2.1.1 Pakistan Port of Karachi

Total Page:16

File Type:pdf, Size:1020Kb

2.1.1 Pakistan Port of Karachi 2.1.1 Pakistan Port of Karachi Port Overview Description and Contacts of Key Companies Port Performance Berthing Specifications Port Handling Equipment Container Facilities Discharge Rates and Terminal Handling Charges Pakistan International Container Terminal Customs Guidance Key port information can also be found at: Maritime Database information on Pakistan Ports Port Overview Karachi is known as the gateway to Asia due to its geographical and strategic location. Karachi city also has the distinction of being the birthplace of the founder of Pakistan, Mohammad Ali Jinnah and was the first capital of Pakistan till 1963. It is now the largest city with a bustling and ever increasing population of over 18 million. By 1852, Karachi was an established city with a population of about 14,000 with prosperous trade in over-seas markets. However, the existing Karachi Port started taking shape in 1854, when the projects of dredging the main navigable channel and the construction of a mole or causeway joining the main harbour with the rest of the city were undertaken. The construction of the wharves started in 1882, and by 1914 the East Wharves and the Napier Mole Boat Wharf had been completed. During the period between 1927 and 1944, the West Wharves of the Port, the lighterage berths and the ship-repairing berths were constructed. Most of these facilities were rendered obsolete by the time Pakistan came into existence in 1947. Since then, the port administration has embarked on extensive development of the port on modern lines. Karachi Port is now handling over 11.74 million tons of liquid cargo and 25.45 million tons of dry cargo, including 1,213,744 TEUs (Twenty-foot Equivalent Units) which constitute about 60% of import/ export of the country. Port website: Pakistan Port of Karachi Website Port Location and Contacts Country Pakistan Province or District Karachi Town or City (Closest location) with Distance (km) Name: Karachi Port km: 15 km Port's Complete Name Port of Karachi Latitude 24.81667 Longitude 66.98333 Managing Company or Port Authority (If more than one operator, Karachi Port Trust break down by area of operation) Management Contact Person General Manager – Operations Mr. Azhar Hayat + 92 21 99214375 +92 21 99214530-40 Ext. 2240 [email protected] Closest Airport and Frequent Airlines to / from International Airport Name: Jinnah International Airport Destinations Dist: 23.8 km Time: 37 min Airlines: PIA, EMIRATES, CATHY Pacific, Thai, SHAHEEN, Saudi Airlines, Indus Airways, Malaysian Airlines. Description and Contacts of Key Companies Page 1 For information on Port of Karachi Port contact details, please see the following link: 4.3 Pakistan Port and Waterways Company Contact List Port Performance TYPE OF CARGO HANDLED 2012-13 2013-14 %age growth IMPORTS (Millions Tons) Dry General Cargo 11.539 12.641 +9.55 Dry Bulk Cargo 4.839 5.995 +23.89 Total Dry Cargo 16.378 18.636 +13.79 Liquid Bulk Cargo 10.322 11.707 +13.42 TOTAL 26.700 30.343 +13.64 EXPORTS (Millions Tons) Dry General Cargo 8.844 8.591 - 2.86 Dry Bulk Cargo 1.607 1.015 -36.84 Total Dry Cargo 10.451 9.606 -8.09 Liquid Bulk Cargo 1.699 1.401 17.54 Total 12.150 11.007 -9.41 TOTAL IMPORTS & EXPORTS (Million Tons) Dry General Cargo 20.383 21.232 +4.17 Dry Bulk Cargo 6.446 7.010 +8.75 Total Dry Cargo 26.892 28.242 +5.27 Liquid Bulk Cargo 12.021 13.108 +9.04 Grand Total 38.850 41.350 +6.44 CONTAINER HANDLING (TEUs in Million) No of Imports 0.769 0.811 +5.39 No of Export 0.752 0.780 +4.55 Total TEUs 1.522 1.591 +4.55 SHIP MOVEMENT (In Nos) Containers Ships 785 817 +4.08 Bulk Cargo Ships 198 172 -13.13 Gen. Cargo Ships 189 229 +21.16 Oil Tankers 424 456 +7.55 Total 1596 1674 +4.89 Berthing Specifications PORT PARAMETER Page 2 OP-1 MAX LOA 259 M MAX DWT 75.000 TONS Crude Oil & HSD. CHEM (PRIVATE) (POL PRODUCTS) MAX BEAM 44 M MAX DISPL 95.000 TONS MAX DRAFT IMPORT 13 M MAX DRAFT EXPORT 13 M OP-2 MAX LOA 259 M MAX DWT 75.000 TONS Chemical, Ethanol, Mollasses (POL PRODUCTS) MAX BEAM 44 M MAX DISPL 95.000 TONS Crude Oil, Palm Oil, HSD & MAX DRAFT IMPORT 11.88 M AV GAS.MOGAS.NAPTHA .HSFO.LSFO. MAX DRAFT EXPORT 11.28 OP-3 MAX LOA 259 M MAX DWT 75.000 TONS Chemical, Ethanol, Mollasses (POL PRODUCTS) MAX BEAM 44 M MAX DISPL 95.000 TONS Crude Oil, Vegetable Oil, MAX DRAFT IMPORT 12.5 M Naphtha, Base LSFO, HSFO MAX DRAFT EXPORT 12.25 M AV GAS, MO GAS BERTH NO. 1,2,3 MAX LOA NR Dedicated coal Berth and General Cargo/ Bulk/ Deep Draft all dirty Cargoes DB-1 CHEM.ETHANOL.MOLLASSES. MAX BEAM NR MAX DRAFT 10.67 M BERTH NO. 4-5 MAX LOA 186 M Deep Draft/Bulk/General Cargo/Cruise Ships/ Naval Ships MAX BEAM NR MAX DRAFT 10.75 M PICT MAX LOA 305 M Dedicated Container Terminal in Private Sector PICT BERTH NO. 6-9 MAX BEAM NR w.e.f 01-08-2005. BERTH NO. 10,11,12 MAX LOA 250 M Deep Draft/Bulk/General Cargo/ Naval Ships MAX BEAM NR MAX DRAFT 13 M BERTH NO. 13 MAX LOA 250 M Deep Draft/Bulk/General Cargo/ Naval Ships MAX BEAM NR MAX DRAFT 13 M BERTH NO. 18 MAX LOA 140 M General + Project cargo, Jute/Break bulk +Geared Containers MAX BEAM NR MAX DRAFT 9.5 M BERTH NO. 19-21 MAX LOA 160 M General + Project cargo, Jute/Break bulk +Geared Containers MAX BEAM NR MAX DRAFT 9.5 M BERTH NO. 22-23 MAX LOA 150 M General , Jute/Break bulk +Geared Containers MAX BEAM NR MAX DRAFT 7.5 M BERTH NO. 24-25 MAX LOA N.R General + Project cargo, Jute/Break bulk +Geared Containers, Bulk Cement. MAX BEAM NR MAX DRAFT 10.0 M KICT MAX LOA 340 M Dedicated Container Terminal in Private Sector KICT BERTH NO 26-30 MAX BEAM NR n/a MAX DRAFT 13 M OTHER INFORMATION 1. There are no restriction on the beam for the general Cargo vessels when the ships are working with their own gear Page 3 2. There are no Rail served Berths on East Wharves. 3. 40 Tons shore crane available at berth No 18 4. Movement at Berth No.18 to 23 restricted to Day light only. 5. Vessel drawing draft of more than the sanctioned depth will not be allowed to enter the Port. 6. The above draught/ dimensions are subject to availability of sufficient tide/weather condition 7. Deep draft vessels are to commence loading/discharging immediately after berthing. 8. Ship on arrival at outer anchorage are to communicate correct draught and other vessels particulars Karachi Port Trust Karachi Port Trust (KPT) is situated in the city of Karachi and has two different wharves East & West wharf and it has 3 oil pier berths 21 General Cargo berths and 2 Container Terminals on both wharves. OIL PIER From berth # OP-1 to OP-3= are oil pier berths and situated at East Wharf and the following detail of the berths are as follows. Berth # LOA Draft Remarks OP-1 260 M 11.88 M Oil Pier OP- 2 260 M 11.88 M Oil Pier OP- 3 260 M 11.88 M Oil Pier CONVENTIONAL BERTHS From berth # 1 to 5 and 10 to 17 are conventional berths and situated at East Wharf and B # 6 to 9 allotted to Pakistan International Container Terminal (PICT). The following are the details of the berths and permissible draft at East Wharf. Berth # LOA Draft Remarks 1. 