Wärtsilä Ship Design References

Total Page:16

File Type:pdf, Size:1020Kb

Wärtsilä Ship Design References WÄRTSILÄ SHIP DESIGN REFERENCES Conversions/ upgrades/ modifications © Wärtsilä NOT YET CLASSIFIED SK 4209 BIT VIKING SCOPE OF SUPPLY ADDITIONAL • Ship Design • NOx measurement during • Engine conversion sea trial DF and • LNGPac system (2 x • LNGPac training for 500m3) personnel • Gas supply units • Torque meter for power measurement • Bunkering system • Gas piping (single and double walled) • Exhaust system • Fire-fighting upgrade • Gas detection system • Electrical system © Wärtsilä NOT YET CLASSIFIED CALA SERIES HIGHLIGHTS WSD SCOPE • Reefer vessels (4 no.’s) • Basic design • Lloyd Werft Bremerhaven • Detail design GmbH (Germany) • Steel production documentation CONVERSION SCOPE • Lengthening for increase of cargo capacity © Wärtsilä NOT YET CLASSIFIED M/T FOUR MOON HIGHLIGHTS WSD SCOPE • OBO carrier, 54,500dwt • Basic design conversion to 65,000 DWT • Detail design Crude oil tanker • Steel production documentation CONVERSION SCOPE • Lengthening for increase of cargo capacity © Wärtsilä NOT YET CLASSIFIED PETROTRYM HIGHLIGHTS WSD SCOPE • Product/Crude oil tanker • Basic design • 82,000 DWT • Detail design • Steel production CONVERSION SCOPE documentation • Conversion to buoy loader/shuttle tanker © Wärtsilä NOT YET CLASSIFIED M/T NCC ARAR, M/T NCC ASIR, M/T BOW HUNTER HIGHLIGHTS WSD SCOPE • Chemical tankers • Basic design • 22,500 DWT • Tender documentation package MODIFICATION SCOPE • Refitted with innershell © Wärtsilä NOT YET CLASSIFIED M/T JO BREVIK, M/T JO CLIPPER, M/T JO LIND, M/T JO BIRK, M/T JO OAK HIGHLIGHTS • Refitted with innershell • Chemical tankers • 33,000 DWT WSD SCOPE • Basic design MODIFICATION SCOPE • Tender documentation • Refitted with new tanks package • Increased cargo subdivision © Wärtsilä NOT YET CLASSIFIED MS TRANS CARRIER HIGHLIGHTS WSD SCOPE • RO/RO container carrier • Basic design • 7,300 DWT • Tender documentation package CONVERSION SCOPE • Rebuilding/elongation • Lengthening 18.9m © Wärtsilä NOT YET CLASSIFIED M/V HAWK ARROW HIGHLIGHTS indipendent cargo tanks for • General cargo carrier liquid tar pitch /tanker for coal tar pitch WSD SCOPE MODIFICATION SCOPE • Feasibility study • Modification of cargo tanks • Basic design to comply with IMOII • Tender documentation • Centre bulkhead inserted in package © Wärtsilä NOT YET CLASSIFIED M/V OHM EXPRESS HIGHLIGHTS WSD SCOPE • Paper carrier • Feasibility study • Basic design CONVERSION SCOPE • Tender documentation • Conversion to package Seismic/survey/research vessel © Wärtsilä NOT YET CLASSIFIED M/V OHM LEADER HIGHLIGHTS WSD SCOPE • Paper carrier • Feasibility study • Basic design CONVERSION SCOPE • Tender documentation • Conversion to Seabed package logging vessel © Wärtsilä NOT YET CLASSIFIED M/V BULK SATURN HIGHLIGHTS WSD SCOPE • Bulk carrier • Feasibility study • Basic design CONVERSION SCOPE • Tender documentation • Conversion to combined package bulk/tanker • Three cargo-holds into combined bulk and tank- rooms for Caustic soda carriage © Wärtsilä NOT YET CLASSIFIED M/V IBIS ARROW HIGHLIGHTS WSD SCOPE • General cargo carrier • Feasibility study /tanker for coal tar pitch • Basic design • Tender documentation MODIFICATION SCOPE package • Supporting Structure for hose handling Crane • Extension of deckhouse for new generating set © Wärtsilä NOT YET CLASSIFIED M/V MOZU ARROW HIGHLIGHTS WSD SCOPE • Totally enclosed bulk • Basic design carrier CONVERSION SCOPE • Conversion to juice carrier • Supporting Structure for hose handling Crane © Wärtsilä NOT YET CLASSIFIED PANAMAX TANKER HIGHLIGHTS SCOPE • Panamax tanker for oil and • Feasibility study caustic soda • Basic design • Pno: 10166 • Yard specification • Tender documentation