City of Modesto Building Safety Division Issued Permits for 10/1

Total Page:16

File Type:pdf, Size:1020Kb

City of Modesto Building Safety Division Issued Permits for 10/1 11/30/2015 6:03 City of Modesto Building Safety Division Page: 1 Issued Permits for 10/1/2015 Through 10/31/2015 Census Cd: 101 -New Single Family Houses Detached Work Desc: "ROSE VILLAS" RES. SINGLE FAMILY DWELLING ~ MASTER PLAN 2-X ( FIRE SPRINKLERED ) {{ LANDSCAPE SUBMITTAL DEFERRED (NO WORK BEYOND FRAME INSPECTION }} Work Addr: 2101 MABLE AVE Applicant: DAN DIMAS Assessor No: 082025002 Case No: BLD2015-71964 Subdivision: 055PM012 Map#: 055PM012 Block No.: Lot No.: P2 Inspection Area: 2 Contractor: D B F A CALIFORNIA CORPORATION Master Plan: 1701 W MARCH LN STE D Occ Class: R-3 Total Square Feet: 1940 Type of Work: New STOCKTON CA 95207 Type of Const: VB 29-473-1106 Floor Space: 1940 Parking Spaces: Contractor License No.: 855528 Bldg Use: B. Single Family Residential/Duplex Pri/Pub: PRIVATE Designer: WALEED MARI & ASSOC City Project: N/A 1020 15TH ST STE 10 Fire Sprinklers: Y Resid Units: MODESTO CA 95354 Zoning: SP # of Stories: 2 209-521-8786 Appl Date: 06/03/2015 Valuation: $0.00 Fax No: 209-521-3979 Issue Date: 10/16/2015 Declared Value: Finaled Date: Census Cd: 101 -New Single Family Houses Detached Work Desc: "ROSE VILLAS" MASTER PLAN 4 ~ ( FIRE SPRINKLERED ) {{ LANDSCAPE SUBMITTAL DEFERRED (NO WORK BEYOND FRAME INSPECTION }} Work Addr: 2101 MABLE AVE Applicant: DAN DIMAS Assessor No: 082025002 Case No: BLD2015-71966 Subdivision: 055PM012 Map#: 055PM012 Block No.: Lot No.: P2 Inspection Area: 2 Contractor: D B F A CALIFORNIA CORPORATION Master Plan: 1701 W MARCH LN STE D Occ Class: R-3 Total Square Feet: 1400 Type of Work: New STOCKTON CA 95207 Type of Const: VB 29-473-1106 Floor Space: 1000 Parking Spaces: Contractor License No.: 855528 Bldg Use: B. Single Family Residential/Duplex Pri/Pub: PRIVATE Designer: WALEED MARI & ASSOC City Project: N/A 1020 15TH ST STE 10 Fire Sprinklers: Resid Units: MODESTO CA 95354 Zoning: SP # of Stories: 209-521-8786 Appl Date: 06/03/2015 Valuation: $0.00 Fax No: 209-521-3979 Issue Date: 10/16/2015 Declared Value: Finaled Date: 11/30/2015 6:03 City of Modesto Building Safety Division Page: 2 Issued Permits for 10/1/2015 Through 10/31/2015 Census Cd: 101 -New Single Family Houses Detached Work Desc: "ROSE VILLAS" RES. SINGLE FAMILY DWELLING MASTER PLAN 5 ( FIRE SPRINKLERED ) {{ LANDSCAPE SUBMITTAL DEFERRED (NO WORK BEYOND FRAME INSPECTION }} Work Addr: 2101 MABLE AVE Applicant: DAN DIMAS Assessor No: 082025002 Case No: BLD2015-71967 Subdivision: 055PM012 Map#: 055PM012 Block No.: Lot No.: P2 Inspection Area: 2 Contractor: D B F A CALIFORNIA CORPORATION Master Plan: 1701 W MARCH LN STE D Occ Class: R-3 Total Square Feet: 1400 Type of Work: New STOCKTON CA 95207 Type of Const: VB 29-473-1106 Floor Space: 1000 Parking Spaces: Contractor License No.: 855528 Bldg Use: B. Single Family Residential/Duplex Pri/Pub: PRIVATE Designer: WALEED MARI & ASSOC City Project: N/A 1020 15TH ST STE 10 Fire Sprinklers: Resid Units: MODESTO CA 95354 Zoning: SP # of Stories: 209-521-8786 Appl Date: 06/03/2015 Valuation: $0.00 Fax No: 209-521-3979 Issue Date: 10/16/2015 Declared Value: Finaled Date: Census Cd: 101 -New Single Family Houses Detached Work Desc: LOT E-32 ~ NEW RES. SFD [ MODEL HOME ] "ROSE VILLAS" PLAN 5-BR ( FIRE SPRINKLERED ) {{ LANDSCAPE & STORMWATER SUBMITTAL DEFERRED (NO WORK BEYOND FRAME INSPECTION }} Work Addr: 4001 SPRING OAK DR Applicant: STEVE WOODHOUSE Assessor No: 082025002 Case No: BLD2015-73553 Subdivision: 055PM012 Map#: 055PM012 Block No.: Lot No.: P2 Inspection Area: 2 Contractor: D B F A CALIFORNIA CORPORATION Master Plan: 1701 W MARCH LN STE D Occ Class: R-3 U Total Square Feet: 2728 Type of Work: New STOCKTON CA 95207 Type of Const: VB 29-473-1106 Floor Space: 2728 Parking Spaces: Contractor License No.: 855528 Bldg Use: B. Single Family Residential/Duplex Pri/Pub: PRIVATE Designer: ASSOCIATED ENGINEERING City Project: N/A 4206 TECHNOLOGY DR STE 4 Fire Sprinklers: Y Resid Units: 1 MODESTO CA 95356 Zoning: SP # of Stories: 2 209-545-3390 Appl Date: 09/14/2015 Valuation: $100,000.00 Fax No: 209-545-3875 Issue Date: 10/21/2015 Declared Value: $100,000.00 Finaled Date: 11/30/2015 6:03 City of Modesto Building Safety Division Page: 3 Issued Permits for 10/1/2015 Through 10/31/2015 Census Cd: 112-New Mobile Homes in MH Park Work Desc: MH - INSTALLATION (SPACE #43) , AWNING, & DECK {SERIAL # 36406, HUD # PFS 1154167, MAKE FLEETWOOD} Work Addr: 2621 PRESCOTT RD Applicant: DAVID BORDWINE Assessor No: 005080001 Case No: BLD2015-73838 Subdivision: FRIENDLY VILLAGE MOBILE HOME PARK Map#: Block No.: Lot No.: Inspection Area: 1 Contractor: NORTHGATE CONSTRUCTION Master Plan: 7775 N PALM AVE STE #102-55 Occ Class: R-3 Total Square Feet: Type of Work: New FRESNO CA 93711 Type of Const: VB 559-977-4050 Floor Space: Parking Spaces: 0 Contractor License No.: 716418 Bldg Use: O. Mobile Home Pri/Pub: PRIVATE Designer: City Project: N/A Fire Sprinklers: Resid Units: Zoning: PD46 # of Stories: Appl Date: 10/02/2015 Valuation: $20,000.00 Issue Date: 10/02/2015 Declared Value: $20,000.00 Finaled Date: 10/28/2015 Census Cd: 112-New Mobile Homes in MH Park Work Desc: INSTALL NEW MOBILE HOME (2028 KAUAI DRIVE SPACE 178) Work Addr: 2000 MABLE AVE Applicant: DALE BOUCHER Assessor No: 052066001 Case No: BLD2015-74106 Subdivision: EASTERN PORTION OF HOMEWOOD VILLAGE Map#: Block No.: Lot No.: Inspection Area: 2 Contractor: QUALITY MANUFACTURED HOME SERV Master Plan: 4941 CLOUTIER DR Occ Class: R-3 Total Square Feet: Type of Work: Mobile Home SALIDA CA 95368 Type of Const: VB 209-575-4651 Floor Space: Parking Spaces: 0 Contractor License No.: 412937 Bldg Use: O. Mobile Home Pri/Pub: PRIVATE Designer: City Project: N/A Fire Sprinklers: Resid Units: Zoning: PD72 # of Stories: Appl Date: 10/20/2015 Valuation: $100,000.00 Issue Date: 10/20/2015 Declared Value: $100,000.00 Finaled Date: 11/30/2015 6:03 City of Modesto Building Safety Division Page: 4 Issued Permits for 10/1/2015 Through 10/31/2015 Census Cd: 112-New Mobile Homes in MH Park Work Desc: {#29 SCHOONER LN} INSTALLATION OF NEW MANUFACTURED HOME (24' x 56') & CARPORT AWNING Work Addr: 331 CORALWOOD RD Applicant: LARRY LANG Assessor No: 052060003 Case No: BLD2015-74141 Subdivision: 024PM076 Map#: 024PM076 Block No.: Lot No.: PA Inspection Area: 2 Contractor: LARRY LANG MOBILE HOME SERVICE Master Plan: 4111 SAN BERNADINO AVE Occ Class: R-3 Total Square Feet: Type of Work: New SAN JOSE CA 95111 Type of Const: VB 408-363-9464 Floor Space: Parking Spaces: 0 Contractor License No.: 500093 Bldg Use: O. Mobile Home Pri/Pub: PRIVATE