The Corniche, Albert Embankment, London

Total Page:16

File Type:pdf, Size:1020Kb

The Corniche, Albert Embankment, London The Corniche, Albert Guide Price of £800,000 Embankment, London SE1 Independent property consultants specialising in Prime Central London real estate. www.reslon.co.uk The Corniche, Albert Embankment, London SE1 Overview • Luxury One Double Bedroom Apartment • 12th floor • Houses of Parliament • Swimming pool Selling your home? If you are considering selling your home • 24 Hour Concierge please contact us today for your no • Balcony obligation free market appraisal. • Iconic Building Our dedicated and friendly team will assist you 6 days a week. Get in touch today! • River View +44 (0)20 3176 0594 • Including a private screening room Email: [email protected] • Skyline Club lounge and spa facilities • 583 sq ft Directions Located in the heart of London, this exclusive riverside development is conveniently placed for getting around one of the world's most exciting cities. The Corniche is located in the London Borough of Lambeth and situated on the southern stretch of Albert Embankment, adjacent to the River Thames. This development falls within the Vauxhall, Nine Elms Battersea Regeneration Area, which runs from Lambeth Bridge to Chelsea Bridge and aims to be an exciting new region in the city centre. Mayfair Office: Green Park House, 15 Stratton Street, W1J 8LQ Phone: +44 (0)20 3176 0594 www.reslon.co.uk R1016 Printed by Ravensworth Tel: 01670 713330 IMPORTANT: we would like to inform prospective purchasers that these sales particulars have been prepared as a general guide only. A detailed survey has not been carried out, nor the services, appliances and fittings tested. Room sizes should not be relied upon for furnishing purposes and are approximate. If floor plans are included, they are for guidance only and illustration purposes only and may not be to scale. If there are any important matters likely to affect your decision to buy, please contact us before viewing the property. .
Recommended publications
  • Albert Embankment, Parliament View,London
    Albert Embankment, Parliament View, London SE1 THREE BEDROOM APARTMENT WITH RIVER THAMES AND WESTMINSTER VIEWS. This rare three bedroom apartment in the desirable Parliament View Apartments is perfectly positioned on the 8th floor, taking advantage of the spectacular views of the River Thames, Houses of Parliament and London Eye. Accommodation is arranged so that both the reception room and master bedroom face the river and enjoy the fabulous views. There is a separate kitchen which is fully fitted and equipped with an abundance of storage. There are two further double bedrooms to the rear of the apartment – these have use of a separate family bathroom, whilst the master enjoys a private en suite. The apartment also comes with the added benefit of a designated parking space in the development’s secure underground car park. *Please note, the photos shown were taken more than 6 months ago since the property is currently tenanted. Parliament View is a popular development located on the banks of the river close to Lambeth Bridge. Residents will benefit from excellent on site security and 24 hour concierge service, as well as a private gymnasium. Whilst being an easy walking distance from Westminster and the cultural attractions of the South Bank, it is also serviced by the Bakerloo line from Lambeth North (0.6 miles) and the District, Circle and Jubilee Lines from Westminster (0.7 miles) which offer access to the rest of Central London. Riverbus services from Millbank pier also provide a pleasant commute into the City. ACCOMMODATION Reception room ◆ Separate kitchen ◆ Master bedroom en suite ◆ Two further bedrooms ◆ Family bathroom ◆ Spectacular river and Westminster Views Secure parking space ◆ 24 hour security and concierge ◆ Residents gym EPC=B Gross Internal Area (Approx.) 95.7 Sq M - 1,030 Sq Ft Eighth Floor Viewing: Strictly by appointment with Savills.
