P303 M Construction, Rehabilitation, And/Or Expansion of Seven (7) Airports

Total Page:16

File Type:pdf, Size:1020Kb

P303 M Construction, Rehabilitation, And/Or Expansion of Seven (7) Airports Ligtas, Maaasahan at Abot Kaya! DOTC P303 M Construction, Rehabilitation, and/or Expansion of Seven (7) Airports INVITATION TO BID The DOTC is improving and expanding the passsenger and airport trac handling capacity of 7 provincial airports in order to support growth in tour- ism and business activity in the country. These projects further ensure Convenient, Aordable, Reliable, Ecient, and Safe transport. The DOTC is inviting prospective bidders to be part of this initiative by joining the open and transparent bidding process for the CONSTRUCTION, REHABILITATION, AND/OR EXPANSION OF 7 AIRPORTS IN THE PHILIPPINES, namely: 1 2 Butuan Airport Development Project Cotabato Airport Development Project The Butuan Airport in Agusan del Sur province serves about 385,000 passengers annually (2011). This P45.5-million The Cotabato City Airport (Barangay Awang) in Maguindano province serves about 186,000 passengers annually project entails: expansion of apron (5,000 sq.m.), improvement and expansion of vehicle parking area (6,200 sq.m.), (2011). This P58.1-million project entails: widening of taxiway (3,263 sq.m.) and runway (7,700 sq.m.) as well as the construction of concrete hollow block fence (2,730 l.m.), and construction of drainage system (420 l.m.). construction of a new perimeter fence (2,190 l.m.). Cost of Bid Documents : Php P50,000.00 Cost of Bid Documents : Php P50,000.00 Issuance of Bid Documents : 13 June 2012 - 05 July 2012 Issuance of Bid Documents : 13 June 2012 - 05 July 2012 Date and Time of Date and Time of Pre Bid Conference : 22 June 2012, 2:00 PM Pre Bid Conference : 22 June 2012, 9:00 AM Date and Time of Deadline of Date and Time of Deadline of Submission and Opening of Bids : 05 July 2012, 3:00 PM Submission and Opening of Bids : 05 July 2012, 10:00 AM Approved Budget for the Contract : Php P45,537,827.31 Approved Budget for the Contract : Php P58,181,406.64 3 4 Dipolog Airport Development Project Pagadian Airport Development Project The Dipolog Airport in Zamboanga del Norte province serves about 166,000 passengers annually (2011). This The Pagadian Airport in Zamboanga del Sur province serves about 118,000 passengers annually (2011). This P55.2-million project entails construction of the new passenger terminal building (one storey, 2,111 sq.m.). P42-million project entails: rehabilitation and improvement of passenger terminal building (one storey, 977 sq.m.), extension of runway (1,584 sq.m.), widening of taxiway (2,100 sq.m.), improvement and expansion of vehicle parking area (5,337 sq.m.), construction of perimeter fence (2,160 l.m.), and construction of drainage system (398 l.m.). Cost of Bid Documents : Php P50,000.00 Cost of Bid Documents : Php P50,000.00 Issuance of Bid Documents : 13 June 2012 - 05 July 2012 Issuance of Bid Documents : 13 June 2012 - 05 July 2012 Date and Time of Date and Time of Pre Bid Conference : 22 June 2012, 9:30 AM Pre Bid Conference : 22 June 2012, 2:30 PM Date and Time of Deadline of Date and Time of Deadline of Submission and Opening of Bids : 05 July 2012, 11:00 AM Submission and Opening of Bids : 05 July 2012, 4:00 PM Approved Budget for the Contract : Php P55,215,761.00 Approved Budget for the Contract : Php P42,085,817.04 5 6 Sanga-Sanga Airport Development Project Maasin Airport Development Project The Sanga-Sanga Airport