Fazeley Mile Oak and Bonehill Report

Total Page:16

File Type:pdf, Size:1020Kb

Fazeley Mile Oak and Bonehill Report Lichfield District FAZELEY Rural Planning MILE OAK Project BONEHILL A. WHAT YOU SAID B. WHAT C.A.B.E. SAID C. OTHER EVIDENCE RELEVANT TO PLANNING FOR THE FUTURE OF FAZELEY D. TOWARDS A VISION FOR THE FUTURE Lichfield District Council September 2011 NB – To be read in conjunction with the Introduction and Conclusion Reports. November 2011 A. What you said: workshop event said that they valued the poor maintenance of shops, of both the countryside and the canal. spaces and a proliferation of signage. 1. The following paragraphs summarise the main outcomes from the rural planning project in terms of the views gathered, principally from residents of the village, between July 2010 and February 2011. The original analyses on which this summary is based are included as Appendix 2. Views and ideas arising from the February 2011 workshop event are illustrated on the accompanying Composite Plan of Workshop Ideas. Reindeer Road Houses on Coleshill Street: scaffolding • Character and environment 4. Although many people There is a strong and widely held local acknowledged the history of Fazeley view that cumulatively these issues 2. The size, linear form and historic as part of its environment, its historic are significantly reducing the development of the present village buildings and the canals, most people environmental quality of the area. from a number of settlements were had issues with the quality of the Coleshill Street and other streets in recognised as impacting upon today’s environment as it is at present. the centre of Fazeley are particularly character and environment. People affected. Some people recognised visiting the events identified several 5. There are several buildings which maintenance cost as an issue but different communities within the whole are damaged or in a poor state of considered it should have been and many raised the difficulty of repair, including fire damage to addressed when funding recent integrating the mix of communities as Bonehill Mill and Fazeley garage. environmental schemes. an issue. These buildings are scaffolded and two of the buildings, along Coleshill 6. Some residents are concerned at 3. Notwithstanding this, people living Street and Lichfield Street, have been what is viewed as a poor standard of in the Fazeley, Mile Oak, Bonehill area scaffolded for a number of years. care and maintenance within a value the environment they have, People viewed these as giving the Conservation Area. A number of including the ease of access to the area the appearance of being derelict. people identified that a lack of trees countryside, the relative peacefulness In addition some areas, in particular and other planting contributed to and a feeling of safety resulting from a within Fazeley, are suffering from reducing the environmental quality of low level of crime. Many said that damage or poor maintenance to street the area. This was further impacted there was an atmosphere of a village. furniture and from issues such as litter, upon at times by traffic, including Children who visited the February queues sometimes arising related to 2 visitors to Drayton Manor Park and workshops included the lack of a the District Council offices. It was also traffic accessing Ventura Park, central focus for the community. Some noted that there were currently no bus Tamworth. raised this as an issue and asked services along Coleshill Street. whether new play and community 7. At the February workshop there was facilities located centrally could help to 11. There was some consensus great concern expressed at the address the problem. Some identified amongst those taking part that more general quality and care for the making better use of the square as a traffic management should be a environment of Fazeley/Mile Oak, but means of focussing community priority. The objectives of this should in particular the central part of activity, but others identified lack of be to reduce speed and the level of Fazeley. A need to significantly parking as an issue, which gives rise heavy vehicle movement, and to improve the environmental quality of to a conflict unless it can be facilitate better pedestrian movement, this area was seen as a priority, addressed elsewhere. both within the centre of Fazeley and including a general need for ‘tidying also along the former A5, particularly up’, for environmental improvements, 9. Although people recognised the crossings to access public transport. and for more planting – there were relationship of Fazeley to Tamworth, several suggestions for this, ranging many were concerned at the need to 12. Visitors to the events made from a tree avenue stretching from maintain the physical separation from several traffic management Fazeley to Mile Oak – a ‘mile of oaks’ Tamworth where it still exists. They suggestions. These included reducing (a point picked up in the CABE report), therefore wanted to see no spread of the speed limit on the former A5 from to flower planters/hanging baskets development into these areas, but also 40 mph to 30 mph at Mile Oak and within the streets around Fazeley wished to see better access to them introducing a weight limit on this road, centre. by improving walking and cycling introducing more crossings and routes. creating a cycle route along the north side of the former A5 from Fazeley to • Transport and traffic Mile Oak. A series of mini- management roundabouts at the road junctions along Sutton Road were suggested 10. Many people were happy with along with more parking within public transport links from Fazeley to Fazeley centre. Tamworth, Sutton Coldfield and Birmingham although some 13. Some people noted that there commented that they were too were several footpaths or alleyways expensive. Several people providing connecting links that were commented that the lack of a direct closed, which, if opened would allow Coleshill Street bus service to Lichfield did not help better connections and play a role in with the identity of Fazeley as part of improving the linkages between the 8. Another environmental issue arising Lichfield District, nor did it help with different parts of the community, through the consultations and reaching some services – for example combined with more crossings of 3 major roads. The improvement of the • Community activities and improvement of the Mile Oak play footpath/cycleway route from Bonehill facilities area. to the canal, for access to Tamworth, was specifically identified. 