CONVERSION SCOPE package • Conversion to bulk carrier © Wärtsilä NOT YET CLASSIFIED SUEZMAX CRUDE OIL TANKER HIGHLIGHTS SCOPE • Suezmax Crude oil tanker • Basic design • Pno:10255 • Yard specification • Tender documentation CONVERSION SCOPE package • Conversion to DP2 shuttle tanker © Wärtsilä NOT YET CLASSIFIED M/V BGP PIONEER HIGHLIGHTS SCOPE • Stern trawler (F/V SJØVIK) • Feasibility study • Basic design CONVERSION SCOPE • Yard specification • Converted to 8 streamer 3D • Tender documentation seismic research vessel package Sponsoons added • Seismic hangar • Seismic equipment • Helideck © Wärtsilä NOT YET CLASSIFIED M/V GEOWAVE CHAMPION HIGHLIGHTS SCOPE • Fishing vessel • Feasibility study • Basic design CONVERSION SCOPE • Yard specification • Converted to 12 streamer • Tender documentation 3D seismic research vessel package Sponsoons added • Seismic hangar • Seismic equipment • Helideck © Wärtsilä NOT YET CLASSIFIED PERTINACIA PLV HIGHLIGHTS SCOPE • Cable Laying Vessel • Feasibility study • Basic design CONVERSION SCOPE • Yard specification • Converted to into Flexible • Tender documentation Pipe-Laying Vessel (vertical package flex-lay) • Extended beam for lay tower • Storage of products in 2 circular tanks • A-frame © Wärtsilä NOT YET CLASSIFIED NORMAND SEVEN HIGHLIGHTS Installation • Offshore construction • Flexi pipe and umbilical vessel installation CONVERSION SCOPE SCOPE • Converted Construction / • Feasibility study PLV • Basic design • ROV support • Yard specification • Construction, Maintenance • Tender documentation and Installation Capabilities package using Crane lifting 250 t / 2500 m water depth • Vertical Laying System • Subsea Maintenance and © Wärtsilä NOT YET CLASSIFIED SAIPEM FDS HIGHLIGHTS • J/Lay tower upgrade • Offshore construction • Retrofit of larger A&R winch vessel/Pipelayer system UPGRADE SCOPE SCOPE • Retrofit of swell • Feasibility study compensation system for • Basic design main crane • Yard specification • Storage winches and hang- • Tender documentation off system for deep-sea package piling • Crane capacity upgrade © Wärtsilä NOT YET CLASSIFIED NORMAND CUTTER, NORMAND CLIPPER HIGHLIGHTS ploughing • Offshore construction • Upgradeable to large vessel offshore crane CONVERSION SCOPE SCOPE • Conversion to Cable layer • Feasibility study • Cablelaying – stern • Basic design operation • Yard specification • Capacities cable tanks • Tender documentation • 2 x 3000 tonnes for fibre package optic cable • 2 x 250 tonnes spare tanks • Bouy handling • 2 x 100 Repeater stacks • Fully integrated fibre optic laying system including © Wärtsilä NOT YET CLASSIFIED ILE DE RE HIGHLIGHTS SCOPE • RO-RO • Feasibility study • Basic design CONVERSION SCOPE • Yard specification • Conversion to Cable layer • Tender documentation • Cablelaying – stern package operation • Handling any type of underwater telecommunication cable • Handling repeaters up to 380mm diameter • Storing of maximum 15 repeaters © Wärtsilä NOT YET CLASSIFIED WIND INNOVATION HIGHLIGHTS SCOPE • Research/Survey (Veritas • Feasibility study Viking II) • Basic design • Detail design CONVERSION SCOPE • Yard specification • Conversion to • Tender documentation accommodation vessel for package windmill support • Site supervision • accommodation and hotel facilities for 125 people • heave compensated gangway • SPS © Wärtsilä NOT YET CLASSIFIED VESTLAND CYGNUS HIGHLIGHTS SCOPE • Platform Supply Vessel • Feasibility study (PSV) • Basic design • Yard specification CONVERSION SCOPE • Tender documentation • Conversion to offshore wind package farm service vessel • accommodation module for 134 people • 100 ton offshore crane with a range of 40 metres • Gangway for transferring personnel to offshore fixtures © Wärtsilä NOT YET CLASSIFIED .
