Metro LA New Construction & Proposed Multifamily Projects

Total Page:16

File Type:pdf, Size:1020Kb

Metro LA New Construction & Proposed Multifamily Projects Metro LA New Construction & Proposed Multifamily Projects 3Q19 ID PROPERTY UNITS 165 641 Imperial Street 140 263 234 Center Street 430 166 6AM 1,305 264 4th & Hewitt 93 2 AlexanHope + Webster, Flower The 233730 167 740 Jackson Street 88 265 670 Mesquit 308 65 AltaAMP WaverlyLofts 196320 168 754 Hope Street 547 107 TelegraphPark Fifth Arts 34797 169 785 Towne Avenue 60 188 HalcyonTrademark 31374 170 845 Olive 205 219 HanoverAlina Northgate 224341 171 949 Hope Street 236 13 Broadway,Total Lease TheUp 2,051423 172 Alexan 305 Total Lease Up 1,247 173 Arris 312 23 Grand, The 436 174 E.On Los Angeles 100 1747 BroadstoneForeman & on Clark Broadway Building Phase I & II 218124 175 Emerald 154 1962 Lakeside1400 Fig Lofts, The 11079 176 Figueroa Centre 200 2163 Station4th & Spring on 12th 416188 23 AtlasTotal Under Construction 634858 31 3000 Broadway 127 7233 10001100 ClayHill Street 700288 7335 6031721 South Webster Broadway 25050 7437 92014th South& Alice Hill Street 239262 7538 Vara19th & Harrison 161224 9543 1600401 29th South Street Figueroa Street 13483 9644 7th1700 & WebsterMaple Street 452206 9746 AVAAlta WoodsonArts District 475140 98 EighthTotal Under & Figeuroa Construction 2,927438 99 Flower Market Redevelopment 323 10056 277Hill Street 27th 405235 10157 AntonMain Street Edge Park 37991 75 1433Total Planned Webster 3,586168 77 LakeHouse Commons 270 152 1045Total Planned Olive Street 794934 153 1101 South Hill Street 528 113154 22701115 BroadwaySouth Olive Street 223536 177 Lane Building, The 109 114155 23051120 WebsterSouth Olive Street Street 130713 178 Main Tower 196 115156 24011123 BroadwaySouth Main Street 36370 266 676 Mateo Street 185 179 Medallion Phase II, The 500 121157 Villas1148 atSouth Auto Broadway Row 50050 267 6th at Central 236 180 Olympia 1,367 122158 13311340 Harrison6th Street 127193 268 Angels Landing 261 181 Onyx Phase II 248 123159 16011349 SanGrand Pablo Avenue Avenue 28476 269 Beacon Tower 428 182 Stationer's Building 360 124160 17501400 BroadwayFlower Street 307152 270 Camden Arts District 344 183 Times Mirror Square 1,127 125161 18881600 MartinSouth Flower Luther StreetKing Jr. Way 25088 271 Decatur and Seventh 122 259 1024 Mateo Street 106 126162 1900222 West Broadway 2nd Street 452680 272 Little Tokyo Galleria 994 260 1100 East 5th Street 220 128163 2015330 Alameda Telegraph Street Avenue 144186 273 Mateo, The 600 261 2110 Bay 110 129164 2016350 South Telegraph Figueroa Street 344570 274 Palmetto Colyton 310 262 2143 Violet Street 353 Total Prospective 17,958 1000 ft Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Metro LA New Construction & Proposed Multifamily Projects 3Q19 ID PROPERTY UNITS 36 1560 Lincoln Blvd 100 37 Catherine Santa Monica 282 65 Junction Santa Monica 66 Total Under Construction 448 88 1543 7th Street 100 89 500 Broadway 249 135 1415 5th Street 102 136 1650 Lincoln Blvd 98 138 234 Pico Blvd 105 Santa Monica State Beach Total Planned 654 234 1318 4th Street 150 235 1325 6th Street 64 236 1425 5th Street 92 237 1430 Lincoln Blvd 100 238 1437 7th Street 65 Bubba Gump Shrimo Co 239 1637 Lincoln Blvd 143 241 601 Colorado 140 242 612 Colorado Avenue 50 Pacific Park 357 1338 5th Street 96 360 501 Broadway 94 361 Ocean Avenue 79 Route 66 Last Stop Shop 362 Ocean Avenue 105 363 Plaza at Santa Monica, The 96 Total Prospective 1,274 500 ft Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Metro LA New Construction & Proposed Multifamily Projects 3Q19 ID PROPERTY UNITS 32 4864 Melrose Avenue 51 43 3160 Riverside Drive 65 51 1750 Glendale Blvd 77 Total Under