Designer: City Project: N/A Fire Sprinklers: Resid Units: Zoning: PD203 # of Stories: Appl Date: 10/22/2015 Valuation: $18,000.00 Issue Date: 10/22/2015 Declared Value: $18,000.00 Finaled Date: Census Cd: 112-New Mobile Homes in MH Park Work Desc: {#46 CLIPPER LN} INSTALLATION OF NEW MANUFACTURED HOME (24' x 56') WITH CARPORT AWNING Work Addr: 331 CORALWOOD RD Applicant: LARRY LANG Assessor No: 052060003 Case No: BLD2015-74142 Subdivision: 024PM076 Map#: 024PM076 Block No.: Lot No.: PA Inspection Area: 2 Contractor: LARRY LANG MOBILE HOME SERVICE Master Plan: 4111 SAN BERNADINO AVE Occ Class: R-3 Total Square Feet: Type of Work: New SAN JOSE CA 95111 Type of Const: VB 408-363-9464 Floor Space: Parking Spaces: 0 Contractor License No.: 500093 Bldg Use: O. Mobile Home Pri/Pub: PRIVATE Designer: City Project: N/A Fire Sprinklers: Resid Units: Zoning: PD203 # of Stories: Appl Date: 10/22/2015 Valuation: $18,000.00 Issue Date: 10/22/2015 Declared Value: $18,000.00 Finaled Date: 11/30/2015 6:03 City of Modesto Building Safety Division Page: 5 Issued Permits for 10/1/2015 Through 10/31/2015 Census Cd: 112-New Mobile Homes in MH Park Work Desc: {#41 CLIPPER LN} INSTALLATION OF NEW MANUFACTURED HOME (24' x 56') & CARPORT AWNING Work Addr: 331 CORALWOOD RD Applicant: LARRY LANG Assessor No: 052060003 Case No: BLD2015-74152 Subdivision: 024PM076 Map#: 024PM076 Block No.: Lot No.: PA Inspection Area: 2 Contractor: LARRY LANG MOBILE HOME SERVICE Master Plan: 4111 SAN BERNADINO AVE Occ Class: R-3 Total Square Feet: Type of Work: New SAN JOSE CA 95111 Type of Const: VB 408-363-9464 Floor Space: Parking Spaces: 0 Contractor License No.: 500093 Bldg Use: O. Mobile Home Pri/Pub: PRIVATE Designer: City Project: N/A Fire Sprinklers: Resid Units: Zoning: PD203 # of Stories: Appl Date: 10/23/2015 Valuation: $18,000.00 Issue Date: 10/23/2015 Declared Value: $18,000.00 Finaled Date: Census Cd: 112-New Mobile Homes in MH Park Work Desc: {#125 CLIPPER LN} INSTALLATION OF NEW MANUFACTURED HOME (24' x 56') Work Addr: 331 CORALWOOD RD Applicant: LARRY LANG Assessor No: 052060003 Case No: BLD2015-74153 Subdivision: 024PM076 Map#: 024PM076 Block No.: Lot No.: PA Inspection Area: 2 Contractor: LARRY LANG MOBILE HOME SERVICE Master Plan: 4111 SAN BERNADINO AVE Occ Class: R-3 Total Square Feet: Type of Work: New SAN JOSE CA 95111 Type of Const: VB 408-363-9464 Floor Space: Parking Spaces: 0 Contractor License No.: 500093 Bldg Use: O. Mobile Home Pri/Pub: PRIVATE Designer: City Project: N/A Fire Sprinklers: Resid Units: Zoning: PD203 # of Stories: Appl Date: 10/23/2015 Valuation: $18,000.00 Issue Date: 10/23/2015 Declared Value: $18,000.00 Finaled Date: 11/30/2015 6:03 City of Modesto Building Safety Division Page: 6 Issued Permits for 10/1/2015 Through 10/31/2015 Census Cd: 112-New Mobile Homes in MH Park Work Desc: {#161 CLIPPER LN} INSTALLATION OF NEW MANUFACTURED HOME (24' x 56') & CARPORT AWNING Work Addr: 331 CORALWOOD RD Applicant: LARRY LANG Assessor No: 052060003 Case No: BLD2015-74154 Subdivision: 024PM076 Map#: 024PM076 Block No.: Lot No.: PA Inspection Area: 2 Contractor: LARRY LANG MOBILE HOME SERVICE Master Plan: 4111 SAN BERNADINO AVE Occ Class: R-3 Total Square Feet: Type of Work: New SAN JOSE CA 95111 Type of Const: VB 408-363-9464 Floor Space: Parking Spaces: 0 Contractor License No.: 500093 Bldg Use: O.