515 feet 10.70 m CONVENTIONAL 2. 480 feet 10.70 M CONVENTIONAL 3. 550 feet 10.70 M CONVENTIONAL Berth # LOA Draft Remarks 4. 480 feet 10.50 M CONVENTIONAL 5. 670 feet 10.50 M CONVENTIONAL 10. 480 feet 10.00 M CONVENTIONAL 11. 550 feet 10.00 M CONVENTIONAL 12. 484 feet 10.00 M CONVENTIONAL 13. 550 feet 10.00 M CONVENTIONAL 14. 480 feet 10.00 M CONVENTIONAL 15. 485 feet 10.00 M CONVENTIONAL 16. 550 feet 10.00 M CONVENTIONAL 17. 500 feet 10.00 M CONVENTIONAL Pakistan International Container Terminal (PICT) Berth # LOA Draft Remarks Page 4 6. 580 feet 12.00 M P I C T 7. 390 feet 12.00 M P I C T 8. 480 feet 12.00 M P I C T 9. 530 feet 12.00 M P I C T Karachi Port Trust From berth # 18 to 25 are conventional berths and situated in the city of Karachi at West Wharf and B # 26 to 30 allotted to Karachi International Container Terminal (KICT). Conventional Berths The following are the details of the berths and permissible draft at West Wharf. Berth # LOA Draft Remarks 18 470 feet 8.50 M CONVENTIONAL 19 540 feet 9.50 M CONVENTIONAL 20 540 feet 9.50 M CONVENTIONAL 21 530 feet 9.50 M CONVENTIONAL 22 550 feet ONLY BARGES 23 500 feet ONLY BARGES 24 550 feet 10.00 M CONVENTIONAL 25 550 feet 10.00 M CONVENTIONAL KARACHI INTERNATIONAL CONTAINER TERMINAL KICT (WEST WHARF) Berth # LOA Draft Remarks 26 480 feet 12.00 M K I C T 27 600 feet 12.00 M K I C T 28 560 feet 12.00 M K I C T 29 700 feet 12.00 M K I C T 30 600 feet 12.00 M K I C T New deep water Container Terminal is going to built by M/S.
Recommended publications
  • Iranshah Udvada Utsav
    HAMAZOR - ISSUE 1 2016 Dr Nergis Mavalvala Physicist Extraordinaire, p 43 C o n t e n t s 04 WZO Calendar of Events 05 Iranshah Udvada Utsav - vahishta bharucha 09 A Statement from Udvada Samast Anjuman 12 Rules governing use of the Prayer Hall - dinshaw tamboly 13 Various methods of Disposing the Dead 20 December 25 & the Birth of Mitra, Part 2 - k e eduljee 22 December 25 & the Birth of Jesus, Part 3 23 Its been a Blast! - sanaya master 26 A Perspective of the 6th WZYC - zarrah birdie 27 Return to Roots Programme - anushae parrakh 28 Princeton’s Great Persian Book of Kings - mahrukh cama 32 Firdowsi’s Sikandar - naheed malbari 34 Becoming my Mother’s Priest, an online documentary - sujata berry COVER 35 Mr Edulji Dinshaw, CIE - cyrus cowasjee Image of the Imperial 39 Eduljee Dinshaw Road Project Trust - mohammed rajpar Custom House & bust of Mr Edulji Dinshaw, CIE. & jameel yusuf which stands at Lady 43 Dr Nergis Mavalvala Dufferin Hospital. 44 Dr Marlene Kanga, AM - interview, kersi meher-homji PHOTOGRAPHS 48 Chatting with Ami Shroff - beyniaz edulji 50 Capturing Histories - review, freny manecksha Courtesy of individuals whose articles appear in 52 An Uncensored Life - review, zehra bharucha the magazine or as 55 A Whirlwind Book Tour - farida master mentioned 57 Dolly Dastoor & Dinshaw Tamboly - recipients of recognition WZO WEBSITE 58 Delhi Parsis at the turn of the 19C - shernaz italia 62 The Everlasting Flame International Programme www.w-z-o.org 1 Sponsored by World Zoroastrian Trust Funds M e m b e r s o f t h e M a n a g i
    [Show full text]
  • Diagnostic Centers'!A1 Laboratories!A1 Dental Centers'!A1 Ophthalmology Clinics'!A1 Medical Center'!A1 Diagnostic Centers