Construction 193 84 Hollyhill 202 120 1276 North Western 75 121 Swansea Village 54 125 2468 Glendale Blvd 50 126 Myra Avenue 100 Total Planned 481 210 1375 St. Andrews 185 211 4629 Maubert Avenue 150 212 4632 Santa Monica Blvd 177 213 5420 Sunset Mixed-Use 735 215 LaTerra Select Los Feliz I 96 222 3303 Sunset Blvd 104 306 1225 North Vermont Avenue 58 307 1317 North New Hampshire Avenue 92 308 4100 Sunset 91 310 Deluxe Hollywood 203 312 SunWest 412 314 4658 Melrose Avenue 66 315 5430 Virginia Avenue 65 320 1868 North Western Avenue 87 321 4311 Sunset 108 Total Prospective 2,629 2000 ft Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Metro LA New Construction & Proposed Multifamily Projects 3Q19 ID PROPERTY UNITS 11 Alexan Bahay 200 20 LA Plaza Village 355 Total Lease Up 555 76 College Station 725 78 Bixel Tower Residences 422 79 Ferrante 1,500 102 211 Alpine Street 153 103 Sunset and Everett 204 105 1800 Beverly Blvd 243 Bob Baker Marionette Theater 106 Redevelopment 102 107 Burlington Residences 130 108 LaTerra Select West Temple 54 109 Lifan Tower 306 Total Planned 3,839 184 1201 North Broadway 118 185 200 Mesnagers Street 285 Barlow Respiratory Hospital Rede- 186 velopment 400 187 BrickWorks 100 188 Elysian Park Lofts, The 920 189 LA Chinatown Lofts 318 190 Spring Street 294 191 Stadium Villas 151 193 810 Garland Avenue 118 194 1240 West 2nd Street 335 195 136 South Beaudry 220 196 1614 West Temple 55 197 Sapphire 369 214 600 North Alvarado Street 60 219 1911 Sunset Blvd 170 220 2015 Reservoir Street 50 221 2217 Sunset Blvd 62 275 1111 Sunset Blvd 778 284 1600 Wilshire Blvd 85 276 1251 Sunset Blvd 70 285 224 North Alvarado Street 60 277 181 North Avenue 21 100 309 Alvarado Temple 73 278 Harmony 178 311 Rosenell Terrace 71 279 Lincoln Heights Jail 50 Total Prospective 5,567 280 Sunset Reflection 77 2000 ft Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Metro LA New Construction & Proposed Multifamily Projects 3Q19 ID PROPERTY UNITS 205 IB Plaza Redevelopment 230 206 550 South Vermont 172 8 Mariposa on 3rd 122 207 Westmoreland Avenue 77 15 Thompson, The 202 208 645 South Ardmore Avenue 268 Total Lease Up 324 281 1001 South Park View Street 108 282 825 South Coronado Street 77 24 2900 Wilshire 644 283 831 South Westlake Avenue 79 25 Rise Koreatown, The 364 286 329 South Rampart Blvd 53 30 966 South Kenmore Avenue 50 287 668 South Coronado Street 122 31 678 South Ardmore Avenue 123 288 Lake on Wilshire 479 45 8th Street and Harvard Blvd 131 289 1047 Fedora Street 50 48 3350 Wilshire 216 290 1120 South Serrano Ave 52 49 South Serrano Avenue 104 291 2870 West Olympic Blvd 126 52 Berendo Street 98 292 2972 7th Street 228 59 411 Normandie 224 293 737 South Oxford Avenue 92 64 Catalina Street 122 294 738 Normandie Avenue 50 67 Manhee Manor 70 295 744 South Serrano Avenue 157 Total Under Construction 2,146 296 Arapahoe Street 173 297 Parks in LA, The 251 77 2500 Wilshire Boulevard 248 298 200 North Vermont Avenue 490 80 3540 Wilshire 206 299 Soul 256 81 3255 Wilshire Blvd 240 300 350 South Alexandria Avenue 82 104 2405 West 8th Street 144 301 Vermont Avenue 250 110 3240 Wilshire Boulevard 545 319 E.On Beverly 67 111 748 South Kingsley Drive 67 Total Prospective 5,857 112 900 South Vermont Avenue 193 113 950 South Berendo Street 75 114 Apartments on 7th Street @ Hoover 166 115 Bora 3170, The 252 116 Mariposa and Fedora 182 117 Pinnacle 360 221 Total Planned 2,539 192 2101 West 8th Street 57 198 1000 Vermont 228 199 1045 Dewey Avenue 67 200 3470 Wilshire Blvd 641 201 3700 West Wilshire Blvd 506 202 707 South Berendo Street 50 203 968 Fedora Street 50 204 Catalina, The 269 1000 ft Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Metro LA New Construction & Proposed