ITA Cosuf, Rome, 22.06.2012 Tunnel Renewal + Safety @ SBB

Total Page:16

File Type:pdf, Size:1020Kb

ITA Cosuf, Rome, 22.06.2012 Tunnel Renewal + Safety @ SBB ITA Cosuf, Rome, 22.06.2012 Tunnel Renewal + Safety @ SBB Jan Dirk Chabot SBB Bern, I-AT-IU-TEC Roma, 22.06.2012 Tunnel Renewal + Safety @ SBB Content ITA-Cosuf Rome 22.06.2012 Number + age of tunnels SBB Damages / impacts Tunnel safety Renewal cases and methods SBB • I• AT-IU • 22.06.2012 2 Tunnel Renewal + Safety @ SBB Quantity + age of tunnels SBB ITA-Cosuf Rome 22.06.2012 Number + age of single + double track tunnels on SBB network Number of tunnels SBB 2012 Tunnels single track: 158 pcs., 123.4 km 70 Tunnels double track: 133 pcs., 134.0 km 60 Total: 291 pcs., 257 km 50 40 masonry 30 brickwork 20 concrete (in situ) 10 0 1850 60 70 80 90 1900 10 20 30 40 1950 60 70 80 90 2000 10 20 year SBB • I• AT-IU • 22.06.2012 3 Tunnel Renewal + Safety @ SBB Tunnels SBB today ITA-Cosuf Rome 22.06.2012 .Tunnel length 257 km .Number of tunnels 264 .Number of objects to be inspected 291 .(thereout cut & cover 32) SBB • I• AT-IU • 22.06.2012 4 Tunnel Renewal + Safety @ SBB Tunnels SBB tomorrow (-2019) ITA-Cosuf Rome 22.06.2012 .Cross-city tunnel Zurich DML 5.5 km DML .Gotthard Base Tunnel 2 x 57.0 km 5.3 km .Ceneri Base Tunnel 2 x 15.4 km Eppenberg .Tunnel de Sierre 0.4 km 3.5 km .Eppenbergtunnel 3.5 km .CEVA (S-Bahn Geneva) 8.8 km + 163 km Gotthard Base Tunnel 2 x 57 km CEVA 9 km Tunnel de Sierre Ceneri Base 0.4 km Tunnel 2 x 15.4 km SBB • I• AT-IU • 22.06.2012 5 Tunnel Renewal + Safety @ SBB Clustering Tunnel Renewal (2010-2019) ITA-Cosuf Rome 22.06.2012 SH WAH Kannenfeld Schloss Laufen Schützenmatt RA Scheme network BS KB EW EGL KR Wolf LFG 31.05.2012 W SEU BCT Angenstei SLG BUE CTM n Adler Liesberg LST NG EF Villnacher NW RH Choindez I -PORIII DMTBärschwi Hauenstein n NIE SG BG WIL Verrerie-de-Moutier l LF GLO BasisAA (HBT) WI TG Haf RS Verrerie-de-Roches BD WUER ZOER GSS TA Vorbourg SMG Moutier I - IX MOU WE OT Rosenberg (Flachdecke) SO LBIN OEN Rosenberg (Kabelrohrblock) OL BAEW BMA SCB KLW Erlenbach LEN SUHR LB HI LSG SPK ZUE WZ Col-des-Roches Combe Convers ARCH BI LTH Aarburger ZF WO BGW WL LOC Mont Sagne BUER BW TW CF HB Landikon RUET WA Des Loges REI RW Ricken (Sohle) LY NE SS HO BDF Burgdorfe UZ La Luche INS Zuger ZB SA ZOL r HWIL BU La Sauge KZ Frasne PONT TR Gibet RK ZG Stadttunnel VER GMMBN Wolhusen PF HA Lothenbach WH Rindelfluh G100 Kerenzerberg Bommerstein FLE MRT GD LPN Wiggen LZ Rindelfluh G200 Bühl (ZG) FLM Rossplatten (ZG) Untere Schächli CH KF LN St. Adrian VAL Obere Schächli DAY PAY GI Ruffibach ORBE YV FRI SCBG Entlenstalden Kalkofen Wilzigen PT Mühlefluh (ZG) Epoisats TH MR Villangeau Windgälle LIN ROM Pfaffensprung BRA x Bristenn Muhren SP PAL IO Mühle REIK GOE PUI BUL Gotthard Kirchberg Gotthard (Autorampe) Wattingen LS Bertholod KA VV Rohrbach Crêtes (Burier) Leggistein MX La Lume SIO Stalvedro BR Pianotondo Travi STG BOU GEAP VI St. Maurice Simplon I + II Crocetto Giustizia SM Svito GE DOMO LO CD BEL ZERM Dragonato Costa MA TAVPrecassino- LGMeggiagra Legende VARE Arcisate MEN Tunnels renewed STAO CHI Tunnel Renewal 2012 