China Railway Eryuan Engineering Group Co., Ltd. National Environmental Impact Assessment Certificate Jia No. 3210 May 2010 Public Disclosure Authorized Contents Chapter I General ...... 1 1.1 Background ...... 1 1.1.1 Project origin...... 1 1.1.2 Necessity of construction ...... 1 1.2 Basis for EA Report Preparation ...... 1 1.2.1 PRC Laws and Regulations...... 1 1.2.2 WB Requirements ...... 2 1.2.3 Industry systems of the State...... 2 1.2.4 Main technical Guides...... 3 1.2.5 Relevant technical documents ...... 3 1.3 EIA (Environmental Impact Assessment)Summary ...... 3 1.3.1 Environmental impact assessment category of the project...... 3 1.3.2 General information on preparation of environmental impact assessment reports of works...... 4 1.3.3 Main assessment scope...... 6 1.3.4 Assessment standards and environmental protection targets...... 6 Chapter II Project Description...... 14 2.1 Project location...... 14 2.2 Construction content, scale, investment and period ...... 14 2.3 Planning compatibility ...... 24 Chapter III Regional Environment Overview...... 24 3.1 Natural condition...... 24 3.1.1 Overview of natural condition of Province...... 24 3.1.2 Overview of natural condition of works...... 25 3.2 Socio-economic environment...... 33 3.2.1 Overview of social environment of Sichuan Province ...... 33 3.2.2 Overview of social environment of works ...... 34 3.3 Current environmental quality...... 43 3.3.1 Survey and assessment of current eco-environment quality...... 43 3.3.2 Survey and assessment of current water environment quality...... 44 3.3.3 Survey and assessment of current atmosphere environment quality ...... 47 3.3.4 Survey and assessment of current acoustic environment quality ...... 47 Chapter IV Environmental Management Plan ...... 47 4.1 Analysis of major pollutants...... 53 4.2 Analysis of major impacts and mitigation measures...... 54 4.2.1 Ecological environmental impact and mitigation measures ...... 54 4.2.2 Analysis and assessment of noise environmental impact...... 60 4.2.3 Analysis and assessment of water environmental impact...... 69 4.2.4 Atmospheric environmental impact analysis and assessment ...... 75 4.2.5 Environmental impact analysis and assessment of solid wastes...... 81 4.2.6 Social environmental impact analysis and assessment...... 84 Chapter V Public Consultation and Information Disclosure...... 88 5.1 Purpose of public consultation ...... 88 5.2 Approaches for public participation ...... 88 5.3 Summary of main opinions ...... 94 5.4 Information Disclosure...... 97 5.5 Responses on public opinions ...... 101 Chapter VI Environmental Management Plan ...... 103 6.1 Environmental management institutions ...... 103 6.1.1 Environmental management system and procedures...... 103 6.1.2 Environmental management institutions and the responsibility...... 103 6.1.2 Supervision institution...... 104 6.2 Environmental Management Plan ...... 107 6.3 Training Program...... 107 6.4 Mitigation measures operation ...... 114 6.4.1 Expenditure budget for mitigation measures...... 114 6.4.2 Mitigation measures operation ...... 123 6.5 Environmental monitoring plan...... 129 6.5.1 The Purpose of environmental monitoring...... 129 6.5.2 Environmental monitoring plan...... 129 Chapter VII Summary ...... 133

Chapter I General 1.1 Background 1.1.1 Project origin At present, the Grand Western Development Program and Urban and Rural Integrative Development Strategy, determined by the Central Government, are under full implementation in Sichuan Province, in which, as a key link, construction of small towns is of significant importance. However, current status in development of small towns in Sichuan is far from being satisfactory. In the nationwide selection for “One Thousand Powerful Towns” in 2006, the selected towns in the four provinces (municipalities) at Yangtze River Delta and , i.e. , , and , account for as high as 74.6%. Only four towns in Sichuan characterized by huge population were selected, which clearly shows the big gap. Therefore, promoting development of small towns, especially infrastructure construction, became an important measure to break through the existing pattern. Sichuan Small Towns Development Project (SSTDP) by WB Loans is the infrastructure construction project approved by the State Council and sponsored by WB Loans, and also the 4th urban construction and environmental protection project by WB loans implemented in Sichuan, which was listed in the “Plan of Candidate Projects for Utilization of WB Loans during 2008-2010” (FGWZ [2007] No. 2536) in Sep. 2007 and has been listed in the “Plan of WB Loans for Fiscal Years of 2009-2011” (CGJ [2008] No. 111) by now. In accordance with the Several Suggestions on Promoting Healthy Development of Small Towns and relevant spirits of the National Development and Reform Committee, the people’s governments at all the districts and counties strive to improve living conditions for the residents and promote development of regional economy, under the subject of scientific development and by means of speeding up construction of the key small towns. Sichuan Provincial Development and Reform Committee approved, in succession, all the subprojects under SSTDP by WB Loans, in August 2009. The client of each subproject entrusted the organization qualified for environmental impact assessment to perform environmental impact assessment according to the Law of the People’s Republic of on Environmental Impact Assessment and Regulations on the Administration of Construction Project Environmental Protection, and the environmental impact assessment reports of all the subprojects have already been completed now. 1.1.2 Necessity of construction All the subprojects under SSTDP belong to municipal works in cities and towns, which include road construction, (environmental) waterway treatment, wastewater interception pipe network and construction of wastewater treatment plant. Implementation of the works contributes to local social and economic development and accelerating urban and rural integrative construction under overall planning, and is very necessary to improve regional ecological environment, to prevent flood and intercept wastewater, as well as to upgrade living quality. 1.2 Basis for EA report preparation 1.2.1 PRC laws and regulations 1. Environmental Protection Law of the People’s Republic of China 2. Law of the People’s Republic of China on the Prevention and Control of Atmospheric Pollution 3. Law of the People's Republic of China on Prevention and Control of Water Pollution

1 4. Law of the People’s Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste 5. Law of the People’s Republic of China on Prevention and Control of Pollution from Environmental Noise 6. Law of the Peoples Republic of China on Water and Soil Conservation 7. Urban and Rural Planning Law of the People’s Republic of China 8. Highway Law of the People’s Republic of China 9. Law of the People’s Republic of China on Promotion of Cleaner Production 10. Law of the People's Republic of China on Environmental Impact Assessment 11. Regulations on the Protection of Basic Farmland 12. Regulations on the Administration of Construction Project Environmental Protection (Decree [1998] No. 253 of the State Council of the People’s Republic of China) 13. EIA Classification Management Regulation of Construction Project (Decree [2008] No. 2 of the Ministry of Environmental Protection) 14. Notice on Enhancing Management on Environmental Impact Assessment for Construction Projects by Loans from International Financial Organizations (HJ [1993] No. 324 of State Environmental Protection Administration) 1.2.2 WB requirements WB requirements include 10 basic safeguard policies, among which the policy on environmental assessment (OP4. 01) is the basic requirements and also one of the main basis for preparation of environmental impact assessment reports. The proposed project neither involves international waterways (OP7.50), nor stands at the disputed area defined in OP7.60, so these two policies shall not be applied in the assessment. Other policies will be reflected in the assessment on the basis of survey analysis and screening. WB safeguard policies Correlation Non-correlation OP 4.01 Environmental Assessment All subprojects undergo EIA works. OP 4.04 Natural Habitats OP 4.09 Pest Management OP 4.36 Forestry OP 4.37 Safety of Dams Only Environmental Treatment Subproject of OP 4.11 Cultural Property (Hongchuan Town) covers Zhoujiaci provincial heritage conservation unit. It covers land requisition and OP 4.12 Involuntary Resettlement demolition. OP 4.20 Ethnic Minorities OP 7.50 Projects on International Waterways OP 7.60 Projects in Disputed Areas 1.2.3 National and industrial systems 1. Technical Standard of Highway Engineering (JTG B012003) 2. Code for Design of Municipal Road (CJJ 37-1990) 3. Codes for Design on Accessibility of Urban Roads and Buildings (JGJ 50-2001) 4. Code for Planting Planning and Design on Urban Road (CJJ 75-97) 5. Code of Urban Engineering Pipeline Comprehensive Planning (GB 50289-98)

2 6. Measures for the Administration of Environmental Protection of Transport Construction Projects (Order No. 5 of the Ministry of Transport in 2003) 7. Notice on Enforcement of Relevant Policies and Measures about the Several Suggestions of the CPC Central Committee and State Council on Advancing Construction of New Socialist Countryside (GBH [2006] No. 13), issued by General Office of the State Council 1.2.4 Main technical guides Notice on the Problems Related to Ambient Noise in Environmental Impact Assessment of the Construction Projects of Highways and Railways (Including light rail) (HF [2003] No. 94) Technical Specifications to Determinate the Suitable Areas for Environmental Noise of Urban Area (GB/T 15190 94) Technical Guidelines for Environmental Impact Assessment (HJ/T 2.12.3) Technical Guidelines for Environmental Impact Assessment - Atmospheric Environment (HJ/T2.2-2008) Technical Guidelines for Environmental Impact Assessment - Acoustic Environment (HJ 2.42009) Technical Guidelines for Environmental Impact Assessment - Non-polluted Ecological Impact (HJ/T 191997) Technical Criterion for Eco-environmental Status Assessment (trail implementation) (HJ/T1922006) 1.2.5 Relevant technical documents Feasibility study report of each subproject; Social impact report of each subproject; China Sichuan Small Towns Development Project (P110632) Identification Mission: April 20-22, 2009 and May 12-15, 2009 Aide-Memoire No. 1 Final; China Sichuan Small Towns Development Project (P110632) Pre-Appraisal Mission: March 1-8, 2010 Aide-Memoire No. 2 Draft. 1.3 EIA (Environmental Impact Assessment) summary 1.3.1 Environmental impact assessment category of the Project The proposed project is mainly aimed at improving infrastructure and managing environment in the districts, counties and townships and towns under the jurisdiction of Sichuan Province, and laying the foundation for developing economy at poverty-stricken areas, improving living quality of the residents and reducing gaps between urban and rural areas. As the proposed project is located dispersedly and needs investment in small amount, and moreover it is known according to field survey carried out by the WB experts in environmental impact assessment, project group of Sichuan Provincial Project Management Office (PPMO) and EIA consultants of each subproject that there’s no environment sensitive area, like ecologically sensitive or fragile area, areas to be particularly protected and area of social interest within the project-affected area, the environmental impact assessment experts of PPMO and environmental impact assessment experts of World Bank Safeguard Mission suggested to classify the proposed project as the Category B project of WB in terms of environmental screening, which was already confirmed by WB.

3 1.3.2 Overview of preparation for environmental impact assessment reports of subprojects Preparation of the environmental impact assessment documents of each subproject shall satisfy not only the requirements on environmental impact assessment examination and approval in China, but also the requirements of the safeguard policies of WB. According to the suggestions of the environmental assessment experts of World Bank Safeguard Mission, the PPMO already organized training to the EIA consultants, design institutes and consultants engaged in the project by WB loans, so that they can learn WB policies and requirements, take all the WB safeguard policies that may be involved in the project into comprehensive consideration and reflect them in the environmental impact assessment documents. All the organizations undertaking and participating in environmental impact assessment of all the subprojects of SSTDP have the qualification certificate of environmental impact assessment issued by the Ministry of Environmental Protection of China and researchers and engineers in varied disciplines, such as sociology, human geography, ecology, environmental engineering and traffic engineering; some EIA consultants undertook environmental impact assessment for the WB loaned railway projects, metro projects and infrastructure projects in post-disaster reconstruction in cities and towns in recent years. There are totally 8 environmental impact assessment documents for all the subprojects of SSTDP, among which 6 are environmental impact assessment reports and 2 are environmental impact assessment tables, and all shall be examined for approval by the Environmental Protection Department of Sichuan Province according to the requirements on classification management of environmental impact assessment in China. Refer to Table 1.3-1 for general information on all the subprojects of SSTDP and the environmental impact assessment documents. Table 1.3-1 General information on all subprojects of SSTDP and relevant environmental impact assessment documents Type of Name of Construction environmental Power of districts Description of Preparation S/N investment impact examination (counties) and subprojects organization (million ) assessment and approval subprojects documents Construction of 15 municipal roads in the new area of the town, upgrading and reconstruction of ABCD School of Environment Environmental Subproject of pipeline at the old area of Science and Protection 1 Puxing Town, the town, environmental 333.32 Report Engineering, Department of Xinjin County Treatment (including No. Southwest Jiaotong Sichuan 1 branch canal, No. 2 University Province branch canal, Mushan Lake) and one 3500t wastewater treatment plant Rainwater and Wastewater Reconstruction of roads Environmental Pipe Network and rainwater and China Railway Eryuan Protection & Road wastewater pipelines, 2 110.503 Report Engineering Group Department of Reconstruction reconstruction of pipe Co., Ltd. Sichuan Subproject of network to septic-tank of Province Daying the urban area County

4 Type of Name of Construction environmental Power of districts Description of Preparation S/N investment impact examination (counties) and subprojects organization (million ) assessment and approval subprojects documents (Penglai Town) Chief compiler: School Infrastructure of Environment Comprehensive Construction Science and improvement of Environmental Subproject of Engineering, waterways, interceptor Protection Yingxi Town, Southwest Jiaotong 3 sewer at the two 102.019 Report Department of Shunqing University riverbanks, construction Sichuan , Co-compiler: China of roads and supporting Province Huaxi Engineering facilities City Design & Construction Co., Ltd. Binjiang Road (Southern Binjiang Road of Section) Road 2.18km, rainwater and and School of Environment Environmental wastewater pipeline and Wastewater Science and Protection covered channel of 4 Interception 92.7415 Report Engineering, Department of 5.271km, crown Subproject of Southwest Jiaotong Sichuan emergency access of Fengming University Province 2.178m and road slope Town, protection of 46693m2 Pengshan County Construction of main waterway of about 4.4km and dredging moat waterway of about Environmental 4.8km; construction of Treatment walkway at the two sides Environmental Subproject of of channel revetment of China Railway Eryuan Protection 5 Hongya about 8.8km; 104.8166 Table Engineering Group Department of County construction of greenbelt Co., Ltd. Sichuan (Hongchuan at the two sides of Province Town) channel revetment of about 8.8km; wastewater main along the two sides of waterway of about 18.76km Dredging reconstruction of the existing waterway, construction of branch Waterway waterways, construction Treatment School of Environment Environmental of walkways and Project of Science and Protection greenbelts at the two 6 Xiaoshanzi River 70.4017 Table Engineering, Department of (Downtown river banks, construction Southwest Jiaotong Sichuan Section) in of small bridges over the University Province , river, drainage work, Nanchong City construction of intercepting pipeline of 7210m totally Northern The northern outer ring Environmental Outer Ring road, with the designed China Railway Eryuan Protection 7 Road length of 3290m and 101.2414 Report Engineering Group Department of Construction planned width of Co., Ltd. Sichuan Subproject of boundary limits of 40m, Province

