MTR & Shenzhen Metro System

Total Page:16

File Type:pdf, Size:1020Kb

MTR & Shenzhen Metro System 港鐵及深圳地鐵路綫圖 MTR & Shenzhen Metro system map mtr.hk365day.com 龍城廣場 橫崗 荷坳 愛聯 Longcheng 雙龍 Henggang He'ao Ailian Square Shuanglong 清湖 龍崗綫 Qinghu 永湖 大運 吉祥 南聯 Longgang Line 塘坑 Yonghu Universiade Jixiang Nanlian 龍華 Tangkeng Longhua 六約 Liuyue 龍勝 Longsheng 丹竹頭 Danzhutou 機場東 上塘 Shangtang 大芬 Airport East Dafen 紅山 木棉灣 Hongshan 后瑞 興東 留仙洞 西麗 大學城 塘朗 長嶺陂 民治 坂田 上水徑 長龍 Mumianwan Hourui Xingdong Liuxiandong Xili University Town Tanglang Changlingpi Minzhi Bantian Shangshuijing Changlong 深圳北站 五和 楊美 下水徑 布吉 固戍 Shenzhen North Wuhe Yangmei Xiashuijing Buji Gushu 環中綫 Station 白石龍 草埔 Caopu Huanzhong Line Baishilong 百鴿籠 洪浪北 Baigelong Honglang North 西鄉 水貝 民樂 Shuibei Xixiang Minle 布心 龍華綫 田貝 Buxin 上梅林 Tianbei 坪洲 靈芝 Longhua Line 深圳 Shangmeilin Pingzhou Lingzhi 翠竹 Shenzhen Cuizhu 太安 蓮花北 Tai'an Lianhua North 寶體 蓮花村 華新 通新嶺 紅嶺 老街 曬布 Bao'an 少年宮 Shaibu Lianhuacun Huaxin Tongxinling Hongling Laojie Stadium 翻身 Children's Palace 怡景 Fanshen Yijing 寶安中心 香梅北 安托山 僑香 香蜜 Xiangmei 景田 蓮花西 福田 市民中心 Bao'an Center 深康 寶華 Shenkang Antuo Hill Qiaoxiang Xiangmi North Jingtian Lianhua West Futian Civic Center Baohua 蛇口綫 新安 崗廈北 華強北 燕南 大劇院 湖貝 黃貝嶺 新秀 Shekou Line Xin'an 僑城北 購物公園 Gangxia Huaqiang Yannan Grand Hubei Huangbeiling Xinxiu Qiaocheng North 臨海 Shopping Park North North Theatre Linhai 國貿 會展中心 Guomao 鯉魚門 大新 桃園 深大 高新園 白石洲 世界之窗 華僑城 僑城東 竹子林 車公廟 香蜜湖 崗廈 華強路 科學館 前海灣 Liyumen Daxin Taoyuan Shenzhen Hi-Tech Park Baishizhou OCT Qiaocheng East Zhuzilin Chegongmiao Xiangmihu Convention & Gangxia Huaqiang Rd Window of Science Qianhaiwan University Exhibition Center the world Museum 石廈 福民 Shixia Fumin 紅樹灣 羅寶綫 Hongshuwan 福田口岸 Futian Checkpoint Luobao Line 科苑 益田 羅湖 Luohu Keyuan Yitian 后海 Houhai 落馬洲 羅湖 登良 Lok Ma Chau Lo Wu Dengliang 海月 Haiyue 灣廈 上水 Wanxia 東角頭 Sheung Shui Dongjiaotou 水灣 粉嶺 Shuiwan Fanling 海上世界 Sea World 蛇口港 太和 大埔墟 Shekou Port Tai Wo Tai Po Market 赤灣 Chiwan 天水圍 元朗 Tin Shui Wai Yuen Long 馬鞍山 烏溪沙 Ma On Shan Wu Kai Sha 朗屏 錦上路 Kam Sheung Road Long Ping 大學 恆安 University Heng On 大水坑 兆康 Tai Shui Hang Siu Hong 新界 New Territories 火炭 Fo Tan 屯門 *馬場 石門 Shek Mun Tuen Mun 沙田 Racecourse Sha Tin 荃灣 第一城 Tsuen Wan City One 大窩口 沙田圍 Tai Wo Hau Sha Tin Wai 荃灣西 Tsuen Wan West 車公廟 葵興 Che Kung Temple Kwai Hing 大圍 Tai Wai 葵芳 Kwai Fong 青衣 茘 景 博覽館 Tsing Yi Lai King AsiaWorld-Expo 美孚 茘 枝角 樂富 黃大仙 鑽石山 Mei Foo Lai Chi Kok 九龍塘 Lok Fu Wong Tai Sin Diamond Hill Kowloon Tong 彩虹 Choi Hung 長沙灣 Cheung Sha Wan 深水埗 石硤尾 觀塘綫 南昌 Sham Shui Po Kwun Tong Line Shek Kip Mei 九龍灣 Nam Cheong 機場 太子 九龍 Kowloon Bay Airport Prince Edward Kowloon 寶琳 荃灣綫 牛頭角 Po Lam Tsuen Wan Line 欣澳 Ngau Tau Kok 迪士尼 奧運 旺角 旺角東 Sunny Bay Disneyland Resort Olympic Mong Kok East 坑口 Mong Kok 港島綫 觀塘 Hang Hau Island Line Kwun Tong 東涌 九龍 油麻地 柯士甸 將軍澳 Tung Chung Kowloon Yau