15. In the initial consultations (2010) 17. Some Bonehill residents said that people identified the range of shops, Bonehill lacked facilities, although services and facilities available there was no particular strong call amongst things they liked about living emerging as to whether facilities there in Fazeley/Mile Oak. This was also would be generally what people related to the good access to the town wanted. There was one suggestion centre and other facilities in Tamworth. that the field lying between Bonehill and Lichfield Street should be used as an ‘events park’. This may have been related to the issue of whether there was a need or desire to strengthen Fazeley, Mile Oak and Bonehill as a strong community with a single Fazeley ‘crossroads’ identity. There was some discussion in the event and workshop about 14. Issues related to the highway whether more centrally located play network were identified by some. and community facilities would create These included Mile Oak crossroads, more of a sense of community. where some thought that the introduction of a right filter lane out of Local shops, Mile Oak 18. Others mentioned a lack of Tamworth towards Hints would help, facilities for the elderly, that there 16. During the course of the whilst others suggested its conversion should be a local library and that there consultations differing views emerged from traffic lights to a roundabout. was a shortage of pubs. Others identified issues on the A5 about the range and quality of trunk road network, suggesting that facilities. The shortage of facilities for 19. Generally people wanted to see the ‘tight’ exit eastbound towards Mile teenagers was highlighted as a more facilities and at the workshops Oak was dangerous whilst one person particular concern, along with play widening the range of uses in or near suggested a new westbound slip road facilities for children. A number of to Fazeley centre seemed to be a could be constructed to allow traffic to suggestions were made including theme highlighted. Suggestions arising access Hints without the need to pass provision for skateboarding and BMX included a ‘tea room’, café/coffee through Mile Oak crossroads. and a desire for more and better shop, that would accommodate both quality play and open spaces. There local and tourist trade. The vacant were individual ‘calls’ for the use of Methodist Church was a suggested ‘waste land’ to provide for children’s location for the latter. One suggestion facilities, for a library and for the was that Fazeley should have a canal4 and mill museum that would be an to meet needs locally. At the February settlement to accommodate District- additional attraction for the area. workshops event the ‘post-it’ wide housing need. While there was responses showed 20 comments no desire expressed for any significant 20. The cost of activities and facilities indicating that there was a good local housing development, where the was raised as an issue by a number of choice and only 1 resident disagreed possibility of more housing people, suggesting that this may be a with this view. During the workshop development was acknowledged, significant factor limiting access by sessions there was no recorded brownfield sites were flagged up as some residents to certain facilities. mention of affordable housing. the most acceptable options and it One suggestion was made that the However within the exercise overall, was felt that these should be used District Council should negotiate with including the February event, some first.
Recommended publications
  • River Basin Management Plan Humber River Basin District Annex C
    River Basin Management Plan Humber River Basin District Annex C: Actions to deliver objectives Contents C.1 Introduction 2 C. 2 Actions we can all take 8 C.3 All sectors 10 C.4 Agriculture and rural land management 16 C.5 Angling and conservation 39 C.6 Central government 50 C.7 Environment Agency 60 C.8 Industry, manufacturing and other business 83 C.9 Local and regional government 83 C.10 Mining and quarrying 98 C.11 Navigation 103 C.12 Urban and transport 110 C.13 Water industry 116 C.1 Introduction This annex sets out tables of the actions (the programmes of measures) that are proposed for each sector. Actions are the on the ground activities that will implemented to manage the pressures on the water environment and achieve the objectives of this plan. Further information relating to these actions and how they have been developed is given in: • Annex B Objectives for waters in the Humber River Basin District This gives information on the current status and environmental objectives that have been set and when it is planned to achieve these • Annex D Protected area objectives (including programmes for Natura 2000) This gives details of the location of protected areas, the monitoring networks for these, the environmental objectives and additional information on programmes of work for Natura 2000 sites. • Annex E Actions appraisal This gives information about how we have set the water body objectives for this plan and how we have selected the actions • Annex F Mechanisms for action This sets out the mechanisms - that is, the policy, legal, financial and voluntary arrangements - that allow actions to be put in place The actions are set out in tables for each sector.
