Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 16/2/2004 Sakyong - - 20 hac Champ, panisaj, sour, - Arupatay, kaijal and lampatey

2 17/2/2004 Chumbong Jhora - - 3 hac Teak, Sal, Simal, - Nayabazar block Dhalney, Angeri and Soreng Range ground bushes

3 13/3/2004 Srithnag RF - - 7 hac Sal, Lampatey,, Dhalney, - Gyalshing range Chelauney and bushes

4 14/3/2004 Srithnag RF - - 1.5 hac Sal & N.R damaged - Gyalshing range, Legship Block

5 17/3/2004 Shipsoo RF - - 2 hac Ground flora damaged - Nayabazar Block Soreng Range

6 30/3/2004 Birdang Khas - - 2 hac Sal & N.R Damaged - Nayabazar block

7 30/3/2004 Salghari RF - - 1.5 hac Sal & N.R Damaged - Block

8 20/4/2004 Pipaley Tar - - 1.5 hac Sal & N.R Damaged - Nayabazar Block

9 3/5/2004 Zoom RF - - 20 Hac Teak, Sal, Lampatey and - Nayabazar Block Shrubs Soreng Range

Year: 2005

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 18/12/2005 Gorley Bhir Ground fire - 2 hac Ground bushes - Nayabazar Block Soreng Range

2 19/12/2005 Changey RF Ground fire - 12 hac Ground bushes - Geyzing Range

3 19/2/2005 Khari RF Nayabazar ground bushes - 1 hac Ground bushes - Block 4 19/2/2005 Khari R.F - - 1 hac Ground bushes - Nayabazar Block

5 20/2/2005 Srithang RF - - 15 hac Local species, Sal and - Gyalshing Range bushes

6 20/2/2005 Bega, deoneglik - - 30 hac Malingo, Junifer, Silver - dhap Bersay fir varities of Rhododendron Rhodendron Sanctuary

7 25/02/2005 Kharay, Nayabazar - - 1 hac Ground bushes - block Soreng range Wls

8 02/03/2005 Zoom Namrek Ground - 3 hac Ground bushes -

9 9/3/2005 Sherithang RF Ground bushes - 2.5 hac Ground bushes -

10 1/3/2005 Rajatar Nayabazar Ground fire - 2 hac Ground bushes - block (Salimbo)

11 12/3/2005 Rajatar Sipsoo Ground fire - 3 hac - Road side Nayabazar

12 14/3/2005 , Daramdin Ground fire - 2.5 hac Ground fire Private Holding RF Sombaria Range

13 2/4/2005 Budang Rf Ground fire - 3 hac Ground fire frim road side Nayabazar block

14 8/4/2005 Nayabazar RF Ground fire - 4 hac Ground bushes - above mandir

15 29/05/2005 Zoom Rf Ground fire - 3 hac Ground bushes -

16 12/1/2005 Dhathang RF - - 30 hac Ground bushes -

17 9/2/2005 Sakyong Smriti Van - - 7 hac Ground bushes -

18 15/2/2005 Shipsoo RF- - - 6 hac Ground bushes -

19 18/2/2005 Sangshu RF - - 2 hac Ground bushes -

20 13/2/2005 Danak RF Mamring Ground fire - 2 hac Ground bushes - Block Namthnag Range

21 18/2/2005 Payong RF Melli Ground fire - 5 hac Ground bushes - Range

22 18/2/2006 Rong, Sumbuk RF Ground fire - 5 hac Ground bushes - (Salimbo)

23 18/2/2005 Chirberay tar RF - - 2 hac Sal regeneartion Ground - bushes

24 18/2/2005 Wok RF - - 3 hac Ground bushes - Range Omchu Rf

25 20/2/2005 Sanganath Bhir RF - - 5 hac Sal belt -

26 21/2/2005 Mamring , Turuk - - 3 hac Ground bushes and sal - RF local species

27 22/2/2005 kartikey RF - - 20 hac Ground bushes (Salimbo - Hingdam Bhir) Nearlegship

28 27/2/2005 Payong, Melli - - 4 hac Sal & local species - Range

29 27/2/2005 Bhari khola, - - 8 hac Ground bushes (salimbo) - Jorethang Block Melli range

30 10/3/2005 Kitam RFR melli - - 8 hac Sal, Cirpine and Ground - range bushes 31 10/3/2005 Mamring RF - - 30 hac Ground bushes - Damthang range

Year: 2006

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 3/1/2006 Mager Dara baga , Ground fire - 4 hac Gurash, Mohaua, - Gureshey Chelauney & Ground bushes

2 17/1/2006 Bega Dhap Upper Ground fire - 10 hac Gurash, Mohaua, - dentam Chelauney & Ground bushes

3 17/1/2006 Chewa Bhangyang Ground fire - 10 hac Rhododenderon and - Bajrathang, major dar bamboo of high altitude Dentam Range

4 13/1/2006 Suthar Bhir Khas, Ground fire - 3 hac Thatch & Bushes - Tashiding Range

5 23/1/2006 Nausaya Bhir Khas, Ground fire - 4 hac Salimbo and Gorund - Gyalshing Range bushes of Bhir

6 26/1/2006 Sakyong Khas Ground fire - 5 hac Gurash, Aughari Mouha, - Gyalshing Range Chelauney, Shour, Silveroak, Kaphal including 2 hac plantation areas.

7 31/1/2006 lalgaon Khasmal Ground fire 2/2/2006 time 2.5 hac Chelauney, Katus and - Gyalshing Range 11.30 am Mauha

8 31/1/2006 Shaligram Tashiding Ground fire 12 noon 3 hac Salimbo & Bushes - Range

9 8/2/2006 Mangshila Yanssom Ground fire 8 pm to 10.15 pm 1 hac Medicinal plantation - Rinchenpong bushes and Katus

10 8/2/2006 Mangshila Yanssom Ground fire 8 pm to 10.15 pm 1 hac Medicinal plantation - Rinchenpong bushes and Katus

11 12/2/2006 to Rashem RF Ground fire 3 pm to 6 pm 5 hac Katus, Kafal, Gighaney, - 15/2/2006 Rinchnpong Block Kharaney and Grund bushes

12 27/2/2006 Chumbong Khas Ground fire 11.30 am 1 hac Ground bushes - Nayabazar Block Soreng Range

13 1/3/2006 Taray Vir Sombaria Ground fire 11.30 am 12 Hac Local species & Ground - Range bushes

14 28/2/2006 Chungrang Khas Ground fire 3.00 pm 1 hac Chelauney 20 poles & - Tashiding Range Ground bushes

15 08/3/2006 Tashiding RF Ground fire 6.15 pm to 1145 3 hac salimbo & Ground - Tashiding range pm bushes

16 8/3/2006 to Reythang RF Legship Ground fire 9.30 am to 2.00 30 hac Maula, Chilauney, - 9/3/2006 pm Gufalo, Dhalney, Sindurey & MFP Nursery & salimbo

17 9/3/2006 Yangtey Gyalshing Ground fire 2.15 pm 1 hac Mouha, Chelauney & - bushes

18 18/3/2006 Tatopani Vir Legship Ground fire 9.35 pm to 11.30 2 hac Salimbo & Bushes - pm,

19 25/3/2006 Srithang RF Gyalshing Ground fire 2.30 pm yo 8.30 2 hac Sal NR & Ground bushes - Range pm

20 27/3/2006 Bega mangmoo Ground fire 10.00 am to 5.00 5 hac SPD Plantation of 04-05 - ANR plantation of 04-05 dentam range pm Dhupi & bushes

21 27/3/2006 Ghumauney Khas Ground fire 1.00 pm to 5.00 10 hac Rocky Vir only bushes - Nayabazar block am

22 29/3/2006 ot Tashiding RF Ground fire 3.15 pm to 6.00 35 hac Katus, siries, mohuwam, - 30/3/2006 am chelauney, bamoos, simal & salimbo

23 29/3/2006 to Tashiding RF Ground fire 3.15 pm to 6 .00 35 Hac Katus, siries, mohuwam, - 1/4/2006 pm chelauney, bamoos, simal & salimbo

24 2/4/2006 Sirithang RF Ground fire 11.40 am to 7.15 25 hac Sal, Amla. Cherry, - Gyalshing Range pm Chewrey, sindurey, Chelauney & bushes

25 14/4/2006 Kmorong RF Ground fire 11.30 am yo 3.10 2 hac Ground bushes - Gyalshing Range pm

26 14/4/2006 Tikjuk Khas 12.15 pm to 3.10 4 hac 4 hac Salimbo - RabentseGround fire

27 14/4/2006 to Rethang RF Gyalshing Ground fire 1.40 pm 40 hac Local species, - 17/4/2006 Range chelauney, angeri, chewri, mouha etc and salimbo

28 7/1/2006 Lamatar in Bhareng Ground fire - 80 hac paeng, Bamboos, - RF Rhododendrons, Taxus buccatta, temlock, rosa rubus, junipers, chereto, kutki Jatamasi ect.

