CCOOMMPPAANNYY PPRROOFFIILLEE

SINCE 1976 QQuuaalliittyy AAssssuurraannccee

Musaffah Industrial Area Abu Dhabi: Tel: +971 (2) 5508042 Fax: +971 (2) 5508046 P.O. Box # 132634 Investment Park, Beside (MB Mix) Off. Tel: +971 (4) 8854854 Off. Fax: +971 (4) 8854853 Dubai: P.O. Box # 60462 Lab Tel: +971 (4) 8854771 Lab Fax: +971 (4) 8854772 Sharjah Ind. Area – 17 Sharjah: Tel: +971 (6) 5350357 Fax: +971 (6) 5350358 P. O. Box # 5116 Industrial Area 38, Gate 54, Doha Qatar: Tel: +974 44715063 Fax: +974 44515387 P. O. Box # 491 Website: www.ahamgeo.com Email: [email protected]

CP/UAE/2013

TABLE OF CONTENTS

INTRODUCTION ...... 3 KEY PERSONNEL QUALIFICATIONS ...... 5 MOHAMMAD MUKADDAM ...... 6 ADEEB ELIAS SAWAYA ...... 8 BASSEL MUKADDAM ...... 12 ALI ABDEL AZIZ ALI ...... 14 SAJID JALIL ...... 19 AZIZ ZERAIDI ...... 25 FEBIN MICHAEL ...... 29 AHMED MOHAMMED EL HOSARY ...... 31 GURDARSHAN SINGH ...... 34 FARID TONY KYAME ...... 36 LIST OF ACTIVITIES ...... 39 GEOTECHNICAL INVESTIGATION ...... 40 DEPARTMENT CHART – GEOTECHNICAL INVESTIGATION ...... 41 MACHINERY & EQUIPMENT (GEOTECHNICAL INVESTIGATION) ...... 42 NORDMEYER DSB 1/3.5 ...... 42 NORDMEYER DSB 0/3 ...... 43 NORDMEYER RSB 0/1.4 ...... 44 ACKER SOIL-MAX-SL ...... 45 PILCON WAYFARER ...... 47 DANDO ...... 48 CPT MACHINE (A.P. V.D. BERG) ...... 49 JACK-UP BARGE ...... 50 PRESSURE METER EQUIPMENT ...... 51 PS SUSPENSION LOGGING EQUIPMENT ...... 52 PACKER TEST EQUIPMENT ...... 54 IN-SITU CBR ...... 56 LIST OF SOME MAJOR PROJECTS ...... 57 GEOPHYSICAL STUDIES ...... 70 DEPARTMENT CHART – GEOPHYSICAL STUDIES ...... 72 MACHINERY & EQUIPMENT - (GEOPHYSICAL STUDIES)...... 73 MULTICHANNEL ANALYSIS OF SURFACE WAVES (MASW) ...... 75 ELECTRICAL RESISTIVITY TOMOGRAPHY (ERT) ...... 78 RD 8000 ...... 80 MATERIAL TESTING & QUALITY CONTROL ...... 82 DEPARTMENT CHART – MATERIAL TESTING AND QUALITY CONTROL: ...... 90 MACHINERY & EQUIPMENT - (MATERIAL TESTING & QUALITY CONTROL) ...... 91 SOIL SECTION ...... 91 CONCRETE PHYSICAL SECTION ...... 94

PAGE | 1 CP/UAE/2013

COMPRESSION MACHINE (CONCRETE) ...... 94 CONCRETE DURABILITY SECTION (WATER PENETRATION) ...... 95 CONCRETE DURABILITY SECTION (RAPID CHLORIDE PENETRATION) ...... 95 CONCRETE DURABILITY SECTION (WATER ABSORPTION & ISAT) ...... 96 STEEL SECTION ...... 97 CHEMICAL LAB ...... 98 ATOMIC ABSORPTION SPECTROPHOTOMETER (CHEMICAL) ...... 98 NITROGEN ESTIMATION APPARATUS (CHEMICAL) ...... 99 CARBON SULPHER ANALYZER FOR STEEL (CHEMICAL) ...... 99 UNIVERSAL TESTING MACHINE (MATERIAL) ...... 100 LIST OF SOME MAJOR PROJECTS ...... 101 PILE TESTING ...... 113 DEPARTMENT CHART – PILE TESTING ...... 114 MACHINERY & EQUIPMENT - (PILE TESTING) ...... 115 PILE DYNAMIC TESTING (PDA) ...... 115 CROSS-HOLE SONIC LOGGING (CSL) ...... 116 MECHANICAL CALIPER LOGGING (MCL) ...... 117 PILE INTEGRITY TESTING (PIT) ...... 118 STATIC LOAD TESTS ...... 118 PILE INSTRUMENTATION ...... 119 LIST OF SOME MAJOR PROJECTS ...... 120 ASSESSMENT, MONITORING & TESTING OF CONCRETE STRUCTURES ...... 126 DEPARTMENT CHART – ASSESSMENT, MONITORING & TESTING OF CONCRETE STRUCTURES ...... 127 MACHINERY & EQUIPMENT - (ASSESSMENT, MONITORING & TESTING OF CONCRETE STRUCTURES) ...... 128 PULL OFF TEST ...... 128 STRUCTURAL MONITORING ...... 128 FERRO SCAN / COVER METER ...... 129 CRACK MEASURMENTS ...... 130 CORING ...... 131 PULL OUT TEST ...... 131 LIST OF SOME MAJOR PROJECTS ...... 132 CERTIFICATES & LICENSES ...... 139 ABU DHABI ...... 140 DUBAI ...... 143 ACCREDITATION CERTIFICATES ...... 145 SHARJAH ...... 149 QATAR ...... 151 AL AIN MUNCIPALITY ...... 153 MINISTRY OF PUBLIC WORKS CERTIFICATES ...... 154

PAGE | 2 CP/UAE/2013

INTRODUCTION

Dear Sirs:

Upholding quality assurance is our priority.

Noted as one of the pioneers in the field of Civil Engineering specializing in Geotechnical Services, Geophysical Studies and Material Testing, Al Hai & Al Mukaddam was founded by Professor Mohammad Mukaddam in 1976 and currently operates with offices in Abu Dhabi, Dubai, Sharjah & Doha-Qatar.

Presented hereby is our pre-qualification enclosed with our projects and engineering expertise associated with quality control, site investigation and soil-structure interaction problem solving. We have been rendering services to clients including property owners, public authorities, developers, consultants, contractors and specialized sub-contractors.

The scope of activities are categorized as Geotechnical Investigation (Offshore & Onshore), Geophysical Studies, Material Testing (Soil, Aggregates, Concrete, Steel, Cement & Water), Testing of Piles (PDA, PIT, CHA, Caliper Logging), Assessment, Monitoring & Testing Of Concrete Structures and Quality Control in Construction Sites.

All our equipment are regularly calibrated and are in accordance with international standards as well as local authorities.

We assure you of our dedicated service at all times with strict adherence to our Quality Management System in compliance to the requirements stipulated in the standards of ISO 9001:2008 and ISO 17025:2005 as well as the guidelines set by the Local authorities.

Looking ahead to serving you in future projects and we will be grateful for receiving your comments and suggestions.

Mohammad Mukaddam, Ph.D. Managing Partner

PAGE | 3 CP/UAE/2013

ORGANIZATION CHART

MANAGING PARTNER

TECHNICAL MANAGER OPERATIONS MANAGER

ADMINISTRATIVE MANAGER PILE & ASSESSMENT, MATERIAL TESTING GEOTECHNICAL GEOPHYSICAL QUALITY CONTROL

MONITORING & TESTING OF DEPARTMENT INVESTIGATION DEPARTMENT DEPARTMENT OFFICER CONCRETE STRUCTURES DEPARTMENT

ACCOUNTS IT / TECHNICIANS DRILLERS / OPERATORS TECHNICIANS DEPT. PURCHASE INTERNAL AUDITOR

Asst.Tech Asst. Tech.

CHEMICAL SECTION STEEL SECTION SOIL & AGGREGATE CONCRETE SECTION DOCUMENT CONTROLLERS (SECTION HEAD) (SECTION HEAD) (SECTION HEAD) (SECTION HEAD)

LABORATORY TECHNICIANS Asst. Lab. Tech.

PAGE | 4

KEY PERSONNEL QUALIFICATIONS

PAGE | 5 CP/UAE/2013

MOHAMMAD MUKADDAM

PERSONAL DETAILS:

Name : Mohammad Mukaddam Nationality : Lebanese Position : Managing Partner

HIGHER EDUCATION

B.E. American University of (A.U.B.) - 1965. Major: Civil Engineering (with distinction).

M.sc. University of California - Berkeley, California - 1966. Major: Structural Engineering and Structural Mechanics. Minor: Soil Mechanics and Foundations.

Ph.D University of California - Berkeley, California - 1969. Major: Structural Engineering and Structural Mechanics. Minor: Soil Mechanics and Foundations

POST DOCTORATE FELLOWSHIP:

University of California - Berkeley, California - Summer 1973. University of California - Berkeley, California – Summer & Fall 1983-1984.

TEACHING EXPERIENCE & EXTRA CURRICULAR ACTIVITIES AT THE AMERICAN UNIVERSITY OF BEIRUT  Joined the Faculty of Engineering and Architecture in July 1970 as Assistant Professor of Civil Engineering.  Promoted to the rank of Associate Professor in July 1974.  Promoted to the rank of Full Professor in July 1986.  Served as Chairman of the Civil Engineering Department from 1980 to 1986

 Served as Associate Dean of Faculty of Engineering & Architecture from 1985 to 1987.  Has taught the following undergraduate courses: statics, structures, concrete, strength of materials, soil mechanics and foundations and science of material.  Has introduced and taught the following graduate courses: finite element method, advanced structural analysis, advanced mechanics of solids and engineering analysis.

PAGE | 6 CP/UAE/2013

PUBLICATIONS:  “Use of Expansive Cement for Pre-stressing tendons in Concrete Beams” SESM report, University of California, Berkeley 1966.  “Behaviour of Concrete under Variable Temperature and Loading” SESM report, University of California, Berkeley, September 1969. Sponsored by UNION CARBIDE, Atomic Energy Commission, U.S.A.  Presented a paper in Madrid, Spain, 1970 in the Symposium of International Association for Bridge and Structural Engineering on “Design of Concrete Structures for Creep, Shrinkage and Temperature Changes” which was published in the final report (pp. 301 - 310).  A paper was presented by Mukaddam and Bresler on the “Behaviour of Concrete and Concrete Structures under Long Term Thermal Effects - ACI International Seminar on Concrete for Nuclear Reactors” held in Berlin, West Germany, October 1970 (pp. 771 - 779).  “Effects of Fire on Reinforced Concrete Structures” SESM report, University of California, Berkeley 1973.  “Creep Analysis of Concrete at Elevated Temperatures” ACI Journal, February 1974.  “Concrete in Lebanon” Lebanese Council for Scientific Research - 1975.  “Behaviour of Reinforcing Bars in Reinforced Concrete Joints Under Cyclic Loading” American Society of Civil Engineers, Structural Division - By Mukaddam and Kasti - 1986.  “Compaction of Concrete by High Frequency Vibration” Research and Construction Journal, Iraq - 1987 - By Mukaddam.  “Inversion of the Compliance Functions by the Laplace Transformations” American Society of Civil Engineers, Journal of Engineering Mechanics, vol. 113 No 10, October 1987 - By Mukaddam and Zaim.  “Behaviour of Reinforced Concrete Joints subjected to Earthquake Loading” American Society of Civil Engineers, Structural Division, vol. 114 No 9, September 1988 - By Mukaddam and Harajli.  “High Strain Dynamic Testing of Cast in-situ Piles in U.A.E.” This paper was presented at the 5th International Conference on the Application of Stress-Wave Theory to piles in Orlando, September 96. (Published in the final report pp. 805 - 822).  “Hammer System Design Using Wave Equation Analysis for Testing Cast-in-Situ Concrete Piles”. This paper was presented at the 6th International Conference on the Application of Stress Wave Theory to Piles in Sao Paolo, September 2000 and published in the final report (pp. 91 – 97)

PAGE | 7 CP/UAE/2013

ADEEB ELIAS SAWAYA

PERSONAL DETAILS: Name : Adeeb Elias Sawaya Nationality : Lebanese Position : Technical Manager

QUALIFICATIONS

2001- University of Kentucky Faculty of Civil Engineering – U.S.A. B.Sc. Civil Engineering

PROFESSIONAL TRAINING March 2002: Training in the use of PDA, CHA, PIT, CAPWAP, and PITWAP by M/s. Pile Dynamics. September 2002: Attended PDA/CAPWAP Workshop course conducted by M/s. Pile Dynamics Inc Cleveland/Pile Dynamics Europe and GSP in Germany.

PROFESSIONAL EXPERIENCE

June 2009 - Till Date

Working as a Technical Manager/Operations Manager reporting directly to the Managing Partner.

Duties: Include and not limited to

 Planning and implementing different internal laboratory auditing programs.  Reviewing the effectiveness of the quality system in all aspects of the company.  Performing laboratory and on site quality control tests for construction material according to relevant standards (AASHTO, ASTM and BS).  Interacting with Dubai Municipality for external auditing and other quality system related issues (Amendments, equipment calibrations, etc...).  Supervising the execution of deep foundations in some of the major projects and all related quality assurance aspects.  Supervised main soil investigation projects (on land and off-shore) on different sites and prepared factual as well as final interpretative reports.  Performed Integrity and Dynamic Testing on Piles as well as analysis and interpretation of measurements by means of sophisticated software (PITWAP, WEAP and CAPWAP).  Supervised static pile load testing in some major projects.

PAGE | 8 CP/UAE/2013

 Acting as a Geotechnical Engineer consultant on some major project.  Supervising the execution of deep foundations and soil improvement and implementing quality assurance measurement according to international standards and projects specifications.  Performing Sonic Core Tests for pile foundations.  Performing Caliper logging Tests for pile foundations.  Pile instrumentation by means of vibrating wire gauges and submitting the final interpretive report.  Temperature monitoring by means of Thermo coupling of different structure elements and submitting the final interpretive report.  Involved in many geo-technical and quality control activities on construction projects as well as existing structures, material quality control and assessment of concrete quality in existing structures (destructive and non-destructive).  Planned and implemented the quality system for insuring the first accreditation certification of soil investigation from M/s Dubai Municipality in the Emirate of Dubai.

June 2005 - Till June 2009 Working as a Operations Manager reporting directly to the Managing Partner/Technical Manager

Duties: Include and not limited to

 Interacting with clients (consultants, contractors & local government authorities) and coordinating field works.  Planning and supervising geotechnical site investigation programs including field and laboratory works and responsible for assuring and maintaining high level of quality in all aspects of the field testing system.  Preparing a comprehensive soil investigation reports including foundation recommendations and soil improvement methods.

February 2002 till June 2005 Worked as a Geotechnical Engineer (Al Hai & Al Mukaddam for Geotechnical Works)

Duties:  Supervising main soil investigation projects (on land and off-shore) on different sites and prepared factual as well as final interpretative reports.  Expert on using different drilling techniques to ensure more than 90% recovery during geotechnical investigations.  Was responsible for designing and manufacturing our own in-house drilling rig.

PAGE | 9 CP/UAE/2013

 Performed Integrity and Dynamic Testing on Piles as well as analysis and interpretation of measurements by means of sophisticated software (PITWAP, WEAP and CAPWAP).  Supervising static pile load testing in major projects.  Acting as a Geotechnical Engineer consultant on major project.  Supervising the execution of deep foundations and soil improvement and implementing quality assurance measurement according to international standards and projects specifications.  Performing Sonic Core Tests for pile foundations.  Performing Caliper logging Tests for pile foundations.  Pile instrumentation by means of vibrating wire gauges and submitting the final interpretive report.

List of Some major projects:  Supervised the execution of pile foundation for M/s Etisalat Tower in Sharjah.  coordinated the off shore soil investigation works for M/s DFC , in addition to designing and fabricating a jack-up barge, as well as preparing the final factual as well as the final interpretive reports.  Supervised the drilling works (land and off-shore) for Project with M/s Dubai Municipality.  Coordinated the onshore/off shore soil investigation works for Dubai Metro, in addition to designing and fabricating a jack-up barge, as well as preparing the final factual reports.  Liaise with M/s. Dubai Municipality for Dubai Rail Project.  Conducting Dynamic Load Testing on a pile cap (test load up to 7000 Ton) for the proposed Conference Palace in Abu Dhabi.  Conducting Dynamic Load Testing at Dubai Int’l Airport Terminal III project (pile load test 2500 Ton).  Conducting Dynamic Load Tests, Sonic Core Test, Pile integrity Test as well as Caliper logging tests for the proposed Burj Dubai (the highest tower in ).  Supervised the preliminary static load test (3000 ton) and supervised the execution of pile foundation (pile length 43.5 meters) for M/s A.C.C. (Rose Rotana Tower) at Shk. Zayed road- Dubai.  Conducting Dynamic Load Testing on a pile cap (test load up to 7000 Ton) for the proposed Conference Palace in Abu Dhabi.  Conducting Dynamic Load Testing at Dubai Int’l Airport Terminal III project (pile load test 2500 Ton).

COMPUTER KNOWLEDGE

PAGE | 10 CP/UAE/2013

MS office, Windows 95-98, C++, Q Basic, Visual Basic, AutoCAD, Kenpave, KY Frame, HCS Transt 7F and Maple

Languages Known: English: Fluent Arabic: Mother tongue

PAGE | 11 CP/UAE/2013

BASSEL MUKADDAM

PERSONAL DETAILS: Name : Bassel Mukaddam Nationality : Lebanese Position : Administrative Manager

EDUCATIONAL BACKGROUND:

1998 – 2001 American University of Beirut Business Dept. Graduated in 2001 from the American University of Beirut with a Bachelor in Business Administration. 1996–1998 A.U.B Faculty of Engineering & Architecture Took courses in sciences and engineering. Graduated in 1996 with a High School Diploma from the International School of Chouifat- Sharjah.

PROFESSIONAL EXPERIENCES:

December 2004 – Till Date Worked as an Administrative Manager (Al Hai & Al Mukaddam for Geotechnical Works) reporting directly to the Managing Partner

Responsible for the overall administrative operations of the Laboratory accordance with standard. Provide the necessary resources and maintain appropriate environment required to ensure the quality of the Laboratory Ensure that all the requirements of the Quality Manual

December 2001 – Till December 2004 Worked as an Assistant Manager in the Accounting Department at BLOM Bank

In charge of preparation of all financial statements, such as balance sheets and income statements, shareholder management, including dividend distribution & Tax returns .

Implementation of the new Continuous Settlement System (CLS) for forward operations at the bank.

TRAINING ATTENDED:

 Uncertainty Measurements in Calibration and Testing(LMQ)  Lead Assessor Training Course of ISO 17025 (ICS)

PAGE | 12 CP/UAE/2013

 Environmental Auditing (AFAQ-ETA)  Occupational Health and Safety(NEBOSH)  Seminars regarding IAS 39 & IAS 42, Lebaneese tax system.

Computer Proficiency: Have good command in Microsoft Excel, Word, and Visual Basic.

PAGE | 13 CP/UAE/2013

ALI ABDEL AZIZ ALI

PERSONAL DETAILS:

Name : Ali Abdel Aziz Ali Nationality : Egyptian Position : Geotechnical Engineer / Operations Manager

EDUCATION College: - Graduated from Faculty of Engineering – Civil Engineering Department (Geotechnical) - 2007 Benha University – Shoubra Overall Grade – Very Good

ENGINEERING SOCIETIES  Egyptian Engineering Syndicate – Cairo - Egypt  Society of Engineers – UAE  Authorized Engineering Card - Civil (Geotechnical) – Sharjah Municipality & Director of Public Works

PROFESSIONAL EXPERIENCE Since June 2009 till present working as a Operations Manager reporting directly to the Managing Partner/Technical Manager

Duties: Include and not limited to

 Interacting with clients (consultants, contractors & local government authorities) and coordinating field works.  Planning and supervising geotechnical site investigation programs including field and laboratory works and responsible for assuring and maintaining high level of quality in all aspects of the field testing system.  Preparing a comprehensive soil investigation reports including foundation recommendations and soil improvement methods.

From October 2007 till June 2009 Geotechnical Engineer in Al Hai & Al Mukaddam for Geo- Technical Works LLC

PAGE | 14 CP/UAE/2013

 In charge of preparing and finalizing the Soil Investigation Reports including the compilation of the report and preparing recommendations to suite both the current soil conditions and structural requirements.  In charge of the preparation of tender documents as well as technical proposals for prestigious project, including:- o Union Railway o Masdar City Project o Heart of Doha – Qatar.

 Acting as a document controller on prestigious project and ensuring the delivery of the correspondence to the concerned personnel as well as responding to technical requirements based on the contract details.  Developing In-house data processing programs to suite the requirements of the works, such include:- o Elastic Settlement calculations for foundations. o Pile Settlement and Stiffness. o Lateral Pile Capacities (Brom’s Method). o Driven Pile Capacities. o Bored Cast In-situ Pile Capacities (US Army). o Liquefaction Analysis (Seed & Idriss)  Handle all laboratory tests related to Soil Investigation activities as well as processing the test results to obtain reports.  Conduct all in-situ tests related to Soil Investigation, including:- o CPT o P.S. Logging o Pressure meter Testing o Packer Testing o Plate Load Test o Etc…  Monitor of Gas Imitations from within the boreholes.  Capable of conducting and carrying out Survey works, which include but not limited to:- o GPS Survey using Trimble o Total Station Survey o Automated Level Survey o Digital Automated Level Survey (Trimble Dini)  Processing Field survey data, which include:- o Topographical Survey (Using GPS Survey and Total Station Survey) o Road Survey (Road Link) – Cross Sections. o Contouring (DTM Link) and producing Surfaces.

PAGE | 15 CP/UAE/2013

o Cut/Fill Data Processing.  Co-ordination of site works.  Site supervision of drilling works on site as well as real-time monitoring of the drilling parameters (DPM) (Diagraphy Drilling)  Health & Safety Supervision on site  Handle Material Testing related to Universal Testing machine (Plastics, Rubber, Mortar, Wood, Membranes, Bitumen, etc.).  Introduce new Testing Routines for the Automated Universal Testing Machine using QMat Software including:- o Statistical Process Control (SPC). o Customized Reports. o Advancing Cyclic Routines (Fatigue).  Conduct Non-Destructive Testing including Ultra Sonic Testing, Crack Monitoring, Schmidt Hammer, etc. Including the generation of reports.  Capable of programming DataTaker to undertake any data processing required and produce the output in the desired Engineering Units, using in built Programming of the Data Processing Unit. Such works include but not limited to:- o Monitor Temperature of Concrete. o Monitoring of installed Strain gauges on Struts and Instrumented Piles. o Monitoring of installed Centre Hole Load Cells. o Monitoring of In Place Inclinometers. o Monitoring of Load Cells during the conducting of Static Load, Plate Load and Zone Load Tests. o Monitoring change in Water Table Levels.  Simple modeling of sub-surface conditions and soil-structure interaction on Plaxis.  gINT Software Data Entry from October 2007 and promoted to gINT Software Manager since November 2008. Duties include:- o Provide Technical advice/help to customers with AGS Correspondence files. o Generate AGS Correspondence files to enable easy import of data to/from AGS compatible software. o Generate AGS files to suite client templates and libraries. o Provide In-house Technical Support and Training for gINT staff/users. o Develop and generate Libraries on gINT Software to suite AHAM Users requirements during Input and Processing. o Data entry for Soil Strata Description and borehole Logs Records. o Data entry for all laboratory and in-situ testing. o Provide detailed Site Plans and Fencing Reports (Cross-Sections), showing the detailed soil straighraphy and averaged/estimated Soil/Rock Parameters.