5 Type of Name of Construction environmental Power of districts Description of Preparation S/N investment impact examination (counties) and subprojects organization (million ) assessment and approval subprojects documents Zhonglong is equipped with one Town, water, rainwater and Zizhong wastewater pipeline County respectively and is provided with road lamps, landscape, traffic works and other municipal pipelines along the whole line. Infrastructure Environmental Construction Municipal road work, China Railway Eryuan Protection Subproject of flood control dam work 8 107.4654 Report Engineering Group Department of and the supporting pipe Co., Ltd. Sichuan (Panlian network Province Town) The comprehensive summary of the environmental impact assessment report on SSTDP was prepared on the basis of the above environmental impact assessment reports of subprojects. 1.3.3 Main scope of assessment Refer to Table 1.3-2 for the environmental impact assessment scope of each subproject. Table 1.3-2 Assessment scope Assessment Assessment scope content The directly affected area and surrounding area of works, generally including the Social area within 200m at the two sides along roads and the whole town where the environment works is located The area within 300m at the two sides along the centre line of the line, the area Eco- within 300m at the two sides along the centre line of river bank, the directly environment affected area and the area within 500m around plant area, and river reaches involved by the works Acoustic The area within 200m at the two sides along the centre line of roads and the area environment of 100m around plant area The area within 200m at the two sides along the centre line of roads; the area of 200m at the two sides along the line, and the area within 500m outside of the Ambient air boundary of wastewater treatment plants, which shall be extended to 1000m in the downwind direction Rivers within the area within 200m at the two sides along the center of roads; the Surface water area of 500m upstream or 1000m downstream of the bridge location for river- environment crossing sections; the river reach of 500m upstream of the drain outlet of wastewater treatment plants to 10km downstream of Yangliu River 1.3.4 Assessment standards and environmental protection targets 1. Assessment standards The assessment standards of each subproject were determined according to the requirements on environmental impact assessment standards of the environmental protection bureau (city level) at the location of works (refer to annex A for details). 2. Pollution control targets and environmental protection targets (1) Pollution control targets

6 According to field survey and survey on current status of social and ecological environment along or around each proposed subproject of SSTDP carried out by the EIA consultant of each subproject, only the Environmental Treatment Subproject of Hongya County (Hongchuan Town) involve the historical and cultural sites under government protection at the provincial level, which are located within construction control area of Zhoujiaci (refer to the Annex B), and other works involve no natural reserve, wild animals and plants under government protection, scenic spots and historical sites, or historical and cultural sites under government protection within the assessment scope. The environmental protection targets were determined as follows, according to nature and surrounding environmental features of each subproject: 1) Impact of noise, exhaust gas and dust generated during construction period on the environmental sensitive points, like residential quarters, schools, hospitals, water sources shall be alleviated as much as possible; engineering measures and environmental protective measures shall be taken to relieve impact of water and soil erosion, and vegetation deterioration during construction period on ecological environment and surface water and underground water. 2) After implementation of the works, quality of the surface water environment and air environment shall be improved; quality of acoustic environment shall mot be worse obviously than current status. 3) Adverse impact on natural and social resources at the location of the works shall be avoided and reduced. 4) Vegetation affected during construction shall be recovered, soil and water conservation level shall be improved and regional ecological system shall be kept intact. (2) Environmental sensitive protection targets The environmental sensitive protection targets under SSTDP were determined as follows, according to analysis on the results of field survey and current status monitoring (refer to Table 1.3-3). Table 1.3-3 List of environmental sensitive protection targets Environmental Works of District and General Description Position Sensitive Point Impact Factor County of Sensitive Point Relationship No. Name Puxing Primary 1 Air and noise 8 classes, 350 people Line B, 30m School Hospital of 2 Air and noise 30 beds Line B, 20m Puxing Town Residential houses of Subproject of Puxing 3 Puxing Town Air and noise 2-2-storey masonry- Line B.10-30m Town, Xinjin County concrete structure Water body Water received by 4 Yangliu River environment and Water body of III type wastewater ecology treatment plant

7 Environmental Works of District and General Description Position Sensitive Point Impact Factor County of Sensitive Point Relationship No. Name 7-storey houses of masonry-concrete Rainwater and structure after 2000, Wastewater Pipe Network Longsheng South side of mainly used as & Road Reconstruction 1 Resettlement Air and noise mid Qijiang resettlement. There are Subproject of Daying Community Road, 2m 2-5-storey commercial County (Penglai Town) and residential buildings around. School’s occupation is about 280 sq, and the area of structure is more than 100,000 of Right side of mid Middle school of 2 Air and noise sq with 119 classes, Qijiang Road, Daying County more than 400 teaching 156m and administrative staff and more than 8000 students 7-storey building, 13 Right side of east 3 Boji Hospital Air and noise doctors and 35 Qijiang Road, sickbeds 2m Established in 1938, Penglai School West side of now there are 157 4 of Daying Air and noise Shuyuan street, teachers and 2,587 County 80m students 7-storey houses of masonry-concrete structure after 2000, Splendid Penglai East side of the houses next to the 5 Residential Air and noise Shuyuan street, street are commercial Community 5m and residential, and there are about 400 resident families Established in September 2003, it is a general hospital which incorporated medical End of west side Daying Union treatment, precautions, 6 Air and noise of Nanhua street, Hospital health care and 2m rehabilitation. Now there are 56 medical personnel and more than 80 sickbeds Interchange of Established in 1906, 3- Qilin street and Daying Middle 4-storey building, now Jiaotong street, 7 School, Penglai Air and noise there are 205 teachers north side of Campus and 4,150 students Jiaotong street, 136m 6-7-storey houses of masonry-concrete Residential structure after 2000, Both sides of 8 Community of Air and noise the houses next to the Qilin street, 5m Qilin Street street are commercial and residential.

8 Environmental Works of District and General Description Position Sensitive Point Impact Factor County of Sensitive Point Relationship No. Name 3-7–storey houses of Residential masonry-concrete Both sides of houses on both structure after 2000, 9 Air and noise Keguan street, sides of Keguan the houses next to the 2m Street street are commercial and residential. 3-5-storey houses of Residential masonry-concrete Both sides of houses on both structure after 2000, 10 Air and noise lower Jiaotong sides of Lower the houses next to the street, 2m Jiaotong Street street are commercial and residential. 2-5-storey houses of Residential masonry-concrete Both sides of houses on both structure after 2000, 11 Air and noise Luogui street, sides of Luogui the houses next to the 6m Road street are commercial and residential. Parallel to Water Qijiang mid road Surface water, waters 12 Qijiang environment and and Qijiang east of III type ecology road, the closest distance is 5m Flow into Qijiang from south to north, Water Surface water, waters Hongqi bridge 13 Gubo Brook environment and of III type which is under ecology construction crosses this brook Infrastructure Residents in the Residents of Construction Subproject 1 Air and noise area of right side Yingxi Town of Yingxi Town, of Yingxi river , Scattered Residents of Nanchong City residents in the 2 Yingxi Town Air and noise area of left side (being relocated) of Yingxi river West side of No. 1 Primary Yingxi river, and 3 School of Yingxi Air and noise teaching area’s Town distance to river is about 100m Residents of Residents along 4 Air and noise Yingxi Town Naoxi river South side of Vocational Naoxi river, and 5 Middle School of Air and noise teaching area’s Yingxi Town distance to river is about 110m West side of Government of 6 Air and noise Naoxi river, Yingxi Town 300m

9 Environmental Works of District and General Description Position Sensitive Point Impact Factor County of Sensitive Point Relationship No. Name Residents within Residents of 200m area along 7 Air and noise Yingxi Town right side of Yingxi river West side of No. 1 Primary Yingxi river, and 8 School of Yingxi Air and noise teaching area’s Town distance to river is about 200m Residents within Residents of 9 Air and noise 200m area along Yingxi Town Naoxi river Southwest side of Naoxi river, Vocational and teaching 10 Middle School of Air and noise area’s distance to Yingxi Town river is about 110m West side of Government of 11 Air Naoxi river, Yingxi Town 300m Water Waterway 12 Yingxi River environment and Water body of III type treatment ecology Water Waterway 13 Naoxi River environment and Water body of III type treatment ecology Concentrated K0+140 - distribution, 6-storey of Apartment K0+200, right of 1 Air and noise masonry-concrete houses at ends road 12m, structure, 36 resident broadside on family Pengshan 5-storey of masonry- K0+480, right of 2 Vocational High Air and noise concrete structure, 600 road 64m, direct School teachers and students on Binjiang Road (Southern Concentrated Section) Road and Tongjiangli distribution, 2-3-storey K0+980, right of Wastewater Interception 3 Residential Air and noise of masonry-concrete road 80m, Subproject of Fengming Community structure, 20 resident broadside on Town, Pengshan County family Concentrated K1+880 - Farmhouses at distribution, brick K2+080, right of 4 Air and noise ends houses, 10 resident road 25m, direct family on Water Planned roads 5 Minjiang River environment and Water body of III type along Minjiang ecology River Disease Environmental Prevention and 5-storey nursing home, Reconstruction Subproject Right side of 1 Control Center Air and noise 80 sickbeds, about 100 of Hongya County river, 52m of Hongya doctors (Hongchuan Town) County People’s 5-storey nursing home, Left side of river, 2 Hospital of Air and noise 200 sickbeds, about 37m Hongya County 200 doctors

10 Environmental Works of District and General Description Position Sensitive Point Impact Factor County of Sensitive Point Relationship No. Name 5-storeyteaching Hongya Middle building and 6-storey Left side of river, 3 Air and noise School dorm, about 2000 47m students, 198 teachers 4-storey teaching Zhongbao High building and 2-storey School of Left side of river, 4 Air and noise dorm, about 600 Hongya County, 29m students which all live Central Campus in dorm, 250 teachers One 4-storey and one Hongchuan No. 3-storey teaching 2 Primary School Left side of river, 5 Air and noise building, about 500 of Hongya 100m students and about 150 County teachers 5-storey teaching Hongya building and 3-storey Left side of river, 6 Vocational High Air and noise dorm, about 1300 48m School students, about 150 teachers Residential 1-6-storey building, 15 to 200m along 7 houses along Air and noise mainly established in both sides of northern moat 1990s river Residential 1-6-storey building, 15 to 200m along 8 houses along Air and noise mainly established in both sides of southern moat 1990s river Zhoujiaci belongs to the seventh batch of provincial heritage conservation units of Sichuan Province. Existing Zhoujiaci was established at the first year of Tongzhi Reign Located in 10 Zhoujiaci Historical relic of , and it Zhoujiaci’s is a duplex quadrangle construction area courtyard composed of three main structures, namely antechamber, main hall (Guangyu Hall) and back hall, with bilateral wing- rooms. The water resource for waterway treatment is from 11 Qingyi River Surface water Water body of III type Qingyi River, and the downstream flows into Qingyi River South side of Waterway Treatment Baimamiao About 100 resident 1 Air and noise Dushan bay Project (City Section) of Village family, 350 people branch, 60m Xiaoshanzi river, Jialing

11 Environmental Works of District and General Description Position Sensitive Point Impact Factor County of Sensitive Point Relationship No. Name Xiaoshanzi river, Jialing Jialing No. 1 North side of 1000 teachers and district, Nanchong city 2 Middle School Air and noise Dushan bay students (New Campus) branch, 20m River flow Spark Computer 500 teachers and 3 Air and noise through buried Hope Primary students culvert, next to it Jialing No. 1 2000 teachers and South of pipe, 4 Middle School Air and noise students 100m (Old Campus) Nanhong River flow About 200 resident 5 Residential Air and noise through buried family, 650 people Community culvert Duweiba River flow About 150 resident 6 Residential Air and noise through buried family, 500 people Community culvert Water Waterway 7 Xiaoshanzi River environment and Water body of III type Treatment ecology Water South side of 8 Nixi River environment and Water body of III type project area, ecology receives water 1-3-storey farmer (AK0 - 1 Qing’s Court Air and noise house, mainly AK0+200) established in 1990s both sides, 97m (AK0 - 1-3-storey farmer AK0+780 2 Zhou’s Court Air and noise house, mainly AK1+040 - Northern Outer Ring Road established in 1990s AK1+440) Construction Works of both sides, 35m Zhonglong town, Zizhong (AK2 - county 1-3-storey farmer AK2 3 Zhangjiabian Air and noise house, mainly AK2 - established in 1990s AK2 both sides, 20m 1-3–storey farmer (AK2+820 - 4 Xiaoyuanzi Air and noise house, mainly AK2 established in 1990s both sides, 20m About 220 resident family, mainly 1-7 storeys of masonry- Infrastructure Water concrete structure, (GJLK0+000 - Construction Subproject 1 Hexi Community environment and building of III type, GJLK0+300) of Miyi County (Panlian ecology most of them are used both sides, 20m Town) by company or as resident house, established in 1990s About 45 resident family, mainly 1-3 storeys of masonry- concrete structure, (GJLK0+300 - Commune 2 of building of III type, 2 Air and noise GJLK0+600) Shuitang Village mainly established in both sides, 20m 1990s. Xipan highway is located at the west side of the planned road, 55m to 110m

12 Environmental Works of District and General Description Position Sensitive Point Impact Factor County of Sensitive Point Relationship No. Name 19 resident family, mainly 1-3 storeys of masonry-concrete structure, building of III type, mainly established in 1990s. (GJLK0+580 - This sensitive point is GJLK0+780 and Commune 3, 3 Air and noise located at the DQJGDK0+00 - Shuitang Village interchange of planned DQJGDK0+200 west ring road and left sides, 20m Beiqiao road. Xipan highway is located at the west side of the planned west ring road, 40m About 90 resident family, mainly 1-3 storeys of masonry- concrete structure, (DBLK0+880 - Group 8, Qingpi building of III type, 4 Air and noise DBLK1+000) Village mainly established in both sides, 16m 1990s. Provincial road 214 is located at the east side of planned Shuidian road, 80m About 48 resident family, mainly 1-7 storeys of masonry- concrete structure, (QYGD0+000 - Group 8, Qingpi 5 Air and noise building of III type, QYGD0+220) Village mainly used by left sides, 20m company or as resident house, and mainly established in 1990s. Surface water, water area of III type, Flow from north Water protection area for to south, direct 6 environment and average fish, has through project ecology functions as scenic construction area spots, irrigation and power generation The above environmental protection purposes can be divided into ecological sensitive area, surface water body river and habitants residence. The ecological sensitive area only covers Zhoujiaci provincial heritage conservation unit. Waterway works of Environmental Treatment Subproject of Hongya County (Hongchuan Town) cross the construction control zone of Zhoujiaci and they are not located in protection scope of cultural property. Since their construction has little impact upon Zhoujiaci, relic protection authorities have issued a letter on approval of the project crossing the construction control zone of Zhoujiaci. All surface water bodies of the Project belong to Yangtze River valley and they are located at different branches. SSTDP mostly covers such projects as municipal roads and environmental treatment and its main impacts upon water environment are disturbances to surface water body during construction period, which are short-term impacts controllable in local area. It has no impact during

13 operation period. In addition, environmental treatment project can intercept wastewater and reduce drainage which is favorable for improvement of water quality. As for impacts upon residential environment of habitants, interferences to habitants near the site with construction degrading air quality and producing noises during construction period are short-term impacts controllable in local area. Traffic noises may impact habitants at both sides of the road during operation period of the road project. Chapter II Project Description 2.1 Project location The distribution diagram of each subproject under SSTDP shall be as follows. Table 2.1-1 Geological location distribution of each subproject under SSTDP S/N District & county and name of subproject Location Puxing Town, Xinjin County, 1 Subproject of Puxing Town, Xinjin County City Rainwater and Wastewater Pipe Network & Road Reconstruction 2 Penglai Town, Daying County Subproject in Daying County (Penglai Town) Infrastructure Construction Subproject of Yingxi Town, Shunqing Yingxi Town, Shunqing District, 3 District, Nanchong City Nanchong City Binjiang Road (Southern Section) Road and Wastewater Fengming Town, Pengshan 4 Interception Subproject of Fengming Town, Pengshan County County Environmental Treatment Subproject of Hongya County Hongchuan Town, Hongya 5 (Hongchuan Town) County Waterway Treatment Project of Xiaoshanzi River (Downtown 6 Jialing District, Nanchong City Section) in Jialing District, Nanchong City Northern Outer Ring Road Construction Subproject of Zhonglong Zhonglong Town, Zizhong 7 Town, County Infrastructure Construction Subproject of Miyi County (Panlian 8 Panlian Town, Miyi County Town) 2.2 Construction content, scale, investment and period See Table 2.2-1 for the construction content, scale, investment and period of each subproject under SSTDP.

