Airport Code/ Weblink Location

Total Page:16

File Type:pdf, Size:1020Kb

Airport Code/ Weblink Location AIRPORT STATION STATION CODE/ LOCATION COUNTY STATE LATITUDE LONGITUDE ELEVATION TYPE WEBLINK (ft/m) KAST Astoria Regional Airport ASOS Clatsop OR 46.15694 -123.8825 10/3 KUAO Aurora State Airport ASOS Marion OR 45.2471 -122.7696 194/59 KBDN Bend Airport AWOS III Deschutes OR 44.0948 -121.2006 3455/1053 KCLS Chehalis-Centralia Airport AWOS III Lewis WA 46.677 -122.9827 177/54 KDLS Columbia Gorge - The Dalles Municipal Airport ASOS Klickitat WA 45.6185 -121.1728 233/71 KCVO Corvallis Municipal Airport AWOS III P/T Benton OR 44.49711 -123.28333 246/75 K77S Creswell - Hobby Field Airport AWOS III Lane OR 43.93075 -123.00667 541/165 KEUG Eugene - Mahlon Sweet Field ASOS Lane OR 44.13333 -123.21444 364/111 K6S2 Florence Municipal Airport AWOS III Lane OR 43.9828 -124.1114 52/16 K4S2 Hood River - Ken Jernstedt Airfield AWOS III Hood River OR 45.6727768 -121.5338639 600/183 KKLS Kelso - Southwest Washington Regional Airport AWOS III P/T Cowlitz WA 46.1192 -122.8972 13/4 KS33 Madras Municipal Airport AWOS III P/T Jefferson OR 44.6653 -121.1564 2427/740 KMMV McMinnville Municipal Airport ASOS Yamhill OR 45.1993 -123.1384 157/48 KONP Newport Municipal Airport AWOS III Lincoln OR 44.58028 -124.05806 161/49 KHIO Portland - Hillsboro Airport ASOS Washington OR 45.5329 -122.948 194/59 KTTD Portland - Troutdale Airport ASOS Multnomah OR 45.5479 -122.3968 36/11 KPDX Portland International Airport ASOS Multnomah OR 45.5898 -122.5951 20/6 KS39 Prineville Airport AWOS III P/T Crook OR 44.287 -120.9038 3250/991 KRDM Redmond - Roberts Field ASOS Deschutes OR 44.25588 -121.14059 3048/929 KSLE Salem - McNary Field ASOS Marion OR 44.9105 -123.0082 207/63 KSPB Scappoose Industrial Airpark ASOS Columbia OR 45.7710278 -122.8618333 49/15 KS21 Sunriver Airport AWOS III P/T Deschutes OR 43.88333 -121.45 4154/1266 KTMK Tillamook Airport AWOS III Tillamook OR 45.41806 -123.81444 36/11 KVUO Vancouver - Pearson Airfield ASOS Clark WA 45.6387 -122.6615 20/6 Source: 1) Federal Aviation Administration (FAA) - Air Traffic, Surface Weather Observation Stations, ASOS/AWOS: https://www.faa.gov/air_traffic/weather/asos/?state=OR 2) National Weather Service and MesoWest Time Series: https://www.wrh.noaa.gov/mesowest/timeseries.php?wfo=pqr&sid=kpdx&num=72 Notes: - ASOS (Automated Surface Observing Systems) - units are operated and controlled cooperatively in the United States by the National Weather Service (NWS), Federal Aviation Administration (FAA), and the Defense Department (DOD). These systems generally report at hourly intervals, but also report special observations if weather conditions change rapidly and cross aviation operation thresholds. They generally report all the parameters of the AWOS-III, while also having the additional capabilities of reporting temperature and dew point in degrees Fahrenheit, present weather, icing, lightning, sea level pressure and precipitation accumulation. Besides serving aviation needs, ASOS serves as a primary climatological observing network in the United States, making up the first-order network of climate stations. Because of this, not every ASOS is located at an airport; for example, one of these units is located at Belvedere Castle in Central Park, New York City; another is located at the Blue Hill Observatory near Boston, Massachusetts; and another is located at Camp David, in Maryland's Catoctin Mountains. - AWOS (Automated Weather Observing Systems) - a fully configurable airport weather system that provides continuous, real time information and reports on airport weather conditions. AWOS stations are mostly operated, maintained and controlled by aviation service providers. - AWOS (I): wind speed and wind gusts (in knots), wind direction (from which the wind is blowing) and variable wind direction (in degrees of the compass), temperature and dew point (in degrees Celsius), altimeter setting and density altitude. - AWOS II: all AWOS (l) parameters, plus visibility and variable visibility (in miles). - AWOS III: all AWOS II parameters, plus sky condition (in oktas), cloud ceiling height (in feet), and liquid precipitation accumulation (in inches). - AWOS III P/T: all AWOS III parameters, plus precipitation type identification and thunderstorm detection..
