CITY of TACOMA Tacoma Public Utilities – Tacoma Power

Total Page:16

File Type:pdf, Size:1020Kb

CITY of TACOMA Tacoma Public Utilities – Tacoma Power CITY OF TACOMA Tacoma Public Utilities – Tacoma Power ADDENDUM NO. 5 DATE: February 3, 2020 REVISIONS TO: Request for Bids Specification No. PG19-0018F Elevator Upgrades NOTICE TO ALL Bidders: This addendum is issued to clarify, revise, add to or delete from, the original specification documents for the above project. This addendum, as integrated with the original specification documents, shall form the specification documents. The noted revisions shall take precedence over previously issued specification documents and addenda and shall become part of this contract. REVISIONS TO THE PROPOSAL PAGES: Replaced Proposal Pages as attached Addendum No. 5. REVISIONS TO THE SPECIAL PROVISIONS: Replace Section 01010 page 8 with attached Addendum No. 5. Replace Section 01025 page 3 with attached Addendum No. 5. REVISIONS TO THE TECHNICAL PROVISIONS: Replace entire Section 14 22 00 page 1 with attached Addendum No. 5. NOTE: Acknowledge receipt of this addendum by initialing the corresponding space as indicated on the signature page. Vendors who have already submitted their bid/proposal may contact the Purchasing Division at 253-502-8468 and request return of their bid/proposal for acknowledgment and re-submittal. Or, a letter acknowledging receipt of this addendum may be submitted in an envelope marked Requests for Bids Specification No. PG19-0018F Addendum No. 5. The City reserves the right to reject any and all bids, including, in certain circumstances, for failure to appropriately acknowledge this addendum. Patsy Best, Procurement and Payables Manager Finance/Purchasing Division Cc: Jay Madden, Project Lead, Generation/Plant Engineering & Construction Services Terry Ryan, Assistant Generation Manager, Generation/Plant Engineering & Const Sves Addendum No 5 SIGNATURE PAGE CITY OF TACOMA - DEPARTMENT OF PUBLIC UTILITIES - TACOMA POWER All submittals must be in ink or typewritten and must be executed by a duly authorized officer or representative of the bidding/proposing entity. If the bidder/proposer is a subsidiary or doing business on behalf of another entity, so state, and provide the firm name under which business is hereby transacted. Submittals will be received and time stamped only at the City of Tacoma Purchasing Division, located in the Tacoma Public Utilities Administration North Building, Main Floor, at 3628 South 35th Street, Tacoma, WA 98409. See the Request for Bids page near the beginning of the specification for additional details. REQUEST FOR BIDS SPECIFICATION NO. PG19-0018F TACOMA PUBLIC UTILITIES – ELEVATOR UPGRADES The undersigned bidder/proposer hereby agrees to execute the proposed contract and furnish all materials, labor, tools, equipment and all other facilities and services in accordance with these specifications. The bidder/proposer agrees, by submitting a bid/proposal under these specifications, that in the event any litigation should arise concerning the submission of bids/proposals or the award of contract under this specification, Request for Bids, Request for Proposals or Request for Qualifications, the venue of such action or litigation shall be in the Superior Court of the State of Washington, in and for the County of Pierce. Non-Collusion Declaration The undersigned bidder/proposer hereby certifies under penalty of perjury that this bid/proposal is genuine and not a sham or collusive bid/proposal, or made in the interests or on behalf of any person or entity not herein named; and that said bidder/proposer has not directly or indirectly induced or solicited any contractor or supplier on the above work to put in a sham bid/proposal or any person or entity to refrain from submitting a bid/proposal; and that said bidder/proposer has not, in any manner, sought by collusion to secure to itself an advantage over any other contractor(s) or person(s). Bidder/Proposer’s Registered Name Signature of Person Authorized to Enter Date into Contracts for Bidder/Proposer Address Printed Name and Title City, State, Zip (Area Code) Telephone Number / Fax Number E-Mail Address State Business License Number In WA, also known as UBI (Unified Business Identifier) Number E.I.No. / Federal Social Security Number Used on Quarterly Federal Tax Return, U.S. Treasury Dept. Form 941 State Contractor’s License Number (if applicable) (See Ch. 18.27, R.C.W.) Addendum acknowledgement: #1____ #2____ #3___ #4____ #5____ THIS PAGE MUST BE SIGNED AND RETURNED WITH SUBMITTAL Form No. SPEC-080A 1 Revised: 3/12/12 Addendum No 5 (PG19-0018F) Contractor Name __________________________ City of Tacoma Certification of Compliance with Wage Payment Statutes The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (November 13, 2019), that