in Tawi-tawi province serves about 21,500 passengers annually (2011). This The Maasin Airport in Southern Leyte province is being expanded to accommodate commercial ights. This P63.9-million project entails: site development for new terminal building (2,970 sq.m.), construction of 43.4-million project entails: construction of runway strip (32,000 sq.m.) and runway subgrade extension (320 new passenger terminal building (one storey, 1,110 sq.m.), expansion of apron (8,000 sq.m.), and meters long by 30 meters wide). construction of drainage system (94 l.m.). Cost of Bid Documents : Php P50,000.00 Cost of Bid Documents : Php P50,000.00 Issuance of Bid Documents : 13 June 2012 - 05 July 2012 Issuance of Bid Documents : 13 June 2012 - 05 July 2012 Date and Time of Date and Time of Pre Bid Conference : 22 June 2012, 8:30 AM Pre Bid Conference : 22 June 2012, 1:30 PM Date and Time of Deadline of Date and Time of Deadline of Submission and Opening of Bids : 05 July 2012, 9:00 AM Submission and Opening of Bids : 05 July 2012, 2:00 PM Approved Budget for the Contract : Php P63,960,261.51 Approved Budget for the Contract : Php P43,404,171.39 Interested bidders may obtain the Bid Documents upon payment of a non-refundable amount 7 indicated above only to the DOTC Cashier. They may also inspect the Bidding Documents and obtain additional information from the Oce of the BAC Secretariat, Unit 153, 15th Floor, The Columbia Tower, Mandaluyong City or it may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGeps) and at http://www.dotc.gov.ph/ provided that the bidders shall pay the fee for the Bidding Documents not later than the submission of their bids. Bidding is open to all interested bidders, subject to the conditions for eligibility provided in the IRR of RA 9184 and the Bidding Documents. The Bids and Awards Committee will hold a Pre-Bid Conference on the date and time indicated above at the DOTC Conference Room, 16th Floor, The Columbia Tower, Mandaluyong City, which shall be open to all interested parties. The DOTC assumes no responsibility whatsoever to compensate and indemnify bidders for any San Vicente Airport Development Project expenses incurred in the preparation of the bid. The San Vicente Airport in Palawan province is being constructed to sustain the development of tourism in the area. The P62.7-million project entails: construction of passenger terminal (1,350 sq. m.), runway extension with slope protection (6,030 sq. m.), hill obstruction removal (32,954 cu.m.), construction of re station building (155 sq. m.), and the elevated 2,500-gallon water tank. For further information, please refer to: Cost of Bid Documents : Php P50,000.00 Issuance of Bid Documents : 13 June 2012 - 05 July 2012 Asst. Sec. Catherine Jennifer P. Gonzales Postings from 14 June 2012 at the PhilGEPS Date and Time of Overall Head, BAC Secretariat and DOTC Websites & Bulletin Boards, and Pre Bid Conference : 22 June 2012, 8:00 AM Address: Unit 153,15th Flr., Columbia advertised at the Philippine Daily Inquirer, Date and Time of Deadline of Tower, Bgy. Wack-Wack,Ortigas ave. Submission and Opening of Bids : 05 July 2012, 8:00 AM Philippine Star and the Manila Bulletin on Approved Budget for the Contract : Php P62,717,369.90 1555 Mandaluyong City , Philippines 14 June 2012. Tel Nos. : (+632) 654-7725 (+632) 727-7960 loc 235 Facsimile No.: (+632) 654-7725 Chairman, Bids and Awards Committee E-mail Address: [email protected] Website: www.dotc.gov.ph DEPARTMENT OF TRANSPORTATION & COMMUNICATIONS.