Recommended publications
  • Annex 10 PDF Page Vanderlaan, ASM, Taggart, CT, Serdynska, AR
    Fisheries and Oceans Canada (DFO) Annex 10 PDF Page Vanderlaan, A.S.M., Taggart, C.T., Serdynska, A.R., Kenney, R.D., and Brown, M.W. 2008. 2 Reducing the risk of lethal encounters: vessels and right whales in the Bay of Fundy and on the Scotian Shelf. Endang. Spec. Res. 4:283–297. Veirs, S., Veirs, V., and Wood, J.D. 2016. Ship noise extends to frequencies used for 17 echolocation by endangered killer whales. PeerJ, 4, p.e1657. Yang, Z., Hollebone, B.P., Zhang, G., Brown, C.E., Yang, C., Lambert, P., Wang, Z., 53 Landriault, M., and Shah, K. 2017. Fate of Photodegraded Diluted Bitumen in Seawater, Proceedings of the 2017 International Oil Spill Conference, American Petroleum Institute, Washington, D.C., pp. 2286-2305. Yang, Z., Zhang, G., Hollebone, B.P., Brown, C.E., Yang, C., Lambert, P., Landriault, M., 73 and Shah, K. 2017. Fate of Oxygenated Components for Solar Irradiated Diluted Bitumen in Saltwater, Proceedings of the Fortieth AMOP Technical Seminar on Environmental Contamination and Response, pp. 415-440, Environment and Climate Change Canada, Ottawa, ON. Yang, Z., Zhang, G., Hollebone, B.P., Brown, C.E., Yang, C., Lambert, P., Wang, Z., 99 Landriault, M., and Shah, K. 2017. Fate of Oxygenated Components for Solar Irradiated Diluted Bitumen Mixed with Seawater, Environmental Pollution, Vol. 231, pp. 622-634, http://dx.doi.org/10.1016/j.envpol.2017.08.043. Yergeau, E., Maynard, C., Sanschagrin, S., Champagne, J., Juck, D., Lee, K., and Greer, C. 112 2015. Microbial Community Composition, Functions, and Activities in the Gulf of Mexico 1 Year after the Deepwater Horizon Accident.
    [Show full text]
  • Spanish National Action Framework for Alternative Energy in Transport
    INTERMINISTERIAL GROUP FOR GOVERNMENT COORDINATION OF THE NATIONAL ACTION FRAMEWORK FOR OF SPAIN ALTERNATIVE ENERGY IN TRANSPORT NATIONAL ACTION FRAMEWORK FOR ALTERNATIVE ENERGY IN TRANSPORT MARKET DEVELOPMENT AND DEPLOYMENT OF ALTERNATIVE FUELS INFRASTRUCTURE. IN COMPLIANCE WITH DIRECTIVE 2014/94/EU OF THE EUROPEAN PARLIAMENT AND THE COUNCIL, OF 22 OCTOBER 2014. 14 OCTOBER 2016 COORDINATED BY SECRETARIAT-GENERAL FOR INDUSTRY AND SMALL AND MEDIUM-SIZED ENTERPRISES PRESIDENCY OF THE INTERMINISTERIAL GROUP INTERMINISTERIAL GROUP FOR GOVERNMENT COORDINATION OF THE NATIONAL ACTION FRAMEWORK FOR OF SPAIN ALTERNATIVE ENERGY IN TRANSPORT TABLE OF CONTENTS I. INTRODUCTION .................................................................................................. 9 I.1. PRESENTATION OF DIRECTIVE 2014/94/EU......................................... 9 I.2. BACKGROUND.................................................................................... 10 I.3. PREPARATION OF THE NATIONAL ACTION FRAMEWORK......................... 13 II. ALTERNATIVE ENERGY IN THE TRANSPORT SECTOR............................................. 17 II.1. NATURAL GAS.................................................................................... 17 II.2. ELECTRICITY..................................................................................... 21 II.3. LIQUEFIED PETROLEUM GAS.............................................................. 23 II.4. HYDROGEN………………………………………..…………................. 26 II.5. BIOFUELS…………………………………………….………………….. 28 III. ROAD TRANSPORT…………………………………………..………..…………….