29 3/1/2006 Sandupchey Ground fire - Below 1 hac Ground fire -

30 27/1/2006 Putali Bhir RF Ground fire - 2 Hac Bhuk, Phalay parang, - Range Shalimbo (Ground fire)

31 29/1/2006 Tarey Bhir Khas Melli Ground fire - 4 hac Shalimbo (Ground fire) - range

32 29/1/2006 Suming Khola RF Ground fire - 2 hac Ground fire Salimbo & - Namthang Range kharaney`

33 30/1/2006 Hingdam Khas Ground fire - 1 hac Ground fire - Kewzing block

34 26/1/2006 damthang Ground fire - 2.5 hac Ground fire (Malingo & - pareng)

35 30/1/2006 Legship Bhir Hingdam Ground fire - 1 hac Ground fire & Shalimbo - 36 31/1/2006 Ralang Kitam Bhir Ground fire - 3 hac Salimbo -

37 06/02/2006 Kopchey (River Bed) Ground fire - 01 hac Khas (Thatch) - Namthang Range

38 8/2/2006 Majitar Gaikhorey RF Ground fire - - Ground fire -

39 16/2/2006 Rolu RF Melli range Ground fire - 5 hac Ground bushes -

40 27/2/2006 Bhari Khola Majitar Ground fire - 1 hac Teak plants & ground - Melli range bushes

41 15/3/2006 Majitar Khas Ground fire - 2 hac Ground bushes -

42 24/3/2006 Bhari Khola Majitar Ground fire - 2.5 hac Salimbo & bushes Private holding

43 27/3/2006 Rock Garden (Khas) Ground fire - 1 hac Ground bushes -

44 26/3/2006 Pamphok RF Ground fire - 3 hac Chelauney & Ground - Gairigaon Namthang bushes Range

45 27/3/2006 to English Bhir Ground fire - 35 hac Katus, Champ and - 29/3/2006 Namthang range Ground bushes (Private Turung Khas holding) 46 29/3/2006 to Pamphok RF Ground fire - 25 hac Sal NR and Ground - 1/4/2006 Namthang Range bushes Gairigaon, Malbassey RF and Kasur Khas.

47 29/3/2006 to RF 20 Miles Ground fire - 22 hac Sal NR & Ground bushes - 31./3/2006 Chalamthang Namthang

48 30/3/2006 Ratomatey Majhitar Ground fire 1.30 pm 1 hac Ground bushes -

49 30/3/2006 to Lamba bhir Sumbuk Ground fire 1 pm to 8 pm 5 hac Teak & Sal NR - 31/3/2006 RF Melli range

50 14/4/2006 Manpur RF Majhitar Ground fire 2.50 pm to 6.45 1.5 hac Bamboo plantation 5 - Block pm hac & thatches

51 16/4/2006 Sumin khore Suntoley Ground fire 3.00 pm to 8.30 6ha Ground bushes - RF Namthang pm

52 17/4/2006 Ratomatey & Ground fire 5.00 pm to 7.20 1 hac Ground bushes - Majhitar RF pm

53 30/4/2006 Kitam RF (Kitam Bird Ground fire 3.30 pm to 10.00 4 hac Sal & Teak NR Thatch - sanctuary) pm etc. 54 30/4/2006 Kitam RF Ground fire 2.15 pm to 7.00 2 hac Thakal &Ground bushes - pm

55 7/5/2006 Gaikhorey RF Ground fire 9.30 am to 11.15 1 hac Thakal & bushes - Majhitar am

56 24/12/2006 Majhitar Rangit river Ground fire 13.40 to 15.50 hrs 5 hac Ground bushes - bed

Year :2007

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 9/1/2007 Raja tar Naya Ground fire 1330 pm to 12.50 1 hac Ground bushes - Bazar Block pm

2 13/1/2007 Srithang RF Ground fire 1310 hrs to 1430 5 hac Hatibar Plantation area - Geyzing Range hrs

3 13/1/2007 Kyongsha bhir , Ground fire 1530 hrs to 1645 .05 hac Thatch & Ground bushes - Geyzing hrs.

4 27/1/2007 Lingkang Ground fire 1510 hrs. to 1645 1 hac Moucha, Uttis, - Goucharan Chelauney and Bamboo Tashiding hrs plantation areas

5 27/1/2007 to Sudur Khas Ground fire 19 hrs to 8.00 hrs 4 ha chelauney, Uttis Mouha - 28/1/2007 Tashiding and ground bushes

6 30/1/2011 kerabari Khas Ground fire 1400 hrs to 1540 2 hac Ground bushes - Tashiding hrs.

7 01/2/2007 Ramji bhir Ground fire 1535 hrs to 2130 1 hac malata, Mouha, - Garethang, hrs. Chelauney and Ground Yuksum Range flora

8 20/3/2007 tashiding Ground fire 8.30 hrs to 11.15 10 hac Chelauney, Simal, Siris, - Sudurlakha hrs Simal, Kaulo & bushes

9 10/1/2007 Salghari Khas Ground fire 12.40 hrs to 13.50 0.5 hac Ground bushes - hrs

10 18/1/2007 Majhitar RF River Ground fire 13.15 hrs to 14.05 0.5 hac Ground bushes - bed Melli Range hrs

11 29/01/2007 Debran Khas (Bhir) Ground fire 13.30 hro to 15.10 2 hac Thatch & Ground Bushes - Namchi Range hrs

12 15/03/2007 Narak RF Mamring Ground fire 2.30 pm to 8.30 10 hac Thatch & Ground bushes - Block pm (Dry leaves) 13 30/3/2007 Mamring Block Ground fire 3 pm to 31/3/2007 7 hac Dry leaves & Ground - Kharpni khas to 13.30 pm bushes

14 31/3/2007 kabrey Khas Ground fire 11.30 hrs to 14.10 1 hac Bamboo plantation, - Namthang hrs Chelauney and Ground Bushes

15 4/4/2007 Melli Payong RF Ground fire 1600 hrs to 1800 2 hac Dry leaves of Sal - hrs

16 14/4/2007 Choti RF Mamring Ground fire 1600 hrs to 1800 2 hac Dry leaves & Ground - Block hrs bushes

17 15/4/2007 Kunam RF Ground fire 11 hrs to 1400 hrs 2 hac Dry leaves & Ground - Mamring Block

18 18/4/2007 Kitam bird Ground fire 10 hrs to 12.30 13 hac Ground bushes and dry - sanctuary hrs. leaves of sal

Year: 2008

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 5/1/2008 Lingthing RF Danak Ground fire 1510 hrs to 1635 01 hac Ground bushes & leaves - hrs

2 11/1/2008 Kartikay RF above Ground fire 1700 hrs to 1930 2 hac Ground bushes - Legship Shiv hrs Mandir

3 28/3/2008 Mamring Block Ground fire 1600 hrs to 2300 15 hac Ground fire - Chemsey RF hrs

4 28/3/2008 Mazitar Block Surface fire 12.00 hrs to 20.00 10 hac Ground fire sal, chirpine, - Melli Range hrs chelauney etc. (Mazitar range)

5 29/3/2008 Melli Range Gume Surface fire 10 .00 hrs to 18.00 5 hac Ground fire - RF hrs

6 31/3/2008 Suminkhor Ground fire 09.00 hrs to 1430 5 hac Ground fire - Namthang Range hrs

7 31/3/2008 Narak RF Mamring Ground fire 15 hac approx. 17.30 hrs to 20.00 Surface fire - Block Namthang Range (T) hrs

8 16/1/2008 Tarey Bhir Melli Ground fire 7 hac approx. 10.00 hrs to 12.00 Dry Grassesand Ground - range hrs fire

9 22/3/2008 Pamphok RF, Ground fire 50 hac approx. 17.30 hrs to 20.00 Plantation, Teak, sal and - Namthang Range hrs Chelauney etc. (T)

10 15/3/2008 Paiyong RF Melli Ground fire 10.30 hrs to 17.00 3 hac Chilauney, Sal, lampatey - Range (T) hrs etc.

11 24/3/2008 Kubindey RF Melli Ground fire 14.30 hrs to 20.00 4 hac Chilauney, Sal , - Range (T) hrs Lampatey etc.

12 26/3/2008 Kubindey RF Melli Ground fire 15.00 hrs 3.5 hac Chilauney, Lampatey and - Range ground fire

13 26/3/2008 Paiyong RF Melli Ground fire 13.00 hrs to 14.50 5 hac Surface fire - Range hrs

14 29/3/2008 Rolu RF Melli Ground fire - 2 hac Ground fire, Lampatey, - Range Chilauney etc.

15 29/3/2008 Rolu RF Melli Ground fire - 2 hac Ground fire - Range Block 16 31/3/2008 Aleyter RF Melli Ground fire - 4 hac Ground fire - Range

17 31/3/2008 Suntaley RF Melli Ground fire - 4 hac Ground fire Chilauney, - Range Thakal etc.

18 28/3/2008 majhitar RF Ground fire 12.00 hrs to 13.00 10 hac Ground fire Sal and - hrs. thaksl old trees

19 29/3/2008 Gom RF Majitar RF Ground fire 16.00 hrs to 22.00 5 hac Ground fire - hrs

20 5/4/2008 Melli Salghari RF Ground fire 1700 hrs to dt. 15 hac Ground fire - Jorethang Block 6/4/2008 11.30 am

21 7/4/2008 mell salghari RF Ground fire 12.45 am to 15.00 01. hac Ground fire Dry leaves - hrs

22 9/4/2008 Melli (Salghari) RF Ground fire 11.00 hrs to 13.00 50 hac Ground fire - hrs

23 14/11/2008 Raomatey RF 11th G. fire 9.15 hrs to 1.00 2.5 hac Ground flora - mile Gom Khola am Melli Range 24 20/1/2008 Rethang Khas & RF Ground fire 1330 hrs to 1615 07 hac Ground flora - Sakyong hrs

25 29/3/2008 Naya Bazar RF Surface fire 1400 hrs to 1630 2.5 hac Ground fire - Sipsoo hrs

26 6/3/2008 Tashiding Ground fire - 2.5 hac Ground fire - (Sudhirbhir khas)

27 7/3/2008 Sudhur Bhir Khas Ground fire - 2.5 hac Ground fire -

28 21/3/2008 Galling Fatak Ground fire - 5 hac Ground fire -

29 25/3/2008 Kalsing RF Ground fire - 2.5 hac Ground fire & Dry leaves -

30 15/4/2008 Baiguney Rf Ground fire 3.30 pm 2 hac Ground fire -

31 6/4/2008 Zoom RF West Ground fire - 1 hac Ground fire - Division

32 7/4/2008 Baiguney RF Ground fire - 1 hac Ground fire -

33 10/4/2008 Sipsoo patley RF Ground fire - 3 hac Ground fire -

34 10/4/2008 Sipsoo RF Ground fire - 4 hac Ground fire , surface - andd dry leaves 35 2/5/2008 Raja tar Kharey Ground fire 17.10 hrs to 5.00 5 hac Chekreshey, sal & - Naya bazar Block hrs Ground bushes