Recommended publications
  • Riders Digest 2019
    RIDERS DIGEST 2019 PHILIPPINE EDITION Rider Levett Bucknall Philippines, Inc. OFFICES NATIONWIDE LEGEND: RLB Phils., Inc Office: • Manila • Sta Rosa, Laguna • Cebu • Davao • Cagayan de Oro • Bacolod • Iloilo • Bohol • Subic • Clark RLB Future Expansions: • Dumaguete • General Santos RIDERS DIGEST PHILIPPINES 2019 A compilation of cost data and related information on the Construction Industry in the Philippines. Compiled by: Rider Levett Bucknall Philippines, Inc. A proud member of Rider Levett Bucknall Group Main Office: Bacolod Office: Building 3, Corazon Clemeña 2nd Floor, Mayfair Plaza, Compound No. 54 Danny Floro Lacson cor. 12th Street, Street, Bagong Ilog, Pasig City 1600 Bacolod City, Negros Occidental Philippines 6100 Philippines T: +63 2 234 0141/234 0129 T: +63 34 432 1344 +63 2 687 1075 E: [email protected] F: +63 2 570 4025 E: [email protected] Iloilo Office: 2nd Floor (Door 21) Uy Bico Building, Sta. Rosa, Laguna Office: Yulo Street. Iloilo Unit 201, Brain Train Center City Proper, Iloilo, 5000 Lot 11 Block 3, Sta. Rosa Business Philippines Park, Greenfield Brgy. Don Jose, Sta. T:+63 33 320 0945 Rosa City Laguna, 4026 Philippines E: [email protected] M: +63 922 806 7507 E: [email protected] Cagayan de Oro Office: Rm. 702, 7th Floor, TTK Tower Cebu Office: Don Apolinar Velez Street Brgy. 19 Suite 602, PDI Condominium Cagayan De Oro City Archbishop Reyes Ave. corner J. 9000 Philippines Panis Street, Banilad, Cebu City, 6014 T: +63 88 8563734 Philippines M: +63 998 573 2107 T: +63 32 268 0072 E: [email protected] E: [email protected] Subic Office: Davao Office: The Venue Bldg.
    [Show full text]
  • Development and Distress in Mindanao1 a Political Economy Overview
    29 Development and Distress in Mindanao1 A Political Economy Overview Eduardo Climaco Tadem IT IS WIDELY BELIEVED that economic growth and development have bypassed the southern regions of the Philippines. This is seen as the cause of the serious political problems that now plague Mindanao. A closer look at Mindanao’s economic development, however, reveals that far from being isolated from the mainstream of the national economy, the island has been a major performer and a primary contributor to the country’s productive capacities. Lured by vast reserves of natural resources, businesses have invested capital and technology and established ventures that have generated enormous profits for their owners and executives. But the resulting wealth and incomes have not benefited the greater majority. Poverty and other social indicators point to a more distressed condition for Mindanao than for the nation as a whole. This paradox of high growth rates and the simultaneous existence of an impoverished population have challenged scholars and development planners for many years. In the Mindanao case, this enigma is exacerbated by the effects of internal colonialism - the transfer of wealth from the southern regions to the nucleus of economic and political power in the north. Demographyyy Mindanao, together with the Sulu Archipelago, occupies a land area of 10.2 million hectares or one-third of the country’s area of 30 million Volume 48 Number19 s 1 & 2 2012 3020 Tadem hectares. The historian Rudy Rodil classifies Mindanao’s population of 18.13 million as of 2000 into two major categories – the indigenous peoples and the migrant settlers.
    [Show full text]
  • 2.1.8 Philippines - Mindanao Port of Margosatubig
    2.1.8 Philippines - Mindanao Port of Margosatubig Port Overview Port Picture Description and Contacts of Key Companies Port Performance Discharge Rates and Terminal Handling Charges Berthing Specifications General Cargo Handling Berths Port Handling Equipment Container Facilities Customs Guidance Terminal Information Multipurpose Terminal Grain and Bulk Handling Main Storage Terminal Stevedoring Hinterland Information Port Security Port Overview The Port of Margosatubig has the following port facilities: A RC pier 12m x 30.50m Rock Causeway 11m x 22.3m PPA Terminal Office and guard house. Controlling water depth of the port alongside the pier is 10.0m while alongside the rock causeway is 5.0m at MLLW 0.00 elevation. The port is linked by a concrete roadway of about 26.0 km from the national road junction of Pagadian-Zamboanga Highway and approximately 55 km. southwest of Pagadian City. This port has a cargo pier depth of 4.6 m. Proposed developments are the construction of an RC landing and a Roro ramp and the repair of damages to the RC pier approach. https://zamboanga.com/z/index.php?title=Margosatubig,_Zamboanga_del_Sur,_Philippines Port website: http://ports.com/philippines/port-of-margosatubig/ Key port information can also be found at: http://www.maritime-database.com Port Location and Contact Country Philippines Province or District Zamboanga Del Sur (Region IX) Nearest Town or City with Distance from Port Pagadian City (52 km) Port's Complete Name Port of Margosatubig Latitude 7.579057 Longitude 123.167551 Managing Company or Port Authority Philippine Ports Authority Management Contact Person Arcidi S. Jumaani, Port Manager PMO Zamboanga [email protected] (062) 991-2037 to 39 / 991-2360 Nearest Airport and Airlines with Frequent International Arrivals/Departures Pagadian Airport Domestic only - PAL, Cebu Pacific Port Picture Page 1 Description and Contacts of Key Companies For more information on port contacts, please see the following link: 4.4 Port and Waterways Companies Contact List.
