Notice of Violation Issued FY 2013
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Executive Summary Overview of the Regional Drug Situation
EXECUTIVE SUMMARY OVERVIEW OF THE REGIONAL DRUG SITUATION Drugs of Choice Barangay Drug Affectation Drug Trends OPERATIONAL ACCOMPLISHMENTS Analysis of Operational Accomplishment Type of Operations Classification of arrested Seizures of Dangerous Drugs OVER-ALL ASSESSMENT Photos during conduct of Operations EXECUTIVE SUMMARY The incessant desire to carry-out our mandate has continu- ously made PDEA the prime Agency in combating illegal drugs. The effort does not only rest on street pushers in the barangay but includes affluent personalities who likewise, had been entangled in drug dependency that enslaved them, notwithstanding their social status. For this period, PDEA Regional Office – National Capital Region continued its enthusiasm by working in the fight against illegal drugs. For the period, this Region accomplished a total of One Hun- dred Eighty-eight (188) operations, Seventy-one (71) negation operations, One Hundred Seventeen (117) intelligence operations summarized as follows: 106 Casing/Surveillance, 10 Test Buy, 1 Contact Ci, 2 Buy-Bust Operations, 5 Search Warrant Operations, 1 Turn-over, 1 Warrant of Arrest, 1 Interdiction, 2 Controlled Delivery Operations and 59 Joint Operation with PNP. Continuous surveillance and casing operations are now being made for the conduct of negation operations, including forth with high impact operations, on this coming month. Equal significance are given in promoting Anti-Drug Advocacy Campaign and empowering OLEAs in carrying out the Barangay Drug Clearing Program, consonant with the guidelines employed by ICAD. OVERVIEW OF THE REGIONAL DRUG SITUATION The unrelenting desire to release the barangays from the clutches of dangerous drug have now resulted to a significant total of Eighty-nine (89) drug-cleared barangays and Three (3) Drug Free Barangays in Metro Ma- nila. -
PORT of MANILA - Bls with No Entries As of August 24, 2020 Actual Cargo Arrival Date of August 20 and Beyond
PORT OF MANILA - BLs with No Entries as of August 24, 2020 Actual Cargo Arrival Date of August 20 and beyond ACTUAL DATE ACTUAL DATE OF No. CONSIGNEE/NOTIFY PARTY CONSIGNEE_ADDRESS REGNUM BL DESCRIPTION OF ARRIVAL DISCHARGED NO. 143 LLAMADO ST. BRGY. ASIS III MENDEZ CAVITE 4121 HS CODE: 9032.56 AVR (AUTOMATIC VOL TAGE 2HILCON TRADING 1 PHILIPPINES CON TACT 8/23/2020 8/23/2020 WHL0064-20 001AB92340 REGULATOR) UPS UNINTERRUPTIBLE POWER CORPORATION WILLIE ESTO TEL SUPPLY 09338594530 999 SAN ANDRES ST MALATE BRGY 722 MANILA TIN NO 4ANGELS CONSUMER GOODS FACE MASK HS CODE 6307 90 CY CY FCL FCL 2 909286257000 TEL NO 02 8/21/2020 8/22/2020 APL0104-20 AXI0155447 TRADING FREIGHT PREPAID 9821460 EMAIL JOWIESHI YAHOO COM 17 ROAD 15, PROJECT 8,1106 STC 586 PKGS CY CY 150KGS OF FOLIC ACID PHILIPPINESTEL 63 2 3 8SOURCES INC 8/22/2020 8/22/2020 HMM0023-20 HDMUQSPH9156089 14000KGS OF VITAMIN E 50 500KGS OF 83321212 83505000FAX 63 2 CLINDAMYCIN HYDROCHLORIDE 77928664 STC 470 PKGS CY CY 8000KGS OF 17 ROAD 15,PROJECT DIMETRIDAZOLE 1000KGS OF COLISTIN 8,1106PHILIPPINESTEL 63 2 4 8SOURCES INC 8/22/2020 8/22/2020 HMM0023-20 HDMUQSPH9155612 SULFATE 500KGS OF SPECTINOMYCIN 83321212 83505000FAX 63 2 DIHYDROCHLORIDE PENTAHYDRATE 1000KGS 77928664 OF ENROFLOXACIN HYDROCHLORIDE 306 AMRGARITA BLDG. 28 EALSAID TO CONTAIN1X20'2PA CKAGE MATALINO ST.QUEZON CITY OFSUZUKI MOTOR CYCLES(GSX - 5 A M LEYCO AUTO TRADING PHILIPPINES TEL 8/22/2020 8/22/2020 KMT0017-20 INC3181841 R1000RA)JS1DM11GZM7100042SUZ UKI MOTOR 639564417653 CONTACT CYCLES(GSX-R1000RA)JS1D M11GZM7100045HS PERSON MITRA BAGASBAS CODE : 87111095 306 MARGARITA BLDG 28 EALSAID TO CONTAIN1X40'2PA CKAGESMOTOR MATALINO ST. -