the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the state of Washington that the foregoing is true and correct. Bidder Signature of Authorized Official* Printed Name Title Date City State Check One: Individual ☐ Partnership ☐ Joint Venture ☐ Corporation ☐ State of Incorporation, or if not a corporation, the state where business entity was formed: If a co-partnership, give firm name under which business is transacted: * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. Revised 7/12/17 2 Addendum No 5 (PG19-0018F) Name of Bidder State Responsibility and Reciprocal Bid Preference Information Certificate of registration as a contractor (must be in Number: effect at the time of bid submittal): Effective Date: Expiration Date: Current Washington Unified Business Identifier (UBI) number: Number: Do you have industrial insurance (workers' Yes No compensation) coverage for your employees working in Washington?: Not Applicable Washington Employment Security Department Number: number: Not Applicable Washington Department of Revenue state excise tax Number: registration number: Not Applicable Have you been disqualified from bidding on any public Yes No If yes, provide works contracts under RCW 39.06.010 or an explanation of your 39.12.065(3)? disqualification on a separate page. Do you have a physical office located in the State of Yes No Washington? If incorporated, in what state were you incorporated? State: Not Incorporated If not incorporated, in what state was your business entity formed? State: Have you completed the training required by RCW 39.04.350, or are you on the list of exempt businesses Yes No maintained by the Department of Labor and Industries? Revised 7/12/17 3 Addendum No 5 (PG19-0018F) Name of Bidder PROPOSAL A – PLANNED WORK QUANTITY BID UNIT UNIT COST TOTAL COST ITEM 1A Modernization of Traction Elevator ABN Elevator #1 1 LS $___________ (04569 PC) ITEM 2A Modernization of Traction Elevator ABN Elevator #2 – 1 LS $___________ Center West Elevator (04571 PC) ITEM 3A Modernization of Traction Elevator ABN Elevator #3 – 1 LS $___________ East Elevator (04570 PC) ITEM 4A Modernization of Traction Elevator ABN Elevator #4 – 1 LS $___________ West Elevator(04572 PC) ITEM 5A Modernization of Traction Elevator ABN Elevator #5 – 1 LS $___________ Freight Elevator (04568 FC) ITEM 6A Modernization of ECC Hydraulic Elevator #1 (05402 05042 PH) 1 LS $___________ ITEM 7A Five (5) Year Preventative Maintenance ABN #1 Main 5 Year $___________ $___________ Elevator (04569 PC) (per year) (total) ITEM 8A Five (5) Year Preventative Maintenance ABN #2 Center 5 1 Year LS $___________ $___________ West Elevator (04571 PC) (per year) (total) ITEM 9A Five (5) Year Preventative Maintenance ABN #3 East 5 1 Year LS $___________ $___________ Elevator (04570 PC) (per year) (total) ITEM 10A Five (5) Year Preventative Maintenance ABN #4 West 5 1 Year LS $___________ $___________ Elevator (04572 PC) (per year) (total) Revised 7/12/17 4 Addendum No 5 (PG19-0018F) Name of Bidder QUANTITY BID UNIT UNIT COST TOTAL COST ITEM 11A Five (5) Year Preventative Maintenance ABN #5 Freight 5 1 Year LS $___________ $___________ Elevator (04568 PC) (per year) (total) ITEM 12A Five (5) Year Preventative Maintenance ECC Hydraulic 5 1 Year LS $___________ $___________ Elevator (05402 05042 PH) (per year) (total) ITEM 13A Five (5) Year Preventative ABS 5 1 Year LS $___________ $___________ (ISIS) Gen II Elevator (per year) (total) ITEM 14A Five (5) Year Preventative Maintenance Cushman 5 1 Year LS $___________ $___________ Substation Elevator (04305 FC) (per year) (total) ITEM 15A Five (5) Year Preventative Maintenance Alder Dam Freight 5 1 Year LS $___________ $___________ Elevator (00811 FC) (per year) (total) ITEM 16A Five (5) Year Preventative Maintenance LaGrande Dam 5 1 Year LS $___________ $___________ Surface Tram (00813 IL) (per year) (total) ITEM 17A Five (5) Year Preventative Maintenance Mossyrock Dam 5 1 Year LS $___________ $___________ Freight Elevator (01863 FC) (per year) (total) ITEM 18A Five (5) Year Preventative Maintenance Cushman #2 Dam 5 1 Year LS $___________ $___________ Freight Elevator (09145 FC) (per year) (total) ITEM 19A Five (5) Year Preventative Maintenance Cushman #1 Dam 5 1 Year LS $___________ $___________ Surface Tram (01946 IL) (per year) (total) ITEM 20A Five (5) Year Preventative Maintenance Wynoochee Dam 5 1 Year LS $___________ $___________ Elevator (02961 PC) (per year) (total) ITEM 21A Force Account $ 400,000 *Bidders shall include the $ 400,000 figure as part of their overall bid. TOTAL ITEMS PROPOSAL A $___________ Revised 7/12/17 5 Addendum No 5 (PG19-0018F) Name of Bidder PROPOSAL B – OPTIONAL BID ITEMS Note: The City reserves the right to award any or all of the optional bid items, independent of each other, at the discretion of the City considering cost, overall list of contract, and timing of work.