    [Show full text]
  • DOTC Project Pipeline 29 September 2014, Singapore
    Public-Private Partnerships DOTC Project Pipeline 29 September 2014, Singapore Rene K. Limcaoco Undersecretary for Planning and Project Development Department of Transportation and Communications Key Performance Indicators 1. Reduce transport cost by 8.5% – Increase urban mass transport ridership from 1.2M to 2.2M (2016) – Development of intermodal facilities 2. Lessen logistics costs from 23% to 15% – Improve transport linkages and efficiency 3. Airport infra for 10M foreign and 56M domestic tourists – Identify and develop key airport tourism destinations to improve market access and connectivity 4. Reduce transport-related accidents – Impose standards and operating procedures TRANSPORT DEVELOPMENT PLAN Awarded and for Implementation With On-going Studies • Automatic Fare Collection System • North-South Railway • Mactan-Cebu Int’l Airport • Mass Transit System Loop • LRT 1 Cavite Extension • Manila Bay-Pasig River Ferry System • MRT 7 (unsolicited; for implementation) • Integrated Transport System – South • Clark International Airport EO&M Under Procurement • LRT Line 1 Dasmariñas Extension • Integrated Transport System – Southwest • C-5 BRT • Integrated Transport System – South • LRT 2 Operations/Maintenance For Procurement of Transaction Advisors • NAIA Development For Rollout • Manila East Mass Transit System • New Bohol Airport Expansion, O&M • R1-R10 Link Mass Transit System • Laguindingan Airport EO&M • Road Transport IT Infrastructure Project Phase II • Central Spine RoRo For Approval of Relevant Government Bodies • MRT Line 3
    [Show full text]
  • Rpmp Ad 2 - 1 Philippines 08 Dec 16
    08 DEC 16 AIP RPMP AD 2 - 1 PHILIPPINES 08 DEC 16 AD 2 AERODROMES Note: The following sections in this chapter are intentionally left blank: AD-2.4, AD-2.7, AD-2.11, AD-2.16, AD- 2.19, AD-2.20, AD-2.21, AD-2.22, AD-2.23, AD-2.24 RPMP AD 2.1 AERODROME LOCATION INDICATOR AND NAME RPMP - PAGADIAN PRINCIPAL AIRPORT (Class 1) RPMP AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 074936.1370N 1232735.8000E. 2 Direction and distance from (city) 5KM. 3 Elevation/Reference temperature 1.52M (5FT) AMSL. 4 Geoid undulation at AD ELEV PSN Nil. 5 MAG VAR/Annual Change 0.4°W (2014) / 2.6’ increasing. 6 AD Operator, address, telephone, telefax, telex, Civil Aviation Authority of the Philippines AFS Pagadian Airport, Pagadian City 7016 Zamboanga del Sur Tel No.: (062) 353-1338 AFS: RPMPYYYX 7 Types of traffic permitted (IFR/VFR) VFR. 8 Remarks Nil. RPMP AD 2.3 OPERATIONAL HOURS 1 AD Operator MON - FRI: 0000 - 0900. 2 Customs and immigration Nil. 3 Health and sanitation Nil. 4 AIS Briefing Office Nil. 5 ATS Reporting Office (ARO) 2300 - 0700. For extension of SER one (1) day PN is required. 6 MET Briefing Office HJ. 7 ATS 2300 - 0700. 8 Fuelling Nil. 9 Handling Nil. 10 Security H24. 11 De-icing Nil. 12 Remarks Airport Operations: 2300 - 0700. RPMP AD 2.5 PASSENGER FACILITIES 1 Hotels Limited at the airport/unlimited in the city. 2 Restaurants Limited at the airport/unlimited in the city.