Multifamily Projects 3Q19 ID PROPERTY UNITS 6 AVA Hollywood at La Pietra Place 695 12 Prizma 169 22 Mansfield, The 138 Total Lease Up 1,002 26 Melrose 52 29 Residences at Wilshire Curson, The 285 35 Fairfax WeHo 53 60 3980 Wilshire 228 61 Audrey 160 68 525 North Wilton Place 88 Total Under Construction 866 82 635 South Western Avenue 132 83 719 South St. Andrews Place 65 118 Heights, The 189 119 Kentish Town 79 131 333 La Cienega 145 Total Planned 610 209 1009 Crenshaw Blvd 209 217 7001 Santa Monica Blvd 105 218 901 South Vine Street 76 228 7617 Santa Monica Blvd 71 229 Town and Country Center 331 230 6001 West Olympic Blvd 57 231 Fairfax Theatre 71 232 NMS La Jolla 90 302 3869 Wilshire Blvd 227 303 Manhattan on 6th 51 304 Western Avenue 73 305 1180 La Brea 67 332 5801 West Pico Blvd 80 313 1114 North St. Andrews Place 60 333 5945 West Pico Blvd 123 316 5530 Virginia Avenue 64 334 6055 West Pico Blvd 125 317 5601 Santa Monica Blvd 375 335 7951 Beverly Blvd 57 318 6901 Santa Monica Blvd 231 336 8000 West 3rd Street 50 329 5411 Wilshire 317 339 La Cienega 114 330 Bond Residences, The 70 340 San Vicente 54 331 333 South San Vicente Blvd 153 Total Prospective 3,301 1000 ft Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Metro LA New Construction & Proposed Multifamily Projects 3Q19 ID PROPERTY UNITS 216 6200 Sunset 270 1 Modera Hollywood 248 223 1723 Wilcox Avenue 68 Total Lease Up 248 224 6100 Hollywood Blvd 220 225 Hollywood & Bronson 156 226 Hollywood & Wilcox 260 33 5750 Hollywood 161 227 Horizon Hollywood 410 38 Essex Hollywood 200 322 1749 North Las Palmas 70 41 Hollywood Cherokee 224 323 Crossroads Hollywood 950 44 Residences at Academy on Vine, The 196 324 Hollywood and Gower 220 50 1840 North Highland Avenue 118 325 Hollywood Arts Collective 152 53 Sunset Rise 60 326 Hollywood Center 1,005 69 Rise Hollywood, The 369 327 Inspire Hollywood 200 70 Sunset and Gordon 299 328 7500 Sunset 213 Total Under Construction 1,627 337 8555 Santa Monica Boulevard 97 379 2340 Venice Blvd 180 85 6007 Sunset Boulevard 63 Total Prospective 4,471 86 Lombardi, The 86 122 6400 Sunset Blvd 200 123 Citrus & Highland 72 124 Hollywood
Recommended publications
  • VI. Other CEQA Considerations VI
    VI. Other CEQA Considerations VI. Other CEQA Considerations 1. Significant and Unavoidable Impacts Section 15126.2(b) of the CEQA Guidelines requires that an EIR describe any significant impacts which cannot be avoided. Specifically, Section 15126.2(b) states: Describe any significant impacts, including those which can be mitigated but not reduced to a level of insignificance. Where there are impacts that cannot be alleviated without imposing an alternative design, their implications and the reasons why the project is being proposed, notwithstanding their effect, should be described. As evaluated in Section IV, Environmental Impact Analysis, of this Draft EIR, and summarized below, implementation of the Project would result in significant and unavoidable impacts related to on-site construction noise, on- and off-site construction vibration (related to human annoyance), and intersection levels of service during Project operation.1 Cumulative impacts with respect to on- and off-site construction noise and off-site construction vibration (related to human annoyance) would also be significant and unavoidable.2 All other impacts associated with the Project would be less than significant or reduced to a less-than-significant level with mitigation. 1 The Project’s on-site construction noise impact and on-site construction vibration impact (with respect to human annoyance) would only be significant and unavoidable if Related Project No. 121 (Times Mirror Square project) is completed and occupied before or during Project construction. 2 Cumulative on-site construction noise impacts would only be significant and unavoidable if construction of Related Project No. 121 (Times Mirror Square project) occurs concurrently with Project construction.