Recommended publications
  • Production and Saturation of Porosity in the Lunar Highlands from Impact Cratering
    The fractured Moon: Production and saturation of porosity in the lunar highlands from impact cratering The MIT Faculty has made this article openly available. Please share how this access benefits you. Your story matters. Citation Soderblom, Jason M., et al. “The Fractured Moon: Production and Saturation of Porosity in the Lunar Highlands from Impact Cratering.” Geophysical Research Letters, vol. 42, no. 17, Sept. 2015, pp. 6939–44. © 2015 American Geophysical Union As Published http://dx.doi.org/10.1002/2015GL065022 Publisher American Geophysical Union (AGU) Version Final published version Citable link http://hdl.handle.net/1721.1/118615 Terms of Use Article is made available in accordance with the publisher's policy and may be subject to US copyright law. Please refer to the publisher's site for terms of use. PUBLICATIONS Geophysical Research Letters RESEARCH LETTER The fractured Moon: Production and saturation 10.1002/2015GL065022 of porosity in the lunar highlands Key Points: from impact cratering • The relation between impact-generated porosity and crater size is quantified Jason M. Soderblom1, Alexander J. Evans2, Brandon C. Johnson1, H. Jay Melosh3, Katarina Miljković1,4, • Impacts into highly porous targets 5 6 7 8 3 result in positive gravity anomalies Roger J. Phillips , Jeffrey C. Andrews-Hanna , Carver J. Bierson , James W. Head III , Colleen Milbury , 9 7 1 2,10 11 • The cratering record of the oldest Gregory A. Neumann , Francis Nimmo , David E. Smith , Sean C. Solomon , Michael M. Sori , lunar surfaces is preserved in the
    [Show full text]
  • Southwestern M O N U M E N
    SOUTHWESTERN MONUMENTS MONTHLY REPORT OCTOBER - - - - 1938 DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE SOUTHWESTERN MONUMENTS OCTOBER, 1338, REPORT INDEX OPENING, by Superintendent Frank Pinkley, 27,1 CONDENSED GENERAL REPORT Travel ........... ,277 400 Flora, Fauna, and Natural 000 General. -278 Fhenomena. .280 100 Administrative . , . .278 500 Tse of Facilities by Public,280 200 Maintenance, Improvements, 600 Protection 281 and New Construction . .279 700 Archeology, Fist. ,Pre-Hist... 281 300 Activities Other .Agencies,279 900 Miscellaneous. ...... 282 RETORTS FPOM KEN IN THE FIE'D Arches .£34 Gran Ouivi'-a. ......... .294 Aztec Ruins ......... -.284 Hove:.weep 286 Bandelier .... ...... ..297 Mobile Unit .......... .336 Bandelier CCC ..... .299 Montezuma Jastle. ........ ,305 Bandelier Forestry. , .300 Natural Fridges ........ .320 Canyon de Chelly. ...... .318 • Navajo .312 Capulin Mountain. ...... ,319 pipe Spring 292 Casa Grande .......... -308 Saguaro ............ .237 Casa Grande Side Camp .... .310 Sunset Crater ......... .291 Chaco Canyon. ........ .302 Tumacacori. .......... .312 Chiricahua. ......... .295 -Yalnut Canyon ......... .301 Chiricahua CCC. ....... .296 White Sands .......... .283 El Morrc. .......... .315 Wupatki 289 HEADQUARTERS Aztec Ruins Visitor Statistics.333 Casa Grande Visitor Statistics. .331 Branch of Accounting. .... .339 Comparative Visitor Figures . .329 Branch of Education ..... .324 October Visitors to S.W.M 334 Branch of Maintenance .... :323 Personnel Notes 340 THE SUPPLEMENT Beaver Habitat at Bandelier, By W. B. McDcugall ..... .351 Geology Notes on the Montezuma Castle Region, by E..C. Alberts. .353 Geology Report on the Hovenweep National Monument, by C. N. Gould . .357 Moisture Retention of Cacti,'by David J.'Jones 353 Ruminations, by The Boss. '.'•'. .361 Supplemental Observations, from the- Field ........ .344 , SOUTHWESTERN MONUMENTS PERSONNEL HEADQUARTERS: National Park Service, Coolidge, Arizona. Frank Pinkley, Superintendent; Hugh M.