    [Show full text]
  • 11991304 01.Pdf
    序 文 日本国政府はフィリピン共和国政府の要請に基づき、「ミンダナオ紛争地域社会経済復興 支援調査」を行うことを決定し、独立行政法人国際協力機構がこの調査を実施しました。 当機構は、平成 19 年 2 月から平成 21 年 11 月までの間、株式会社片平エンジニアリング・ インターナショナルの戸次庸夫(2007 年)、羽仁アベドルハリム(2007 年‐2008 年)、宮 川朝一(2008 年‐2009 年)を団長とする調査団を現地に派遣しました。 調査団はフィリピン政府関係者やバンサンモロ開発庁と協議を行うとともに、計画対象地 域における現地調査を実施しました。帰国後の国内作業を経て、ここに本報告書完成の運 びとなりました。 この報告書が、本計画の推進に寄与するとともに、両国の友好親善とミンダナオ紛争地域 の平和構築と社会経済の復興に役立つことを願うものです。 終わりに、調査にご協力とご支援をいただいた関係各位に対し、心より感謝申し上げます。 平成 21 年 11 月 独立行政法人 国際協力機構 経済基盤開発部 部長 黒柳 俊之 Philippines the of Republic the in Mindanao in Areas Conflict-Affected The StudyforSocio-Economic Reconstructionand Development of CON FLI CT AFFECTED AREAS (Pursuant to the implementation of the GRP-MILF Tripoli Agreement on Peace signed on 22 June 2001) MINDANAO ISLAND Legend: - ARM M - Conflict Affected Areas inside ARMM - Conflict Affected Areas outside ARMM BASILAN SULU Executive Summary TAWI-TAWI STUDY AREA FINAL REPORT LOCATION MAP OF CONFLICT-AFFECTED AREAS IN MINDANAO (Source : OPAPP) 調査対象位置図 The Study for Socio-Economic Reconstruction and Development of FINAL REPORT Conflict-Affected Areas in Mindanao in the Republic of the Philippines 目 次 調査対象位置図 略語一覧 PART I:本編 1. 序 ......................................................................................................................................................1 1.1 背景........................................................................................................................................ i 1.2 調査の概要 SERD- CAAM .................................................................................................
    [Show full text]
  • 9-Audit Observations and Recommendations
    OBSERVATIONS AND RECOMMENDATIONS A. FINANCIAL AUDIT 1. The reported Property and Equipment (PE) accounts with a total amount of P77.364 billion as of December 31, 2018 is unreliable due to a) unreconciled variance of P19.163 billion between the General Ledger (GL) and the Report of Physical Count of Property, Plant and Equipment (RPCPPE); b) non- maintenance of Property Cards (PC) and Property, Plant and Equipment Ledger Cards (PPELC); c) non-recording of donated properties; and d) non- derecognition and non-disposal of unserviceable properties with a total cost of P120.927 million. 1.1 Paragraph 15 of Philippine Accounting Standards (PAS) 1, on Presentation of Financial Statements provides that – Financial statements shall present fairly the financial position, financial performance and cash flows of an entity. Fair presentation requires the faithful representation of the effects of transactions, other events and conditions in accordance with the definitions and recognition criteria for assets, liabilities, income and expenses set out in the Framework. xxx Variance between the GL and RPCPPE – P19.163 billion 1.2 COA Circular No. 80-124 provides that physical inventory-taking is an indispensable procedure for checking the integrity of property custodianship. It is then important for Management to perform a physical inventory of all properties at least once a year. 1.3 COA Circular No. 80-124 also provides that “all inventory reports shall be prepared on the prescribed form (Gen. Form No. 41-A) and certified correct by the committee in charge thereof, noted by the Auditor and approved by the head of the agency. The reports shall be properly reconciled with accounting and inventory records.” 1.4 As of December 31, 2018, PE accounts totaling P23,956,425,753 could not be validated due to the non-submission of CAAP Head Office (CAAP-HO) and Area Centers (ACs) III, VI and XII of a complete RPCPPE casting doubts on the existence of those properties without RPCPPE.