    [Show full text]
  • High Speed Two Phase 2A: West Midlands to Crewe Working Draft Environmental Impact Assessment Report Volume 2: Community Area Report CA1: Fradley to Colton
    HS2 Phase 2a: West Midlands to Crewe HS2 Phase 2a: West Midlands to Crewe High Speed Two Phase 2a: West Midlands to Crewe Working Draft Environmental Impact Assessment Report Working Draft EIA Report | Volume 2: Community Area report | CA1: Fradley to Colton Working Draft EIA Report | Volume 2: Community Area report | CA1: Fradley to Colton Volume 2: Community Area report CA1: Fradley to Colton September2016 September2016 High Speed Two (HS2) Limited One Canada Square Canary Wharf September 2016 London E14 5AB www.gov.uk/hs2 CS590_C6 High Speed Two Phase 2a: West Midlands to Crewe Working Draft Environmental Impact Assessment Report Volume 2: Community Area report CA1: Fradley to Colton September 2016 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. High Speed Two (HS2) Limited, One Canada Square, Canary Wharf, London E14 5AB Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.gov.uk/hs2 A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. © High Speed Two (HS2) Limited, 2016, except where otherwise stated.
    [Show full text]
  • Weeford Quarry: Hydrogeological Assessment
    Weeford Quarry: Hydrogeological Assessment Prepared for Cemex UK Operation Ltd. Oldbury Warley West Midlands B694RJ Report reference: 60073R1, August 2008 Report status: Final Confidential Prepared by ESI Ltd New Zealand House,160 Abbey Foregate, Shrewsbury, SY2 6FD, UK Tel +44(0)1743 276100 Fax +44 (0)1743 248600 email [email protected] Registered office: New Zealand House, 160 Abbey Foregate, Shrewsbury, SY2 6FD. Registered in England and Wales, number 3212832 Weeford Quarry: Hydrogeological Assessment This report has been prepared by ESI Ltd in its professional capacity as soil and groundwater specialists, with reasonable skill, care and diligence within the agreed scope and terms of contract and taking account of the manpower and resources devoted to it by agreement with its client, and is provided by ESI solely for the internal use of its client. The advice and opinions in this report should be read and relied on only in the context of the report as a whole, taking account of the terms of reference agreed with the client. The findings are based on the information made available to ESI at the date of the report (and will have been assumed to be correct) and on current UK standards, codes, technology and practices as at that time. They do not purport to include any manner of legal advice or opinion. New information or changes in conditions and regulatory requirements may occur in future, which will change the conclusions presented here. This report is provided to the client. Should the client wish to release this report to any other third party for that party’s reliance, ESI accepts no responsibility of any nature to any third party to whom this report or any part thereof is made known.
    [Show full text]
  • A Landscape Survey of the Parish of Shenstone
    A Landscape Survey of the Parish of Shenstone Edited by Richard Totty for The Staffordshire Archaeological and Historical Society Lichfield 2009 A Landscape Survey of the Parish of Shenstone Edited by Richard Totty for The Staffordshire Archaological and Historical Society President John Hunt, B.A. , Ph.D., FSA, F.R.Hist.Soc, P.G.C.E. Contributions by members of the Society including Brian Bull, Dr Dianne Barre , Betty Fox , Dr John Hunt, Alan Moore , Bronwen Ross , Dr Richard Totty , Diana Wilkes , Roland Watson and others. Lichfield 2009 www.sahs.uk.net 1 St John's Church Shenstone in a 1784 water colour ( from a print in the William Salt Library ) This publication, and the project upon which it is based, would not have been possible without the support of the Heritage Lottery Fund who first grant-aided the Society's project in 2005 through the Local Heritage Initiative scheme. Staffordshire Archaeological and Historical Society gratefully acknowledge the support of the HLF for this project from its inception through to the production of this Report. We would also like to acknowledge the interest and enthusiasm of the many Shenstone residents who have supported and shared in the research of the project, opening their homes to members of the buildings group, sharing their own knowledge of the village and parish, and participating in the various community-based events that the Society has promoted during the course of the project. Particular thanks are owed to Shenstone Library, and to the committee of the Wesley Hall. 2 THEMES 1. Introduction 2. Topography 3.