GAL Balerna Tunnels to be renewed MICL SBB • I• AT-IU • 22.06.2012 6 Tunnel Renewal + Safety @ SBB typical damages / refurbishment works ITA-Cosuf Rome 22.06.2012 After approx. > 40-60 years of use 1st refurbishment / Renewal resp. next refurbishment of an earlier refurbishment. Tunnel mit Tunnel mit Betonverkleidung Mauerwerkverkleid 1 2 ung 3 Causes / origin: 3 4 1 5 Enlarging tunnel profiles 6 5 (e.g. Optimizing profile in tunnel, 5 3 higher / wider trains) SBB1 1 5 7 4 10 6 Damages masonry / lining 12 1 1 (contact with groundwater / frost) SBB5 12 1 11 1 Water ingress (dripping / ice 8 7 formation) / defective drainage 7 8 7 7 7 9 9 11 1 Retrofit Safety elements 7 escape way, tunnel lighting, signalization SBB SBB • I• AT-IU • 22.06.2012 7 Tunnel Renewal + Safety @ SBB Impact: Water ITA-Cosuf Rome 22.06.2012 (Re-) Actions of water H2O Swelling Lime deposits Concrete-«corrosion» / Corrosion of steel + (Weathering) technique Infiltrations SBB • I• AT-IU • 22.06.2012 8 Tunnel Renewal + Safety @ SBB Impact: Water ITA-Cosuf Rome 22.06.2012 Example of damages: - water ingress, leakage, damages of lining, - repair of joints SBB SBB SBB Ecological electricity?? Pic. Marti Renesco AG SBB • I• AT-IU • 22.06.2012 9 Tunnel Renewal + Safety @ SBB Impact: Water ITA-Cosuf Rome 22.06.2012 Weathering of tunnel lining due influence of mountain- / groundwater (evaporation-inducted salt-enrichment in mortar / concrete) + Humidity-contact for decades + Temperature + influence of surrounding geology Accumulation of harmful salts in the concrete or mortar due a „stream“ of humidity for decades trough the lining or invert. SBB Amount of ground water evaporation Tunnel- geology interior Concentration of salts in groundwater Partially detention in the lining Concentration salts in lining accumulation of salts until / destruction of cement SBB (crystallization and / or SBB Ettringite / Thaumasite). Lining Esp.where change dry / wet SBB • I• AT-IU • 22.06.2012 10 Tunnel Renewal + Safety @ SBB Typical damages & Problems: Water ITA-Cosuf Rome 22.06.2012 Most tunnels have a drained concept drainage system, No water pressure behind lining / under vault – permanent function! SBB SBB SBB • I• AT-IU • 22.06.2012 11 Tunnel Renewal + Safety @ SBB Fire prevention ITA-Cosuf Rome 22.06.2012 SBB SBB SBB Minimising impact in case of fire due to waste / paper in cable-ducts / electrical boxes for rail technique: protection with barriers / cover panels of the cable ascents 12 SBB • I• AT-IU • 22.06.2012 12 Tunnel Renewal + Safety @ SBB Typical renewal + upgrading works ITA-Cosuf Rome 22.06.2012 Waterproofing vault New catenary / rock mass rigid electrical rail improvement Local widening Repair of joints/ of profile (shotcrete shells) Drainage vault Protective Tunnel Safety / technical (emergency light) refuges Cable ducts Lowering of track Underpinning of lining SBB New drainage system + Drainage invert Lowering of the invert Arch invert inspection manholes SBB • I• AT-IU • 22.06.2012 13 Tunnel Renewal + Safety @ SBB Improving tunnel Safety ITA-Cosuf Rome 22.06.2012 Risk categories in tunnels: 3.7% (< 100 m) A A 39.5% 23.0% (< 