    [Show full text]
  • GSA TODAY December Vol
    Vol. 5, No. 12 December 1995 INSIDE • New Members, Fellows, Student Associates, p. 247 GSA TODAY South-Central Section Meeting, p. 250 • A Publication of the Geological Society of America • Northeastern Section Meeting, p. 253 Seismic Images of the A B Core-Mantle Boundary Michael E. Wysession, Department of Earth and Planetary Sciences, Washington University, St. Louis, MO 63130 C D ABSTRACT INTRODUCTION Seismology presents several ways While most geologists, including of providing images of the geologic specialists in the field of seismology, structures that exist in the lowermost study rocks at Earth’s surface, more mantle just above the core-mantle attention also is being paid to the boundary (CMB). An understanding planet’s other major boundary, that of the possibly complex geophysical between the core and mantle. With a E F processes occurring at this major density jump of 4.3 kg/m3 between discontinuity requires the combined the silicate lower mantle and the liquid efforts of many fields, but it is the iron outer core, as well as a tempera- role of seismology to geographically ture increase of possibly 1500 °C map out this largely uncharted terri- between the lower mantle adiabat and tory. Seismic phases that reflect, outer core, the core-mantle boundary diffract, and refract across the CMB (CMB) may well be Earth’s most signifi- can all be used to provide different cant and dramatic discontinuity. Our Figure 1. Images from a motion picture showing the propagation of seismic shear energy information in different ways. increasing knowledge of this highly through the mantle (Wysession and Shore, 1994).
    [Show full text]
  • Development of a Lunar Regolith Thermal Energy Storage Model for a Lunar Outpost
    Development of a Lunar Regolith Thermal Energy Storage Model for a Lunar Outpost Aaron Valle Lozano Space Engineering, masters level 2016 Luleå University of Technology Department of Computer Science, Electrical and Space Engineering Development of a Lunar Regolith Thermal Energy Storage Model for a Lunar Outpost Aaron Valle Lozano [email protected] Luleå University of Technology Kiruna, Sweden A thesis submitted for the degree of: Master in Space Science and Technology September 2016 Conducted at the European Space Agency Supervised by Dr. Aidan Cowley and Assoc. Prof. Thomas Kuhn 2 Acknowledgements First and foremost, I would like to thank my supervisor, Aidan Cowley, for offering me the possibility of being part of Spaceship EAC. It was a great environment which encouraged me to work in such an amazing project. My UPS supervisor, Peter Von Ballmoos, and my LTU supervisor, Thomas Kuhn. Both deserve recognition for helping shape and correct this Master Thesis. I would also like to thank my colleagues, both from the SpaceMaster and the K-28 dungeon inside the European Astronaut Centre. They all provided immense help and knowledge when it was required. Last, but not least, I would like to thank my family for their constant support. That’s no Moon. It’s a space station. - Obi Wan Kenobi, Star Wars Episode IV: A New Hope 3 Abstract – English The Moon has always been an important milestone in space exploration. After the Apollo landings, it is logical to think that the next step should be a permanent habitation module, which would serve as a testing ground for more ambitious projects to Mars and beyond.