36 2/5/2008 Baiguney (Sisney) Ground fire 1600 hrs to 5.00 07 hac teak, sal panisaj & - Naya Bazar hrs Ground flora

37 8/4/2008 Raja Tar Naya Ground fire 1030 hrs to 8.00 30 hac Barking dear calf and - Bazar am 9/4/2008 Ground fire

38 10/4/2008 Zoo RF and Raja Ground fire 1400 hrs to 22.00 30 hac surface fire - Tar Nayabazar hrs Block

39 4/4/2008 Zoom RF Ground fire - 1hac Ground fire -

40 9/4/2008 Zoom RF Ground fire - 3 hac Ground fire -

41 11/4/2008 Sipsoo RF Ground fire 4 pm 7 hac Surface fire -

42 11/4/2008 Zoom RF Ground fire 8.00 pm 4 hac Ground fire -

43 25/11/2008 Upper Malbasey Ground fire 1155 hrs 2 hac Ground fire and - Khas Soreng range Groundd bushes

44 289/11/2008 Shipsoo RF Ground fire 3.45 hrs 1 hac Taki , Siris and bushes - 45 12/12/2008 tikjek Bhir Geyzing Ground fire 1330 hrs. to 15.30 1.5 hac Dhupi plantation & 0.5 km from road Khas hrs Ground bushes side

46 28/12/2008 Below Tashiding Ground fire 11.30 am to 1400 3 hac only bushes - Sudhir Bhir hrs

year: 2009

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 22/01/2009 Ringdand R.F, Ground fire - 1.5 ha Local tress and ground - Mangan range bushes

2 12/03/2009 Dikchu Bhir Mangan Ground fire - - Ground bushes -

3 13/03/2009 Lower Phodong, - - - - - Private holding

4 22/1/2009 Mazitar Rangit Ground fire 07.00 hrs to 10.00 3.5 hac Ground bushes - reserve (River) hrs

5 15/2/2009 Tiffindara, Mamring, Ground fire 10.00 hrs to 21.00 10 hac Dry bushes ofthe Bhir - Namthang hrs 6 26/2/2009 Meekhola Melli Ground fire 1.00 am to 3 pm 1 hac Dry bushes - Range

7 3/3/2009 Khanewbotey Ground fire 1500 hrs to 2040 hrs 03 hac Thatches and bushes of - Khasmal Lingmoo rockey bhir

8 3/01/2009 Sardung (Mangling) Ground fire 10.50 am to 3.30 pm 2 ha Ground bushes 5 km Khasmal

9 3/3/2009 Danak RF Namthang Ground fire 1410 hrs to 1515 hrs 5 hac Ground bushes -

10 3/01/2009 Sardung (Mangling) Ground fire 10.50 am to 3.30 pm 1 ha Ground bushes 0.05 km below Private land holding dentam road

11 11/3/2009 to Melli Range(Triveni) Ground fire (11/3/2009)1.30 pm 12 Hac - - 12/3/2009 to 12.30 pm (12/3/2009)

12 12/3/2009 Ravangla Block, Ground fire 4.30pm to 7.30 pm 13 hac - - NHPCC, Hormal

13 12/3/2009 Salghari RF Melli Ground fire 11.30 am to 1.15 pm 0.5 hac - Road side Range

14 13/3/2009 Sumbuk RF Melli Ground fire 2.15 pm to 5.40 pm 3 hac - 30 km range 15 7/01/2009 Kerabari bhir Ground fire 2.00 pm to 5.45 pm 1 ha Ground bushes 2 km

16 13/3/2009 Salghari RF Ground fire 9 am to 11.50 am 2 hac - -

17 28/2/2009 Salghari RF Ground fire 11 am to 2.15 pm 3 hac - -

18 7/01/2009 Kerabari khasmal, Ground fire 2.00 pm to 6.10 pm 1 ha Chilawnay, Chewri, - Tashiding Phalat and Gorund bushes

19 1/3/2009 Salghari RF Ground fire 8.30 am 9.40 am 0.5 hac - -

20 4/3/2009 Khanibottey Ground fire - 3 hac - - Khasmal Lingmoo

21 14/3/2009 Ralong RF Ravangla Ground fire 9.30 am to 2.15 pm 9 hac - - Block Deurali Lunsing

22 14/3/2009 Lower Teesta Belt - - - - - lingmoo Range Private land

23 7/01/2009 Zoom Budang RF Ground fire 2.00 pm to 3.30 pm 3 ha Ground bushes -

24 14/3/2009 to Katang Khaltey Bhir Ground fire 14/3/2009 12 pm to 3 hac - - Melli Range 15/3/2009 Tendong RF 530 pm

25 15/3/2009 to , Mahabhir, Ground fire 8.30 am to 4.45 pm 4 hac - - 16/3/2009 Namchi Range Tendong RF

26 16/3/2009 Sumbuk 8th Mile Ground fire 5 pam to 7.15 pm 1 hac - -

27 17/3/2009 Dank RF Ground fire 1.30 pm to 4 pm 1 hac Dry sal leave 1 km

28 17/3/2009 Bharikhola RF Melli Ground fire 1.30 pm to 6.30 pm 2.5 hac Ground fire - Range

29 17/3/2009 Salam RF Namchi Ground fire 9 pm to 1 pm 10 hac Bamboo plantation - Range Nursery

30 20/3/2009 Narak RF Mamring Ground fire 5 pm to 10.30 pm 5 hac Ground bushes Road side

31 21/3/2009 Dharay RF Mamring Ground fire 21/3/2009- 3 pm to 10 hac Ground bushes 2 km from the Block 22/3/2009 2 pm road side

32 19/2/2009 Salghari RF Melli Ground fire - 2 hac Ground bushes 2 km from road side

33 12/3/2009 Mikhola (Ralep RF Ground fire - 0.5 hac Ground bushes 2 km from road )namchi side 34 14/3/2009 Mikhola RF Ground fire - 4 hac Ground bushes 2 km from road side

35 13/3/2009 Pakhring Khasmal Ground fire - 0.5 hac Ground bushes Road side

36 11/3/2009 Private Holding near Ground fire - 40 hac Ground bushes Road side public school

37 19/01/2009 Nausaya bhir Ground fire 4.00 pm to 6.40 pm 1 ha Thatch and bushes of - khasmal, Gyalshing bhir

38 15/3/2009 Tendong RF Ground fire - 40 hac Ground bushes Road side (Parengtar)

39 1/3/2009 Salghari RF Ground fire - 0.5 hac Ground bushes 2 km from the road side

40 03/02/2009 to Raythang RF, Ground fire 11.30 am at 50 ha RF; 2 ha Pvt Katus, Chilawnay, - 5/02/2009 Gyalshing 3/2/2009 to 2.30 pm holdings Chewri, Sinduray, sal at 5/02/2009 ground bushes and thatches

41 4/02/2009 Hospital PHC Ground fire 3.20 pm to 4.10 pm 0.5 ha Ground bushes 0.5 ha compound, Private holdings, Gyalshing 42 5/02/2009 Zoom. Garaley Bhir, Ground fire 3.00 pm to 5.30 pm 3 ha Ground Bushes - RF

43 11/02/2009 Sakyoung Dhangrey Ground fire 7.14 pm to 8.30 pm 1.0 ha Ground bushes and - Private holding vegetation

44 16/02/2009 to Sudur bhir, Ground fire 11.00 am at 9 ha Phalat, utis, Maowa, - 17/02/2009 Tashiding 16/02/2009 to 9.30 Odal, Chewri, and am to 17/02/2009 Ground bushes

45 27/02/2009 to Namparing khasmal Ground fire 8.15 am at 10 ha Ground bushes 23 km 28/02/2009 27/02/2009 to 6.00 am 28/02/2009

46 3/03/2009 to Gorthang Ground fire 1.30 pm to 11.00 pm 2 ha Bushes only - 4/03/2009 Goucharan, Gyalshing

47 5/03/2009 to Sudur bhir, khasmal Ground fire 11.40 am at 15 ha Ground bushes 60 metres 6/03/2009 5/03/2009 to 10.00 am at 6/03/2009

48 6/03/2009 Sipsoo Road Reserve Ground fire 2.30 pm to 4.00 pm 1ha Ground bushes -

49 10/03/2009 Mangsaray Ground fire 8.00 am to 5.00 pm 15 ha Ground bushes - Gardhaney Gorucharan

50 10/03/2009 Chakung 10th mile, Ground fire 2.00 pm to 4.30 pm 10 ha Ground bushes - khasmal

51 11/03/2009 Bhasmey Chakung Ground fire 11.30 am to 2.00 pm 1 ha Ground bushes - RF

52 11/03/2009 to Reshi bhir, Land Ground fire 7.30 pm at 4 ha Mauwa, Siris, Pareng, fire started from 12/03/2009 diverted to M/S JPCL 11/03/2009 to 3.15 Bamboo and amliso the roadside pm at 12/03/2009

53 11/03/2009 to Barsay Ground fire 11.00 am on 200 ha - - 12/03/2009 Rhododendron 11/03/2009 to 5 pm Sanctuary, Dentam on 12/03/2009 range, Achalay dhap Barsay RF

54 16/3/2009 Rong RF (Hani gaon) Ground fire - 15.00 hac bushes Road side Namchi

55 17/3/2009 Gyanchung Tendong Ground fire - 0.5 hac Ground bushes Road side RF Namchi

56 26/3/2009 Gupti (Sadam RF) Ground fire - 0.01 hac Ground bushes Road side Namchi Range 57 26/3/2009 Mikhola (Raley RF) Ground fire - 0.02 hac Ground bushes Road side Namchi Range

58 14/3/2009 Raniban Gaucharan Ground fire - 1.50 hac Ground bushes Road side Sumbuk, Melli Range