Recommended publications
  • Capital Improvement Program Chapter Seven Port of Portland
    PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITALCAPITAL IMPROVEMENTIMPROVEMENT PROGRAMPROGRAM The analyses conducted in the previous chapters evaluated airport development needs based upon safety, security, potential aviation activity, and operational efficiency. Through these analyses, a plan for the use and development of the airport was defined. The purpose of this chapter is to identify the projects to implement the proposed plan for the use and development of Hillsboro Airport, and those capital needs required to operate and maintain the airport in a safe and environmentally acceptable manner. The presentation of the financial plan and its feasibility has been organized into two sections. First, funding sources on the federal and local levels are identified and discussed. Second, the airport's capital needs, costs, and funding eligibility are presented in narrative and tabulated form. CAPITAL IMPROVEMENTS FUNDING Financing capital improvements at the airport will not rely exclusively upon the financial resources of the Port of Portland (Port). Capital improvement funding is available at the federal level for many airport projects. The following discussion outlines the key sources for capital improvement funding. 7-1 FEDERAL GRANTS entitlement. For eligible general avia- tion airports, Vision 100 provides up to Through federal legislation over the $150,000 of funding each year. As a years, various grants-in-aid programs general aviation airport, Hillsboro Air- have been established to develop and port does not qualify for the commercial maintain a system of public airports service entitlement; however, it does throughout the United States. The qualify for the annual $150,000 enti- purpose of this system and its federally- tlement.
    [Show full text]
  • Individual Airport Reports
    Table of Contents – Individual Airport Reports Chapter 1 Introduction Chapter 2 2.1 Oregon Aviation Plan 2007 ( OAP 2007 ) Study Components 2.1.a State Aviation System Plan 2.1.b State Aviation Master Plan 2.1.c State Aviation Economic Impact Study 2.2 Overall Study Goals & Objectives 2.3 Airport Functional Roles 2.4 Performance Measures 2.5 Summary Chapter 3 3.1 General Airport Description and Location 3.2 Existing Airport Facilities 3.2.a Airside Facilities 3.2.b Landside Facilities 3.2.c Support Facilities 3.3 Current and Forecast Demand 3.3.a Forecasting Approach 3.4 Survey Responses 3.4.a Community Information 3.4.b Economic Development 3.4.c Airport Development and Use 3.4.d Air Shuttle 3.5 Summary Chapter 4 4.1 Airport Facility and Service Needs 4.1.a Recommendations Based on Performance Criteria 4.1.b General Observations and Recommendations 4.1.c Airport Capital Improvement Program 4.1.d Other Potential Improvements for Consideration 4.2 Definition of Airport System Role 4.3 Economic Impact Analysis 4.3.a Contribution of Airport to the Economy of Oregon Figures Chapter 3 3.1 Location Map Tables Chapter 2 2.1 Public-Use Airports in Oregon 2.2 OAP 2007 Recommended Airport Classification Chapter 3 3.1 Summary of Aviation Projections Chapter 4 4.1 Economic Contribution of Airport to the Oregon Economy Individual Airport Reports – Volume II Albany Municipal Airport Chehalem Airpark Alkali Lake State Airport Chiloquin State Airport Arlington Municipal Airport Christmas Valley Airport Ashland Municipal-Sumner Parker Field Columbia Gorge
    [Show full text]
  • The City of Newport Airport Committee Will Hold a Meeting at 2:00 P.M., On
    The City of Newport Airport Committee will hold a meeting at 2:00 P.M., on Tuesday, September 15, 2015 in Conference Room A in the Newport City Hall, 169 SW Coast Highway, Newport, Oregon 97365. The meeting location is accessible to persons with disabilities. A request for an interpreter for the hearing impaired, or for other accommodations for persons with disabilities, should be made at least 48 hours in advance of the meeting to Peggy Hawker, City Recorder 541.574.0613. The City of Newport Airport Committee reserves the right to add or delete items as needed, change the order of the agenda, and discuss any other business deemed necessary at the time of the work session and/or meeting. CITY OF NEWPORT AIRPORT COMMITTEE MEETING AGENDA Tuesday September 15, 2015 2:00 P.M. I. Call to Order II. Roll call