1‘000 m) B B 44.6% 26.8% (> 1‘000 m) C C 12.2% 46.5% D (> 3‘000 m) D 3.8% Risk analysis: Number of Length of Length of tunnel + Frequency of trains tunnels tunnels SBB • I• AT-IU • 22.06.2012 14 Tunnel renewing + safety @ SBB Tunnel safety: Tunnels with SRM ITA-Cosuf Rome 22.06.2012 SH WAH RA BS KB EW Kannenfeld EGL KR LFG W SEU BCT SLG Adler BUE CTM LST NG EF NW Hagenholz RH POR DMT NIE Hauenstein- Bözberg BG Kreuzliberg Flughafen WIL SG LF GLO Basistunnel AA WI TG Haf Weinberg (N) RS BD WUER Rosenberg ZOER GSS TA Hirschengraben SMG MOU Aarau I + II KäferbergOT SO LBIN WE Zürichberg OEN Wipkinger Aegerten OL Riesbach BAEW BMA SCB Langenthal KLW LEN SUHR LB HI Heitersberg Ulmberg ZUE LSG Gishübel Murgenthal SPK WZ WolfacherARCH N + S Enge BI ThunstettenLTH ZF WO BGW WL LOC BUER Oenzberg Stamml. + NBS BW Zürich - Thalwil Vingelz TW CF Rüdtlingen HB RUET WA De Loges REI RW Ricken BDF Zimmerberg Em mequerungLY NE Burgdorfer SS HO Albis UZ INS ZB SA ZOL HWIL BU KZ Grauholz LuzernerRK- Kerenzerberg Frasne PONT TR BN ZG VER GMM Stadttunnel PF HA St-Aubin- WH Mont d‘Or FLE Sauges MRT LPN GD FLM LZ La Raisse Ölberg CH Fin de Lance KF LN Fronalp VAL DAY PAY GI ORBE YV FRI SCBG Stutzeck-Axenberg PT Axenberg TH MR Bristen ROM LIN Pfaffensprung BRA Wattinger Vauderence SP Leggistein PA IO L Naxberg REIK GOE PUI BUL Gotthard Cornallaz LS KA Freggio GBT (N) VV Prato MX Pianotondo SIO Legend BR Travi GEAP STG BOU VI Simplon I + II Tunnels with self-rescue St-Maurice SM measures SRM St-Jean BEL GE DOMO LO CD CEVA (N) ZERM CBT (N) MA Tunnels to be equipped with TAV LG SRM (GBT: 2016, CBT 2018) Paradiso Renewal existing illumination VARE Arcisate MEN STAO CHI Mont d‘Or (under GAL responsibility SNCF) MICL SBB • I• AT-IU • 22.06.2012 15 Tunnel Renewal + Safety @ SBB Upgrading Tunnel Safety ITA-Cosuf Rome 22.06.2012 Self rescue measures in 62 new or existing tunnels (150 from 252 km) (Simplon: +2x 20 km) Retrofit / Elements: improvement Tunnel lightning incl. Alarming tunnel Safety Walkway and handrail Signalization (escape signs) Improvement visibility of existing cross-passages / escape possibilities. SBB • I• AT-IU • 22.06.2012 16 Tunnel Renewal + Safety @ SBB rescue shaft ITA-Cosuf Rome 22.06.2012 Example Zimmerberg Base Tunnel SBB • I• AT-IU • 22.06.2012 17 Tunnel Renewal + Safety @ SBB rescue shaft ITA-Cosuf Rome 22.06.2012 Example of one rescue shaft at the Zimmerberg Base Tunnel near Zurich H = 60 m Stairs + “Alimak”-elevator for fire service + rescue teams Enough «buffer space» for passengers Overpressure ventilation to prevent a «chimney effect» SBB • I• AT-IU • 22.06.2012 18 Tunnel Renewal + Safety @ SBB Upgrading Tunnel Safety ITA-Cosuf Rome 22.06.2012 Zimmerberg Base Tunnel (9.5 km) - Improving Tunnel ligthning - better visibility of emergency exits Simplon Tunnel handrail with integrated LED light SBB • I• AT-IU • 22.06.2012 19 Tunnel Renewal + Safety @ SBB Simplon Tunnel - History ITA-Cosuf Rome 22.06.2012 Example Simplon Tunnel SBB • I• AT-IU • 22.06.2012 20 Tunnel Renewal + Safety @ SBB Simplon Tunnel - History ITA-Cosuf Rome 22.06.2012 Key-data I / History: - 2 parallel tubes, each 19.8 km long.