Recommended publications
  • Improving Elevator Performance by Monitoring Elevator Cab Volume by James O’Laughlin
    EW ECO-ISSUES: Continuing Education Improving Elevator Performance by Monitoring Elevator Cab Volume by James O’Laughlin Learning Objectives After reading this article, you should: N Understand why some elevator applications have the problem of full elevator cabs stopping unnecessarily to service hall calls. N Be able to describe several methods that help minimize the problem of full elevator cabs stopping unnecessarily to serv- ice hall calls. N Recognize why camera technol- ogy provides a better solution for monitoring consumed elevator- cab volume. N Know the application require- ments for monitoring consumed CEDES ESPROS/VOL camera installation (photo elevator-cab volume using courtesy of New York Elevator) infrared camera technology. sponding to hall calls. Increasing the N Obtain knowledge regarding the number of elevators is one possibil- installation and operation of the ity, but is generally cost prohibitive. CEDES ESPROS/VOL Camera Destination-dispatch systems can sensor. also help to alleviate this issue. How- ever, destination-dispatch systems Optimal elevator system perform- are best implemented in new instal- ance has always been a concern for lations, and also may be cost prohib- facilities and building management. itive for modernization applications. People expect that the elevator will More cost-effective solutions include Value: 1 contact hour arrive shortly after they press the hall using load-weighing systems or call button. When the elevator ar- camera-based monitoring to deter- This article is part of ELEVATOR WORLD’s mine a threshold that corresponds to rives, people are disappointed when Continuing Education program. Elevator-industry it is full, and they have to press the the consumed volume inside the ele- personnel required to obtain continuing-education hall call button and wait for the next vator cab.
    [Show full text]
  • Interstate Commerce Commission in Re
    INTERSTATE COMMERCE COMMISSION IN RE INVESTIGATION OF AM" ACCIDENT WHICH OCCURRED ON THE DENVER & INTERURBAN RAILROAD, NEAR GLOBEVILLE, COLO , ON SEPTEMBER 6, 1920 November 17, 1920 To the Commission On September G, 1920, there was a hoad-end collision between two passenger tiams on the Denvei & Intemiban Railioad neai Globe ville, Colo , which lesulted m the death of 11 passengeis and 2 em­ ployees, and the injury of 209 passengers and 5 employees This accident was investigated jointly with the Public Utilities Commis­ sion of Coloiado, and as a result of this investigation I lespectfully submit the following lepoit The Dem ei & Interurban Railioacl is a bianch of the Coloiado & Southern Railway, the rules of which govern Denver & Interurban trains Donvei & Intemiban tiains aie opeiated between Denvei and Bouldei, 31 miles noith of Denvei, over the Denvei Tiamway Co's tiacks between Denvei and Globeville and ovei Denvei & In­ temiban tiacks between Globeville and Denver & Inteiuiban Junc­ tion, at which point the line blanches, one line extending to Louis­ ville Junction and the othei to Webb Junction, and between these two junctions and Bouldei the trains of the Denvei & Inteiuiban j.»,ailroad opeiate over the tiacks of the Colorado & Southern Kail- way From Marshall, between Louisville Junction and Bouldei, a bianch line .extends to Eldorado Spimgs, this is also used jointly by the tiams of the two laihoads On this line Denvei & Intel urban employees aie ordinarily re­ lieved by Denver Tiamway employees at Globeville, the tiamway employees
    [Show full text]
  • From the 1832 Horse Pulled Tramway to 21Th Century Light Rail Transit/Light Metro Rail - a Short History of the Evolution in Pictures
