneel Kumar* Department of Strategic and Regional Studies, University of Jammu Jammu-180006-Jammu and Kashmir, India 1 Received 4.11.2011, received in revised form 11.11.2011, accepted 16.07.2012 China in collaboration with Pakistan has integrated Kashmir in its grand strategy to contain India. Beijing’s involvement in various mega projects related to construction and development of strategic infrastructure in the Pakistan-Occupied-Kashmir (PoK), influx of People’s Liberation Army (PLA) in the Gilgit-Baltistan region, adoption of visa-related controversial policies and invitation to India’s Kashmiri separatist leader, are being seen in the India’s official and strategic circles, as the encirclement of India by China through Kashmir. During the Cold War era, Beijing had bestowed Pakistan with the status of ‘spoiler state’ in order to weaken the natural predominance of India in the South Asian region. Nevertheless, now, it is being viewed that China has transformed Pakistan into a ‘ frontline state’ to contain the increasing Indian influence at regional and global levels.
    [Show full text]
  • ODOP-Final-For-Digital-Low.Pdf
    ODOP FINAL-NEW24.qxd 8/6/2018 3:46 PM Page 1 ODOP FINAL-NEW24.qxd 8/6/2018 3:46 PM Page 2 ODOP FINAL-NEW24.qxd 8/6/2018 3:46 PM Page 3 ODOP FINAL-NEW24.qxd 8/6/2018 3:46 PM Page 4 First published in India, 2018 Times Group A division of Books Bennett, Coleman & Co. Ltd. The Times of India, 10 Daryaganj, New Delhi-110002 Phone: 011-39843333, Email: [email protected]; www.timesgroupbooks.com Copyright ©Bennett, Coleman & Co. Ltd., 2018 All rights reserved. No part of this work may be reproduced or used in any form or by any means (graphic, electronic, mechanical, photocopying, recording, tape, web distribution, information storage and retrieval systems or otherwise) without prior written permission of the publisher. Disclaimer Due care and diligence has been taken while editing and printing the Book. Neither the Publisher nor the Printer of the Book holds any responsibility for any mistake that may have crept in inadvertently. BCCL will be free from any liability for damages and losses of any nature arising from or related to the content. All disputes are subject to the jurisdiction of competent courts in Delhi. Digital Copy. Not for Sale. Printed at: Lustra Print Process Pvt. Ltd. ODOP FINAL-NEW24.qxd 8/6/2018 3:46 PM Page 5 ODOP FINAL-NEW24.qxd 8/6/2018 3:46 PM Page 6 ODOP FINAL-NEW24.qxd 8/6/2018 3:46 PM Page 7 ODOP FINAL-NEW24.qxd 8/6/2018 3:46 PM Page 8 ODOP FINAL-NEW24.qxd 8/6/2018 3:47 PM Page 9 jke ukbZd ODOP FINAL-NEW24.qxd 8/6/2018 3:47 PM Page 10 ODOP FINAL-NEW24.qxd 8/6/2018 3:47 PM Page 11 ;ksxh vkfnR;ukFk ODOP FINAL-NEW24.qxd 8/6/2018 3:47 PM Page 12 ODOP FINAL-NEW24.qxd 8/6/2018 3:47 PM Page 13 lR;nso ipkSjh ODOP FINAL-NEW24.qxd 8/6/2018 3:47 PM Page 14 ODOP FINAL-NEW24.qxd 8/6/2018 3:47 PM Page 15 vuwi pUnz ik.Ms; ODOP FINAL-NEW24.qxd 8/6/2018 3:47 PM Page 16 Contents Introduction .
    [Show full text]
  • World Bank Document
    Initial Project Information Document (PID) Report No: AB137 Project Name INDIA -Lucknow-Muzaffarpur National Highway Project Region South Asia Regional Office Public Disclosure Authorized Sector Roads and highways (100%) Theme Infrastructure services for private sector development (P); Public expenditure, financial management and procurement (S) Project P077856 Borrower(s) GOVERNMENT OF INDIA Implementing Agency(ies) NATIONAL HIGHWAYS AUTHORITY OF INDIA Address: NHAI, Plot No. G5&G6, Sector 10, Dwarka, New Delhi Contact Person: G. R. Singhal, Chief General Manager (East-West Corridor) Tel: 91-11-2507-4100 Fax: 91-11-2508-0360 Email: [email protected] Environment Category A (Full Assessment) Date PID Prepared June 24, 2003 Auth Appr/Negs Date April 15, 2004 Public Disclosure Authorized Bank Approval Date September 30, 2004 1. Country and Sector Background Road transport plays a significant role in India's economy, carrying 80% of the land transport demand. The national highway network has a total length of 58,100 km, which accounts for about 1.8% of the total road network but carries over 40% of the road traffic. With steady economic growth during the last 12 years, traffic on the national highways have increased 6 to 7.5% a year. The network is divided into two parts, the National Highway Development Program (NHDP) network (13,000 km) and non-NHDP network (about 45,000 km), which are managed by the National Highways Authority of India (NHAI) and the Ministry of Road Transport & Highways (MORTH), respectively. NHAI is an implementing agency established Public Disclosure Authorized by Government of India (GOI) under the NHAI Act of 1988.
    [Show full text]