    Diagnostic Centers'!A1 Laboratories!A1 Dental Centers'!A1 Ophthalmology Clinics'!A1 Medical Center'!A1 Diagnostic Centers L I S T O F A L L I A N Z E F U N E T W O R K D I S C O U N T D I A G N O S T I C C E N T R E S S.No Hospital Name Address Contact Contact Person Email Contact Number City Discount Category 021-35662052 Mr. Yousuf Poonawala 1 Burhani Diagnostic Centre Jaffer Plaza, Mansfield Street, Saddar, Karachi. 021-5661952 Karachi 10-15% Diagnostic Center 0336-0349355 (Administrator) [email protected] 02136626125-6 0334-3357471 [email protected] 2 Dr. Essa's Laboratory & Diagnostic Centre (Main Centre) B-122 (Blue Building) Block-H, Shahrah-e-Jahangir, Near Five Star, North Nazimabad. Mr. Shakeel / Ms. Shahida 021-36625149 Karachi 10-20% Diagnostic Center 0335-5755529 [email protected] 021-36312746 0335- 2.1 Ayesha Manzil Centre Ali Appartment, FB Area Karachi Karachi 10-20% Diagnostic Center 5755536 021-35862522 021- 2.2 Zamzama Centre Suite # 2, Plot 8-C (Beside Aijaz Boutique), 4th Zamzama Commercial Lane Karachi 10-20% Diagnostic Center 35376887 2.3 Medilink Centre Suite # 103, 1st Floor, The Plaza, 2 Talwar, Khayaban-e-Iqbal, Main Clifton Road, Karachi 021-35376071-74 Karachi 10-20% Diagnostic Center 2.4 Abdul Hassan Isphahani Centre A-1/3&4, Block-4, gulshan-e-Iqbal. Main Abdul Hassan Isphahani Road, Karachi 021-34968377-78 Karachi 10-20% Diagnostic Center 2.5 KPT Centre Karachi Port Trust Hospital Keemari, Karachi 021-34297786 Karachi 10-20% Diagnostic Center 021-34620176 021- 2.6 Gulistan-E-Johar Centre S
    [Show full text]
  • Drivers of Climate Change Vulnerability at Different Scales in Karachi
    Drivers of climate change vulnerability at different scales in Karachi Arif Hasan, Arif Pervaiz and Mansoor Raza Working Paper Urban; Climate change Keywords: January 2017 Karachi, Urban, Climate, Adaptation, Vulnerability About the authors Acknowledgements Arif Hasan is an architect/planner in private practice in Karachi, A number of people have contributed to this report. Arif Pervaiz dealing with urban planning and development issues in general played a major role in drafting it and carried out much of the and in Asia and Pakistan in particular. He has been involved research work. Mansoor Raza was responsible for putting with the Orangi Pilot Project (OPP) since 1981. He is also a together the profiles of the four settlements and for carrying founding member of the Urban Resource Centre (URC) in out the interviews and discussions with the local communities. Karachi and has been its chair since its inception in 1989. He was assisted by two young architects, Yohib Ahmed and He has written widely on housing and urban issues in Asia, Nimra Niazi, who mapped and photographed the settlements. including several books published by Oxford University Press Sohail Javaid organised and tabulated the community surveys, and several papers published in Environment and Urbanization. which were carried out by Nur-ulAmin, Nawab Ali, Tarranum He has been a consultant and advisor to many local and foreign Naz and Fahimida Naz. Masood Alam, Director of KMC, Prof. community-based organisations, national and international Noman Ahmed at NED University and Roland D’Sauza of the NGOs, and bilateral and multilateral donor agencies; NGO Shehri willingly shared their views and insights about e-mail: [email protected].