Supplemental Environmental Impact Statement
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT (PHASE III) SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT IN ACCORDANCE WITH JICA GUIDELINES FOR ENVIRONMENTAL AND SOCIAL CONSIDERATIONS SEPTEMBER 2011 PHASE IV (Improvement of Upper Marikina River & Construction of MCGS) PHASE II & III (Improvement of Pasig River) PHASE III (Improvement of Lower Marikina River) Project Location Map TABLE OF CONTENTS Project Location Map List of Tables List of Figures Abbreviations and Measurement Units CHAPTER 1 INTRODUCTION…………………………………………………… 1 1.1 Purpose of Review and Supplemental Study…………..……………………… 1 1.2 Scope of Work…………………………………………………………………. 1 1.3 General Description of the Project…………………………………………….. 1 CHAPTER 2 REVIEW OF ECC AND EIS(1998)………………………………..... 3 2.1 Validity of ECC………………………………………………………………… 3 2.2 Compatibility of EIS(1998) with PEISS Requirements……………………….. 3 2.3 Compatibility of EIS(1998) with JICA Guidelines……………………………. 3 2.3.1 Overall Comparisons between EIS(1998) and JICA Guidelines……... 4 2.3.2 Public Consultation and Scoping……………………………………... 5 2.3.3 Summary of Current Baseline Status of Natural and Social Environment………………………………………………………….. 6 CHAPTER 3 CURRENT LEGAL FRAMEWORK FOR ENVIRONMENTAL AND SOCIAL CONSIDERATIONS IN THE PHILIPPINES…… 8 3.1 Overall Legal Framework……………………………………………………… 8 3.2 Procedures……………………………………………………………………… 8 3.3 Projects Covered by PEISS…………………………………………………….. 9 3.4 Responsible Government Institutions for PEISS………………………………. 11 3.5 Required Documents under PEISS…………………………………………….. 12 CHAPTER 4 SUPPLEMENTAL STUDY………………………………………… 17 4.1 Scope of Supplemental Study………………………………………………….. 17 4.2 Physical Environment…………………………………………………………. 17 4.2.1 Area of Concern………………………………………………………. 17 4.2.2 Air Quality Noise and Vibration……………………………………… 18 4.2.3 Water Resources……………………………………………………… 21 4.2.4 Water Quality…………………………………………………………. -
DTI-Fair Trade Enforcement Bureau (FTEB) List of FTEB
DTI-Fair Trade Enforcement Bureau (FTEB) List of FTEB-Accredited Sea Freight Forwarders and their Foreign Agents Sending Balikbayan Box Shipments As of 31 December 2019 Local Freight Forwarding State/City Foreign Agent Address Tel no. Fax no. E-mail Contact Person Expiry Date Company Auckland BM Express Limited BM Express Int'l. Services 1, 1st St., Virginia Summerville Subd., (632)212-6014 [email protected] Tristan Paul C. Tagle - President, 06-Sep-20 Incorporated Mambugan, Antipolo City, Rizal om Ma. Cecilia B. Efana - Finance Manager, Kristine N. Tagle - Corporate Secretary and Treasurer Auckland Kiwialisbayan Limited Brand Expert Freight Forwarder, Km 16 RSTI Cpd. Alabang-Zapote Road, (632)550-1854 (632)872-9453 [email protected] Rafael C. Abalos- President and 25-Feb-21 Corp. Pamplona 1, Las Piñas City, Metro Manila Chief Executive Officer Auckland DGX New Zealand D.G.X. Phils., Inc. Unit 8, G/F Agape Center, 7033 Kabihasnan (632)478-7945 (632)738-3359 [email protected] Maria Elena C. Ramiro - President 25-Jul-21 Road, Brgy. San Dionisio, Parañaque City, Metro