14 Table 2.2-1 Summary of construction content, scale, investment and period of each subproject Total Environmental Construction investment Construction S/N Project name Major project and scale investment content (million period (million ) yuan) (1) Road and water supply & drainage pipeline project in new town: Construct 15 roads (overall length 10102.7m) at the width of 12-30m, along with auxiliary projects including the major municipal pipe network project, road lighting project, traffic project, etc.; Upgrading and construct 10010m of water pipeline, 9695m of environmental wastewater pipeline, 10017m of rainwater pipeline and governance of 15 ancillary facilities. The project municipal roads in Main project (2) Supply & drainage pipeline reconstruction project in shall be new town and old town: Construct 1100m of water pipeline, 990m of constructed Subproject of ABCD pipelines in wastewater pipeline and 1141m of rainwater pipeline. from June of 1 Puxing Town, old town (including 333.32 8.72 (3) Wastewater treatment plant project: Construct one 2010 to June Xinjin County branch canal 1, wastewater treatment plant, covering an area of 7.45mu, of 2012, with branch canal 2 and 3 with daily treatment capacity of 3500m . the period of Mushan Lake), and (4) Trunk and branch canal (city section) treatment project 2 years one wastewater in Muma Mountain: The overall length if 4540m. treatment plant Roadway lighting and traffic control system. (3500t/d) Aided project Road, power supply facility, water supply facility and warehouse within the wastewater treatment plant. Power shall be supplied by municipal power system; water Ancillary facility shall be supplied by the existing water plant in Xinjin County.

15 Total Environmental Construction investment Construction S/N Project name Major project and scale investment content (million period (million yuan) yuan) 1. Luogui Road, with the length of 3402.350m and the width of 25m; 2. Build Gubo Brook Binjiang Road, with the length of 1301.984m and the width of 15m; 3. Qijiang Middle Road, with the length of 913.453m and the width of 28m; 4. Qijiang East Road, with the length of 1216.070m and the width of 15m; 5. Shuyuan Street, with the length of 303.260m and the Road project width of 12m; 6. Nanhua Street, with the length of 334.7340m and the Road & width of 12m; rainwater 7. Qilin Street, with the length of 367.110m and the width Rainwater and and of 12m; Wastewater Road & rainwater wastewater 8. Keguan Street, with the length of 426.213m and the Pipe Network and wastewater pipeline width of 25m; & Road pipeline renovation From July of renovation 9. Jiaotong Lower Street, with the length of 649.830m and Reconstruction project, septic tank 2010 to 2 project the width of 25m; 110.503 89 Subproject of connection pipe December of 1. Luogui Road, with the length of rainwater pipeline of Daying network renovation 2011 5000m (including the branch pipeline) and the with County project length of wastewater pipeline of 5000m (including the (Penglai branch pipeline); Town) 2. Construct the Gubo Brook Binjiang Road, with the Pipe network length of rainwater pipeline of 1500m (including the project branch pipeline) and the wastewater pipeline of 1500m (including the branch pipeline); 3. Other roads, with the rainwater and wastewater pipe network laid along two sides; long roads shall be identical with the renovated section. The septic tank connection pipe network renovation will employ the plastic pipe (D400mm) as connection pipe to Septic tank connection prevent the domestic wastewater from entering the septic pipe network renovation tank but lead it directly to the municipal wastewater pipe; project there are 489 septic tanks in the town, and thus, calculated by 8m per septic tank, 3992m of pipe will be needed.

16 Total Environmental Construction investment Construction S/N Project name Major project and scale investment content (million period (million yuan) yuan) Infrastructure Integrated waterway This waterway dredging covers 2.75km of section along The project Construction treatment, Waterway Yingxi River, commencing from Huangshiyan Bridge of plans to 3 Subproject of wastewater dredging Yingxin Highway till Huanxi Bridge. The average depth of 102.019 6.00 commence in Yingxi Town, interception pipe project dredging is 0.6m and total volume of dredging is about January of Shunqing along two banks, 45360m3. 2010 and District, construction of road The treatment of 2.75km of section along Yingxi River, expects to Nanchong and auxiliary facility commencing from Huangshiyan Bridge of Yingxin Highway complete in City till Huanxi Bridge, will employ 5.37km of composite December of ecological embankment (including 2.684km of left 2010, with Integrated embankment and 2.686km of right embankment), that is, the total period waterway annual flood level below will be C15 concrete foundation of 12 months treatment Composite and retaining wall (50,100m3), the upper of which will project ecological employ clay rock residues for the homogeneous-sloped slope embankment that will adopt the eco-bags; employ C15 fine protection stone concrete for capping (576m3); the eco-protection and project landscape greening will cover an area of 58300m2; and meanwhile, M10 mortar stone river step ladder shall be set every 300m or so of the embankment project. The total earthwork of the project will be 445,000 m3, the fill volume will be 258,400 m3 and the discard volume will be 186,600 m3. The embankment line renovation and road system planning along Yingxi waterway will commence from the end of Huangshiyan Bridge, which is in level crossing with the existing Yingxin Road, till the north (95m) of the original Road Huanxi Bridge in Lianghekou Village of Yingxi Town, Line project project which is in level crossing with the planned vertical trunk, with the overall length of about 2.7km, the width of 24m, the design speed of 30km/h, the highway grade of urban secondary trunk III grade, the permanently occupied land of 94m and the demolition area of 2614.1m2.

17 Total Environmental Construction investment Construction S/N Project name Major project and scale investment content (million period (million yuan) yuan) The width will be 24m, the section layout will be: 5m of sidewalk + 7m of driveway + 7m of driveway + 5m of sidewalk = 24m, the roadbed earthwork excavation will be 6440m3, the roadbed fill will be 325240m3, and the borrowed fill volume will be 318800m3; the pavement will Roadbed and employ 10cm of asphalt concrete, covering an area of pavement 36624m2, the roadbed will employ 35cm of natural sand and project gravel bottom and 20cm of 5% cement-stabilized macadam base pipeline project laid under the right of sidewalk along the road. (1) Rainwater pipeline: D450-900, C30 socket-type reinforced concrete pipe, 2608m; (2) wastewater pipeline: D300-800, C30 socket-type reinforced concrete pipe, 2608m; Lighting The whole line will be equipped with 175 sets of double- facility armed road lamps Traffic 523m2 pavement marking and 15 marks and signs (single- safety cantilever aluminum marks) facility Road 5232 square meters of greening area and 665 greening trees greening Lay the interception pipe (with the overall length of about 4.322km) along two banks, wherein, the interception pipe laid on the left bank commences from Huangshiyan Bridge of Yingxin Road, crossing Binjiang Road along the left bank, till Huanxi Bridge, with the length of 2.608km; the interception pipe laid on the right bank commences from Interception pipe project Lailong Bridge of Yingxi Town, crossing the embankment along the right bank, till the wastewater treatment plant, with the length of about 1.714km; the interception pipe on the left bank will meet the interception pipe on the right bank through the inverted siphon; employ C30 socket-type reinforced concrete pipe with the diameter of D300-800; the construction of interception pipe will include the pipe laying, inspection well, inverted siphon, etc.

18 Total Environmental Construction investment Construction S/N Project name Major project and scale investment content (million period (million yuan) yuan) The road fill volume will be 6440m3, the roadbed fill will be 325240m3, the borrowed fill volume will be 318800m3, which will be supplied by the discard generated by the ground leveling in Yingxi education park and the discard generated by the waterway treatment and interception pipe project; The excavation volume of interception pipe project will be Excavation and fill 12966m3, the fill will be 10373m3 and the discard will be 2593, used for roadbed fill of this project; The total volume of waterway dredging will be about 45360m3, used for embankment greening; The total earthwork of composite ecological slope protection project will be 445,000 m3, the fill volume will be 258,400 m3 and the discard volume will be 186,600 m3. Employ asphalt concrete pavement; it is recommended that the part of the southern section of Binjiang Road from Binjiang Suojiang Road to the square will be considered by the width Road project of 16m and the remained by the width of 20m, with the Binjiang Road overall length of 2180.964m. (Southern 2.18km of Binjiang The wastewater project will be 3.1km, the diameter of Drainage Section) Road Road, 5.271km of pipeline will be D800 and the overall length of rainwater Commence in Main project and rainwater/wastewater project will be 2.18km. January of project Wastewater and covered drain, Slope The slope protection project will be about 46693 square 2011, 4 Interception 2.178m of protection meters, including 11673.25 square meters for protection and 92.742 1.924 complete by Subproject of embankment project 35019.75 square meters for greening landscape. the end of Fengming emergency access Embankment December of Town, project and 46693m2 emergency The width of road will be 5 - 7m and the length will be 2011 Pengshan of slope protection access 2178m. County project One construction workshop; the site access for construction Aided Construction will make use of the existing road; the construction camp project workshop will rent houses along the line; and the temporary topsoil dump occupancy will be included in the roadbed occupancy.

19 Total Environmental Construction investment Construction S/N Project name Major project and scale investment content (million period (million yuan) yuan) Construction of Length of about 4.4km of trunk Drainage drainage 18750m waterway, about project pipe Complete the Environmental 4.8km of waterway Earthwork Temporary pilling and backfilling waterway Treatment for dredging; about Length of project, Subproject of 8.8km of sidewalks 4401m waterway drainage 5 Hongya along two banks; 2 104.817 0.253 Sidewalk 8802m project from County about 8.8km of 3 Waterway The excavation will be 101,200m July in 2010 (Hongchuan greening belt along Earthwork 3 project The fill will be 13,200m to December Town) two banks; and about in 2011. 18.76km of Dredging 78857m3 wastewater pipeline volume along two banks. Construct 7210m of wastewater pipeline, collect domestic The Drainage wastewater nearby the river, and drain to the constructed construction project interception pipelines along Huohua Road and Yaomu Road. period of Dredging and Waterway dredging and expansion, with the dredging Xiaoshanzi Waterway renovation of the volume of 21920m3. waterway Treatment existing waterway, Main will be from Project of construction of project Waterway Reconstruct 2820m of the main waterway (build the February in Xiaoshanzi branch waterway, treatment embankment), and construct 3093m of branch waterway; 2 2010 to River sidewalk and project 10006m of ecological slope protection; construct 32838m August in 6 (Downtown greening belt along of sidewalk and 8 bridges. 70.402 0.45 2 2011; the Section) in two banks, and The greening belt along two banks will cover 30198m . construction Jialing cross-river bridge; period of District, drainage project; drainage Nanchong construction of project will City 7210m of Aided The spoil will be 24,117. The spoil ground will be located in Spoil ground be from interception pipeline project some low-lying places I Huanglianwan area. February in 2010 to April in 2011. 7 Northern Northern outer ring Length of line 3.29km 101.241 1.33 The Outer Ring road design with the Pavement 78953m2 construction Road length of 3290, road Sidewalk 32000m2 period will be Construction boundary limit with Culvert 6 3 years from

20 Total Environmental Construction investment Construction S/N Project name Major project and scale investment content (million period (million yuan) yuan) Subproject of the width of 40m, Drainage 3.29km 2009 to 2012 Zhonglong construction of water Median greening belt 3.29km Town, supply pipe, Roadside tree 1096 Zizhong rainwater pipe and Electricity into the earth 6580m County wastewater pipe, and Road lamp 328 construction of Traffic project 3.29km matching road lamp, Fire-fighting project 54 greening, traffic project and other Sanitation facility 108 municipal pipelines Construct 5 roads: Xihuan Road, with the length of 1016.860m and the width of 26m; Beiqiao Road, with the length of 486m and the width of 32m; the Landscape Road, Road with the length of 284.109m and the width of 32m; the Water-Electricity Road, with the length of 749.908m and the The width of 19m; Xiner Street, with the length of 375.525m and Infrastructure Municipal road construction the width of 19m. Construction project, flood control period will be Lay the supply and drainage pipelines and cable tunnel along Subproject of project, pipe network 1.5 years 8 the road, with the overall length of water pipeline of 2535m, 107.465 2.246 Miyi County project matching from July in Pipe network the overall length of wastewater pipeline of 2062m, the (Panlian with road project and 2010 to overall length of rainwater pipeline of 2692m and the overall Town) flood control project December in length of cable tunnel of 2889m. 2011 The full length will be 1470m. The length of ecological embankment protection will be 1470m. The area of greening Flood control belt will be 4410 m2. The width of embankment will be 3.5m (0.5m for railings and trees, and 3.0m for flood control road), with that of flood control raised to 6.27-6.33m.

21 Fig. 2.1-1 Location of Sichuan Province

22 Fig. 2.1-2 Distribution of subprojects under SSTDP

23 2.3 Planning compatibility Each subproject under SSTDP, from the preparation of project proposal to the completion of feasibility design document, has been screened level by level, reviewed by expert panel and endorsed by WB experts and domestic experts that it complies with local urban master planning and thus its implementation is highly necessary. Chapter III Regional Environment Overview 3.1 Natural condition 3.1.1 Overview of natural condition of Sichuan Province 1. Geographic location Sichuan Province is located in the southwest of China, in the upper reaches of Yangtze River, and at east longitude 92°21 -108°12 DQd north latitude 26°03 -34°19  ,WLV 1075km long from east to west and 900km wide from south to north. It borders on Municipality in the east, Province and Province in the south, Tibet Autonomous Region in the west and Qinghai Province, Gansu Province and Province in the north. Its area reaches 485,000km2, being ranked at the 5th place among all provinces/municipalities/autonomous regions of China, next to Xinjiang Autonomous Region, Tibet Autonomous Region, Inner Mongolia Autonomous Region and Qinghai Province. 2. Topography The topography of the whole province is complicated and varies from east to west. Sichuan is located at the first and the second ones of the three major steps in the topography of China mainland, namely, at the transition zone between Qinghai-Tibet Plateau as the first step and the plain in the middle and lower reaches of Yangtze River as the second step. The province shows a significant elevation difference, obviously higher in the west and lower in the east. The west part of Sichuan Province comprises plateau and mountain land, over 4000m in altitude; the east part of Sichuan Province comprises basin and hill, between 1000m and 3000m in altitude. The whole province can be divided into three parts, i.e., , Northwest Sichuan Plateau and Sichuan Basin in the east part is one of the four major basins of China, 165,000km2 in area. The basin is surrounded by Qinling Mountains, with Micang Mountain and Daba Mountain in its east, Dalou Mountain in its south and Longmen Mountain and Qionglai Mountain in its northwest. The basin has a warm and humid climate, warm in winter and hot in summer, with an annual precipitation of 900-1200mm in most parts. The climate is a subtropical humid monsoon climate. The vegetation is subtropical broad leaved evergreen forest. The agriculture is double-cropped. The west part of the basin is West Sichuan Plain, where soil is fertile; this part is Dujiangyan Gravity Irrigation Area, where farmland is productive. The middle part of the basin is purple soil hills, with an altitude of 400-800m; the topography is slightly inclined towards south; Minjiang River, Tuojiang River and flow southwards into Yangtze River from the mountain land in the north. The east part of the basin is East Sichuan Paralleled Ridge-Valley, comprising Mountain, Tongluo Mountain and Mingyue Mountain. The northwest part of the province is Northwest Sichuan Plateau, as a corner in the southeast of Qinghai-Tibet Plateau, with an average altitude of 3000-5000m. The climate is puna. The vegetation is alpine meadow. 3. Climatic condition