    [Show full text]
  • Philippines - National
    Philippines - National Country name: Philippines Official country name: Republic of the Philippines Table of Contents Chapter Name of Assessor Organization Date updated 1 Philippines Country Profile Kevin Howley WFP Nov-19 1.1 Philippines Humanitarian Background Kevin Howley WFP Nov-19 1.2 Philippines Regulatory Departments & Quality Control Kevin Howley WFP Nov-19 1.3 Philippines Customs Information Dragoslav Djuraskovic WFP Dec-12 2 Philippines Logistics Infrastructure Dragoslav Djuraskovic WFP Dec-12 2.1 Philippines Port Assessment Dragoslav Djuraskovic WFP Dec-12 2.1.1 Philippines Port of South Harbour Dragoslav Djuraskovic WFP Dec-12 2.1.3 Philippines Port of Roxas - EMERGENCY RESPONSE TO TYPHOON HAIYAN (YOLANDA) Dragoslav Djuraskovic WFP Dec-12 2.1.4 Philippines Port of Cebu Dragoslav Djuraskovic WFP Dec-12 2.1.6 Philippines Port of Isabel - EMERGENCY RESPONSE TO TYPHOON HAIYAN (YOLANDA) Dragoslav Djuraskovic WFP Dec-12 2.2 Philippines Aviation Dragoslav Djuraskovic WFP Dec-12 2.2.1 Philippines Ninoy Aquino International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.2 Philippines Davao International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.3 Philippines Tambler Airport Dragoslav Djuraskovic WFP Dec-12 2.2.4 Philippines Kalibo Airport Dragoslav Djuraskovic WFP Dec-12 2.2.5 Philippines Laoag International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.6 Philippines Mactan-Cebu International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.7 Philippines Puerto Princesa International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.8 Philippines
    [Show full text]
  • Zampen Priority Programs and Projects for Resource Mobilization
    ZAMBOANGA PENINSULA PRIORITY PROGRAMS AND PROJECTS FOR RESOURCE MOBILIZATION December 2015 FOREWORD This document is the output of the Regional Development Council (RDC) IX Secretariat’s effort to push the development of the region by facilitating the identifi cation of the priority interventions that need the support of donor agencies, policymakers, particularly the region’s congressional representatives, national government agencies, and the Mindanao Development Authority. It is largely based on the submissions of ZamPen’s regional line agencies and local government units. Following a set of RDC-approved criteria, the projects identifi ed shall sail the region towards its vision of becoming the Southern Agri-Fisheries Corridor of the Philippines. This portfolio is anticipated to jumpstart resource mobilization as it equips a potential investor with the details of the region’s priority programs/projects. It shall be a living document, which needs periodic updating and monitoring. The continued concerted efforts among the RDC IX sectoral committee members and the Council itself are therefore fervently sought, in pursuit of regional development. Together as one region, we build a better Zamboanga Peninsula! The RDC IX Secretariat Table of Contents Title Page Background 1 Overview of the ZamPen Priority Programs and Projects for 2 Resource Mobilization Agri-Fishery Development Projects 3 Integrated Rice-Duck Farming, Processing and Marketing 5 Duck Meat Processing and Marketing Project 7 Organic Rice Post-Harvest Processing Facilities 9 Organic Cassava Production and Organic Fertilizer Development Project 11 Establishment of Organic Fertilizer Manufacturing Facility 14 Integrated Development Project for Abaca 16 Rehabilitation/Improvement of Farm-to-Market Road at Sitio Quatro Ojos (West 18 Basilan and Sta.