    [Show full text]
  • TRIPOD a P~Relations Plan Lesley Moran CM441 December 13, 1999
    TRIPOD A P~Relations Plan !, ' Lesley Moran CM441 - December 13, 1999 I • • ((/ !_;/ } Client: TRIPOD 1727 West Burbank Boulevard Burbank, CA 91506 Phone (818) 972-2080 Fax (818) 972-2090 Client Background: TRIPOD is a private, non-profit educational research organization committed to helping families raise their deaf and hard-of-hearing children in a supportive environment. Mission: TRIPOD's mission is to demonstrate a cost-effective educational model in which deaf and hard-of-hearing children are co-enrolled with their hearing peers so all can realize their full academic potential. • History: The TRIPOD organization has evolved through several different stages~In 1983, TRIPOD founder Megan Williams was researching educational opportunities for her profoundly deaf son Jacob and found them completely sub-par to hearing schools. By raising $150,000 in funding and recruiting deaf education s~ecialis!s, it began as a private pre-school with four children .an ,three years late formed a partnership with a small private elementary school (Stage I). + In 1989, TRIPOD entered into a partnership with the Burbank Unified School District (Stage II). + In 1993, this public/private partnership evolved into a regional program serving four school di~tricts within the Special Education Local Plan Agencies (SELP A) (Stage III). + These efforts have been successful because ofTRIPOD's active role in private fundraising activities. The program is now officially known as the Foothill & Pasadena SELPAs/TRIPOD program for deaf and hard-of-hearing children. It is housed at four sites within the Burbank Unified School District. Nature of Services: Education: Tripod offers an effective combination of programs and services to children and families affected by hearing loss.
    [Show full text]
  • FOR SALE OR LEASE 8151 W. 3Rd St. LA
    FOR SALE OR LEASE 8151 W. 3rd St. LA The Beverly Center The Grove/ Farmers Market Famed West Third Street District EXISTING 3,500 SF BUILDING IDEAL FOR OWNER/USER OPPORTUNITY OR REDEVELOPMENT 8151 W. 3RD ST LOS ANGELES, CA 90048 PREMISES 3,508 SF PRICE $5,500,000 LOT SIZE 8,590 SF LEASE RATE Market Rate/Negotiable OCCUPANCY Immediate PARKING Onsite and Street Parking ZONING LAC2 FEATURES -perfect owner/user or redevelopment -“famed” West 3rd street location -corner location -pole signage -existing 3508 s.f. -ample parking on site -first time offered in years -ideally situated between the Grove and Beverly Center CONTACT Duncan Lemmon 310.899.2733 [email protected] BRE 00857008 1508 17th Street, Santa Monica, CA | 310.899.2700 8151 W. 3RD ST WWW.LEEWESTLA.COM | BRE 01222000 LOS ANGELES, CA 90025 No warranty or representation is made to the accuracy of the foregoing information. Terms of sale or lease are subject to change or withdrawal without notice. PLOT MAP 1508 17th Street, Santa Monica, CA | 310.899.2700 8151 W. 3RD ST WWW.LEEWESTLA.COM | BRE 01222000 LOS ANGELES, CA 90066 No warranty or representation is made to the accuracy of the foregoing information. Terms of sale or lease are subject to change or withdrawal without notice. West 3rd St Tenants 1508 17th Street, Santa Monica, CA | 310.899.2700 8151 W. 3RD ST WWW.LEEWESTLA.COM | BRE 01222000 LOS ANGELES, CA 90066 No warranty or representation is made to the accuracy of the foregoing information. Terms of sale or lease are subject to change or withdrawal without notice.