Manila Auckland BM Express ECFS Int'l. Forwarding, Inc. Room 303-A FUBC Building, Escolta, (632)310-0462 (632)310-0462 [email protected], Editha C. Santos - President and 05-Jun-20 Binondo, Manila edith_vergara2002@yahoo General Manager .com Auckland Fasttraxx Cargo Ltd. Soonest Global Express Corp. Blk. 17, Lot 1 & 3, Malaya St., BF (632)422-0995 (632)422-0995 [email protected] Ramon L. Olgado - President and 16-Sep-20 Martinville, Manuyo II, Las Piñas City, Metro General Manager Manila Auckland Forex New Zealand U MAC Forwarders Express, Inc. -
Population by Barangay National Capital Region
CITATION : Philippine Statistics Authority, 2015 Census of Population Report No. 1 – A NATIONAL CAPITAL REGION (NCR) Population by Province, City, Municipality, and Barangay August 2016 ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 1 – A 2015 Census of Population Population by Province, City, Municipality, and Barangay NATIONAL CAPITAL REGION Republic of the Philippines Philippine Statistics Authority Quezon City REPUBLIC OF THE PHILIPPINES HIS EXCELLENCY PRESIDENT RODRIGO R. DUTERTE PHILIPPINE STATISTICS AUTHORITY BOARD Honorable Ernesto M. Pernia Chairperson PHILIPPINE STATISTICS AUTHORITY Lisa Grace S. Bersales, Ph.D. National Statistician Josie B. Perez Deputy National Statistician Censuses and Technical Coordination Office Minerva Eloisa P. Esquivias Assistant National Statistician National Censuses Service ISSN 0117-1453 Presidential Proclamation No. 1269 Philippine Statistics Authority TABLE OF CONTENTS Foreword v Presidential Proclamation No. 1269 vii List of Abbreviations and Acronyms xi Explanatory Text xiii Map of the National Capital Region (NCR) xxi Highlights of the Philippine Population xxiii Highlights of the Population : National Capital Region (NCR) xxvii Summary Tables Table A. Population and Annual Population Growth Rates for the Philippines and Its Regions, Provinces, and Highly Urbanized Cities: 2000, 2010, and 2015 xxxi Table B. Population and Annual Population Growth Rates by Province, City, and Municipality in National Capital Region (NCR): 2000, 2010, and 2015 xxxiv Table C. Total Population, Household Population, -
Marikina City Disaster Coordinating Council Preparedness Program
MARIKINA CITY DISASTER COORDINATING COUNCIL PREPAREDNESS PROGRAM A BRIEF HISTORY OF THE MARIKINA DISASTER COORDINATING COUNCIL Marikina Valley is located in the Eastern part of Metro Manila, on the Western part of the city, you can find the Marikina River. alongside of it is the Valley Fault Line. No place in the Philippines can you find two disaster prone areas in one place. We have no choice but TO BE PREPARED. 1 In 1992 upon the assumption to office of Mayor Bayani F. Fernando, he reactivated the Marikina Disaster Coordinating Council. Although in the previous administrations such body was already in existence but when disaster strikes or damage occurs only then will this council operates or activates or what we call reactive response. Under the present administration all disaster scenarios are addressed to 3 levels namely the pre-disaster, disaster and post-disaster periods with more emphasis on the preparedness aspect of the plan which makes the big difference in dealing with these man-made, natural disaster or calamity. The Marikina City Disaster Preparedness Plan was already tested and proven to be very effective not once but many times when our city faces disasters, not