59 12/03/2009 tatopani RF, Geyzing Ground fire 10.33 am to 12.15 0.5 ha Ground vegetation 30 km range pm

60 12/03/2009 Neythan Rimbi, Ground fire - - - - Geyzing Range RF

61 12/03/2009 to Salley RF, khasmal Ground fire 6.45 pm on 14 ha Utis, Malata, Lampatey, 0.5 km 13/03/2009 12/03/2009 to 9.00 gagleto am on 13/03/2009

62 12/03/2009 to Sakyoung RF Ground fire 9.00 am on 6 ha Chilawnae, Mauwa, 0.5 13/03/2009 12/03/2009 to 11.30 Katus, F.D.A plantation am on 13/03/2009

63 13/03/2009 Burong khas - - - - -

64 16/3/2009 Salghari RF Melli Ground fire - 2500sqft. Ground bushes Road side Range 65 13/3/2009 Sumbuk RF Melli Ground fire - 50 hac Ground bushes Road side Range

66 16/3/2009 Narak RF Namthang Ground fire - 10 hac Ground bushes Road side Range

67 23/3/2009 Yampha RF Ground fire - 7 hac Ground bushes Road side Namthang Range

68 2/3/2009 Donak RF Namthang Ground fire - 3 hac Ground bushes Road side Range

69 12/3/2009 Salghari RF Melli Ground fire - 3 hac Ground bushes Road side Ranage

70 5/3/2009 Sumoinkhar RF Ground fire - 10 hac Ground Bushes Road side Namthang Range

71 8/3/2009 Kharpani RF Ground fire - 5 hac Ground bushes Road side Namthang

72 11/3/2009 Yampha Tar RF Ground fire - - Ground bushes Road side Namthang

73 27/3/2009 Melli Range Office Ground fire - 2 hac Ground bushes Near the Melli Range office 74 28/3/2009 Sumbuk RF Melli ground fire - 2 hac Ground bushes Sumbuk 3rd mile range 3rd Mile Road side

75 14/3/2009 to Mikhola RF Namchi Ground fire 2 pm to 11. 30 Am 8 hac Ground bushes 1 km from Road 15/3/2009 Range side

76 14/3/2009 Ralang RF Deorali Ground fire 11.30 am to 12.15 5 hac Ground bushes 3 km from the Mansingh Khasmal pm Road side

77 15/3/2009 Ben Kabrey Tarku Ground fire 5.30 pm to 11.00 pm 3 hac Ground bushes 2 km from the Road side

78 31/3/2009 Sumbuk RF Ground fire 2.15 hrs - - -

79 24/4/2009 Belbotey Majitar Ground fire 12.15 pm to 8 pm 10 hac Ground Bushes 1 km from the Block (Melli) road side

80 18/5/2009 Sumbuk RF Melli Ground fire 13.30 hrs to 17.00 8 hac Sal R Thakal 50 ft from Road Range hrs side

81 22/1/2009 Bardang RF Rangpo Ground fire 16.00 hrs to 21.00 10 hac Bahar, Mangos - hrs plantation and Ground bushes

82 3/2/2009 Pachey Khasmal Ground fire 1600 hrs to 1630 hrs 05 hac Ground bushes - Pakyong 83 05/02/2009 Bardang, mining RF Ground fire 1140 hrs to 1000 hrs 50 hac Natural regeneration of - Khani RF sal, vhelauney Mouha and ground bushes

84 5/2/2009 Lashithang khasmal Ground fire 1100 hrs to 1500 hrs 1 hac Chelauney, Dhatrey and - Pakyoung Ground bushes

85 7/2/2009 to Dipu dara Lower Ground fire 1330 hrs of 7/2/2009 20 hac Sal Natural - 9/2/2009 Khamdong RF to 1115 hrs of regeneration, Range 9/2/2009 Chelauney and Ground Bushes

86 8/2/2009 Namrang Khasmal Ground fire 1100 hrs to 2240 hrs 15 Ha Shurbs and herbs of - Sang Bhir

87 10/2/2009 Thegu RF Ground fire 1215 hrs to 1345 hrs 1 hac medicinal herbs and - Kyongnosla bushes

88 10/2/2009 Kumalay Dara Ground fire 1500 hrs to 2015 hrs 01 hac Ground bushes only - Khasmal B Pathings

89 12/2/2009 Assam Lingzey river Ground fire 1100 hrs to 1450hrs 1.5 hac Gorund bushes - Reserved Ranipool

90 13/2/2009 Dikling Airdrum Ground fire 1030 hrs to 1115 hrs 5 Hac Ground bushes - area, Pakyong 91 21/2/2009 Mining Khani RF Ground fire 2030 hrs to 2300 hrs 8 hac Sal natural - above 2 km from 31 Regeneration damaged NH around 1000 sapling approx.

92 27/2/2009 Salingay RF Rangpo Ground fire 5.15 hrs to 6.30 hrs 10 m x 10 m Ground bushes -

93 27/2/2009 Sittey RF Rangpo Ground fire 1900 hrs to 2040 hrs 01.5 Hac ANR plantation areas of - 06-07

94 3/3/2009 Tumblabong RF Ground fire 9.30 am to 3 pm 8 hac Ground fire sa;belt sp- - Gaotamey RF Damal sal natural sapling Kharka

95 28/2/2009 Serwani River Ground fire 1500 hrs to 1730 hrs 01.5 hac Thatches and bushes - Reserved, Singtam

96 7/3/2009 Khani RF Ground fire 2115 hrs to 2240 01 hac Ground bushes -

97 9/3/2009 LD Kazi Ground fire 12 Noon to 215 pm 1.5 hac Ground bushes - BridgeSingtam Range Phaykhu Lakha Khasmal

98 10/3/2009 Salingay RF Rangpo Ground fire 9.15 pm to 3 pm 08 hac Ground fire - Block 99 11/3/2009 Shyari Pvt. land Ground fire 9 pm to 3pm 05 hac Chelamey bamboo - Gangtok range

100 11/3/2009 Ganesh Tok Ground fire 3.00 pm to 3.30 pm 1/2 hac uttish, other bushes - Chanmari

101 9/3/2009 Bhashmey RF Ground fire 4.15 pm to 11 am 50 hac Ground bushes 1.5 km Pakyong Range

102 12/3/2009 Sang block singtam Ground bushes 8.15 am to 1040 pm 20 hac Ground bushes 1.5 km Range

103 12/3/2009 Sinchyal RF/p.h Ground fire 1.30 pm to 2.15pm 1.5 hac Ground bushes 1 km Singtam Range Khasmal

104 12/3/2009 Nimthang RF Ground fire 6.30 pm to 11.30 pm 08 hac Ground bushes 4 km Near Road Ranipool

105 73/2009 Kalikhola RF Singtam Ground fire 9/3/2009 to 5 hac Sleep area 1 km from the Block 13/3/2009* Road side

106 12/3/2009 Shayri RF (Bhir) Ground fire 6 pm to 7.30 pm 01 hac Ground bushes 5 km from the road side

107 12/3/2009 Shyari Kopi bari pvt. Cow shed 1.30 am to 5.30 pm 6 nos of Cow Pig n Cow shed only 1.5 km from the holding nos 5 Hac road side

108 12/3/2009 Center Pandam Ground fire 1.30 pm to 6.00 pm 10 hac Ground bushes 1 km from the Ahdery Khasmal road side Rangpo Range

109 13/3/2009 Ranka Gangtok Ground fire 12 Noon 4.30 pm 3 hac Pvt. area medicinal 2 km from the range malamthan herbdone by NEGLA , road side Gwocharan Chelauneyand Ground bushes

110 13/3/2009 Fambonglho Ground fire 12 noon to 1.20 pm 40 hac Ground bushes 4 hours Sanctuary Wildlife boundary Near tingchurey nazitam

111 13/3/2009 Rongay Bhir Pvt Ground fire 11.30 am to 1.30 pm 03 hac Katus , Chelauney and 2 km from the holding mawa piplii Rongay road side

112 13/3/2009 Nam Nam Bhir Ground fire 9 am to 1130 am 1 hac Ground bushes Road side

113 13/3/2009 to Rodhong Khasmal Ground fire 6 pm to 12 pm 08 hac Ground bushes 1/2 km from the 14/3/2009 Rumtek block road side

114 14/3/2009 to Fambonglalho W/L Ground fire - 200 hac Ground bushes 1 kam to 4 km 15/3/2009 santuary total 10 Location (4 RF)

115 14/3/2009 Thathangchen pvt. Ground fire 12.30 pm to 2.00 pm 0.3 hac - - holding

116 14/3/2009 Thangshing Khasmal Ground fire 8/3/2009 27 hac Ground fire - Sang block

117 14/3/2009 Upper Samdong pvt. Ground fire 2 pm to 8 pm 4 hac Ground bushes 1/2 km holding

118 14/3/2009 Sichey Khasmal Ground fire 1.30 om to 4.00 pm 05 hac Ground bushes Dhupi, 1/2 km from the chelauney IBP Raod

119 14/3/2009 Tumin Range Ground fire 3 pm to 7 pm 03 hac Ground bushes 1/2 km Rakdong RF Khasmal

120 14/3/2009 Sichey Pvt. holding Ground fire 4.30 pm to 5.30 pm 0.5 hac Ground fire 0.5 km below sichey school

121 14/3/2009 Pangolakha W/lL Ground fire 13/3/2009 2.00pm 20 hac Ground fire 7 km from nearest sanctuary to 14/3/2009 3.00 road pm

122 4/3/2009 Namley Gowchoren Ground fire 7 pm to 9 pm 7 hac Ground bushes 0.5 km ranipool range 123 4/3/2009 to Dikling RF Rangpo Ground fire 6 pm to 2.30 pm 35 hac Sal sapling thousand of 2 km 5/3/2009 Block thousand