PAGE | 16 CP/UAE/2013

o Develop and generate reports on gINT Software to suite the Associated Testing Standard, AHAM Quality Standards as well as including Client Requirements. o Using basic SQL procedure and Call-outs to assist the data processing and generating desired Outputs.

PROFESSIONAL TRAINING

 Attended and completed a course in “AutoCAD” conducted by M/s. CAIRO UNIVERSITY (Computer Division) in Cairo - Egypt.  Attended and completed a course on “CONSTRUCTION SITE GENERAL SAFETY”

conducted by M/s. EUROLINK SAFETY and Approved by M/s. MINISTRY OF LABOUR & SOCIAL

AFFAIRS.

 Attended Beginner Training for gINT Software conducted by M/s. LEEK ASSOCIATES.

 Applications of Data Takers conducted by M/s. AL BAYAN EQUIPMENTS under direct

supervision of M/s. DUBAI MUNICIPALITY  Intermediate In-house training for gINT Software conducted by Eng. Salvatore Caronna, President of M/s. gINT Software.  Introduction to the use and advantages of gINT Software – Enterprise Edition conducted by M/s. gINT Software.  Basic Training for ACONEX documentation systems held by M/s. Aconex  gINT Workshop on the advances features of gINT Software conducted by Eng. Strah Antojlak from M/s. gINT Software, held under the supervision of M/s. Bentley Solutions.  Attended and completed a PLAXIS standard short course on Computational Geotechnics carried out by Dr. Ronald Brinkgreve of M/s. PLAXIS, held under the supervision of American University of Dubai.

COMPUTER SKILLS  Advanced User of Microsoft Office 2000, 2003, XP and 2007 (Word (including in-housed XML and VBA), Excel (including in-housed VBA), PowerPoint, Front page)  gINT Software (Geotechnical Works)  Global Mapper v11& v12 (GIS and Mapping Software)  SAP v9.2  SAFE  AutoCAD 2007 & AutoCAD 2009 (2D)  Geostudio 2004 (GeoSlope 5.0 - Slope Stability Analysis)  GonSite (CPT Software)  Go4 (CPT Analysis)  CPeT iT (CPT Interpretation)  Geovision (Diagraphy Drilling Software)

PAGE | 17 CP/UAE/2013

 Datalogger (Data Processing and Analysis)  QMat (Universal Testing Machine)  TGOffice (Survey Works)  Fox Pro  Web Page Design (HTML, CSS, Java 1.2, Flash 5.0)  Basic knowledge of VBA and SQL Scripting.

LANGUAGES  Arabic : Mother tongue  English : Fluent  French : Moderate  Hindi : Moderate

PAGE | 18 CP/UAE/2013

SAJID JALIL

PERSONAL DETAILS:

Name : Sajid Mehmood Jalil Nationality : Pakistani Present Position : Geophysical Manager

ACADEMIC QUALIFICATIONS

2000-2002: Masters In Geophysics Department Of Earth Sciences, Quaid-i- Azam University, Islamabad.

PROFESSIONAL EXPERIENCE:

September 2012 – Recent Geophysical Manager (Advanced Geotechnical works company LLC)

Responsible for management of Geophysical surveys in UAE and Middle East.

Projects UAE:  Worked as geophysical manager for Al Wathba geophysical survey for ATKINS using MASW and ERT techniques for approximately 145 LKMs at Abu Dhabi. Successfully completed the job.  Worked as geophysical manager for Al Rahmania Mall Sharjah Geophysical survey for Sharjah Cooperative Society using MASW technique. Site works completed, reporting ongoing.  Worked as geophysical manager for OSC site at Jafza, Dubai using GPR technique. Successfully completed the job.  Worked as geophysical manager for Le-Meridian hotel GPR survey. Successfully completed the job.

November 2010 - September 2012 Geophysical Projects Manager/ Business Development Manager: (SOLDATA Middle East- French based company).

Responsible for projects management of all ongoing geophysical projects and business development in the UAE and Gulf. UAE:  Worked as project manager for Jebel Hafeet geophysical survey of approximately 138 hectares at Al- Ain. Successfully completed the job.  Worked as project manager for Abu Dhabi and Al-Ain Airports Task-1, 2 and 4. Successfully completed the jobs.

PAGE | 19 CP/UAE/2013

 Worked as project manager for Ghareba Shamal Al Shuaibah Geophysical survey at Al-Ain. Successfully completed the job and awaiting award of Phase-2 of the same project.  Worked as project manager for Bloom Academy Al-Ain. Successfully completed the job.

QATAR:  Been a part of the business development in Qatar. WCT geophysical project at Muscat Qatar awarded. Successfully completed the job.

June 2007- October 2010 Senior to Project Geophysicist: (Fugro Middle East- Abu Dhabi, Dutch based company)

UAE:  Worked for regional geophysical survey including data acquisition, processing, interpretation, borehole allocation and Final Reporting as a Supervisor/Senior Geophysicist at Abu Dhabi International Airport, Abu Dhabi, UAE. Techniques include MASW and ERT  Worked on detailed geophysics survey on risk areas revealed from the previous regional survey at Abu Dhabi International Airport using ERT, MASW, EM-34 and MG techniques. Prepared 3D MASW models of the pilot study area with complete volume estimation of the cavity zones generated from Diagraphy and Cored borehole data using JASON interpretation software.  Worked for Masdar Future City (Abu Dhabi) MASW survey, UAE  Worked for geophysical survey at jabel Hafeet, AL AIN, UAE.Techniques include MASW, ERT and GPR.  Worked for geophysical survey at Ruwais Oil field, for Petrofac, Ruwais, UAE. Techniques include EM and RD (Radio detection).

QATAR:  Worked for Hulul Island Offshore Oil and Water tanks site MASW and GPR survey for Occidental Petroleum, Qatar.

BAHRAIN:  Worked for GPR survey at Sakhir Air Base, for Haji Hasan Group, Manama, Bahrain.

OMAN:  Worked for GPR survey at Mukhaizna Airstrip runway, for Occidental Petroleum, Oman.

KSA:  Worked on ERT and GPR survey for SAUDI ARAMCO at Safaniyah Oil Field, Saudi Arabia.

PAGE | 20 CP/UAE/2013

JORDAN:  Worked on Seismic survey for Jordan Railways at Amman, Jordan.

Techniques Used : Multi-Channel Analysis of Surface Waves (MASW) Survey:  Instrument Used: GEODE of GEOMETRICS.  Software Used: Seismodule Controller  Processing Software: SurfSeis, PickWin.

Electrical Resistivity Tomography (ERT) Survey:  Instrument Used: 1. STING 2. SYSCAL  Software Used: Electra  Processing Software: RESIS 2D

Ground Penetrating Radar(GPR) Survey:  Instrument Used: SIR 3000 200 & 400 MHz  Processing Software: Reflex 2D/3D

Electric conductivity (EM) survey:  Instrument Used: EM-34  Processing Software: Oasis Montage

Micro Gravity (MG) survey:  Instrument Used: CG-5  Processing Software: Oasis Montage

Job Specifications:  Manage Geophysical projects as project geophysicist.  Supervise Junior Geophysicist Teams.  Survey Planning and time schedules.  QA & QC of Survey Data.  In house processing of Acquired Geophysical Data.  Direct liaison with the client.  Report writing and Progress evaluation.  Risk management and HSE reports.  Processing of Acquired Data.  Interpretation of the Processed Data and Borehole Locations.  Final Report and Project delivery.

PAGE | 21 CP/UAE/2013

 Project Management.  Technical and commercial proposals, BOQ’s and work schedule preparations.  Final invoice.

Other Duties Performed

Processing of Down Hole and Cross Hole Data using PickWin and Cross Hole Tomography using GeoTomo software

April 2007- June 2007 2D/3D Seismic Acquisition as a QC Geophysicist: (Bureau of Geophysical prospecting BGP – Chinese based)).

March 2007-April 2007: Worked as a Data QC person for Anadarco/Halliburton through LMKR using GeoFrame- (American based company)

Project Creation in GeoFrame. Import/Export of seismic data from SeisWorks to GeoFrame, Horizons, Faults ,Velocities Classes and Surveys QC. Interpretation Software Support Geoscientist.

July 2003–March 2007: LandMark Resources Islamabad (American based company) - Processing Geophysicist

Job responsibilities

Geometry Installation, Editing of Bad Traces, Processing Parameter testing and selection for True amplitude Recovery, Pre-stack noise attenuation, Deconvolution, Statics, stacking, Velocities, Residual Statics, final digital outputs and plotting.

2D Seismic Data Processing Projects:  200 LKms 2D Processing of Chak Naurang Project. OGDCL Worked as a team member from initial to PSTM level Processing.  400 LKms 2D Processing of Dhok Sultan Project. OGDCL Worked as a team member from initial to PSTM level Processing.  300 LKms 2D Processing of Sangarh Block. OPI Worked as a team member from initial to Final level Processing.  1406 LKms 2D Reprocessing of Gambat Area. OMV PAKISTAN  730 LKms 2D Processing of South West Miano Area. Worked as a team member, from initial to final level Processing

PAGE | 22 CP/UAE/2013

 120 LKms Processing of SARA SURI Area. TULLOW PAKISTAN 1078 LKms Reprocessing of Nawabshah Block. Worked as a team member from initial to final level Processing.  3D Seismic Data Processing Project  200 Sq Km 3D Processing of Missa Kaswal Project. OGDCL Worked as a team member from initial to final level Processing

July 2002- July 2003 2D Seismic Acquisition Projects  2D Seismic acquisition survey Umar Kot , Mitthi Rajar and Thar blocks Sindh for ENI (Pakistan) as Onsite Processor/QC Geophysicist  2D Seismic acquisition survey Karsal ( Phase-I & Phase-II) and Jhamat blocks for Pakistan Petroleum Ltd. As Geophysicist  2D Seismic acquisition survey Gambat, Sarasuri and other blocks for OGDCL, Pakistan  3D Seismic Acquisition Survey of Latif Block for OMV (Pakistan) as Onsite processor/ QC Geophysicist

Job Specifications/ General Duties  Serve as QC Onsite Processor and Geophysicist in the field  Daily check the data tapes, Tape QC, Download the data to work station, trace QC, Geometry QC, Merge the raw data with geometry, LMO, Geometry check, Bad Trace killing, Elevation statistics, parameters testing, velocity picking, FB picking, First velocity analysis,2nd Velocity analysis,3rd velocity Analysis, Making brute stack on daily basis, residual stack, DIP move out stack, Migrated stack . Making Processing reports, Responsible for data shipment etc.  Provide seismic survey planning and ensure supervision of 2D and 3D seismic data acquisition & processing  Ensure well seismic acquisition, Up Hole processing and interpretation, QA & QC  Archive and properly format seismic data and relevant document for transmission to other departments and shareholders  Ensure QA/QC of target data and their storage in appropriate database  Define an appropriate development and training programme for a new geophysicist.  Ensure all tasks are carried out to appropriate standard in a timely manner  Maintain liaison with other experts within the department providing with the necessary support for construction of detailed models to better define wells locations, prognosis, sequence to be drilled, reservoir attributes  Prepare annual work programme for the relevant activities  Provide contribution in high specialized studies cooperating with experts from different disciplines, within client or from Parent Companies or Contractors  Ensure updating and organization of the client data base for the geophysical raw and processed data  Provide liaison with Parent Companies and RoK Organizations for geophysical data transmission

PAGE | 23 CP/UAE/2013

 Report directly to, and maintain close communications with Company Representative.  Ensure that the Geophysical Contractor adheres to all contractual requirements and specifications.  Ensure that all field operations of Geophysical Contractor are conducted according to our client's Health, Safety, and Environmental (HSE) specifications. In case the client's HSE specifications are silent on any HSE issue, industry standard practices shall apply.

SOFT WARES used  GeoEast ,Promax for Processing (Land and Marine),Unix,Linux, Greysis, Auto cad, K L- Seis for Block fold analysis and static corrections ,Making SPS files, Up hole data processing, Vibro seis for vibrator,s QC,Ultra Edit,Ms Office,Windows, Snaglt, ZEH,Window 2000 Professional,Strata Visor NZ II, Geomatrics etc

CERTIFICATES  Sea survival certificate (ENERTECH AVIATION & MARITIME ACADEMY QATAR).  Hydrogen Sulphide and breathing apparatus certification (ENERTECH AVIATION & MARITIME ACADEMY QATAR).  THUET (OPITO approved) (ENERTECH AVIATION & MARITIME ACADEMY QATAR). \  NEBOSH- Level-2 (HSE certification)

PROFESSIONAL TRAININGS:  Project Management Professional (PMP) course from Cambridge Education Institute Abu Dhabi. (still to appear before PMI)  Interactive Seismic Data Processing using Landmark’s ProMAX 2D/3D Software.  Trained on engineering geophysics software including Resis2D, Reflex2D/3D, Surfseis, Pickwin, Jason, GeoTomo, Oasis Montage, Geosoft etc.  Refraction Static Modeling using Hampson & Russell’s GLI-3D Software.  Training of HSE (Health precautions, Safety Measures, Crises Management, Fire Drills etc BGP Pakistan.

LANGUAGES Fluency in written and oral English, Arabic and Urdu.

PAGE | 24 CP/UAE/2013

AZIZ ZERAIDI

PERSONAL DETAILS:

Name : Aziz Zeraidi Nationality : French Present Position : Geophysical Area Manager

ACADEMIC QUALIFICATIONS

 1990 - 1991 Pierre et Marie Curie - PARIS VI University DESS of geophysical  1989 - 1990 Faculty of Science PARIS University – SUD-XI Modules of Geophysics applied to the Civil Engineering  1984 - 1987 University Mohammed Ben Abdellah - MOROCCO Geological diploma

INSTITUTION  Member of USG – Union Syndical Geotechnics  Member of board of AGAP (Association for quality in Applied Geophysics)

TEACHING  Teaching assistant – University Mohammed Ben Abdullah - 1987 – 1988 - Geophysics

PUBLICATIONS  Cavity detection 2005 – Flavigny-Le Grand, France Franceff : Search tunnel under a church by geophysical methods (Microgravity, GPR and Electric Cylinder).  EG10, Conference on Engineering Geophysics. 11 - 14 December 2011. Al Ain, United Arab : Site Investigation Methodology (Microgravity, GPR and Electric Cylinder) – Exemple of Ministry of interior project in Doha Qatar.

EMPLOYMENT HISTORY

Since March 2013 Working as Geophysical Area Manager of Al Hai & Al Mukaddam for Geotechnical Works (LLC) In charge of.  Business Development and Marketing

2010- 2013 Working as a Manager of SOLDATA Geophysical Department, Abu Dhabi branch and Middle East

PAGE | 25 CP/UAE/2013

In charge of  Technical Manager of Soldata Abu Dhabi branch and Middle East  Business Development and Marketing for Soldata Middle East  Geophysical Department Manager for Soldata Qatar

2006–2010 - Européenne de Géophysique – Nanterre 92 North and West Branch

 Business Development and Marketing - all Geophysical methods

2001–2006 - Européenne de Géophysique – Nanterre 92 North as Branch Manager

 Business Development and Marketing  Non Destructive specialist (Microgravity)

1996–2001 - Europeenne de Geophysique - Nanterre 92 North and West Brunch

 Business engineer in charge of operation Organization and technical development

1991–1996 – Techsol - Nanterre 92 North and West Branch

 Business engineer – Marketing  Site engineer operation – all Geophysical methods

SOME OF MAJORS PROJECTS EXECUTED AS PROJECT MANAGER AND GEOPHYSICAL DEPARTMENT MANAGER:

Cavity Detection Projects  Project of near surface cavity detection, utility detection, shallow stratigraphy, gravity and EM modeling underground water exploration and bed rock profiling in UAE, Qatar.  Worked for geophysical survey including data acquisition, processing, interpretation, borehole allocation and Final Reporting for Ministry of interior project, Qatar, 2011. Techniques include Microgravity (1500 points), GPR and Electric Cylinder.  Worked for geophysical survey at jebel Hafeet (180 000 points of ERT), AL AIN, UAE.Techniques include MASW, ERT and GPR.  Worked for geophysical survey for BLOOM, AL AIN, UAE.Techniques includes ERT and EM34.  Worked for geophysical survey at GHAREBA EMIRATI HOUSSING Project, AL AIN, UAE for KEO and SOROUH.Techniques include MASW, ERT and EM34.

PAGE | 26 CP/UAE/2013

 Worked for geophysical survey at GHAREBA EAST - EMIRATI HOUSSING Project – Phase 2, AL AIN, UAE for WSP, EWAN and SOROUH.Techniques include MASW, EM34 and Electric Cylinder for volume estimation of cavities.  Cavity detection, Techniques includes Microgravity (4500 points), Electric Cylinder, city of SANTANDER in Spain.  Project of the Souks of BEYROUTH (1997 (Microgravity 2000 points) and Junieh in LEBANON 1998 (Microgravity 1200 points)  Escapes of dam – SYMVOULOS in CYPRUS  Towns of PARIS, CAEN, ARRAS in FRANCE (microgravity and GPR)  Railway lines of SNCF in FRANCE, 2001: Northern TGV (more than 10,000 stations of microgravity), 6 month duration, Total amount: 0.7 millions €).  Railway lines of SNCF in FRANCE, 2003: Northern TGV (more than 19,000 stations of microgravity, one year duration, 16 Engineers, 32 technicians and 16 helpers, Total amount : 1.5 millions €).  Projects of Motorways, works of civil engineering

Investigation underground  Collector of cleansing (town of PARIS, the MANS)  Search for underground tanks, FRANCE.  Investigation during tunnelling works by electric cylinder method (project “Eole” and Meteor- France)  Worked for geophysical survey – underground utility – Ras Abu Aboud Power and Water Plant – DOHA, QATAR. Technique includes GPR.

Environment – Search of water and pollution  Landfill waste (town of ARRAS - France)  Namur (BELGIUM)

TECHNIQUES DEPLOYED

Multi-Channel Analysis of Surface Waves (MASW) Survey  Instrument Used: GEODE of GEOMETRICS  Software Used: Seismodule Controller  Processing Software: SurfSeis, Pick Win.

Electrical Resistivity Tomography (ERT) Survey:  Instrument Used: 1. Lund 2. Tetrameter LS  Software Used: ABEM  Processing Software: RESIS 2D

PAGE | 27 CP/UAE/2013

Ground Penetrating Radar (GPR) Survey:  Instrument Used: SIR 3000 200 & 400 MHz  Processing Software: RADAN 2D/3D

Electric conductivity (EM) survey:  Instrument Used: EM-34  Processing Software: CYLCART

Micro Gravity (MG) survey:  Instrument Used: CG-5, Lacoste and Romberg.  Processing Software: TMG, TOPOCOR, DAMIER

Electric Cylinder (EC) survey:  Instrument Used: Tetrameter LS  Processing Software: CYLCART, CYLINV, CYLMOD

PROFESSIONAL TRAININGS:  Complete Training of Project Manager + (Plus) - Training program developed by Vinci- Soletanche Bachy-Freyssinet. From the hand-over phase to feedback in the REX database (Return of Experience).

LANGUAGES Arab: mother tongue  French: read, written, spoken.  English: read, written, spoken

PAGE | 28 CP/UAE/2013

FEBIN MICHAEL PERSONAL DETAILS: Name : Febin Michael Nationality : Indian Position : Quality Control Manager

SCHOLASTIC ACCOMPLISHMENT:

MS University (Indian) Bachelor of Science in Mechanical Engineering Year Graduated: 2003

PROFESSIONAL EXPERIENCES:

Al Hai & Al Mukaddam for Geotechnical Works L.L.C. Position: Quality Control Manager June 2010- Present ISO 9001 and ISO 17025 Accredited Lab  Responsible for implementation of Quality Management System requirements.  Monitor the effectiveness of the Quality System by conducting audits in accordance with the Corporate or Project Quality System Audit Schedule as appropriate.  Track quality problems and expedite their resolution.  Interact with Dubai Municipality and Bureau Veritas for external auditing and other quality system related issues (Amendments, Equipment calibrations, etc.)  Prepare and Review Project Quality Plans in accordance with Company Policy and Contractual requirements.  Monitoring laboratory quality control test for construction material according to relevant standards (BS, ASTM, AASHTO and APHA).  Perform Internal Calibration of apparatuses and equipment such as thermometers, sieves; go not go gauges, vicat apparatus, blaine permeability, stopwatch, large pouring cylinder, CBR mould, surcharge disc and many more.  Develop New Testing Activities and its implementation.  Investigate customer complaints and find out discrepancies.  Revising the quality manual if needed.  Maintenance of equipment records, IQC system, staff training as well as authorization records, calibration records and other documents.

Darwish Engineering Emirates (Sharjah) Position: Quality Control Officer

PAGE | 29 CP/UAE/2013

May 2006 – June 2010  Inspection and quantifying of incoming raw materials.  In-process checking of products.  Daily monitoring of storage conditions.  Perform internal audits to ensure that the quality of the works is being maintained as per the Quality System.  Perform audits and monitoring of personnel regarding the personal safety practices and operational safety of machines.  Maintaining equipment records, IQC system, staff training and authorization records and other documents.  Carry out and conduct inventory checks of raw materials to ensure stock rotation.

The Aluminum Industries Limited (India) Position: Graduate Engineer September 2004 – September 2005

 In-process checking of products  Work Planning for the different products like control panels, circuit breakers.  Scheduling for the different activities  Supervising for the Assembly of different products  Internal Auditing SEMINARS AND LECTURES ATTENDED:  Uncertainty Measurements in Calibration and Testing  Internal Auditing of ISO 17025  Internal Auditing of ISO 17025  First Aid and Saving  Safety Awareness According to the Local Laws and Regulation

PAGE | 30 CP/UAE/2013

AHMED MOHAMMED EL HOSARY

PERSONAL DETAILS: Name : Ahmed Mohammed El Hosary Nationality : Egyptian Position : Laboratory Manager

QUALIFICATION: Bachelor of Science from the University of Tanta – Egypt Major:- Geology Minor:- Chemistry (General chemistry, Physical chemistry, Organic chemistry, Geochemistry, Non-organic chemistry)

FACULTY TRAINING COURSE:  Applications of Geophysics related to geology  Geological Survey and Mapping (Contour Mapping, Structure Mapping)  Practical Identification of Igneous, Sedimentary, Metamorphic rocks and identifying their composition, texture and background.  Methods of identifying potential Petroleum Reservoirs and all the related processes starting from extraction until the production stage.

PROFESSIONAL EXPERIENCE: 2007 to present: Working with M/s. Al Hai & Al Mukaddam for Geotechnical Works as Lab Manager  Conducts regular monitoring on the productivity of the laboratory sections in terms of the work load and ensure that the specific time frame set by the client is being satisfied while maintaining a quality service.  Held responsible for checking the needs of senior technicians (i.e. equipment, purchase requests, labour, stock and other facilities).  Guarantees the required stability considering the volume of work on hand relative to the capacity of the laboratory.  Performs periodic spot-checking of the technicians working on particular sites.  Follow up calibration schedule based on necessity and requirements.  Recommends purchase of new equipment depending on the needs of each section. Checking safety measures of all employees and take suitable corrective actions, if needed.  Responsible for the proper handling and maintenance of all laboratory equipment.

PAGE | 31 CP/UAE/2013

 Report immediately to the Technical Manager and/or Operations Manager the breakdown or malfunctioning of any equipment in addition to the occurrence of unforeseen incidents.  Propose to the Technical Manager and/or Operations Manager amendments/modification of an adopted procedure in the day to day functioning of the Sections.