    [Show full text]
  • Established Korea Shipping Co., Ltd
    1. HSM Introduction 2. HSM Procedure in High Risk Area 3. Prevention case from Somali Piracy HSM Introduction 1. History 2. Organization 3. Figure - Full Ship Management 4. Transit status in high risk area 3 1. History 1949 Established Korea Shipping Co., Ltd 1977 Established Hanjin Shipping Co., Ltd 1988 Merged Korea Shipping Corp. 1995 Merged KeoYang Shipping Co., Ltd 1997 Merged Senator Lines Co., Ltd 2006.09 Spun off from Hanjin Shipping Co., Ltd, and established Hanjin Ship Management Co., Ltd 2007.10 Opened Hanjin Shipping Training Center 2008.10 Merged the Maritime Group of Hanjin Shipping Co., Ltd 4 1. History (Introduction of Hanjin Group) Marine Transportation Aviation Ground Transportation We are always there for our customers, We are committed to excellence as we We promise to become the 21st century's offering the best services as the leader in seek to become a respected leader in the total logistics company through Global marine transportation. global aviation industry. e-Logistics. Information Service Tourism/Hotel/Real Estate Non-Profit As an IT company for greater values, we We provide our customers with We are dedicated to fostering manpower support our customers' successful a high-quality travel/recreation culture. and developing local communities as well business. as aim to become a leading international public beneficiary for the advancement of Korea. 2. Organization CEO Ryu, Jae-Heog Inaugurated as CEO in 2009 CEO Regional Manager in Seattle 153 in total and Long beach in USA graduated from Korea Maritime University in 1980 VP VP VP VP VP Fleet Crew Management Marine SHEQ Marina Marketing Management Management Support Engineering Management Business Container Crew Business Newbuilding Safety, Fleet 11 Mgmt I 10 Administration Supervision Health, 9 28 Marina Bulk Crew Sales Environment 11 Business Fleet Mgmt II 10 & Quality Purchasing & Marine Crew Management Specialized Procurement R&D Center Mgmt III 9 Fleet 9 6 6 6 10 3 Fleet Support & Crew Training Safety Mgmt.
    [Show full text]
  • BLÜCHER Marine References
    BLÜCHER Marine References Country Project Shipyard Owner Vessel Type Hull no. Year Argentina Frigate Naval Shipyard Frigate Frigate Refitting 2005 Australia Australian Customs and Austal Ships Australian Customs and Border Cape Class Patrol Boat 361 2013 Border Protection Service Protection Service Australia Australian Customs and Austal Ships Australian Customs and Border Cape Class Patrol Boat 362 2013 Border Protection Service Protection Service Australia Australian Customs and Austal Ships Australian Customs and Border Cape Class Patrol Boat 363 2013 Border Protection Service Protection Service Australia Australian Customs and Austal Ships Australian Customs and Border Cape Class Patrol Boat 364 2013 Border Protection Service Protection Service Australia Australian Customs and Austal Ships Australian Customs and Border Cape Class Patrol Boat 365 2014 Border Protection Service Protection Service Australia Australian Customs and Austal Ships Australian Customs and Border Cape Class Patrol Boat 366 2014 Border Protection Service Protection Service Australia Australian Customs and Austal Ships Australian Customs and Border Cape Class Patrol Boat 367 2014 Border Protection Service Protection Service Australia Australian Customs and Austal Ships Australian Customs and Border Cape Class Patrol Boat 368 2014 Border Protection Service Protection Service Australia Australian Defence Civmec/ASC Australian Defence OPV OPV1 2019 Australia Australian Defence - ASC Shipyard Australian Defence Air Warfare Destroyer 2012 AWD Australia Australian Defence - LHD BAE Systems Australian Defence Landing Helicpoter 2012 Dock Australia Dick Smith Tenix Dick Smith Ocean Research Ulysses Blue 2005 Vessel Australia Esso West Tuna Esso Platform 1996 Australia HMAS Arunta BAE Systems Australian Defence ANZAC Frigate ANZAC 2019 Australia Jean de la Valette - Virtu Austal Ships Virtu Ferries High Speed Ferry 248 2010 Ferries Australia RNZN Tenix RNZN Ocean Research 42826 2006 Vessel Australia Taylor Bros.