    [Show full text]
  • Board Certified Fellows
    AMERICAN BOARD OF MEDICOLEGAL DEATH INVESTIGATORS Certificant Directory As of September 30, 2021 BOARD CERTIFIED FELLOWS Addison, Krysten Leigh (Inactive) BC2286 Allmon, James L. BC855 Travis County Medical Examiner's Office Sangamon County Coroner's Office 1213 Sabine Street 200 South 9th, Room 203 PO Box 1748 Springfield, IL 62701 Austin, TX 78767 Amini, Navid BC2281 Appleberry, Sherronda BC1721 Olmsted Medical Examiner's Office Adams and Broomfield County Office of the Coroner 200 1st Street Southwest 330 North 19th Avenue Rochester, MN 55905 Brighton, CO 80601 Applegate, MD, David T. BC1829 Archer, Meredith D. BC1036 Union County Coroner's Office Mohave County Medical Examiner 128 South Main Street 1145 Aviation Drive Unit A Marysville, OH 43040 Lake Havasu, AZ 86404 Bailey, Ted E. (Inactive) BC229 Bailey, Sanisha Renee BC1754 Gwinnett County Medical Examiner's Office Virginia Office of the Chief Medical Examiner 320 Hurricane Shoals Road, NE Central District Lawrenceville, GA 30046 400 East Jackson Street Richmond, VA 23219 Balacki, Alexander J BC1513 Banks, Elsie-Kay BC3039 Montgomery County Coroner's Office Maine Office of the Chief Medical Examiner 1430 Dekalb Street 30 Hospital Street PO Box 311 Augusta, ME 04333 Norristown, PA 19404 Bautista, Ian BC2185 Bayer, Lindsey A. BC875 New York City Office of Chief Medical Examiner District 5 and 24 Medical Examiner Office 421 East 26th Street 809 Pine Street New York, NY 10016 Leesburg, FL 34756 Beck, Shari L BC327 Beckham, Phinon Phillips BC2305 Sedgwick Co Reg. Forensic Science Center Virginia Office of the Chief Medical Examiner 1109 N. Minneapolis Northern District Wichita, KS 67214 10850 Pyramid Place, Suite 121 Manassas, VA 20110 Bednar Keefe, Gale M.
    [Show full text]
  • Summary of Sexual Abuse Claims in Chapter 11 Cases of Boy Scouts of America
    Summary of Sexual Abuse Claims in Chapter 11 Cases of Boy Scouts of America There are approximately 101,135sexual abuse claims filed. Of those claims, the Tort Claimants’ Committee estimates that there are approximately 83,807 unique claims if the amended and superseded and multiple claims filed on account of the same survivor are removed. The summary of sexual abuse claims below uses the set of 83,807 of claim for purposes of claims summary below.1 The Tort Claimants’ Committee has broken down the sexual abuse claims in various categories for the purpose of disclosing where and when the sexual abuse claims arose and the identity of certain of the parties that are implicated in the alleged sexual abuse. Attached hereto as Exhibit 1 is a chart that shows the sexual abuse claims broken down by the year in which they first arose. Please note that there approximately 10,500 claims did not provide a date for when the sexual abuse occurred. As a result, those claims have not been assigned a year in which the abuse first arose. Attached hereto as Exhibit 2 is a chart that shows the claims broken down by the state or jurisdiction in which they arose. Please note there are approximately 7,186 claims that did not provide a location of abuse. Those claims are reflected by YY or ZZ in the codes used to identify the applicable state or jurisdiction. Those claims have not been assigned a state or other jurisdiction. Attached hereto as Exhibit 3 is a chart that shows the claims broken down by the Local Council implicated in the sexual abuse.
    [Show full text]
  • Columbia Global Centers | Amman
    Columbia Global Centers | Amman .............................................................................................. 3 Columbia Global Centers | Beijing ............................................................................................. 17 Columbia Global Centers | Istanbul ............................................................................................ 30 Columbia Global Centers | Mumbai ........................................................................................... 41 Columbia Global Centers | Nairobi ............................................................................................. 48 Columbia Global Centers | Paris ................................................................................................. 52 Columbia Global Centers | Rio de Janeiro ................................................................................. 