    [Show full text]
  • Lambeth Bridge and the Location of the Southbound Bus Stop on Lambeth Palace Road Has Been Moved Back to Its Existing Location
    Appendix B: Likely journey time impacts following changes to the design post consultation Summary of changes from 2017 consultation Following consultation feedback in 2017 several turning movements have now been retained eastbound onto Lambeth Bridge and the location of the southbound bus stop on Lambeth Palace Road has been moved back to its existing location. The following turning movements are now allowed at all times of day for all vehicles: Millbank North to Lambeth Bridge and Millbank South to Lambeth Bridge. The shared pedestrian and cycle areas have been reviewed and removed where it is safe for cyclists to use the carriageway. Shared use remains between Millbank South and Horseferry Road. There is also a carriageway level cycle lane through the footway between Millbank North and Lambeth Bridge. These alterations to the design in response to consultation feedback have resulted in some changes to the modelled journey times. Please note journey times are not directly comparable to the 2017 consultation. This is due to the modelled area being extended to ensure all journey times changes are captured by the modelling assessment. The tables below compare future modelled journey times with and without the Lambeth Bridge scheme. Both models include demand changes associated with committed developments and population growth, and planned changes to the road network. This allows us to isolate other changes on the network and present the predicted impact of the Lambeth Bridge scheme. 39 Revised Journey Times: Buses Future Journey Time without
    [Show full text]
  • London and Its Main Drainage, 1847-1865: a Study of One Aspect of the Public Health Movement in Victorian England
    University of Nebraska at Omaha DigitalCommons@UNO Student Work 6-1-1971 London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England Lester J. Palmquist University of Nebraska at Omaha Follow this and additional works at: https://digitalcommons.unomaha.edu/studentwork Recommended Citation Palmquist, Lester J., "London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England" (1971). Student Work. 395. https://digitalcommons.unomaha.edu/studentwork/395 This Thesis is brought to you for free and open access by DigitalCommons@UNO. It has been accepted for inclusion in Student Work by an authorized administrator of DigitalCommons@UNO. For more information, please contact [email protected]. LONDON .ML' ITS MAIN DRAINAGE, 1847-1865: A STUDY OF ONE ASPECT OP TEE PUBLIC HEALTH MOVEMENT IN VICTORIAN ENGLAND A Thesis Presented to the Department of History and the Faculty of the Graduate College University of Nebraska at Omaha In Partial Fulfillment of the Requirements for the Degree Master of Arts by Lester J. Palmquist June 1971 UMI Number: EP73033 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a complete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. Dissertation Publishing UMI EP73033 Published by ProQuest LLC (2015). Copyright in the Dissertation held by the Author. Microform Edition © ProQuest LLC.
    [Show full text]
  • Albert Embankment Conservation Area Conservation Area Character
    AlbertAlbert EmbankmentEmbankment Conservation Area Character Appraisal, 2017 Conservation Area Conservation Area Character Appraisal May 2017 Albert Embankment Conservation Area Character Appraisal, 2017 Lambeth river front in the 1750s. The construction of the Albert Embankment. 2 Albert Embankment Conservation Area Character Appraisal, 2017 CONTENTS PAGE CONSERVATION AREA CONTEXT MAP 4 CONSERVATION AREA MAP 5 INTRODUCTION 6 1. PLANNING FRAMEWORK 7 2. CONSERVATION AREA APPRAISAL 7 2.2 Geology 9 2.4 Historic Development 9 2.22 City Context 14 2.24 Spatial Analysis 15 2.75 Character Areas 29 2.103 Major Open Spaces 35 2.106 Trees 36 2.107 Building Materials and Details 36 2.111 Signs 37 2.112 Advertisements 37 2.113 Activities and Uses 37 2.114 Boundary Treatments 37 2.116 Public Realm 38 2.124 Public Art / Memorials 40 2.130 Designated Heritage Assets 42 2.133 Non Designated Heritage Assets 42 2.137 Positive Contributors 44 2.138 Views 44 2.151 Capacity for Change 48 2.152 Enhancement Opportunities 48 2.161 Appraisal Conclusion 50 APPENDICES 51 Appendix 1— WWHS Approaches map 51 Appendix 2— Statutory Listed Buildings 52 Appendix 3— Archaeological Priority Area No. 2 53 3 Albert Embankment Conservation Area Character Appraisal, 2017 CONSERVATION AREA CONTEXT MAP Whitehall CA CA 38 Westminster Abbey and CA 40 Parliament Square CA CA 10 Smith CA 50 Square CA Millbank CA CA 08 CA 56 Pimlico CA CA 32 08 – Kennington CA, 10 – Lambeth Palace CA, 32 – Vauxhall CA, 38 – South Bank CA, 40 – Lower Marsh CA, 50 – Lambeth Walk and China Walk CA, 56 – Vauxhall Gardens Estate CA.