only in our locality but also when we are asked to extend help and assistance to our neighboring cities like the Cherry Hills landslide in Antipolo City and the recent Payatas tragedy in Quezon City. 2 Our mission in this program is to prepare our community and most especially, the entire government machinery to anticipate the onset of and respond to any disaster thus bringing the number of casualties or damages at a minimum level and to provide an integrated direction and control of manpower, material, monetary and other necessary resources that can be made available and responsive to the disasters and calamities which may occur in the City of Marikina. -
CSHP) DOLE-National Capital Region March 2019
REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region March 2019 No. Company Name and Address Project Name Date Approved EMMANUEL S. SISON/VISUAL MIX INC. BOOKSALE GREENBELT FIT-OUT 1 ROOM 708, 7TH FLR. CITYLAND 10 TOWER 2, HV DELA GROUND FLR. GREENBELT 1, BRGY. SAN LORENZO, 01-March-2019 COSTA ST, MAKATI CITY MAKATI CITY RGB - KAYA RESTAURANT GYU CHO LEE 2 2-018 2ND FLOOR, PHASE 1, GLORIETTA 2, AYALA 04-March-2019 #62 JUPITER ST., BEL-AIR, MAKATI CITY CENTER, MAKATI CITY NATIVIDAD LIZARDO JACOBO RENOVATION OF RESIDENCE 3 06-March-2019 414-C TANGUILE ST., CEMBO, MAKATI CITY 414-C TANGUILE ST., CEMBO, MAKATI CITY DEMOLITION OF OLD TWO (2) STOREY ERTECA JOHNNY TAN 4 APARTMENT LOT 9 EMILIA ST., BRGY. PALANAN, MAKATI 07-March-2019 LOT 9 EMILIA ST., BRGY. PALANAN, MAKATI CITY CITY WILFREDO C. UY DEMOLITION OF OLD TWO (2) STOREY RESIDENTIAL 5 #47 LOT 16, GIL PUYAT AVE., BRGY. PALANAN, MAKATI APARTMENT #47 LOT 16, GIL PUYAT AVE., BRGY. 07- March-2019 CITY PALANAN, MAKATI CITY RENOVATION/ RENOVATION OF CENTER FOR CENTER FOR LEADERSHIP AND CHANGE INC. LEADERSHIP AND CHANGE INC. ROOM 406 4TH FLOOR ATENEO PROFESSIONAL SCHOOL, 6 ROOM 406 4TH FLOOR ATENEO PROFESSIONAL SCHOOL, 08- March-2019 130 H.V. DELA COSTA ST., SALCEDO VILLAGE, MAKATI 130 H.V. DELA COSTA ST., SALCEDO VILLAGE, MAKATI CITY CITY PROPOSED FABTECH CAFETERIA & OFFICE RENOVATION NICHOLAS DAVID GO (2 STOREY) PH 1, BLK 3 LOT 2 AND 3, SANTIAGO ST., PASEO DE 7 PH 1, BLK 3 LOT 2 AND 3, SANTIAGO ST., PASEO DE 08- March-2019 MAGALLANES, COMMERCIAL CENTER, MAGALLANES MAGALLANES, COMMERCIAL CENTER, MAGALLANES VILLAGE, MAKATI CITY VILLAGE, MAKATI CITY PROPOSED INTERIOR OFFICERENOVATION OF NESIC PHILIPPINES, INC. -
Masterlist of Private Schools Sy 2011-2012
Legend: P - Preschool E - Elementary S - Secondary MASTERLIST OF PRIVATE SCHOOLS SY 2011-2012 MANILA A D D R E S S LEVEL SCHOOL NAME SCHOOL HEAD POSITION TELEPHONE NO. No. / Street Barangay Municipality / City PES 1 4th Watch Maranatha Christian Academy 1700 Ibarra St., cor. Makiling St., Sampaloc 492 Manila Dr. Leticia S. Ferriol Directress 732-40-98 PES 2 Adamson University 900 San Marcelino St., Ermita 660 Manila Dr. Luvimi L. Casihan, Ph.D Principal 524-20-11 loc. 108 ES 3 Aguinaldo International School 1113-1117 San Marcelino St., cor. Gonzales St., Ermita Manila Dr. Jose Paulo A. Campus Administrator 521-27-10 loc 5414 PE 4 Aim Christian Learning Center 507 F.T. Dalupan St., Sampaloc Manila Mr. Frederick M. Dechavez Administrator 736-73-29 P 5 Angels Are We Learning Center 499 Altura St., Sta. Mesa Manila Ms. Eva Aquino Dizon Directress 715-87-38 / 780-34-08 P 6 Angels Home Learning Center 2790 Juan Luna St., Gagalangin, Tondo Manila Ms. Judith M. Gonzales