62 Columbia Global Centers | Santiago ........................................................................................... 69 Columbia Global Centers | Tunis ................................................................................................ 77 Columbia Global Centers | Amman Center Launch: March 2009 Website: http://globalcenters.columbia.edu/amman Email: [email protected] Address: 5 Moh’d Al Sa’d Al Batayneh St., King Hussein Park, P.O. Box 144706, Amman 11814 Jordan Director Biography SAFWAN M. MASRI [email protected] Professor Safwan M. Masri is Executive Vice President for Global Centers and Global Development at Columbia
    [Show full text]
  • Rock, Cherry Creek, Nannie Creek
    Rock, Cherry and Narmie r-teks 3rhw t ;MeA o;- Watershed Analysis A 13.2: R 6 2/2x Winema National Forest - / TABLE OF CONTENTS Page I. INTRODUCTION 1 II. DESCRIPTION OF THE WATERSHED AREA 1 A. Location and Land Management 1 B. Geology 7 C. Climate 9 D. Soils 9 E. Hydrology 10 F. Potential Vegetation 10 III. BENEFICIAL USES AND VALUES 12 A. Biodiversity 12 B. Wilderness/Research Natural Area 12 C. Recreation 12 D. Cultural Resources 13 E. Timber and Roads 14 F. Agriculture and Water Source 14 G. Mineral Resources 15 H. Aesthetic/Scenic Values 15 IV. ISSUES TO BE EVALUATED 16 V. ANALYSIS OF ISSUES 17 A. Forest Health Decline 17 B. Wildlife and Plant Habitat Alteration 22 C. Fish Stocking in Subalpine Lakes 29 D. Impact to Native Fish Populations 31 E. Fish Habitat Degradation 36 F. Channel Condition Alteration 41 G. Hydrograph Change 45 H. Increased Sediment Loading 56 VI. MANAGEMENT RECOMMENDATIONS AND RESTORATION OPPORTUNITIES 63 A. Upland Forests 63 B. Low Elevation Wetlands 63 C. Fish/Aquatic Habitats 64 D. Roads and Channel Morphology 64 E. Trails 67 F. Riparian Reserves 67 G. Geomorphological Reserves 69 H. Soils 69 VII. REFERENCES 70 VIII. APPENDICES A. List of People Consulted 74 B. Wildlife Species 75 C. Plant and Fungi Species 80 D. Source of Vegetation Data 89 |&j0hERN OflEGOX~@NUND~IVEAQ UORARY WATERSHED ANALYSIS REPORT FOR THE ROCK, CHERRY. AND NANNIE CREEK WATERSHED AREA I. INTRODUCTION This report documents an analysis of the Rock, Cherry, and Nannie Watershed Area. The purpose of the analysis is to develop a scientifically-based understanding of the processes and interactions occurring within the watershed area and the effects of management practices.
    [Show full text]
  • I/ .SA with Indexes
    NASA SP-7041 (53) Earth Resources May 1987 A Continuing Bibli_graph%_ I/ .SA with indexes = National Aeronautics and Space Administration oo/a 3 ACCESSION NUMBER RANGES Accession numbers cited in this Supplement fall within the following ranges. STAR (N-10000 Series) N87-10001 -- N87-15159 IAA (A-10000 Series) A87-10001 -- A87-19610 This supplement is available from the National Technical Information Service (NTIS), Springfield, Vir- ginia 22161, price code A08. NASA SP-7041(53) EARTH RESOURCES A CONTINUING BIBLIOGRAPHY WITH INDEXES Issue 53 A selection of annotated references to unclassified reports and journal articles that were introduced into the NASA scientific and technical information system and announced between January 1 and March 31, 1987 in • Scientific and Technical Aerospace Reports (STAR) • International Aerospace Abstracts (IAA) Scientific and Technical Information Office 1987 NASA National Aeronautics and Space Administration Washington, DC i / / This bibliography was prepared by the NASA Scientific and Technical Information Facility operated for the National Aeronautics and Space Administration by RMS Associates. INTRODUCTION The technical literature described in this continuing bibliography may be helpful to re- searchers in numerous disciplines such as agriculture and forestry, geography and cartography, geology and mining, oceanography and fishing, environmental control, and many others. Until recently it was impossible for anyone to examine more than a minute fraction of the Earth's surface continuously. Now vast areas can be observed synoptically, and changes noted in both the Earth's lands and waters, by sensing instrumentation on orbiting spacecraft or on aircraft. This literature survey lists 604 reports, articles, and other documents announced between January 1 and March 31, 1987 in Scientific and Technical Aerospace Reports (STAR), and International Aerospace Abstracts (IAA).