    [Show full text]
  • Reconnecting London with the River Thames
    RECONNECTING LONDON WITH THE RIVER THAMES ANNUAL REPORT 2017/18 Contents Vision and Purpose 03 Strategic Report Tideway is an independent regulated 05 Chairman’s Introduction water company, with a vision to reconnect 06 Chief Executive Officer’s Report London with the river Thames. 09 Who We Are and What We Do 16 Business Model 20 Reconnecting London with the River Thames We will achieve this vision by delivering the 22 Our Vision and Strategy Thames Tideway Tunnel, a major new sewer 26 Risk Management 32 Long-Term Viability Statement which is urgently needed to protect the tidal 36 Performance Review River Thames from pollution. 59 Financial Performance Review 65 Governance The tunnel is the largest project in the water 67 Chairman’s Introduction sector since the construction of Sir Joseph 68 Board Leadership, Bazalgette’s interceptor sewers in the 1860s. Transparency and Governance – The Board It is being financed by the private sector, 90 Audit Committee Report with half the equity provided by UK investors. 94 Remuneration Committee Report This includes a large number of UK pensioners, 104 Board Leadership, through investment by major pension funds. Transparency and Governance – Relationship with Shareholders We aim to deliver on time and budget, at the 108 Directors’ Report right quality. The health, safety and wellbeing 111 Financial Statements of our people and the public are paramount 112 Independent Auditor’s Report – we intend to work safely or not at all. 116 Financial Statements 120 Notes to the Financial Statements We are working closely with our local stakeholders in delivering the tunnel, delivering 137 Regulatory Reporting benefits for them, our investors, Thames Water’s 138 Introduction 142 Regulatory Annual Performance bill payers and the environment.
    [Show full text]
  • MERANO ALBERT EMBANKMENT London SE1
    MERANO ALBERT EMBANKMENT London SE1 DL PORTRAIT PORTRAIT PRIMARY LOGO A6 PORTRAIT Square is for position. Top right hand corner. A5 PORTRAIT When you produce publications in a nonstandard size, please refer to the closest A size as the starting point for your logo size and adjust incrementally to suit your format. A4 PORTRAIT A3 PORTRAIT A2 PORTRAIT Exceptional penthouse apartment with sweeping River Thames and Westminster views This fantastic penthouse apartment in the desirable Merano Residences offers the ultimate riverside lifestyle, boasting sensational panoramic views of the Thames and London skyline. Arranged over two floors, the upper level comprises a spacious reception/dining room, with floor to ceiling glass allowing for an abundance of natural light and the views to be enjoyed throughout. This opens out to a generous balcony which spans the width of the flat and offers the perfect spot for taking in the iconic vista. A separate kitchen is fully equipped with plenty of storage and integrated Miele appliances. There is also a guest WC on this level. Downstairs you will find two spacious double bedroom suites; the principal bedroom offers a walk in dressing room and luxuriously appointed bathroom, complete with dual vanity and a separate bath and shower. The room opens out to a second private balcony which also enjoys the fabulous views. The second double bedroom also offers an exquisite en suite shower room and built in wardrobes. There is also a large utility room and additional storage on this level. Merano Residences is one of the newest additions to Albert Embankment’s transforming riverside.
    [Show full text]
  • CA 57 Albert Embankment D a O R H T E B M
    Conservation Areas in the London Borough of Lambeth CA 57 Albert Embankment D A O R H T E B M A 1 St John's 10.7m L r CR te el Police Support Gardens D Sh E Wa rd Headquarters A Bdy N y L a a R mb Horseferry Lambeth Bridge eth w 5.1m b Y Bri dg u L e House S Post E S Fn T R E E 2 S 1 to 7 T t Eustac e 6 J 7 5 7 o P 9 2 House o h l t o 4.0m a n t 1 6 B y ' 1 1 9 3.8m s M g r o 4 N O u . B 4 n R 0 H e d F m n o MLW Parliament View Centra O n l L u 1 Apartment s t K e o K s itch e n t 1 R e t 9 El 0 O Sub Sta W 5.4m W H M OLD 1 ) PAR h A 3.6m t Su bway DIS u E ST o R PAGE S TRE ET E ET 32 S ( T s H CR 3.2m he Pa viou r's Arms n 5.3m T O e R d LB 3 .41m (P H) r 1 to BM 3 N 30 PAGE S TRE ET a E 7 G 5 G T a br Y iel H El Sub Sta r ous e N W e 8 3 S Westminster 1 M a E T 6 e Neville House w A 4 ( s R 1 to 141 P r A o t 5 M m 10 Tower E H m R T (Government Offices) s K ) i S E n a i T N s H r t Neville A e A o t r M House c B i (Govt V S M R T W Offices) E o R L g M T E Water e E R r r T E s e t l B 4 e H h L T o S E A u E El Cleland House R s T e W Sub S 1 1 1 Play Area G Sta e 8 4 1 1 M H s t t a t TCB o o o G a r t 1 I 1 4 1 m 5 W SM d 2 r 2 6 H D s Recreation Ground to e i 1 n H h n t 42 T a o s s E l 1 t e e m B t 5 e s s m 5 M r 2 o C u A 0 H .