Ma Tei 藍田 東涌綫 Austin Tseung Kwan O Tung Chung Line Lam Tin 纜車 佐敦 Cable Car 紅磡 油塘 昂坪 Ngong Ping 360 Jordan Hung Hom Yau Tong 東鐵綫 East Rail Line 調景嶺 尖沙咀 Tiu Keng Leng Tsim Sha Tsui 尖東 西鐵綫 East Tsim Sha Tsui 康城 LOHAS Park West Rail Line 持一張單程車票不可在 大嶼山 尖沙咀/尖東站轉綫 ONE Single Journey Ticket is not valid for interchange between lines at Lantau Island Tsim Sha Tsui/East Tsim Sha Tsui stations 馬鞍山綫 Ma On Shan Line 將軍澳綫 Tseung Kwan O Line 迪士尼綫 Disneyland Resort Line 香港 堅尼地城 西營盤 Hong Kong Kennedy Town Sai Ying Pun 機場快綫 AirportExpress 香港大學 上環 中環 金鐘 灣仔 銅鑼灣 天后 炮台山 北角 鰂魚涌 太古 西灣河 筲箕灣 杏花邨 柴灣 HKU Sheung Wan Central Admiralty Wan Chai Causeway Bay Tin Hau Fortress Hill North Point Quarry Bay Tai Koo Sai Wan Ho Shau Kei Wan Heng Fa Chuen Chai Wan 輕鐵 Light Rail 港島 Hong Kong Island 隧道(非入閘區) Subway (Unpaid area) 隧道(已付費區) Subway (Paid area) 之 只限賽馬日 Racing Day Only 今 ΕΖ MTR 昔 expo.
Recommended publications
  • Monitoring the Land Subsidence Area in a Coastal Urban Area with Insar and GNSS
    sensors Article Monitoring the Land Subsidence Area in a Coastal Urban Area with InSAR and GNSS Bo Hu * , Junyu Chen and Xingfu Zhang Surveying Engineering, Guangdong University of Technology, Guangzhou 510006, China * Correspondence: [email protected]; Tel.: +86-20-3932-2530 Received: 21 May 2019; Accepted: 14 July 2019; Published: 19 July 2019 Abstract: In recent years, the enormous losses caused by urban surface deformation have received more and more attention. Traditional geodetic techniques are point-based measurements, which have limitations in using traditional geodetic techniques to detect and monitor in areas where geological disasters occur. Therefore, we chose Interferometric Synthetic Aperture Radar (InSAR) technology to study the surface deformation in urban areas. In this research, we discovered the land subsidence phenomenon using InSAR and Global Navigation Satellite System (GNSS) technology. Two different kinds of time-series InSAR (TS-InSAR) methods: Small BAseline Subset (SBAS) and the Permanent Scatterer InSAR (PSI) process were executed on a dataset with 31 Sentinel-1A Synthetic Aperture Radar (SAR) images. We generated the surface deformation field of Shenzhen, China and Hong Kong Special Administrative Region (HKSAR). The time series of the 3d variation of the reference station network located in the HKSAR was generated at the same time. We compare the characteristics and advantages of PSI, SBAS, and GNSS in the study area. We mainly focus on the variety along the coastline area. From the results generated by SBAS and PSI techniques, we discovered the occurrence of significant subsidence phenomenon in the land reclamation area, especially in the metro construction area and the buildings with a shallow foundation located in the land reclamation area.