24 As for Sichuan Basin central subtropical humid climate zone, the whole year is warm and humid, with an average temperature of 16-18 and accumulated temperature of 4000-60007KHGDLO\UDQJHRIDLUWHPSHUDWXUHLVVPDOODQGWKHDQQXDOUDQJHRIDLU temperature is large. Winter is warm and summer is hot. The frost-free period is 230- 340 days. The cloud amount is large and the fine days are less. The sunshine time is short, only 1000-1400 hours a year, 600-800 hours less than that of the areas in the lower reaches of Yangtze River at the same latitude. The precipitation is abundant, 1000-1200mm annually, over 50% in summer, especially at night. As for subtropical subhumid climate zone of Southwest Sichuan mountainous region, the air temperature of the whole year is high, 12-20 in average annually. The daily range of air temperature is large and the annual range of air temperature is small. The morning is cold and the noon is warm. The four seasons are not distinct. The cloud amount is small and the fine days are more. The sunshine time is long, 2000-2600 hours annually. The precipitation is small. The dry season and the wet season are distinct. Totally 7 months of a year are dry season. The annual precipitation is 900- 1200mm, 90% of which in the period from May to October. The river valley area has a typical dry and hot river-valley climate due to the impact of foehn wind. The mountain land has a prominent stereoscopic climate. As for northwest Sichuan High Mountain & Plateau puna zone, the altitude difference is large. The climate has obvious stereoscopic changes. Subtropical zone, warm temperate zone, mid temperate zone, cold temperate zone, subfrigid zone, frigid zone and permafrost zone appear in turn from river valley to ridge. The cold temperate zone climate is dominant. The river valley is dry and warm. The mountain land is cold and humid. Winter is cold and summer is cool. The water heat is insufficient. The annual temperature is 4-127KHDQQXDOSUHFLSLWDWLRQLV-900mm. The weather is clear and the sunshine is sufficient. The annual sunshine time is 1600-2600 hours. The climate of Sichuan Province can be generally described as follows. The monsoon climate is prominent. The rainy season is the hot season. The local difference is obvious; the east part has warm winter, early spring, hot summer, rainy autumn, more cloud and mist, less sunshine, and long growing season; the west part is cold, with long winter, sufficient sunshine, centralized precipitation, and distinct dry season and rainy season, but without summer basically. The vertical climate change is great and the climate types are various, which do good to the comprehensive development of agriculture, forestry and animal husbandry. The climatic damage has various types, with a high frequency and a wide range, mainly including drought, rainstorm, flood and low temperature. 3.1.2 Overview of natural conditions of subprojects See Table 3.1-1 for the natural condition of subprojects under SSTDP.

25 Table 3.1-1 Natural condition of subprojects under SSTDP Name of Geographic S/N Geographic condition Topography Climatic condition subproject location Xinjin County is located in the west part of Xinjin County mainly comprises plain, but also has Xinjin has a subtropical humid Sichuan Basin and at the edge of the south some shallow hill and tableland. The plain, in the monsoon climate, with long frost-free part of Chengdu Plain, with geographic view of geologic structure, is Chengdu Cenozoic period, abundant precipitation and coordinates of north latitude 30°19  - fault subsidence. Muma Mountain and Changqiu distinct four seasons. It has the 33°31  DQG east longitude 103°42 3 - Mountain in its southeast and southwest are shallow following climate features due to its 103°55   ,W ERUGHUV RQ 6KXDQJOLX &RXQW\ hill and tableland, part of Longquan Mountain fault- geographic location and atmospheric in the east, Pengshan in the south, Dayi and fold zone. The plain accounts for 76.6% of the total circulation; winter is not freezing, Qionglai in the west and in the area of the whole county, mainly distributed over the summer is not sweltering, spring is north. Xinjin is the south gate of Chengdu northeast, the north and the northwest parts of Xinjin warm and easily changeable, and City. It is 28km away from downtown area County. autumn is rich in continuous rain; the of Chengdu, and 18km away from The land is flat and the area is square and round. The annual mean temperature is 16.4 WKH Southwest Airport. It enjoys an obvious dominant topography is plain consisting of river, hottest month July has an average location advantage. floodplain and terrace. The county consists of 76.6% temperature of 25.6 WKH FROGHVW Puxing Puxing Town is located on the southwest flat area, 14.1% hill and 9.3% water surface, with an month January has an average Town, side of Chengdu City and in the east part of altitude of 442-673m. The plain area is distributed temperature of 5.7 Subproject of  WKH DYHUDJH Xinjin the county seat of Xinjin. The town borders over the edges of the midwest and east parts and a temperature of the hottest month (July) 1 Puxing Town, County, on Shuangliu County in the east, Jinhua portion of the south part, with an altitude of 442-480. is 25.5 Xinjin County  DQG LWV DYHUDJH WHPSHUDWXUH DW Chengdu Town in the south, Huaqiao Town in the The land is inclined from northwest to southeast, 14:00 is 28.0 WKH H[WUHPH ORZHVW City west across Yangliu River and Huayuan stepping down gradually with a gradient ratio of temperature is -4.7 ; the extreme Town in the north. The site of the town 2.2‰. The land has a slight hypsographic feature. highest temperature is 36.6 ; the government is located in Puxingchang in the The plain is also distributed over the northeast, the annual average frost-free period is 297 south-central part of the town and on the north and the northwest parts of the county; suppose days; the annual average precipitation is Xinjin-Puxing Highway (Dayi-Huanglongxi Jinma River as a boundary, the west side of the river 987mm. Highway) as a county-level highway. is inclined from northwest to southeast, with an average ground gradient ratio of 1.17‰, and the east side of the river is inclined from northeast to southwest, with an average ground gradient ratio of 1.04%. The plain area accounts for 76.6% of the total area of the whole county. The southeast of the county seat is Muma Mountain tableland, with an altitude of 450-500. The southwest of the county is long hill, with an altitude of 500-600. Rainwater and County seat The proposed works is located in Daying Daying County has a topography of hill. It mainly Daying County lies in Sichuan Basin Wastewater of Daying County of Suining City. Daying County lies comprises mid-shallow hill and also has some mid-subtropical humid monsoon 2 Pipe Network County, in the hinterland in central Sichuan, in the alluvial flat area along river. The land is higher in the climate zone, where it is warm and four & Road Penglai lower reaches of Qijiang River, and within south and the north, but lower in the middle. The seasons are distinct. The annual mean

26 Name of Geographic S/N Geographic condition Topography Climatic condition subproject location Reconstruction Town the territory of Suining City. The land is slightly inclined from northwest to east. The temperature is 17.4 7KH SUHFLSLWDWLRQ Subproject of geographic coordinates are north latitude average altitude is 429m. The highest points are at is abundant. The annual average Daying 30°26 -30°44 DQG HDVW ORQJLWXGH ƒ - Gaoguan Mountain in the north, 492m, and at precipitation is 800.8mm. The quantity County 105°28  7KH FRXQW\ LV NP ORQJ IURP Zhenwu Mountain in the south, 465m. The lowest of heat is high. The annual sunshine (Penglai south to north and 41.5km wide from east to point is at Weijiajiao where Qijiang River meets with time is 1189.1 hours. The total annual Town) west. The total area is 703km2, covering 8 Fujiang River, with an altitude of 271m. The altitude solar radiation is 93.37kcal/km2. The towns and 3 townships. Daying County difference within the county is 221m. frost-free period is 294 days. The year’s borders on Zhoushan District and Anju dominant wind direction is north and District of Suining City in the southeast, north-west. The climatic condition is of Suining City in the east, suitable for crop growing. County of Suining City and of City in the north, and of City and of City. Nanchong City is located in the northeast Nanchong City is located in the connection zone Nanchong City has a mid-subtropical part of the basin of Sichuan Province. It is between the north remote mountainous area of humid monsoon climate. According to in the middle reaches of Jialing River. Its Sichuan Basin and the central Sichuan hill area. The the local ground meteorological geographic coordinates are east longitude land is shallow hill, higher in northwest and lower in observation data of the past years, the 105°26 -107°2 DQG QRUWK ODWLWXGH ƒ - southeast. The altitude within the city is 261.5-429.6 maximum air temperature is 41.3 (on 31°51  ,WV WRWDO DUHD LV NP ,W ERUGHUV m, and the downtown area has an altitude of about July 2, 1951), and the minimum air on City and City in the 274.5m. The works locates in Shunqing District of temperature is -2.2 RQ 1RY  north, City in the east, Guangan Nanchong City, within the hill and low mountain Infrastructure 1995). January is the coldest month, City in the southeast, and Mianyang City area. Since the Quaternary Period, due to the Construction Yingxi with a monthly average air temperature and Suining City in the southwest. intermittent rising of earth crust, the topography Town, of 6.6 $XJXVW LV WKH KRWWHVW PRQWK Subproject of The developed area of Nanchong, including shows three-step terraces. The first-step terrace: 7- Yingxi Town, Shunqing with a monthly average air temperature 3 Shunqing, Gaoping and Jialing, lies in the 17m higher than the existing riverbed; the terrace is of 27.8 7KH SUHFLSLWDWLRQ LV DEXQGDQW, Shunqing District, south part of the city. The whole city lies in complete and relatively flat. The second-step terrace: District, Nanchong with an annual average precipitation of the river valley terrace, higher in the 30-45m higher than the existing riverbed; the terrace 1025.2mm. The precipitation mainly Nanchong City northwest and lower in the southeast. The surface is primarily cut and damaged. The third-step City happens in the period from May to city development is now in process. The terrace: 60-70m higher than the existing riverbed; the September. The area is one of areas in city has formed the structure featured which terrace surface is damaged, and the slope change is China with the lowest solar radiation Jialing River as axis, north-south extension, obvious. The proposed works is located in the and sunshine hours. The annual average eastward development across river, and second-step terrace, facing no significant harmful sunshine time is 1254h, accounting for comprehensive development based on river. geology. For stratum, the earth’s surface comprises 29% of the available sunshine time. The Nanchong City is 218km away from farming soil and slope and alluvial clayey soil, with average total solar radiation is Chengdu in the west and 200km from terrace pebble bed lying below; the bedrock is 3864.25MJ/m2. The frost-free period is Chongqing in the south. Middle Jurassic sand-mud rock. The geologic 310d. The dominant wind direction in

27 Name of Geographic S/N Geographic condition Topography Climatic condition subproject location The works is located in Yingxi Town, structure is simple, and the stratum inclination is the downtown area is north-north-west. Shunqing District. Yingxi Town lies in the gentle. The geologic structure of batholite has the The wind direction frequency is 8%. Its north part of Shunqing District, Nanchong wide and gentle folds as the main part. The stratum main features include distinct four City. It borders on Jingxi Township in the in Middle Triassic Suining Formation is thick. The seasons, warm winter and hot summer, east, Huafeng Township and Xinfu earthquake reflecting horizon shows no obvious midsummer-drought in summer and Township in the south, Gongxing Township rupture, indicating that the geologic structure is excessive rain in autumn. in the west, and Jintai Township in the simple and the recent crust movement is basically north. It is about 10km away from stable. downtown area of Nanchong City. It is The works is located in Yingxi Town, where the flat adjacent to National Highway No. 212 and area combines with the shallow hill. provincial highway Yingxi-Xinzheng Highway. The location is advantageous and the traffic is convenient. Pengshan County is located in the south The land within the whole county is higher in the Pengshan County is within a edge of West Sichuan Plain and in the north north and lower in the south, with the highest point subtropical humid climate zone. The part of City. Geographically, it is in northwest and the lowest point in the southeast. It altitude difference within the county is in the middle reaches of Minjiang River. is within the front belt of the transition zone between small. The climate change among parts The Fuhe River and Nanhe River enter the Northwest Sichuan hill-plateau mountain land and of the county is not great. The annual county from the northwest, meet in Sichuan Basin. The county mainly comprises a temperature range is within 2.l ,WV Jiangkou Town, and flow southwards out of synclinal geologic structure, surrounded by basic features include the following; the Binjiang Road the county. The county borders on Renshou mountains in the east and the west, but open in the climate is warm; the precipitation is (Southern in the east, in the south, south and the north. The land has a shape of “II”. abundant; the four seasons are distinct; Section) Road Pujiang and Qionglai in the west, and Xinjin The Fuhe River and Nanhe River in the upper there is no intense heat and less and Fengming and Shuangliu in the north. Its geographic reaches of Minjiang River met in Jiangkou Town and midsummer drought in summer; flood Wastewater Town, coordinates are east longitude 103°40 - then flow southwards out of the county. The east and and water-logging of various degrees 4 Interception  Pengshan 103°59 21 - west sides of the flat area are shallow hill, round hill, appear every year; there is no severe Subproject of DQG QRUWK ODWLWXGH ƒ  County 30°21 -711.6m. hogback and cuesta. The gulley width is between cold, less frost and snow but more cold Fengming   ZLWK DQ DOWLWXGH RI  The county is 28.7km long from east to west 100m and 200m. wave and low temperature in winter; Town, and 25.9km wide from south to north. the air temperature rebounds early in Pengshan The project site, Fengming Town, is located spring; there is more continuous rain in County in the southeast part of Pengshan County. It autumn and temperature drops soon. is within the economic zone of Chengdu Plain, where the CPC county committee and county government of Pengshan County reside. The site is the political, economic and cultural center of the whole county. The proposed works is located in the east

28 Name of Geographic S/N Geographic condition Topography Climatic condition subproject location part of the downtown area of Pengshan County, south of Pengzu Plaza, east of provincial highway No. 103, and 260m away on the north side from the crossing between the road route beginning in the north and Suojiang Road. It extends southwards and crosses Suojiang Road, Guihua Road, Tongjiang Road, Zhiyuan Road, Huaxi Road and Xinglong Road in turn and ends at Xinglong Road. Hongya County is located in the southwest Hongya County has a total area of 1896.49km2. The Hongya County has a mid-subtropical edge of Sichuan Basin. Its geographic land appears a step-change from southwest to humid climate. It is warm and humid in coordinates are east longitude 102°49'- northeast, forming high mountain, medium the county. The precipitation is 103°32' and north latitude 29°24'-30°00'. It mountain, deep hill, shallow hill, tableland, river abundant; the four seasons are distinct; lies in the triangle zone among Chengdu, valley and flat area. The topography mainly the rainy season is the hot season; the and Ya’an. It borders on Jiajiang comprises mountain land and hill. The river valley dry season and the rainy season are County and in the east, flat area is distributed over both banks of Qingyi distinct; there is no intense heat in and Jinkouhe District in River and Huaxi River, with a forest cover rate of summer; there is no severe cold and the south, and Rongjing 65.8%. It is called “70% mountain, 20% water and less frost and snow in winter; the air County of Ya’an in the west, and Mingshan 10% farmland”. temperature rebounds early in spring; Environmental County and Danleng County in the north. The site of the works, Hongchuan Town, is the site but there is more cold wave, low Site of Treatment The county is 64km long from south to of the county seat of Hongya County. The developed temperature and continuous rain, and county seat Subproject of north, 43km wide in the north and 46km area is 5km2 and the land is flat. the temperature drops soon. of Hongya 5 Hongya wide in the south, and 112km, 55km, 50km The annual mean temperature is 16.8 County,  County and 62km away from Chengdu, Leshan, the maximum air temperature is 36.2 Hongchuan  (Hongchuan Meishan and Ya’an, respectively. the minimum air temperature is -3.3 Town  Town) The site of the works is also the site of the the average annual precipitation is county seat, Hongchuan Town. 1493.9 mm; the recorded highest annual precipitation is 2165.4 mm; 60% of precipitation of the whole year happens in the period from June to August; the average rate of sunshine for years in succession is 24%; the average frost-free period for years in succession is 303.2 days; the dominant wind direction in the county seat is east and west; the wind direction frequency is

