WÄRTSILÄ DESIGN REFERENCES

Conversions/ upgrades/ modifications

© Wärtsilä NOT YET CLASSIFIED SK 4209 BIT VIKING

SCOPE OF SUPPLY ADDITIONAL • Ship Design • NOx measurement during • Engine conversion sea trial DF and • LNGPac system (2 x • LNGPac training for 500m3) personnel • Gas supply units • Torque meter for power measurement • Bunkering system • Gas piping (single and double walled) • Exhaust system • Fire-fighting upgrade • Gas detection system • Electrical system

© Wärtsilä NOT YET CLASSIFIED CALA SERIES

HIGHLIGHTS WSD SCOPE • Reefer vessels (4 no.’s) • Basic design • Lloyd Werft Bremerhaven • Detail design GmbH (Germany) • Steel production documentation CONVERSION SCOPE • Lengthening for increase of cargo capacity

© Wärtsilä NOT YET CLASSIFIED M/T FOUR MOON

HIGHLIGHTS WSD SCOPE • OBO carrier, 54,500dwt • Basic design conversion to 65,000 DWT • Detail design Crude oil • Steel production documentation CONVERSION SCOPE • Lengthening for increase of cargo capacity

© Wärtsilä NOT YET CLASSIFIED PETROTRYM

HIGHLIGHTS WSD SCOPE • Product/Crude • Basic design • 82,000 DWT • Detail design • Steel production CONVERSION SCOPE documentation • Conversion to buoy loader/shuttle tanker

© Wärtsilä NOT YET CLASSIFIED M/T NCC ARAR, M/T NCC ASIR, M/T BOW HUNTER

HIGHLIGHTS WSD SCOPE • Chemical tankers • Basic design • 22,500 DWT • Tender documentation package MODIFICATION SCOPE • Refitted with innershell

© Wärtsilä NOT YET CLASSIFIED M/T JO BREVIK, M/T JO CLIPPER, M/T JO LIND, M/T JO BIRK, M/T JO OAK

HIGHLIGHTS • Refitted with innershell • Chemical tankers • 33,000 DWT WSD SCOPE • Basic design MODIFICATION SCOPE • Tender documentation • Refitted with new tanks package • Increased cargo subdivision

© Wärtsilä NOT YET CLASSIFIED MS TRANS CARRIER

HIGHLIGHTS WSD SCOPE • RO/RO container carrier • Basic design • 7,300 DWT • Tender documentation package CONVERSION SCOPE • Rebuilding/elongation • Lengthening 18.9m

© Wärtsilä NOT YET CLASSIFIED M/V HAWK ARROW

HIGHLIGHTS indipendent cargo tanks for • General cargo carrier liquid tar pitch /tanker for coal tar pitch WSD SCOPE MODIFICATION SCOPE • Feasibility study • Modification of cargo tanks • Basic design to comply with IMOII • Tender documentation • Centre bulkhead inserted in package

© Wärtsilä NOT YET CLASSIFIED M/V OHM EXPRESS

HIGHLIGHTS WSD SCOPE • Paper carrier • Feasibility study • Basic design CONVERSION SCOPE • Tender documentation • Conversion to package Seismic/survey/

© Wärtsilä NOT YET CLASSIFIED M/V OHM LEADER

HIGHLIGHTS WSD SCOPE • Paper carrier • Feasibility study • Basic design CONVERSION SCOPE • Tender documentation • Conversion to Seabed package logging vessel

© Wärtsilä NOT YET CLASSIFIED M/V BULK SATURN

HIGHLIGHTS WSD SCOPE • • Feasibility study • Basic design CONVERSION SCOPE • Tender documentation • Conversion to combined package bulk/tanker • Three cargo-holds into combined bulk and tank- rooms for Caustic soda carriage

© Wärtsilä NOT YET CLASSIFIED M/V IBIS ARROW

HIGHLIGHTS WSD SCOPE • General cargo carrier • Feasibility study /tanker for coal tar pitch • Basic design • Tender documentation MODIFICATION SCOPE package • Supporting Structure for hose handling Crane • Extension of deckhouse for new generating set

© Wärtsilä NOT YET CLASSIFIED M/V MOZU ARROW

HIGHLIGHTS WSD SCOPE • Totally enclosed bulk • Basic design carrier

CONVERSION SCOPE • Conversion to juice carrier • Supporting Structure for hose handling Crane