    [Show full text]
  • The Transition of Urban Growth in China
    The Transition of Urban Growth in China A Case study of the Shenzhen Special Economic Zone by Mingzheng Gao Bachelor of Science in Architecture Harbin Institute of Architecture and Engineering Harbin, P. R. China July 1987 Submitted to the Department of Architecture in Partial Fulfillment of the Requirements for the Degree of Master of Science in Architecture Studies at the Massachusetts Institute of Technology June 1995 (c)Mingzheng Gao 1995. All rights reserved. The author hereby grants to M.I.T. permission to reproduce and to distribute publicly paper and electronic copies of this thesis document in whole or in part. Signature of the author Mingzheng Gao' Department of Architecture May 10, 1995 Certified by Michael Dennis Professor of Architecture Thesis Supervisor Accepted by .ASS.IV6AGHUSETTS INSTITUTE Roy Strickland OF TECHNOLOGY Chairman, Department Committee on Graduate Students JUL 251995 LIBRARIES - The Transition of Urban Growth in China A Case study of the Shenzhen Special Economic Zone by Mingzheng Gao Submitted to the Department of Architecture on May 12, 1995 in partial fulfillment of the requirements for the Degree of Master of Science in Architecture Studies ABSTRACT The Chinese government announced new economic reform policies in December of 1978. The announcement included an urban distribution policy that emphasized small cities and towns for rural urbanization as a means to achieve modernization in China. This distribution policy called for limited development in large metropolitan areas, selective development of only a few medium-sized cities, and more development in small cities and towns. Until now, the urbanization and development of small cities and towns have been the most dramatic changes; however, the issue is how a small city can grow in a proper way, fitting to its geographical, social and economical development requirements.
    [Show full text]
  • (Presentation): Improving Railway Technologies and Efficiency
    RegionalConfidential EST Training CourseCustomizedat for UnitedLorem Ipsum Nations LLC University-Urban Railways Shanshan Li, Vice Country Director, ITDP China FebVersion 27, 2018 1.0 Improving Railway Technologies and Efficiency -Case of China China has been ramping up investment in inner-city mass transit project to alleviate congestion. Since the mid 2000s, the growth of rapid transit systems in Chinese cities has rapidly accelerated, with most of the world's new subway mileage in the past decade opening in China. The length of light rail and metro will be extended by 40 percent in the next two years, and Rapid Growth tripled by 2020 From 2009 to 2015, China built 87 mass transit rail lines, totaling 3100 km, in 25 cities at the cost of ¥988.6 billion. In 2017, some 43 smaller third-tier cities in China, have received approval to develop subway lines. By 2018, China will carry out 103 projects and build 2,000 km of new urban rail lines. Source: US funds Policy Support Policy 1 2 3 State Council’s 13th Five The Ministry of NRDC’s Subway Year Plan Transport’s 3-year Plan Development Plan Pilot In the plan, a transport white This plan for major The approval processes for paper titled "Development of transportation infrastructure cities to apply for building China's Transport" envisions a construction projects (2016- urban rail transit projects more sustainable transport 18) was launched in May 2016. were relaxed twice in 2013 system with priority focused The plan included a investment and in 2015, respectively. In on high-capacity public transit of 1.6 trillion yuan for urban 2016, the minimum particularly urban rail rail transit projects.