Recommended publications
  • A Construction Project Serving Europe – Factfigures
    NEW RAIL LINK NEDERLAND THROUGH Rotterdam THE ALPS (NRLA) Duisburg Zeebrugge Düsseldorf A ONCE-IN-A- Antwerpen Köln CENTURY PROJECT Gent Mechelen Aachen FOR EUROPE Montzen DEUTSCHLAND BELGIË Mannheim Karlsruhe FRANCE Freiburg im Breisgau Basel SWITZERLAND Gotthard Base Tunnel Lötschberg Base Tunnel Domodossola Luino Ceneri Base Tunnel Chiasso Novara Milano ITALIA Genova © Federal office of transport FOT transport office of © Federal FACTS AND FIGURES NRLA The New Rail Link through the Alps (NRLA) is the largest railway construction project ever undertaken in Swiss history. It includes the expansion of two north- south axes for the rail link. The main components of the NRLA are the Lötsch- berg Base Tunnel, the Gotthard Base Tunnel and the Ceneri Base Tunnel. Since 2007 Successful operation of the Lötschberg Base Tunnel 11 December 2016 Commissioning of the Gotthard Base Tunnel The world’s longest railway tunnel will be commissioned on schedule on 11 December 2016. Up to 250 freight trains a day will then travel on the Gotthard axis instead of 180 previously. Transalpine rail transport will become more cost-effective, flexible and rapid. 2020 Opening of the Ceneri Base Tunnel 2020 Four-metre corridor on the Gotthard axis The expansion of the Gotthard axis to create a larger tunnel profile is a key part of the Swiss policy of transferring freight from road to rail. It will enable semi- trailers with a four-metre corner height to also be loaded onto railway wagons for transport on the Gotthard axis on a continuous basis. This further fosters the transfer of transalpine freight transport from road to rail.
    [Show full text]
  • Ceneri-Basistunnel Ceneri Base Tunnel 47
    Tunnel 04/2010 Ceneri-Basistunnel Ceneri Base Tunnel 47 Ceneri-Basistunnel Ceneri Base Tunnel Denis Rossi Denis Rossi Der Ceneri-Basistunnel (CBT) ist nach dem The Ceneri Base Tunnel (CET) is Switzerland’s Gotthard- und dem Lötschberg-Basistunnel third largest rail tunnel project after the das drittgrößte Bahntunnelprojekt der Gotthard and Lötschberg Base Tunnels. Schweiz. Als logische Fortsetzung des As the logical continuation of the Gotthard Gotthard-Basistunnels erlaubt der CBT die Base Tunnel the CBT permits the establish- Realisierung einer Flachbahn für den ment of a fl at trajectory railway for goods traffi c Güterverkehr durch die Schweiz und die through Switzerland and the securing of con- Sicherstellung der Personenverkehrs- nections for passengers in centres to the north anschlüsse in den Zentren nördlich und and south of the Alps. südlich der Alpen. Bedeutung des Auf Bestellung des Kantons Signifi cance of the Overview of the Ceneri Ceneri-Basistunnels Tessin wird mit dem Bau des Ceneri Base Tunnel Base Tunnel Project Ceneri-Basistunnels die „Bre- Die Rampen der heutigen tella Locarno“ realisiert. Sie The ramps of the present The tunnel system for the Bahnstrecke am Ceneri weisen liegt im Bereich des Nordportals railway route at the Ceneri pos- Ceneri Base Tunnel calls for Steigungen von bis zu 26 ‰ des CBT und dient dem Tessiner sess gradients of up to 26 ‰. If 2 single-track bores each 15.4 auf. Bei einem Verzicht auf den Regionalverkehr. Sie wird die the Ceneri Base Tunnel were not km long. They run from Bau des Ceneri-Basistunnels Reisezeit zwischen Locarno to be built additional locomo- Camorino near Bellinzona to wären für den alpenquerenden und Lugano mehr als halbieren: tives would continue to be Vezia in the vicinity of Lugano.