2004 to 2007: Working with M/s. Al Hai & Al Mukaddam for Geotechnical Works L.L.C.  Receiving and Visual Identification of Samples retrieved from within the boreholes for Engineering Purposes.  Sample Description for Soil & Rock as per the relevant British Standard for Engineering Purposes.  Selecting samples for conducting all necessary laboratory testing to suite the project requirements and meet the demands required for the design.  Geologic mapping, sampling, testing, with high level of quality  Supervision of in-situ testing including field testing as well as Site Supervision  In charge of conducting all in-situ tests related to Soil Investigation (CPT, P.S. Logging, Pressuremeter Testing, Packer Testing, Gas Monitoring, etc.).  Wide range of coordination with the Operation Manager, Project Managers, concerned authorities as well as to the site people throughout the duration of the job.  Conducting regular visits and spot-checking on site to ensure that the drilling works and other relative testing are being carried out in accordance with the standard operating procedures in addition to the agreed guidelines set by the Client/Owner/Contractor of the project.  Head of Non-Destructive Testing Department.  In charge of conducting and reporting All Non-Destructive Testing conducted on site.  Assessing of existing structures.  Localization of steel reinforcement of steel in concrete using FerroSCAN (HILTI/PS200)  Temperature monitoring of Concrete during and after casting using Digital Data Takers and Manual Readings  Conducting Non-Destructive Testing including:-  Ultrasonic Measurement of velocity in concrete.  Pull-off Strength of Concrete  Schmidt (Rebound) Hammer  Slab & Crack Monitoring of existing concrete structures

PROFESSIONAL TRAINING:  Use and Maintenance of Pressure Meter Equipment conducted by M/s. OYO & M/s.

ROBERTSON GEOLOGGING LIMITED

PAGE | 32 CP/UAE/2013

 Applications of Data Takers conducted by M/s. AL BAYAN EQUIPMENTS under direct

supervision of M/s. DUBAI MUNICIPALITY

MAJOR PROJECTS  Conducting In-situ field testing on METRO DUBAI  Supervision of Marine Boreholes conducted in M/s.

COMPUTER SKILL  Microsoft Office (Word, Excel, PowerPoint, Front page)  AutoCAD 2007  Data logger (Data Analysis)  QMat (Universal Testing Machine)  Internet  Digital Suspension PS Logger (Version 3.00 - Robertson Geologging Limited)  GLOG-SUS. Version 1.12 (OYO Corporations Suspension P.S. Logging - Data Analysis and Reporting)

LANGUAGES Arabic: Mother tongue English : Excellent

PAGE | 33 CP/UAE/2013

GURDARSHAN SINGH

PERSONAL DETAILS:

Name : Gurdarshan Singh Nationality : Indian Present Position : Project Manager

EDUCATIONAL QUALIFICATION 2001: B.E in Industrial Engineering & Management 2006: Done courses in Operation Management and supply chain Management from Seneca College, Ontario, Canada.

PROFESSIONAL EXPERIENCE: From July 2006: Al Hai & AL Mukaddam for Geotechnical Works LLC Position: Project Manager reporting directly to Operations manager.

Duties and responsibilities: Include and not limited to the following:-

 Ensuring that all engineering work is carried out in accordance with specifications, statutory requirements, laws, rules, regulations and other contractual requirements.  Interacting with clients (consultants, contractors & local government authorities).  Managing project budgets and keeping costs down.  Prepares and coordinates the project schedule and maintains this throughout the project. Optimizes the use of personnel to achieve the schedule. Forecasts and addresses deviations to schedule.  Responsible for the total administration of the project in line with procedures.  Attends and minutes all project meetings  Responsible for assuring and maintaining high level of quality in all aspects of the field testing system.  Overseeing drilling and sampling activities to ensure workers safety and housekeeping on site.  Testing and analyzing data through In-situ tests: Gas Monitoring, SPT- CPT, Pressure meter, Packer test, Permeability tests, Electrical CPT (Piezocone) in addition to installation of standpipe piezometers and gas monitoring piezometers.  Preparing and assisting in drafting borehole logs based on visual inspection.  Geophysics test like Soil Electrical Resistivity and Thermal Resistivity test.

List of Some major projects:

PAGE | 34 CP/UAE/2013

 Supervised the drilling works for Dubai Metro Project with M/s Dubai Municipality. Conducted packer test & permeability tests at Metro stations.  Performed Pressure meter tests for M/s Hyder at proposed Versace hotel in .  Performed Falling head permeability tests for proposed Almullah plaza interchange.  Supervised various soil investigation projects for Dubai Festival City.  Supervised Cone penetration testing for Etihad railways project and prepared factual reports using CPeT-IT software.  Supervised drilling works proposed Mina Link in Abu Dhabi for M/s WSP Middle East.  Worked as Project Manager for soil investigation works required for the Assessment of Seismic Hazard and Risk in Emirate of Abu Dhabi, project executed by Municipality of Abu Dhabi.

PROFESSIONAL TRAINING

2007 : Training in the use of Pressure meter equipment by M/s. Oyo, Japan. 2009 : Training in the use of Electrical CPT (Piezocone) by A.P.Van Den Berg, Nederland.

COMPUTER PROFICIENCY: Auto CAD , MS Excel (Excellent), etc Software: Primavera Project Planner (Basic), CPT Software (GO4, GOnsite, CPeT-IT), Diagraphy Logging Software (GEOVISION).

LANGUAGES KNOWN: English, Hindi.

PAGE | 35 CP/UAE/2013

FARID TONY KYAME

PERSONAL DETAILS:

Name : Farid Tony Kyame Nationality : Lebanese Position : Project Manager / Environmental Health & Safety Manager

SCHOLASTIC ACCOMPLISHMENT

Study in Microsoft Office/Internet/Accounting S.Y. 2004- 2005

Bacalore Technique Informatical and Accounting Notre Dame De la Consolata (Taanayel) S.Y. 2001-2004

PROFESSIONAL EXPERIENCE

M/s Al Hai & Al Mukaddam for Geotechnical Works L.L.C

Position Held: Environmental Health & Safety Manager / Project Manager

Duties & Responsibilities:

 Primarily in-charge for the orientation of the crew indulged on site works in terms of health & safety procedures that must be adhered to during field operations.  Ensures that site people are well equipped with protection devices prior to commencing to work as well as the proper maintenance to be observed within the working premises.  Serves as a liaising officer with the authorities dealing on Health & Safety Regulations while securing the right observance of the abiding rules set by the said authorities.  Facilitates proper coordination with Project Managers, site people and other concerned individuals involved in fieldworks to ensure smooth operation during the period of soil investigation works.  The main responsibility involves wide range of coordination with the Operation Manager, Project Managers, concerned authorities as well as to the site people throughout the duration of the job.

PAGE | 36 CP/UAE/2013

 Conducting regular visits and spot-checking on site to ensure that the drilling works and other relative testing are being carried out in accordance with the standard operating procedures in addition to the agreed guidelines set by the Client/Owner/Contractor of the project.  Updating the Operation Manager about the development of site works and evaluating concerns arising from the same.  Make sure that the needs of the site people are also taken into priority. It does not only comprise of their personal necessities such as the first aid kits but as well as taking immediate action in cases of equipment breakdown, shortage of facilities and other vital aspects that could hinder the site operations.  Attending in meetings with clients and authorities who are partaking into the soil investigation activity. Usually, there is also the presence of Consultants on site while the drilling work is ongoing.  Responsible for securing that the crew working on site is always in strict adherence to the operational requirements at all times.

SOIL INVESTIGATION PROJECTS PARTAKEN  Proposed Residential Villas on Plot No. (332-810) at Village First- Dubai  Proposed Palma Residence on Plot No. (MRA005) at Jumeirah Village-Dubai  Proposed Building on Plot No. (JVC14CMRP004) in Jumeirah Village- Dubai  Proposed Mixed-Use Dev't on Plot No. (JVC18TCP016) in Jumeirah Village- Dubai  Proposed (G+2) 9 Villas on Plot No. (JVC12RFRP003) at Jumeirah Village- Dubai  Proposed(3B+G+3P+14) Bldg. on Plots (MRM003-004 & MRH010) at Jumeirah Village  Proposed (2B+G+1P+M+10) Office Bldg. on Plot No. (4.0) at Rawdhat- Abu Dhabi  Proposed (3B+G+4P+16) Tower on Plot No. (C28) in Al Meena Road, Abu Dhabi  Proposed (G+5 Typ.) Building on Plot No. (531-376) in Dubai Industrial City 1  Proposed Project on plot No. (D13B) in  Proposed Canary Residence on Plot (JVT 04J MRA 008) at Jumeirah Village- Dubai  Proposed Al Shirawi Enterprises Headquarters on Plot No. (500-1011) at DIC  Proposed 7 Substations in & Dubai Industrial City  Proposed Residential Buildings on 4 Plots at Dubai Waterfront – Dubai  Proposed (G+5 & G+6) Icon Residences on Plot Nos. (500-1386,1299) at DIC- Dubai  Proposed Burj Al Dhabi Residences on Plot 16 at Mussafah- Abu Dhabi  Proposed Residential Tower on Plots R2C13 & C14 at Al Reem Island in Abu Dhabi  Major/minor Projects in other Emirates

LANGUAGES

 Arabic: Fluent (Mother tongue)  English: Very good

PAGE | 37 CP/UAE/2013

 French: Very good

COMPUTER SKILLS

 MICROSOFT Office  (Word, Excel, PowerPoint)

PAGE | 38 CP/UAE/2013

LIST OF ACTIVITIES

PAGE | 39 CP/UAE/2013

GEOTECHNICAL INVESTIGATION

LIST OF ACTIVITIES:  Soil Investigation, Boring and Sampling, SPT, CPT  PS Suspension Logging Test (Shear Wave Velocity)  Pressure-meter Testing  Packer (Lugeon) Test for Rock  Falling Head Permeability  Automated Beklin Beam Plate Load Test  Infiltration & Percoloation Testing  Diagraphy Drilling (Real Time Monitoring)  Soil Resistivity  Plate Load Test  In-Situ CBR  Gas Monitoring  Thermal Resistivity/Conductivity  Installation of Piezometers (Water Table Monitoring Wells)  Environmental Sampling & Testing  Topographic Survey

FURTHER SOIL ANALYSIS:  Liquefaction Analysis  Slope Stability Analysis

SOFTWARES:  gINT (Goetechnical / AGS Software)  AutoCAD  GonSite / GO4  CPeT-IT, Liq-IT and C-Liq  Geovision

PAGE | 40 CP/UAE/2013

DEPARTMENT CHART – GEOTECHNICAL INVESTIGATION

TECHNICAL MANAGER / OPERATIONS MANAGER

PROJECT MANAGERS GEOTECHNICAL ENGINEERS

DATA ENTRY SOIL/AGGREGATE SURVEYOR FOREMEN GEOLOGISTS OPERATORS DEPARTMENT

DRILLERS / OPERATORS (27 CREWS)

HELPERS

PAGE | 41 CP/UAE/2013

MACHINERY & EQUIPMENT (GEOTECHNICAL INVESTIGATION) NORDMEYER DSB 1/3.5

Make: Germany Power Unit: 6 cylinder, air cooled, HALTZ engine, 150 BHP Rotary drill Head: Power head 1 Maximum Torque: 500 kgm Speed: 0-100 rpm Power head 2 Maximum torque: 200 kgm Speed: 0 – 700 rpm Mast details Length: 8.0 meters Travel (stroke): 3.5meters Max. Pull up: 5000 kgs Max. Pull down: 6000 kgs Truck mounted hydraulic driven Water pump Capacity: 150 l/min Pressure: 24 bars Winch’s pull capacity: 5000 kg

The Nordmeyer DSB 1/3.5 is a 4X4 truck mounted Power head driven rotary rig. The Nordmeyer is equipped to drill in rock with double and triple tube core barrels to a 100mm diameter core. It can also handle rotary wash boring in soils and weak rock with 3 wing step type bits and diamond/TC tipped casings. Equipped with a deck mounted high capacity pump and twin power head, the rig can drill to a depth of 200meters with a Swivel type double and triple tube core barrel of HW size, rotary wash boring with 3 wing step type bit of 150mm diameter to a depth of 50 meters, and with diamond/TC tipped 115mm diameter casing to a depth of 40 meters. The auxiliary 6 tonne capacity winch is used both for rod handling and conducting the standard penetration test.

PAGE | 42 CP/UAE/2013

NORDMEYER DSB 0/3

Make: Germany Power Unit: 4 cylinder, air cooled, HALTZ engine, 80 BHP Rotary drill Head: Power head 1 Maximum Torque: 300 kgm Speed: 0-80 rpm Power head 2 Maximum torque: 100 kgm Speed: 0 – 500 rpm Mast details Length: 5.0 meters Travel (stroke): 3.0meters Max. Pull up: 3000 kgs Max. Pull down: 1500 kgs Deck mounted hydraulic driven Water pump Capacity: 150 l/min Pressure: 24 bars Winch’s pull capacity: 3000 kg

The Nordmeyer DSB 0/3 is a Power head driven rotary rig, and is towed on roads and to sites by a normal 4 wheel drive vehicle. The Nordmeyer is equipped to drill in rock with double and triple tube core barrels to a 90mm diameter core. It can also handle rotary wash boring in soils and weak rock with 3 wing step type bits and diamond/TC tipped casings. Equipped with a deck mounted high capacity pump and twin power head, the rig can drill to a depth of 100meters with a Swivel type double and triple tube core barrel of HW size, rotary wash boring with 3 wing step type bit of 150mm diameter to a depth of 50 meters, and with diamond/TC tipped 115mm diameter casing to a depth of 40 meters. The auxiliary 3 tonne capacity winch is used both for rod handling and conducting the standard penetration test

PAGE | 43 CP/UAE/2013

NORDMEYER RSB 0/1.4 Make: Germany Power Unit: 3 cylinder, air cooled, HALTZ engine, 46 BHP Rotary drill Head: Power head 1 Maximum Torque: 190 kgm Speed: 0-80 rpm Power head 2 Maximum torque: 38 kgm Speed: 0 – 300 rpm Mast details Length: 4.0 meters Travel (stroke): 2.2meters Max. Pull up: 1400 kgs Max. Pull down: 700 kgs Deck mounted hydraulic driven Water pump Capacity: 75 l/min Pressure: 12 bars Winch’s pull capacity: 1000 kg

The Nordmeyer RSB 0/1.4 is a Power head driven rotary rig, and is towed on roads and to sites by a normal 4 wheel drive vehicle. The Nordmeyer is equipped to drill in rock with double and triple tube core barrels to an 86mm diameter core. It can also handle rotary wash boring in soils and weak rock with 3 wing step type bits and diamond/ tipped casings. Equipped with a deck mounted high capacity pump and twin power head, the rig can drill to a depth of 100meters with a Swivel type double and triple tube core barrel of HW size, rotary wash boring with 3 wing step type bit of 150mm diameter to a depth of 50 meters, and with diamond/TC tipped 115mm diameter casing to a depth of 40 meters. The auxiliary 1 tonne capacity winch is used both for rod handling and conducting the standard penetration test.

PAGE | 44 CP/UAE/2013

ACKER SOIL-MAX-SL

PAGE | 45 CP/UAE/2013

PAGE | 46 CP/UAE/2013

PILCON WAYFARER

Method of Drilling in Soil: By Cable Percussion Method of Drilling in rock: By Rotary core drilling Winch’s Capacity: 1.5 Tons Height when erect: 5.5 m Depth of Exploration: Up to 50 meters Diameter of Hole: Up on 200mm for light cable Percussion Up to 115mm for rotary core drilling

PAGE | 47 CP/UAE/2013

DANDO

Method of Drilling in Soil: By Cable Percussion Method of Drilling in rock: By Rotary core drilling Winch’s Capacity: 2.0 Tons Height when erect: 6.5 m Depth of Exploration: Up to 50 meters Diameter of Hole: Up on 200mm for light cable Percussion Up to 115mm for rotary core drilling

PAGE | 48 CP/UAE/2013

CPT MACHINE (A.P. V.D. BERG)

PAGE | 49 CP/UAE/2013

JACK-UP BARGE

Name: AHAM1

Make : Designed and fabricated in the Dubai

Dimensions 8 meters x 9 meters

Operational Water depth 0.00 – 9.00 meters

Number of Pontoons 3 Nos.

For near shore Geotechnical Investigation The Jack-up has been designed to carry Geotechnical Investigation in near shore lines, ports and tidal waters, with water depths up to 10 meters. The Jackup is mobilized between locations by two outboard engines. The jack-up can be dismantled into its three pontoons and can be transported. The jack-up can be easily assembled on ports or barges, where there is water to float the barge The jack-up is large enough to accommodate any size of soil investigation rig, will all the possible different in-situ test equipment for testing in boreholes.

PAGE | 50 CP/UAE/2013

PRESSURE METER EQUIPMENT

PAGE | 51 CP/UAE/2013

PS SUSPENSION LOGGING EQUIPMENT

PAGE | 52 CP/UAE/2013

PAGE | 53 CP/UAE/2013

PACKER TEST EQUIPMENT

PAGE | 54 CP/UAE/2013

PAGE | 55 CP/UAE/2013

IN-SITU CBR

PAGE | 56 CP/UAE/2013

LIST OF SOME MAJOR PROJECTS

Project Location Client Year

QATAR

Wedding Hall Al Refaa – Qatar Unii Design 2012

Infrastructure (Bridges/Underpasses) Various Location - Qatar QIL Lab 2012

UNITED ARAB EMIRATES

Proposed (P651CU) Inspection Facility QHC Architects & Engineers 2012

Pedestrian Bridge Dubai Mall Dutco Balfour Beatty L.L.C 2012

Down Town West Development Dubai 2012

Proposed Airport Hangar Project Central - Jebel Ali Al Futtaim Group Real Estate 2012

GEMS Wellington Academy Phase 3 Dubai Silicon Oasis Chicago / AEIB 2012

Proposed Project Ras Al Khaimah TDIC 2012

Proposed Al Falah City Al Falah City Al Zahia - Sharjah Sharjah Holding (Al Qabdha ) 2012

Proposed (G+1) 41 Nos. Villa Masfout - Ajman Al Tatweer Contracting L.L.C. 2012 WSP Middle East (Environment Al Nasseriah Mall Sharjah 2012 And Energy) Proposed School Al Khail Road GEMS Education 2012

Proposed District Cooling Plant Empower Energy Solutions 2012

Pedestrian Bridge Dubai Mall Dutco Balfour Beatty L.L.C. 2012 Proposed Sign Board Foundations for Dubai Al Rowaiyah Third Daktronics 2012 Cultural Sports Club The External Corridor Surrounding The DP World UAE Region 2012 Existing DP World Head Office (Lob-17) Arcan Project Management Proposed Factory Jebel Ali Industrial First 2012 Services Proposed Villa Second System Construct 2012 Thomas Bell- Wright Proposed Single Prototype Building – Industrial Second 2012 International Consultants Proposed Extension of Dubai American First AEIB 2012 Academy Proposed Irrigation Storage Tank Burj Dubai Development Al Futtaim Carillion 2012

Down Town West Development Dubai Emaar Properties 2012

GEMS Wellington Academy Phase 3 Dubai Silicon Oasis Chicago / AEIB 2012 (P636ja) Enhancement And Development Of Jebel Ali Port DP World UAE Region 2012 Jebel Ali Tanker Berth 4 Proposed Aircraft Hangar DWC Jebel Ali Al Futtaim Group Real Estate 2012

Proposed School Al Khail Road GEMS Education 2012 Hadaeq H.H. Sheikh Mohammed Bin Proposed GEMS International School GEMS Education 2012 Rashid Modern Executive System Proposed Residential Building (G+8+Roof) Acacia Avenues, Tecom 2012 Contracting Proposed (C15JA) Leaking Container & Joint Mena Jabal Ali (594) DP World UAE Region 2012 Tank (C120JA) Refurbishment Of Existing General Jebel Ali Port DP World UAE Region 2012 Cargo Office Proposed (G+2) CIS School The Villa - Dubai Land GEMS Education 2012

PAGE | 57 CP/UAE/2013

Project Location Client Year

Proposed District Cooling Plant Business Bay Empower Energy Solutions 2012 Proposed Business Bay Phase 1 & 2 – District Business Bay Empower Energy Solutions 2012 Cooling Plants DCP-03 Proposed Expansion Of (G+2) The Millennium First GEMS Education 2012 School Building Proposed Substation H.H. Sheikha Palace - Zaabeel Second Khatib & Alami 2012 Premier Schools International Proposed GEMS American Academy Al Barsha First 2012 L.L.C Proposed Aquaventure Expansion Atlantis, Laing O’rourke 2012 Proposed Le Meridien Airport Hotel Complex Allied Consultants 2012 – District Cooling Works Cundall Johnston & Partners Proposed New Facility For UNA Trading Fze Jafza 2012 L.L.C Proposed P443JA Development Of Berth Nos. Jebel Ali DP World 2012 (49 & 52) Proposed Little GEMS School Al Barsha Third GEMS Education 2012

Proposed Winchester School Nad Al Shibba (Motor City) GEMS Education 2012

Proposed GEMS Wellington Primary School Sports City GEMS Education 2012

Proposed Residential Building Al Garhoud Khatib & Alami 2012

Proposed Foremarke School Dubiotech - Tecom Evolvence Capital 2012

Proposed Project For M/s.Dewa Dubai Gulf Jyothi 2012 Proposed OSC Development Jafza Engineering Jebel Ali Oilfields Supply Center Ltd 2012 Workshop Extension Premier Schools International Proposed Extension Al Barsha First 2012 (L.L.C) Proposed Project Ras Al Khaimah TDIC 2012

Proposed Building Al Nahda Marwan General Contracting 2012

Proposed Aster Hospital Al Nad – Al Qasimya QHC Architects & Engineers 2012 18km South West From Ras Al Proposed Jazeera Al Hamra Buro Happold 2012 Khaimah Proposed Project R627 – Auto Zone Al Rukka Al Hamra Khatib & Alami 2012

Proposed (G+1) 41 Nos. Villa Masfout - Ajman Al Tatweer Contracting L.L.C 2012 WSP Middle East (Environment Al Nasseriah Mall Sharjah 2012 And Energy) Educational Investment Proposed Women’s College Industrial Area 18 - Sharjah 2012 International L.L.C Proposed Warehouse And Office Building Al Sajaa Industrial Area AMB Building 2012

Proposed Hotel Tower Al Majaz Area QHC Architects & Engineers 2012 Omis Contracting & Proposed Al Jawharah Apartment Tower Al Majaz 1 – Al Majaz District 2012 Maintenance Co. Farglory Sowwah Development EW11 Sowwah Island 2012 Company Ltd Housing Development Jebel Hafeet, Al Ain Pal Technology 2012 Proposed Etihad Airways Headquarters WSP Environmental And Khalifa City A - Abu Dhabi 2012 Security Fence And Visitors Entrances Energy Khalifa Port & Industrial Zone (Kizad) IBR Steel Construction Proposed Cold Storage Warehouse 2012 - Abu Dhabi Contracting Proposed City Of Lights, C1 & C2 Al Reem Island - Abu Dhabi Brookfield Multiplex 2012

Weight-In-Motion (Wim) Stations E40 Road, Al Ain Aecom Middle East Limited 2012

Proposed Project Yas Marina - Abu Dhabi Davis Langdon (Miral) 2012

PAGE | 58 CP/UAE/2013

Project Location Client Year Taweelah Aluminum Extrusion Proposed Aluminum Extrusion Plant Al Taweelah, Kizad Zone 2012 Company L.L.C. (Talex) Proposed Project ICAD Halliburton 2012