    [Show full text]
  • Transshipment by Ministry of Maritime Affairs
    GOVERNMENT OF PAKISTAN MINISTRY OF MARITIME AFFAIRS **** Draft Working Paper Transshipment INDEX S. No. Topic Page 01 Year 2020 declared as “Year of The Blue Economy” by Prime Minister 01 02 Concept of Transshipment for Pakistan 02 03 Potential for Growth in Transshipment at Karachi Port Terminals 02 04 Concepts of Transshipment 03 05 Transshipment Hubs 03 06 Forms of Transshipment 04 07 Ingredients of a successful model 05 08 Middle East – As A Successful Model 06 09 Consultations with major stakeholders 06 10 Pakistan’s Potential as Transshipment Hub - Graphic Illustrations 07 11 Establishing of a transshipment business friendly environment 11 12 Transshipment Business Model & Hub Selection - Phases 11 13 Proximity of Ports to Cities as a factor for Transshipment 12 14 Landlocked Countries & Arabian Sea Ports 12 15 Regional Ports & Shipping Routes 12 16 Gwadar Port Connectivity Potential 13 17 Barriers facing Pakistan vis-à-vis regional ports – Present Capacity & Utilization 13 18 Indian Ports Increasing Potential 14 19 Container Throughput – Comparison of Regions & Opportunities 14 20 Shipping Routes Transshipment Ports Wise Comparison 15 21 Chahbahar Port location – India attempting to benefit 15 22 Arabian Sea (Pakistan) Corridor 16 23 Comparative Analysis of Regional Ports for Transshipment Charges 16 24 Berthing/Charges Analysis Regional Comparison 18 25 Break up of Port Charges & their Comparison with Regional Ports 20 26 Port of Karachi Cargo & Container Capacity – Reduction of Volume 21 27 Transshipment Karachi Port Terminals
    [Show full text]
  • Gwadar: China's Potential Strategic Strongpoint in Pakistan
    U.S. Naval War College U.S. Naval War College Digital Commons CMSI China Maritime Reports China Maritime Studies Institute 8-2020 China Maritime Report No. 7: Gwadar: China's Potential Strategic Strongpoint in Pakistan Isaac B. Kardon Conor M. Kennedy Peter A. Dutton Follow this and additional works at: https://digital-commons.usnwc.edu/cmsi-maritime-reports Recommended Citation Kardon, Isaac B.; Kennedy, Conor M.; and Dutton, Peter A., "China Maritime Report No. 7: Gwadar: China's Potential Strategic Strongpoint in Pakistan" (2020). CMSI China Maritime Reports. 7. https://digital-commons.usnwc.edu/cmsi-maritime-reports/7 This Book is brought to you for free and open access by the China Maritime Studies Institute at U.S. Naval War College Digital Commons. It has been accepted for inclusion in CMSI China Maritime Reports by an authorized administrator of U.S. Naval War College Digital Commons. For more information, please contact [email protected]. August 2020 iftChina Maritime 00 Studies ffij$i)f Institute �ffl China Maritime Report No. 7 Gwadar China's Potential Strategic Strongpoint in Pakistan Isaac B. Kardon, Conor M. Kennedy, and Peter A. Dutton Series Overview This China Maritime Report on Gwadar is the second in a series of case studies on China’s Indian Ocean “strategic strongpoints” (战略支点). People’s Republic of China (PRC) officials, military officers, and civilian analysts use the strategic strongpoint concept to describe certain strategically valuable foreign ports with terminals and commercial zones owned and operated by Chinese firms.1 Each case study analyzes a different port on the Indian Ocean, selected to capture geographic, commercial, and strategic variation.2 Each employs the same analytic method, drawing on Chinese official sources, scholarship, and industry reporting to present a descriptive account of the port, its transport infrastructure, the markets and resources it accesses, and its naval and military utility.