    [Show full text]
  • Case Study Elasticity for the Slab Track in the Gotthard Base Tunnel, (CH)
    Case Study Elasticity for the Slab Track in the Gotthard Base Tunnel, (CH) The project of the century: With 57 kilometres the world's longest railway tunnel Highest requirements: Outstanding material properties over the entire service life Optimised solution, comprehensive project support and just-in-time logistics Elastic Sylodyn® Insertion Pads for Sleeper Boots in the World's longest Railway Tunnel Description of the project Prestigious project with highest Gotthard Base Tunnel requirements in terms of railway Altdorf Overall length 57 km technology Altdorf/Rynächt Length 4.4 km t 57 kilometres in length, the A Gotthard Base Tunnel is cur rently Erstfeld the longest railway tunnel in the world. Erstfeld Length 7.8 km It links the Swiss communities of Erst- feld and Bodio. The tunnel forms part Amsteg of the New Railway Link through the Alps (NRLA), which is at present the Amsteg largest construction project in Swit- Length 11.3 km zerland. With the construction of this "project of the century", north/south railway transit trafic will be further Sedrun improved, meaning that transit trafic Sedrun can be moved off the roads and onto Length 9.2 km the railways. More over, travel time for public transport services will be sig- Andermatt niicantly reduced – in conjunction with the Ceneri Base Tunnel which is currently being constructed – (the Faido travel time from Zurich to Milan will be Length 12.9 km cut by one hour), thereby considerably increasing the attractiveness of rail- way travel compared with taking the Ariolo car or plane. In future, passenger and freight trains will pass through the Faido tunnel at speeds of up to 250 km/h.
    [Show full text]
  • Risk Management During Construction of the Gotthard Base Tunnel
    Risk Management During Construction of the Gotthard Base Tunnel Heinz Ehrbar AlpTransit Gotthard Ltd., Lucerne, Switzerland Jakob Kellenberger Ernst Basler + Partners Ltd., Zurich, Switzerland ABSTRACT: A new railway tunnel through the Swiss Alps is currently being constructed which will reach 57 km length and represents the most significant component of the new Alp-crossing railway connection (NEAT). An integral management system was implemented to cover the issues quality management, envi- ronmental management and work safety. Risk management is comprehensively being addressed on a strategic and an operative level involving all project partners. It covers the assessment of threats and opportunities in- cluding their causes, which have a potential long-term influence on planning and execution of the new con- nections as a total. As crucial project requirements in the context of operational risk management were identi- fied: functionality, costs, construction scheduling, environmental impact, work safety, and project organization. Finally, the terminology "risk" was extended to include threats and opportunities contained in the project. 1 GOTTHARD BASE TUNNEL component of the new Alp-crossing railway connec- tion (NEAT) through the Swiss Alps. On one hand, Since 1996 the longest tunnel of the world is being NEAT will serve the transportation of people, on the constructed: The new railway tunnel through the other hand, it is a crucial measure in the context of Swiss Alps (Figure 1). The length of the tunnel will Swiss traffic policy to switch from road to railway reach 57 km and represents the most significant for the transportation of goods. Figure 1: Gotthard Base Tunnel: Length 57 km, status of work progress in spring 2003 With the new Gotthard Base Tunnel the Alps will be crossed at the lowest possible altitude.
    [Show full text]
  • Gotthard Base Tunnel the World's Longest Railway Tunnel
    Gotthard Base Tunnel The world's longest railway tunnel Dr. Renzo Simoni AlpTransit Gotthard AG LZ01-371164 1 The NRLA under the Gotthard Final breakthrough LZ01-371164 2 The NRLA under the Gotthard Transalpine goods traffic LZ01-371164 3 The NRLA under the Gotthard Journey times Zurich − Lugano / Basel − Lugano LZ01-371164 4 The NRLA under the Gotthard FinöV (Financing Public Transport) decision 1998 LZ01-371164 5 The NRLA under the Gotthard A flat railway route through the Alps LZ01-371164 6 The NRLA under the Gotthard Key features of the only flat railway route through the Alps • Newly constructed twin-track route • Mixed operation • Maximum speed passenger trains: 250 km/h • Maximum speed goods trains: 160 km/h • 50 – 80 passenger trains per day • 220 – 260 goods trains per day • Loaded vehicles: max. height 4.2 m • Max. Gradient: ≤ 12.5 ‰ • Min. Radius: ≥ 5,000 metres • Useful life: 100 years • Max. temperature: 40° C LZ01-371164 7 The NRLA under the Gotthard Challenge – Implementation of organisation • Direct management, simple control • Transparency through direct parliamentary control • Clear allocation of responsibilities, best governance • Efficiency thanks to lean organisation (short paths, simple decision processes) LZ01-371164 8 The NRLA under the Gotthard Interest partners LZ01-371164 9 The NRLA under the Gotthard Allocation of Public Transport Financial Fund (FinöV) NRLA (45%) Heavy road vehicle New Rail Link through the Alps tax (64%) Rail 2000 Phase 1 and ZEB (44%) ZEB: Future Development of the Railway Infrastructure Fund for the Oil tax financing of (23%) public transport HSR (4%) European High-Speed Rail Network Value added tax Noise mitigation (VAT) (13%) (7%) LZ01-371164 10 The NRLA under the Gotthard Swiss Government Decision c.