    [Show full text]
  • Maritime Orientation Package
    MARITIME ORIENTATION PACKAGE Port Nelson 1 MARITIME ORIENTATION PACKAGE Introduction This ‘Maritime Orientation Package’ will introduce the complex Maritime industry to Health Protection Officers (HPOs) who may have to implement and apply health measures within it. Background New Zealand Public Health Units are designated as ‘competent authorities’ by the World Health Organisation for ensuring maritime Points of Entry (POE) comply with the standards required by the International Health Regulations (2005) (IHR) and the International Maritime Organisation. Most New Zealand Public Health Units have a Maritime POE in their region. The Maritime Environment comprises many unique factors and has its own language rich with acronyms. For a HPO to be competent and feel confident working in the maritime environment they need a basic understanding of: • Vessel Types – their purpose and the possible public health issues associated with them. • The layout of a ship – where to go and what to look for. • Maritime Terminology – communication with the personnel on board and dockside in the lexicon. • The sequence a vessel follows upon entering NZ waters and the ensuing processes; o gaining pratique, o berthing, o discharging and loading cargo, o replenishment of food and water, o refuelling, and o departure for another jurisdiction, and • The suite of documents that ships maintain to show that management practices on board comply with international regulations and requirements. Purpose The purpose of this orientation package is to familiarise HPOs with some background information that will enable them to be able to confidently conduct their duties at the port. The package is in three parts; • maritime terminology, • an illustrated compendium of ship types that might be encountered in NZ waters, and • a schematic showing the layout of a ship.
    [Show full text]
  • The Otranto-Valona Cable and the Origins of Submarine Telegraphy in Italy
    Advances in Historical Studies, 2017, 6, 18-39 http://www.scirp.org/journal/ahs ISSN Online: 2327-0446 ISSN Print: 2327-0438 The Otranto-Valona Cable and the Origins of Submarine Telegraphy in Italy Roberto Mantovani Department of Pure and Applied Sciences (DiSPeA), Physics Laboratory: Urbino Museum of Science and Technology, University of Urbino Carlo Bo, Urbino, Italy How to cite this paper: Mantovani, R. Abstract (2017). The Otranto-Valona Cable and the Origins of Submarine Telegraphy in Italy. This work is born out of the accidental finding, in a repository of the ancient Advances in Historical Studies, 6, 18-39. “Oliveriana Library” in the city of Pesaro (Italy), of a small mahogany box https://doi.org/10.4236/ahs.2017.61002 containing three specimens of a submarine telegraph cable built for the Italian Received: December 22, 2016 government by the Henley Company of London. This cable was used to con- Accepted: March 18, 2017 nect, by means of the telegraph, in 1864, the Ports of Otranto and Avlona (to- Published: March 21, 2017 day Valona, Albania). As a scientific relic, the Oliveriana memento perfectly fits in the scene of that rich chapter of the history of long distance electrical Copyright © 2017 by author and Scientific Research Publishing Inc. communications known as submarine telegraphy. It is known that, thanks to This work is licensed under the Creative the English, the issue of submarine electric communication had an impressive Commons Attribution International development in Europe from the second half of the nineteenth century on. License (CC BY 4.0). Less known is the fact that, in this emerging technology field, Italy before uni- http://creativecommons.org/licenses/by/4.0/ fication was able to carve out a non-negligible role for itself, although primar- Open Access ily political.
    [Show full text]
  • Etir Code Lists
    eTIR Code Lists Code lists CL01 Equipment size and type description code (UN/EDIFACT 8155) Code specifying the size and type of equipment. 1 Dime coated tank A tank coated with dime. 2 Epoxy coated tank A tank coated with epoxy. 6 Pressurized tank A tank capable of holding pressurized goods. 7 Refrigerated tank A tank capable of keeping goods refrigerated. 9 Stainless steel tank A tank made of stainless steel. 10 Nonworking reefer container 40 ft A 40 foot refrigerated container that is not actively controlling temperature of the product. 12 Europallet 80 x 120 cm. 13 Scandinavian pallet 100 x 120 cm. 14 Trailer Non self-propelled vehicle designed for the carriage of cargo so that it can be towed by a motor vehicle. 15 Nonworking reefer container 20 ft A 20 foot refrigerated container that is not actively controlling temperature of the product. 16 Exchangeable pallet Standard pallet exchangeable following international convention. 17 Semi-trailer Non self propelled vehicle without front wheels designed for the carriage of cargo and provided with a kingpin. 18 Tank container 20 feet A tank container with a length of 20 feet. 19 Tank container 30 feet A tank container with a length of 30 feet. 20 Tank container 40 feet A tank container with a length of 40 feet. 21 Container IC 20 feet A container owned by InterContainer, a European railway subsidiary, with a length of 20 feet. 22 Container IC 30 feet A container owned by InterContainer, a European railway subsidiary, with a length of 30 feet. 23 Container IC 40 feet A container owned by InterContainer, a European railway subsidiary, with a length of 40 feet.