    [Show full text]
  • The World Bank for OFFICIAL USE ONLY
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 56032-PK PROJECT APPRAISAL DOCUMENT ON A Public Disclosure Authorized PROPOSED LOAN IN THE AMOUNT OF US$115.8 MILLION TO THE ISLAMIC REPUBLIC OF PAKISTAN FOR A Public Disclosure Authorized KARACHI PORT IMPROVEMENT PROJECT August 13, 2010 Sustainable Development Unit Pakistan Country Management Unit South Asia Region This document is being made publicly available prior to Board consideration. This does not imply a Public Disclosure Authorized presumed outcome. This document may be updated following Board consideration and the updated document will be made publicly available in accordance with the Bank’s Policy on Access to Information. CURRENCY EQUIVALENTS (Exchange Rate Effective June 30, 2010) Currency Unit = Rupees Rs 85.52 = US$1 US$1.48 SDR FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS ADB Asian Development Bank MoPS Ministry of Ports and Shipping CAO Chief Accounts Officer MPCD Marine Pollution Control Department CAS Country Assistance Strategy CFAA Country Financial Accountability MTDF Medium Term Development Assessment Framework CAPEX Capital Expenditure MOF Ministry of Finance DSCR Debt to Service Coverage Ratio NCB National Competitive Bidding DPL Development Policy Loans NHA National Highway Authority GAAP Governance Accountability Action Plan NMB Napier Mole Boat GDP Gross Domestic Product NPV Net Present Value GOP Government of Pakistan NTCIP National Trade Corridor Improvement Project EBITDA Earnings before interest,
    [Show full text]
  • Year Book 2011-2012
    CMYK + Ground Job No. 2248(13) Ports & Shipping YEAR BOOK 2011-12 F DOCK WO O RK E E T R A S R O S T A DDWS C F E E T R I Y D GOVERNMENT OF PAKISTAN MINISTRY OF PORTS & SHIPPING ISLAMABAD M.T. PC # 02 Job No. 2248(13)P&S GOVERNMENT OF PAKISTAN MINISTRY OF PORTS & SHIPPING Islamabad CONTENTS S.No. Contents Page No. 1. Foreword iii 2. Introduction 1 3. Mission Statement 2 4. Objectives 3 5. Functions of the Ministry 4 6. Organogram 5 7. Directorate General Ports & Shipping Wing 7-8 8. Mercantile Marine Department 9-11 9. Government Shipping Office 12 10. Pakistan Marine Academy 13-20 11. Karachi Port Trust 21-51 12. Port Qasim Authority 52-56 13. Pakistan National Shipping Corporation 57-62 14. Gwadar Port Authority 63-65 15. Directorate of Dock Workers Safety 66-67 16. Korangi Fisheries Harbour Authority 68-75 17. Marine Biological Research Laboratory, Karachi 76-77 18. Marine Fisheries Department 78-86 1 FOREWORD The Ministry of Ports & Shipping presents its Year Book for the period 2011-12 as a statement of the activities undertaken during the year. 2. I anticipate that this book will also serve as a reference and source material for the policy makers and the general public at large. (Dr. Muhammad Khawar Jameel) Secretary 2 INTRODUCTION The Ports of Pakistan provide a lifeline for country‘s economy. The importance of this sector of economy can well be realized by the fact that 97% of our trade takes place through sea and the national ports facilitate this trade.