III. Approval of minutes from August 11, 2015 meeting IV. Continued: Discussion of RFP for Airport/FBO Operational Services V. Air charter service VI. Call for Airport Improvement Projects VII. Operations report VIII. Committee comments. IX. Public comments X. Develop next agenda XI. Adjournment August 11, 2015 2:00 PM Newport, Oregon The City of Newport Airport Committee met on the above date in Conference Room A of Newport City Hall. In attendance were Committee members: Committee chair Jeff Bertuleit, committee members Susan Painter, Mark Watkins, Ralph Grutzmacher, and Gary Baker; Debra Smith has previously submitted her resignation from the committee due to time constraints and therefore was not in attendance, and Ken Brown was absent. Also in attendance were: City Manager Spencer Nebel, City Attorney Steve Rich, City Council liaison Ralph Busby, and Committee staff Bob Fuller (Public Works).
    [Show full text]
  • (Asos) Implementation Plan
    AUTOMATED SURFACE OBSERVING SYSTEM (ASOS) IMPLEMENTATION PLAN VAISALA CEILOMETER - CL31 November 14, 2008 U.S. Department of Commerce National Oceanic and Atmospheric Administration National Weather Service / Office of Operational Systems/Observing Systems Branch National Weather Service / Office of Science and Technology/Development Branch Table of Contents Section Page Executive Summary............................................................................ iii 1.0 Introduction ............................................................................... 1 1.1 Background.......................................................................... 1 1.2 Purpose................................................................................. 2 1.3 Scope.................................................................................... 2 1.4 Applicable Documents......................................................... 2 1.5 Points of Contact.................................................................. 4 2.0 Pre-Operational Implementation Activities ............................ 6 3.0 Operational Implementation Planning Activities ................... 6 3.1 Planning/Decision Activities ............................................... 7 3.2 Logistic Support Activities .................................................. 11 3.3 Configuration Management (CM) Activities....................... 12 3.4 Operational Support Activities ............................................ 12 4.0 Operational Implementation (OI) Activities .........................
    [Show full text]
  • State Land Use Board of Appeals
    BEFORE THE LAND USE BOARD OF APPEALS OF THE STATE OF OREGON JOSEPH SCHAEFER, CITY OF AURORA, CITY OF WILSONVILLE, 1000 FRIENDS OF OREGON, and FRIENDS OF FRENCH PRAIRIE, Petitioners, and CLACKAMAS COUNTY, Intervenor-Petitioner, v. OREGON STATE AVIATION BOARD and OREGON DEPARTMENT OF AVIATION, Respondents, and AURORA AIRPORT IMPROVEMENT ASSOCIATION, BRUCE BENNETT, WILSON CONSTRUCTION COMPANY INC., TED MILLAR, TLM HOLDINGS, LLC, ANTHONY ALAN HELBLING, and WILSONVILLE CHAMBER OF COMMERCE, Intervenor-Respondents. LUBA Nos. 2019-123/127/129/130 PETITIONER CITY OF WILSONVILLE’S PETITION FOR REVIEW September 21, 2020 Counsel appear on the following page. Joseph Schaefer Lucinda D. Jackson 15140 Park Ave NE Rachel E. Bertoni Aurora OR 97002 Oregon Department of Justice 503.819.4764 1162 Court St NE Petitioner Salem OR 97301 503.947.4530 Sara Kendrick Attorney for Respondents Kendrick Law, LLC 317 Court St NE Ste 203 Eric S. Postma Salem OR 97301 Bittner & Hahs PC 503.369.8323 4949 SW Meadows Rd Ste 260 Attorney for Petitioner Lake Oswego OR 97035 City of Aurora 503.228.5626 Attorney for Intervenor-Respondent Andrew Mulkey Wilsonville Chamber of Commerce Rural Lands Staff Attorney 1000 Friends of Oregon Wendie L. Kellington 133 SW 2nd Ave Ste 201 Kellington Law Group Portland OR 97204 PO Box 159 503.497.1000 x138 Lake Oswego OR 97034 Attorney for Petitioners 1000 Friends 503.636.0069 of Oregon and Friends of Attorney for remaining French Prairie Intervenor-Respondents Stephen L. Madkour Scott A. Norris Nathan Boderman Marion County Legal Counsel County Counsel PO Box 14500 Clackamas County Salem OR 97309 2051 Kaen Rd 503.588.5220 Oregon City OR 97045 Attorney for Amicus Curiae 503.655.8362 Marion County Attorneys for Intervenor-Petitioner Clackamas County Page i 1 TABLE OF CONTENTS 2 I.