    [Show full text]
  • Cable Layer JOSEPH HENRY - NNS Hull #114
    ONE OF A KIND… …and ONE HUNDRED-PLUS YEARS OLD Cable Layer JOSEPH HENRY - NNS Hull #114 On May 7, 1908, the Newport News Shipbuilding (NNS) entered into a contract with the U.S. War Department to build a small cable laying vessel. It was NNS’ first and only experience with the construction of such a ship. That lack of experience, coupled with her unusual design resulted in the shipyard suffering a financial loss. But as the company’s motto states, regardless of profit or loss “Always Good Ships” and now, over a hundred years later, the JOSEPH HENRY remains afloat and virtually unchanged when delivered on March 31, 1909. A modest-sized vessel, she measures slightly over 167 feet in length and has a beam of 32 feet. Her displacement is 800 tons; a fraction of the size of the vessels that NNS currently designs and builds. Two coal-fired boilers and a pair of compound reciprocating engines provided a total of 1,000 SHP, which allowed her two, four-bladed propellers to achieve a top speed of 11.3 knots. In order to provide good maneuverability during cable-laying in confined waters, she was also fitted with twin rudders. Fairly elaborate guards to help prevent cables from being entangled with her propellers were also included in her design, as this photo taken following a 2007 bottom cleaning (and before final underwater hull painting) indicates. The JOSEPH HENRY was built for the Submarine Cable Service of the U.S. Army Signal Corps. Her initial duties included laying cables for the army’s fire control systems at coastal fortifications in New York Harbor and elsewhere along the Eastern Coast of the United States and in the Gulf of Mexico.
    [Show full text]
  • New Market Open Fig.: LMG Marin Pages 3 - 4
    Customer Magazine ISSUE 4 (12) 2014 New market open Fig.: LMG Marin Pages 3 - 4 Cable layer afloat 3600 tons in motion! Rendezvous with ferry Next milestone in the construction First of five arctic supply vessels for Representatives of renowned Ca- of the most technically advanced Royal Arctic Line launched nadian Owner arrived to see the vessel in Poland is reached shipyards of Remontowa Holding in magazine Pages 5 - 6 Pages 9 - 11 Pages 16 - 17 editorial contents ferries remontowa shipbuildingnews Customer Magazine What ISSUE 4 (12) 2014 We will built two ferries for Estonian operation New market open Fig.: LMG Marin Pages 3 - 4 Cable layer afloat 3600 tons in motion! Rendezvous with ferry do we wish Next milestone in the construction First of five arctic supply vessels for Representatives of renowned Ca- of the most technically advanced Royal Arctic Line launched nadian Owner arrived to see the vessel in Poland is reached shipyards of Remontowa Holding in magazine Pages 5 - 6 Pages 9 - 11 Pages 16 - 17 on our 70th 3 New market open New market anniversary... We will built two ferries for Estonian operation open In October 2014, Remontowa Shipbuild- To achieve this it is important to develop 5 Cable layer ing along with its parent company Remon- a second vessel production line aligned afloat As announced early November 2014, the Port of Tallinn has signed a contract with towa Holding was recognized as the most with the existing one which we have al- Next milestone in the Remontowa Shipbuilding for the construction of two new car-passenger ferry boats succesful company operating within the ready had at our disposal.