    [Show full text]
  • Case Study on the Competitiveness Comparisons of Karachi Port With
    Case study on the Competitiveness Comparisons of Karachi Port with the Page 12 Neighbouring Emerging Ports in Received: 10 June 2020 Revised: 18 Aug 2020 Persian Gulf and Indian Ocean. Revised: 11 Sep 2020 Accepted: 24 Sep 2020 Raja Awais Liaqaita a Department of Mechanical Engineering, Capital University of Science & Technology, Islamabad, Pakistan; Email: [email protected] Mujtaba Hassan Aghab,*1, b NUST Business School (NBS), National University of Science and Technology, Islamabad, Pakistan; Email: [email protected] Till Beckerc cFaculty of Business StudiesUniversity of Applied Sciences Emden/Leer Emden, Germany; Email: [email protected] d Salman Sagheer Warsi d Department of Mechanical Engineering, Capital University of Science & Technology, Islamabad, Pakistan Abstract Purpose: This study evaluates competitiveness of emerging ports located in the Indian Ocean and the Persian Gulf. Traditionally, ports operational efficacy is evaluated only on basis of throughput, a case in point being the Lloyds International Port ranking. However, we do not concur with this approach and adopt a multi- criteria methodology. NBR Methodology: Three criteria - throughput, physical infrastructure, and performance are used to assess the operational efficacy of the ports. TOPSIS augmented with the NUST Business Review NBR- NBS20061001 “entropy weight” is used to devise weights for the chosen criteria and overall Vol. 02, No. 01 operational efficacy for each port is calculated. 10, 2020 pp. 12-42 Results: The study revealed that infrastructure plays a critical role in the overall © NUST Business School operational efficacy of the port. Karachi port is behind the contemporary ports in the Indian Ocean and the Persian Gulf because of its inadequate infrastructure.
    [Show full text]
  • The Karach Port Trust Act, 1886
    THE KARACH PORT TRUST ACT, 1886. BOMBAY ACT NO.VI OF 1886 (8th February, 1887) An Act to vest the Port of Karachi in a Trust Preamble, Whereas it is expedient to vest the Port of Karachi in a true and to provide for the management of the affairs of the said port by trustees; It is enacted as follows:- I – PRELIMINARY 1. Short Title – This Act may be called the Karachi Port Trust Act, 1886. 2. Definitions – In this Act, unless there be something repugnant in the subject or context:- (1) “Port” means the port of Karachi as defined for the purpose of this Act: (2) “high-water mark” means a line drawn through the highest points reached by ordinary spring-tides at any season of the year. (3) “low-water mark” means a line drawn through the lowest points reached by ordinary spring-tides at any season of the year. (4) “land” includes the bed of the sea below high-water mark, and also things attached to the earth or permanently fastened to anything attached to the earth; (5) “master” when used in relation to any vessel, means any person having for the time being the charge or control of such vessel; (6) the word “goods” includes wares and merchandise of every description; (7) “owner” when used in relation to goods includes any consignor, consignee, shipper, agent for shipping, clearing or removing such goods, or agent for the sale or custody of such goods; and when used in relation to any vessel includes any part-owner, charterer, consignee or mortgagee , in possession thereof.
    [Show full text]
  • Appendix 4-1 Desirable Plan for Station Plaza Proposed in SAPROF-I Desirable Plaza Plans at Each Station Are Shown in the Following Figures with Satellite Images
    APPENDIX 4-1 Desirable Plan for Station Plaza Proposed in SAPROF-I Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report Appendix 4-1 Desirable Plan for Station Plaza Proposed in SAPROF-I Desirable plaza plans at each station are shown in the following figures with satellite images. (1) Drigh Road Station Structure Station Plaza (2) Johar Source: SAPROF-I Figure 1 Desirable Station Plaza Plan (1/12) APP4-1-1 Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report (3) Alladin Park Station Structure Station Plaza (4) Nipa Source: SAPROF-I Figure 2 Desirable Station Plaza Plan (2/12) APP4-1-2 Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report (5) Gilani Station Structure Station Plaza (6) Yasinabad Source: SAPROF-I Figure 3 Desirable Station