    [Show full text]
  • A Hybrid Method for Predicting Traffic Congestion During Peak Hours In
    sensors Article A Hybrid Method for Predicting Traffic Congestion during Peak Hours in the Subway System of Shenzhen Zhenwei Luo 1, Yu Zhang 1, Lin Li 1,2,* , Biao He 3, Chengming Li 4, Haihong Zhu 1,2,*, Wei Wang 1, Shen Ying 1,2 and Yuliang Xi 1 1 School of Resources and Environmental Science, Wuhan University, Wuhan 430079, China; [email protected] (Z.L.); [email protected] (Y.Z.); [email protected] (W.W.); [email protected] (S.Y.); [email protected] (Y.X.) 2 RE-Institute of Smart Perception and Intelligent Computing, Wuhan University, Wuhan 430079, China 3 School of Architecture and Urban Planning, Shenzhen University, Shenzhen 518000, China; [email protected] 4 Chinese Academy of Surveying and Mapping, 28 Lianghuachi West Road, Haidian Qu, Beijing 100830, China; [email protected] * Correspondence: [email protected] (L.L.); [email protected] (H.Z.); Tel.: +86-27-6877-8879 (L.L. & H.Z.) Received: 11 October 2019; Accepted: 23 December 2019; Published: 25 December 2019 Abstract: Traffic congestion, especially during peak hours, has become a challenge for transportation systems in many metropolitan areas, and such congestion causes delays and negative effects for passengers. Many studies have examined the prediction of congestion; however, these studies focus mainly on road traffic, and subway transit, which is the main form of transportation in densely populated cities, such as Tokyo, Paris, and Beijing and Shenzhen in China, has seldom been examined. This study takes Shenzhen as a case study for predicting congestion in a subway system during peak hours and proposes a hybrid method that combines a static traffic assignment model with an agent-based dynamic traffic simulation model to estimate recurrent congestion in this subway system.
    [Show full text]
  • China Clean Energy Study Tour for Urban Infrastructure Development
    China Clean Energy Study Tour for Urban Infrastructure Development BUSINESS ROUNDTABLE Tuesday, August 13, 2019 Hyatt Centric Fisherman’s Wharf Hotel • San Francisco, CA CONNECT WITH USTDA AGENDA China Urban Infrastructure Development Business Roundtable for U.S. Industry Hosted by the U.S. Trade and Development Agency (USTDA) Tuesday, August 13, 2019 ____________________________________________________________________ 9:30 - 10:00 a.m. Registration - Banquet AB 9:55 - 10:00 a.m. Administrative Remarks – KEA 10:00 - 10:10 a.m. Welcome and USTDA Overview by Ms. Alissa Lee - Country Manager for East Asia and the Indo-Pacific - USTDA 10:10 - 10:20 a.m. Comments by Mr. Douglas Wallace - Director, U.S. Department of Commerce Export Assistance Center, San Francisco 10:20 - 10:30 a.m. Introduction of U.S.-China Energy Cooperation Program (ECP) Ms. Lucinda Liu - Senior Program Manager, ECP Beijing 10:30 a.m. - 11:45 a.m. Delegate Presentations 10:30 - 10:45 a.m. Presentation by Professor ZHAO Gang - Director, Chinese Academy of Science and Technology for Development 10:45 - 11:00 a.m. Presentation by Mr. YAN Zhe - General Manager, Beijing Public Transport Tram Corporation 11:00 - 11:15 a.m. Presentation by Mr. LI Zhongwen - Head of Safety Department, Shenzhen Metro 11:15 - 11:30 a.m. Tea/Coffee Break 11:30 - 11:45 a.m. Presentation by Ms. WANG Jianxin - Deputy General Manager, Tianjin Metro Operation Corporation 11:45 a.m. - 12:00 p.m. Presentation by Mr. WANG Changyu - Director of General Engineer's Office, Wuhan Metro Group 12:00 - 12:15 p.m.