    [Show full text]
  • Ground Transportation
    Los Angeles Harbor Department Section 3.3 Ground Transportation 1 Section 3.3 2 Ground Transportation 3 SECTION SUMMARY 4 Section 3.3, Ground Transportation, provides the following: 5 • A review of the ground transportation mitigation measures of the 2008 EIS/EIR; 6 • A description of observed existing ground transportation conditions in the study area, and the 7 differences from the 2008 EIS/EIR; 8 • A discussion of the methodology used to determine whether the Revised Project would result 9 in a new or substantially more severe significant impact on ground transportation; 10 • A summary of the ground transportation impacts of the Revised Project; and 11 • A description of revised, feasible mitigation measures proposed to reduce significant adverse 12 impacts, as applicable. 13 Key Points of Section 3.3: 14 Four of the mitigation measures imposed in the 2008 EIS/EIR (MM TRANS-2, -3, -4, and -6, see Section 15 3.3.1) to mitigate potential impacts at study intersections are not included in the Revised Project; this 16 SEIR evaluates future conditions without those measures and determines whether their removal would 17 have new or more serious significant impacts relative to the findings of the 2008 EIR/EIR. Roadway 18 circumstances have changed since the certification of the 2008 EIS/EIR and new information is available 19 concerning traffic conditions at study area intersections that calls into question the need for those 20 measures. Ten of the 17 study area intersections analyzed in the 2008 EIS/EIR have undergone physical 21 changes, including those where mitigation measures were proposed in the 2008 EIS/EIR.
    [Show full text]
  • Into the Heart of Screenland Culver City, California
    INTO THE HEART OF SCREENLAND CULVER CITY, CALIFORNIA AN INEXHAUSTIVE INVESTIGATION OF URBAN CONTENT THE CENTER FOR LAND USE INTERPRETATION CENTER E FO H R T L A N N O I D T U A S T E RE INTERP THE HEART OF SCREENLAND “The Heart of Screenland” is the official city motto for Culver City, an incorporated city of 40,000 people in the midst of the megalopolis of Los Angeles. “All roads lead to Culver City,” its founder, Harry Culver, once said. All roads indeed. Culver built the city from scratch starting in 1913, selecting a location that was halfway between downtown Los Angeles and the beach community of Venice, at the crossroads of a now long-gone regional public trolley system. Culver City quickly became home to several movie studios, some of which disappeared, others which still dominate the scene. Hal Roach’s Laurel and Hardy comedies, shot on Main Street, captured the town in the 1920s, and Andy Griffith’s everytown of Mayberry was broadcast from the city’s backlots to screens across America. In the 1950s, the city modernized. Its original Main Street was upstaged by a new Culver Center shopping area, a few blocks west. The studios turned to television, and the 1950s became the 1960s. In the 1970s the studio backlots were filled in with housing and office parks, as homogenization flooded the Los Angeles basin, turning Culver CIty into part of the continuous urban suburb. In the 1990s, the city’s efforts to restore its identity and its downtown Into the Heart of Screenland: Culver City, California An Inexhaustive Investigation of Urban Content came together, beginning a rebirth of the Heart of Screenland.