29 Name of Geographic S/N Geographic condition Topography Climatic condition subproject location 36%; the relative humidity is 82%; the absolute humidity is 16.7%. Nanchong City is located in the northeast Nanchong City has a topography divided into two Nanchong City is located in the low part of Sichuan Basin and in the middle major parts, the north low mountain area and the mountain and hill area in the east part reaches of Jialing River. Its coordinates are south hill area. The land is inclined from north to of Sichuan Basin, within the subtropical north latitude 30035 -310 51 DQG HDVW south, with an altitude of 256-889m. The topography monsoon climate zone, where cold air longitude 1050 27 -1060 58  ,W LV NP mainly comprises hill; shallow hill flat area, medium is active. The air temperature is not long from south to north and 143km wide hill and medium valley, and high hill and low stable. The precipitation in spring and from east to west. It borders on Dazhou City mountain account for 1/3, respectively. early summer is not even. Drought is in the east, Guangan City in the south, The site of the works lies in Duweiba, the downtown seen, but no intense heat is found in Suining City and Mianyang City in the west area of Jialing District, Nanchong City, within summer. The precipitation is and Guangyuan City and Bazhong City in Jialing River alluvial plain. It borders on Jialing concentrated. More flood and water- the north. River in the east, Chaqi Mountain in the north, logging are seen. Gale is found Jialing District is a county-level Fengya Mountain in the south and Dajian Mountain sometimes, and hail is found Waterway administrative district approved by the State in the west. The land is higher in the north and lower occasionally. In autumn, the air Treatment Council in September 1993. It has a total in the south, higher in the west and lower in the east. temperature drops soon, with more Project of population of 680,000. Its total area is The area is between 268.0m and 377.2m; most of continuous rain. According to the local Xiaoshanzi Within 1278km2. National Highways No. 212 and farmland is between 270.0m and 280.0m. The north ground meteorological observation data River Jialing No. 318 meet in the district. Chengdu- of Mahuang Weir is a shallow hill belt, but half of of the past years, the maximum air (Downtown 6 District, Nanchong Expressway goes through the the south central is below the flooded line (274.0m) temperature is 41.3 Section) in RQ -XO\    Nanchong district. Jialing District lies in the northeast of a 50a flood. The groundwater table is high. In the and the minimum air temperature is - Jialing City part of Sichuan, and on the west bank of the view of structure, the different thick layers of sand 2.2 (on Nov. 22, 1995). The annual District, middle reaches of Jialing River. Its rock and mud rock form wide and gentle folds. The mean temperature is 17.60 Nanchong  WKH DQQXDO coordinates are east longitude 105°45 - inclination of rock formation is 2-7o, generally. precipitation is 1054.5mm; the annual City 106°00 DQG QRUWK ODWLWXGH ƒ -30°52  ,W Because the rock formation is generally flat, the evaporation capacity is 812.3mm; the borders on Shunqing District in the north, step-shape mountain ranges and valleys are formed relative humidity is 79%; the year’s in the south, Xichong due to erosional cutting. The mountain top is wide dominant wind direction is N; the County and Pengxi County in the west and and flat, or appears as a dome. Deep combe develops average wind speed is 1.4m/s, and the in the east. It is only 3km along the edge of the tableland, and the surface maximum wind speed is 19m/s. away from Nanchong City, an economic appears as irregular sawtooth. The surface width is and cultural center of northeast Sichuan. between scores of meters and hundreds of meters. Chengdu, Chongqing and Nanchong The surface mainly comprises of mud rock. The land together form a 2-hour economic is flat and the effect of weathering is strong. The development circle. height of the rock step at the edge of the tableland The works lies in the Jialing District of relates closely to the thickness of sand rock. Nanchong City. The works starts at Therefore, the heights of steps are different, 10-20m Baimamiao Village, Huanglianwan Area generally, but 30-50m in some locations.

30 Name of Geographic S/N Geographic condition Topography Climatic condition subproject location and ends at entrance of Nixi River downstream. Zizhong County is located in the middle The county seat of Zizhong County has a shape of Zizhong County has a subtropical part of Sichuan Basin, at east longitude open “V”. The total area of the county is 1734km2. humid monsoon climate, distinct four 104°27 -105°07 DQG QRUWK ODWLWXGH ƒ - The land is inclined from west and southwest to east seasons, early spring, long summer, 30°02  =L]KRQJ &RXQW\ LV XQGHU WKH and northeast. The southwest part is low mountain, short winter and a long frost-free administration of City. It lies in the deep hill and narrow valley. The middle part is period. There is no severe cold in central belt of the connection zone between gentle hill and wide valley. Out of the total area, the winter. The frost and snow are less. The Sichuan and Chongqing and borders on shallow hill accounts for 65.7%, plateau-shape high average wind speed is low. The annual Northern and Shizhong District of hill 23.0%, gentle hill and wide valley 5.5%, low precipitation is abundant. This climate Outer Ring Neijiang City in the east, Weiyuan County mountain and narrow valley 4.4%, and river valley is very suitable for agricultural Road in the south, of Meishan flat area 1.3%. production. But some negative factors Zhonglong Construction City in the west and and The topography around the county seat is Tuojiang still exist; the spatiotemporal Town, 7 Subproject of in the north. River floodplain and terrace hill. The topography is distribution is not even, and drought Zizhong Zhonglong The works lies in Zhonglong Town (the not uniform. The relative altitude difference is 30- and waterlogging happens sometimes; County Town, north part of Zizhong County) of Zizhong 40m generally, 70-80m locally, and even over 100m winter is dry, summer is droughty; Zizhong County, where the old downtown of individually. The topography is cuesta formed by midsummer drought often happens; County Zizhong County resides. It borders on grey sand rock and purple rock in Shaximiao continuous rain is more in autumn; Tuojiang River in the south, Shuanglong Formation. The upper part of the stratum is a cover sunshine hours are less. Town, Liuma Town and Ganlu Town in the layer, 3-6m thick generally; the middle part of the north, Sujiawan Town in the east and Suya stratum is a pebble and gravel layer, 5-7m generally, Township and Guide Town in the west, and and the lower part of the stratum is a mud-sand rock faces Shuinan Town of Xincheng District of layer. It is the tectonic level of post-Jinning platform Zizhong County across the river. region with stable geologic structure.

Miyi County is located on both banks of Miyi County lies in the southeast edge of the Miyi County has a stereoscopic climate Anning River in the northeast part of Qinghai-Tibet Plateau and on the east side of the based on south-subtropical zone. The City. Its geographic location is at Hengduan Mountains. It borders on Longzhou low mountain river valley area has a Infrastructure north latitude 26°42'-27°10' and east Mountain in the east and Yalong River in the west. south-subtropical dry and hot river Construction longitude 101°44'-102°15'. The county is Baipo Mountain is in the county area. Anning River valley climate, with abundant heat and Panlian Subproject of 52.5km wide from east to west and 73.2km goes through the county from south to north. The rich sunshine. The precipitation is 8 Town, Miyi Miyi County long from south to north. The total area of county area is informally called “two mountains, two abundant. It is an area suitable for County (Panlian the whole county is 2153km2. It borders on valleys and three slopes”; the two mountains are growth of south subtropical and Town) in the north, Longzhou Mountain and Baipo Mountain; the two subtropical lives. The medium in the east, Yanbian and Yanyuan in the valleys are the east and west parts of Anning River mountain area has subtropical and west across Yalong River, and Yanbian Valley and the valley on the east bank of Yalong extratropical warm climates, similar to County in the south. River; the three slopes are east and west slopes of that of Sichuan Basin, suitable for

31 Name of Geographic S/N Geographic condition Topography Climatic condition subproject location Anning River Valley and east slope of Yalong River. growth of animals and plants and The average altitude in the county is 1836.2m, with development of agriculture, forestry, the highest one of 3447m and the lowest one of animal husbandry, fruit industry and 980m. The county has staggered valleys and medicinal materials industry. The mountain ranges, with significant altitude medium high mountain area has differences. The topography mainly comprise extratropical and frigid cold and wet medium mountain. The river valleys with an altitude climates, suitable for development of below 1500m account for 28.69% of the total area of forestry and animal husbandry as well the county; the low medium mountains with an as forestry sidelines and local and altitude between 1500m and 2000m account for special products. 46.67%; the high medium mountains with an altitude over 2000m account for 24.64%. Panlian Town is the site of the county seat, where land is relatively flat.

32 3.2 Socio-economic environment 3.2.1 Overview of social environment of Sichuan Province 1. Administrative division and population The whole province governs 21 cities/regions/prefectures and 177 counties and county-level cities (districts). The whole province has a population of 88,150,000 as of December 31, 2007. Sichuan Province has many ethnic groups. It has 55 minorities, with a total population of 4,220,000. There are 14 traditional minorities, i.e., Yi, Tibetan, Qiang, Miao, Hui, Mongolian, Tujia, Lisu, Man, Naxi, Buyi, Bai, Zhuang and Dai. Most of the minorities reside in Liangshan Yi , Ganzi Tibetan Autonomous Prefecture, Aba Tibetan and Qiang Autonomous Prefecture, Mabian Yi Autonomous County, Ebian Yi Autonomous County and Beichuan Qiang Autonomous County. All subprojects under SSTDP do not cover ethnic minority habitation and inhabitants in the Project construction area are mainly of the Han nationality. 2. Socio-economic development The total output value of the whole province in 2009 is 1415.13 billion yuan, up by 14.5% over last year; the rate of growth is 3.5% higher than that of last year. The primary industry saw an increased value of 224.06 billion yuan, up by 4.0%; the secondary industry saw an increased value of 671.19 billion yuan, up by 19.5%; and the territory industry saw an increased value of 519.88 billion yuan, up by 12.4%. The three industries contributed to the economic growth by 4.2%, 62.8% and 33.0%, respectively. The total output value per capita is 17,339 yuan, up by 14%. The proportions among the three industries changed from the last year’s 17.6:46.2:36.2 to 15.8:47.4:36.8. 3. Resources Sichuan is rich in energy resources. The resources mainly comprise water energy, coal and natural gas. The coal accounts for 23.5%, the natural gas and petroleum 1.5% and water energy 75%. The theoretical reserve of water energy in the whole province reaches 143 million kw, accounting for 21.2% of the total reserve of the country, only next to Tibet. Out of the total reserve, the technically developable quantity is 103 million kw, accounting for 27.2% of the total quantity of the country, while the economically developable quantity is 76.112 million kilometers, accounting for 31.9% the total quantity of the country, and being ranked at the first place among all provinces in the country. The water energy resources are mostly distributed over three water systems, i.e., , and Yalong River. The said three water systems provide 2/3 of the total water energy resources of the province and are the largest “rich mine field” of hydroelectric power in the country. Their technically developable quantity accounts for over 79.2% of their theoretical reserve and accounts for 80% of the total quantity of the whole province. The Ertan Hydropower Station on Yalong River has a installed gross capacity of 3.30 million kilometers. The recoverable deposit of coal in the whole province is 9733 million ton. Its proven reserve accounts for 0.9% of the total reserve of the country. The petroleum and natural gas resources mainly comprise natural gas. The petroleum resources see a very small reserve. Sichuan Basin has accumulatively proven new geologic reserves of 67,960,000 ton. However, the natural gas resources in Sichuan Basin are very rich. In fact, Sichuan Basin is one of the major basins in China with petroleum and natural gas

33 resources. So far over 7000 billion m3 natural gas resources have been found. Besides, Sichuan is also rich in biological energy sources; every year the developable human and livestock dejecta quantity is 31,485,300 ton, the core wood 11,890,300 ton, the stalk 42,122,400 ton, and marsh gas 1 billion m3 approximately. The peat coal resources see a primary proven reserve of 2 billion ton. Solar energy, wind energy and terrestrial heat resources are also abundant, which can be developed and used in the future. 4. Tourism Sichuan has rich tourist resources. It enjoys beautiful natural scenery, time-honored history and culture and distinctive national features. The quantity and quality of tourist resources have been ranked at top ones of the country. Actually, Sichuan is a famous province of tourist resources in China. The whole province has 5 world heritages, being ranked at the second in the country, including 3 natural heritages (Jiuzhaigou, Huanglong and Sichuan giant panda habitat), 1 natural and cultural dual heritage (Emei Mountain – Leshan Giant Buddha) and 1 cultural heritage (Qingcheng Mountain – Dujiangyan). Totally 4 natural reserves of Sichuan (Jiuzhai, Wolong, Huanglong and Daocheng-Yading) are listed into the Man and Biosphere Reserve Network. Sichuan has 15 national key scenic spots, being ranked at the first in the country; in addition, it also has 75 provincial scenic spots. Sichuan has 5 resorts listed into “China’s Top 40 Tourist Resorts”. Qingcheng Mountain - Dujiangyan Scenic Spot, Emei Mountain Scenic Spot, Emei Mountain Scenic Spot and Jiuzhaigou Scenic Spot are on the list of the first batch of national 5A scenic spots. At present, Sichuan has 3 national 5A scenic spots and 34 national 4A scenic spots, 21 excellent tourist cities of China, and 21 national natural reserves, including 1 national natural reserve for giant panda. So far, the whole province has 88 established forest parks, including 31 national forest parks and 49 provincial forest parks. Moreover, Sichuan has many geologic and topographic landscapes, including 220-plus geologic relics, 2 world-class geologic parks (Xingwen and ) and 12 national geologic parks; these numbers are ranked at top ones of the country. Actually, Sichuan has 7 national historical and cultural cities, ranked the first of the country; besides, it also has 55 provincial historical and cultural cities (towns), 128 national key sites protected for historical and cultural value and 337 provincial key sites protected for historical and cultural value. All subprojects under SSTDP do not cover any natural reserve, scenic area or forest park, except for that Environmental Treatment Subproject of Hongya County (Hongchuan Town) covers Zhoujiaci provincial heritage conservation unit. 3.2.2 Overview of social environments of subprojects See Table 3.2-1 for the social environment of subprojects under SSTDP.