    [Show full text]
  • A Data-Driven Urban Metro Management Approach for Crowd Density Control
    Hindawi Journal of Advanced Transportation Volume 2021, Article ID 6675605, 14 pages https://doi.org/10.1155/2021/6675605 Research Article A Data-Driven Urban Metro Management Approach for Crowd Density Control Hui Zhou ,1 Zhihao Zheng ,2 Xuekai Cen ,1 Zhiren Huang ,1 and Pu Wang 1 1School of Traffic and Transportation Engineering, Rail Data Research and Application Key Laboratory of Hunan Province, Central South University, Changsha 410000, China 2Department of Civil Engineering and Applied Mechanics, McGill University, Montreal H3A 0C3, Quebec, Canada Correspondence should be addressed to Pu Wang; [email protected] Received 9 November 2020; Revised 1 March 2021; Accepted 17 March 2021; Published 31 March 2021 Academic Editor: Yajie Zou Copyright © 2021 Hui Zhou et al. +is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Large crowding events in big cities pose great challenges to local governments since crowd disasters may occur when crowd density exceeds the safety threshold. We develop an optimization model to generate the emergent train stop-skipping schemes during large crowding events, which can postpone the arrival of crowds. A two-layer transportation network, which includes a pedestrian network and the urban metro network, is proposed to better simulate the crowd gathering process. Urban smartcard data is used to obtain actual passenger travel demand. +e objective function of the developed model minimizes the passengers’ total waiting time cost and travel time cost under the pedestrian density constraint and the crowd density constraint.
    [Show full text]
  • An Adapted Geographically Weighted Lasso (Ada-GWL) Model For
    An Adapted Geographically Weighted Lasso (Ada-GWL) model for estimating metro ridership Yuxin He∗1, Yang Zhaoy2 and Kwok Leung Tsuiz1,2 1School of Data Science, City University of Hong Kong, Kowloon, Hong Kong 2Centre for Systems Informatics Engineering, City University of Hong Kong, Kowloon, Hong Kong April 3, 2019 Abstract Ridership estimation at station level plays a critical role in metro transportation planning. Among various existing ridership estimation methods, direct demand model has been recognized as an effective approach. However, existing direct demand models including Geographically Weighted Regression (GWR) have rarely included local model selection in ridership estimation. In practice, acquiring insights into metro ridership under multiple influencing factors from a local perspective is important for passenger volume management and transportation planning operations adapting to local conditions. In this study, we propose an Adapted Geographi- cally Weighted Lasso (Ada-GWL) framework for modelling metro ridership, which performs regression-coefficient shrinkage and local model selection. It takes metro network connection intermedia into account and adopts network-based distance metric instead of Euclidean-based distance metric, making it so-called adapted to the context of metro networks. The real-world arXiv:1904.01378v1 [stat.AP] 2 Apr 2019 case of Shenzhen Metro is used to validate the superiority of our proposed model. The results show that the Ada-GWL model performs the best compared with the global model (Ordinary Least Square (OLS), GWR, GWR calibrated with network-based distance metric and GWL in terms of estimation error of the dependent variable and goodness-of-fit. Through understanding the variation of each coefficient across space (elasticities) and variables selection of each station, ∗email: [email protected] yCorresponding author, email: [email protected] zemail: [email protected] 1 it provides more realistic conclusions based on local analysis.