    From the 1832 Horse pulled Tramway to 21th Century Light Rail Transit/Light Metro Rail - a short History of the Evolution in Pictures By Dr. F.A. Wingler, September 2019 Animation of Light Rail Transit/ Light Metro Rail INTRODUCTION: Light Rail Transit (LRT) or Light Metro Rail (LMR) Systems operates with Light Rail Vehicles (LRV). Those Light Rail Vehicles run in urban region on Streets on reserved or unreserved rail tracks as City Trams, elevated as Right-of-Way Trams or Underground as Metros, and they can run also suburban and interurban on dedicated or reserved rail tracks or on main railway lines as Commuter Rail. The invest costs for LRT/LMR are less than for Metro Rail, the diversity is higher and the adjustment to local conditions and environment is less complicated. Whereas Metro Rail serves only certain corridors, LRT/LRM can be installed with dense and branched networks to serve wider areas. 1 In India the new buzzword for LRT/LMR is “METROLIGHT” or “METROLITE”. The Indian Central Government proposes to run light urban metro rail ‘Metrolight’ or Metrolite” for smaller towns of various states. These transits will operate in places, where the density of people is not so high and a lower ridership is expected. The Light Rail Vehicles will have three coaches, and the speed will be not much more than 25 kmph. The Metrolight will run along the ground as well as above on elevated structures. Metrolight will also work as a metro feeder system. Its cost is less compared to the metro rail installations.
    [Show full text]
  • Dynamic Changes in Rail Shipping Mechanisms for Grain
    Agribusiness and Applied Economics Report No. 798 June 2020 Dynamic Changes in Rail Shipping Mechanisms for Grain Dr. William W Wilson Department of Agribusiness & Applied Economics Agricultural Experiment Station North Dakota State University Fargo, ND 58108-6050 ACKNOWLEDGEMENTS NDSU does not discriminate in its programs and activities on the basis of age, color, gender expression/identity, genetic information, marital status, national origin, participation in lawful off-campus activity, physical or mental disability, pregnancy, public assistance status, race, religion, sex, sexual orientation, spousal relationship to current employee, or veteran status, as applicable. Direct inquiries to Vice Provost for Title IX/ADA Coordinator, Old Main 201, NDSU Main Campus, 7901-231-7708, ndsu.eoaa.ndsu.edu. This publication will be made available in alternative formats for people with disabilities upon request, 701-231-7881. NDSU is an equal opportunity institution. Copyright ©2020 by William W. Wilson. All rights reserved. Readers may make verbatim copies of this document for non-commercial purposes by any means, provided this copyright notice appears on all such copies. ABSTRACT Grain shipping involves many sources of risk and uncertainty. In response to these dynamic challenges faced by shippers, railroad carriers offer various types of forward contracting and allocation instruments. An important feature of the U.S. grain marketing system is that there are now a number of pricing and allocation mechanisms used by most rail carriers. These have evolved since the late 1980’s and have had important changes in their features over time. The operations and impact of these mechanisms are not well understood, yet are frequently the subject of public criticism and studies and at the same time are revered by (some) market participants.
    [Show full text]
  • Iiii3 9080 02993 0523Iiii
    MIT LIBRARIESI IIII390803 0002993 02993 0523IIII0523 .2: HYDDIEAICS THE HYDROFOIL BOAT (Dos Tragflugelboot) AME 'IGCS Dipl..Ing. K. Bililer STRUCTURAL MECHANICS Translated by E.N. Lobouvie, Ph. D. APPLIED MAhETICS December 1959 Translation 293 PrNC-TN~6 (Rev. 9-b8) ' II This tuwstln.to be disdnd oely wNlt~ith m s thmit off tA* IWld States Ord ts TnrlfftwIn. ,IMI ilMMIM liIIi i il li 111 . -,11 THE HYDROFOIL BOAT (Das Tragfliigelboot) by Dipl.-Ing. K. Builler HANSA, No. 33/34 (1952), p. 1090 Translated by E.N. Labouvie, Ph. D. December 1959 Translation 293 ABSTRACT This report gives a short summary of the development of the hydrofoil boat during the past 50 years. The limitations of size, the power required, and the stability of these high-speed boats are discussed. 6nrr I- I I_, I I __I 311~ba~ 0 'THE HYDROFOIL BOAT Although work has been going forward on the development of the hydrofoil boat for more than fifty years and although a number of such boats of the most diverse types and sizes have been constructed, the general public is not very familiar with this type of high-speed craft. However, the state of research and technology as well as the test results obtained with hydrofoil boats built thus far have enabled us for years to utilize hydrofoil boats which are of considerable size and are safe to operate in ship traffic. The technical and economic inter- est presently being shown in these boats justifies the assumption that the hydrofoil boat will soon develop into a familiar means of transportation in high-speed ship traffic.