34 Administrative Name of S/N division and Socio-economic description Resources/industries Infrastructure subproject population The total area of Xinjin In 2008, Xinjin County reached a Primary industry: Puxing Town lies Traffic condition: Puxing Town enjoys County is 331.5km2, regional total output value of 8758 in the hill zone of Chengdu Plain, good traffic conditions. Chengdu-Ya’an covering 11 towns and million yuan, up by 17.5% over last year. where soil is fertile and crop is rich. (Chengdu-Leshan, similarly hereinafter) 1 township, with a total The primary industry saw an increased The agriculture mainly comprises Expressway goes through the town from population of 304,700. value of 1055 million yuan, up by 7.2%; crop farming, including paddy, south to north, with an interchange exit at The urban population is the secondary industry saw an increased wheat, rape, garlic and pollution-free Puxing Town. It also has a county-level 107,400. The total area value of 4930 yuan, up by 22.6%; and vegetables. In 2007, the planted area highway Xinjin-Puxing Highway (Dayi- of Puxing Town is the territory industry saw an increased of grains of Puxing Town was 53393 Huanglongxi Highway) (Dayi-Shuangliu- 42km2, covering 9 value of 2773 yuan, up by 12.5%. The mu (1 mu = 1/15 of a hectare), and Huanglongxi) goes through the town from villages, 2 communities proportions among the three industries the total output of grains was 14,757 east to west. Chengdu-Ya’an Expressway and 117 groups, with a were 12.0:56.3:31.7. The three industries ton. The economic crops mainly is an important economic corridor from total population of contributed to the GDP by 4.6%, 71.2% comprise vegetable, fine fruits and Chengdu to Leshan and Ya’an. Xinjin- 23875 by the end of and 24.2%, respectively. Calculated nurseries. Especially, the fine fruits Puxing Highway (Dayi-Huanglongxi 2007, forming 6943 based on resident population, the industry developed rapidly and Highway) is an important branch of West households. regional total output value per capita of towards an ecologic and efficient Sichuan tourist ring route. Puxing Town’s the whole county reached 28,876 yuan, industry. two trunks constitute very convenient Subproject of up by 14.7%. In 2007, Puxing Town’s Secondary industry: Puxing Town’s traffic channels to the outside. 1 Puxing Town, GDP was 282 million yuan; the primary enterprises started early and Power condition: Puxing Town’s power is Xinjin County industry saw an increased value of 72 developed fast. At present, it has 20 currently supplied by a 220KV substation million yuan, accounting for 41.7% of –plus enterprises of remarkable at Xujiadu of Xinbai Village within the the total number; the secondary industry scales, mainly comprising town. Puxing Town is provided with a saw an increased value of 98 million construction and building materials, 10KV switching station. yuan, accounting for 29.8% of the total food processing, chemical industry number; the territory industry saw an and foundry. increased value of 94 million yuan, Territory industry: Puxing Town accounting for 28.5% of the total enjoys convenient traffic conditions, number. The net income per capita of with a traffic system extending in all peasants was 5364 yuan. directions. The urban commercial In 2008, Puxing Town’s GDP was 354 logistics is active and the million yuan; the primary industry saw warehousing industry is booming. an increased value of 72 million yuan, Puxing Town is the main accounting for 41.7% the total number. commercial town of Xinjin County. The net income per capita of peasants The development of infrastructure was 6192 yuan. and supporting commercial facilities in Puxing Town must push the

35 Administrative Name of S/N division and Socio-economic description Resources/industries Infrastructure subproject population further development of industries in Puxing Town. Daying County governs The national economy keeps increasing. Daying County is rich in mineral Daying County is located in the west part 8 towns, 3 townships, In 2007, the county’s GDP is 3.93 billion resources. Petroleum, bittern, natural of Suining City, with excellent traffic 302 villagers’ yuan, GDP per capita 7176. The primary gas, halite, alluvial gold and conditions. According to the statistics of committees, 21 urban industry saw an increased value of 1089 sandstone have been proven and the traffic administration, the county residents’ committees, million yuan; the secondary industry saw mined. Daying County has currently has 1905.5km highways, 2920 villagers’ groups, an increased value of 1347 million yuan; remarkable reserves of bittern, including 52.5km provincial highways, and 79 urban residents’ the territory industry saw an increased which is distributed over Penglai, 69.5km county-level highways, 155.5km groups, with a total value of 791 million yuan. The Xiangshan, Zhuotongjing, Hebian township-level highways and 1628km population of 547,500. proportions among the three industries and Yufeng. The county has village-level highways. Besides, Chengdu- were 33.5: 40.5: 26. In local finance, the developed some tourist projects such Dazhou Railway and Chengdu-Nanchong Rainwater and general budgetary revenue was 46.53 as the “dead sea”, generating Expressway (under construction) go Wastewater Pipe million yuan, up by 15%; the total retail outstanding benefit. through the county. The open waterways network & Road sales income of consumer goods was are 50km. The county also has 5km 2 Reconstruction 1346 million yuan, up by 15%. In 2007, entrance/exit ways to and from the county Subproject of the annual net income per capita of as level-1 cement-pavement road Daying County peasants in the whole county reached (including Chengdu-Nanchong (Penglai Town) 3480 yuan (lower than the standard for Expressway Connection Line), 12km provincial eco-county development, • Penglai-Lezhi Highway as level-2 cement- 4500 yuan); the annual disposable pavement road, 12.5km Penglai-Guanyin income per capita of urban residents was Highway, Santai-Xiangshan Highway, and 7108 yuan (lower than the standard for 16.5km Xiajia-Tuanjie Highway as level-2 provincial eco-county development, • asphalt pavement road. The county seat 11000 yuan). has a level-2 bus transport center. The county has extended cement-pavement roads or asphalt-pavement roads to every town and township. Nanchong City is Nanchong City is a regional central city, The transportation modes available in the Infrastructure located in the northeast with main industries such as silk, textile, downtown area of Nanchong City include Construction part of Sichuan Basin, machinery, food, chemicals, leather, highway transportation, water Subproject of with an area of garment, power, oil refining, electronic transportation, railway transportation and 3 Yingxi Town, 12494km2, covering 3 information and building materials. It is air transportation, which constitute a Shunqing districts, 5 counties, 1 also actively developing tourism. In transportation network extending to all District, city and 180 towns. By 2008, the GDP was 33527 million yuan, directions. National Highways No. 212 Nanchong City the end of 2005, it has a including the primary industry of 10.7 and No. 318 go through Nanchong from

36 Administrative Name of S/N division and Socio-economic description Resources/industries Infrastructure subproject population total population of billion yuan, the secondary industry of north to south after their confluence. 7,289,400, including 11.3 billion yuan, and the territory Dazhou-Chengdu Railway goes through. non-agricultural industry 11.5 billion yuan. The average Chengdu-Nanchong Expressway population of 1,438,800 annual wage of employees was 11735 Nanchong-Guangan Expressway and and agricultural yuan, and the, net income per capita of Nanchong Second-grade Airport have population of peasants was 2646 yuan. The agriculture been put into operation. - 5,850,600, with a was expanded with increased output; the Chongqing Railway already constructed population density of industry rose again in difficult situation; and Nanchong-Chongqing Expressway 584/km2. the losses of enterprises were under construction goes through the Yingxi Town has a significantly reduced; the consumer downtown area. A highway network has total area of about goods retail market was still booming; been developed consisting of national 57km2 and governs 28 the financial revenue was stably highways, provincial highways and administrative villages increased; the average annual wage of township highways supporting each other; and 3 urban residents’ employees was 7764 yuan, and the net Airways are open to , committees. The town income per capita of peasants was 2665 and , etc. has a total population yuan. Jialing River waterway runs northwards to of 42765, including Shunqing District is the site where Party Guangyuan and southwards to Chongqing. non-agricultural and government organizations are Nanchong has a developed water transport population of 19000. located and is the center of the city for system since ancient times, Jialing River is The urbanization ratio politics, economy, trade, finance and open to traffic all the year round. 10-plus is 44.43%. The water & land transportations. The branches such as Xihe River and Donghe population density is commercial services are centralized in River are open to traffic discontinuously. 750 /km2. the center of the city. Parks, The whole city has 6 counties, county- entertainment services, apartment level cities and districts where water buildings and residential quarters are transport is available. The total mileage dense. The industrial enterprises are open to traffic is 458km. There are 7 fleets distributed in suburbs. A commercial with total tonnage of 12500t. The water zone represented by Mofan Street and a routes extend to , , , cultural zone represented by Beihu Park , Jiangsu and Shanghai in the middle have come into being. The urban traffic and lower reaches of Yangtze River and structure is ring-shaped and radial. flow into Dongting Lake, Poyang Lake and Beiyun River. The service mileage reaches more than 3000km. Jialing River is the main channel for water transportation of Nanchong, which can accommodate 100-300t barges all the year

37 Administrative Name of S/N division and Socio-economic description Resources/industries Infrastructure subproject population round. The waterway northward to Guangyuan can accommodate 100t barges and 160hp motor ships all the year round. The waterway southward to Chongqing can accommodate 300t barges and 300 hp motor ships all the year round. Nanchong Port is the largest port on Jialing River, which is located in Shunqing District. It is an important port for materials transportation within north-central Sichuan, with an annual throughput of more than 800,000t. Yingxi Town is close to National Highway G212 and Provincial Highway Yingxi- Xinzheng Highway. Its developed areas have 10 main roads and streets, with a property line 8-36m wide. Pengshan County In 2008, the county’s total output value Pengshan County has 60-plus urban roads governs 9 towns and 4 (GDP) was 5288 million yuan, up by at various levels, including Chengdu- townships. The total 14.2% over last year; the county’s GDP Leshan Highway, and Pengshan-Xiejia area is 465km2. The per capita was 18399 yuan, up by 16.5% Highway section going through the works is located at over last year; the proportions among the county. The land used for roads and plazas Binjiang Road Fengming Town. three industries were 18.0: 57.8: 24.2; the is 82.0ha., 10.78m2 per capita. A road (Southern By the end of 2005, local financial revenue was 301.96 network in the county seat has been Section) Road Pengshan County has a million yuan, up by 19.98% over last shaped comprising south-north Pengzu and Wastewater total population of year, including general budgetary Road and Fengming Road (Chengdu- 4 Interception 320,000, including revenue of 183.12 million yuan, up by Leshan Highway county seat section) and Subproject of agricultural population 26.33% over last year; the financial east-west Pengxie Road North (Pengshan- Fengming Town, of 210,000, accounting revenue accounted for 5.7% of the GDP; Xiejia Highway county seat section), Pengshan for 66.6%, and non- the number of industrial enterprises Jianshe Road and Yingbin Road. County agricultural population above designated size was 75; the of 110,000, accounting increased value in private economy for 33.4%. The main accounted for 52.3% of the county’s ethnic group is Han, GDP. The urbanization ratio was 39.80% and other ethnic groups and the forest cover rate was 32.6%. such as Hui, Zhuang

38 Administrative Name of S/N division and Socio-economic description Resources/industries Infrastructure subproject population and Yi also reside. Hongchuan Town is the In 2008, Hongya County’s GDP was Hongya County’s tourist industry site of county seat of 4038 million yuan, up by 14.4%; the started late but saw a promising Hongya County, in the whole society’s total investment to fixed future. From the view of tourist northeast part of assets was 2.46 yuan, up by 17%; the location, Hongya County is located Hongya County. The local finance general budgetary revenue between the preferential total area of the town is was 176.8 million yuan, up by 17.33%; development area of Chengdu for 42.5 km2, with a total the net income per capita of peasants was tourism and the preferential population of more than 4720 yuan; the disposable income per development area of South Sichuan 42100. It governs 14 capita of urban residents was 11084 for tourism. Through nearly 10- administrative villages, yuan, up by 12.3%.. year’s development of tourism, it and 5 urban residents’ By the end of 2008, Hongchuan Town has established a national AAA committees. has 52 enterprises, with an industrial scenic spot-Wawu Mountain (a output of 590.1 million yuan, and a total national forest park) and some profit and tax amount of 172 million provincial scenic spots such as yuan. The total employed was 8350. Caoyutan, building up some Environmental Three rural professional organizations reputation in the region. Treatment were established. The surplus labor force It covers 1 provincial heritage Subproject of 5 of 17259 persons were shifted to other conservation unit, namely Zhoujiaci. Hongya County fields. The total income from labor Zhoujiaci, belonging to the seventh (Hongchuan service was 862.95 million yuan. The batch of provincial heritage Town) tourist income was 152 million yuan. conservation units of Sichuan Province, is located at Wentang Village, Hongchuan Town, Ximenkou, Hongya County, close to Hongya Vocational High School of Sichuan. The existing Zhoujiaci was established at the first year of Tongzhi Reign of Qing Dynasty and it is a duplex quadrangle courtyard composed of three main structures, namely antechamber, main hall (Guangyu Hall) and back hall, with bilateral wing-rooms. Total construction area is 858m2, total floor area is 3137m2 and the grand

39 Administrative Name of S/N division and Socio-economic description Resources/industries Infrastructure subproject population total area is 4.7mu. The Project is located in the construction control zone of Zhoujiaci. The People’s Nanchong is rich in resources. It is Nanchong, Chengdu and Chongqing have Government of an important base for development formed a greater triangular economic zone. Nanchong City is of water energy. The reserve of The traffic system is well developed. located in Shunqing petroleum is 77.79 million ton; the National Highways No. 318 and No. 212, District. In 2003, the reserve of natural gas is 9 billion Chengdu-Nanchong Expressway, city governed 180 m3; the reserve of salt rock is 1.8 Nanchong-Guangan Expressway and towns and 302 trillion ton, ranking as the largest Dazhou-chengdu Railway have connected townships. The natural salt mine in west China; Nanchong closely with Chengdu, developed area in 2009 Jialing River goes through the city, Chongqing, Shanghai, Guangdong and was 68km2, with an with a reserve of water energy of other developed cities. Nanchong Gaoping urban resident more than 2 million kw. Nanchong Airport put into use in May 2004 and Waterway population of 863,600. has abundant labor force and Lanzhou-Chongqing Railway in planning, Treatment developed science, technology and as well as the first city-belt expressway Project education. It is the major city of among all second-grade cities of China, (Downtown human resources, science & Jialing River channeling works and 6 Section) of technology and labor force resources Nanchong Port will shape a water, land Xiaoshanzi in Sichuan. The population of and air three-dimensional transportation River in Jialing Nanchong is ranked the second hub for Nanchong City. In 2002, District, among all cities of Sichuan, only Nanchong saw a highway traffic mileage Nanchong City next to Chengdu. of 5571km; all the 482 towns and townships of the city were provided with highways, and 93.3% of villages were open to the traffic. The reconstruction of highway from Nanchong to Langzhou has been fully competed, which opens a south- north channel for Nanchong, enhances the traffic capacity from Nanchong to Xichong, Nanbu and Langzong, and realize the road network from Nanchong to each county seat under a 2-hour economic circle planning. Northern Outer Zizhong County has a Zhonglong Town as a municipal key Zhonglong Town has a long history. Zhonglong Town has over 79.2km 7 Ring Road total area of 1734km2, town has developed fast socially and Early in Zhou Dynasty and the Qin highways at county and village levels. The

40 Administrative Name of S/N division and Socio-economic description Resources/industries Infrastructure subproject population Construction covering 33 towns and economically. Since 1992, it has Dynasty, it was the economic, downtown area of Zhonglong Town is Subproject of townships, with a total introduced capital to infrastructure cultural and logistical center of located on the north bank of Tuojiang Zhonglong population of 1.32 construction. The town has 2 bus Zizhong County. It is a principal River. It has good water transportation Town, Zizhong million. Zhonglong transport stations, 5 markets, 16 schools historical and cultural town. It is rich conditions. It is 140km away from County Town currently governs at various levels with students of over in natural resources and tourist Chengdu, 190km from Chongqing and 23 administrative 25000, and 6 medical organizations. In resources. It has national sites 30km from Neijiang. It is a transfer station villages and 8 urban 2008, Zhonglong Town’s GDP was protected for historical and cultural of land transportation extending to residents’ committees, 1417.8 million yuan, up by 32.3% over value, Wenmiao and Wumiao, and Chengdu and Chongqing. Its traffic is with a total area of last year (present price, the similarly provincial scenic spots, Zhonglong convenient and its location advantage is 47.57km2; the farmland hereinafter); the total output of industry Mountain and Ningguo Temple. obvious. area is 23420hm2, and in present price was 948 million yuan; There are mineral resources such as the farmland area per 5.7km highways were newly constructed, limestone, ceramic mud, rock capita is 0.55hm2; the including 4.2km cement-pavement roads; materials and carbon, showing some total population is 46 mountain ponds and 1 reservoir potential for development. 102,000, including spillway were regulated; a total agricultural population investment of 56.80 million yuan was of 46000 and non- absorbed subject to agreements; the agricultural population family planning rate is 93.7%. The whole of 56000. town saw a healthy and rapid trend of development in economy and all social undertaking also developed in a harmonious manner. Miyi County has a total By the end of 2008, the whole county had a The county is rich in natural By the end of 2008, Miyi County had a population of 210,000, total registered population of 215,595. The resources, especially mineral total highway mileage of 1083km, with 23 minorities such urbanization ratio was 29.5%, up by 0.4% resources, which are widely including 295km level-1 and level-2 as Yi, Hui and Lisu; the over last year. In 2008, the annual distributed. They mainly comprise highways and 50km expressway. The population of the disposable income per capita of the urban vanadium titanium magnetite, service mileage of railway was 72km. The Infrastructure minorities is 36000, residents was 11,182 yuan, and granite and limestone. The basically whole year saw a total volume of circular Construction accounting for 14.5% nonproductive expenditure per capita was proven reserves include 4.04 billion flow of freight by highway 344.40 million 8 Subproject of of the total population 9292. The income of peasants increased ton vanadium titanium magnetite, 2 tkm and a total volume of circular flow of Miyi County of the county. rapidly. In 2008, the annual net income per billion ton granite, 1.68 billion ton passenger by highway 160.05 million (Panlian Town) By the beginning of capita of peasants reached 5179 yuan. limestone, 10 million ton silicon person-km. There are roads and highways 2005, the county seat According to sample surveys, at the end earth and rare minerals such as gold, open to traffic among the county seat, saw a developed area of of 2008, the total building area per capita copper, nickel, zinc, tungsten, towns and townships. The section of 2.5km2; the resident of urban residents of county seat of Miyi uranium, lead, barium, quartz and Chengdu- Railway within the population in the County was 30.65m2, and the total crystal. county was 57km, which is the trunk way