    [Show full text]
  • MTR's Experiences in PPP for Railway Projects
    MTR’s Experiences in PPP for Railway Projects Dr Jacob Kam Managing Director – Operations & Mainland Business 11 May 2017 MTR Businesses in China and Overseas 港铁公司在国内及海外的铁路业务 Line 4 & Daxing Line 1.881 Mil Line 14, Line 16 113.4 km Elizabeth Line Stockholm Metro 14.2k 1.228 mil 32.5 km 110km South Western rail Contract started MTR Express Hangzhou Metro Line 537k 53.7km from Aug 2017 455km(shared track) 1 and Ext Shenzhen Metro 550k Stockholm Hong Kong MTR Line 4 and Ext Commuter rail 20.5km 8.6 mil 34.3k 266 km 241 km Sydney Metro 36 km North West Under construction Melbourne Metro • Over 1,200km route length (exclude shared track) • Over 14 Million Passenger trips per weekday (using line based counting) 812k • Line based passenger trips do not match with the passenger trip data in annual report 390km MTR Corporation 5/16/2017 Page 2 Why cities need railways? • High capacity • High energy efficiency, low carbon emission In persons per hour in both direction Source: UITP MTR Corporation 5/16/2017 Page 3 Why cities need railways? Effective land use Modal Bus Rapid Bus Tram Light Rail Metro Characteristics Transit Max Flow 2,500 6,000 12,000 18,000 30,000 & above (per hour per direction) Average speed 10-14 15-22 15-22 18-40 18-40 (kph) Reliability Improving Good Medium to Good Good Very Good Mixed running Largely Road-space Mixed running Totally segregated and on-road tram segregated Totally segregated with traffic alignment Allocation lanes alignments All underground: Land Consumed 15 – 25 times 10 – 15 times 5 – 10 times 3 – 6 times 1
    [Show full text]
  • Rail Plus Property Development in China: the Pilot Case of Shenzhen
    WORKING PAPER RAIL PLUS PROPERTY DEVELOPMENT IN CHINA: THE PILOT CASE OF SHENZHEN LULU XUE, WANLI FANG EXECUTIVE SUMMARY China’s rapid urbanization has increased the demand CONTENTS for both housing and transport, leading to a continuing Executive Summary .......................................1 need for urban transit. Cities face significant challenges 1. Introduction ............................................. 2 in financing the growth of urban transit infrastructure. The current practice of financing urban metro or subway 2. Financing Urban Rail Transit Projects in Chinese projects through municipal fiscal revenues (partly from Cities: The Current Situation ............................. 4 land concession fees) and government-backed bank 3. Implementing R+P in China: Opportunities loans is not only inadequate to meet the demand, but and Challenges ........................................... 6 also exacerbates deep-seated problems like mounting municipal financial liabilities, urban sprawl, and urban 4. Analytical Framework ................................ 10 encroachment on farmland. To address these problems, 5. Shenzhen Case Study ................................ 12 Chinese cities need to diversify the ways in which they 6. Summary and Recommendations ...................29 finance urban metro projects. Appendix............................... ...................... 37 Endnotes 38 In a variety of approaches that aim to alleviate the financ- .................................................. ing problems of local governments, Rail
    [Show full text]
  • The Way for a Super Complex to Make a City More Convenient and Beautiful
    ctbuh.org/papers Title: The Way for a Super Complex to Make a City More Convenient and Beautiful Authors: Hang Xu, Chairman, Parkland Real Estate Development Co., Ltd Marianne Kwok, Principal, Kohn Pedersen Fox Associates Subjects: Architectural/Design Urban Design Keywords: Connectivity Design Process Human Scale Master Planning Mixed-Use Urban Planning Publication Date: 2016 Original Publication: Cities to Megacities: Shaping Dense Vertical Urbanism Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / Hang Xu; Marianne Kwok The Way for a Super Complex to Make a City More Convenient and Beautiful | 超级综合体如何让城市更便利更美好 Abstract | 摘要 Hang Xu | 徐航 Chairman | 董事长 Today’s super high-rise buildings not only present the height of buildings, but also play more Parkland Real Estate Development important roles of integrating into the development of cities, coexisting with them, promoting 深圳市鹏瑞地产开发有限公司 the efficiency of them and enhancing regional value to a certain degree. Based on the case study Shenzhen, China | 深圳,中国 of One Shenzhen Bay, this paper shows how the project maximizes the value of the city. This includes 1) how the complex form makes the city more intensive, and 2) how it influences the Xu Hang is Chairman of Shenzhen Parkland Investment Group cosmopolitan way of life in the city. Co. Ltd.; Founder & Chairman of Mindray Medical International Limited (listed on the NYSE, code MR); Honorary Chairman of the Shenzhen General Chamber of Commerce; Chairman of Keywords: Urban Planning, Connectivity, Design Process, Human Scale, Master Planning, the Federation of Shenzhen Industries; Executive Vice President Mixed-Use of the Shenzhen Harmony Club; Guest Professor at Tsinghua University; and Director of the Shenzhen Contemporary Art and Urban Planning Board.