Proposed Project Abu Dhabi Island Khatib & Alami 2012

Du Yas Arena Phase II Yas Island Abu Dhabi Aecom 2012 Ws ATKINS & Partners & Proposed North Wathba Infrastructure Design North Wathba – Abu Dhabi. Overseas (Infrastructure 2012 Engineer), Proposed Bawabat Al Sharq Phase 3 Baniyas City Aecom Middle East Limited 2012 Proposed Al Ain University Of Science And Associated Consulting Mohammed Bin Zayed City 2012 Technology Engineers (Ace) International Madinat Zayed, Western Region – Abu Proposed Baynunah Academic Complex Fibrex Construction Group 2012 Dhabi Proposed Emiratis Housing Development Jebel Hafeet – Al Ain Pal Technology 2012

Proposed New Sports Pavalion Building Sharaf Foundation 2011

Proposed School Building Dubai Investment Park Arab Turk Int. 2011

Proposed Canopy Sheikh Zayed Brookfield Multiplex 2011

Proposed Mixed Use Building Al Wasl Arif & Bintoak 2011

Proposed Villa Zabeel Second Dutco 2011

Palazzo Versace Hotel Al Jaddaf Arabtec Emirates Sunland JV 2011

Proposed Villa Al Barari Second Nature 2011

Proposed Mosque Wadi Al Amardi Al Hikma Building Contracting 2011

Proposed Project Jafza Keller 2011

Proposed Substation Zabeel Second Khatib & Alami 2011

Proposed (G+4) Building Al Karama Pioneers Of Experts 2011

Proposed Khalifa Al Naboodah Building Al Raffa Khatib & Alami 2011 Proposed Ax465 Foundation Works For Dubai International Airport Terminal II Zetas Zemin Teknolojisi. A.S. 2011 Terminal 2 Expansion (Phase III) (Phase III) Presidential Palace Ras Al Akhdar Bauer International 2011 Intermass Engineering & UAE Armed Forces Al Ain 2011 Contracting Abu Dhabi Basic Industrial Aluminum Extrusion Plant Taweelah Kizad 2011 Corporation (ADBIC) Proposed Security Gates Abu Dhabi Air Port ADAC P&D 2011 Proposed Ground Service Equipment And Abu Dhabi Air Port ADAC P&D 2011 Airport Maintenance Facility Proposed Taxiways & Rough Grading Works Al Ain International Airport ADAC P&D 2011

Proposed Development Mafraq - Abu Dhabi Waterman Emirates 2011

Calibration Boreholes For SCADIA Abu Dhabi Air Port Soldata 2011 Geophysical Works For Al Ain International Abu Dhabi Air Port Soldata 2011 Airport Proposed Emiratis Housing Development Jebel Hafeet Dorsch Holding Gmbh 2011

Al Wagan Hospital Al Ain Burt Hill 2011

Weight-In-Motion (Wim) Stations Abu Dhabi Aecom Middle East Limited 2011

PAGE | 59 CP/UAE/2013

Project Location Client Year

Al Ghareba Emiratis Housing Project Al Ghareba – Al Ain Sol Data 2011

Shed KPIZ Bauer International 2011

Proposed Project Yas Maina - Abu Dhabi Miral (Davis Langdon) 2011 Premier School International / Propsed School Building Sharjah 2011 Neb Al Juairina Mall Sharjah Laing O'rourke 2011

Al Mirgab Mall Sharjah Laing O'rourke 2011

Proposed ADNOC Filling Station Waset - Sharjah G.A. Architects & Engineers 2011

Proposed Villa Sharjah Tawazun Construction Co. 2011 Proposed Commercial And Residential Al Fisht 1 Area - Sharjah QHC Architects & Engineers 2011 Building Proposed Sharjah Co-Operative Society Sharjah QHC Architects & Engineers 2011

Proposed ADNOC Filling Station Waset - Muweilah Ali Moosa & Sons Contracting 2011 Proposed Staff Accommodation And Service Tawi Musanad Tawazun Construction Co. 2011 Block Proposed Construction & Maintenance For New Block inside Al Sadiq Islamic English Al Qusais Second Al Awtan Contracting 2010 School Proposed “A” Star Villas Al Barari Arif & Bintoak 2010

Proposed Palazzo Versace – Park Site , Al Jaddaf Emirates Sunland Group 2010 Proposed (2b+G+1f) Retail And Office First Stromek Emirates 2010 Building Proposed Water Edge Tower Business Bay Damac Star Properties 2010

Proposed Commercial Square Tower Business Bay Damac Star Properties 2010

Proposed Capital Bay Business Bay Damac Star Properties 2010

Proposed Executive Bay Business Bay Damac Star Properties 2010 Amana Pipeline Construction Proposed Tanks Dubai 2010 L.L.C. Proposed R6 Gallery Villa Emco Building Contracting 2010

Proposed Villa Jumeirah First Dutco 2010 Brookfield Multiplex Proposed Canopy Pole Sheikh Zayed Road - 2nd Interchange 2010 Construction Proposed Mixed Use Residential Building Jumeirah Village Dimensions 2010

Proposed Al Sultan Hypermarket Jafza Al Talal Supermarket 2010

Proposed Al Barsha Strip Road Dubai Parsons Overseas Limited 2010

Proposed Commercial And Office Building Al Souq Al Kabeer, Modern Executive System 2010 Proposed General Department Of Forensic Dubai Al Hashemi 2010 And Criminology Proposed Project Dubai T.M.F. Euro Foundation 2010

Proposed Improvement Works JAFZA Dutco Balfour Beatty L.L.C 2010 Arcan Project Management Proposed Mosque Al Warqaa Fourth 2010 Services Proposed Al Barsha Strip Road Dubai Parsons Overseas Limited 2010

Proposed Building Zahrat al Safa 2010

PAGE | 60 CP/UAE/2013

Project Location Client Year

Proposed Building Al Nahda Second Zahrat al Safa 2010

Proposed Development Of Al Hisn Fort Sharjah Scott Wilson Middle East 2010 Proposed Nesto Hypermarket & Car Parking Sharjah QHC Architects 2010 Building Improvement Of The 5th Industrial Sharjah- Emirates Road Parsons Overseas Limited 2010 Intersection Proposed Neighbourhood Shopping Sharjah Sharjah Holdings 2010 Mall Proposed Internal Roads For Waste Landfill Sajaa Area Khatib & Alami 2010 Improvement, Development, Upgrading Of Dibba – Masafi Road Stage 2 Part 2 (From Masafi Road Khatib & Alami 2010 Gona To Masafi) Proposed (G+M) Building Al Arqab - Sharjah Sun Engineering Contracting 2010

Proposed Al Falah City Sharjah Sharjah Holdings 2010

Proposed Building Sajaa Delta Engineering Consultants 2010

Proposed Residential Private Villas Complex Shargan QHC Architects 2010

Proposed Expansion Of Shed & Office Hamriyah Free Zone Trofina Food Fzc L.L.C. 2010

Proposed Bawabbat City Abu Dhabi Hydra Properties 2010 Four Level Sub-Terrain Basements With A Reem Island RDK Commercial Investment 2010 Podium And 25 Storey Building. Four Level Sub-Terrain Basements With A Reem Island RDK Commercial Investment 2010 Podium And 25 Storey Building. Etihad Railway GIA 2 - Abu Dhabi International Bechtel Co. 2010 Proposed Sheikh Khalifa Bridge Connection Abu Dhabi WSP Middle East 2010 To Corniche And Mina Roads Proposed Tanks Al Ain Amana Pipe Line 2010 Proposed Al Wataniya Development Abu Dhabi - Airport Road Projacs Project Management 2010 Commercial Tower James Cubitt & Partners Proposed Residential Building Mohamed Bin Zayed City 2010 Consultants James Cubitt & Partners (3 Basement + G + 22 + Roof) Building Mohamed Bin Zayed City 2010 Consultants (3 Basement + 2 Podium + 16 + Health Club + James Cubitt & Partners Mohamed Bin Zayed City 2010 Roof) Building Consultants Proposed (3 Basement + G + 22 + Roof) James Cubitt & Partners Mohamed Bin Zayed City 2010 Residential Building Consultants Proposed (3 Basement + G + 22 + Roof) James Cubitt & Partners Mohamed Bin Zayed City 2010 Residential Building Consultants Proposed South Airfield Abu Dhabi - Air Port ECG 2010

Proposed South Airfield Rehabilitation Abu Dhabi - Air Port SCADIA 2010 James Cubitt & Partners Proposed Residential Building Mohamed Bin Zayed City 2010 Consultants Expansion Of Abu Dhabi International Airport Air Side Abu Dhabi - Air Port SCADIA 2010 (South Airfield Rehabilitation). (East Midfield And Perimeter Roads) - Proposed East Midfield And Perimeter Road SCADIA 2010 Abu Dhabi - Air Port (B + G + F + Roof) Building Abu Dhabi Shankland Cox 2010 Residential & Office Building Which Will Comprise Of A (3b + G + 2p + 6 Offices + 5 Rawdhat Arcan Project Management 2010 Residential) Building Residential & Health Club Building Which Will Comprise Of A (3b + G + 2p + 11) Rawdhat Arcan Project Management 2010 Building Proposed Al Falah Development Al Falah Capital Survey 2010

PAGE | 61 CP/UAE/2013

Project Location Client Year

Proposed Technology Centre Abu Dhabi Air Port SCADIA 2010

Fire Training Facility Centre Abu Dhabi Air Port SCADIA 2010 Existing Tawam Hospital And Will Comprise Of The Construction Of The Tawam Dialysis Al Ain Burt Hill 2010 Centre Amana Pipeline Construction 2009- Proposed Tanks 10km From Al Ain City L.L.C. 2010 2009 - Proposed Development Abu Dhabi Mace International 2010 Proposed Office Building Oud Metha Civil Construction Center 2009 Proposed Ferry Terminals & Abra Stations For Ws ATKINS & Partners 2009 RTA Overseas Bin Dalmouk Engineering Proposed Project Hatta 2009 Consultants Proposed Conveyor Structures Jebel Ali Al Khaleej Sugar Co. L.L.C 2009 Proposed Renovations Second Brewer Smith Brewer Gulf 2009 Emirates Golf Club Proposed (2b+G+31+F+M+Roof) West National Engineering Bureau 2009 Avenue Tower Proposed (G+1) Villa Al Khawaneej First Al Gurg Consultants 2009 Amana Pipeline Construction Proposed Tanks 10km From 2009 L.L.C. Proposed Villa Al Khawaneej Engineering Consultants Group 2009

Proposed Tanks Jebel Ali Aqua Engineering Co. L.L.C 2009

Al Wasel Shopping Center Al Wasel Road Art Consultants 2009

Proposed Demineralization Plant Jebel Ali Power Station Complex Metito 2009 Proposed Service Block And Extension To The Al Safouh First National Engineering Bureau 2009 Existing (G+1) Villa Proposed (G+1) Villa Iv ZAS / PSE 2009 Brewer Smith Brewer Gulf Proposed Buildings Al Jadaf 2009 Chartered Architects Proposed (3b + G + 3p + 14) Residential And International City Phase 3 National Engineering Bureau 2009 Commercial Building Wanders Werner Falasi Proposed Private Villa , 2009 Consulting Arch. Proposed Meydan Canal Nad Al Sheba Sharaf Foundation 2009

Proposed Villa Nad Al Shiba Fourth ZAS / PSE 2009

Proposed Majlis Al Twar Third Mubarak Marine 2009

Proposed (3b + G + 8) Residential Building Al Qusais Third Art Consultants 2009

Proposed Building Dubai Sports City UNEC 2009

(G + 5) Multi Storey Car Park Building Al Nahda First Arif & Bintoak 2009

Proposed (B+G+1) Villa Zabeel First Dutco Balfour Beatty L.L.C. 2009

Proposed Residential Building Dubai World Central - Residential City National Engineering Bureau 2009

Proposed Residential Building International City – Phase III National Engineering Bureau 2009 Al Khail Rd.- Umm Suqeim Rd., Proposed R842/4 Road Works Wade Adams Contracting L.L.C. 2009 Junction 17 Godwin Austen Johnson / Dutco Proposed Palm Tree Court Chalets Jebel Ali 2009 Group Proposed Mixed Use Development Al Safa First Meraas Development 2009

PAGE | 62 CP/UAE/2013

Project Location Client Year

Proposed Villa Al Barsha South First Al Diwan Al Handasi 2009

Proposed R762 Dubai Bypass Phase III Project Dubai Bypass Road Al Naboodah Contracting L.L.C 2009 Proposed Central Fire Station & Fire Training Dubai Electricity & Water Al Hassyan 2009 Facilities Authority Proposed Building Al Warqaa First Shadid Engineering Consultants 2009 Proposed R855/2 Nad Al Sheba Race Course Africon Engineering Nad Al Sheba 2009 Development International Proposed Al Taqwa Mosque Dubai Sports City Art Consultants 2009

Proposed Villa Nadd Al Hamar WWF Architects 2009

Proposed Residential Villa Development The Palm Jumeirah Arif & Bintoak 2009

Proposed Laundry Facility Dubai Investment Park Second Delta Engineering Consultants 2009 Proposed R507 Al Karama Office Al Karama Dubai Real Estate Corporation, 2009 Development Proposed Extension Of Audit & It Building H.H. The Ruler’s Court Arif & Bintoak 2009 Proposed Infrastructure – Phase Binladin Contracting Group Global Village 2009 III (L.L.C.) Al Turath Engineering Proposed Staff Accommodation Building Hassyan 2009 Consultants Proposed Private Villa Umm Suqeim Second Al Gurg Consultants 2009 Elite International Pm Proposed Private Villa Jumeirah Third 2009 Consultants Proposed Factory Dubai Investment Park First ZAS/PSE International 2009 Proposed (3b+G+M+18) Emirates National , Deira Group Consult International 2009 Bank Office Tower Proposed (G+17) Three Towers Having A Reem Island RDK Commercial Investment 2009 Three Level Basement Proposed Building Al Geemi - Al Ain Khatib & Alami 2009 Proposed (2b + G + 12) Liwa Suites Furnished Abu Dhabi Khatib & Alami 2009 Apartments Proposed Cleveland Clinic Development Abu Dhabi Bauer International 2009 Proposed Abu Dhabi Fairmont Hotel & Abu Dhabi Dewan Architects & Engineers 2009 Service Apartments Proposed Private Villa Abu Dhabi Hamad Al Amri (Hydra) 2009

Proposed Etihad Terminal Abu Dhabi Airport - Abu Dhabi Al Habtoor / Murray & Roberts 2009 Proposed ADNOC New Headquarters Abu Dhabi Arabian Foundations 2009 Complex Applied Technology & Proposed ADIMSC Marina Abu Dhabi 2009 Management Proposed (3b + G + P + 9 And 10) Commercial Al Reem Island -Rawdhat National Engineering Bureau 2009 Building Proposed Private Villa Abu Dhabi Al Hatem Contracting 2009

Proposed Project Abu Dhabi Satcon Soil Studies 2009

Proposed Project Abu Dhabi Langan International 2009

Proposed Al Forsan Hotel Khalifa City - Abu Dhabi Ws ATKINS 2009

Proposed Liwa Hotel Refurbishment Abu Dhabi RDK Commercial Investment 2009

Proposed Project Sadiyat Island Bauer International 2009 Proposed Etihad Interim Terminal Abu Dhabi Airport - Abu Dhabi Al Habtoor / Murray & Roberts 2009 Construction Amana Pipeline Construction Proposed Tanks Al Ain 2009 L.L.C.

PAGE | 63 CP/UAE/2013

Project Location Client Year

Proposed Jehan Green Walls Fze Hamriyah Free Zone Elard Group 2009

Proposed Tires Reclamation Facility Sajaa Landfill - Sharjah Terna 2009

Proposed Mosque Mamzar Al Khan - Sharjah Architectural Academic Office 2009 Emco Building Contracting Proposed Labour Accommodation Al Sajaa 2009 L.L.C Proposed (G+1) Scfa Office Building Sharjah Cansult Maunsell 2009

Proposed German School Muweilah Arif & Bintoak 2009 Proposed 25 Storey Office & Hotel Building Al Khan QHC Architects 2009 With A (1 B + G + 8) Car Parking Proposed Showroom & Warehouses Al Rukka Al Hamraa QHC Architects 2009

Proposed Commercial Building Sharjah Brewer Smith Brewer Gulf 2009

Proposed Project Khorfakan Sharjah Holding 2009

Proposed Project Sharjah QHC Architects 2009

Proposed Private Villa Complex QHC Architects & Engineers 2009

Proposed Air Arabia Centro Hotel Sharjah Gustav Pegel & Sohn L.L.C. 2009

Proposed Office Buildings Ras Al Khaimah Two Construct 2009

Proposed Building Al Khan City Consultants 2009 Projacs Project Management & Proposed Mubarak Hassawi Medical Centre Muweilah 2009 Control Co Proposed Villa Adam Bureau Dubai 2009

Proposed Corporate Bay Business Bay AEIB 2009

Proposed 68 Villas Jumeirah Golf Estate Al Naboodah Contracting 2009

Proposed Building Dubai Sports City UNEC 2009

Proposed Labor Accommodation Jebel Ali Industrial Area National Ready Mix 2009

Proposed Labor Accommodation Jebel Ali Industrial Area National Ready Mix 2009

Proposed American Community School Nad Al Shiba ZAS International 2008

Proposed Buildings Sharjah QHC Architects & Engineers 2008

Proposed Villa Dubai Architectural Academic Office 2008

Proposed Boulder Steel Finishing Plant Sharjah QHC Architects & Engineers 2008

Proposed Asas (Land Development) Dubai Khatib & Alami 2008

Proposed ADNOC Filling Station Sharjah QHC Architects & Engineers 2008 Khatib & Alami (Eastern Proposed School Dubai 2008 International) Proposed Industrial Complex Dubai Industrial City TNQ 2008

Proposed Accommodation Camp Al Mafraq Al Naboodah Contracting L.L.C 2008

Proposed Creek Tower Al Reem Island - Abu Dhabi BA & BES Contracting L.L.C. 2008 National Petroleum Construction Proposed Anchor Block Ras Al Qila 2008 Co. Proposed Harbour Heights Abu Dhabi Damac Abu Dhabi Properties 2008

Proposed Burj Al Dhabi Mohammad Bin Zayed City Mussafah RAK Properties 2008

PAGE | 64 CP/UAE/2013

Project Location Client Year

Proposed Residential Towers Abu Dhabi National Engineering Bureau 2008 James Cubitt & Partenes Proposed Al Ghayathy Community Hospital Abu Dhabi 2008 Consultants Proposed Meydan Canal Meydan MEFG 2008 Nibras Management Royal Estate Project DIP 2008 Consultancy Proposed Villas Jumeirah Park Package 3 Jumeirah Park Al Huda & Dar Al Handasah 2008

1209 Villas Arabtec & Arif & Bintoak 2008

Proposed 68 Villas Jumeirah Golf Estate Archgroup Consultants 2008 Lacasa Arch. & Eng'g Proposed 5 Nos. Building Jumeirah Village 2008 Consultants(Deyaar) Architectural & Engineering Yuvi Residential Building Jumeirah Village 2008 Innovations Bureau(AEIB) Architectural & Engineering Harbour Residential Building Jumeirah Village 2008 Innovations Bureau(AEIB) Architectural & Engineering Cassia Park Residential Building Jumeirah Village 2008 Innovations Bureau(AEIB) Dimensions Engineering (5b+G+M+4p+29 Floor) Building Jumeirah Village 2008 Consultants Package 3 Villas Jumeirah Park Al Huda 2008 4b+G+8 Floors – Cascade Manor Residential Dimensions Engineering Jumeirah Village 2008 Building Consultants (DEC) (6b+G+3p+18) Residential & Commercial Dimensions Engineering Jumeirah Village 2008 Building Consultants (DEC) Vehicle Service Station Sheds & Building Al Barsha Al Gurg Consultants /D.M. 2008

2b+G+22 Residential Building Jumeirah Village National Engineering Bureau 2008

3b+G+6 Floors + Roof - Office Building Jumeirah Village Arif & Bintoak 2008

Proposed Polygon Tower Business Bay Real Estate Solutions 2008

Proposed Showroom & Workshop Buildings Dubai Arif & Bintoak 2008

Proposed Tower & Multi Storage Car Park Dubai Arex Consultants 2008 4b+G+M+15 Floors – Mixed Use Jaddaf Jones Sweet Global 2008 Development Proposed F1 Theme Park Confluence Project Management 2008

Proposed (G+19) Residential Building Jumeirah Village South National Engineering Bureau 2008 Proposed Dubai Waterfront Tower Dubai Waterfront Brewer Smith & Brewer Gulf 2008 (2b+G+5p+17) Proposed Office Building ETA Star 2008

Proposed Residential Building Dubai Maritime City ETA Star 2008 4b+G+6p+Sky Lobby+30 Floors Commercial Sh. Zayed Road Arif & Bintoak 2008 Office Building Dimensions Engineering Proposed 4 Nos. 16 Floors Buildings Jumeirah Village South 2008 Consultants Proposed (CW/380B/2003) Water Reservoir Lusaily Alpha Geophysical Laboratory 2008 Project Proposed 4 Star Hotel Building Al Nahda Arif & Bintoak 2008 GEMS Global Education School Building Dubai 2008 Management System Al Rawda Towers Jumeirah Village South National Engineering Bureau 2008 Proposed Oman Insurance Company Plaza & Edara Project Management 2008 Residential Tower Lacasa Arch. & Eng'g Proposed Astrolab Resort And Village Downtown Jebel Ali 2008 Consultants

PAGE | 65 CP/UAE/2013

Project Location Client Year

Proposed Building Jumeirah Village Arcan Project Management 2008

DLC – Roads And Infrastructure Dubai World Central Al Naboodah Contracting 2008

PT-11 Oasis Residential Complex Tecom Al Wasl Al Jaded Consultants 2008

Proposed (2b+G+25) Building Jumeirah Village Arcan Project Management 2008

Proposed (2b+G+4 Typ.) Building Mizin Continental Engineering 2008 Dimensions Engineering Proposed (2b+G+6 Podium + 38) Building Jumeirah Village 2008 Consultants Proposed Mixed Use Development Jumeirah Village Al Duaa Holdings 2008 (G+M+5p+21) Commercial & Residential Jumeirah Village National Engineering Bureau 2008 Building Halcrow / National Contracting Proposed Wasit Road Improvements Phase II Wasit - Sharjah 2008 & Transport Co. Proposed VIP Terminal & East Side Expansion Abu Dhabi Airport GHD Global 2008 Continental Consulting Proposed Building & Warehouse Al Barsha 2008 Engineers QHC Architects & Engineers / Proposed ADNOC Filling Station Ajman 2008 ADNOC Proposed Beach Resort Hotel Sharjah QHC Architects & Engineers 2008 QHC Architects & Engineers / Proposed ADNOC Filling Station Sharjah 2008 ADNOC Proposed Towers Jumeirah Village South Arenco 2008 Proposed New SAA Flight Catering Unit Sharjah International Airport City Diamond Contracting 2008 Project Proposed Industrial Complex Jebel Ali Industrial Area TNQ 2008

Dubai Water Front Madinat Al Arab Emirates Sunland 2007

Housing Scheme For DFF & Army Officers Al Quoz Arif & Bintoak 2007

(3b+G+Mc+45+Roof) Tower Art Consultants 2007

Formula One Theme Park Motor City App International 2007

Commercial Buildings (6 Nos.) Dubai Land Naga Architects 2007 7 Residential Towers On Plot Nos. 25-001 & Dubai Silicon Oasis Archgroup Consultants 2007 25-011 Canal View Tower Dubai Sports City AEIB 2007

Stadium Gateway Towers Dubai Sports City AEIB 2007

Shopping Mall, Office & Hotel Buildings Jumeirah Village South Lacasa 2007

Main Street Building Motor City Burthill 2007

Dubai Maritime City Breakwater / Revetment Dubai Maritime City Bermello Ajamil & Partners 2007