124 13/03/2009 Soreng Ground fire 3.00 pm on 40 ha - - range,Rubshang RF, 13/03/2009 to 5.30 Barbotay Goucharan pm on 14/03/2009

125 14/3/2009 Marchak pvt. Ground fire 3.30 pm to 8.00 pm 10 hac Ground bushes 2 km holding Marchak Khasmal Tumin Range

126 15/3/2009 Upper Ground fire 1.30 pm to 4.30 pm 2 hac Ground bushes 2 km Thanthengchen , dichiling Khasmal

127 13/03/2009 Malabasay RF, Ground fire 7.00 pm on 5 ha Ground bushes - Champey Kalsing 13/03/2009 to 1.30 pm on 14/03/2009

128 15/3/2009 Kadamtam Ground fire 17 pm to 2.30 pm 10 hac Ground bushes 2 km Assamlingzey Khasmal and pvt. holding block

129 16/3/2009 Sang Tarey Bhir Ground fire 16/3/2009 6.40 pm 2.5 hac Ground bushes 1.5 km martam Khas to 2.00 am

130 14/03/2009 Buriakhop RF - - - - -

131 16/3/2009 Tenjurey Ground fire - - - - Fambonglho wildlife sanctuary

132 14/03/2009 Pipalay Rothak (JNV Ground fire 11.30 am to 12.30 2 ha Gorund bushes - School) pm

133 15/3/2009 Shittrey RF Rangpoo Ground fire 7.30 am to 2.30 pm 12 hac Sal thousand of 12 km from the Block thousand sal sapling road side

134 14/03/2009 to Nayabazar block, Ground fire 8.00 am 14/03/2009 5o ha Ground bushes - 15/03/2009 Auropatey RF to 12.30 pm to 15/03/2009

135 16/3/2009 Ranka Gangtok Ground fire 2.30 pm to 3.30 pm 05 hac Ground bushes 1 km from road Range side

136 14/03/2009 to Daramdin Kharbari Ground fire 11.40 am to 5 ha Ground bushes - 15/03/2009 khas, Sombaria 14/03/2009 5.30 to range 15/03/2009

137 14/3/2009 to Rabdang khasmal Ground fire 4.48 am to 1.30 pm t 17 hac Ground bushes Road side 16/3/2009 Sang block

138 14/03/2009 Kharbaray khasmal. Ground fire 11.00 am to 5.30 pm 5 ha Gorund bushes 1.5 km Sombaria range

139 14/03/2009 Salley Pvt holding (7) Ground fire 9.30 am to 12.00 pm 0.1 ha Utis, Malata, Lampatey, 1 km guryelo and ground vegetation

140 14/03/2009 Zoom Naya bazaar Ground fire 2.00 pm to 4.00 pm 4 ha Ground bushes - FRH

141 14/03/2009 Gangyap Tatopani Ground fire 9.00 am to 3.00 pm 3 ha Ground bushes 5 km

142 12/3/2009 to Andhari khasmal Ground fire 6 pm to 3.30 pm 10 hac 2007-2008 Bamboo 3 km from road 13/3/2009 to Gumba area Rangpo plantation 3 hac side 15/3/2009 block

143 15/3/2009 Amba RF Pakyong Ground fire 1.00 pm to 8.00 pm 2 hac Ground bushes 2 km Range

144 15/3/2009 to Rorathang Bhasmey Ground fire 12 noon to 9.00pm 40 hac Ground bushes 0.5 km 17/3/2009 RF pakyong Range

145 17/03/2009 to Naku Chunbung, Ground fire 4.15 pm on 10 ha - 20 km 18/03/2009 Private land holding 17/03/2009 til 2.00 aom on 18/03/2009

146 17/3/2009 Bagpani Amba RF Ground fire 7.00 am to 6.00 pm 20 Hac Bamboo bushes 2 km Pakyong

147 17/3/2009 Shaliggfey RF Ground fire 10.00 am to 4.30 pm 20 hac State Green Mission Road side 31 NH Rangpo Block of Rangpo

148 18/03/2009 to Nambu Geyzing RF Ground fire 3.30 pm on 5 ha Ground fire 5 km 19/03/2009 18/03/2009 to 3.30 pm on 19/3/2009

149 18/3/2009 Kopani Tumin Range Ground fire 7.30 am - - -

150 23/3/2009 Reymendo Khasmal Ground fire 5.00 pm to 9.00 pm 4 hac Ground bushes - Ranipool Range

151 21/3/2009 Mining/ Khani RF Ground fire 1.00 pm to 11.00 pm 30 hac Ground bushes Distance from Road side 3 km

152 19/03/2009 Sirithang RF Ground fire 1.00 am to 9.00 am 2 ha Ground bushes 2 km

153 19/03/2009 Sipsoo Zoom Ground fire 9.30 am to 3.00 pm 15 ha Jatropa plantation, roadside Bamboo plantation

154 19/03/2009 Sinek Tashiding pvt Ground fire 1.30 pm to 2.30 pm - - - holding

155 23/03/2009 Nambong bhir khas Ground fire 9.30 am to 5.00 pm 18 ha Ground bushes 1 km (Gangyap tatopani) Tashiding range

156 23/03/2009 Khorong, Geyzing - - - Cattle and poultry - range

157 23/03/2009 Nabung Bhir Khas Ground fire 9.30 am to 5.00 pm 18 ha Ground bushes 7 km (gangyap tatopani)

Year: 2010

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 7/1/2010 Guransey Ground fire 8.30 hrs to 9.00 5 Ha Ground Bushes 1 km Fambonglho WLS hrs

2 11/1/2010 kami bhir RF - 1315 hrs to 1410 5 ha Ground bushes and 25 100 Mtr Rangpo Block hrs Nos. of Chewri plants which was planted in last year plantation 3 20/1/2010 10th Mile Bhusuk, Ground fire 1500 hrs. 2 HA - - Gangtok Range (Pvt. Holding)

4 15/1/2010 Nam Nam Gangtok Ground fire 1330 hrs to 1500 2 hac Plantation (L/U) 2 Hac - Range hrs

5 3/2/2010 Nam Nam Gangtok Ground fire 1.30 hrs to 16.00 - Ground Bushes - Range

6 26/01/2010 Simkhork (W/L) Ground fire - 1 hac Ground Bushes - Fambonghlo WLS

7 6/2/2010 Below SSB Camp. - - - - - Near Mitogange

8 15/2/2010 Lower Martam RF Ground fire 4.30 am to 7.30 1 hac Ground bushes Road side above 32 Mile am

9 9/2/2010 Ghari centre Ground fire, - 10 hac Bhir RF 2 Ground bushes - pandam Rangpo Surface Khasmal block

10 20/2/2010 Changrong RF Ground fire 6.00 pm to 1.30 5 hac 1600 Rhizomes of - Luing (Gangtok pm bamboo plantation Range) parang 50 Nos 11 21/2/2010 Ghanday Jhora Ground fire 10.30 am to 1.30 2 hac Ground shrubs and - Lower sichey pm hurbs Gangtok

12 19/3/2010 Losing Khsmal Ground fire 900 hrs. to 1500 4 hac One Katus tree and - pakyoung hrs Ground shrubs & herbs

13 31/01/2010 Phensong, Ground fire 5.00 am to 9.15 - - - Phodong Range am

14 31/01/2010 Pakshep View Ground Fire 1.00pm - 4.15pm - - - point, Mangan Range

15 8/02/2010 Meyong chu, Ground fire 5.30 am to 6.10 6 ha Ground bushes and local - Mangan Range pm species

16 16/02/2010 Saffo Dzongu Ground fire - - Ground bushes - Range

17 16/02/2010 Mum Dzongu Ground fire - - Ground bushes - Range

18 01/01/2010 Khopa srithang, Ground fire 10.00 am to 2.00 1.5 ha Ground bushes 1 km Geyzing Range pm 19 11/01/2010 Yangthang (P), Ground fire 6.30 pm to 9.00 2.5 ha Ground bushes 100 meter Geyzing Range pm

20 17/01/2010 Lingkyang Khas, Ground fire 2.00 pm to 6.30 2 ha Ground flora 0.50 km Tashiding Range pm

21 17/01/2010 Dentam Khas Ground fire 3.00 to 6.00 1.5 ha Ground bushes 150 metres

22 8/02/2010 Arithang Khas, Groung fire 5.30 pm to 9.15 2 ha Ground bushes, bamboo Road side Tashiding pm clums, chilawnay, siris

23 9/02/2010 Smriti Van, Ground fire - 1 ha - - Geyzing

24 20/02/2010 Zoon R.F, Ground fire 2.00pm to 3.30 pm 8 ha Ground bushes 50 metres (Chunbatti) Naya bazaar Block

25 6/03/2010 Sakyoung Khas Ground fire 10.50 am to 12.50 1 ha JFMCs Bamboo - school area pm plantation

26 3/03/2010 Sisney, R.F Ground fire 5.00 pm to 10.30 10 ha 100 nos of Teak plants - pm with Ground bushes

27 11/03/2010 Rajatar Ground fire 4.30 pm to 12 ha Ground flora - Nayabazaar 11.00pm 28 11/03/2010 Shipsoo R.F Ground Fire 2.00 pm to 10.30 10 ha one dried maina tree, - pm local plant species and ground bushes

29 10/3/2010 Mamring Block Ground fire 1100 hrs to 1630 25 hac Chelauney Mouha, 200 mtrs Turung Kirtryzen hrs Sindurey, shrubs and Khasmal herbs Namthang Range

30 10/3/2010 Kitam RF Melli Ground fire 1100 hrs to 1315 1 hac Chirpine, Chelauney and 100 mtrs hrs bushes

31 10/3/2010 Kitam Khasmal Ground fire 1430 hrs to 1545 5 hac Ground bushes above roadside Melli hrs

32 14/3/2010 Mamring Ground fire 1330 hrs to 1800 5 hac Ground Bushes 100 mtrs Namthang Range hrs