    [Show full text]
  • Market Rent Study - Improved Air Side Sites Roberts Field - Redmond Municipal Airport 2522 SE Jesse Butler Circle Redmond, Oregon 97756
    Market Rent Study - Improved Air Side Sites Roberts Field - Redmond Municipal Airport 2522 SE Jesse Butler Circle Redmond, Oregon 97756 Date of Inspection – May 7, 2019 Prepared For: Zachary Bass Airport Director Redmond Municipal Airport 2522 SE Jesse Butler Circle Redmond, Oregon 97756 Prepared By: Jeremy L. Cowan Bratton Appraisal Group LLC 25 NW Hawthorne Avenue Bend, Oregon 97703 EXPERTS IN REAL ESTATE ANALYSIS 25 NW Hawthorne Ave. May 15, 2019 Bend, Oregon 97703 Zachary Bass, Airport Director Redmond Municipal Airport 2522 SE Jesse Butler Circle Dana Bratton, MAI Redmond, Oregon 97756 Mike Caba, MAI Jeremy Cowan Cal Gabert RE: Market Rent Study of Air Side Sites Located at Roberts Field – Nancy Gabert, SRA Redmond Municipal Airport Dear Mr. Bass: At your request, I have completed a market rent study of the property identified above and provided the results within this document. The purpose and intended use of this rent study is to estimate the annual fair market rent for improved air side properties located at the Redmond Municipal Airport. The effective date of value is May 7, 2019. This rent study has been written to conform with the Uniform Standards of Professional Appraisal Practice (USPAP) set forth by the Appraisal Standards Board of the Appraisal Foundation and adopted by the State of Oregon Appraiser Certification and Licensure Board. In the course of research, I have completed a physical inspection of the subject property, as well as a study of comparable rentals. Note that comparable ground leases located at airports outside of the Central Oregon region have not all been physically inspected by the appraiser; however, I have viewed Google maps of the individual airports.
    [Show full text]
  • Airport Master Plan Update 2008
    JUNE 2006 PORT OF ASTORIA The preparation of this document may have been supported, in part, with financial assistance from the Federal Aviation Administration Astoria through the Airport Improvement Program. The contents do not necessarily reflect the official views or policy of the FAA. Acceptance of these Regional documents by the FAA does not in any way constitute a commitment on the part of the United States to participate in any development Airport depicted herein nor does it indicate that the proposed development is environmentally acceptable in accordance with appropriate public law. Master Plan Update BarnardDunkelberg Company Barnard Dunkelberg & Company TULSA DENVER 1616 East 15th Street 1743 Wazee Street, Suite 400 Tulsa, Oklahoma 74120-6027 Denver, Colorado 80202 Phone Number. 918 585 8844 Phone Number. 303 825 8844 FAX Number. 918 585 8857 FAX Number. 303 825 8855 Email. [email protected] Reid Middleton, Inc. Everett, Washington Contents. Contents i Tables iii Illustrations iv A. Inventory of Existing Conditions Introduction A.1 Airport Role and Facilities A.2 Airport System/Navigation and Communication Aids A.9 Airport Environs A.12 Financial Inventory A.14 Summary A.14 B. Forecasts of Aviation Activity Introduction B.1 Historical and Existing Activity Summary B.5 Aviation Activity Forecasts B.11 Based Aircraft Forecast B.18 Summary B.20 C. Capacity Analysis and Facility Requirements Introduction C.1 Airport Reference Code (ARC)/Critical Aircraft Analysis C.1 Airfield Capacity Methodology C.2 Airfield Capacity Analysis C.10 Facility Requirements C.11 Landside Facilities C.21 Summary C.24 D. Development Plan Introduction D.1 Goals for Development D.2 Airfield Development Considerations and Alternatives D.3 Landside Development Considerations, Alternatives, and Recommendations D.11 Long-Term Landside Development Considerations D.14 Summary D.22 i E.