    [Show full text]
  • Chronology of a Project of the Century Milestones in the Construction History up to 2010
    13.08.2010 LZ01-210755-v3 Chronology of a Project of the Century Milestones in the Construction History up to 2010 1947 Carl Eduard Gruner, engineer and urban planner from Basel, sketches the visionary idea of a Gotthard Base Tunnel as an element of a rapid transit system. 1960s In 1963, the Swiss Federal Government establishes a committee for a "Railway Tunnel through the Alps". It evaluates various base-tunnel solutions and in 1970 recommends construction of a Gotthard base tunnel from Erstfeld to Biasca. 1970s A new committee is set up to review the proposed variants again. However, political disagreement between the proponents of the Gotthard, Simplon and Splügen routes, as well as an economic recession, block the tunnel project. In 1971, the Swiss Federal Council assigns to Swiss Federal Railways (SBB) the task of elaborating the construction project for the Gotthard base route Erstfeld-Biasca to allow rapid implementation of construction work. The construction project is presented in 1975. 1980s In 1983, the Swiss Federal Council concludes in a report that a new rail link through the Alps is "not urgent". In 1986, new evaluation studies investigate variants for a continuous flat route from the northern edge of the Alps to the southern border of Switzerland. After formal consultation with the cantons, in 1989 the Federal Council decides on implementation of a so-called "network variant", which proposes a combination of a Gotthard base tunnel, a Lötschberg base tunnel, and a Hirzel tunnel to provide a link to eastern Switzerland. 1992 May 2 In the Through Traffic Agreement with the European Union, Switzerland commits to providing the agreed traffic capacities.
    [Show full text]
  • Gotthard Basetunnel: Aspects of Long Tunnels
    TBM Tunnelling in the Himalayan Region, Kathmandu, Nepal, January 27, 2011 FUTURE CIRCULAR COLLIDER WORKSHOP 13. / 14. FEBRUAR 2014, GENEVA Gotthard Basetunnel Aspects of Long Tunnels presented by: M.Sc. F Amberg Amberg Engineering Ltd., Regensdorf, Switzerland FCC Workshop, 13. / 14. February 2014, Geneva Content 1. Introduction 2. NEAT and Gotthard Basetunnel: From Concept to Completion 3. Gotthard Basetunnel: Some Constructional Aspects 4. Risk and Risk Mitigation 5. FCC and Gotthard Basetunnel FCC Workshop, 13. / 14. February 2014, Geneva Introduction Main Challenges of Long (and Deep) Tunnels . Tunnel length leeds to long construction time . Mechanization / automation of procedures, trend to the use of TBM in order to increase performance . Intermediate points of attack (if feasible) to cut construction time . Geological variety, (high overburden) . Investigations . Not possible / reasonable over the entire length . Higher remaining risks compared to other projects . Logistics . Long transport distances . Access shafts and galleries . Muck treatment, material deposits FCC Workshop, 13. / 14. February 2014, Geneva Content 1. Introduction 2. NEAT and Gotthard Basetunnel: From Concept to Completion 2.1 Background 2.2 Contractual and Organisational Aspects, Communication 2.3 Costs 3. Some Constructional Aspects Gotthard Basetunnel 3.1 Investigation, Logistics, Excavation, TBM 3.2 Environment, Muck Treatment 3.3 Safety, Fire Prevention and Control, Ventilation 4. Risk and Risk Mitigation 5. FCC and Gotthard Basetunnel FCC Workshop, 13. / 14. February 2014, Geneva More and More People and Goods Cross the Alps (Source: GBT, der längste Tunnel der Welt, Die Zukunft beginnt, Hrsg. R.E. Jeker Werd Verlag Zürich, 2002) FCC Workshop, 13. / 14. February 2014, Geneva Traffic Crossing the Alps, Estimated Increase between 1991 and 2020 (Source: www.alptransit .ch) FCC Workshop, 13.