    [Show full text]
  • TAME, ANKER and MEASE CATCHMENT ACTION MANAGEMENT PLAN March 2017
    TAME, ANKER AND MEASE CATCHMENT ACTION MANAGEMENT PLAN March 2017 Severn Trent Birmingham & Black Country Wildlife Trust Trent Rivers Trust Warwickshire Wildlife Trust Contents Foreward ................................................................................................................................................. 3 A Message from Severn Trent .............................................................................................................. 4 Introduction ............................................................................................................................................ 5 Catchment Vision .................................................................................................................................... 7 Catchment Objectives .......................................................................................................................... 7 Catchment Challenges ......................................................................................................................... 7 Data and Evidence ................................................................................................................................... 8 Catchment Characterisation ................................................................................................................ 8 Birmingham and the Black Country .................................................................................................. 8 North and West Warwickshire ........................................................................................................
    [Show full text]
  • Volume 5: Water Resources (WR-001-000)
    HIGH SPEED RAIL (LONDON - WEST MIDLANDS) Supplementary Environmental Statement and Additional Provision 2 Environmental Statement Volume 5 | Technical appendices Water resources (WR-001-000) High Speed Two (HS2) Limited One Canada Square July 2015 London E14 5AB T 020 7944 4908 X74A E [email protected] SES and AP2 ES 3.5.6.1 SES AND AP2 ES – VOLUME 5 SES AND AP2 ES – VOLUME 5 www.gov.uk/hs2 HIGH SPEED RAIL (London - West MidLands) Supplementary Environmental Statement and Additional Provision 2 Environmental Statement Volume 5 | Technical appendices Water resources (WR-001-000) High Speed Two (HS2) Limited One Canada Square July 2015 London E14 5AB T 020 7944 4908 X74A E [email protected] SES and AP2 ES 3.5.6.1 SES AND AP2 ES – VOLUME 5 SES AND AP2 ES – VOLUME 5 www.gov.uk/hs2 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited, One Canada Square, London E14 5AB Details of how to obtain further copies are available from HS2 Ltd. Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.gov.uk/hs2 Copyright © High Speed Two (HS2) Limited, 2015, except where otherwise stated. High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full via the HS2 website.
    [Show full text]
  • Sites and Monuments
    Staffordshire County Council Historic Environment Record Monument Full Report 12-Mar-2009 Number of records: 42 PRN Number Site Name Record Type 01105 - MST1103 Blackbrook Bridge, Weeford Monument The site of a wooden footbridge destroyed by floods and replaced by a single span cart bridge in the early 18th century. Monument Types and Dates FOOTBRIDGE (Built, (between) POST MEDIEVAL - 1486 AD? to 1700 AD?) Evidence DOCUMENTARY EVIDENCE Main Building WOOD Material ROAD BRIDGE (POST MEDIEVAL to Georgian - 1700 AD to 1750 AD) Evidence STRUCTURE Main Building STONE Material Description and Sources Description Road Bridge: Site of a wooden footbridge destroyed by floods and replaced by a stone cart bridge between 1700 and 1750. <1> A single span stone bridge of early 18th century date. The eastern side is modern. <2> Sources (1) Index: Ordnance Survey. See cards. Ordnance Survey Card Index. SK 10 SW - 6 (Collections for a History of Staffordshire' 1934, p81 & map p144 (by A.L. Thomas)) (2) Index: Ordnance Survey. See cards. Ordnance Survey Card Index. SK 10 SW - 6 (V.J. Burton - Ordnance Survey Field Inspector - 01-Apr-1958) Location National Grid Reference SK 1344 0363 (point) SK10SW Dispersed Administrative Areas Parish Weeford, Lichfield District Designations, Statuses and Scoring Associated Legal Designations - None recorded Other Statuses and Cross-References Primary Record Number - 01105 Active Ordnance Survey Card number - SK 10 SW - 6 Active Ratings and Scorings - None recorded Related Monuments - None Recorded Finds - None recorded Associated Events/Activities - None recorded Associated Individuals/Organisations - None recorded zMonFullWithDesigLegDe Report generated by HBSMR from exeGesIS SDM Ltd Page 1 PRN Number 01108 - MST1106 Site Name Gorsey Hill Mound, Hints PRN Number Site Name Record Type 01108 - MST1106 Gorsey Hill Mound, Hints Monument One of two mounds of unknown date and function.