Plaza Plan (3/12) APP4-1-3 Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report (7) Liaquatabad Station Structure Station Plaza (8) North Nazimabad Source: SAPROF-I Figure 4 Desirable Station Plaza Plan (4/12) APP4-1-4 Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report (9) Orangi Station Structure Station Plaza (10) HBL Source: SAPROF-I Figure 5 Desirable Station Plaza Plan (5/12) APP4-1-5 Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report (11) Manghopir Station Structure Station Plaza (12) SITE Source: SAPROF-I Figure 6 Desirable Station Plaza Plan (6/12) APP4-1-6 Preparatory Survey (II) on Karachi Circular Railway Revival Project Final
    [Show full text]
  • China-Pakistan Economic Corridor
    U A Z T m B PEACEWA RKS u E JI Bulunkouxiang Dushanbe[ K [ D K IS ar IS TA TURKMENISTAN ya T N A N Tashkurgan CHINA Khunjerab - - ( ) Ind Gilgit us Sazin R. Raikot aikot l Kabul 1 tro Mansehra 972 Line of Con Herat PeshawarPeshawar Haripur Havelian ( ) Burhan IslamabadIslamabad Rawalpindi AFGHANISTAN ( Gujrat ) Dera Ismail Khan Lahore Kandahar Faisalabad Zhob Qila Saifullah Quetta Multan Dera Ghazi INDIA Khan PAKISTAN . Bahawalpur New Delhi s R du Dera In Surab Allahyar Basima Shahadadkot Shikarpur Existing highway IRAN Nag Rango Khuzdar THESukkur CHINA-PAKISTANOngoing highway project Priority highway project Panjgur ECONOMIC CORRIDORShort-term project Medium and long-term project BARRIERS ANDOther highway IMPACT Hyderabad Gwadar Sonmiani International boundary Bay . R Karachi s Provincial boundary u d n Arif Rafiq I e nal status of Jammu and Kashmir has not been agreed upon Arabian by India and Pakistan. Boundaries Sea and names shown on this map do 0 150 Miles not imply ocial endorsement or 0 200 Kilometers acceptance on the part of the United States Institute of Peace. , ABOUT THE REPORT This report clarifies what the China-Pakistan Economic Corridor actually is, identifies potential barriers to its implementation, and assesses its likely economic, socio- political, and strategic implications. Based on interviews with federal and provincial government officials in Pakistan, subject-matter experts, a diverse spectrum of civil society activists, politicians, and business community leaders, the report is supported by the Asia Center at the United States Institute of Peace (USIP). ABOUT THE AUTHOR Arif Rafiq is president of Vizier Consulting, LLC, a political risk analysis company specializing in the Middle East and South Asia.
    [Show full text]
  • 2059 PAKISTAN STUDIES 2059/02 Paper 2 (Environment of Pakistan), Maximum Raw Mark 75
    CAMBRIDGE INTERNATIONAL EXAMINATIONS Cambridge Ordinary Level MARK SCHEME for the May/June 2015 series 2059 PAKISTAN STUDIES 2059/02 Paper 2 (Environment of Pakistan), maximum raw mark 75 This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the details of the discussions that took place at an Examiners’ meeting before marking began, which would have considered the acceptability of alternative answers. Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for Teachers. Cambridge will not enter into discussions about these mark schemes. Cambridge is publishing the mark schemes for the May/June 2015 series for most ® Cambridge IGCSE , Cambridge International A and AS Level components and some Cambridge O Level components. ® IGCSE is the registered trademark of Cambridge International Examinations. Page 2 Mark Scheme Syllabus Paper Cambridge O Level – May/June 2015 2059 02 1 (a) (i) On the outline map of Pakistan Fig. 1 mark and shade two areas which experience low annual rainfall (125mm or less). [2] Any two separate regions within the overlay provided. Shaded areas may touch lines but not go outside lines. 1 mark for each accurately drawn and shaded region (ii) Name the crop which is mainly grown in these areas of low annual rainfall. [1] Dates (iii) Explain the difficulties for people living in areas of low rainfall. [3] Very little pasture/have nomadic lifestyle with livestock Very little arable area limited to oases/valley floors or where Karez underground irrigation/limited crops/shortage of food Few rivers/water has to be supplied from great distances/lack of water for irrigation/irrigation needed Lack of water for cleaning/hygiene/domestic use/drinking Lack of water for industries Problems associated with an arid climate, e.g.
    [Show full text]