    [Show full text]
  • The NRLA Via Lötschberg, Gotthard and Ceneri, the New Rail Link Through the Alps
    The NRLA Via Lötschberg, Gotthard and Ceneri, the New Rail Link through the Alps The NRLA The New Rail Link through the Alps (NRLA) is the centrepiece of Swiss transport policy. Switzerland has constructed a se- ries of high-performance rail links through the Alps, compris- ing three base tunnels and several auxiliary structures. Thanks to the NRLA, more trains can run through the Alps and with much shorter travel times. The high quality of passenger and freight travel is assured. The NRLA provides the basis for transferring traffic from road to rail, with the aim of protecting the Alpine environment. Close international cooperation is required in order to achieve the best possible availability, punctuality and quality in rail trans- port through Europe. Passenger transport The new north-south axis creates shorter travel times and more connections for passengers. Once finished, the NRLA will shorten travel time on the Gotthard route to just over two hours between Zurich and Lugano and around three hours between Zurich and Milan. On the Simplon route, which includes the Lötschberg Base Tunnel, the NRLA has reduced travel times by up to one hour. The Ceneri Base Tunnel will transform public transport con- nections in the canton of Ticino, with much shorter travel times in the Bellinzona – Locarno – Lugano triangle. There will be a direct connection between Lugano and Locarno, cutting up to 30 minutes off the journey. Freight transport The Ceneri Base Tunnel completes the NRLA project, a flat, faster rail link through the Alps that brings the north and south closer together. Freight transport capacity is in- creased, and gentler gradients on the Gotthard axis mean that trains no longer require additional traction.
    [Show full text]
  • Storylines and Fact Sheets on the Gotthard
    Swiss Travel System AG Limmatstrasse 23 Postfach 1975 CH-8021 Zürich [email protected] SwissTravelSystem.com/gotthard 1 Index: 0. Coverpage: ............................................................................................................................ 3 1. Storyline History I: The Gotthard Route - world-class historical heritage ............................ 4 1.1 Storyline History II: The Gotthard at the cutting edge of history ....................................... 6 1.2 Storyline History III: From crossing the Gotthard in 20 hours to speeding through in 20 minutes ....................................................................................................................... 8 History of the Gotthard transit route: 1200 – 2016 ...................................................... 10 Significance of the Gotthard railway for Switzerland ................................................... 11 2. Storyline Construction: Girl power in the tunnel ............................................................... 12 2.1 Storyline Construction II: The Gotthard rocks have their own tales to tell………………...14 Geology fact sheet ..................................................................................................... 16 Engineering fact sheet ......................................................................................... 17 3. Storyline Sustainability I: The Gotthard Base Tunnel - a gigantic envionmental project ... 18 3.1 Storyline Sustainability: Gotthard rock for bathin belles…………………………………….20
    [Show full text]
  • The Gotthard Base Tunnel: Project Overview
    8.32 THE GOTTHARD BASE TUNNEL: PROJECT OVERVIEW The 6th annual Tunnelling Conference th st Sydney 30 & 31 August 2004 by Davide Fabbri, Chief designer Engineering joint-venture Gotthard Base Tunnel South Our Ref.: 102.1-R-158 August 2004 Abstract: The Gotthard-Base Tunnel will be the worlds longest traffic tunnel, with a length of 57 km. The tunnel is part of the New Alpine Transverse in Switzerland. The dual purpose of this project is to provide a highspeed link for passengers between Germany in the North of Europe and Italy in the South of Europe and to transfer freight traffic from roads to rail. It makes an essential step to actively protect the Alps and to get an important contribution to preserve the environment in general. At the present time the construction works are proceeding ahead at both portals and at the three intermediate ac- cesses. Over 33% of the total length of tunnels and the galleries are excavated. Some difficult parts of the tunnel have been completed successfully, some others with over 2,000 m of overburden and poor rock mass properties have to be excavated next. Introduction: The transalpine rail routes through Switzerland are more than a hundred years old. As they no longer meet the requirements of ever-increasing rail-traffic between north and south they are now being re- built. The actual Gotthard rail route is in facts a mountain railway: the northern and the southern ac- cess ramps – with a maximum speed of 80 km/h and with a maximum decline of up to 2.2% climbs up to about 1,100 m a.s.l., where the old Gotthard rail tunnel is located, approximately 900 m higher as the city of Milan.