33 18/3/2010 shampany RF Ground Fire - - - - Namchi

34 20/03/2010 Majhitar RF - - 6 hac - - Majhitar Block Melli range

Year: 2011

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 12/01/2011 Namnam Bhir Ground fire 2.00 PM to 3.30 8 HA Cherry, Broom, Banaba, 25 Km Gangtok East Pm Ground flora Sikkim

2 04/02/2011 Khani Rangpo RF Surface fire 1100 Hrs To 1430 20 Hac Ground flora 100 Mtrs above IBM Hrs Singtam Range

3 6/02/2011 to Changu Bhir (KAS) Ground fire 2050 hrs To 1630 5 Hac thotnay, Silverfir, Junifer Above the road 7/2/2011 and ground flora side

4 23/02/2011 Salingay Bhir Surface Fire 1450 hrs. To 1600 5 Hac Ground Bushes - Rangpo hrs

5 11/03/2011 Sittey RF (Jithang) Ground fire 6.30 pm to 8.00 1 Ha Ground Bushes abve the Road side Rangpo Block pm

6 15/03/2011 Upper Syari Ground fire 1.30 pm To 3.30 5 Hac Khasmal 1 - - Gangtok Khasmal pm Hac Range

7 15/03/2011 Rongli Range , Ground fire 11 AM To 4 PM 6 Hac Utish Road Side Aritar Army Camp, Chambong R.F and Kazi Tar Khasmal

8 20/02/2011 Sumbuk Melli Ground Fire 1430 hrs To 1630 0.5 ha Ground bushes 0.5 km Range hrs

9 11/3/2011 Jholongy RF Ground Fire 10.00 am to 11.30 1.5 ha Ground bushes Roadside am

10 14/3/2011 Triveni RF, Melli Ground Fire 12 noon to 5 pm 10 ha Ground bushes - Range

11 15/03/2011 to Katyong RF near Ground Fire 2 pm 10 HA Ground flora and - 16/03/2011 Rani khola, Melli thaches range.

12 15/03/2011 to Sokpay wild life Ground Fire 8 pm on Approx 20 ha Bajrath, ghogay, champ, Approx 15 km 16/03/2011 area, Maenam 15/03/201 to 11 Angeri and ground Flora from roadside Sanctuary am on 6/03/2011

13 15/03/2011 Salghari RF, Ground Fire - 5 ha Ground bushes - Jorethang Block 14 11/02/2011 Kari khola, Ground Fire 14.00 hrs to 22.30 15 ha Sal, Maina, Tak, shrubs - Shipsoo, Naya hrs and herbs bazaar

15 13/03/2011 Nayabazar Block, Ground Fire 8 am to 7pm 10 ha Sal seedling and ground - Zoom RF flora

16 15/03/2011 Tashiding Bhir, Ground Fire - 5 ha Siris, Mauwa, thatch - Upper Polok Tarpin Gangyap khas.

17 15/03/2011 to Aspataley RF, Ground Fire 10 pm to 10 am 15 ha Ground bushes - 16/03/2011 Nayabazaar block. Tharpaney busty

18 20/3/2011 dentam Range Ground Fire 5 pm to 11 pm 2.1 hac Ground flora - Gurashey Dara

19 15/03/2011 Sangkanang, Ground fire 7.30 pm to 10.00 1 hac Ground flora - Namprikthang pm above Ground khas

20 11/3/2011 Ranka Khas Ground fire 12 Noon to 4.00 1 Ha - Road side Gangtok Range pm 21 11/3/2011 Dikling RF Ground fire 4.30 pm to 9.30 1 Hac Bhir Rocky area - pm

22 15/03/2011 Phodong khasmal, Ground fire 11.00 am to 3.30 1 ha Ground flora - below hospital pm area. Jajong and Bothok

23 14/3/2011 to Pagla Bhir Ground fire - 10 hac Ground flora No. loss of Road side 16/3/2011 Fambonglha fire is wildlife or major damage still wildlife to tree uncontrolled Sanctuary

24 - Namli Bhir Ground fire 10 pm - ground fire - Ranipool Range

25 20/3/2011 Magitar Ground fire 9 am to 3pm 50 hac Ground flora and Middle of the Tumblabung RF thousand of Natural Forest in foof path Rangpoo Block sapling

26 21/3/2011 Amba khas Ground fire 8 am 6 hac Ground fire Road side Pakyong Range

27 22/3/2011 Pakyong Ground fire 8 am to 10.45 am appx. 1 hac Ground bushes Road side (Private Pachaykhani holding) Dhurey Khas

28 22/3/2011 Rangpoo Block Ground fire 6 am to 3.30 pm 25 hac Ground bushes - Shalingey RF (Near 20th mile)

29 23/3/2011 Pakyong Range Ground fire 7 pm to 10.15 pm 1.5 Hac (RF) and 1 Ground flora - (Bangthang RF) Hac (Private)

30 24/3/2011 gangtok Range Ground fire - - - - ganesh Tok

31 24/3/2011 pakyong range Ground fire 3 hac 9 om to 11 pm Ground bushes 1 km Pachaykhani RF

32 20/3/2011 salay Khas Geyzing Ground fire 8 pm 2 hac Ground bushes - Range

33 20/3/2011 Maha Bhir Soreng Ground fire 1 pm to 7 pm 1 hac Ground flora, Dhupi to - Range Kalikath 7Gurash 10 Ghugani 6 Nos. Patly katus 6 Nos.

34 20/3/2011 to Rinchenpong Block Ground fire 5 pm to 2.30 pm 3 Hac Ground flora Bamboo - 21/3/2011 (Thatak) plantation 0.5 hac 35 21/3/2011 Payong RF Ground fire 5.30 pm to 11 pm - - - (Geyzing Range)

36 20/3/2011 Nayabazar Block Ground fire 5.30 pm to 10 pm 20 hac 2,3, Maina, Simble 7 - Budhang RF Nos. Gharul 7 Nos. Takiee 6 Nos. State Green Mission Plantation

37 24/3/2011 Gryzing range Ground fire 1.30 pm to 11.30 30 hac and 3 hac Chelauney, Mouha, 30 ft above (Changchey Khas) pm Bamboo Rhododendron and roadside plantation Ground flora

38 25/03/2011 Sipsoo RF Ground fire 4pm to 10 pm 25 hac Jharul 10 Nos. Taki 10 -5 km Below Road Nayabazar Block Nos. teak 05 Nos. side Soreng range

39 26/3/2011 Zoom Salghari Ground fire 3 am - - - Nayabazar Block

40 26/3/2011 Soreng Range Ground fire 8 am to 4.30 pm approx. 40 hac. Chelauney, Siris, - Geeiling RF Rhododendron 55 Nos.

41 27/4/2011 Geyzing Range Ground fire 12 Noon to 6 pm 3.5 hac Ground flora 4 km Thagay RF 42 26/4/2011 Rabdentse Geyzing Ground fire 1.30 pm to 5 pm 2. hac Ground flora 3 km Range

43 15/3/2011 to katang RF (Melli Ground fire 2 pm to 7 pm 25 Hac Dry Bushes and Dry - 16/3/2011 Range) leaves

44 16/3/2011 Sumbuk RF Melli Ground fire 11 am to 1 pm 20 hac Private 6 nos. fo Gaot Road side range and one house Mr. kubir man Chettri and Bamboo plantationd

45 15/3/2011 to Salghari RF Ground fire 11 am to 4.30 pm 10 hac Ground flora Road side 16/3/2011 Jorethang Block

46 20/3/2011 Melli kerabari RF Ground fire 6 pm to 1 pm 10 hac Ground bushes Village footpath

47 20/3/0211 Namchi Singithang Ground fire 1 pm to 2 pm 0.5 hac - - (Private holding)

48 21/3/2011 melli RF Ground fire 5pm to 8.30pm 4 hac Ground flora Road side

49 19/3/2011 melli Range Ground fire 5.30pm to 11pm 10 hac Dry leaves of sal and 2 km from road (Kerabari RF) Ground flora side

50 22/3/2011 melli Range Ground fire 9 am to 2 pm 5 hac Dry bushes 4 km Katyang RF 51 22/3/2011 Namthang Range Ground fire 9.30am to 5 pm 10 hac Ground bushes 10 km (Choukli RF)

52 22/3/2011 Namthang range Ground fire 12.30 pm to 4 hac RF and 2 Hac Ground flora 5 km (Donghay pani RF) 7.30pm private. mamring Block

53 23/3/2011 Melli Range Ground fire 1 pm to 5 pm 1 hac dry leaves and bushes 7 km (Kubendey RF)

54 13/3/2011 melli Range Ground fire 7pm to 8 pm 1 hac Ground flora Road side Mazitar RF (Boom Khola)

55 25/3/2011 Namthang Range Ground fire 9.45 am to 3.15 4.5 hac Ground flora and dry 3 km turung Khasmal pm leaves Bhir

56 25/3/20111 Melli Range Ground fire 3 pm to 5.20 pm 2 hac Ground flora 300 ft form road (Sumbuk RF) side

57 28/3/2011 Melli Range Ground fire 3.30 pm to 6.30pm 7 hac dry leaves and Ground 2km 9Kubenday Rf) bushes

58 27/4/2011 Melli range Ground fire 11am to 8 pm 15 hac Dry bushes foof path 2 km (Kubenday, Kerabari RF)

59 27/4/2011 Salghari RF Ground fire 12.15 hrs to 15.30 2 hac Ground flora - Jorethang block hrs, (above bhutia Gumpa)

60 27/4/2011 karfectar, Ground fire 15.30 hrs to 16.10 5 hac Ground flora Below raod Jorethang Block hrs. salghari RF

61 27/4/2011 to salghari RF above Ground fire 14.30 to 6 pm and 15 hac Ground bushes - 28/4/2011 RMDD 4.30 to 7.10 am

62 28/4/2011 Triveni RF Melli Ground fire 8am to 9.30 am 1 hac Dry leaves Road side range