    [Show full text]
  • Albert Embankment Draft CA Statement
    ALBERT EMBANKMENT CONSERVATION AREA DRAFT CONSERVATION AREA STATEMENT London Borough of Lambeth January 2015 CONTENTS Page CONTEXT CONSERVATION AREA MAP 4 EXISTING CONSERVATION AREA MAP 5 INTRODUCTION 6 Consultation 7 1 PLANNING FRAMEWORK 8 2 CONSERVATION AREA APPRAISAL 10 Introduction 10 Geology and Landscape 10 Archaeology 10 Historic Development 10 City Context 13 Spatial Analysis 14 Open Spaces 19 Trees 22 Character Areas 22 Buildings Character and Materials 28 Boundary Treatments 29 Public Realm 29 Street Furniture 30 Public Art / Memorials 31 Signs and Advertisements 32 Activity and Uses 32 Listed Buildings 32 Buildings and structures that make a Positive 34 Contribution Buildings that make a Neutral Contribution 34 Buildings that make a Negative Contribution 35 Views 35 Capacity for Change 38 Appraisal Recommendations 38 Conservation Area Boundary 38 3. GUIDANCE 40 Alterations to Existing Properties 40 New Buildings 42 Pubfronts 43 Railway Arches 43 Signs and Advertisements 43 New Uses 45 Refuse Storage 45 Plant and Equipment 45 2 Boundary Treatments 45 Trees 45 Sustainability 46 Further Information 46 4. MANAGEMENT PROPOSALS 47 Planning Controls 47 Monitoring and Enforcement 47 Signs and Advertisements 47 Highways / Street works 47 Trees 48 Enhancement Opportunities 48 Management Conclusion 49 5. CONTACTS 50 6. SOURCES 52 APPENDIX 1 – STATUTORY LISTED BUILDINGS 54 APPENDIX 2 – PROPOSED CA BOUNDARY MAP 55 3 CONSERVATION AREA CONTEXT MAP 4 EXISTING CONSERVATION AREA BOUNDARY 5 INTRODUCTION This draft Conservation Area Statement is prepared by the Council to assist with the management and enhancement of the Albert Embankment Conservation Area. It is hoped that it will be useful for residents, property managers and developers alike in understanding the objectives of the conservation area designation.
    [Show full text]
  • ALBERT EMBANKMENT FORESHORE COMMUNITY LIAISON WORKING GROUP 4 November 2020 ALBERT EMBANKMENT FORESHORE SITE UPDATE Albert Embankment Foreshore Overview
    ALBERT EMBANKMENT FORESHORE COMMUNITY LIAISON WORKING GROUP 4 November 2020 ALBERT EMBANKMENT FORESHORE SITE UPDATE Albert Embankment Foreshore Overview Shaft Interception Chamber Cofferdam 1 Progress 48m-Deep Shaft • Excavated to 48m deep using sprayed concrete lining method. • Started construction of secondary lining, working up 3m at a time. Connection Tunnel • Connects the base of the shaft to the main super sewer tunnel. • Completed construction of 10m connection tunnel from base of the shaft to main ‘super sewer’ deep below the River Thames. • Concrete secondary lining of connection tunnel completed. Cofferdam 2 Progress Interception Chamber • Excavation of Interception Chamber completed. • Broken through into culvert tunnel that links the shaft in Cofferdam 1 to the Interception Chamber • Construction of concrete walls below ground level in progress • Brixton sewer diversion structure construction in progress • Reception structure for the Clapham combined sewer overflow (CSO) diversion in process Cofferdam 3 Progress • Excavating route of pipe tunnel under Vauxhall Bridge • Installation of props within the launch chamber underway • Construction of river wall protection • Construction of the temporary Clapham CSO diversion in progress Working Hours Monday to Friday*: 08:00 – 18:00 Saturday: 08:00 – 13:00 *Extended hours working in exceptional circumstance 3-month Look Ahead Cofferdam 1 – Shaft • Continue to construct internal concrete walls as secondary lining within the shaft structure. Cofferdam 2 • Continue below ground concrete
    [Show full text]
  • 53080 Albert Embankment Lambeth.Pdf
    London Fire Brigade Headquarters 8 Albert Embankment, SE1 London Borough of Lambeth Archaeological Desk-Based Assessment y g o l o e a h c r A x e s s e Ref: 53080.1 W April 2003 LONDON FIRE BRIGADE HEADQUARTERS 8 ALBERT EMBANKMENT, LONDON SE1 LONDON BOROUGH OF LAMBETH ARCHAEOLOGICAL DESK-BASED ASSESSMENT Prepared on behalf of Frogmore Estates Ltd 11-15 Wigmore Street London W1A 2JZ by Wessex Archaeology in London Unit 701 The Chandlery 50 Westminster Bridge Road London SE1 7QY Report Ref: 53080.1 April 2003 ©Trust for Wessex Archaeology Limited 2003, all rights reserved Trust for Wessex Archaeology Limited is a Registered Charity No. 287786 LONDON FIRE BRIGADE HEADQUARTERS 8 ALBERT EMBANKMENT, LONDON SE1 LONDON BOROUGH OF