    [Show full text]
  • 2016 Skechers Performance Los Angeles Marathon Media Guide
    2016 Skechers Performance Los Angeles Marathon Media Guide Important Media Information 3 Race Week Schedule 4 About the Race 7 8 Legacy Runners The Course 10 History 25 Logistics 32 On Course Entertainment 37 Media Coverage 43 LA BIG 5K 44 Professional Field 46 Race Records 52 Charities 67 Partners & Sponsors 72 Marathon Staff 78 2017 Skechers Performance Los Angeles Marathon Media Guide Media Contacts Carsten Preisz Jolene Abbott VP, Brand Strategy and Marketing Executive Director, Public Relations Conqur Endurance Group Skechers Performance 805.218.7612 310.318.3100 [email protected] [email protected] Molly Biddiscombe Kerry Hendry Account Supervisor Vice President Ketchum Sports & Entertainment Ketchum Sports & Entertainment 860-539-2492 404-275-0090 [email protected] [email protected] Finish Line Media Center Media Credential Pickup Fairmont Hotel LA Convention Center Wedgewood Ballroom West Hall, Room 510 101 Wilshire Blvd 1201 S. Figueroa Street Santa Monica, CA Los Angeles, CA 90015 310-899-4136 Friday, March 17: 10:30 am – 5 pm Saturday, March 18: 9 am – 2 pm Press Conference Schedule Fairmont Hotel Friday, Wedgewood Ballroom 8:00 am Sunday 6:00 am to 3:00 pm ‘Meet the Elites’ Event, Griffith Park Top athletes, Conqur CEO Tracey Russell Social 11:00 am Pages Website: www.lamarathon.com Pre-race Press Conference, LA Convention Center, West Hall, Room510 www.goconqur.com Top athletes Facebook: facebook.com/LAmarathon Instagram: @lamarathon Sunday, Twitter: @lamarathon 10:00 am Snapchat: @lamarathon
    [Show full text]
  • ANALYSIS of EXISTING CONDITIONS a Subregional View Of
    ANALYSIS OF EXISTING CONDITIONS A subregional view of travel on the Westside has been drawn from interviews with elected officials, meetings with MTA and other agencies and analysis of existing data. The subregion considered in this analysis is shown in Figure 1. Because transportation does not respect political boundaries, the Westside Mobility Study area is roughly all of Los Angeles County west of La Brea Avenue, north of Los Angeles International Airport and south of Mulholland Drive. The Westside has many of the most important activity centers in all of Southern California; 16 of these are shown in Figure 2. The Westside Mobility Study has begun to define what might be done to meet those needs for improved linkages, specifying the most critical locations for major transit improvements and other multimodal improvements. Evaluation of Existing Transportation Conditions A goal of the Westside Mobility Study is to provide an accurate picture of the existing traffic and congestion levels on primary arterials and corridors in the Westside area. As there was a large amount of readily available, current data, no new supplementary traffic counts were conducted. Data was acquired from the following sources and ranges predominantly from 2000 to the present day: · Traffic data from the Cities of Beverly Hills, Culver City, Santa Monica and West Hollywood · Transit data from Culver City Bus, Big Blue Bus and MTA · Information from MTA’s Short Range Transportation Plan: Technical Document · Los Angeles Department of Transportation (LADOT) database of traffic counts · Previous Kaku Associates projects · Caltrans counts 10 WESTSIDE MOBILITY STUDY SSOCI TES A Corporation FIGURE 1 STUDY AREA Multi-purpose Activity Centers WESTSIDE MOBILITY STUDY SSOCI TES A Corporation FIGURE 2 MAJOR ACTIVITY CENTERS Area Characteristics - Employment, Population and Housing: The Westside area has at least 10% of the jobs in Los Angeles County and is home to over 6% of County residents.