    [Show full text]
  • Trolleybuses: Applicability of UN Regulation No
    Submitted by the expert from OICA Informal document GRSG-110-08-Rev.1 (110th GRSG, 26-29 April 2016, agenda item 2(a)) Trolleybuses: Applicability of UN Regulation No. 100 (Electric Power Train Vehicle) vs. UN Regulation No. 107 Annex 12 (Construction of M2/M3 Vehicles) for Electrical Safety 1. At 110th session of GRSG Belgium proposes to amend UN R107 annex 12 by deleting the requirements for trolleybuses (see GRSG/2016/05) and transfer the requirements into UN R100 (see GRSP/2016/07), which will be on the agenda of upcoming GRSP session in May 2016. 2. Due to the design of a trolleybus and stated in UN Regulation No. 107, trolleybuses are dual- mode vehicles. They can operate either: (a) in trolley mode, when connected to the overhead contact line (OCL), or (b) in bus mode when not connected to the OCL. When not connected to the OCL, they can also be (c) in charging mode, where they are stationary and plugged into the power grid for battery charging. 3. The basic principles of the design of the electric powertrain of the trolleybus and the connection to the OCL is based on international standards developed for trams and trains and is implemented and well accepted in the market worldwide. 4. Due to the fact that the trolleybus is used on public roads the trolleybus has to fulfil the regulations under the umbrella of the UNECE regulatory framework due to the existing national regulations (e.g. European frame work directive). 5. Therefore the annex 12 in UN R107 was amended to align the additional safety prescriptions for trolleybuses with the corresponding electrical standards.
    [Show full text]
  • ELEVATOR INTERIOR DESIGN DESIGN SERIES Contact & About Table of Contents
    ELEVATOR INTERIOR DESIGN DESIGN SERIES Contact & About Table of Contents Website www.ElevatorID.com Section 1 Contact / About EID • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1 Address 100 Marine Blvd Section 2 Elevator Cab Design Introduction • • • • • • • • • • • • • • • • • 3 Lynn, MA 01905 Elevator Cab Design Elevator Cab Series 100 • • • • • • • • • • • • • • • • • • • • • • • • • 5 Telephone (781) 596-4200 Elevator Cab Series 200 • • • • • • • • • • • • • • • • • • • • • • • • • 7 Fax (781) 596-4222 Elevator Cab Series 300 • • • • • • • • • • • • • • • • • • • • • • • • • 9 Elevator Cab Series 400 • • • • • • • • • • • • • • • • • • • • • • • • • 11 Note: An employee directory and further contact information is available on our website. Please visit ElevatorID.com/contact Elevator Cab Series 500 • • • • • • • • • • • • • • • • • • • • • • • • • 13 Section 3 Island Ceiling Design • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 15 Formed to meet the needs of the ever expanding demands Through inventive collaboration and fusion of your About Elevator Interior Design Elevator Component Design Elevator Handrail Design • • • • • • • • • • • • • • • • • • • • • • • • • 17 and creative passions that fuel our world, Elevator Interior ideas along with our product expertise and command of Design provides the finest elevator cabs in the industry. materials, we deliver an elevator cab design that stretches the boundaries of imagination. Section 4 Material Selection Introduction • • • • • • • • • • • • • • • • • • • 19
    [Show full text]
  • Elevator Cab Refurbishment Specification
    Elevator Cab Refurbishment Specification LOCATION OF PROPERTY: EQUIPMENT DESCRIPTION: UC Hastings Three (3) Traction Elevators 100 McAllister St. San Francisco, CA SPECIFICATION TYPE: SPECIFICATION DATE: Elevator Cab Refurbishment April 4, 2018 Part I: General Conditions A. Form of Agreement 1. This Specification was written to be included as an attachment to a refurbishment or construction form of agreement. Throughout this document, the word “Agreement” shall refer to that agreement, as well as any/all attachments, including this specification. It is acknowledged that, in some cases, terms and conditions found in this Specification may overlap with terms and conditions found in the Agreement. In most cases, such overlap will occur because this Specification has terms specific to an elevator refurbishment, versus the Agreement which is a general document. Wherever overlap or conflict exists within or between any portion of the Agreement and any attachment, the most stringent terms and conditions shall apply. 2. If any conflict or discrepancy occurs in this specification with respect to the work specified, Contractor shall notify ECA immediately so that ECA may issue an appropriate amendment to the specification. If such a conflict or discrepancy is discovered after the award of the Agreement, it shall be assumed that Contractor has bid according to the more expensive option. In no case shall a chargeable change order result from a conflict or discrepancy within the Agreement. B. Scope 1. The scope of this specification and the resulting Agreement is for the cab refurbishment of the subject elevator equipment. Contractor is fully responsible for all work required to perform the refurbishment according to industry standards and all applicable codes, laws and guidelines as modified by any authority having jurisdiction, except where specific tasks and functions are explicitly stated within the Agreement to be the responsibility of another party.