    [Show full text]
  • INTRODUCTION Airport Master Plan Update Aurora State Airport
    Chapter One: INTRODUCTION Airport Master Plan Update Aurora State Airport This update to the 2000 Airport Master Plan was undertaken to assess the role of the Aurora State Airport (Airport), evaluate the Airport's capabilities, forecast future aeronautical activity for the next 20 years, and plan for the timely development of any new or expanded Airport facilities needed to accommodate future aviation activity. The owner and operator of the Airport, the Oregon Department of Aviation (ODA), obtained and matched a grant from the Federal Aviation Administration (FAA) to fund this study. ODA has organized a Planning Advisory Committee (PAC), representing Airport users and neighbors, to participate in the planning process. In addition to six PAC meetings, public involvement in the master plan update includes a website to disseminate information and gather comments and questions, and five open houses for the general public. The purpose of this first draft chapter of the Airport Master Plan Update (Plan) is threefold: • to summarize major issues that the Plan should address • to identify goals for the planning process and for the future development of the Airport • to determine the Airport’s current and future role within the system of airports GOALS Goals for the master plan update were a subject of the first PAC meeting held on July 22, 2010. The common themes of PAC members’ statements have been synthesized and are presented below. The goals are divided between two categories – goals for the planning process and goals for the master plan itself. Planning Process Goals The goals for the planning process should guide the conduct of the ODA, ODA’s consultants, and the PAC throughout the development of the master plan update.
    [Show full text]
  • 3 Madras Activity Forecasts.Indd
    MADRAS MUNICIPAL AIRPORT AIRPORT MASTER PLAN This chapter is a preliminary working draft prepared for review by City of Madras staff and the Airport Master Plan Update - Planning Advisory Committee (PAC). The chapter will be submitted to the Federal Aviation Administration (FAA) and the Oregon Department of Aviation (ODA) for formal review after local review is completed, and is therefore, subject to change. MADRAS MUNICIPAL AIRPORT I AIRPORT MASTER PLAN Chapter 3 Aviation Activity Forecasts COVID-19 IMPACTS ON AVIATION ACTIVITY FORECASTS This forecast was prepared during the first full year of the COVID-19 pandemic. The disruption of airport activity experienced throughout the U.S. airport system related to COVID-19 in 2020 is unprecedented and has led to a significant decline in activity that is not consistent with recent historic trends. Although the limits of the current disruption have yet to be defined, it is believed that the underlying elements of demand within general aviation will remain largely intact until all public health constraints are fully addressed and economic conditions gradually return to normal. Two notable conditions are defined in these forecasts: 1. 2019 activity is used as the base for the updated twenty-year aviation activity forecast. 2019 represents a reasonable “pre-COVID” indication of current conditions and it was the last full calendar year of activity available at the time the forecasts were prepared. To simplify the projection, the 2019 data was carried forward to 2020, representing base year activity in the 2020- 2040 master plan forecast window. The twenty year forecasts are provided in five-year increments beginning in 2025.
    [Show full text]
  • Chapter 10, Oregon Aviation Plan V6.0
    10. RECOMMENDED PLAN This update to Oregon Aviation Plan (OAP v6.0) has taken a comprehensive look at how the system is performing based on current conditions. This evaluation identified various actions and projects that are recommended to improve the performance of the Oregon airport system. The process for how the recommendations were developed are summarized in this chapter. 10.1 Review of FAA ASSET Roles for Oregon Airports The National Plan of Integrated Airport Systems (NPIAS) is a document used by the Federal Aviation Administration (FAA). The NPIAS includes airports in the United States that are open to the public and that are eligible for federal funding. Fifty-seven of the publicly-owned airports in Oregon are included in the NPIAS. This section compares roles assigned by the FAA to study airports to their current state airport roles. There are 3,340 existing or proposed airports in the United States that are included in the NPIAS1; 382 of these airports have scheduled commercial airline service. Commercial airports are classified as “Primary” airports, and commercial airports in the United States are further defined by the FAA as Large, Medium, Small, and Non- Hub airports. The hub assignments are based on the number of enplanements accommodated at each commercial airport. The remaining 2,958 landing facilities (which include airports, seaplane bases, and heliports) are referred to as “Nonprimary” airports; the nonprimary airports mainly consist of the nation’s general aviation airports. However, within the Nonprimary category, 127 of the airports are “Nonprimary Commercial Service” airports. Nonprimary commercial service airports always have less than 10,000 annual passenger enplanements.