41 Administrative Name of S/N division and Socio-economic description Resources/industries Infrastructure subproject population developed area was building area per capita of rural residents from Panzhihua to Chengdu. 34000, approximately. was 35.97m2. The framework of urban road network has Agriculture is the basic industry of Miyi basically come into being, but not County. The traditional crop farming complete. Currently, Miyi County’s roads mainly comprises paddy, corn, wheat and are divided into three grades, 16-18m sugarcane. In 2008, Miyi County’s total arterial road, 13m branch road and 8m seeded area of crops was 23302hm; the path. The framework of roads is fan- total output of grains was 8470t; the total shaped, with an area of 64300m2, output of tobacco leaf was 7250t; the occupying 3.53% of the current urban total output of fruits was 36624t; the total construction land area; the road area per output of vegetable was 190,200t; the capita is 5.66m2. total output of silkworm cocoon was The county seat has two water plants. The 627t; the total output of sugarcane was water source comes from back of Guangdong 167953t; the total output of Chinese Mountain through a diversion channel. The chestnut was 344t; the total output of water plants and elevated tanks are jointly walnut was 1945t; the total output of used for water supply. The water supply pepper was 172t; the total output of pipeline is 32km in total. The comprehensive potato and the like was 3583t; the total capacity of the water plant is 13000m3/d; the output of corn was 11989t. current average water supply is about Miyi County has developed various 8000m3/d; the water is supplied to a industrial systems covering sugar population of about 35,000. The water supply refining, electric power, building network can fully cover the downtown area materials, mining, smelting and printing. and part of the outskirts. The county seat has It has totally 1123 industrial enterprises. 2 waste landfill sites (1 already established, The industry mainly comprises sugar with a daily capacity of 25t; 1 under refining and building materials. In 2008, construction, with a daily capacity of 80t). the county realized an industrial output The county has one wastewater plant, with a of 1698.45 million yuan; the revenue designed capacity of 10000m3/d. This plant from main operations of the industry adopts the improved oxidation ditch aeration above designated size was 3672 million process. It will be constructed in two phases; yuan; the profit was 270 million yuan. the 1st phase has been completed with a capacity of 5000m3/d and will be put into preliminary operation soon.

42 3.3 Current environmental quality 3.3.1 Survey and assessment of current eco-environment quality 1. Subproject of Puxing Town, Xinjin County According to the field survey, there is no rare plant in the scope of works under assessment. The land types mainly comprise farmland, dryland and wild land. 2. Rainwater and Wastewater Pipe Network & Road Reconstruction Subproject of Daying County (Penglai Town) The works is located in Penglai Town, the county seat of Daying County. All land used for works construction is within the urban planning area. This land has been planned as land for urban construction. No basic farmland protection area is concerned. Road and rainwater/wastewater pipe network reconstruction and expansion works will take advantage of the existing roads; the current state of the land is urban construction land. For the newly-constructed Binjiang Road along Bobai River and its rainwater/wastewater pipe network, the current state of the land is dryland. Within the urban area, the ecosystem is simple. The vegetation is mainly distributed over the green belts on both sides of the existing roads and the dryland within the newly-constructed road area. The road greening mainly depends on arbor, for examples, Camphor tree and indialaurel fig. The crops in dryland mainly comprise corn, sweet potato and vegetable. 3. Infrastructure Construction Subproject of Yingxi Town, Shunqing District, Nanchong City The nature of the land used for the works is urban construction land. It is the newly- confiscated land. This land mainly comprises farmland and also involves some house site, woodland and flood land. Within the scope of construction of the works, no rare plant, rare animal, scenic spot or historic site is concerned. 4. Binjiang Road (Southern Section) Road and Wastewater Interception Subproject of Fengming Town, Pengshan County The scope of the proposed works under assessment mainly comprises farmland. There is a little amount of tree beside the riverbank along the line. Most of the vegetation is wild grass. Within the scope of assessment, no rare plant, rare animal, ancient tree, famous tree, scenic spot, cultural relic or historic site which needs protection is concerned. 5. Environmental Treatment Subproject of Hongya County (Hongchuan Town) The vegetation within the area of the works mainly comprises economic forest, crop and land vegetation. According to the field survey, within the scope of land used for the works, no rare plant, ancient tree or famous tree which needs protection is concerned. Animals within the scope of construction are all commonly-seen rats, bird sand insects. No eco-sensitive target such as rare or endangered species of animal is found. The works involves the south and the north moats. There is no fish due to serious pollution. In the irrigation ditches, there are only loach and crab, other than any rare fish. The current states of the land used for the works are farmland and construction land. According to the Planning for Protection of Basic Farmland in Hongchuan Town (2006-2020), the farmland occupied by the works has been adjusted to urban construction land in the planning.

43 6. Waterway Treatment Project (Downtown Section) of Xiaoshanzi River in Jialing District, Nanchong City The works site is located in the Jialing District. On its both sides, there are industrial enterprises, residential quarters and commercial and administrative office buildings. The eco-environment mainly comprises the urban ecosystem. Within this ecosystem, human is the major life group. The animal community is basically comprised of the domestic animal, whose survival mainly depends on human, not natural enemies, except for part of them impacted by climate or disease. The green plant mainly comprises the planted street tree and greensward. They are the core of the ecosystem. They can beautify the condition, eliminate the pollution and purify the air. Within the scope of the works, no rare or endangered species of terrestrial animal and plant, rare or endangered species of aquatic life, or population, spawning ground, habitat or migration channel of aquatic life worthy of protection is concerned. 7. Northern Outer Ring Road Construction Subproject of Zhonglong Town, Zizhong County The site of the works is located at the outskirts of the urban area, where human activities are frequent. The vegetation in the area is mainly the planted vegetation. The planted crops mainly comprise paddy, corn, sweet potato, soy and various vegetable. The human activities are frequent in the works site. No wildlife is found except sparrow, rat, snake and frog. According to investigation, the works site as well as the 1km range around the works site covers no natural reserves, scenic spot, site protected for historical and cultural value or other eco-sensitive targets. The primary use of the land in the works site is farmland. The secondary and the thirdly uses of the land are wild land and protective green belt. The ecosystem is simple. The works does not involve any basic farmland. 8. Infrastructure Construction Subproject of Miyi County (Panlian Town) The current states of the land used for the works are farmland and construction land. The works is located in the south part of the county seat of Miyi County and in the outskirts. Within the scope of urban area construction, the current use of land is mainly the land used for greenhouse. The natural vegetation has been basically replaced by the planted vegetation. The ecosystem within the works site is simple. There is no large-scale living environment of wildlife, except some habitats of birds such as barn swallow and sparrow. The works site as well as the 1km range around the works site covers no national, municipal or county-level natural reserves, wildlife refuge, forest park, scenic spot, cultural relic or historic site under key protection, eco-sensitive site, or habitat of rare wild animal or plant. 3.3.2 Survey and assessment of current water environment quality Based on the field survey and according to the works design documents, the impacted water bodies on the earth’s surface within the scope of assessment of the subprojects under SSTDP shall be confirmed. Some points shall be arranged to monitor the current condition of the water environment. For some areas where the existing monitored data is complete, the relevant statistics can be directly used. See Table 3.3-1 for the current condition of water environment of the subprojects under SSTDP. Table 3.3-1 Current condition of water environment of subprojects under SSTDP

44 Name of Current condition of water Remarks S/N subproject environment Yangliu River currently has a poor water Monitoring was carried out from Nov. 3-5, quality, which cannot meet the 2009. requirement of category-3 water quality standard in GB3838-2002. The main substances exceeding the standard are Subproject of chemical oxygen demand and ammonia 1 Puxing Town, nitrogen. The main cause for the Xinjin County unqualified water quality of Yangliu River is the waste from the areas along the river banks. Large amounts of domestic wastewater and agricultural wastewater along the river banks are discharged to Yangliu River. Monitoring data were picked from Monthly According to the monitored data, the water Report Form for Surface Water Monitoring quality of Qijiang River is good. All water by Daying County Environmental quality factors can meet the category-3 Monitoring Station (Aug. 3, 2009). water quality standard in GB3838-2002 - Environmental Quality Standards for Rainwater and Surface Water. But the water quality of Wastewater Gubai River is poor. Two factors, i.e., Pipe Network CODCr and total phosphorus, exceed the & Road limits. But the remaining factors can meet Reconstruction 2 the category-3 water quality standard. This Subproject of is because of the mixed flow of the storm Daying wastewater (domestic wastewater) in the County residents’ area close to Gubai River (Penglai (Hongqi Bridge and Luogui Road); this Town) mixed flow is discharged to the rivers on the earth’s surface before proper treatment, which causes the pollution of water body and the decrease of the water quality.

Data from monitoring current conditions of All parameters of the water body in the Xihe River and Naoxi River water qualities evaluated section of Yingxi River can carried out by Nanchong Environmental meet the category-3 water quality standard Monitoring Station on Nov. 3-5, 2009. Infrastructure in GB3838-2002 - Environmental Quality Construction Standards for Surface Water. But three Subproject of factors, i.e., COD, BOD5 and NH3-N, of Yingxi Town, 3 the water body in the evaluated section of Shunqing Naoxi River exceed the limits. The District, remaining factors can meet the category-3 Nanchong water quality standard in GB3838-2002 - City Environmental Quality Standards for Surface Water. This is because of the urban wastewater along the river discharged to the water body. Binjiang Road Meishan Environmental Monitoring Station (Southern Within the evaluated section of Minjiang carried out water quality monitoring for Section) Road River-Maohe River, except chemical surface water Minjiang River – Maohe and oxygen demand, all indicators can meet River of the proposed project located valley 4 Wastewater the category-3 water quality standard in on Oct. 14-16, 2009 and total four Interception GB3838-2002 - Environmental Quality monitoring sections were distributed for Subproject of Standards for Surface Water. The monitoring. Fengming chemical oxygen demand can meet the Town, standard in Cross-section I, Cross-section

45 Name of Current condition of water Remarks S/N subproject environment Pengshan II and Cross-section III, but exceeds the County limit in Cross-section IV. This is because of the domestic wastewater along the Cross-section IV; this wastewater cannot flow into the wastewater treatment plant and is therefore directly discharged to the water body. For the south and the north moats, because Survey sensory indexes on site. Environmental of the untreated domestic wastewater Treatment discharged directly to the river, the water Subproject of quality of the rivers is quite poor. The 5 Hongya water bodies are black and give out smell. County Water weed, waste and oil appear on the (Hongchuan river surface. The indicators of water Town) quality of these water bodies cannot meet the category-4 water quality standard. According to the monitored data of the Monitoring was carried out from Nov. 2-4, current condition, at the cross-section 2009 and total two monitoring sections were 500m upstream of the regulated river distributed for monitoring. section under the works, the indicators of Waterway COD, BOD5 and coliform bacteria Treatment significantly exceed the limits. This is Project because of the direct discharge of (Downtown domestic wastewater within the area; there Section) of is no wastewater drainage pipe network on 6 Xiaoshanzi both sides of the line. The other monitored River in cross-section is the cross-section where Jialing Xiaoshanzi River joins Nixi River. In this District, cross-section, all the indicators of COD, Nanchong BOD5, ammonia nitrogen and coliform City bacteria significantly exceed the limits. This is because of the discharge of the farmers’ domestic wastewater and some aquiculture wastewater along the line. In accordance with Zizhong County In 2008, the quality of the water Environmental Quality Report of 2008. environment of Zizhong County is good. The trunk stream of Tuojiang River has a good quality. There are totally 12 cross- sections for water quality monitoring within the whole county, including 7 Northern cross-sections on rivers, 3 cross-sections Outer Ring on lakes and 2 cross-sections on drinking- Road water sources. The cross-sections at Construction Shunhechang and Yinshan Town in the 7 Subproject of trunk stream of Tuojiang River see good Zhonglong water quality all the year round. But the Town, water quality of Qiuxi River and Mengxi Zizhong River is poor. The factors exceeding the County limits are total nitrogen and total phosphorus. The quality of the water from the drinking-water sources, Zizhong Water Plant and Mengxi River Power Station, are good; their water quality can meet the category-3 water quality standard all the year round. Infrastructure The monitored data shows that the water Quote inspection data from Report for 8 Construction quality of Anning River is good. The Water Quality Monitoring of Surface and