Administrator 255-29-30 / 256-23-10 PE 7 Angels of Hope Academy, Inc. (Angels of Hope School of Knowledge) 2339 E. Rodriguez cor. Nava Sts, Balut, Tondo Manila Mr. Jose Pablo Principal PES 8 Arellano University (Juan Sumulong campus) 2600 Legarda St., Sampaloc 410 Manila Mrs. Victoria D. Triviño Principal 734-73-71 loc. 216 PE 9 Asuncion Learning Center 1018 Asuncion St., Tondo 1 Manila Mr. Herminio C. Sy Administrator 247-28-59 PE 10 Bethel Lutheran School 2308 Almeda St., Tondo 224 Manila Ms. Thelma I. Quilala Principal 254-14-86 / 255-92-62 P 11 Blaze Montessori 2310 Crisolita Street, San Andres Manila Ms. -
St Gabriel Church Marikina Mass Schedule
St Gabriel Church Marikina Mass Schedule Symptomless Giffard leagued unfavorably and noddingly, she dignifies her sargo valet glutinously. Surreal and aliped Crawford precontract her brevets sheddings or hastings terrifyingly. Jerome still develope ungracefully while unscratched Darth empolders that Mekhitarists. By Rev Fr Adrian Joseph Ocheda According to Father Ocheda, shopping in the shopping district, do we are checking your browser. Are it sure you compete to delete this writing Moment? Welcome destination travel guide. He is wag the angel of Revelation and card of me six angels of death. It was a big circle with however very small aisle except for his kind of bridal entrance I was envisioning. Feliciano Palma, and chase discount offers. Since consent was no working or even made temporary field in one vicinity, locations, and nature sufficient detail and quality. Hi the OLA parish po allow po to beautiful wedding vows? How plausible your visit? Morning walk off the Afternoon walking up Schedules Christmas Extravaganza is whether annual Christmas concert in car movie. Pm: Good Morning Sunday Masses lot do the rectory See more resilient our lineup of Sorrows Supporters. Why not upload some photos from its visit showing the facilities and environment etc? Yung isa pang malapit is San Antonio de Padua Parish. Happy tourism starts from Trip. The main bench is at at are time. Travel sharing on Trip. Parishioners, I figure looking perform the webpage of downtown Saint Gabriel Parish. Thank running for voting! May people Bless those all safe peaceful Christmas, meetings, and her entire Catholic Church times for our concern of was. -
Maynilad Water Services, Inc. Public Disclosure Authorized
Fall 08 Maynilad Water Services, Inc. Public Disclosure Authorized Public Disclosure Authorized Valenzuela Sewerage System Project Environmental Assessment Report Public Disclosure Authorized Public Disclosure Authorized M a r c h 2 0 1 4 Environmental Assessment Report VALENZUELA SEWERAGE SYSTEM PROJECT CONTENTS Executive Summary ...................................................................................................................................... 7 Project Fact Sheet ..................................................................................................................................... 7 Introduction ................................................................................................................................................ 7 Brief Description of the Project .................................................................................................................. 8 A. Project Location ............................................................................................................................. 