    [Show full text]
  • March 2013 (Website Copy)
    SOUTHERN CALIFORNIA UNITED FOOD & COMMERCIAL WORKERS UNIONS AND DRUG EMPLOYERS TRUST FUNDS 2220 HYPERION AVENUE LOS ANGELES, CALIFORNIA 90027 TEL (323) 666-8910 FAX (323) 663-9495 www.ufcwdrugtrust.org Administrative offices for: SOUTHERN CALIFORNIA UNITED FOOD & COMMERCIAL WORKERS UNIONS AND DRUG EMPLOYERS PENSION FUND SOUTHERN CALIFORNIA DRUG BENEFIT FUND Date: March 2013 (Website Copy) To: All Active Participants in CA – except Kaiser Employees who have Kaiser Coverage All Retirees in CA – except Retirees who have Kaiser Senior Advantage or UnitedHealthcare Secure Horizons Coverage Re: Participating Pharmacy Directory – OptumRx Dear Participants and Retirees: As directed by the Board of Trustees, pharmacies which do not have an agreement with a UFCW Local Union are to be removed from the OptumRx Network. Pharmacies could be added at a later date. Therefore, please take a moment to review the attached directory. Please remember, in order to receive prescription coverage under this Plan, all prescriptions must be filled by a participating pharmacy listed in the attached directory. If you attempt to fill a prescription at a pharmacy which is not included in the OptumRx Network, the prescription will not be covered under the plan. This office will continue to advise you of any changes to the OptumRx Network. Should you have any questions, please feel free to contact this office or our Local Union Insurance Department. Sincerely, Trust Fund Office Extension #500 for Retirees Extension #503 for Actives * * Note: Kaiser Employees and dependents enrolled in Kaiser must use Kaiser pharmacies. OptumRx is not available to Kaiser Employees and their dependents enrolled in Kaiser. Note: Medicare Eligible Retirees enrolled in an HMO must use the HMO’s pharmacies.
    [Show full text]
  • 1981 Caltrans Inventory of Pacific Electric Routes
    1981 Inventory of PACIFIC ELECTRIC ROUTES I J..,. I ~ " HE 5428 . red by I58 ANGELES - DISTRICT 7 - PUBLIC TRANSPORTATION BRANCH rI P37 c.2 " ' archive 1981 INVENTORY OF PACIFIC ELECTRIC ROUTES • PREPARED BY CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) DISTRICT 07 PUBLIC TRANSPORTATION BRANCH FEBRUARY 1982 • TABLE OF CONTENTS PAGE I. EXECUTIVE SUMMARY 1 Pacific Electric Railway Company Map 3a Inventory Map 3b II. NQR'I'HIRN AND EASTERN DISTRICTS 4 A. San Bernardino Line 6 B. Monrovia-Glendora Line 14 C. Alhambra-San Gabriel Line 19 D. Pasadena Short Line 21 E. Pasadena Oak Knoll Line 23 F. Sierra Madre Line 25 G. South Pasadena Line 27 H. North Lake Avenue Line 30 10 North Fair Oaks Avenue Line 31 J. East Colorado Street Line 32 K. Pomona-Upland Line 34 L. San Bernardino-Riverside Line 36 M. Riverside-Corona Line 41 III. WESTERN DISTRICT 45 A. Glendale-Burbank Line 47 B. Hollywood Line Segment via Hill Street 52 C. South Hollywood-Sherman Line 55 D. Subway Hollywood Line 58 i TABLE OF CONTENTS (Contd. ) -PAGE III. WESTERN DISTRICT (Conta. ) E. San Fernando valley Line 61 F. Hollywood-Venice Line 68 o. Venice Short Line 71 H. Santa Monica via Sawtelle Line 76 I. westgate Line 80 J. Santa Monica Air Line 84 K. Soldier's Home Branch Line 93 L. Redondo Beach-Del Rey Line 96 M. Inglewood Line 102 IV. SOUTHIRN DISTRICT 106 A. Long Beach Line 108 B. American Avenue-North Long Beach Line 116 c. Newport-Balboa Line 118 D. E1 Segundo Line 123 E. San Pedro via Dominguez Line 129 F.