    [Show full text]
  • Grain and Soybean Industry Dynamics and Rail Service
    Grain and Soybean Industry Dynamics and Rail Service Analytical Models of Rail Service Operations Final Report Michael Hyland, Hani Mahmassani, Lama Bou Mjahed, and Breton Johnson Northwestern University Transportation Center (NUTC) Parr Rosson Texas A&M University 1 Executive Summary To remain globally competitive, the United States’ grain industry and associated transportation services underwent significant restructuring over the past fifteen years. New technologies, helped by weather changes, led to sustained yield volume increases in the Upper Midwest. To move larger volumes faster and at lower cost, the railroad industry introduced shuttle train service. Traveling as a unit to the same destination, shuttle trains save considerable time in transit and potential delay, bypassing intermediate classification yards. Grain shippers concurrently began consolidating and storing grain in larger, more efficient terminal elevators (shuttle loaders) instead of country elevators. This report examines the effectiveness of shuttle train service and the terminal elevators supporting the shuttle train system, under different demand levels, through the formulation of simple mathematical models. In order to compare shuttle and conventional rail service, this paper introduces three distinct models. The first model, referred to as the ‘time model’, determines the time it takes to transport grain from the farm to a destination (e.g. an export elevator). The second model, referred to as the ‘engineering cost model’, determines the aggregate variable costs of transporting grain from the farm to an export elevator. The third model, referred to as the ‘capacity model’, determines the maximum attainable capacity (i.e. throughput) of a rail network as a function of demand for rail transport and the percentage of railcars on the network being moved via shuttle service and conventional service.
    [Show full text]
  • Nebraska Railway Council Study
    NEBRASKA RAILWAY COUNCIL STUDY Wilbur Smith Associates in association with HWS Consulting Group Denver Tolliver, Ph.D. NEBRASKA RAILWAY COUNCIL STUDY prepared by Wilbur Smith Associates in association with HWS Consulting Group Denver Tolliver, Ph.D. December 4, 2003 TABLE OF CONTENTS Chapter Page No. 1 Nebraska Rail System 1-1 Rail System Components 1-1 Freight Railroads 1-1 Rail System Use 1-5 Rail Freight Traffic 1-6 Traffic Density 1-8 2 Grain Transportation 2-1 Modal Share 2-1 Rail Shipments 2-2 Strategic Agricultural Issues 2-4 Railroad Rates and Grain Elevator Network Characteristics 2-8 3 Light Density Lines 3-1 Light Density Line System 3-1 Screening Process 3-3 Core System Delineation 3-5 LDL Core System 3-6 Appendices Appendix A – Grain Transportation Analysis Appendix B – Light Density Lines Appendix C – LDL Elevator Locations Nebraska Railway Council Study i EXHIBITS Exhibit No. Page No. 1-1 Nebraska Rail System 1-2 1-2 Nebraska Freight Railroads 2002 1-3 1-3 Nebraska Rail Movements 2000 1-6 1-4 Nebraska Rail Commodity Volumes 2000 1-7 1-5 Destination of Shipments Originating in Nebraska 1-9 1-6 Origination of Shipments Terminating in Nebraska 1-10 1-7 Nebraska Rail Density 1-11 2-1 Nebraska Cereal Grain Transportation 1997 2-1 2-2 Nebraska Rail Grain Shipments 2000 2-2 2-3 Rail Grain Destinations 2000 2-3 2-4 Major Grain Elevators and Corn Production by County 2-5 2-5 Ethanol Plants Nebraska 2-6 2-6 Inbound Grain Shipment Distances 2-8 2-7 Grain Elevator Delivery Truck Configurations 2-9 2-8 Shuttle Elevator Radial Market 2-10 3-1 Nebraska Light Density Line System 3-2 3-2 LDL System by Railroad 3-1 3-3 Screening Process Flow Diagram 3-4 3-4 LDL Core System 3-7 3-5 Core System Light Density Lines 3-8 Nebraska Railway Council Study ii Chapter 1 NEBRASKA RAIL SYSTEM This chapter defines the Nebraska rail system by describing the major characteristics of each of the system’s components and the use made of them.