    [Show full text]
  • Spatial and Temporal Characteristics of Urban Tourism Travel by Taxi—A Case Study of Shenzhen
    International Journal of Geo-Information Article Spatial and Temporal Characteristics of Urban Tourism Travel by Taxi—A Case Study of Shenzhen Bing He 1 , Kang Liu 1,2,3,*, Zhe Xue 1, Jiajun Liu 4, Diping Yuan 5, Jiyao Yin 5 and Guohua Wu 5,6 1 Shenzhen Institute of Advanced Technology, Chinese Academy of Sciences, Shenzhen 518055, China; [email protected] (B.H.); [email protected] (Z.X.) 2 Big Data and Pervasive GIS Group, State Key Laboratory of Resources and Environmental Information System, Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China 3 University of Chinese Academy of Sciences, Beijing 100049, China 4 Shandong Zhengyuan Geophysical Information Technology CO., LTD, Jinan 250101, China; [email protected] 5 Shenzhen Urban Public Safety and Technology Institute, Shenzhen 518000, China; [email protected] (D.Y.); [email protected] (J.Y.); [email protected] (G.W.) 6 Shenzhen Urban Transport Planning Center CO., LTD, Shenzhen 518063, China * Correspondence: [email protected] Abstract: Tourism networks are an important research part of tourism geography. Despite the significance of transportation in shaping tourism networks, current studies have mainly focused on the “daily behavior” of urban travel at the expense of tourism travel, which has been regarded as an “exceptional behavior”. To fill this gap, this study proposes a framework for exploring the spatial and Citation: He, B.; Liu, K.; Xue, Z.; temporal characteristics of urban tourism travel by taxi. We chose Shenzhen, a densely populated Liu, J.; Yuan, D.; Yin, J.; Wu, G.
    [Show full text]
  • Current Situation and Development Prospect of Shenzhen Railway Transportation Hub Construction
    深圳市铁路交通枢纽建设现状 与 发展展 望 Current situation and development prospect of Shenzhen railway transportation hub construction December 10th, 2016 Dr. Hong Zhang Vice‐president of Shenzhen Metro Group Co.,Ltd Headlines • Current situation of Shenzhen 1 railway transportation hub • Development prospect of Shenzhen 2 railway transportation hub • A few enlightments 3 1. Current situation of Shenzhen railway transportation hub 一、深圳市铁路交通枢纽现状 (1) Current situation of Shenzhen regional railway layout Shenzhen has formed the “Double Cross” railway network and “Two Main, Three Auxiliary” railway transportation hub layout, which plays an important role in South China. Guangzhou‐Shenzhen‐Hongkong passenger dedicated line: Total length: 116km (48km in Shenzhen). Total investment: 29.4 billion. Shenzhen North Station and Futian Station commenced in 2011 and 2015 respectively. Xiamen‐Shenzhen railway: Total length: 357km (47km in Shenzhen). Total investment of Guangdong section: 37 billion. Put into operation in 2013. Guangzhou‐Shenzhen railway: Total length: 147km. 24km in Shenzhen. Pingnan railway: Total length: 42km. From Pinghu station to Shekou and Mawan. Pingyan railway: Total length: 23km, Shugang railway. (1) Current situation of Shenzhen regional railway layout Combined with the urban function, integrated planning and construction through intensive way has formed the “Two Main, Three Auxiliary” railway transportation hub layout. Especially, Luohu transportation hub, Shenzhen North station hub and Futian station hub become models of domestic large‐ scale integrated hub. “Two Main”: Shenzhen North Station Shenzhen Station “Three Auxiliary”: Futian Station Pingshan Station Shenzhen East Station (2) Current situation of Shenzhen regional built railway transportation hub Luohu transportation hub: Function: connect the passenger flow with transfer port, metro, train, bus, taxis and coaches.
    [Show full text]