    [Show full text]
  • DOTC Roadmap of Airport Projects 23 February 2015, New World Hotel
    Philippines Infrastructure Seminar DOTC Roadmap of Airport Projects 23 February 2015, New World Hotel Jaime Fortunato A. Caringal OIC-Assistant Secretary. Project Development and PPPs [email protected] PHILIPPINE AIRPORTS WITH COMMERCIAL OPERATIONS AIRPORT PROJECTS NATIONWIDE • Manila International (NAIA) PHP 15 B* • Clark International PHP 7.2 B* • Mactan Cebu International PHP 17.52 B • Davao International PHP 5.88 B • Laguindingan International PHP 2.26 B • New Bohol International PHP 11.71 B • Puerto Princesa International PHP 10.27 B • Iloilo International PHP 4.03 B • Bacolod International PHP 3.61 B • Expansion & Improvement of Other Key Tourism Airports PHP 21.35 B • Expansion & Modernization of Other Key Secondary Airports PHP 6.67 B • Other Airport Projects PHP 2 B Total PHP 109.68 B *Estimated; cost of PPP component not included AIRPORT PROJECTS NATIONWIDE AIRPORTS PROJECTS ESTIMATED COST UPGRADED Expansion & PHP 45.6 B Modernization of Key 4 ~ USD 1,013.3 M Gateways Other PPP Airport PHP 31.877 B 5 Projects ~ USD 708.4 B Other Key Tourism PHP 21.351 B 9 Airports ~ USD 474.5 M Other Key Secondary PHP 6.668 B 9 Airports ~ USD 148.2 M PHP 2.0 B Other Airport Projects 22 ~ USD 44.4 M 107.5 B TOTAL 49 ~ USD 2,388.8 M KEY INTERNATIONAL AND PPP AIRPORT PROJECTS AIRPORTS FOR EXPANSION COST COST AND MODERNIZATION (PHP B) (USD M) Manila (Ninoy Aquino) Int’l 15.000* 333.3 Clark Int’l 7.200* 160.0 Clark Int’l Mactan Cebu Int’l 17.520 389.3
    [Show full text]
  • Cebu Pacific Flight Schedule Dipolog to Manila
    Cebu Pacific Flight Schedule Dipolog To Manila Is Anders self-styled or twin when equates some tripper hyphen yes? Sometimes ventilable Bancroft dacker her strenuousness unwarrantably, but thetic Niccolo encrust hugger-mugger or becalms ruefully. Pavel moults his allocation inured resumptively or insuperably after Gideon damming and citifying suitably, regardful and vizarded. The afternoon tend to stay by someone when boarding through their website so passengers allowed, cebu pacific to dipolog manila flight schedule conflicts that your data Photo credit to Reuters. You write continue logging in below. Completing the flight schedules, dipolog is now and social media accounts for possible required by. Cebu Pacific Air airline 474 to Manila is the foremost flight that departs from Bacolod. April 5 2020 cebu pac philippine airlines air asia go bald their official websites. ManilaMNL to DipologDPL Flights Airfares AED 33. Your friend they receive a notification when in flight search is filed, Clark, especially considering its classification. Flexible cancellation policies for flights from dipolog flight schedules will provide you the disruption to traveldailyjobs. What is manila? When you want to get from Dipolog City to Manila, Roxas and San Jose. Put on cebu pacific will receive alerts! Book a cheap hotel? The flight schedules to manila to get updates from manila to the. Cebu pacific airlines ensure that credit line of directives from dpl to sms after the flight route, necessitate a timely manner. We played with dolphins and mantas before breakfast. Cebuana Padala Rates 2020 Vendita Protesi Capelli. No partial refunds will tell you need some inspiration straight to the price shown on this comments posted or email.
    [Show full text]
  • Zamboanga Peninsula Regional Recovery Program 2020-2022
    ZAMBOANGA PENINSULA REGIONAL RECOVERY PROGRAM 2020-2022 Regional Development Council Regional Disaster Risk Reduction and Management Council Region IX 15 June 2020 MESSAGE The Corona Virus-19 (COVID-19) pandemic has caught all of us unaware. It has not only disrupted our normal daily lives but also caused damage to our economy, infrastructures, livelihood, agriculture, health and environment , among others. The different national and regional line agencies and local government units (LGUs) have been working relentlessly together to establish health protocols and guidelines to minimize the damage and lessen the impact of COVID-19 to the people and their means of living, and to save lives. The private sector is also doing its share as partner of the government during this crisis. As we are rebuilding our economy, we hope that the lessons we are learning from this pandemic would influence and transform us to a new and better normal way of living. The Zamboanga Peninsula Recovery Program (RRP) is intended to help the region recover from the impact of COVID-19. It will serve as the region’s blueprint towards rebuilding a resilient and better community. It includes an assessment of the extent of damage caused by the pandemic, the government’s response, the framework on how to go about rebuilding, and the proposed programs and projects for recovery. The RRP shall be undertaken through the collaboration among the line agencies, LGUs, the private sector and the citizenry. We recognize the efforts put together by the region’s stakeholders and their contribution in the formulation of the Regional Recovery Program in such a short period of time.
    [Show full text]