LAMBETH ARCHAEOLOGICAL DESK-BASED ASSESSMENT CONTENTS Executive summary ACKNOWLEDGEMENTS ........................................................................................V 1 INTRODUCTION ...............................................................................................1 1.1 Project background....................................................................................1 1.2 Site description, topography and geology................................................1 1.3 Planning background.................................................................................2 1.4 Methodology ...............................................................................................3 2 RESULTS.............................................................................................................3
    [Show full text]
  • Lambeth Bridge North and South - Traffic Impacts and Data Table
    Lambeth Bridge north and south - Traffic impacts and data table Buses Our proposals would have an impact on the operation of the bus network and passenger journeys around Lambeth Bridge. The removal of the roundabouts on both sides of the river would result in reductions in journey times on some routes, such as the route 3 westbound, which would likely experience journey time improvements of up to two minutes. Whereas other routes would experience journey time increases, such as those travelling northbound on Albert Embankment in the evening peak, which are predicted to experience delays of up to four minutes. Cycles Our proposals aim to protect cyclists from traffic movements where possible. This would be achieved through a combination of cycle bypasses at footway level for left turning cyclists, physical segregation on approach to the junctions, two stage right turn facilities and dedicated cycle signals where possible at both junctions. The majority of journey times for cyclists would increase by no more than two minutes. However, cyclists using the two stage right turn facilities would see increases in journey times. The two stage right turn facilities would provide a safer alternative to turning right with general traffic in the centre of the junction. Movements using multiple two stage right turns for example from Lambeth Palace Road to Millbank north would see an increase in journey time of up to eight minutes. This is a low frequency movement. Pedestrians Our proposals include changes to pedestrian crossing facilities on both sides of Lambeth Bridge. At the northern roundabout, the existing zebra crossings will be converted into signalised straight across crossings, allowing pedestrians to cross the road in one movement; whereas on the southern roundabout, crossings would be staggered.
    [Show full text]
  • Albert Embankment Conservation Area Character Appraisal, 2017
    AlbertAlbert EmbankmentEmbankment Conservation Area Character Appraisal, 2017 Conservation Area Conservation Area Character Appraisal May 2017 Albert Embankment Conservation Area Character Appraisal, 2017 Lambeth river front in the 1750s. The construction of the Albert Embankment. 2 Albert Embankment Conservation Area Character Appraisal, 2017 CONTENTS PAGE CONSERVATION AREA CONTEXT MAP 4 CONSERVATION AREA MAP 5 INTRODUCTION 6 1. PLANNING FRAMEWORK 7 2. CONSERVATION AREA APPRAISAL 7 2.2 Geology 9 2.4 Historic Development 9 2.22 City Context 14 2.24 Spatial Analysis 15 2.75 Character Areas 29 2.103 Major Open Spaces 35 2.106 Trees 36 2.107 Building Materials and Details 36 2.111 Signs 37 2.112 Advertisements 37 2.113 Activities and Uses 37 2.114 Boundary Treatments 37 2.116 Public Realm 38 2.124 Public Art / Memorials 40 2.130 Designated Heritage Assets 42 2.133 Non Designated Heritage Assets 42 2.137 Positive Contributors 44 2.138 Views 44 2.151 Capacity for Change 48 2.152 Enhancement Opportunities 48 2.161 Appraisal Conclusion 50 APPENDICES 51 Appendix 1— WWHS Approaches map 51 Appendix 2— Statutory Listed Buildings 52 Appendix 3— Archaeological Priority Area No. 2 53 3 Albert Embankment Conservation Area Character Appraisal, 2017 CONSERVATION AREA CONTEXT MAP Whitehall CA CA 38 Westminster Abbey and CA 40 Parliament Square CA CA 10 Smith CA 50 Square CA Millbank CA CA 08 CA 56 Pimlico CA CA 32 08 – Kennington CA, 10 – Lambeth Palace CA, 32 – Vauxhall CA, 38 – South Bank CA, 40 – Lower Marsh CA, 50 – Lambeth Walk and China Walk CA, 56 – Vauxhall Gardens Estate CA.
    [Show full text]