JUNE 2006 PORT OF ASTORIA The preparation of this document may have been supported, in part, with financial assistance from the Federal Aviation Administration Astoria through the Airport Improvement Program. The contents do not necessarily reflect the official views or policy of the FAA. Acceptance of these Regional documents by the FAA does not in any way constitute a commitment on the part of the United States to participate in any development Airport depicted herein nor does it indicate that the proposed development is environmentally acceptable in accordance with appropriate public law. Master Plan Update BarnardDunkelberg Company Barnard Dunkelberg & Company TULSA DENVER 1616 East 15th Street 1743 Wazee Street, Suite 400 Tulsa, Oklahoma 74120-6027 Denver, Colorado 80202 Phone Number. 918 585 8844 Phone Number. 303 825 8844 FAX Number. 918 585 8857 FAX Number. 303 825 8855 Email.
[email protected] Reid Middleton, Inc. Everett, Washington Contents. Contents i Tables iii Illustrations iv A. Inventory of Existing Conditions Introduction A.1 Airport Role and Facilities A.2 Airport System/Navigation and Communication Aids A.9 Airport Environs A.12 Financial Inventory A.14 Summary A.14 B. Forecasts of Aviation Activity Introduction B.1 Historical and Existing Activity Summary B.5 Aviation Activity Forecasts B.11 Based Aircraft Forecast B.18 Summary B.20 C. Capacity Analysis and Facility Requirements Introduction C.1 Airport Reference Code (ARC)/Critical Aircraft Analysis C.1 Airfield Capacity Methodology C.2 Airfield Capacity Analysis C.10 Facility Requirements C.11 Landside Facilities C.21 Summary C.24 D. Development Plan Introduction D.1 Goals for Development D.2 Airfield Development Considerations and Alternatives D.3 Landside Development Considerations, Alternatives, and Recommendations D.11 Long-Term Landside Development Considerations D.14 Summary D.22 i E.