Odathurai “A” Village, Bhavani Taluk, Erode District
Total Page:16
File Type:pdf, Size:1020Kb
Form-1 (As per EIA Notification 2006) For the Proposed Earth Quarry Project- 2.75.0Ha S.F.No: 337/1 (P), Odathurai “A” Village, Bhavani Taluk, Erode District, Tamilnadu Proposed by R.Iyyappan Application Form for Obtaining Environmental Clearance from State Level Environmental Impact Assessment Authority (SEIAA) Tamilnadu FORM I (I) Basic information S. No Item Details 1 Name of the project/s Odathurai “A” Earth Quarry project 2 S.No. in the schedule 1 (a) Proposed capacity/area/length/ The proposed quantity of reserves is 20000m3 of Earth tonnage to be handled / command for a period of Three months only. area/lease area/number of wells to Area = 2.75.0Ha be drilled Dimensions of the area Description Pit D (m) L (m) W (m) Avg 3 1 150 50 1.0 Conceptual 2 250 50 1.0 3 150 50 1.0 It is Open cast method of shallow quarrying. The Earth is clearly visible right from the surface hence No wells are proposed not drilled. New/ Expansion/ Modernization It is a New Proposal Earth Quarry Project in Odathurai 4 “A” Village. Existing capacity / Area etc. The proposed quantity of reserves is 20000m3 (or) 3333 Lorry Loads of Earth up to a depth 1.0m from the existing profile of Tank for a period of Three months only. 5 Description Earth in m3 Geological Resources 27500 Available Mineable reserves 27500 Three months plan period 20000 As in the approved mining plan 6 Category of project i.e. `A’ or ‘B’ Category-B (B2) Does it attract the general 7.5m safety distance from the adjacent lands in the 7 condition? If yes, please specify. lease area Does it attract the specific 8 The Lease area does not attract any specific condition. condition? If yes, please specify. Location Topo Sheet No. 58-E/11 11°26’56.54’’N to 11°27’07.02’’N 77°30’42.53’’E to 77°30’58.38’’E Plot/ Survey/ Khasra No. 337/1 (P) 9 Village Odathurai “A” Taluk Bhavani District Erode State Tamilnadu Nearest railway station/ airport Perundurai Railway station - 25km -SE 10 along with distance in kms Coimbatore Airport -69km- SW Nearest Town, city, District Nearest Town : Bhavani - 18km -E 11 Headquarters along with distance in Nearest City : Erode - 26km -SE kms. District : Erode - 26km -SE Village Panchayats, ZilaParis had, Village - Odathurai “A” Municipal Corporation, Local body Panchyat Union - Bhavani 12 (Complete postal addresses with Taluk - Bhavani telephone nos. to be given) District - Erode 13 Name of the applicant R.Iyyappan, Registered Address S/o. Rangasamy, 14 2/84, Keelathur, Alangudi Taluk, Pudukkottai District. Address for correspondence Name R.Iyyappan, Designation (Owner/Partner/CEO) Proprietor/Owner S/o. Rangasamy, 2/84, Keelathur, Alangudi Taluk, 15 Address Pudukkottai District. Pin code E-mail [email protected] Mobile No. 9443055669 Fax No. - Details of Alternative Sites examined, if any. Location of these There are no alternative sites examined. The project is 16 sites should be shown on a Topo site specific. sheet Interlinked Projects 17 There is no interlinked projects Whether separate application of As there is no interlinked project, no application has 18 interlinked project has been been submitted submitted? If yes, date of submission As there is no interlinked project hence no application 19 has been submitted. If no, reason 20 The project involves Earth Quarry Project only. Whether the proposal involves (a) The project does not attract the Forest approval/ clearance under: if yes, (Conservation) Act 1980. There is no Forestland details of the same and their status involved within the quarry lease-applied area. to be given. (b) There is no wild life within the 15km radius from 21 (a) The Forest (Conservation) Act, applied area and does not fall under the Wildlife 1980? (protection) Act 1972. (b) The Wildlife (Protection) Act, (C) The project doesn’t attract the C.R.Z. Notification, 1972? 1991. (c) The C. R. Z. Notification, 1991? The Precise area communication letter was issued by the District collector Erode vide Whether there is any Government Rc.No.25373/2016/X-1, Dated.19.09.2016. 22 Order/ Policy relevant/ relating to the site? The Mining plan was approved by the Deputy Director, Department of Geology and Mining Erode vide Rc.No. 25373/2016/X-1, Dated.21.09.2016. 23 Forest land involved (hectares) There is no forest land involved in the lease area. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? There is no court case pending, litigations relating to 24 (a) Name of the Court the project directly and indirectly. (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use changes in water bodies, etc.) Details thereof (with approximate Information/Checklist Yes/ S. No quantities/rates, wherever possible) with confirmation No sources of information data The lease applied area is Odathurai tank, is Permanent or temporary change in changed after the quarrying of Earth as per the land use, land cover or topography Mining plan, 1.1 including increase in intensity of Yes Earth formation is seen right from the surface land use (with respect to local land to a depth of 1.0m from the existing profile of use plan) Tank of Three months only. Clearance of existing land, The quarry lease applied area is devoid of 1.2 vegetation and building? No vegetation’s, Human settlement and buildings hence clearance is redundant. The quarrying activity is proposed to carry out within the quarry lease applied area. 1.3 Creation of new land uses? No Temporary approach road within the area will be form for the easy access of men and machinery which will be well maintained. The Earth deposits are clearly visible right Pre-construction investigations e.g. from the surface hence pre-construction 1.4 No bore houses, soil testing? investigation and soil testing is not proposed before quarrying operation. There will be no major civil work in this project involved. The infrastructure facilities 1.5 Construction works? Yes are proposed in the quarry site on semi- permanent structures. There is no existing building within the quarry 1.6 Demolition works? No lease applied area; hence no demolition work is involved. Temporary sites used for Sites service on semi-permanent structure will 1.7 construction works or housing of Yes be constructed only after grant of quarry lease. construction workers? There are no tall buildings or linear structure Above ground buildings, structures found in and around the quarry site. There is or Savudu works including linear no requirement of cutting and filling in the 1.8 No structures, cut and fill or site. The proposed quarry is to exploit Earth excavations. from unconsolidated sediments for 1.0m from the existing profile of Tank only. Conventional open cast semi mechanized Underground works including 1.9 No quarrying will be adopted. No underground mining or tunneling? mining or tunneling is proposed. The quarry operation is restricted up to a depth of 1.0m from the existing profile of Tank for a period of Three months only, after removing Reclamation works? 1.10 No the Earth there is no proposal for backfilling or reclamation. The quarried out lands will be leveled and used for facilitate the storage capacity of the tank. There is no such type of activities involved in 1.11 Dredging? No this opencast quarrying operation. There is no such type of activities involved; It 1.12 Offshore structures? No is an inland quarrying project. Production and manufacturing No production and manufacturing is involved 1.13 No processes? in the Earth Quarrying. There is no proposal for storage of material within the quarry lease applied area. The Excavated Earth is used for leveling and filling of low lying areas for Road projects and other 1.14 No Facilities for storage of goods or infrastructure development works and also for materials? the strengthening of bunds to increase the storage capacity of the tank for the Chennai metro water project a period of Three months. There is no wastage encountered during the quarrying operation, The Excavated Earth is used for leveling and filling of low lying areas for Road projects and other infrastructure Facilities for treatment or disposal development works and also for the 1.15 No of solid waste or liquid effluents? strengthening of bunds to increase the storage capacity of the tank for the Chennai metro water project a period of Three months. The Earth will not produce toxic effluence in the form of solid, liquid or gas. The proposed project is 2.75.0Ha for a period of Three months only. The required Facilities for long term housing of 1.16 No employees (9Nos) are available in the nearby operational workers? villages, hence long term housing of operational workers are not proposed. No new roads, rail or sea traffic is proposed during operation, the existing road will be New road, rail or sea traffic during utilized for transportation of the Earth. 1.17 construction or operation? No However, internal roads within the quarry lease applied area will be developed and maintained. New road, rail, air waterborne or There is no such type of activities involved in other transport infrastructure this project. 1.18 No including new or altered routes and Existing road will be utilized for the stations, ports, airports etc.? transportation of Earth to the needy sites. Closure or diversion of existing transport routes or infrastructure The project will not cause any changes and 1.19 No leading to changes in traffic hindrance in the existing traffic movements.