Proposed Development For Eta Star Business Bay Dar Consult 2007

Tatweer Tower Al Majan Burthill - Morganti 2007

Residential & Commercial Building Al Nahda First Dar Consult 2007

Dubai Ardec Project Sh. Zayed Road Al Issa Real Development 2007

Proposed “The Lake Preservation Project” International City Bin Hafeez 2007

Proposed Development Al Quoz Industrial First Khatib & Alami 2007

Proposed Development Al Bawadi Middle East Foundation 2007

PAGE | 66 CP/UAE/2013

Project Location Client Year Dimensions Engineering Proposed (B+G+Hc+24) Residential Tower Marsa 2007 Consultants Proposed Metropolis Lofts Residential Tower Jumeirah Village South Hamilton Project Management 2007 Proposed (2b+G+27) Tower & (2b+G+3) Dimensions Engineering Marsa 2007 Town Houses Consultants Proposed (2b+G+P+23) Storey Residential & Al Nahda First Design Architectural Bureau 2007 Commercial Building Proposed Apartment Buildings Jumeirah Park Style Consultants 2007

Proposed Platinum Towers Business Bay Khatib & Alami 2007 Proposed (3b+G+Mc+45 Floors + Roof) Nad Al Hamar Art Consultants 2007 Tower Dimensions Engineering G Al Dua’aa Tower Marsa 2007 Consultants Proposed Development & Construction Nad Al Sheba N.S.C.C. 2007

Proposed (2b+G+3p+16 Floors) Tower Business Bay Emirates Sunland 2007 Proposed (2.5b+G+3p+19 Typical Floors Business Bay Business Bay 2007 Roof) Building Four Seasons Hotel Zone 13 – Dubai Festival Dubai Festival City Dubai Festival City 2007 City Eleven Buildings Zaabel 2nd -Business Bay Phase II Khatib & Alami 2007

Proposed Asia Asia Hotel Al Bawadi Dubai Civil Engineering 2007

Proposed 3b+G+64 Marina Arcade Tower Arc International 2007

Proposed Labour City Dubai Industrial City Dubai Civil Engineering 2007 Proposed 52 Residential & Commercial International City UNEC 2007 Building Proposed Buildings & Sheds Jafza Engineering 2007 Dimensions Engineering Proposed Development Jumeirah Village South 2007 Consultants 4b+25+R Tower Dubai Marina Dimensions Eng. 2006

Burj Dubai Development Dubai Emaar 2006

Crescent Tower International Media Production Zone Damac Properties 2006

1b+G+M+56 Tower Shk. Zayed Road Zetas 2006

The Park Lane Tower Business Bay Kling Consult 2006

Luxury Hotel & Apartment Tower Shk. Zayed Road Arch Group 2006

4b+G+19 Floor Tower Business Bay Jiangsu Nantongliu 2006

4b+G+24 Floor Tower Media City Jiangsu Nantongliu 2006

3b+G+24 Floor Tower Media City Jiangsu Nantongliu 2006

Tower Marsa Dubai Adnan Safarini 2006

3b+G+39 Commercial & Offices Tower Jumeirah Lake National Engineering Bureau 2006

Dpa Staff Accommodation Jebel Ali Al Gurg Consultants 2006

Westgate Tower Dubai Silicon Oasis Khatib & Alami 2006

3b+G+44 Building Jumeirah Lake National Eng. Bureau 2006

Conrad Hotel Trade Centre 1st Currie & Brown 2006

2b+G+16+R Tower Dubai Silicon Oasis Dimensions Engineering 2006

PAGE | 67 CP/UAE/2013

Project Location Client Year

4b+G+44 Tower Jumeirah Lake Tower Design & Arch. 2006

Ras Al Khor Crossing Dubai Dutco Balfour Beatty 2005

Park Tower DIFC – Dubai Damac Properties 2005

Tower 2 Marsa – Dubai Damac Properties 2005

Zen Garden Jebel Ali – Dubai Al Shafar Contracting 2005

Bridges & Tunnels – Dubai Parsons/Dutco 2005

Tower Parking Building Al Khor Lagoon – Sharjah Commodore Contracting Co. 2005

Kangaroo Plastic New Premises Jebel Ali – Dubai Al Gurg Consultant 2005

Building & Villas DFC - Dubai Naboodah Contracting 2005

Dmcc Gold Refinery Emirates Hills 1st – Dubai National Engineering Bureau 2005 Site Investigation Zone – 13 - (Marine Works) DFC - Dubai DFC / Mouchel 2005 – DFC Emirates Golf Club Dubai LC Consultant 2005

Jumeirah Lake Towers Dubai National Engineering Bureau 2005

Twin Residential Tower Development Marsa – Dubai Bauer International 2005

Al Salam Tecom Towers Dubai W.S. ATKINS 2005

5 Star Hotel And Parking Building Sh. Zayed Road – Dubai Dimensions Engineering 2005

285 Villas Dubai Arabtec 2005

Dubai Festival City Dubai Festival City – Dubai Phase II DFC 2004 Khatib & Alami / Arabian Rose Rotana Tower Shk. Zayed Road- Dubai 2004 Construction Various Locations (Onshore & Dubai Railway Project Dubai Central Laboratory 2004 Offshore Dubai) Dubai Festival City Dubai Festival City– Phase 1 LC Consulting 2003

Rostamani Tower Fujairah Khatib & Alami 2003 Naboodah Contracting / Khatib Al Naboodah Tower (2b+G+M+60) Marina – Dubai 2002 & Alami Union Properties / Khatib & Uptown Mirdif Mirdif – Dubai 2002 Alami Dubai Marina (Phase 2) Al Sufouh – Dubai Emaar Properties 2001

(G+50) Building Sh. Zayed Road – Dubai Arenco 2001

Madinat Jumeirah Jumeirah – Dubai Africon 2001

Jebel Ali Complex (134 Buildings) Jebel Ali Jebel Ali Properties 2000

(G+60) Tower Sh. Zayed Road – Dubai Union Properties 2000

Emirates Hills & Lakes Jebel Ali Emmar Properties 2000

Enoc Head Quarters Dubai Khatib & Alami 1999

Gas Pipeline Musaffah – Jebel Ali NPCC 1999

(B+G+M+36) Building Sharjah Khatib & Alami 1998

(B+G+M+30) Building Sharjah Arenco 1998

American University Of Sharjah Sharjah Bin Ladin 1997

PAGE | 68 CP/UAE/2013

Project Location Client Year

40 (G+2) Low Cost Houses Dubai Al Turath Consultants 1997

(G+M+28) Building Dubai Transemirates 1996

H.H. Sheikh Mohammad Palace Extension Dubai Al Futtaim Wimpey 1996

400 Kv Substation Dubai DEWA 1996

Qutaye– Oud Metha Interchange Dubai Dar Al Handasah 1995

Trade Center Extension Dubai Dar Al Handasah 1995

Emirates Engineering Center - Dubai Airport Dubai Maps 1995

Al Bustan Hotel Dubai Khatib & Alami 1994

220 Kv Ohtl Towers Madinat Zayed – Abu Dhabi Kec International Limited 1993

Gas Turbine Khorfakan Electricity & Water Department 1992

Water Tank Ajman Johnson Co 1991

Office Complex Sh. Zayed Road Emirates Petroleum 1990

Dubai Clock Tower (R/A) Dubai Arif & Bintoak 1989

Holiday Center Dubai Casia – Conser / Al Habtoor 1989

Al Awir Grand Mosque Al Aweer Arif & Bintoak 1988

Phosphoric Acid Plant & Silos Jebel Ali Emirates Narmada 1987

Al Shaab Stadium Sharjah Darwish Engineering 1986

Dubai Sewage Treatment Plant Dubai Keang Nam 1985

Sharjah – Dhaid Bridges Sharjah – Dhaid Halcrow International 1984

Aircraft Hangers Abu Dhabi Airport Khatib & Alami 1983

Fujairah Commercial Center Fujairah Khatib & Alami 1982

Sport City Umm Al Quwain Arenco 1981

Dubai Underpasses Dubai LTPA-LTPO 1980 Dhaid – Fujairah 2nd Carriage Way (133 Dhaid - Fujairah J&P 1979 Boreholes) Power Station Ras Al Khaimah Mothercat 1978

Jeddah-Mecca Express Way Saudi Arabia Dar Al Handasah 1977

Cement Factory Ras Al Khaimah Dar Al Handasah 1976

PAGE | 69 CP/UAE/2013

GEOPHYSICAL STUDIES

LIST OF ACTIVITIES:  MASW (Multi-channel Analysis of Surface Waves)  Electrical Resistivity Tomography  Microgravity Surveys  Electromagnetism: EM34  Ground Penetrating Radar  Radio Detection  Vertical Electric Sounding  Cross-hole seismic and electrical (direct and tomography)  Down-hole seismic  Refraction seismic  Reflection seismic  Parallel seismic  Magnetic survey  Gravity exploration (Macro)  Suspension logging  Vertical Electrical Tomography (VET)  Cavity volume estimation-3D  Resistivity, temperature logging  Magnetic survey  High definition 2D and 3D resistivity imaging  Gravity exploration (Macro)  Borehole Radar

FURTHER ANALYSIS:  Depth Slices  3D

SOFTWARES:  RES2D/3D (Processing software)  Electre Pro (Sequence management)  PROSYS II (Data transfer, process, display)  COMSYS PRO (control of syscal by PC)  Surfseis 3 (Processing software)  RADAN 6

PAGE | 70 CP/UAE/2013

o FGWINAD-7 MAIN-RADAN Radar Data. o FGWINRAD7-3D MODULE FGWINRAD7-I3 Interactive 3D

PAGE | 71 CP/UAE/2013

DEPARTMENT CHART – GEOPHYSICAL STUDIES

Managing Partner

Geophysical Geophysical Manager Area Manager

Project Draftsman Managers

Technicians

Asst. Technicians / Helpers

PAGE | 72 CP/UAE/2013

MACHINERY & EQUIPMENT - (GEOPHYSICAL STUDIES)

The following table summarizes the list of equipment that will be utilized to carry out the work on site:-

Standard Specifications Equipment Used Description of Equipments (reference) Transmitter. Max Voltage: 800voltage in switch mode. Max Voltage: 1000V in manual mode. 1.IRIS-Syscal Pro-Switch 72 Max current: 2.5a, accuracy 0.2%.

Electrical Resistivity Max power: 250W with internal DC/DC 2. Four segments of cable with Tomography converter and 12V external battery. 18 electrodes each. (ERT) Option 25mA,

Max for readings on samples- 3. Switch Box Pulse duration 0.2sec, 0.5 sec, 1 sec, 2sec, 4sec, 8sec. Internal 12V, 7Ah, battery, plug for ext.batt. 1. Geometrics Geode-24 High Speed over sampling combined with channels. digital processing provides a 24-bit result using

the crystals, semi-conductor sigma-delta A/D 2.PEG-40 – Source converter. 4.5HZ vertical Geophones Multichannel Analysis Processing of active and passive source surface of Surface Waves 3. Single Geode operating wave data to determine shear wave velocity. (MASW) software for laptop 100m, anti-static cables with red abrasion-

resistant jacket on plastic reel for use with 4. Strike plate hammer switch.

Ultra high molecular weight polyethylene

1.GSSI

High resolution, color screen, internal battery, Ground penetrating 2.Sir-3000 Data Acquisition large data storage capacity, usb ports,3 D data radar System,FGDC-3000/2100 collection and viewing built in. safe and transfer (GPR) with compact flash cards. 3.Model 5104-a 200 MHz Antena, FGMOD5104A 1 Adaptation module to connect 65m lead in. Total length : 100m these cables on a SYSCAL SW 1 connector with 24 pins at lead in. No Cross-hole Electrical 72 connector at the end. equipment Each output is s stainless steel cylinder, 1.3 cm 2 Borehole cable with 24 diameter, 10 cm length. outputs, 1m spacing. 1 Adaptation module to connect 65m lead in. Total length : 100m these cables on a SYSCAL SW 1 connector with 24 pins at lead in. No Vertical Electrical 72 connector at the end. Tomography Each output is s stainless steel cylinder, 1.3 cm 1 Borehole cable with 24 diameter, 10 cm length outputs, 1m spacing.

PAGE | 73 CP/UAE/2013

Standard Specifications Equipment Used Description of Equipments (reference) Sensor Type: Fused Quartz using electrostatic nulling Reading Resolution: 1 microGal Standard Field Repeatability: <5 microGal Operating Range: 8,000 mGal without resetting Operating Temperature: -40°C to +45°C (-40°F to 113°F) Memory: Micrigravity Gravity Meter CG-5 Flash Technology (data security) Survey(MG) Battery Capacity: 2 x 6.6 Ah (11.1 V) rechargeable Lithium-Ion Smart Batteries. Full day operation in normal survey conditions with two fully charged batteries Power Consumption: 4.5 W at +25°C (77°F) Measured Quantity: Apparent conductivity in millisiemens per meter(mSIm) Primary Field Source: Self-contained dipole transmitter Sensor: Self-contained dipole receiver Reference Cable: Lightweight, 2 wire shielded cable Conductivity Ranges: ±10, 100, 1000 mS/m Electromagnetism (EM) EM-34 Intercoil Spacings & Operating Frequencies: 10m at 6.4kHz 20m at 1.6kHz 40m at 0.4kHz Power Supply: Transmitter: 8 disposable or rechargeable "D" cells Receiver: 8 disposable or rechargeable "C" cells Dynamic range: 140dB rms/HZ Selectivity: 120dB/Hz Maximum Depth: Line 6m (20ft), Sonde 15m (50ft) CD Fault-Finding (CDFF): 220Hz to 4kHz RD 8000 Fault-Finding (FF): Diagnose cable sheath faults from short circuit to 2 MΩ using the A-frame. Batteries: Rx: 2 x D-cells (LR20). TX 8 X D cells (LR20).

PAGE | 74 CP/UAE/2013

MULTICHANNEL ANALYSIS OF SURFACE WAVES (MASW)

PAGE | 75 CP/UAE/2013

PAGE | 76 CP/UAE/2013

PAGE | 77 CP/UAE/2013

ELECTRICAL RESISTIVITY TOMOGRAPHY (ERT)

PAGE | 78 CP/UAE/2013

PAGE | 79 CP/UAE/2013

RD 8000

PAGE | 80 CP/UAE/2013

PAGE | 81 CP/UAE/2013

MATERIAL TESTING & QUALITY CONTROL LIST OF ACTIVITIES:

SAMPLING OF SOIL, CONCRETE AND AGGREGATE

Item No. Test Name

1 Sampling of Fresh Concrete

2 Sampling of Soil and Aggregate

3 Sampling of Aggregate

4 Preparing and Testing Specimens from Shotcrete Test Panels

MECHANICAL AND PHYSICAL TESTS ON SOIL

Item No. Test Name

1 Moisture Content

2 Liquid Limit

3 Plastic Limit

4 Plasticity Index

5 Wet Sieve Analysis

6 Dry Sieve Analysis

7 Particle Density

8 Determination of Linear Shrinkage

9 Hydrometer Testing for Particle Size Distribution

10 Dry Density/Moisture Content Relationship

11 Dry Density/Moisture Content Relationship

12 In-situ Density Test by Sand Replacement Method

13 In-situ Density Test by Sand Replacement Method

14 California Bearing Ratio (Soaked)

15 California Bearing Ration (Un-soaked)

16 Determination of Shear Strength by direct Shear (Small Shear Box apparatus)

17 Loose bulk density of soil

18 Bulk density of soil

PAGE | 82 CP/UAE/2013

MECHANICAL AND PHYSICAL TESTS ON SOIL

Item No. Test Name

19 Maximum density of soil

20 Minimum Density of soil

21 Laboratory compaction

MECHANICAL AND PHYSICAL TESTS ON CONCRETE AGGREGATE

Item No. Test Name

1 Sieve Analysis (Wet)

2 Sieve Analysis (Dry)

3 Clay Silt and Dust in Fine and Coarse Aggregate by Decantation Method

4 Flakiness Index of Coarse Aggregate

5 Elongation Index of Coarse Aggregate

6 Aggregate Crushing Value

7 Sand equivalent Test for Soil and Fine Aggregate

8 Relative Density and Water Absorption of Coarse Aggregate

9 Relative Density and Water Absorption of Fine Aggregate

10 Ten Percent Fines Value of Aggregate (Dry)

11 Ten Percent Fines Value of Aggregate (Soaked)

12 Soundness Test of Aggregate by use of Magnesium Sulfate Resistance to Degradation of Small Size Coarse Aggregate by Abrasion and Impact in 13 the Los Angeles Machine Resistance to Degradation of Large Size Coarse Aggregate by Abrasion and Impact in 14 the Los Angeles Machine 15 Clay Lumps and Friable Particles in Aggregate

16 Materials Finer than 75m (no 200) Sieve in Aggregate by Washing

17 Shell Content in Coarse Aggregate

18 Specific Gravity & Absorption of Coarse Aggregate

19 Specific Gravity & Absorption of Fine Aggregate

20 Mass Loss on Ignition of Light-Weight Aggregate

21 Bulk Density of Light Weight Aggregate

PAGE | 83 CP/UAE/2013

MECHANICAL AND PHYSICAL TESTS ON CONCRETE AGGREGATE

Item No. Test Name

22 Bulk Density of Aggregate

23 Determination of Moisture Content in Aggregate

24 Unit Weight and Voids in Aggregate

25 Light Weight pieces in Aggregate

26 Drying Shrinkage of Aggregate

27 Compaction Factor Value

28 Partially Crushed faces of Aggregate

29 Fully Crushed faces of Aggregate

30 Particle size distribution (Wet)

31 Loose Bulk Density

32 Aggregate Impact Value

33 Moisture content of aggregate by drying

MECHANICAL AND PHYSICAL TESTS ON CONCRETE

Item No. Test Name

1 Compressive Strength of Molded Cubes (Site)

2 Compressive Strength of Molded Cubes (Lab)

3 Compressive Strength of Concrete Cores

4 Compressive Strength of Concrete Masonry Blocks (Normal Size)

5 Compressive Strength of Concrete Masonry Blocks (Large Size)

6 Dimensions of Concrete Masonry Blocks

7 Density Determination of Concrete Masonry Blocks

8 Compressive Strength of Paving Blocks

9 Dimensions of Paving Blocks

10 Water Absorption & Moisture Content of Blocks

11 Mix Design

12 Density of Concrete

13 Water Absorption of Concrete Kerbs, Channels, Edgings & Flags

PAGE | 84 CP/UAE/2013

MECHANICAL AND PHYSICAL TESTS ON CONCRETE

Item No. Test Name

14 Compressive Strength of Hydraulic cement Mortars

15 Obtaining & Testing Drilled Cores and Sawed Beams of Concrete

16 Compressive Strength of Cylindrical Concrete

17 Dimensions of Concrete Kerbs

18 Bleeding of Concrete

Standard Test Method For Time Of Setting of Concrete mixtures by Penetration 19 resistance 20 Tensile Splitting Strength of Concrete Cylinders

21 Flexural Strength of concrete beam

22 Air content of Concrete

23 Unit Weight of Concrete

24 Temperature of Freshly mixed Concrete

25 Determination of Slump

26 Compressive Strength of Grout cube

27 Fluidity of grout

28 Bleeding of grout

29 Volume change of grout

30 Unit weight of grout

31 Compressive strength of Autoclaved Aerated concrete blocks

32 Dimensions of Autoclaved Aerated concrete blocks

33 Gross density of Autoclaved Aerated concrete blocks

34 Compressive strength of grout prism

35 Water absorption & density of concrete masonry unit

36 Flexural strength of grout prism

37 Post tension grout testing

38 Drying shrinkage of concrete

39 Flow test for Self compaction concrete

40 V Funnel test for Self compaction concrete

PAGE | 85 CP/UAE/2013

MECHANICAL AND PHYSICAL TESTS ON CONCRETE

Item No. Test Name

41 L Box test for Self compaction concrete

42 J Ring test for Self compaction concrete

DURABILITY TESTING ON CONCRETE

Item No. Test Name

1 Water Absorption Test on Concrete Cores

2 Rapid Chloride Permeability

3 Water Permeability

4 Initial Surface Absorption of Concrete.

MECHANICAL AND PHYSICAL TESTS ON STEEL

Item No. Test Name

1 Tensile Test on Steel Reinforcement Bars

2 Bend Test on Steel Reinforcement Bars

3 Re-bend Test on Steel Reinforcement Bars

4 Testing of Coupled bars

5 Epoxy –Coated Reinforcing Steel Bars

6 Steel Strand, Uncoated Seven-Wire for Pre-stressed Concrete

TEST METHODS FOR UTM (UNIVERSAL TESTING MACHINE)(H50kT)

Item No. Test Name

1 Flexural Strength

2 Tear Resistance

3 Tensile Strength

4 Puncture Resistance

PAGE | 86 CP/UAE/2013

CHEMICAL TESTS ON SOIL, GROUND WATER, AGGREGATE, CONCRETE, STEEL, CEMENT

Item No. Test Name

1 Water Soluble Sulphate Content of Soil

2 Water Soluble Chloride Content of Soil

3 Acid soluble Sulphate Content of Soil

4 Acid Soluble Chloride Content of Soil

5 Organic Matter Content of Soil

6 Mass Loss on Ignition of Soil

7 Carbonate Content of Soil

8 Determination of pH Value of Soil

9 Sulphate Content of Ground Water

10 Chloride Content of Groundwater

11 Total Dissolved Solids of Ground Water

12 Determination of pH Value of Ground Water

13 Testing of Water for Making Concrete

14 Sulfate Content of Hardened Concrete

15 Chloride Content of Hardened Concrete

16 Cement content of concrete

17 Acid soluble sulphate Content of Aggregates

18 Acid soluble Chloride Content of Aggregate

19 Determination of Alkali Carbonates & Bicarbonates in Water

20 Organic Impurities in Fine Aggregate

21 Water Soluble Sulfate Content of Aggregate

22 Water Soluble Chloride Salts in Aggregate

23 Acid-Soluble Material in Fine Aggregate

24 Determining the Cement content of freshly mixed Concrete

25 Determining the Water content of freshly mixed Concrete

26 Chemical Analysis of Steel Bars

27 Chemical analysis of Cement

28 Chemical Analysis of Admixtures

PAGE | 87 CP/UAE/2013

CHEMICAL TESTS ON SOIL, GROUND WATER, AGGREGATE, CONCRETE, STEEL, CEMENT

Item No. Test Name

29 Potential Alkali-Silica Reactivity of Aggregates

30 Organic Content of Soil by Loss on Ignition

31 Calcium hardness of Water

32 Physical Analysis of Cement

33 Chloride content of Water

34 Biochemical Oxygen Demand (BOD)

35 Total Nitrogen (T-N)

36 Total Phosphorous

37 Total Dissolved Solids (TDS)

38 Ca Content

39 Mg Content

40 Silica Content

41 Fe Content

42 Mn Content

43 Na Content

44 K Content

45 Nitrate Nitrogen (NO3-N)

46 Nitrite Nitrogen (NO2-N)

47 Ammonnia Nitrogen (NH4-N)

48 Phosphate Phosphorous (PO4-P)

49 Carbonate (CO3)

50 Bicarbonate (H-CO3)

51 Sulphate

52 Total Suspended solids (TSS)

53 Volatile Suspended Solids (VSS)

54 Cd Content

55 Pb Content

56 Dissolved Oxygen (DO)

PAGE | 88 CP/UAE/2013

CHEMICAL TESTS ON SOIL, GROUND WATER, AGGREGATE, CONCRETE, STEEL, CEMENT

Item No. Test Name

57 Chemical analysis of microsilica

58 Carbon Equivalent value

59 Water absorption of plastics

60 Water analysis

61 Total solids

62 Chemical Oxygen Demand (COD)

63 Cr Content

64 Cu Content

65 Zn Content

66 Total Hardness of water

67 Residual Chlorine

68 Conductivity of water

69 Oil & Grease

70 Nickel

71 Mercury

72 Selenium

73 Silver

74 Alkali Content of concrete

75 Suitability of water

SOFTWARE:  Proove IT  QMat (UTM Machine)  Lotus Reports (In-Housed Reporting and Sample Management Software)