    [Show full text]
  • GRAIL Gravity Observations of the Transition from Complex Crater to Peak-Ring Basin on the Moon: Implications for Crustal Structure and Impact Basin Formation
    Icarus 292 (2017) 54–73 Contents lists available at ScienceDirect Icarus journal homepage: www.elsevier.com/locate/icarus GRAIL gravity observations of the transition from complex crater to peak-ring basin on the Moon: Implications for crustal structure and impact basin formation ∗ David M.H. Baker a,b, , James W. Head a, Roger J. Phillips c, Gregory A. Neumann b, Carver J. Bierson d, David E. Smith e, Maria T. Zuber e a Department of Geological Sciences, Brown University, Providence, RI 02912, USA b NASA Goddard Space Flight Center, Greenbelt, MD 20771, USA c Department of Earth and Planetary Sciences and McDonnell Center for the Space Sciences, Washington University, St. Louis, MO 63130, USA d Department of Earth and Planetary Sciences, University of California, Santa Cruz, CA 95064, USA e Department of Earth, Atmospheric and Planetary Sciences, MIT, Cambridge, MA 02139, USA a r t i c l e i n f o a b s t r a c t Article history: High-resolution gravity data from the Gravity Recovery and Interior Laboratory (GRAIL) mission provide Received 14 September 2016 the opportunity to analyze the detailed gravity and crustal structure of impact features in the morpho- Revised 1 March 2017 logical transition from complex craters to peak-ring basins on the Moon. We calculate average radial Accepted 21 March 2017 profiles of free-air anomalies and Bouguer anomalies for peak-ring basins, protobasins, and the largest Available online 22 March 2017 complex craters. Complex craters and protobasins have free-air anomalies that are positively correlated with surface topography, unlike the prominent lunar mascons (positive free-air anomalies in areas of low elevation) associated with large basins.
    [Show full text]
  • 117Th Parks by Congressional District
    Parks by Congressional Districts 117th Congress Note: This chart covers designated park units. It does not include NPS-managed or associated entities that are not counted as park units such as National Historic Trails and some National Scenic Trails, Wild and Scenic Rivers, National Heritage Areas, and NPS Affiliated Areas. Abbreviations NP=National Park NHS=National Historic Site NL=National Lakeshore NPRES=National NHP=National Historical Park NB=National Battlefield Preserve NM=National Monument NRA=National Recreation Area NMP=National Military Park NS=National Seashore 4/5/2021 Parks By Congressional District 117th Congress ALABAMA Senators: Richard C. Shelby (R) Tommy Tuberville (R) State/Terr. District Park(s) Representative Party AL 1st None Carl, John R AL 2nd None Moore, Barry R AL 3rd Tuskegee Airmen NHS Rogers, Mike R Tuskegee Institute NHS Horseshoe Bend NMP Freedom Riders NM AL 4th Little River Canyon NPRES Aderholt, Robert R AL 5th Russell Cave NM Brooks, Mo R Natchez Trace NST Natchez Trace Parkway AL 6th None Gary Palmer R AL 7th Birmingham Civil Rights NM Sewell, Terri D ALASKA Senators: Lisa Murkowski (R) Dan Sullivan (R) State/Terr. District Park(s) Representative Party 2 4/5/2021 Parks By Congressional District 117th Congress AK At Large Alagnak Wild River Young, Don R Aniachak NM & NPRES Bering Land Bridge NPRES Cape Krusenstern NM Denali NP & NPRES Gates of the Arctic NP & NPRES Glacier Bay NP & NPRES Katmai NP & NPRES Kenai Fjords NP Klondike Gold Rush NHP Kobuk Valley NP Lake Clark NP & NPRES Noatak NPRES Sitka NHS Wrangell-St. Elias NP & NPRES Yukon-Charley Rivers NPRES AMERICAN SAMOA State/Terr.
    [Show full text]
  • Science Concept 3: Key Planetary
    Science Concept 6: The Moon is an Accessible Laboratory for Studying the Impact Process on Planetary Scales Science Concept 6: The Moon is an accessible laboratory for studying the impact process on planetary scales Science Goals: a. Characterize the existence and extent of melt sheet differentiation. b. Determine the structure of multi-ring impact basins. c. Quantify the effects of planetary characteristics (composition, density, impact velocities) on crater formation and morphology. d. Measure the extent of lateral and vertical mixing of local and ejecta material. INTRODUCTION Impact cratering is a fundamental geological process which is ubiquitous throughout the Solar System. Impacts have been linked with the formation of bodies (e.g. the Moon; Hartmann and Davis, 1975), terrestrial mass extinctions (e.g. the Cretaceous-Tertiary boundary extinction; Alvarez et al., 1980), and even proposed as a transfer mechanism for life between planetary bodies (Chyba et al., 1994). However, the importance of impacts and impact cratering has only been realized within the last 50 or so years. Here we briefly introduce the topic of impact cratering. The main crater types and their features are outlined as well as their formation mechanisms. Scaling laws, which attempt to link impacts at a variety of scales, are also introduced. Finally, we note the lack of extraterrestrial crater samples and how Science Concept 6 addresses this. Crater Types There are three distinct crater types: simple craters, complex craters, and multi-ring basins (Fig. 6.1). The type of crater produced in an impact is dependent upon the size, density, and speed of the impactor, as well as the strength and gravitational field of the target.
    [Show full text]