    [Show full text]
  • Cable Laying Vessels: a Review of the Classification, Statutory and Station Keeping Aspects
    Return to Session Directory > Doug Phillips Verification, Testing and Trials Fail to Meet Expectations Again Dynamic Positioning Committee Marine Technology Society P DYNAMIC POSITIONING CONFERENCE September 18-19, 2001 VERIFICATION, TESTING AND TRIALS Cable Laying Vessels: A Review Of The Classification, Statutory And Station Keeping Aspects Andrew McKinven LR Americas Inc. Andrew McKinven, Lloyd’s Register Cable laying vessels Return to Session Directory Cable laying vessels: A review of the classification, statutory and station keeping aspects INTRODUCTION Section 4 focuses on the more popular, yet Section 1 of the paper provides an overview more onerous, LR DP(AA) notation (IMO of the development of cable laying vessels Class 2 equivalent), identifying the design from their earliest designs to those of the requirements for the proprietary DP control present day; particular reference is made to system and the ship's engineering systems. four Maersk vessels which recently entered Section 5 builds upon previous sections, into Lloyd’s Register (LR) Class. This discussing the requirement for a Failure section continues with a review of the Mode and Effects Analysis (FMEA) to be differences between modern cable laying conducted and the subsequent functional vessels and general cargo vessels before testing during sea trials. The final section considering how cable layers differ as a ship provides an overview of the key issues type. Section 2 addresses the relationship presented within the paper; particular between vessel operational / design emphasis is given to the relationship characteristics and the applicable between vessel operational characteristics / Classification and Statutory requirements. design and the relevant Statutory and The paper moves on in Section 3 to consider Classification requirements.
    [Show full text]
  • Prevalence of Heavy Fuel Oil and Black Carbon in Arctic Shipping, 2015 to 2025
    Prevalence of heavy fuel oil and black carbon in Arctic shipping, 2015 to 2025 BRYAN COMER, NAYA OLMER, XIAOLI MAO, BISWAJOY ROY, DAN RUTHERFORD MAY 2017 www.theicct.org [email protected] BEIJING | BERLIN | BRUSSELS | SAN FRANCISCO | WASHINGTON ACKNOWLEDGMENTS The authors thank James J. Winebrake for his critical review and advice, along with our colleagues Joe Schultz, Jen Fela, and Fanta Kamakaté for their review and support. The authors would like to acknowledge exactEarth for providing satellite Automatic Identification System data and for data processing support. The authors sincerely thank the ClimateWorks Foundation for funding this study. For additional information: International Council on Clean Transportation 1225 I Street NW, Suite 900, Washington DC 20005 [email protected] | www.theicct.org | @TheICCT © 2017 International Council on Clean Transportation TABLE OF CONTENTS Executive Summary ................................................................................................................. iv 1. Introduction and Background ............................................................................................1 1.1 Heavy fuel oil ................................................................................................................................... 2 1.2 Black carbon .................................................................................................................................... 3 1.3 Policy context ..................................................................................................................................4
    [Show full text]
  • War Diary : German Naval Staff Operations Division
    RETURN TC ^P-32-CU INTELLIGENCE .ja&JULX MAVY DEPARTMENT WAR D IARY ( German Naval Staff Operations Division * ^ DBCUSSFlED-MfT. 0445, OPNAVIKST 5510.10 » 9/C DATT --7-67 i PART A VOLUME 28 December 1941 9862 DECUSMJED WAR DIARY OP THE GERMAN NAVAL STAFF (Operations Division) PART A December 1941 Chief, Naval Staff: Grand Admiral Raeder, Dr. h.c. Chief of Staff, Naval Staff: Vice Admiral Fricke Chief, Operations Division, Naval Staff: Captain Wagner Volume 28 begun; 1 Dee. 19^1 closed: 31 Dec. 19*1 9862 , CaWIDcETL-kL OFFICE OF NAVAL INTELLIGENCE Washington, D. C. Foreword 1. The Office of Naval Intelligence has undertaken to translate important parts of the War Diary of the German Naval Staff. The present volume, entitled War Diary of the German Naval Staff, Op- erations Division , Part A, Volume 2tf, is the first one of the series to appear. Other volumes will follow shortly. 2. The War Diaries, Part A, are important because they contain a day by day summary of the information available to the German Naval Staff and the decisions reached on the basis thereof. To- gether with the Fuehrer Conferences on Matters Dealing with the German Navy, 1939- 19^5 # which are in the process of being pub- lished by this office, the War Diaries should provide valuable material for the study of naval problems arising from total war. The War Diary, Part A, is also a useful index to the German Naval Archives of World War II; references may be found in the micro- film library of Naval Records and Library.
    [Show full text]