PAGE | 89 CP/UAE/2013

DEPARTMENT CHART – MATERIAL TESTING AND QUALITY CONTROL:

TECHNICAL MANAGER

QUALITY CONTROL OFFICER

SOIL/AGGREGATE CONCRETE STEEL CHEMICAL

TECHNICIANS PHYSICAL DURABILITY TECHNICIANS TECHNICIANS

ASSISTANT ASSISTANT ASSISTANT TECHNICIANS TECHNICIANS TECHNICIANS TECHNICIANS TECHNICIANS

ASSISTANT ASSISTANT HELPERS HELPERS HELPERS TECHNICIANS TECHNICIANS

HELPERS HELPERS

PAGE | 90 CP/UAE/2013

MACHINERY & EQUIPMENT - (MATERIAL TESTING & QUALITY CONTROL) SOIL SECTION

PAGE | 91 CP/UAE/2013

PAGE | 92 CP/UAE/2013

PAGE | 93 CP/UAE/2013

CONCRETE PHYSICAL SECTION

COMPRESSION MACHINE (CONCRETE)

PAGE | 94 CP/UAE/2013

CONCRETE DURABILITY SECTION (WATER PENETRATION)

CONCRETE DURABILITY SECTION (RAPID CHLORIDE PENETRATION)

PAGE | 95 CP/UAE/2013

CONCRETE DURABILITY SECTION (WATER ABSORPTION & ISAT)

PAGE | 96 CP/UAE/2013

STEEL SECTION

PAGE | 97 CP/UAE/2013

CHEMICAL LAB

ATOMIC ABSORPTION SPECTROPHOTOMETER (CHEMICAL)

PAGE | 98 CP/UAE/2013

NITROGEN ESTIMATION APPARATUS (CHEMICAL)

CARBON SULPHER ANALYZER FOR STEEL (CHEMICAL)

PAGE | 99 CP/UAE/2013

UNIVERSAL TESTING MACHINE (MATERIAL)

PAGE | 100 CP/UAE/2013

LIST OF SOME MAJOR PROJECTS

Project Location Client Year

UNITED ARAB EMIRATES

Islamic Center Moweilah -Sharjah Bin Ladin 2012

DRC Green Field Factory DIP 2-Dubai System / Arif & Bintoak 2012 Kaveri Contr. / Pioneers Of Marina Hotel Marsa -Dubai 2012 Expert Engineering Team Engineering / Al B+G+6 Bldg Al Raffa -Dubai 2012 Khawajah G+6 Res. Bldg Al Liwan New Valley / NEB 2012

Choueifat School Abu Dhabi Choueifat School 2012

Sky Scraper Tower Business Bay -Dubai The Arab Contractors 2012

2b+G+M Commercial & Office Bldg Al Garhoud Naresco / Arch Dome 2012

Lillian Tower Business Bay Zetas / Khatib & Alami 2012

Al Falah City Project Al Falah-Sharjah Al Qabdah / WSP 2012

Burj Side View Bldg Business Bay National Piling 2012 Al Naboodah / Dar Al Dafza Apron Enabling Works Dubai Intl. Airport 2012 Handasah Modern Freight Company Warehouse Jafza Dutco / Monarch 2012 N.C.T.C / Idroesse Al Hayal Road Expansion Fujairah 2012 Infrastructure B+G+7F Hotel Apartments Mankhool Stromek / ARC 2012 Conmix / A.M.B.B / Expo Center Expansion Sharjah 2012 WSP Middle East Al Naboodah / Dar Al Miscellaneous Airfield Works Dubai 2012 Handasah Abu Dhabi Intl. Airport Midfield Austrian Arabian / Abu Dhabi 2012 Terminal Complex Arabtec Sky Dive Center Marghem Profiles / Arkiteknik 2012 S.S.Lootah Contr. / Al Dream Tower Dubai Marina 2012 Ajmi Al Naboodah / Dar Al General Aviation Area& Heliport Jebel Ali 2012 Handasah Aoc Project Burj Dubai District Besix-Arabtec JV 2012 Modern Executive 8 Town House Al Safouh 2012 Systems / BHNS Al Habbai / Style 2b+G+11+Typ+Roof Bldg Oud Metha 2012 Consultant Engineering Tecom 2 Res. Tower Al Barsha Middle East / Ace 2012

Burj Damac District A.N.C. Contr. 2012 Dept. Of Forensic Science & Intermass / Al Madain Al Barashi 2012 Criminology Project Engineering Emirates Beton / Arabian Crown Tower Wadi Al Safa 2012 Universal Piling Multi Purpose Hall Festival City Saleh Constr. 2012 Darwish Engineering / Shk. Ammar Bridge Al Zahra 2012 Cdm Smith Inc.

PAGE | 101 CP/UAE/2013

Project Location Client Year Modern Executive Acacia Avenue Al Safouh 2012 Systems / BHNS Al Naboodah / Dar Al Expo Additional Remote Stands Dubai Intl Airport 2012 Handasah Sharjah General Marwan Residential Bldg Al Nahda-Sharjah Contracting / Emirates 2012 Engineers United Technology Palm Tree Court & Spa Jebel Ali 2012 Trading Al Qabdah / Gulf Universal American School Al Khan 2012 International Engineering Cosmos Piling / Art 3b+G+25 Res & Commercial Bldg. Jumeirah Village 2011 Consultants Darwish Engineering / Choueifat School Complex D.I.P Dubai 2011 Arab& Turk International Abu Dhabi Intl Airport Expansion Abu Dhabi TAV. / Parsons 2011 Darwish Engineering / Green Park A-Residential Bldg Jumeirah Village 2011 Conin 4b+G+17 Commercial & Residential Edrafor Emirates / Danat-Dubai 2011 Bldg. Lacasa Arch Al Falah Community Development Al Falah Zetas / Langan Intl. 2011 / S.S. Lootah Building For Holy Qur’An International Al Mamzar-Dubai 2011 / Artek Al Mulla Tower Al Nahda-Sharjah Becon / Adnan Saffarini 2011

Ware House Jafza System / Semac 2011 Improvement Of 5th Interchange Emirates Road-Sharjah N.C.T.C / Parsons 2011 Sharjah Dubai Silicon Oasis Site Seepage & Dubai Silicon Oasis - Dubai Zetas / Khatib & Alami 2011 Cut Off Wall Dutch Foundation / Khatib Petrofac Office Tower Al Khan-Sharjah 2011 & Alami District Cooling Plant Khalifa City B Al Habtoor / Cansult 2011

G+9 Residential Bldg Al Liwan New Valley / N.E.B 2011 Modern Executive A.R.J Tower Dubai Marina Systems Contracting / 2011 W.S. ATKINS 4b+G+M+12 Floor Mixed Use Bldg Al Muraqabat Emco / Q.H.C 2011 Amana Pipeline Al Sowwah District Cooling Plant Abu Dhabi 2011 Construction / Dc Pro Al Qabdah / Sharjah B+G+7 Bldg Mowailah-Sharjah 2011 Engineering Construction Meydan Business Park Meydan -Dubai Union Cement / Arch 2011 3b+G+29 Residential & Commercial Dubai Dawn / Dubai Land 2011 Bldg Development Consultant Arabtec / Ws ATKINS& PPM Conrad Hotel-Car Park Shk.Zayed Rd. 2011 Partners G+4P+16 Bldg Al Qasmia- Sharjah Dar Al Emarat / Al Bahar 2011

Etihad Airways H.Q. Academy Khalifa City A.M.B.B / Conser 2011 Akpinar Engineering / Opal Towers Business Bay 2011 Lacasa Al Barari Firm / Khatib & Al Barari Development Dubai Land 2011 Alami Capital Center Tower Abu Dhabi Bauer Intl. / Rmjm 2011

PAGE | 102 CP/UAE/2013

Project Location Client Year

Ericson Tower Tubes Sharjah Vsl Middle East 2011 Arabtec / Group Damac Heights Dubai Marina 2011 Consultant Al Habtoor Island Resort & Spa Palm Jumeirah Zetas / Khatib & Alami 2011

Al Hilal Bank Tower Al Sowwah Island Al Ghurair / Serex 2011

Dubai Intl. Airport Expansion Dubai Zetas / Dar Al Handasah 2011

1,047 Villas – Phase II Dubai Silicon Oasis Arabtec / Arch Group 2010

Al Ghurair City Expansion Deira Al Habtoor / Arif& Bintoak 2010 Luv Intl Trdg / Eng Adnan Twin Buildings Sports City 2010 Saffarini Bayt Al Boshra General Light House Tower DIFC-Dubai 2010 Contracting The Matrix Tower Dubai Sports City UNEC / BSBG 2010 Freight & Passenger Union Railway Abu Dhabi 2010 Railway Committee Dec Business Tower Business Bay A.N.C Contracting 2010

Suberbia Bldg Down Town Jebel Ali Stromek Emirates / A.P.G 2010

Internal Road in Al Khalidiya Al Azra N.C.T.C / Halcrow 2010

Al Ghandi Business Center Al Quoz Zetas / Arif & Bintoak 2010 Sun Engineering / Executive Bay Twin Tower Business Bay 2010 Engineering Consortium Sun Engineering / Capital Bay Twin Tower Business Bay 2010 Engineering Consortium Sun Engineering / ZAS Burjside Boulevard Tower Burj Dubai District 2010 PSE Al Salam Hotel Al Khan Stromek / Gulf Sky 2010

G+5P+13 Floor Bldg. Al Nahda Stromek Emirates 2010

Jubail Market Al Qusais Dutco / Gaj / WSP 2010

West Avenue Dubai Marina T.M.F Euro Foundation 2010 A.N.C Arabian Iris Amber Cultural Village 2010 Construction Al Sajaa Camp Al Sajaa Bin Ladin 2010 CRC / National West Avenue Dubai Marina 2010 Engineering A.N.C Arabian Capital Tower Abu Dhabi 2010 Construction 4b+G+Hc+48mech Level Hotel Al Mamzar Al Qabdah 2010

ADNEC Capital Tower Abu Dhabi Al Ghurair / Planner 2010

Dubai Police Head Quarters Aweer City Engineering 2010 Sun Engineering / Golden Multi Use Hall Al Bougha 2010 Planners Darwish Engineering / Commercial & Residential Bldg. Dubai Land 2010 Group Strategic Water Storage / Recovery Liwa Zetas / Giz / Dornier 2010 Project Dubai Marina Hotel Development Marsa Zetas / Pioneers 2010

PAGE | 103 CP/UAE/2013

Project Location Client Year

Silverine Twin Tower Dubai Marina Arabtec / Rmjm 2009 Sun Engineering / Adnan Tower Al Khan -Sharjah 2009 Safarini Sun Engineering / Dolce Vita For Bella Vida Ltd Dubai Marina 2009 Dimension Engineering Canal Residence West Dubai Sports City UNEC / Leo 2009

Kpm Tower Marsa Dubai Zetas / Leo 2009

B+G+6 Office Building DIP-Dubai G.C.C / QHC 2009 East Coast Contracting / G+5p+15+Typ+Hc+Hb Building Al Khan -Sharjah 2009 Almazaya Engineering Factory, Offices & Labor Amana Steel / Al Nahda Industrial Area 17-Sharjah 2009 Accommodation Engineering Belhassa Engineering / Al B+G+8 Floor Residential Building DIP-Dubai 2009 Mazaya Banafseh Tower Business Bay Sun Engineering / Arenco 2009

B+G+46 Floor Al-Khan -Sharjah Stromek / Adnan Saffarini 2009 Austrian Arabian / Khatib Shahala Tower Dubai-Marina 2009 & Alami Al Hazza Contr / National 2b+G+7typ+Hc Bldg Al Raffa-Dubai 2009 Engineering Masdar – H.Q Abu Dhabi Al Ghurair 2009 Solanki / National 2b+G+10+Hc Bldg Al Qusais 2009 Engineering Bureau 12 Buildings Dubai Lagoon Phase3 DIP Belhassa 2009

Commercial Building Jumeirah Village Stromek / Al Habbai 2009

Offices Al Majaz Al Mawarid / Horizon 2009

B+G+7 Residential Bldg Al Nahda Stromek / Al Arif 2009

Palm Tree Court Expansion Jebel Ali Dutco / GAJ 2009 Sun Engineering / Khatib Sahara Mall Expansion Al Nahda 2009 & Alami Platinum Tower Business Bay Pilex Foundation 2009

Maimoon Towers Jumeirah Village T.M.F Euro Foundation 2009 Middle East Foundation / G+8+R Staff Accommodation Al Quoz 2009 ART Commercial & Residential Bldg Al Muraqabat Zahra Al Safa / Al Majal 2009

Beach Resort Hotel Al Muntaza Stromek Emirates / QHC 2009 Ascon / Al Burj Jumeirah Lake Tower Jumeirah Lake Tower Dubai 2009 Engineering Prime Tower Business Bay K.C.P.C / E.C.G 2009

Orchid Jumeirah Village Pilex Foundation 2009

Al Jouri Jumeirah Village Pilex Foundation 2009

B+G+7 Residential Bldg Al Nahda Al Arif / Q.H.C 2009

2b+G+23 Commercial Tower Motor City Lootah 2009

Nilona Tower Dubai Health Care City National Emirates Piling 2009

Sami Tower Business Bay Saqer Engineering 2009

PAGE | 104 CP/UAE/2013

Project Location Client Year

Mothers Residence Sufouh - Dubai Tawazun Construction 2009 Amana Steel Building Emirates Islamic Bank Jafza 2009 Contracting Twin Tower Al Majaz Sun Engineering 2009

3b+G+19 Commercial Bldg Jumeirah Village Stromek Emirates 2009

Haseeb Rasoul Project - (2008-003) D I P - Dubai Arabtec 2008 National Housing Project, Phase- II, Al Barsha, South - Dubai Arabtec 2008 1209 Villas National Housing Project - Phase - 1. Al Barsha - Dubai Arabtec 2008 252 Villas National Housing Project Phase- II, Al Warqa - Dubai Arabtec 2008 504 Villas Shahla Tower (0535) Dubai Marina- Dubai Arabtec 2008

P-26 Cricket Tower (J# 210) Dubai Sports City - Dubai UNEC 2008

G+6P+Hc+25 Floor Building - (J-222) Al Nahda - Sharjah UNEC 2008 International City - Package:15 (J- Al Warsan - Dubai UNEC 2008 230) P-22 Building - (The ) Dubai Sport City - Dubai UNEC 2008

Down Town Center Holiday Inn Hotel King Faisal Road - Sharjah UNEC 2008

The Lake Residential Neighborhood International City - Dubai UNEC 2008 Dubai Sports City (Venetian Canal Residence West (U-234) UNEC 2008 Style) Elite Tower Marina - Dubai Arabian Contracting 2008

Burj Residential Towers Burj Dubai Arabian Constr. Co. 2008 Prestigious Residential Tower (V3 Jumeirah Lake Towers - Dubai Arabian Constr. Co. 2008 Tower) Al Sahel Contracting Co. Royal Oceanic Tower Dubai Marina - Dubai 2008 L.L.C. Prime Tower Near Trade Center - Dubai I J M Construction 2008 Commercial Office & Residential Tecom - Dubai Naresco Bldg Contracting 2008 Building Al Ameri Tower Al Barsha - Dubai Al Oroba Contracting 2008 G+58+Ser.+H.P & G+10 Car Parking Buildings For H.H. Al Sheikh Shk. Zayed Road - Dubai Sun Engineering 2008 Mohammad Bin Khalifa Bin Zayed Al Nehyan G+58+ Service+ H.P & G+ 10 Car Sheikh Zayed Road - Dubai Sun Engineering 2008 Parking 4b+Gp+12+Sp+Gym Residential Jadaff - Dubai Sun Engineering 2008 Building (Niloofar Tower) Iris Amber Residential Development Cultural Village ( Al Jadaf ) Sun Engineering 2008

(3b+Gr+19 Storey) - Hotel Tower Business Bay - Dubai Al Habbai Contracting 2008

2b+G+30 Floor Building Al Nahdha - I , Dubai Al Habbai Cont 2008 Soundstages Complex - For Dubai Amana Steel Building 2008 Studio City Contracting Co. L.L.C. Global Village Development Global Village Dubai Land Al Naboodah (Bldg) 2008

The Oberoi Center - Business Bay Business Bay- Dubai Al Naboodah (Bldg) 2008

PAGE | 105 CP/UAE/2013

Project Location Client Year

Lime Tree Valley - Phase - II Jumeirah Golf Estate - Dubai Al Naboodah (Bldg) 2008 Orange Lakes For Links Properties Jumeirah Golf Estate Al Naboodah (Bldg) 2008 Investment Ltd - (Bvi) (68villas) New Office Building - Dubai Al Naboodah (Bldg) 2008 (G+B+4) Al Badia Phase:III, Al Badia - Dubai Al Naboodah (Bldg) 2008 Residential Complex Sienna Lake Villas. 68 Nos. (255) Jumeirah Golf Estate - Dubai Al Naboodah (Bldg) 2008 Dca-Dubai International Airport Light Dubai International Airport - Al Naboodah (CED) 2008 Rail Station - Terminal - I (Ax-415) Dubai Al Bassam Tower Tecom - Dubai Transemirates Contracting 2008

Jumeirah Lake Tower J.L.T - Dubai Middle East Foundation 2008

Down Town Tower Business Bay - Dubai Middle East Foundation 2008

Bristol Tower Business Bay - Dubai Middle East Foundation 2008 Development - (Diaphram Oud Metha - Dubai Middle East Foundation 2008 Wall Works) Maydan Construction Of Maydan City Bukadra - Ras Al Khor Middle East Foundation 2008 Jumeirah Lake Tower, Ph # 2 Amesco Tower Middle East Foundation 2008 Dubai Acacia Avenue, Gardens - Hilliana Tower Middle East Foundation 2008 Dubai Res. Building Nad Al Sheba Middle East Foundation 2008 2b+G+29+Mech' L. Flr. Residential Dubai Land - Dubai Middle East Foundation 2008 Bldg Shahala Tower Marsa - Dubai Middle East Foundation 2008 For Sheikh Ahmad Marsa - Dubai Middle East Foundation 2008 Bin Sayed Al Maktoum 2Y Dubai Marina - Dubai Middle East Foundation 2008

Al Attar Tower Business Bay - Dubai Middle East Foundation 2008

Trio Towers - Dubai Middle East Foundation 2008

Tamweel Office Tower Business Bay - Dubai Middle East Foundation 2008

Dubai Trade Center Phase: I Near Emirates Tower - Dubai Middle East Foundation 2008 Dubai World Trade Center 3 Star Near Emirates Tower - Dubai Middle East Foundation 2008 Hotel C1 Area Near Emirates Tower - Dubai Middle East Foundation 2008 Dubai Trade Center Phase- I (C2 To Near Emirates Tower - Dubai Middle East Foundation 2008 C5 ) Dubai World Trade Centre Substation Near Emirates Tower - Dubai Middle East Foundation 2008

Dubai World Trade Centre Near - Dubai Middle East Foundation 2008

Burj Al Alam - (The World Tower) Business Bay - Dubai Middle East Foundation 2008

R.T.A Head Quarters Building Middle East Foundation 2008

Fair View Tower Business Bay - Dubai Middle East Foundation 2008

Office Tower Business Bay -Dubai Middle East Foundation 2008

3b+G+19 Office Tower Business Bay -Dubai Middle East Foundation 2008

Oxford Tower Business Bay Middle East Foundation 2008

PAGE | 106 CP/UAE/2013

Project Location Client Year

Meydan City Phase: II Nad Al Sheba - Dubai Middle East Foundation 2008 Al Bateen Hotel And Residence Marsa - Dubai Middle East Foundation 2008 Building (Piling Works Phase - II) (G+1) 14 Villas Jafiliya 1 - Dubai A.N.C. 2008 Jumeirah Golf Estate Flame Tree Jumeirah Golf Estate - Dubai A.N.C. 2008 Ridges Villas Jumeirah Golf Estate Fire Side Villas Jumeirah Golf Estate - Dubai A.N.C. 2008

Deyaar 51 Business Bay A.N.C. 2008 99 Flame Tree Ridge Villas + 66 Jumeirah Golf Estate - Dubai A.N.C. 2008 Fireside Villas Dubai Lagoon D I P - Dubai N.S.C.C. 2008

Arbift Tower Marina - Dubai CRC 2008 (3b+G+5p+29) Commercial Offices Business Bay - Dubai Emirates Belbadi 2008 Building G+3 Residential Building Al Hamriya - Dubai Al Majid Contracting 2008

Dubai Police Head Quarters Complex Al Aweer - Dubai Al Majid Contracting 2008

G+4p+25typ+Hc Tower Emirates City - Ajman Becon Constructions 2008

Al Itihad Tower Ajman Becon Constructions 2008

Emirates Rugby Stadium Lusaily - Dubai Ascon 2008

Summit Tower Dubai Media City - Dubai Ascon 2008 Emirates Road Near Al Sirrah Sharjah Investment Center Darwish Engineering 2008 Area Dubai Int'l Airport Terminal 1 Belhassa Engineering & Ghobash Office Building 2008 Road Contracting Silverene Tower Al Marsa - Dubai Delta Foundation 2008

Dune Tower Jumeirah Village South - Dubai Intermass 2008

Proposed G+5P+15 Building Abu Shagara - Sharjah Master Civil Construction 2008

G+4P+25 Typ+Hc Building Helio - Ajman Master Civil Construction 2008

G+3P+15 Building Abu Shagara - Sharjah Master Civil Construction 2008

G+4P+25 Typ+Hc Building Helio - Ajman Master Civil Construction 2008

Huseini Tower Tecom - Dubai Zetas 2008

Legend Plaza - Dubai Zetas 2008

Sea View Club Hotel & Apartments Palm Jumeirah - Dubai Zetas 2008

Duja Tower Sheikh Zayed Road - Dubai Zetas 2008

Lighthouse Tower DIFC - Dubai Zetas 2008

Porto Dubai Jumeirah Zetas 2008

Damac Heights Dubai Marina Zetas 2008

Commercial Square Business Bay - Dubai Zetas 2008

Dubai Municipality Sports Complex Dubai Land - Dubai Zetas 2008

Tiara Village Palm Jumeirah - Dubai Zetas 2008

PAGE | 107 CP/UAE/2013

Project Location Client Year

Haz Tower Business Bay - Dubai Zetas 2008

G+4p+25typ+Hc Building Al Helio - Ajman Piling Tech 2008 (G+6p+Pod+45typ+Ser+Hc) Al Helio - Ajman Piling Tech 2008 Residential Building Tower Al Helio - Ajman Piling Tech 2008

Tower Emirates City - Ajman Piling Tech 2008

G+4p+25typ+Hc Building Emirates City - Ajman Piling Tech 2008

Chocolate Tower Al Helio - Ajman Piling Tech 2008

Prism Tower Business Bay - Dubai Commodore Contracting 2008

G+5p+S+33typ+Hc Al Khan Al Nasiria Contracting 2008

Air Arabia Studio Apartment 1 And 2 Red Plot - Sharjah Airport Gustav Pegel Contracting 2008