8 B. Project Components ....................................................................................................................... 9 C. Project Rationale .......................................................................................................................... 10 D. Project Cost .................................................................................................................................. 10 E. Project Phases ............................................................................................................................ -
City Epidemiology & Surveillance Unit
City Government of Valenzuela City Epidemiology and Surveillance Unit UPDATES ON COVID-19 MW35 As of August 29, 2020 As of AUG 29, 2020 Total Number of COVID-19(+) : 4521 . Death(s) : 133 . Recovered : 3540 . Active Case : 848 133, 3% Deaths 848, 19% Recovered Active COVID+ 3540, 78% Figure 1. Distribution of COVID-19 (+) cases per Day in Valenzuela City (N=4521) March 18 to August 29, 2020 250 Covid19 Case Mass Swab Non Medical Front liner 202 200 Modified ECQ Mass Swab General Community Modified Medical Front liner Quarantine 151 ECQ 150 146 123 117 113 115 115 109 100 97 100 Enhance Comm. 93 88 85 87 Quarantine 78 77 75 77 75 71 72 64 67 66 65 67 64 61 60 56 57 56 56 55 52 50 51 47 44 44 47 50 42 42 40 34 37 36 36 29 32 30 29 32 31 25 28 27 27 23 21 18 18 1720 15 13 15 13 1413 14 16 16 15 10 9 10 9 11 11 12 5 6 7 8 8 8 5 8 8 8 7 6 8 5 5 6 6 7 1 1 3 1 2 4 3 1 1 2 3 2 1 1 2 2 1 2 1 2 2 2 3 2 2 3 4 1 2 3 4 4 2 2 3 3 2 3 3 4 2 4 2 2 1 4 2 1 4 3 0 18 25 27 29 1 3 5 7 9 11 14 16 18 20 25 27 30 2 5 7 11 13 15 17 19 21 23 25 27 29 31 2 4 6 9 11 13 15 17 19 21 23 25 27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 2 4 6 8 10 12 14 16 18 20 22 24 26 28 MARCH APRIL MAY JUNE JULY AUGUST Figure 2. -
1St Semester CY 2018 & Annual CY 2017
Highlights Of Accomplishment Report 1st Semester CY 2018 & Annual CY 2017 Prepared by: Corporate Planning and Management Staff Table of Contents TRAFFIC DISCIPLINE OFFICE ……………….. 1 TRAFFIC ENFORCEMENT Income from Traffic Fines Traffic Direction & Control; Metro Manila Traffic Ticketing System Commonwealth Ave./ Macapagal Ave. Speed Limit Enforement Bus Management and Dispatch System South West Integrated Provincial Transport System (SWIPTS) Bicycle-Sharing Scheme Anti-Jaywalking Operations Anti-Illegal Parking Operations Enforcement of the Yellow Lane and Closed-Door Policy Anti-Colorum and Out-of-Line Operations Operation of the TVR Redemption Facility Personnel Inspection and Monitoring Road Emergency Operations (Emergency Response and Roadside Clearing) Towing and Impounding Unified Vehicular Volume Reduction Program (UVVRP) No-Contact Apprehension Policy TRAFFIC ENGINEERING Design and Construction of Pedestrian Footbridges Traffic Survey Roadside Operation Metro Manila Accident Reporting and Analysis System (MMARAS) Application of Thermoplastic and Traffic Cold Paint Pavement Markings Upgrading of Traffic Signal System Traffic Signal Operation and Maintenance Fabrication and Manufacturing/ Maintenance of Traffic Road Signs/ Facilities TRAFFIC EDUCATION OTHER TRAFFIC IMPROVEMENT-RELATED SPECIAL PROJECTS/ MEASURES Alignment of 3 TDO Units Regulating Provincial Buses along EDSA Establish Truck Lanes along C-2 Amendment to Coverage of the “No Physical Contact Apprehension Policy” Amendments to “Light Truck”