    [Show full text]
  • Santa Monica Smiley Sand Tram
    Santa Monica Smiley Sand Tram TRANSFORMING BEACH PARKING, TRANSPORTATION AND ACCESS Prepared by Santa Monica Pier Restoration Corporation, February 2006 Concept History In the fall of 2004 a long-term event was staged in the 1550 parking lot occupying over 70% of the lot. The event producer was required to implement shuttle service from the south beach parking lots up to the Pier. A local business man offered the use of an open air propane powered tram and on October 5, 2004 at 8pm, the tram was dropped off in the 2030 Barnard Way parking lot for an initial trial run. The tram was an instant hit. Tram use in Santa Monica is not a new concept. A Santa Monica ordinance adopted in 1971 allows for the operation of trams along Ocean Front Walk and electric trams were operated between Santa Monica and Venice throughout the 1920’s. Electric trams took passengers between the Venice and Santa Monica Piers. - 1920 In 2004, due to pedestrian traffic concerns, Ocean Front Walk was not utilized for the tram. Instead, the official route for the tram was established along the streets running one block east of the beach. This route required extensive traffic management and, while providing effective transportation, provided limited access to the world-class beach. At a late-night brainstorming session on how to improve the route SMPD Sergeant Greg Smiley suggested that the tram run on the sand. With the emerging vision of the “Beach Tram”, the Santa Monica Pier Restoration Corporation began the process of research, prototype design and consideration of the issues this concept would raise.
    [Show full text]
  • The Urban Rail Development Handbook
    DEVELOPMENT THE “ The Urban Rail Development Handbook offers both planners and political decision makers a comprehensive view of one of the largest, if not the largest, investment a city can undertake: an urban rail system. The handbook properly recognizes that urban rail is only one part of a hierarchically integrated transport system, and it provides practical guidance on how urban rail projects can be implemented and operated RAIL URBAN THE URBAN RAIL in a multimodal way that maximizes benefits far beyond mobility. The handbook is a must-read for any person involved in the planning and decision making for an urban rail line.” —Arturo Ardila-Gómez, Global Lead, Urban Mobility and Lead Transport Economist, World Bank DEVELOPMENT “ The Urban Rail Development Handbook tackles the social and technical challenges of planning, designing, financing, procuring, constructing, and operating rail projects in urban areas. It is a great complement HANDBOOK to more technical publications on rail technology, infrastructure, and project delivery. This handbook provides practical advice for delivering urban megaprojects, taking account of their social, institutional, and economic context.” —Martha Lawrence, Lead, Railway Community of Practice and Senior Railway Specialist, World Bank HANDBOOK “ Among the many options a city can consider to improve access to opportunities and mobility, urban rail stands out by its potential impact, as well as its high cost. Getting it right is a complex and multifaceted challenge that this handbook addresses beautifully through an in-depth and practical sharing of hard lessons learned in planning, implementing, and operating such urban rail lines, while ensuring their transformational role for urban development.” —Gerald Ollivier, Lead, Transit-Oriented Development Community of Practice, World Bank “ Public transport, as the backbone of mobility in cities, supports more inclusive communities, economic development, higher standards of living and health, and active lifestyles of inhabitants, while improving air quality and liveability.
    [Show full text]