Air Arabia Centro Hotel Sharjah Airport Gustav Pegel Contracting 2008

Fortune Serene IMPZ - Dubai Kele 2008 Al Ghurair Arabian Chanel Tower For Dubai Promenade Dubai Marina 2008 Foundations Engineering Al Ghurair Arabian Saba Tower - 4 Jumeirah Lake Tower - Dubai 2008 Foundations Engineering (G+5p+15+2hp)Bldg For Mr. Rashed Al Khan - Sharjah Dallas Foundation 2008 Salem Al Hajiry Emirates Tower Ajman Al Diwan Contracting 2008 Al Buhaira National Ins (Residential Al Nahda-Sharjah Al Hamad Contracting 2008 Tower) Pearl Gulf Tower Al Nahda - Sharjah Sharjah Tower Contracting 2008

G+3p+17 Typ Building Al Nahda - Sharjah Sharjah Tower Contracting 2008

Emirates Garden - II Jabel Ali - Dubai Robust Contracting 2008

2b+G+28 Hotel Apartment Tecom - Dubai Al Badr Contracting 2008 Saqer Engineering Dubai Star Tower Jumeirah Lake Tower - Dubai 2008 Contracting (5b+G+39+1m) Building For Al Attar Saqer Engineering Jumeirah Lake Tower. - Dubai 2008 Tower Contracting B+G+4 Podiums+24 Floor+Roof Stromek Emirates Jumeirah Village, South - Dubai 2008 Building Foundation Stromek Emirates (B+G+5p+43 Floors) Burj Saeed Burj Dubai Area - Dubai 2008 Foundation (6b+G+100 Floors) Hotel & Res. Marina - Dubai Tav Construction 2008 Towers. (B+Podium+26 Typ. Floor) A.R.G Modern Executive Dubai Marina 2008 Tower Systems Contracting 9+4p+25 Typ+Hc Residential Building Emirates City - Ajman Sky Construction 2008

Emirates City Al Helio, Emirates City - Ajman Sky Construction 2008

Gold Crest Dreams(2) Emirates City - Ajman Sky Construction 2008

289 Villas Dubai Land - Dubai Sky Construction 2008 Proposed 2b+ G+ 19 Residential & Jumeriah Village, Sports City - National Piling / Team Comm. Tower For M / s. Gulf General 2008 Dubai Engineering & Investment Group (G+2p+12typ.) Building Al Nu'aimia - Ajman Diwan Development 2008

PAGE | 108 CP/UAE/2013

Project Location Client Year

Downtown 595 - L For Limitless L.L.C Jebel Ali - Dubai Al Habtoor Engineering 2008 Jafza Convention Centre Food Court Jafza - Dubai Al Habtoor Engineering 2008 & Hotel Office Complex Al Fattan Mrcb Al Fattan Hotel & Residences Palm Jumeirah 2008 Construction Al Fattan Mrcb Hotel & Residence Block Building Palm Jumeirah - Dubai 2008 Construction Palm Marine Jebel Ali Port Sisco Contracting 2008 Admiral Contracting Salam Tower Al Khan - Sharjah 2008 Company Twin Tower Jumeirah Village - Dubai Al Hatem Contractor 2008 Galadari Readymix / Al 79 Villas - Lime Tree Valley Jumeirah Golf Estate - Dubai 2008 Naboodah Sidra Tower Office & Service Tecom - Dubai Zelan Holdings 2008 Apartments T.M.F Euro Foundation Latheefa Tower Mankhool - Dubai 2008 Company Ppm Conrad Hotel Sheikh Zayed Road - Dubai Arabtec – DCC JV 2008 Augmentation Of D.M Water Jebel Ali Metito Contracting 2008 Production Station Water Homes & Walk Ways For The Taisei Corporation 2008 Nakheel 940 Villas For Mohd. Bin Rashed Dubai Arabtec 2007

1,047 Villas – Phase II Dubai Arabtec 2007

Zumurud Tower Dubai UNEC 2007

(6B+G+100) The Dubai Arabian Construction 2007 Prestigious Residential Tower (V3 Dubai Arabian Construction 2007 Tower) Fortune Executive Tower Dubai IJM Construction 2007 (G+1) Building & Warehouse For Dubai Al Nimr Civil Engineering 2007 Global Village Lime Tree Valley - Phase II Dubai Al Naboodah (Bldg) 2007

Canal Point Hospital Dubai Al Naboodah (Bldg) 2007

Al Barari Development - Phase – 1 Dubai Al Naboodah (Bldg) 2007

Harvard Medical School Dubai Al Naboodah (Bldg) 2007 Concourse–III Structure Up To Dubai Al Naboodah (CED) 2007 Arrivals Level AX-124 Tiffany Tower Dubai Al Rostamani Pegel 2007 (2B+G+5P+23+Mech+R) Al Bassam Dubai Transemirates Contracting 2007 Tower Bay Gate Office Tower Dubai Al Nekreh Contracting 2007

Nad Al Shiba Race Course Dubai N.S.C.C. 2007

Palm Jumeirah (Bottom Trunk) D-Wall Dubai N.S.C.C. 2007

Emirates Rugby Stadium Dubai Ascon 2007

Danat Al Khan Tower Sharjah Darwish Engineering 2007

Burj Dubai Development Dubai Besix / Arabtec 2007

PAGE | 109 CP/UAE/2013

Project Location Client Year

Prism Tower Dubai Commodore Contracting 2007

Emerald Palace Dubai Arabian Foundation 2007

Ritaj Residential Project Dubai Robust Contacting 2007 Middle East / P&T Dubai Architect & Engineering 2006 Ltd. 544 Villas Dubai Arabtec / Arif & Bintoak 2006

R-3 Tower (Palladium Tower) Dubai Ascon / Darr 2006

Canal Point Development Dubai Middle East / Burt Hill 2006 Al Rostamani Pegel / Arif Dubai 2006 & Bintoak Al Habtoor - STFA Group / Damac Executive Heights Dubai ECG Engineering 2006 Consultant Bin Zayeed / Eng. Adnan Damas I & Ii Tower Dubai 2006 Saffarani Dheeraj & East Coast / Dec Residential Tower Dubai 2006 Architecture Engineering Acc / Dimensions Dubai Gate Tower Dubai 2006 Engineering Arabtec / Diwan Development Dubai 2006 Consultants Dubai Textile City Dubai UNEC / Airf & Bintoak 2006 Saleh Construction / Arif Garghash Tower Dubai 2006 & Bintoak Abm / National Golf Tower Dubai 2006 Engineering Bureau Edrafor Emirates L.L.C / Kharbash Tower Dubai 2006 Darr Zetas / Eng. Adnan Princess Tower Dubai 2006 Saffarani Al Ahmadiah Aktor / Dubai Health Care City Dubai 2006 Sharafi Phb Ascon / Al Gurg West Office Building Dubai 2006 Consultant Dar Al Handasah / Al Dubai Women’s College – Ph. III Dubai 2005 Naboodah National Engineering Jumeirah Lake Towers, Cluster Dubai 2005 Bureau / M.E.F.G. Al Sweidi Consultant / Etisalat Telecom Building Dubai 2005 Dhabi Contracting Est. Adnan Safarrini / Arabian Emirates Head Quarter Dubai 2005 Construction Emaar Business Phase -2 Dubai Dar Consultants / A.N.C. 2005 Archon / Arabian Emirates Head Quarter Dubai 2005 Construction Dimensions Engineering / Fortune Tower Dubai 2005 Ijm Construction Khatib & Alami / Mag-214 Jumeirah Lake Towers Dubai 2005 Transemirates Contracting Dar Consultants / Bu Emaar Business Park Dubai 2005 Haleeba Contracting Burj Dubai Business Park Dar Consultants / Bu Dubai 2005 Development Haleeba Contracting B+G+39 Commercial & Residential Dar Consultants / Saleh Dubai 2005 Building Construction

PAGE | 110 CP/UAE/2013

Project Location Client Year Gse Tunnel East Of Concourse – II, Dubai Dar Al Handasa 2005 Dubai International Airport W.S. ATKINS & Partners / Indigo Tower Jumeirah Lake Towers - Dubai 2005 Al Rostamani Pegel (Mediterranean) Dubai E.C.G. / Ali Moosa & Sons 2005 The Gardens Dubai Marina Twin Tower Dubai Marina - Dubai Khatib & Alami / U.N.E.C. 2005

Dubai Festival City DFC Arcon 2004

Jumeirah Beach Residence JBR - Dubai Saleh 2004 Khatib & Alami / Arabian Rose Rotana Tower Shk. Zayed Road – Dubai 2004 Construction Co. Palm Jumeirah Shoreline Apartments Palm Jumeirah - Dubai Ace / Bin Bilaila Baytur 2004

Parking Building Jumeirah Lake Towers - Dubai Wilkins Smith / Ascon 2004 Earthwork & Pilling Works Ax0150 2003- Dubai Airport Dar Al Handasah – ADPI / Dubai International Airport Expansion 2004 Dar Al Handasah – ADPI / Earthwork & Pilling Works Ax056 2002- Dubai Airport Al Naboodah Contracting - Dubai International Airport Expansion 2004 (CED) Dubai Marina Tower (A – 22a) Marsa – Dubai W.S. ATKINS / Arabtec 2003 Norr Group / Al Basti & Emaar Towers Deira – Dubai 2003 Muktah Arif & Bintoak / Al Oroba 320 Villas – Springs - Phase 5 Emirates Hills – Dubai 2003 Contracting 308 Villas – Springs Phase – II Emirates Hills – Dubai Archon / Ginco 2003 Community No. 1 2B+G+5 Finance I.T & Audit Dept Arif & Bintoak / Al Al Souq Al Kabeer – Dubai 2003 Bldg Nakhreh Contracting Archon / Ahmed Bin 268 Villas – Springs Phase – III Emirates Hills – Dubai 2003 Dismal Uptown Mirdif Development Enabling Khatib & Alami / Darwish Mirdif – Dubai 2003 Works Engineering Contracting Commercial Bank Of Dubai Car Park Port Saeed – Dubai Norr Group / Ascon 2003 External Dubai Marina Tower Marsa – Dubai W.S. ATKINS / Arabtec 2003 Arcon / Al Hudaiba 2002- 304 Villas – Springs Emirates Hills – Dubai Contractor 2003 Al Gurg Consultant / 2002- The Meadows 243 Villas - Phase – 1 Emirates Hills – Dubai Dubai Civil Engineering 2003 Al Gurg Consultants / 2002- 402 Villas – Meadows - Phase II Emirates Hills – Dubai Dubai Civil Engineering 2003 2002- 565 Villas – Meadows - Phase III Jebel Ali – Dubai Arabtec 2003 2002- 245 Villas – Meadows - Phase 4a Jebel Ali – Dubai Arabtec 2003 2002- 336 Zulal Villas Jebel Ali – Dubai Arabtec 2003 Dar Al Handasah / 2001- Burjuman Center Expansion Dubai Skanska – Ascon 2002 Khatib & Alami / Al 2001- Main Pumping Station ‘K’ Phase1 Dubai Ghandi CCC 2002 Commercial Bank Of Dubai HQ Dubai Norr Group / Ascon 2001 Sewerage & Treatment Plant Parsons Engineering 1999- Al Aweer - Dubai (DS 100) Science / Al Ghandi CCC 2000 Dubai Ring Road (R 677) Dubai Italconsult 1999

PAGE | 111 CP/UAE/2013

Project Location Client Year Italconsult / Al Ghandi 1998- Roads In Al Goze (R 512) Dubai CCC 1999 Cansult / Arabian Const Etisalat Office Building Sharjah 1997 & Milne Nicolls Higher Colleges Of Technology Al Qusais - Dubai Dar Al Handasah 1997 1996- Faculty Of Civil Engineering AUS - Sharjah Bin Ladin Group 1997 Trade Centre Roundabout Italconsult / Al Ghandi Dubai 1996 Interchange CCC

PAGE | 112 CP/UAE/2013

PILE TESTING

LIST OF ACTIVITIES:  High Strain (PDA) Test for Cast In-Situ and Driven Piles  Cross Hole Sonic Logging Analyzer (CHA)  Mechanical Caliper Logging (MCL)  Low Strain (PIT) Test for Cast In-Situ Concrete Piles  Pile Instrumentation  Supervision oF Static Load Test (SLT)

SOFTWARES:  CAPWAP  PITWAP  GRLWEAP

PAGE | 113 CP/UAE/2013

DEPARTMENT CHART – PILE TESTING

TECHNICAL MANAGER

PILING DEPARTMENT SECTION HEAD

TECHNICIANS

ASSISTANT TECHNICIANS

PAGE | 114 CP/UAE/2013

MACHINERY & EQUIPMENT - (PILE TESTING) PILE DYNAMIC TESTING (PDA)

PAGE | 115 CP/UAE/2013

CROSS-HOLE SONIC LOGGING (CSL)

PAGE | 116 CP/UAE/2013

MECHANICAL CALIPER LOGGING (MCL)

PAGE | 117 CP/UAE/2013

PILE INTEGRITY TESTING (PIT)

v STATIC LOAD TESTS

PAGE | 118 CP/UAE/2013

PILE INSTRUMENTATION

PAGE | 119 CP/UAE/2013

LIST OF SOME MAJOR PROJECTS

Project Location Client Year

QATAR Qatar Foundation HQ and SSC Qatar MIDMAC / Bauer Qatar 2011 Building Musheirb Downtown – Phase 1A Musheirb - Qatar Bauer Qatar 2009

UNITED ARAB EMIRATES Dubai Int’l Airport Expansion Ax-465 Dubai Zetas 2012 Foundation Works Terminal-2 Islamic Center Administration Building Sharjah Delta Foundation 2012

Mosque Of Islamic Center Sharjah Bin Ladin Group 2012

Furnace & Hot End Building Ras Al Khaimah M.E.F.G 2012

Batching Plant And Silo Building Ras Al Khaimah M.E.F.G 2012

Sharjah Expo Center Extension Sharjah Al Marwan 2012

Burj Side View Tower Dubai National Piling 2012

15 Migd Swro Desalination Plant Ras Al Khaimah Al Marwan 2012

108 Naval Base Jabel Ali Dubai Bin Ladin 2012 Prop. G+50typ (Including 5 Per. Off. & Sharjah Al Qabtah 2012 H.C) Tower Lillian Tower Dubai Zetas 2012

Pearl Jumeirah Package-2 Dubai Bin Ladin 2012

Islamic Center Theater Sharjah Bin Ladin 2012 Osaimi Apartment Building & Beach Palm Jumeirah, Dubai APCC 2012 Resort Jewel Of The Creek Development Dubai APCC 2012

Unipole Signboard For “Park N Shop” Dubai Emirates Neon 2012 Supply, Installation Test & Commissioning Of 400kv Overhead Line Dubai Gulf Jyoty 2012 & Associated Work Sedar City-Fontana Project Ph-1a Sharjah Delta 2012 Micro Piling Works For Extension Of Dubai Bin Ladin 2012 Mosque Al Hillal Bank Tower Abu Dhabi Al Ghurair Foundation 2012 Al Ain Stadium & Mixed Use Al Ain Al Ghurair Foundation 2012 Development Masdar (Mist 1b) Abu Dhabi Zetas 2012

Shuwaihat S3 Ipp Abu Dhabi Terrasearch Gulf 2012

Dewa Office Building Dubai Zetas 2011

Damac Height Dubai Zetas 2011

Aks New Conveyor Jabel Ali Port, Dubai Geomar Gulf 2011

West Avenue Tower Dubai TMF Euro Foundation 2011

PAGE | 120 CP/UAE/2013

Project Location Client Year

Emirate Flight Catering Extension Bldg Dubai Airport, Dubai Zetas 2011

Petrofac Office Tower-Ii Sharjah Dutch Foundation 2011

Fair View Residency Dubai M.E.F.G 2011

Al Habtoor Island Resort & Spa Palm Jumeirah, Dubai Zetas 2011 G.H.Q Uae Armed Force H.Q Of Military Sharjah Delta Foundation 2011 Works United Steel Rebar & Wire Rod Rolling Fujairah Stromek Emirates 2011 Mill Factory Al Aryam Villah Abu Dhabi Stromek Emirates 2011

Construction Of Sheeds Abu Dhabi Stromek Emirates 2011

Water Tank Al Ain Zetas 2011

Adnic 2 Building Abu Dhabi Zetas 2011

Al Rayyana Abu Dhabi Bauer International 2011

New York University Abu Dhabi Orascom 2011

Presidential Palace Abu Dhabi Bauer International 2011

Etisalat Tower Dubai, Sharjah, Abu Dhabi Terrasearch Gulf 2010

White Bay Development Umm Al Quwain M&B Foundation 2010 Prop. (1b+Gf+5 Podium+43 Floors) Dubai Stromek Emirates 2010 Tower Prop. (2b+G+20 Floors) Hotel & Office Dubai Dutch Foundation 2010 Building Al Salam Hotel Sharjah Stromek Emirates 2010

Burjside Boulevard Tower Dubai Stromek Emirates 2010

Car Show Room & Workshop Complex Dubai Stromek Emirates 2010

Zulekah Hospital Sharjah Universal Piling 2010

Sea View Club Hotel & Apartment Dubai Zetas 2010

Mamzar Mosque Sharjah Delta Foundation 2010

Ritz Carlton Hotel Dubai Zetas 2010

Jubail Market Sharjah Dutco Foundation 2010

The Golf Gardens-Ii Abu Dhabi Bauer International 2010

Arzanah Medical Complex Abu Dhabi Ellisdon 2010

Housing Villa Compound Abu Dhabi Bauer International 2010 Border Post Highway New Ruwais Abu Dhabi Anderson Piling 2010 Bypass Road Adic Development Abu Dhabi Arabian Foundation 2010

Shekh Zayed Bridge Abu Dhabi Archirodon 2010 Improvement Of Shkh. Maktoum Bin Ajman Arabia Deira Foundation 2009 Rashid Road J-2 Junction Al Bateen Hotel & Residence Marina, Dubai M.E.F.G 2009

Al Rayyan Complex Sharjah Zetas 2009

PAGE | 121 CP/UAE/2013

Project Location Client Year

Dm Dubai Sports Complex Dubai Zetas 2009

Sahala Tower Marina, Dubai M.E.F.G 2009

Dubai University Hospital Dubai Zetas 2009

Dubai Trade Centre District 3 Star Hotel Dubai M.E.F.G 2009

DIP Head Quarter Dubai Stromek Emirates 2009

Arj Tower Marina, Dubai Arabian Foundation 2009

Al Attar Tower Dubai M.E.F.G 2009

Marina Wharf Tower-2 Marina, Dubai Zetas 2009

Mamzar Twin Tower Dubai Zetas 2009

Porto Dubai Dubai Zetas 2009

Celestial Heights Dubai APCC 2009 Nation Tower Dubai Nepw 2009 Eden Blue Tower Dubai Sharaf Foundation 2009 Pedestrain Bridge-2 Dubai Keller 2009 Nilona Tower Dubai Nepw 2009 Prime Tower Dubai Zetas 2009 Emerald Palace Dubai Arabian Foundation 2009 Geant Shopping Mall Sharjah Zetas 2009 Dubai Zetas 2009 Platinum Tower Dubai Pilex 2009

Oxford Tower Dubai M.E.F.G 2009

4-Mixed Use Towers Dubai Compact Foundation 2009

Grosvenor House Dubai M.E.F.G 2009

Meydan Led Dubai Sharaf Foundation 2009

Duja Tower Dubai Zetas 2009

Nillona Tower Dubai Nepw 2009

Hydra Tower Dubai M.E.F.G 2009

The Matrix Tower Dubai Compact Foundation 2009

Burj Al Alam Dubai M.E.F.G 2009

First Gulf Bank Dubai Cosmos Piling 2009

Masdar Head Quarter Abu Dhbai Arabian Foundation 2009

Residential Complex Al Ain Zetas 2009

The Golf Garden-Ii Abu Dhabi Bauer International 2009

Baniyas Car Parking Abu Dhabi Bauer International 2009

2y Residential Tower Dubai M.E.F.G 2008

PAGE | 122 CP/UAE/2013

Project Location Client Year

Al Ghurair City Expansion Dubai M.E.F.G 2008

Trump Hotel & Tower Dubai Arabian Foundation 2008

Al Bateen Hotel & Res. Dubai M.E.F.G 2008

Al Rayyan Complex Sharjah Zetas 2008

Porto Dubai Dubai Zetas 2008

Channel Tower Dubai Arabian Foundation 2008

Dm Dubai Sports Complex Dubai Zetas 2008

Bristol Towers Dubai M.E.F.G 2008

Eden Blue Tower Dubai Sharaf Foundation 2008

Lam Tara Tower Dubai Dutch Foundation 2008

Nation Towers Abu Dhabi Bauer 2008

Capital Centre Hotel Project Abu Dhabi Bauer 2008

Tameer Towers Abu Dhabi Arabian Foundation 2008

Princess Tower Dubai Zetas 2007

Churchill Tower Dubai Edrafor 2007

Sidra Tower Dubai Zetas 2007

Marsa Tower Dubai Zetas 2007

Fairmont Hotel & Residence Dubai Arabian Forasol 2007

(2B+G+30) Bldg Tecom - Dubai S.S. Lootah 2007

Ocean Heights Marsa - Dubai A.P.C.C. 2007

Gateway Tower Dubai N.S.C.C. 2007

Emirates Park Tower Hotel Dubai M.E.F.G. 2007

Emerald Palace Hotel Palm Jumeirah - Dubai Arabian Forasol 2007

Dubai International Airport (Ax 123) Dubai International Airport Bauer 2007

West Wharf Tower Dubai Edrafor 2007

Al Durrah Tower Dubai N.S.C.C. 2007

Wind Tower I & II Dubai Ewfi 2007 Atlantis Management Staff Dubai M.E.F.G 2007 Accommodation Shahla Tower Marsa - Dubai M.E.F.G. 2007

Damac Park Tower Dubai A.P.C.C. 2007

Dunes Village Dubai Investment Park - Dubai Swissboring 2007

Nad Al Sheba Race Course Dubai N.S.C.C. 2007

Marina Wharf Tower 1 Dubai Zetas 2007

Building Of Daman DIFC - Dubai Oger Dubai 2007

Canal Point Development Dubai M.E.F.G. 2007

PAGE | 123 CP/UAE/2013

Project Location Client Year

Al Eissa Tower Al Majaz - Sharjah Al Marwan Gen. Contracting 2007

(B+G+M+6p+30 Typ) Residential Tower Al Nahda - Sharjah TMF Euro 2007

Al Ghurair City Expansion Dubai M.E.F.G. 2007

D.04 Towe. Emirates City - Ajman Piling Tech 2007 American Hospital Dubai Inpatient Bed Oud Metha - Dubai Zetas 2007 Expansion The Pearl Development Dubai Zetas 2006

Dfc Hillside Housing Tower DFC - Dubai Swissboring 2006

Hamriyah Power Station Phase I Ajman Mass Foundation 2006

Yaqoub Tower Dubai Zetas 2006

Dam Tower Trade Cntr. – Dubai Zetas 2006

I.T. Office Development Dubai N.S.C.C. 2006

Dubai Marina Mall Dubai M.E.F.G 2006

Danat Al Khan Tower Sharjah M.E.F.G 2006

City Of Arabia Dubai M.E.F.G 2006

Tiffany Tower Dubai N.S.C.C. 2006

Implementation Of Interchange # 5 Dubai M.E.F.G 2006

Marina Pinnacle Tower Marsa – Dubai Tiger 2006

Dubai International Airport Dubai Bauer / Swissboring 2005

Burj Dubai Dubai M.E.F.G 2005

Twin Tower Dubai Bauer 2005

Concord Tower Dubai N.S.C.C. 2005

Salam Tower Dubai W.S. ATKINS 2005

Cargo Village Dubai Swissboring 2005

Burj Dubai Dubai M.E.F.G / Bauer / Hyder 2004 Khatib & Alami / Acc / Rose Rotana Tower Shk. Zayed Road - Dubai 2004 Zetas Barsha - Dubai Bauer 2004 Earthwork & Pilling Works Ax056 Dubai Bauer / Swissboring / 2003- Dubai International Airport International Airport Expansion M.E.F.G 2004 Dubai International Airport Expansion Dubai International Airport Dar Al Handasah / Bauer 2003

