*** All Quotes must have the Department of Industrial Relations # to be ACCEPTED *** 400 Sunrise Avenue, Ste. 300 All D.I.R.#s expired, a renewal letter must be included. Roseville, CA 95661 Ph (916) 757-6400 Fax (916) 757-6499

TEICHERT CONSTRUCTION Established 1887

Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: US 101/De La Cruz Boulevard/Trimble Road Interchange Improvements – Contract C21001 Santa Clara Valley Transportation Authority Bid Date: 5/18/21 @ 2:00 PM Docs & Plans Available from https://secure.procurenow.com/portal/vta Estimate: $50,600,000 Duration: 1360 calendar days (including 365 calendar days for plant establishment) Agency Goals: 5.26% SBE

Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified SBE firms for the following items of work, including but not limited to: all materials, labor and equipment for CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PLANE ASPHALT , REMOVE BRIDGE ITEM, MODIFY BRIDGE ITEM, CLEARING & GRUBBING, ROADWAY EXCAVATION, GRADING, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, DITCHES EXCAVATION, EMBANKMENT CONSTRUCTION, HIGHWAY PLANTING, SOIL AMENDMENTS, HYDROSEEDING, EROSION CONTROL, IRRIGATION SYSTEM, TEMPORARY EROSION CONTROL , AGGREGATE SUB BASE, AGGREGATE BASE, , PAVING ASPHALT (ASPHALT CONCRETE), PLACE ASPHALT CONCRETE DIKE & MISC, RECYCLE, RECLAIM ASPHALT CONCRETE, PORTLAND CEMENT & CONCRETE PAVEMENT, FURNISH & DRIVE PILING, CAST-IN-DRILLED-HOLE CONCRETE PILING, CONCRETE STRUCTURE, MINOR CONCRETE STRUCTURE, CONCRETE SURFACE FINISH, JOINT SEAL – WATER STOP, REINFORCING STEEL, SIGN STRUCTURE, ROADSIDE SIGN, ALTERNATIVE PIPE CULVERT, REINFORCED CONCRETE PIPE, CORRUGATED METAL PIPE (CSP), FILTER FABRIC, PERMEABLE MATERIAL, PLASTIC PIPE, ROCK SLOPE PROTECTION, CONCRETE & SIDEWALK- MISC, DRAINAGE PUMPING EQUIPMENT, MISC IRON & STEEL FRAME, COVER & GRATE, MISC BRIDGE METAL PUMPING PLANT METAL, FENCING, CONCRETE BARRIER, THERMOPLASTIC TRAFFIC STRIPING & MARKING, PAINTED TRAFFIC STRIPING & MARKING, SIGNAL & LIGHTING, SPEED MONITORING STATION, RAMP METERING SYSTEM, LAND SURVEYING, WATER METER & TEMP FACILITIES, LANDSCAPING CONTRACTOR, ASBESTOS REMOVAL/ABATEMENT, CONSTRUCTION EQUIPMENT RENTAL, HEAVY EQUIPMENT RENTAL, DEMOLITION, SAFETY EQUIPMENT SUPPLIER, SAND & SUPPLIER (BULK ITEM), ASPHALT SUPPLIER(BULK ITEM), PILINGS SUPPLIER, CONCRETE & CEMENT SUPPLIER(BULK ITEM), REINFORCING BAR SECTION SUPPLIER, PIPE SUPPLIER, DRAINAGE SYSTEMS SUPPLIER, STORM WATER SYSTEMS SUPPLIER, WHOLESALE BROKER OF CONSTRUCTION MATERIALS (No Inventory), MATERIAL TESTING SERVICES, LAND SURVEYOR, CONSTRUCTION SCHEDULING, LEAD COMPLIANCE and SWPPP PLANNING. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall SBE participation. Plans and specifications are available from the municipality listed above and the Teichert’s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator.

100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified SBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. SBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to SBE's available from: *** All Subcontractor Quotes must have the Department of Industrial Relations # to be ACCEPTED *** For more Information please contact: Mike Stephenson at (916) 757-6400 - [email protected] Please indicate if you plan on bidding on this project and fax your response to: (916) 757-6499 Company: ______Contact: ______Yes, we will be bidding ______No, not interested Yes, we are a SBE business and we would like assistance regarding______

EQUAL OPPORTUNITY EMPLOYER

Printed on recycled paper. State of California Contractor’s License No. 8