    [Show full text]
  • The Gotthard Base Tunnel – Questions and Answers
    The Gotthard Base Tunnel – questions and answers Copyright Alp Transit Gotthard AG When will the Gotthard Base Tunnel officially become operational? The opening ceremony of the Gotthard Base Tunnel will take place in June 2016. It is scheduled that the tunnel will become operational at the end of 2016. Source: UVEK, http://www.uvek.admin.ch/themen/03527/03866/index.html?lang=de (not available in English) Why and how was the decision taken to construct the Gotthard Base Tunnel? The mobility requirements of Switzerland's growing population have increased greatly over the past 100 years. Current forecasts indicate that the country's transport sector will continue to grow. In addition, the Switzerland's strategic location at the crossroads of the continent makes it a highly important hub for European goods traffic. Swiss government policy is to ensure sustained mobility by increasing the public transport share of overall traffic and providing reliable basic services nationwide. Within this long-term programme, protection of the environment and the population has been accorded high priority. The NRLA (New Railway Link through the Alps) is one of four ambitious projects undertaken by the government, of which the Gotthard Base Tunnel is the flagship focal point. As a level transalpine railway link with few gradients, the Gotthard Base Tunnel will complement Switzerland's existing mountain rail routes. It will also enable higher travelling speeds and permit the use of heavy goods trains. Source: BAV, http://www.bav.admin.ch/alptransit/01271/index.html?lang=de (not available in English) Swiss Travel System AG Limmatstrasse 23, PO Box, CH-8021 Zürich, SwissTravelSystem.com/media, e-Mail [email protected] How is construction of the Gotthard Base Tunnel being financed? In a nationwide vote in 1998, the Swiss electorate approved funding for the construction of the "New Rail Link through the Alps" (NRLA).
    [Show full text]
  • Stand Der Arbeiten Ceneri Base Tunnel: Stage Reached by Work
    40 Schweiz Switzerland Tunnel 4/2011 Ceneri-Basistunnel: Ceneri Base Tunnel: Stand der Arbeiten Stage reached by Work Der Ceneri-Basistunnel ist nach dem Gotthard- After the Gotthard Base Tunnel and the Lötsch- Basistunnel und dem Lötschberg-Basistunnel berg Base Tunnel, the Ceneri Base Tunnel is the das drittgrößte Tunnelbauprojekt der Schweize- third biggest construction project undertaken rischen Bundesbahnen. Nur mit dem Ceneri-Ba- by the Swiss Federal Railways. Only thanks to sistunnel wird die neue Bahnverbindung durch the Ceneri Base Tunnel will the new rail link die Schweizer Alpen zu einer durchgehenden through the Swiss Alps evolve as a continuous Flachbahn (Bild 1). flat trajectory railway (Fig. 1). 1 Einleitung Walter Bernardi, Dipl. Bauing. ETH, Wirtschafting. FH, Leiter Tunnel- und south. The branch chambers in Der Ceneri-Basistunnel durch- Trasseebau Ceneri-Basistunnel, AlpTransit Gotthard AG the south are devised in such quert den Monte Ceneri auf a way that it will be possible einer Länge von 15,4 km. Die tella“, erlaubt in der Zukunft 1 Introduction to construct a future extension Überlagerungen betragen bis direkte Verbindungen von und The Ceneri Base Tunnel passes of the Ceneri Base Tunnel to zu 800 m. Die Linienführung nach Lugano ohne Umsteigen through Monte Ceneri over a Chiasso without interrupting berücksichtigt die geolo- in Bellinzona. Damit wird auch length of 15.4 km. The overbur- train services for any prolonged gischen und topologischen Ver- der regionale Bahnverkehr ge- dens amount up to 800 m. The length of time. The strict division hältnisse, die Siedlungsdichten fördert. route alignment takes the geo- into 2 single-track bores and the und die Anbindungen an die Auch beim Ceneri-Basis- logical and topographical condi- connections to the existing line bestehenden SBB-Stammlinien tunnel sind wesentliche Si- tions into consideration as well in the north in both opposing in Camorino bei Bellinzona und cherheitsaspekte für die Be- as the population density and directions Bellinzona and Lo- Vezia nahe Lugano.
    [Show full text]