60 Storey Tower Dubai Marina Al Naboodah / Swissboring 2003

Dubai Marina Tower Dubai Marina Arabtec / Bauer 2003

Madinat Jumairah Dubai Swissboring / Africon 2003

Dubai Marina Dubai S.P.T. 2003

(G+10) Building Abu Shagara – Sharjah Stromek / Bin Dalmouk 2002 Swissboring / Dutch Al Halyiah Low Cost Houses Abu Dhabi 2002 Foundation

PAGE | 124 CP/UAE/2013

Project Location Client Year 2001- Conference Palace Abu Dhabi Bauer / Keo International 2002 Expo Center Sharjah Swissboring / Cansult 2001

Up Tower (Parking Bldg.) Sheik Zayed Road Dallas Foundation 2001

Waste Power Station Sharjah S.S. Lootah / Stromek 2000 Halcrow Int’l / Dutco 1999- Coast Guard Maintenance Base Dubai (Offshore) Balfour Beatty 2000 Bechtel / Dutco Balfour North Extension Dubai International Airport 1999 Beatty Dubai, Abu Dhabi, Al Ain , Arif & Bin Toak / Bauer 1998- Etisalat Monopoles Sharjah Int’l 2000 Mott Macdonald / Ballast Van Ommeren Tanks Terminal Fujairah Port (Offshore) 1998 Nedam Taweelah ‘B’ Extension Abu Dhabi Bechtel Int’l / Al Jaber Cont 1998 Tractebel Al Khaleej Hill Sheikh Zayed Grand Mosque Abu Dhabi International / Impregilo 1997 Rizzani Khatib & Alami / Al (G+M+18) Building Dubai 1996 Naboodah Cont (G+M+29) Ghaya Tower Dubai Arenco / Al Naboodah Cont 1996

Oil Storage Tanks Sharjah Rigid Construction 1996 Orion Eng’g / Intermass- Sugar Refinery Jebel Ali 1995 Liwan Snc. Lavallin / Arabian Ajman General Hospital Ajman 1995 Construction Giffin Tower Abu Dhabi Khatib & Alami / Group 3 1995

Forte Grand Hotel Jebel Ali Arenco / ANC 1994

400 Kv Cables Dubai Kennedy & Donkin 1994

HQ Of Dubai Chamber Of Commerce Dubai Nscc / Al Futtaim Wimpey 1994 P.W.D / Al Nasr Cont / Low Cost Houses Mirfa – Abu Dhabi 1993 Civilco 1992- Holiday Center Dubai Casia – Conser / Al Habtoor 1993 WORLD WIDE

Asry Basin Quay Wall Keller Bahrain 2010 Water Front Development – Us Keller Bahrain 2010 Navy Future Bank H.Q Keller Bahrain 2009

Biw Business Park Keller Bahrain 2009

Raniya Row-Amwaj Island Bahrain Keller 2009

Dev. Of Arad Bay Protectorate Bahrain Keller 2009

Al Salam Resort (Bahrain) Bahrain Keller 2008

Mubarak Center Pakistan Bauer 2008

Ncb Chemical Berth Yanbu Port - Saudi Arabia Sabtank / Ballast Nedam 1999

PAGE | 125 CP/UAE/2013

ASSESSMENT, MONITORING & TESTING OF CONCRETE STRUCTURES

LIST OF ACTIVITIES:  Conditional Survey of Existing Structures (Photographic & Video Recording)  Structural Monitoring, but not limited to:- o Crack Monitoring o Tilt Monitoring o Settlement Monitoring o Column Shortening using Tape Extensometer o Vibration & Noise Monitoring o Temperature Monitoring  Destructive Tests o Slab Load Test o Near to surface tests (Pull-off / Pull-out) o Concrete Coring o Drop Hammer Test o Carbonation Test  Non-Destructive Tests o Localization of reinforcement steel bars inside concrete using HILTI Ferroscan PS200 o Measurement of Ultrasonic pulse velocity inside concrete o Surface Hardness Testing by Rebound Hammer  Ground Instrumentation o Inclinometers o Settlement Monitoring SOFTWARE:  HILTI - FerroScan  Blastware (Vibration Monitoring)  Data Taker

PAGE | 126 CP/UAE/2013

DEPARTMENT CHART – ASSESSMENT, MONITORING & TESTING OF CONCRETE STRUCTURES

TECHNICAL MANAGER

HEAD OF ASSESSMENT, MONITORING & TESTING OF CONCRETE STRUCTURES DEPARTMENT

TECHNICIANS

ASSISTANT TECHNICIANS

HELPERS

PAGE | 127 CP/UAE/2013

MACHINERY & EQUIPMENT - (ASSESSMENT, MONITORING & TESTING OF CONCRETE STRUCTURES) PULL OFF TEST

STRUCTURAL MONITORING

PAGE | 128 CP/UAE/2013

FERRO SCAN / COVER METER

PAGE | 129 CP/UAE/2013

CRACK MEASURMENTS

PAGE | 130 CP/UAE/2013

CORING

PULL OUT TEST

PAGE | 131 CP/UAE/2013

LIST OF SOME MAJOR PROJECTS

Project Location Client Year

QATAR

Musheirb Downtown – Phase 1A Musheirb - Qatar CAT Qatar 2012

Musheirb Downtown – Phase 1B Musheirb - Qatar Carillion 2012

Musheirb Downtown – Phase 2 Musheirb - Qatar Bauer Qatar 2012 Qatar Foundation HQ and SSC Qatar MIDMAC / Bauer Qatar 2011 Building Musheirb Downtown – Phase 1B Musheirb - Qatar Bauer Qatar 2010

Musheirb Downtown – Phase 1A Musheirb - Qatar HBK / HYUNDAI 2010

Musheirb Downtown – Phase 1A Musheirb - Qatar Bauer Qatar 2009

UNITED ARAB EMIRATES

Suburbia-1(D010) Jebel Ali - Dubai Shapoorji Pallanji Midest 2012

Nad Al Sheba Masjid Nad Al Sheba 4 - Dubai AMBB 2012

Oberoi Center Business Bay - Dubai Al Naboodah Cont. 2012

Jumeirah Village III Jumeirah Village - Dubai Arabtec Cons 2012

Residential & Commercial Building Karama - Dubai Pioneers Of Experts 2012

PPM Conrad Hotel Sheik Zayed Rd - Dubai Arabtec-DCC JV 2012

Signature Homes & Canal Cove Town Palm Jumeirah - Dubai Ascot Cont. 2012

Office Tower Business Bay - Dubai CRC 2012

Bright Point Hospital Abu Dhabi Golden Frond 2012

Hotel & Office Bldg Port Rashid - Dubai Al Habbai Cont. 2012

Hotel & Office Bldg Port Rashid - Dubai Al Habbai Cont. 2012

Sharjah Mall Expansion Al Nahdah - Sharjah S.P.M.E Middle East Cont. 2012

Al Habtor Grand Resort Palm Jumeirah - Dubai Al Shafar General Contracting 2012

Soundstages Complex Dubai Studio City - Dubai Amana Steel Bldg. Cont. 2012

Labour Accommodation DIP - Dubai Al Shafar Civil Eng. 2012

The Matrix Tower DSC - Dubai UNEC 2012

Mushrif Substation Mirdif - Dubai Lootah Bldg. & Cons. 2012

Existing Gate Village DIFC - Dubai Trend Electromechanical 2012

Hotel & Office Bldg Port Rashid - Dubai Al Habbai Cont. 2012

Existing Choueifat School Abu Dhabi Choueifat School 2012

Existing Factory Um Ramool - Dubai Projects & Supplies Industries 2012

Sharjah Mall Expansion Al Nahdah - Sharjah S.P.M.E Middle East Cont. 2012

Existing Gate Village DIFC - Dubai AMBB Interiors 2012

Existing Gate Village DIFC - Dubai Innov8 Group 2012

PAGE | 132 CP/UAE/2013

Project Location Client Year

Executive Bay Twin Towers Business Bay - Dubai Sun Eng 2012

Small Industrial Unit Al Merkaz - Abu Dhabi System Cons. 2012 S.P.M.E. Middle Est. Gen. Sharjah Mall Al Nahda - Sharjah 2012 Cont. Hotel & Office Bldg Port Rashid - Dubai Al Habbai Cont. 2012

Dubai Police Head Quarters Complex Al Awir - Dubai City Eng. 2012

Residential Bldg Al Karama - Dubai Prisma 2012

Residential Villa Emirates Hills - Dubai Bhatia General Cont. 2012

Residential Bldg Liwan - Dubai Al Hazza Cont. 2012

KKR Mena Limited Office DIFC - Dubai Al Tayer Stocks 2012

Hull Int. Business School Al Soufoh - Dubai Al Reyami 2012

Administration Block JAFZA - Dubai Suhaib Cont. 2012

DRC Green Field Factory DIP - Dubai System Cons. 2012

Palm Tree Court & Spa Exp. Works Jebel Ali - Dubai Dutco Balfour Beatty 2012

Sharjah Expo Expansion Al Khan - Sharjah AMBB 2012

Marina Hotel Marsa - Dubai Kavari General Cont. 2012

Jubail Market Sharjah - Sharjah Dubai Plaster 2012 Saint Gobin Gyproc Middle Warehouse/Factory/Office Block JAFZA - Dubai 2012 East Wheel’s Restaurant DIFC - Dubai Arco Turkey Solution Cont. 2012

North side Tower Dubai Land - Dubai Darwish Eng. 2012

Car Parking Modification Dubai Mall - Dubai Dutco Balfour Beatty 2012

MW-OU-193 Sharjah - Sharjah CRC 2012

EMAL Al Tawila - Abu Dhabi Sisco Cont 2012

The Address Hotel Dubai Mall - Dubai Khansaheb Civil Eng 2012

Water Drainage Works DIFC - Dubai Spectrum Dubai 2012

IRIS Tower Cultural Village - Dubai ANC Cont. 2012 Al Ahmadiah Cont. & Car Parking Modification Dubai Mall - Dubai 2012 Trading Building C67 Al Khalidyah - Abu Dhabi Emirates Land Group 2012

Building Al Khan - Sharjah Al Qabdha Bldg. Cont. 2012

Sky Dive Center Marghem - Dubai Profiles Rhc 2012

Sajja Fuel Field Compression Sajjaa - Sharjah Safe Mix 2012

KG & Primary School Madinat Zayed - Abu Dhabi System Cons. 2012

Sky Scraper Tower Business Bay - Dubai The Arab Cont. 2012

Tower No. 2 JLT - Dubai Golden Frond 2012

Tim Horton’s Etisalat - Abu Dhabi Division Nine Interior Design 2012

Bridge Marina - Dubai Mediterranean Bldg. Material 2012

PAGE | 133 CP/UAE/2013

Project Location Client Year

EMAL Al Tawila - Abu Dhabi Bauer International 2012

Building DSO - Dubai City Eng. 2012

Sushi Shop DIFC - Dubai Division Nine Interior Design 2012

Warehouse Al Qusais Industrial - Dubai Luxurious Cont. 2012

Dragon Mart Expansion International City - Dubai UNEC 2012

Office & Residential Building Al Barsha 1st - Dubai Belhasa 2012

Concourse Up To Arrivals Level Dubai Al Naboodah Cont. 2011

Elite Residence Dubai Marina - Dubai Arabian Cons. 2011

Hotel & Office Bldg. Port Rashid - Dubai Al Habbai Cont. 2011

Dubai Police Headquarters Complex Al Awir - Dubai City Diamond Cont. 2011

68 Villas Sienna Lakes Jumeirah Golf Estate - Dubai Al Naboodah Cont. 2011 Construction, Completion And Um Suquim - Dubai Amana Steel Bldg 2011 Maintenance Of National Housing - Phase II - 1240 Nos. Al Barsha South - Dubai Arabtec 2011 Villas Villa Al Barsha 3rd - Dubai Al Muthanna Cont. 2011

Burj Residential Towers Burj Dubai - Dubai Arabian Cons. 2011

Building Al Barsha - Dubai Hadeel Bldg Cont. 2011

Residential Building Al Nahda - Dubai Gulf Spring Cont. 2011

Oberoi Center Business Bay - Dubai Al Naboodah Cont. 2011

Commercial & Residential Building Al Maraqabat - Dubai Zahrat Al Safa Cont. 2011

Burj Side Boulevard Tower Burj Dubai - Dubai Sun Eng. 2011 Mezayed-B/1.225 Student(Girls) - Cycle Mezayed - Abu Dhabi System Construct 2011 2&3 Sharjah Mall Al Khan - Sharjah Darwish Eng 2011

Residential Building Jumeirah Village - Dubai Condor Building Cont. 2011

172 Villas Abuhail - Dubai Al Hudaiba Cont. 2011

Pentominium Tower Marina - Dubai Arabian Cons. 2011

Residential Building Jumeirah Village - Dubai Condor Building Cont. 2011

Roberto's Restaurant DIFC - Dubai Drawlink Interior 2011

Nilona Tower DHCC - Dubai Alrestomani / Wimpey Lab 2011

Cold Store & Office Bldg Ras Alkhoor - Dubai Profiles Rhc 2011

Fujairah Complex Fujairah Commodore Cont. 2011

Silverene Towers - Tower B Marina - Dubai Arabtec Constructions 2010

The Princess Tower Marina - Dubai Arabian Constructions 2010 Existing International American Sharjah Al Ramaqiah - Sharjah Al Qabdha Building Cont 2010 School Extension Male/Female Toilets Sharjah Airport - Sharjah Gustav Pegel 2010

Pentominium Tower Marina - Dubai Arabian Constructions 2010

PAGE | 134 CP/UAE/2013

Project Location Client Year

Concourse Up To Arrivals Level Dubai Airport - Dubai Al Naboodah Cont. 2010

Car Park Bldg Port Rashid - Dubai System Construct 2010

Burj Residential Towers Burj Dubai Area - Dubai Arabian Constructions 2010

Raw Sugar High Rise Silos JAFZA - Dubai Q. Mix 2010

National Housing-Phase-1, 252 Villas Al Barsha South 1st - Dubai Arabtec Constructions 2010

Prime Residential 1 Al Warsan - Dubai Alpha Lab 2010

132KV Power Substation Falcon City - Dubai Eta Star 2010

Duplex Palm Tower 1 Al Khan - Sharjah Ss Lootah 2010

Tower Al Nahda - Sharjah Taif Alemarat Bldg. Cont 2010

Silos For Al Khaleej Sugar JAFZA - Dubai Ascon 2010

Canada Business Center Business Bay - Dubai Al Ajmi Eng. 2010

Oberoi Center Business Bay - Dubai Al Naboodah Cont. 2010

Tower Al Nahda - Sharjah Taif Alemarat Bldg. Cont 2010

Elite Residence Marina - Dubai Arabian Constructions 2010

Tower Marina - Dubai Darwish Eng. 2010

Tower Al Nahda - Sharjah Taif Alemarat Bldg. Cont 2010

Residential & Commercial Bldg Al Barsha South 3rd - Dubai Al Jassmy Cont. 2010

Building Al Nahda1 - Dubai Al Kauther Cont. 2010

Villa Al Sofouh - Dubai Al Tahran Décor 2010

Guggenheim Museum Al Saadiyat - Abu Dhabi Bauer Int. 2010

Block Factory Dubai Ind. City - Dubai New Valley Bldg. Cont. 2010

38 Villas Al Barashi - Sharjah Intermass Eng & Cont. 2010

PPM Conrad Hotel Sh. Zayed Rd - Dubai Arabtec-DCC JV 2010

The Matrix Tower DSC - Dubai UNEC 2010

Villa Al Rahmaniyah 8 - Sharjah Nibras Al Khleej Cont. 2010

Sharjah Mall Al Kahn - Sharjah Darwish Eng. 2010

68 Villas- Sienna Lake2 Jumeirah Golf - Dubai Al Naboodah Cont. 2010

DEC Business Tower Business Bay - Dubai Al Nekhreh Cont. 2010

Villa Al Khawaneej - Dubai Parkway Int. Cont. 2010

Dubai Police Headquarters Al Awir - Dubai City Engineering Cont 2010

Kinder Garden Primary School Sas Al Nakhl - Abu Dhabi System Construct 2010

Mixed Use Development " " Block Trade Center 1st - Dubai Dubai Contracting 2010

Construction Of 2 Filling Stations Abu Dhabi System Construct 2010

Office And Hotel Building Al Corniche - Sharjah Al Qabdha Building Cont 2010 Ajman Corniche Residence (B+G+54) 7 Corniche - Ajman Power Line Gulf Cons. 2009 Towers (Acr 3000)

PAGE | 135 CP/UAE/2013

Project Location Client Year

Silverene Towers-Tower B Marina - Dubai Arabtec Constructions 2009

Arj Tower Marina - Dubai MESC 2009

Bilhab Tower Business Bay - Dubai ANC 2009

Concourse Up To Arrivals Level Dubai Airport - Dubai Al Naboodah Cont. 2009

Al Waha Residence Al Khan - Sharjah Sun Eng. 2009

Dubai Sports Complex Dubai By Pass Road - Dubai Zetas 2009

EMICOOL Plant 6 DIP - Dubai ADC 2009

Churchill Towers Business Bay - Dubai Oger Dubai 2009

Danat Al Khan Al Khan - Sharjah Darwish Engineering 2009

Jewelry Manufacturing Complex Emirates Hills - Dubai Future Cont. 2009

1,047 Villas DSO - Dubai Arabtec Constructions 2009

Moweilah Mosque Extension Opp. Of Shj Airport - Sharjah Amana Steel Bldg. Cont. 2009

Commercial & Official Building DMC - Dubai Ascon 2009

Town House -136 Villas (Sys 5666) Jumeirah Village - Dubai System Cons. 2009

DIP -EMICOOL Plant 3 DIP - Dubai ADC 2009

Sulafa Tower Marina - Dubai TAV Cons 2009

Soundstages Complex Dubai Studio City - Dubai Amana Steel Bldg. Cont. 2009

District Cooling Business Bay - Dubai Gulf District Cooling 2009

Al Barari Development-Villas D.L - Dubai Al Naboodah Cont. 2009

Oberoi Centre Business Bay - Dubai Al Naboodah Cont. 2009

Elite Residence Marina - Dubai Arabian Constructions 2009

Concraft J. Ali Ind.2 - Dubai Al Omran Gulf Cont. 2009

43 Villas - Olive Point JGE - Dubai Al Naboodah Cont. 2009

136 Nos. Town Houses (Sys 5666) Jumeirah Village - Dubai System Cons. 2009

National Housing Project (1209) Al Barsha South 1 - Dubai Arabtec Constructions 2009

The Prime Tower Business Bay - Dubai Kcpc Cons. 2009

Green Lake Tower Emirates City - Ajman Al Sundus Bldg. Cont. 2009

PPM Conrad Hotel Sh. Zayed Rd - Dubai Arabtec DCC JV 2009

The Bridge Tower Dubai Sports City - Dubai China Railway 2009

Canal Residence Dubai Sports City - Dubai UNEC 2009

Yaqoub Tower Sh. Zayed Rd - Dubai Arabian Constructions 2009

DIFC Lighthouse Tower Sh. Zayed Rd - Dubai Zetas 2009

R496 Baniyas Offices Baniyas Square - Dubai W.S.ATKINS 2009

Mirdif City Center Mirdif - Dubai Tiger Steel 2009

Air Arabia Centro Hotel Sharjah Airport - Sharjah Gustav Pegel Cont 2009

PAGE | 136 CP/UAE/2013

Project Location Client Year

Emirates Islamic Bank JAFZA - Dubai Amana Steel Bldg. Cont. 2009

Factory And Office Buildings Jabel Ali Ind. - Dubai System Cons. 2009

Schon Business Park DIP - Dubai UNEC 2009

The Princess Tower Marina - Dubai Arabian Constructions 2009

The Spirit Tower DSC - Dubai UNEC 2009

Mina Al Arab, Precinct 5 Mina Al Arab - RAK Ali Const. & Dev'l Co L.L.C 2009

Marina 101 Marina - Dubai TAV 2009

The Buildings By Daman DIFC - Dubai Oger Dubai 2009

Residential Bldg Liwan - Dubai Al Jassmy Cont. 2009

Al Swaidi Food DIP - Dubai Ali &Sons Cont. 2009

Indoor Sports Facility - Audi Project Sh. Zayed Rd - Dubai Acico Cons. 2009

Al Mamzar Towers Al Khan - Sharjah Darwish Engineering 2009

Pentominium Tower Marina - Dubai Arabian Constructions 2009

Champion Tower DSC - Dubai Al Jassmy Cont. 2009 Rehabilitation Work In American Shj University - Sharjah Future Technology Cont. 2009 University 132 KV Pyramid Substation Falcon City - Dubai Emirates Trade Agency 2009

Hydra Tower Business Bay - Dubai Kele Cont. 2009

Softie Tower Karachi - Pakistan AAA Projects 2009

The Light Tower Arjan - Dubai Land - Dubai Al Jassmy Cont. 2009

Reef Tower Jumeirah Lake Towers Emirates Belbadi Cont. 2008

Prism Tower Business Bay Commodore Contracting 2008

Daman Tower DIFC Oger Dubai 2008

Fortune Executive Tower Jumeirah Lake Towers Ijm Co. 2008

Prestigious Residential Tower (V3 Tower) Jumeirah Lake Towers Arabian Construction 2008

Ocean Heights - 1 Dubai Marina Arabtec 2008

Yaquob Tower Sheik Zayed Road Arabian Construction 2008

Burj Dubai Lake Tower Burj Dubai Development Besix- Arabtec JV 2008

Sulafa Tower Dubai Marina TAV Construction 2008

Al Waha Resident Tower Al Khan – Sharjah Sun Engineering 2008

Emirates Financial Towers DIFC TAV Construction 2008 Convention Center, Food Court, Office JAFZA Al Habtoor Engineering 2008 Complex & Hotel Concourse Up To Arrivals Level Dubai Airport Al Naboodah Contracting 2008

Churchill Towers Business Bay Oger Dubai 2008

I-Rise Office Tower Tecom - Dubai Al Naboodah Contracting 2008

Tiffany Tower Jumeirah Lake Towers Al Rostamani Pegel 2008

PAGE | 137 CP/UAE/2013

Project Location Client Year

Silverene Towers Dubai Marina Arabtec 2008

Al Mamzar Tower Al Mamzar – Sharjah Darwish Engineering 2008

Arbift Tower Dubai Marina Engineering Construction 2008

Emirates Tower Ajman Dewan Development 2008

Trump International Hotel & Tower Palm Jumeirah Arabian Foundations 2008

Elite Residence Marsa - Dubai Arabian Construction 2008

PAGE | 138 CP/UAE/2013

CERTIFICATES & LICENSES

PAGE | 139 CP/UAE/2013

ABU DHABI

PAGE | 140

PAGE | 141 CP/UAE/2013

PAGE | 142 CP/UAE/2013

DUBAI

PAGE | 143 CP/UAE/2013

PAGE | 144 CP/UAE/2013

ACCREDITATION CERTIFICATES

PAGE | 145 CP/UAE/2013

PAGE | 146 CP/UAE/2013

PAGE | 147 CP/UAE/2013

PAGE | 148 CP/UAE/2013

SHARJAH

PAGE | 149 CP/UAE/2013

PAGE | 150 CP/UAE/2013

QATAR

PAGE | 151 CP/UAE/2013

PAGE | 152 CP/UAE/2013

AL AIN MUNCIPALITY

PAGE | 153 CP/UAE/2013

MINISTRY OF PUBLIC WORKS CERTIFICATES

PAGE | 154 CP/UAE/2013