Year: 2012

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 11/03/2012 Pakyong R.F. Ground fire 5Am to 14.00 hrs 25hac Ground Bushes _ Bhasmey 2 10/03/2012 Rangpoo Khani Ground fire 13-00 to 1500 hr 2 hac Groung Bushed Sapling _ R.F.khani Bhir

3 18/03/2012 Rangpoo Sittey Ground fire 1700hrs to 15 hac Ground Bushes Middle of Forest R.F. 1800hrs foot path

4 19/03/2012 Damlakha Khasmal Ground fire 1200 hrs to 19 15 1.5 hac Ground Bushes - Pakyong hrs

5 28/03/2012 Linkey Tareythang Ground fire 1100 hrs to 1800 6hac Ground Bushes sapling - Bujuney Khasmal hrs Pakyong

6 30/03/2012 Rorathang khas Ground fire 1100 hrs to 16 hrs 6 hac Ground Bushes - Pakyong

7 15/03/2012 Melli R.F. champa Ground fire 1430 hrs 1500 hrs 1 hac Local species and ground - bushes

8 19/03/2012 Sumtuk R.F. Ground fire 9.50 AM 2.5 hac Groung Bushed Sapling -

9 19/03/2012 Salghari R.F. Ground fire 12.05 PM to 12.15 1 hac Ground vegetation - Jorethang PM

10 20/03/2012 Sumtuk R.F. Ground fire 11.00 AM 1 hac Ground vegetation - 11 24/03/2012 Salghari R.F. Ground fire 1400 hrs to 1530 1.5 hac Ground vegetation - hrs

12 24/03/2012 Payong R.F. Ground fire 1410 hrs to 1700 4 hac Ground vegetation - hrs

13 25/03/2012 Sumbuk R.F. Ground fire 800 hrs 6 hac Ground vegetation -

14 25/03/2012 Turukv R.F. Ground fire 800 hrs 25 hac Ground vegetation -

15 25/03/2012 Tarey bher Ground fire 1645 hrs to 1145 4 hac Ground vegetation - khasmal hrs

16 24/03/2012 Salghari Jorthang Ground fire 1700 hrs to 1000 10 hac Sal Natural species - hrs

17 26/03/2012 Sumbuk R.F. Ground fire 6.00 AM to 12.45 20 hac FDA Platation 2011-2012 - PM thakal & ground bushes

18 26/03/2012 Melli Gumpa Ground fire 8.00 AM to 10.00 5 hac Ground vegetation - khasmal PM

19 26/03/2012 Payong Ground fire 800 AM to 11 AM 5 hac Ground vegetation -

20 26/03/2012 Turuk R.F. Ground fire 1400 hrs to 2100 25 hac Sal nutural species - hrs 21 28/03/2012 to Payong Ground fire 2300 hrs to 1500 20 hac Ground Bushes sal - 29/03/2012 hrs andnatural species

22 29/03/2012 Melli khbhindey Ground fire 900 hrs to 2000 10 hac Ground vegetation - R.F. hrs

23 30/03/2012 Salghari R.F. Ground fire 1715 hrs 1 hac Ground vegetation -

24 13/03/2012 Zoom RR.F. Naya Ground fire 16:30 hrs to 18:00 1% Ground Bushes 1 1/2 km Bazar bolck hrs

25 16/03/2012 Shisney R.F.Naya Ground fire 11:30 hrs to 14 hrs - Ground Bushes and dog - bazar block leaps plus small teak plants

26 23/03/2012 Rambang Naya Ground fire 10.00 hrs to 13.00 2 hac Ground vegetation - bazar block hrs

27 16/03/2012 Sishney R.F. Naya Ground fire 6.00 PM to 8.30 2 hac Ground vegetation - bazar block PM

28 17/03/2012 Shipso Zoom Ground fire 6.00PM to9.00 PM 2 hac Ground vegetation -

29 23/02/2012 sudur khas Ground fire 7.00 AM to 10.00 20 hac Ground vegetation - Tashiding PM 30 26/03/2012 Rajatar Zoom R.F. Ground fire 11.00 AM to 2.00 4 hac Ground Bushes and - PM saplings

31 1/04/2012 Zoom R.F. Ground fire 9.00 AM to 11.00 2 hac Ground vegetation Roadside AM

32 2/03/2013 Naya bazar Zoom Ground fire 12.30 PM to 4.30 6hac Ground Bushes Sal- - PM 25nos

33 2/04/2012 to Phodong Dhamal Ground fire 113o hrs to 140 15 hac Plta area local species - 3/04/2012 Bher hrs and ground flora etc

34 28/11/2012 Leak R.F.Dzongu Ground fire 1.15 PM 3 hac Katus, Bajrath, Broom - Range grass Dhupi, Plalat

Year 2013

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 15/01/2013 Dikchu Near Tunnle Ground fire 2.15 PM 1 hac Ground Bushes - side of sneha kinetic power project

2 22/01/2013 to Bandarey Bhir loom Ground fire 5.30 PM to 2.00 100 hac 4300Nos Saplings of - 30/01/2013 R.F. kaol block Range PM different species have Mom,Singhiithang been damage Tingda R.F. kabi block

3 26/01/2013 Lower Thusing khasmal Ground fire 7.00 PM to 10.00 1.5 hac Boomboo plantation - phangan PM

4 31/01/2013 Tsungthang Gumpa Ground fire 11.00 AM to 1 hac 45 Nos of saplings of - Complex Tsungthang 12.00 PM different species damaged

5 29/01/2013 Nong khasmal ( Hee- Ground fire 11.00 AM to 6.00 5 hac Ground vegetation - Gyathang) Dzongu PM

6 7/02/2013 (Bay Chandan ) Ground fire 4.00 pm 3 hac Ground Vegetation and - Kedongong khas few saplings 7 7/02/2013 Lagey Dara Khasmal Ground fire 9.00 AM to 7.00 60 hac 355 tree/ poles and - Phodong PM ground flora

8 26/02/2013 Pentok Khasmal Ground fire 2.00 pm to 6.00 5 hac Mixed plantation and - Mangan PM ground flora

9 21/01/2014 Mangan Range ladhey Ground fire 1300 hrs to 2000 5 hac Bushes herbs mix - Dara lower thusing hrs plantation khas

10 2/03/2013 Kanam R.F. Mamsing Ground fire 2.30 PM 1 hac Ground Bushes - Range

11 24/01/2014 Phudong Range Dhajey Ground fire - 5hac Mix species - Dara R.F.

12 1/02/2014 Mangan Range lungma Ground fire - 3 hac Mix plantation - dara upper thusing giri khas old path area

13 17/01/2014 to Yathang R.F Lachen Ground fire 19.00 hrs to 1000 - Juniper-2600 nos - 19/01/2014 Range block Range hrs Rhododendron-3700 nos Poles/Shrubs-6300 nos Re-generation -300 nos Med- Plants-9000 nos(Ground flora(Medicinal plants & Glasses)

14 1/03/2013 Naya bazar Zoom R.F. Ground fire 12.30 PM to 4. 30 6 hac Ground Bushes and sal- - PM 25 nos

15 3.02.2013 Soneny Range Ground fire 11.15 AM - Ground Bushes -

16 2/01/2013 Gangtok Range Ranka Ground fire 6.30 PM to 7.30 4 hac Ground Bushes 2 km PM

17 16/01/2013 Pakyong Range Ground fire 6.PM to 9.30 PM 1 hac Ground Bushes Road side Bagpani R.F.

18 30/01/2013 Gangtok Range Rongey Ground fire - 1 hac - - (Doken dara)

19 26/01/2013 Kyongnoshla Range Ground fire and 8.AM to 9. PM 1.5 hac Parang Dhupi saur, 1 km below Road Lagyep 5 th mile crown fire katus asaray etcand ground bushes and other vegetation

20 30/01/2013 Gangtok Range libing Crown fire and 2 PM to 3.30 PM 3 hac - - Army area ground fire

21 16/01/2013 Bag pani R.F. Ground fire 6.00PM TO 9.30 1 hac Ground Bushes Roadside steep PM area(bhir) 22 2/02/2013 to Sim kharka Ground fire 1.00 PM 10 hac Ground Bushes - 4/03/2013 fambomglho w/s Tumin

23 - Bhusuk R.F. Gangtok Ground fire 4.20 PM 1 hac 10 Parang 30 Bilemey - Range 12 Ghurpis g

24 26/01/2013 5th mile J.N.Road Ground fire - 1.5 hac Ground vegetation - kyongnosla (T) Range Parang Dhupi Kalus and Saur

25 08/02/2013 Pakyong Padamchey Ground fire 2 PM 1.5 hac - - majuan pvt holding Shri H.P.Ghari

26 08/02/2013 Pakyong pandamchey Ground fire 5 PM to 8 PM 2 hac Ground vegetation - tindharey khas

27 13/02/2013 Panchey lhani Ground fire 12.00 PM to3.00 3 hac Ground Bushes and - Dharukey khash PM vegetation

28 13/02/2013 Pandam Budary Dhap Ground fire - 15 hac - - R.F.