© Wärtsilä NOT YET CLASSIFIED PANAMAX TANKER

HIGHLIGHTS SCOPE • Panamax tanker for oil and • Feasibility study caustic soda • Basic design • Pno: 10166 • Yard specification • Tender documentation CONVERSION SCOPE package • Conversion to bulk carrier

© Wärtsilä NOT YET CLASSIFIED SUEZMAX CRUDE OIL TANKER

HIGHLIGHTS SCOPE • Suezmax Crude oil tanker • Basic design • Pno:10255 • Yard specification • Tender documentation CONVERSION SCOPE package • Conversion to DP2 shuttle tanker

© Wärtsilä NOT YET CLASSIFIED M/V BGP PIONEER

HIGHLIGHTS SCOPE • Stern trawler (F/V SJØVIK) • Feasibility study • Basic design CONVERSION SCOPE • Yard specification • Converted to 8 streamer 3D • Tender documentation seismic research vessel package Sponsoons added • Seismic hangar • Seismic equipment • Helideck

© Wärtsilä NOT YET CLASSIFIED M/V GEOWAVE CHAMPION

HIGHLIGHTS SCOPE • • Feasibility study • Basic design CONVERSION SCOPE • Yard specification • Converted to 12 streamer • Tender documentation 3D seismic research vessel package Sponsoons added • Seismic hangar • Seismic equipment • Helideck

© Wärtsilä NOT YET CLASSIFIED PERTINACIA PLV

HIGHLIGHTS SCOPE • Cable Laying Vessel • Feasibility study • Basic design CONVERSION SCOPE • Yard specification • Converted to into Flexible • Tender documentation Pipe-Laying Vessel (vertical package flex-lay) • Extended beam for lay tower • Storage of products in 2 circular tanks • A-frame

© Wärtsilä NOT YET CLASSIFIED NORMAND SEVEN

HIGHLIGHTS Installation • Offshore construction • Flexi pipe and umbilical vessel installation

CONVERSION SCOPE SCOPE • Converted Construction / • Feasibility study PLV • Basic design • ROV support • Yard specification • Construction, Maintenance • Tender documentation and Installation Capabilities package using Crane lifting 250 t / 2500 m water depth • Vertical Laying System • Subsea Maintenance and

© Wärtsilä NOT YET CLASSIFIED SAIPEM FDS

HIGHLIGHTS • J/Lay tower upgrade • Offshore construction • Retrofit of larger A&R winch vessel/Pipelayer system

UPGRADE SCOPE SCOPE • Retrofit of swell • Feasibility study compensation system for • Basic design main crane • Yard specification • Storage winches and hang- • Tender documentation off system for deep-sea package piling • Crane capacity upgrade

© Wärtsilä NOT YET CLASSIFIED NORMAND CUTTER, NORMAND CLIPPER

HIGHLIGHTS ploughing • Offshore construction • Upgradeable to large vessel offshore crane

CONVERSION SCOPE SCOPE • Conversion to Cable layer • Feasibility study • Cablelaying – stern • Basic design operation • Yard specification • Capacities cable tanks • Tender documentation • 2 x 3000 tonnes for fibre package optic cable • 2 x 250 tonnes spare tanks • Bouy handling • 2 x 100 Repeater stacks • Fully integrated fibre optic laying system including

© Wärtsilä NOT YET CLASSIFIED ILE DE RE

HIGHLIGHTS SCOPE • RO-RO • Feasibility study • Basic design CONVERSION SCOPE • Yard specification • Conversion to Cable layer • Tender documentation • Cablelaying – stern package operation • Handling any type of underwater telecommunication cable • Handling repeaters up to 380mm diameter • Storing of maximum 15 repeaters

© Wärtsilä NOT YET CLASSIFIED WIND INNOVATION

HIGHLIGHTS SCOPE • Research/Survey (Veritas • Feasibility study Viking II) • Basic design • Detail design CONVERSION SCOPE • Yard specification • Conversion to • Tender documentation accommodation vessel for package windmill support • Site supervision • accommodation and hotel facilities for 125 people • heave compensated gangway • SPS

© Wärtsilä NOT YET CLASSIFIED VESTLAND CYGNUS

HIGHLIGHTS SCOPE • • Feasibility study (PSV) • Basic design • Yard specification CONVERSION SCOPE • Tender documentation • Conversion to offshore wind package farm service vessel • accommodation module for 134 people • 100 ton offshore crane with a range of 40 metres • Gangway for transferring personnel to offshore fixtures

© Wärtsilä NOT YET CLASSIFIED