    [Show full text]
  • High Speed Rail Ȍl D Ǧ Es Idla
    HIGH SPEED RAIL ȍLD ǧ ES IDLADSȎ Supplementary Environmental Statement and dditional roviion ͮ Environmental Statement olume ͱ | Technical appendices map book Ecology | ͮͭ | rayton assettǡ ints and eeord uly ͮͬͭͱ SES and ͮ ES ͯ.ͱ.ͭͯ.ͭͲ SES and ͮ ES Ȃ E ͱ www.gov.uk/hs2 HIGH SPEED RAIL ȍLD ǧ ES IDLADSȎ Supplementary Environmental Statement and dditional rovision ͮ Environmental Statement olume ͱ | Technical appendices map book Ecology | ͮͭ | rayton assettǡ ints and eeord uly ͮͬͭͱ SES and ͮ ES ͯ.ͱ.ͭͯ.ͭͲ www.gov.uk/hs2 igh Speed Two ȋ SͮȌ imited has been tasked by the epartment or Transport ȋTȌ with managing the delivery o a new national high speed rail network. t is a nonǦdepartmental public body wholly owned by the T. report prepared or igh Speed Two ȋ SͮȌ imitedǣ igh Speed Two ȋ SͮȌ imitedǡ ne anada Suareǡ ondon EͭͰ ͱ etails o how to obtain urther copies are available rom Sͮ td. Telephoneǣ ͬͮͬ ͳ͵ͰͰ Ͱ͵ͬʹ eneral email enuiriesǣ Sͮenuiries̻hs2.org.uk ebsiteǣ www.gov.uk/hs2 opyright ̽ igh Speed Two ȋ SͮȌ imitedǡ ͮͬͭͱǡ ecept where otherwise stated. igh Speed Two ȋ SͮȌ imited has actively considered the needs o blind and partially sighted people in accessing this document. The tet will be made available in ull via the Sͮ website. The tet may be reely downloaded and translated by individuals or organisations or conversion into other accessible ormats. you have other needs in this regard please contact igh Speed Two ȋ SͮȌ imited.
    [Show full text]
  • Draft Drought Management Plan
    Draft Drought Management Plan August 2017 Table of Contents 1 INTRODUCTION............................................................................. 3 1.1 OVERVIEW OF THE PROCESS .......................................................................... 3 1.2 THE SOUTH STAFFS REGION DROUGHT PLAN ................................................. 4 1.3 BACKGROUND TO SOUTH STAFFS WATER ...................................................... 6 2 CONSULTATION ON THE DRAFT DROUGHT PLAN .................. 7 2.1 PRE CONSULTATION ....................................................................................... 7 2.2 CONSULTATION ON THE DRAFT PLAN ............................................................ 10 3 WATER RESOURCES IN THE SOUTH STAFFS REGION ......... 12 3.1 SUPPLY DEMAND BALANCE POSITION ........................................................... 12 3.2 LEVELS OF SERVICE – FREQUENCY OF RESTRICTIONS .................................. 12 3.3 COMPENSATION ........................................................................................... 13 3.4 DEPLOYABLE OUTPUT .................................................................................. 13 3.5 SUMMARY OF RECENT INVESTMENT .............................................................. 14 3.6 LEAKAGE AND EFFICIENT USE OF WATER ....................................................... 14 4 DROUGHT SCENARIOS .............................................................. 16 4.1 DROUGHT SCENARIOS COVERED BY THIS PLAN ............................................ 16 4.2 RESILIENCE
    [Show full text]
  • In Your Area Fradley to Colton
    June 2020 | www.hs2.org.uk In your area Fradley to Colton High Speed Two (HS2) Newton Abbots Bromley Newborough is the new high speed railway for Britain. HS2 Ltd is the company Admaston Hoar Cross responsible for developing the railway. Colwich We’re currently seeking A515 Parliamentary approval Colton Blithbury Hadley End to build and run Phase Rugeley Woodhouses 2a of HS2: West A51 Yoxall Midlands to Crewe, Etchinghill River Trent which we expect Kings Bromley Bromley to achieve in 2020. Go Ape A513 Cannock Brereton Handsacre Orgreave Armitage HS2 Phase 2a A51 Rileyhill Longdon Upper HS2 Phase One A460 Longdon Fradley Hazelslade Cannock Wood Gentleshaw Littleworth Farewell A5192 Introduction We’ve produced this booklet to update you on the route from Fradley to Colton. It includes: • a summary and map of the proposed route in the area; • how Phase 2a is being developed and what’s next; • the benefits that HS2 will bring to your region and to the country; • support for communities and property owners; and • information on how to get in touch with us. The route of Phase 2a from Fradley to Colton The Fradley to Colton area covers an approximately 13.5km section of the proposed route passing through the parishes of Fradley and Streethay, Alrewas, Kings Bromley, Armitage with Handsacre, Mavesyn Ridware, Hamstall Ridware and Colton. This section of the route is within the local authority areas of Lichfield District Council and Staffordshire County Council. The Phase 2a route connects with Phase One of HS2 at the southern end of this section. The northern end of this section is the boundary between Colton and Colwich parishes.
