Community Notice
COMMUNITY NOTICE Temporary Changes to the Roadway Network from Saturday, May 9th, 6AM until Sunday, May 10th, 2015, 9PM As part of the construction of the Green Roof at Barclays Center, a construction crane currently located at the northwest corner of Dean Street and 6th Avenue will be disassembled, requiring these temporary roadway closures: • Dean Street, between Flatbush and Sixth Avenues will be closed intermittently • Sixth Avenue, between Paci c and Bergen Streets will be closed intermittently These closures will necessitate the temporary detour of vehicle, pedestrian, bus and bicycle tra c from the aected blocks. Tra c Enforcement Agents will be provided to assist with vehicular and pedestrian movements. Variable Message Signs will direct drivers to the approved detour routes, which are shown on the map below. Sidewalks in work zone areas will remain open only to residents and visitors of aected blocks. Dean Street between Sixth and Carlton Avenues is only open for local tra c.
Paci c Park Brooklyn Community Liaison Oce ESD Atlantic Yards (866) 923-5315 (212) 803-3736 communityliaison@paci cparkbrooklyn.com [email protected]
Cumberland St S Portland Av Vanderbilt Av Ft Greene Pl S Oxford St Clermont Av Carlton Av
Atlantic Av
6th Av Pacific St Eastbound Flatbush Av B65 bus stop Dean St temporarily Intermittent closed road closures B65 Dean St Eastbound B65 B65 bus stop Eastbound remains open B65 bus stop temporarily closed Carlton Av Vanderbilt Av Vanderbilt
Bergen St 5th Av Eastbound B65 stops at B41/B67 bus stop during detour
St Marks Av Street Direction B65 Work Zone St Marks Av Bus & Vehicle Detour Eastbound Dean St bicyclists rerouted Bicycle Detour 6th Av via 5th Av, St Marks Av, & Carlton Av Pedestrian Detour NOT TO SCALE Vehicle Detour