    [Show full text]
  • Special Minimums
    M1 A ALTERNATE MINS A 21196 INSTRUMENT APPROACH PROCEDURE CHARTS A IFR ALTERNATE AIRPORT MINIMUMS Standard alternate minimums for non-precision approaches and approaches with vertical guidance [NDB, VOR, LOC, TACAN, LDA, SDF, VOR/DME, ASR, RNAV (GPS) or RNAV (RNP)] are 800-2. Standard alternate minimums for precision approaches (ILS, PAR, or GLS) are 600-2. Airports within this geographical area that require alternate minimums other than standard or alternate minimums with restrictions are listed below. NA - means alternate minimums are not authorized due to unmonitored facility, absence of weather reporting service, or lack of adequate navigation coverage. Civil pilots see FAR 91. IFR Alternate Minimums: Ceiling and Visibility Minimums not applicable to USA/USN/USAF. Pilots must review the IFR Alternate Minimums Notes for alternate airfield suitability. NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS ALBANY, OR BAKER CITY, OR ALBANY MUNI (S12)……….VOR/DME or GPS-A BAKER CITY NA except for operators with approved weather MUNI (BKE)……………….….RNAV (GPS) Rwy 131 reporting service. VOR-A23 VOR/DME Rwy 1345 ARLINGTON, WA 1Categories A, B, 900-2; Category C, 1200-3; ARLINGTON Category D, 1400-3. MUNI (AWO)………………...RNAV (GPS) Rwy 34 2NA when local weather not available. NA when local weather not available. 3Categories A, B, 1900-2; Categories C, D, Category D, 800-2½. 1900-3. 09 SEP 2021 to 07 OCT 4Category D, 900-2¾. ASTORIA, OR 5NA when control zone not in effect. ASTORIA RGNL (AST)…………………..RNAV (GPS) Rwy 81 BELLINGHAM, WA RNAV (GPS) Rwy 262 BELLINGHAM VOR Rwy 813 INTL (BLI) ……………………ILS or LOC Rwy 161 1Category C, 1100-3; Category D, 1200-3.
    [Show full text]
  • Troutdale Airport Master Plan Shaping Our Future Planning Advisory Committee Final Report June 2016
    TROUTDALE AIRPORT MASTER PLAN SHAPING OUR FUTURE PLANNING ADVISORY COMMITTEE FINAL REPORT JUNE 2016 May 11, 2016 Port of Portland Executive Director, Troutdale Airport: Shaping Our Future was a complete airport master plan process that went above and beyond. While the master plan followed many of the traditional steps characteristic of an airport master plan, it also explored a broader range of issues important to the Port, City and greater region. Before the process began, the Port of Portland recognized that Troutdale Airport was a valued community asset on an unsustainable path. At the same time, the Port identified a local community need for increased economic opportunities. This master plan process was exceptional in that it not only addressed the airport resources required to continue serving aviation needs, it also evaluated how Troutdale Airport could sustainably serve local community needs as a whole for the next 20 years. The Port of Portland invited a group of 23 stakeholders – representing diverse values of economic, environmental and social sustainability – to create a project advisory committee (PAC) charged with providing input and recommendations for the master plan process. From the spring of 2014 to the spring of 2016, I worked with these outstanding individuals and the Port to develop our recommendations on the Troutdale Airport Master Plan. As a PAC, we were given the opportunity to provide input on planning documents and engage in rigorous discussion about Troutdale Airport’s role in the future. Our recommendations were also informed by community input collected from stakeholder meetings and public involvement activities prior to key project milestones.
    [Show full text]