29 14/02/2013 Pandam Budang Dhap Ground fire - 1 hac - - R.F. 30 4/03/2013 Ranipool Range Ground fire 10.30 AM to 1.00 2 hac Ground Bushes 1/2 km from the PM Road

31 12/03/2013 Dickling Ground fire 12.30 PM to 5.00 1.5 hac Local species - PM

32 6/02/2013 Mainram w/ls pathing Ground fire - 1 hac - - bhern tangang pathing range to bhaley dhunge

33 7/02/2013 Melli Range Ground fire - - - -

34 12/03/2013 Chalamthang R.F. Ground fire 1-15 PM - - -

35 7/04/2013 to Gusang Vir lhas Ground fire 7 pm TO 130 pm 15 hac Ground Bushesonly (Vir - 8/04/2013 Bhalumaney dara area) khasmal

36 8/02/2013 Tashiding Ground fire 11.15 AM - - -

37 14/03/2013 Naya Bazar Tarman Ground fire 5.30 PM 12 hac Ground Bushes and - natural sal past

38 16/03/2013 Rambang khola Ground fire - - - -

Year : 2014

Sl.No Date Location Type of Fire Time Area Damage (in Species Damage Approx Distance Ha) from Road

1 31/03/2014 Payong khas Ground fire 2.00 PM to 8.00 PM 5 hac Ground Bushes Roadside

2 2/04/2014 Bhasmey R.F. Ground fire 1.00 PM to 6.00 PM 12 hac Ground Shrubs and - herbs

3 4/02/2014 Reshidonan Ground fire 10.00 PM 1hac Ground Bushes & - Salghari R.F. shrubs

4 10/03/2014 Andheri khas Ground fire 1300 hrs 1 hac Ground Bushes & - Shrubs

5 19/01/2014 Nam- Nam Ground fire 5 PM to 8 PM 1 hac Ground Bushes - Gangtok Range

6 20/01/2014 Nam-Nam Ground fire 3 PM Controlled 2 hac Ground Bushes - Gangtok Range

7 17/01/2014 Pachey khani Ground fire 12.45 PM to 3.30 PM 2hac Ground Bushes - Ramitey khas

8 29/01/2014 Packey khola Ground fire 6.30 PM to 2 PM 1 hac Ground Bushes 3 Km khas

9 1/04/2014 Kuwa Pani Ground fire 7 PM to 8.30 PM 3 hac Ground Bushes Road Side Gowchram Pakyong Range

10 3/04/2014 Padamchuy Ground fire 8.30 PM to 4.15 PM 6 hac Ground Bushes Raod Side Roamchel khas Pakyong Range

11 3/04/2014 Linkey Bhir 5th Ground fire 2 PM to 4 PM 1 hac Ground Bushes Dry Road Side Mile Pakyong leave Range

12 21/01/2014 Mangan Range Ground fire 13 hrs to 2000 hrs 5 hac Bushes herbs mix - Luagma Dara plantation lower thusing khas

13 24/01/2014 Phudong Range Ground fire 11.20 hrs to 18 hrs 5 hac mix plantation - Dhajey Dara R.F.

14 10/03/2014 Tareybhir Ground fire 1755 hrs(10.03(10.03:14) 10 hac Chilawney, sal Ground - khasmal to 0645 hrs 11.03.14 Bushes

15 28/03/2014 Sumbuk R.F. Ground fire 1145 hrs to 2200 hrs 5 hac Sal Teak Kaijal - 16 11/04/2014 Sumtuk R.F. Ground fire 0700 hrs to 21 hrs 20 hac Ground Bushes Foodpath chelawney

17 11/04/2014 Majhitar R.F. Ground fire 0830 hrs to 2310 hrs 20 hac Sal chilawney Foodpath

18 12/04/2014 Salghari R.F. Ground fire 1100 hrs(12.4.14) to 1700 30 hac Sal ground bushes Middle of Forest hrs(13.04.14) foot path

19 13/04/2014 Melli R.F. Ground fire 0910 hrs(13.04.14) to 1400 15 hac Mix species Foodpath hrs(13.04.14)

20 13/04/2014 Payong R.F. Ground fire 0600hrs to 2325 hrs 20 hac Sal, Teak chilawney etc Foodpath

21 13/04/2014 Suntolay R.F. Ground fire 12 10 hrs to 17 22 hrs 8 hac Sal Bhalney siris Foodpath

22 13/04/2014 Rolu R.F. Ground fire 0800hrs to 1700 hrs 30 hac Goyeto thakal siris sal Mid point of teakiphal etc Forest

23 13/04/2014 Bhari khola Ground fire 1000 hrs to 1500 hrs 10 hac Sal, and other mixed Roadside khasmal species

24 14/04/2014 Melli R.F. Ground fire 0710 hrs to 21 10 hrs 25 hac Sal, chispine etc mid point of forest

25 14/04/2014 Payong R.F. Ground fire 0935 hrs to 2320 hrs 10 hac Thakal sal chilawney Foodpath sindurey etxc 26 14/04/2014 Keratari khasmal Ground fire 1000 hrs to 1315 hrs 05 hac Sal, chilawney mixed Foodpath species

27 15/04/2014 Sumbuk R.F. Ground fire 0700 hrs to 1315 hrs 15 hac Ground Bushes mixed Foodpath species

28 25/03/2014 Reythang Bhir Ground fire 11.00 PM to 7.00 60 hac Mahuwa Chilawney - PM(26/03/2014) Chewri sal Mateto Amla etc

29 16/03/2014 Sudur Bhir Ground fire 4.30 PM to 25 hac Chilawney & Khar - Tahiding Range 5.00PM(17/03/2014)

30 17/03/2014 Chalungthang Ground fire 6.00 PM to 8.00 PM 1 hac Chilawney, Mahuwa - Deorali Kaijal(AR Plantation)

31 17/03/2014 Chalamthang Ground fire 4.00 PM to 9.00 PM 3 hac AR Plantation - Khasmal Chilawney Mahuwa

32 17/03/2014 Tikjel Khasmal Ground fire 3.00 PM to 5.00 PM 1 hac Uttis Champ Cherry -

33 17/03/2014 Sombaria Range Ground fire 4 PM to 9 PM 3 hac Ground fire and A.R. Chiro pani Salangthang Plantation Khasmal

34 - Salangdong Ground fire 6 PM to 8 PM - A.R.Plantation - Deorali khasmal

35 14/04/2014 Zoom R.F. Naya Ground fire 1200 PM to11.30 AM 20 hac Ground Fire small Sal Roadside bazar tree

36 11/04/2014 Aspatelay R.F. Ground fire 10.30 AM to5.30 PM 12 hac Dry leaves ground Roadside bushes

37 11/04/2014 Zoom R.F. Raja Ground fire 11.30 AM to 1.30 PM 5 hac Dry leaves and sal tree - Tar

38 21/04/2014 Srithange R.F. Ground fire 10AM to 6 PM 10 hac Sal Chelanney 6 flora 200 ft and bamboo planta of 2008

39 13/04/2014 Zoom R.F.Naya Ground fire 2 PM to 4 PM 2 hac Ground Bushes and Dry Roadside bazar block leaves

40 - Zoom R.F. Naya Ground fire 2PM to 4 PM 2 hac Ground Bushes and Dry Roadside bazar block leaves

41 14/04/2014 Zoom R.F.Naya Ground fire 12 PM to7 PM 6 hac Ground Bushes and Dry Roadside bazar leaves

42 15/04/2014 Zoom R.F.Naya Ground fire 10 AM to 5 PM 5 hac Ground Bushes and Dry Roadside bazar block leaves 43 16/04/2014 Sisney Zoom R.F. Ground fire 3 PM to 9 PM 12 hac Ground Bushes and Dry Roadside leaves

44 18/04/2014 Sipsoo Aoom R.F. Ground fire 2 PM to 8 PM 2 hac Ground Bushes and Day Roadside Naya bazar block leaves

45 21/04/2014 Zoom R.F. Ground fire 6 PM to 3 PM 20 hac Ground Bushes and Dry Roadside leaves

46 23/04/2014 Aspatelay R.F. Ground fire 11 AM to 5 PM 5 hac Ground Bushes and Dry Roadside Naya bazar block leaves

47 23/04/2014 Sipsoo R.F. Ground fire 1 PM to 9 PM 15 hac Ground Bushes and Dry Roadside leaves

48 23/04/2014 Zoom R.F. Ground fire 11 AM to 1 PM 5 hac Ground Bushes and Dry Roadside leaves

49 6/03/2014 Aspatelay Naya Ground fire 12.30 PM to 5.30 PM 3 hac Bomboo plantation of Roadside bazar 2012-2013

50 14/03/2014 Zoom R.F.below Ground fire 4 PM to 6 PM 2 hac N.R.Damages Roadside Naya bazar police station

51 21/03/2014 Zoom R.F. Sipsoo Ground fire 6 PM to 8 PM 1 hac Ground Bushes and Dry Roadside leaves

52 6/04/2014 Sipsoo Zoom R.F. Ground fire 4 PM to 8 PM 5 hac Ground Bushes and Dry Roadside leaves

53 8/04/2014 Sipsoo Zoom R.F. Ground fire 3 PM to 8 PM 5 hac Ground Bushes and Dry Roadside leaves

54 12/04/2014 Guddi Dara Zoom Ground fire 6 PM to 10 PM 1 hac Ground Bushes and Dry Roadside R.F. leaves

55 12/02/2014 Rani ban Ground fire 5 PM to 1 AM 10 hac 100 Nos of Sal poles 30 - Gowcharen Nos of Chelauney 20 Sombaria Range Nos of Mauhawa 150 Nos of Teak trees

56 22/04/2014 Batasey Dara Ground fire 7 PM to 5 AM 2 hac 50 Nos Mauhawa trees - Dhap khas 200 Nos Chelawney 60 Sombaria Range Nos of Cherry Bamboo plantation 2012

57 22/04/2014 Srithang R.F. Ground fire 7 AM to 8 PM 20 hac - - Geyzing Range

58 23/04/2014 Srithang Ground fire - 30 hac 15 hac of sal seeds - R.F.Geyzing sowing been damaged Range

59 24/04/2014 Toyomg R.F. Ground fire - 5 hac - - Geyzing Range

60 4/01/2014 Phodong Range Ground fire - 2 hac Ground Bushes and - Ladhey khas herbs and shruts

61 1/02/2014 Mangan Range Ground fire - 3 hac Mix plantation - lungma dara upper thusing qirsi khas old path area

62 17/01/2014 Yathang R.F. Ground fire 19.00 hrs to 1000 - Juniper-2600 nos - lachen Range hrs(19/01/2014) Rhododendron-3700 block Range nos Poles/Shrubs-6300 nos, Re-Generation- 300nos Med plants- 9000nos (Ground flora(Medicinal plants and Glasses