    [Show full text]
  • Appendix 5: Historic Environment Character Zone Assessments: Tamworth
    Appendix 5: Historic Environment Character Zone Assessments: Tamworth This appendix provides an assessment of the historic environment for each of the Historic Environment Character zones (HECZs) for the three project areas of Lichfield, Burntwood and Tamworth. It should be noted that the information and any recommendations contained within each of the documents is subject to amendment should any new information become available. For further information regarding the Historic Environment Record (HER); Historic Landscape Characterisation (HLC) and designated sites please contact: Cultural Heritage Team Environment & Countryside Development Services Directorate Staffordshire County Council Riverway Stafford ST16 3TJ Tel: 01785 277281/277285/277290 Email: [email protected] Staffordshire County Council February 2009 1 THECZ1–HopwasHaysWood(HECA2a) Summary The zone once formed part of Cannock Forest and it is likely to have comprised a woodland character from the prehistoric period onwards. It largely retains its woodland character with only one building present which probably dates to the 18th century and whose origins may relate to woodland management. Medium to large scale development within the zone would have a considerable impact upon the woodland character of the zone. There is also the potential for earthworks to survive particularly relating to historic woodland management. Should development be planned for the zone it would need to address impacts upon and potential mitigation strategies for: • the impact upon the Conservation Area • the impact upon the historic building and its sense of isolation. • the potential for the survival of earthworks, including those relating to former woodland management • the potential for below ground archaeological deposits Early consultation with the Conservation Officers at Lichfield District Council and the Cultural Heritage Team at Staffordshire County Council is advised.
    [Show full text]
  • (SAD) Minerals Technical Appendix 2 Permitted Minerals Sites in Walsall
    Walsall Site Allocation Document (SAD) Minerals Technical Appendix 2 Permitted Minerals Sites in Walsall Site Profiles (January 2019) Walsall Site Allocation Document (SAD) Minerals Technical Appendix 2: Permitted Minerals Sites in Walsall – Site Profiles (January 2019) Table of Contents Permitted Minerals Sites - Profiles Pages Introduction 2 – 4 Site Profile MP1: Aldridge Quarry 5 – 11 Site Profile MP2: Atlas Quarry 12 – 19 Site Profile MP3: Birch Coppice 20 – 26 Site Profile MP4: Branton Hill Quarry 27 – 35 Site Profile MP5: Land at Brownhills Common 36 – 42 Site Profile MP6: Highfields South 43 – 50 Site Profile MP7: Sandown Quarry 51 – 59 Site Profile MP9: Highfields North 60 - 67 1 Walsall Site Allocation Document (SAD) Minerals Technical Appendix 2: Permitted Minerals Sites in Walsall – Site Profiles (January 2019) Introduction There are nine Permitted Minerals Sites in Walsall, although at the sites where restoration is now underway, the working conditions do not permit any further mineral extraction. The sites are listed in Table 1 below, which also indicates their operational status at 31.12.16, progress on restoration, and which SAD and BCCS Policies apply. As part of the background evidence for the preparation of the SAD Minerals policies, the Council has produced detailed Site Profiles for each of the Permitted Minerals Sites. The original versions were produced in 2014 to inform the Walsall SAD & AAP Minerals Project, and these have been expanded and updated to reflect the situation at the end of March 2017. Footnotes are also included where more recent information has become available, up to the date of publication (February 2018).
    [Show full text]