    [Show full text]
  • Chapter 4 Transportation and Infrastructure Element
    CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT CHAPTER 4 TRANSPORTATION AND INFRASTRUCTURE GUIDING PRINCIPLE The City of Carson is committed to providing a safe and efficient circulation system that improves the flow of traffic while enhancing pedestrian safety, promoting commerce, and providing for alternative modes of transportation. The City is committed to maintaining and improving all forms of infrastructure including water, sewer and storm drainage facilities, as well as communication and other technological facilities to provide a sustainable system. 1.0 INTRODUCTION The purpose of this Element is to document the methods and results of the analysis of the existing and projected future circulation conditions in the City of Carson. As part of the General Plan, this document outlines Transportation and Infrastructure System policies and describes the future circulation system needed to support the Land Use Element. In addition, the Element addresses public utilities and infrastructure. 2.0 STATE LAW REQUIREMENTS The pertinent Government Code sections relating to the Transportation and Infrastructure Element are as follows: “Government Code Section 65302(b): (The general plan shall include) a circulation element consisting of the general location and extent of existing and Carson General Plan TI-1 Chapter 4 TRANSPORTATION AND INFRASTRUCTURE ELEMENT proposed major thoroughfares, transportation routes, terminals, and other local public utilities and facilities, all correlated with the land use element of the plan. Government Code Section 95303: The general plan may . address any other subjects which, in the judgment of the legislative body, relate to the physical development of the county or city.” 3.0 SUMMARY OF FINDINGS 3.1 EXISTING CIRCULATION SYSTEM The City of Carson is served by the existing network of roadways shown in Exhibit TI-1, Existing Road Network.
    [Show full text]
  • 157067NCJRS.Pdf
    If you have issues viewing or accessing this file contact us at NCJRS.gov. • THE BADGE AND THE PEN: A LOVE-HATE RELATiONSHIP POLICE MEDIA RELATIONS BY THE YEAR 2005 157067 • U.S. Department of Justice National Institute of Justice This document has been reproduced exactly as received from the person or organization originating it. Points of view or opInions stated In this document are those of the authors and do not necess.anly represent the official pOSition or policies of the National Institute of Justice. Permission to reproduce this copyrighted material has been gr'e~1!I?'fornia COmr:'ission on Peace Offlcer Standards and ~alnln~' to the National Criminal Justice Reference Service (NCJRS). Further reproduction outside of the NCJRS system requires permission of the copyright owner. By Anthony W. Batts long Beach Police Department May 1995 20-0402 The Badge and the Pen: A Love-Hate Relationship • Police Media Relations by the Year 2005 A. Batts. Sponsorjng Agenc~: California Commission on Peace Officer Standards and Training. 1995. 163 pp. Availability: Commission on POST, Center for Leadership Development, 1601 Alhambra Boulevard, Sacramento, CA 95816-7053. Single copies free; Order Number 20-0402 National Institute of Justice/NCJRS Microfiche pro;ram, Box 6000, Rockville, MD 20850. Microfiche fee. Microfiche Number NCJ I 10 b 2 . ABSTRACT • The future of law enforcement media relations is examined to provide strategic alternatives for future improvement. A future study of the skills and abilities in media relations that will be required of law enforcement in the year 2005. A model strategic plan is presented to assist in the development of those skills and abilities.
    [Show full text]
  • Venice Blvd. (Grand View Blvd
    SPECIAL FILMING CONDITIONS VENICE BLVD. (GRAND VIEW BLVD. TO CENTINELA AVE.) The Special Filming Conditions described below will be included in the terms and conditions of permits issued for filming in this area and are in addition to the standard terms and conditions applicable to filming permits generally. While these Special Filming Conditions will be included as terms if a permit for filming in this area is issued, they are not intended to, and do not, establish the criteria or standards for determining whether or not a particular permit (or permits) will be issued for this area. The decision whether or not a particular permit (or permits) will be issued is vested in the discretion of the appropriate City or County department or their designees (including FilmLA), to be exercised consistent with public health, safety and general welfare, and applicable land-use ordinances. • Affected residents/merchants on Venice Boulevard between Grandview Boulevard and Centinela Avenue must be notified of any filming activity (including any areas affected by production equipment parking, cast/crew parking, or catering) must be notified at least (2) days in advance of the first filming day or the first day of any substantial set preparation. Permit requests must be submitted to FilmLA at least (3) days in advance. Cast and crew parking is not permitted to park on area streets. Off-street, alternate parking must be provided. • Production vehicles parking and/or the posting of “No Parking” signs require the signature of affected businesses. Posting/parking should not exceed 400’. Production companies are required to submit signatures to the Permit Authority for review and approval at least twenty-fours in advance of the first film date to allow for modification of posting signage if needed.
    [Show full text]