46 Name of Current condition of water Remarks S/N subproject environment Subproject of water quality factors can meet the Potable Water Source Huangqiao Reservoir Miyi County category-3 water quality standard in of Miyi County, Panzhihua City in Aug. (Panlian GB3838-2002 - Environmental Quality 2009 (PHJ Zi [2009-08 SG] No. 200) by Town) Standards for Surface Water. Panzhihua Environmental Monitoring Station. Three monitoring sections were distributed at Xijie Bridge of Anning River, Xiancheng Bridge and Xiaode Stone Bridge. 3.3.3 Survey and assessment of current atmosphere environment quality Based on the field survey and according to the works design documents, the main sensitive points of atmosphere environment within the scope of assessment of the subprojects under SSTDP shall be confirmed. Some points shall be arranged to monitor the current condition of the atmosphere environment. For some areas where the existing monitored data is complete, the relevant statistics can be directly used. See Table 3.3-2 for the current condition of atmosphere environment of the subprojects under SSTDP. According to the monitored result of the current condition as well as the statistics of the routine monitored data, except for adsorbable particles of Zhonglong Town of Zizhong County, which exceeds the limit in the routine monitoring, the site of all other works can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard. Table 3.3-2 Current condition of atmosphere environment of subprojects under SSTDP Name of Name of monitoring Item SO NO TSP PM NH H S Assessment Remarks Subprojects 2 2 10 3 2 point Average According 0.037 0.055 0.286 (mg/m3) to the Standard ( monitored 1# 0.5 0.12 0.3 mg/m3) result, all SO2, NO2 Actual and TSP can Reach the standard. Reach the standard. Reach the standard. Carried out by condition meet the Average level-2 Chengdu 0.036 0.055 0.272 0.12 0.008 4) standard in Jinjiang Subproject of (mg/m GB3095- Environment Puxing Town, Assessment 1996 - Xinjin County standard ( 0.5 0.12 0.3 - - Monitoring Ambient Air mg/m4) Station on Quality Nov. 3-7, 2# Standard, indicating 2009. Actual that the site Reach the standard. Reach the standard. Reach the standard. - - of the works condition has a good atmosphere environment Rainwater and Average No Daying 3 0.047 0.033 0.19 Wastewater (mg/m ) significant Monitoring Pipe Network atmospheric Assessment Station & Road Chinese standard ( 0.15 0.12 0.3 pollution Reconstruction Dead Sea source is sampled and mg/m3) Subproject in found in the monitored Assessment Daying 0.31 0.28 0.63 site; atmospheric County indicator indicators of environment (Penglai Average all quality at 3 0.049 0.034 0.2 Town) Office (mg/m ) assessment three regular factors are Building of Standard ( monitoring 3 0.15 0.12 0.3 much less County mg/m ) than 1; the points at the Government Assessment first half year 0.33 0.28 0.67 quality of indicator the ambient of 2009 5-star Average air is good; according to 0.051 0.035 0.2 Living (mg/m3) the ambient Report for i t 47 Name of Name of monitoring Item SO NO TSP PM NH H S Assessment Remarks Subprojects 2 2 10 3 2 point Quarter - Assessment air can meet Report for Jinxiuyuan standard ( 0.15 0.12 0.3 the level-2 Daying standard in mg/m3) Atmospheric GB3095- 1996 - Environment Ambient Air Quality of Quality First Half Standard; Year of 2009. Assessment 0.34 0.29 0.67 the indicator requirement of functional use can be met. Monitored For the 0.084- value 0.038-0.078 0.024-0.036 1#point, all 0.107 (mg/m3) the SO2, Assessment NO2 and Pi standard ( 0.5 0.24 0.15 of PM10 are Monitoring less than mg/m3) date: 1.0, continuous 7 indicating Infrastructure days, namely that the Construction SO2, NO2 Nov. 2-8, Subproject of and PM10 2009. Data Yingxi Town, 1# do not source: Shunqing exceed the District, Monitoring limit; the Nanchong report issued Assessment 0.56- ambient air City 0.076-0.156 0.1-0.15 by Nanchong indicator 0.71 can meet the level-2 Environment standard in Monitoring GB3095- Center. 1996 - Ambient Air Quality Standard. Monitored Data are value 0.018-0.027 0.056-0.071 0.158-0.170 acquired from (mg/m3) monitoring of Standard ( 3 0.5 0.24 0.3 air around the mg/m ) proposed The quality Project carried of ambient Binjiang Road out by air in the (Southern Meishan evaluated Section) Road area is Environment and good, Monitoring Wastewater meeting the Station on Interception 1# level-2 Subproject of Oct. 14-18, standard in Fengming 2009 at Actual GB3095- Town, Reach the standard. Reach the standard. Reach the standard. Pengshan condition 1996 - Pengshan Ambient Air Fengming County Quality Vocational Standard. High School, aiming at pollution emission characteristics of the Project. Environmental The current condition of the quality of ambient air in the works site is good. According to the routine monitoring data of Regular Treatment Hongchuan Town for the period from 2007 to 2009, provided by the Monitoring Station of Hongya County, Hongchuan monitoring Subproject of Town’s atmosphere environment can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard. data for Hongya H h

48 Name of Name of monitoring Item SO NO TSP PM NH H S Assessment Remarks Subprojects 2 2 10 3 2 point County Hongchuan (Hongchuan Town carried Town) out by Hongya Monitoring Station during 2007-2009. Monitored Within the value 0.071-0.031 0.051-0.008 0.251-0.175 site of the 1#, Spark (mg/m3) works, the Computer ambient air Waterway Assessment Hope can meet the Treatment standard ( 0.5 0.24 0.3 Monitoring Primary level-2 Project of mg/m3) School standard in was carried Xiaoshanzi Actual GB3095- out by River Reach the standard. Reach the standard. Reach the standard. condition 1996 - Nanchong (Downtown Ambient Air Section) in Monitored Monitoring Quality Jialing value 0.028-0.378 0.014-0.045 0.179-0.235 Station on 2#, Jialing 3 Standard. District, (mg/m ) Nov. 3-9, No. 1 The current Nanchong Middle Standard ( condition of 2009. City 3 0.5 0.24 0.3 School (Old mg/m ) atmosphere Campus) Actual environment Reach the standard. Reach the standard. Reach the standard. of the works condition site is good. Monitored SO2 and 0.047- value 0.071-0.031 0.014-0.034 NO2 can 0.253 (mg/m3) meet the Standard ( level-2 0.5 0.24 0.15 Northern mg/m3) standard in Outer Ring GB3095- Road 1996 - Report for Construction Ambient Air Zizhong Subproject of Quality Zhonglong Standard; Environmental Town, Actual exceed but part of Quality (2008) Reach the standard. Reach the standard. Zizhong condition the limit the County monitored data of PM10 exceeds the limit. Infrastructure Monitored No 0.059- Technical Construction Hexi value 0.011-0.014 0.009-0.01 significant 0.084 Report for Subproject of (mg/m3) atmospheric Panzhihua Miyi County standard ( pollution 3 0.5 0.24 0.15 Miyi Ambient (Panlian mg/m ) source is i Q lity

49 Name of Name of monitoring Item SO NO TSP PM NH H S Assessment Remarks Subprojects 2 2 10 3 2 point Town) found in the air Quality site; Monitoring indicators of Points (Dec. all assessment 15, 2006) factors are much less than 1; the quality of the ambient air is good; the ambient Assessment 0.393- air can meet 0.073-0.093 0.113-0.125 indicator 0.56 the level-2 standard in GB3095- 1996 - Ambient Air Quality Standard; the requirement of functional use can be met. 3.3.4 Survey and assessment of current acoustic environment quality Based on the field survey and according to the works design documents, the main sensitive points of acoustic environment within the scope of assessment of the subprojects under SSTDP shall be confirmed. Some points shall be arranged to monitor the current condition of the acoustic environment. For some areas where the existing monitored data is complete, the relevant statistics can be directly used. See Table 3.3-3 for the current condition of acoustic environment of the subprojects under SSTDP. Table 3.3-3 Current condition of acoustical environment of subprojects under SSTDP Name of Monitoring Day Night Location of monitoring point Assessment Remarks subprojects point No. (Leq) (Leq)

Old Urban Area Primary 53.1 44.3 1 School 52.6 43.1

54.3 46.2 According to the monitoring Carried out by 2 Old Urban Area Health Center report, all monitoring points can Subproject of Chengdu Jinjiang 53.7 44.6 meet category-2 standard, Puxing Town, Monitoring indicating that the works site’s Xinjin County Newly-built wastewater 54.0 45.1 current condition of acoustic Station on Nov. 3- 3 environment is good. 4, 2009. treatment plant 54.5 44.3

Boundary between New Urban 64.3 54.3 4 Area and Chengdu-Ya’an Expressway 63.8 54.3 Rainwater and Longshengjie Resettlement For the category-2 zone, the 1 69.1 54.0 Monitor for Wastewater Community current condition of the hospital continuous two Pipe Network Middle School of Daying close to streets basically cannot 2 56.0 45.1 days, namely Oct. & Road County meet category-2 standard in Reconstruction GB3096-2008 - Environmental 8-9, 2009. Subproject in 3 Canton Hospital 70.1 54.8 Quality Standard for Noise; the Daying category-3 zone can basically Penglai School of Daying County 4 54.7 44.5 reach the standard; the category- (Penglai County 4 zone can meet category-4

50 Name of Monitoring Day Night Location of monitoring point Assessment Remarks subprojects point No. (Leq) (Leq) (Penglai Splendid Penglai Residential 4 zone can meet category-4 5 62.9 65.0 Town) Community standard except for the first row of commercial & residential 6 Daying Union Hospital 60.9 52.0 houses on both sides of the trunk road Keguan Street, which Daying Middle School, 7 57.0 60.0 exceed the limit; this is because Penglai Campus the works site is located in the Residential Community of 8 56.9 45.1 urban developed area, where Qilin Street most of roads are within or near Residential houses on both the busy areas, with large traffic 9 71.4 54.0 sides of Keguan Street flows and frequent human activities. Residential houses on both 10 68.2 53.9 sides of Lower Jiaotong Street Residential houses on both 11 67.0 52.2 sides of Luogui Road 53.4 43 1 Yingxi Town Luo’s Court 53 42.6 Monitoring date: Infrastructure The monitored value of noise at Construction No. 1 Primary School of 52.4 44.6 Nov. 4-5, 2009 all points can reach the Subproject of 2 Data source: Yingxi Town standard. The noise in the works Yingxi Town, 51.2 44.1 Monitoring report site in daytime and at night can Shunqing meet the category-2 standard in issued by District, Vocational Middle School of 54.9 44.2 3 GB3096-2008 - Environmental Nanchong Nanchong Yingxi Town 54.4 43.5 Quality Standard for Noise. Environment City Monitoring Center Proposed Site of Yingxi Town 50.5 42.1 4 Wastewater Treatment Plant 49.1 41

Residential Building at 55.6 35.1 1 Data are from Starting Point of Works 54.5 37.6 monitoring of acoustic Binjiang Road Dormitory Building of 56 37.4 environment of (Southern 2 The equivalent sound levels the Project carried Section) Road Vocational High School 56.8 38.4 Leq(A) at all monitoring points and within the evaluated area can out by Meishan Wastewater meet the relevant standards in Environment Residential Building at No. 53, 55 36.4 Interception 3 GB3096-2008 - Environmental Monitoring Tongjiangli Subproject of 55.3 41.7 Quality Standard for Noise. Station on Oct. Fengming Therefore, the quality of 14-15, 2009. Town, 54.8 39.1 acoustic environment within the Totally five noise Pengshan 4 Farmhouses at Ends evaluated area is good. County 57.7 38.8 monitoring points are distributed 56.6 38 along the 5 Tongjiang Road Dike proposed road. 57.7 37.2 Environmental Disease Prevention and Because the evaluated area Monitoring date is Treatment 1 Control Center of Hongya 63.2 52.8 under the works is located in Subproject of County urban area and outskirts of Sep. 22-25, 2009. Hongya People’s Hospital of Hongya Hongya County, no great source 2 54.3 46.5 County County of noise pollution is found (Hongchuan nearby. The major noise comes Town) 3 Hongya Middle School 53.7 45.4 from Disease Prevention and Control Center of Hongya Zhongbao High School of County, and others are social 4 Hongya County, Central 56.9 47.2 noise. The quality of acoustic Campus environment is good. The Hongchuan No. 2 Primary acoustic environment can meet 5 57.8 46.3 School of Hongya County the category-2 standard in Hongya Vocational High GB3096-2008 - Environmental 6 55.6 43.7 Quality Standard for Noise School except for sensitive points

51 Name of Monitoring Day Night Location of monitoring point Assessment Remarks subprojects point No. (Leq) (Leq) Residential houses along except for sensitive points. 7 54.8 46.4 northern moat Residential houses along 8 55.2 44.9 southern moat 1 Baimamiao Village 48.6 45.6 Waterway The acoustic environment of all Jialing No. 1 Middle School Treatment 2 52.6 40.6 monitoring points can meet the Project of (New Campus) category-1 standard in GB3096- Xiaoshanzi Spark Computer Hope Primary 2008 - Environmental Quality Monitoring date is River 3 51.6 38.0 Standard for Noise except for School Nov. 4-6, 2009 (Downtown Jialing No. 1 Middle School Jialing No. 1 Middle School Section) in 4 56.5 43.6 (Old Campus), where noise and there are 6 Jialing (Old Campus) exceeds the limit. Generally, the monitoring points. District, Nanhong Residential quality of acoustic environment 5 54.0 42.3 Nanchong Community within the evaluated area is City Duweiba Residential good. 6 54.1 42.3 Community Because the evaluated area 1 Qing’s Court 54.3 42.7 Northern under the works is located in Outer Ring urban area and outskirts, no 2 Zhou’s Court 56.7 43.2 Road great source of noise pollution Construction is found nearby. The major 3 Zhangjiabian 52.1 44.6 Monitoring date is Works of noise is social noise. The quality Zhonglong of acoustic environment is Sep. 24, 2009. Town of good, meeting the category-2 Zizhong 4 Xiaoyuanzi 51.9 42.1 standard in GB3096-2008 - County Environmental Quality Standard for Noise. 55.2 46.3

1 Hexi Residential Community 54.8 45.9

54.4 46.1

51.2 43.3 Monitoring shall Commune 2 of Shuitang be carried out at 2 51.1 42.8 Village 14:00-15:00 in the day and 22:30- 51 42.6 Within the scope of assessment, Infrastructure there are totally 5 residential 23:30 at night of Construction 57.2 46.8 communities. The quality of Oct. 15-16, 2009 Subproject of Commune 3 of Shuitang acoustic environment is good, at the frequency 3 55.4 45.3 Miyi County Village meeting the category-2 standard of once in the day (Panlian in GB3096-2008 - 53.2 44.9 and once at night. Town) Environmental Quality There are 5 Standard for Noise. 54.4 45.2 monitoring sections and 4 Group 8, Qingpi Village 54.1 45.1 totally 15 53.9 44.8 monitoring points.

52.2 42.1

5 Group 8, Qingpi Village 51.9 42

52 42.1

Generally, acoustic environmental quality of each subproject is high except for that individual sensitive point near the main is greatly impacted by noises and exceeds the standard.

52 Chapter IV Environmental Impacts and Measures 4.1 Analysis of major pollutants See Table 4.1-1 for Analysis of major factors of environmental impacts of SSTDP. Table 4.1-1 Analysis of major factors of environmental impact Location of Factors of Source and stage of Extent of Period Major pollutants source of Characteristics impact impact impact impact Along the road or river Scattered and channels; or Earth and stone Earth and stone; small-scale Ecological address of Slightly works; land waste soil and damage on environment wastewater weak acquisition works site vegetation and treatment debris flow plant, pipe network lines Road, waterway treatment; pipe network Transportation and Transportation The scope of Acoustic construction Slightly construction and machine impact is small environment lines or weak machineries noises and scattered address of wastewater treatment plants Earth and stone and transportation of Road Construction construction construction Period materials; piled lines or Source at road TSP, PM , NO , TSP is dispersed materials; 10 2 address of surface; scope Ambient air CO and asphalt relatively smoke gas of water supply of impact is smoke strong construction factory and small machineries; pipe network construction of lines asphalt road surface Water Construction Slightly Relatively Domestic wastewater SS, COD environment site weak scattered Household rubbish Household and Construction Slightly Solid wastes and works waste by construction site; works Works lines weak construction workers rubbish building zone Relocation of residents; resettlement as a Directly or result of demolishing and relocation; Short-term or Social indirectly Relatively land and resource utilization; road regional environment impact the Obvious occupied; traffic jam and short-term cut- impacts region off of water supply Construction Provincial-level Cultural Works construction Dust and land Relatively control region Cultural heritage in Hongya County occupied weak of Zhoujiaci Protection Site Relatively In the Mostly low-speed weak; only Road traffic proximity of traffic; equipment relatively Operation Acoustic noise; equipment road lines or Long-term manufacturing noise strong in period environment manufacturing address of Impact of wastewater some noise wastewater treatment plant sections of treatment plant road lines

53 Location of Factors of Source and stage of Extent of Period Major pollutants source of Characteristics impact impact impact impact Car exhaust; Along road NO , CO, unbearable smell of 2 lines; nearby Relatively Long-term Ambient air Ammonia and wastewater treatment the wastewater weak impact other smells plant treatment plant In the Road, wastewater Ecological proximity of treatment factory, Slowing Long-term Ecological Environment is road lines and protective slope and down debris beneficial environment changing for water supply ecological vegetation flow impact better factory; pipe restoration network lines Directly or Long-term Social Smooth road network; improve indirectly Obvious beneficial environment environment and living environment impact the impact region

4.2 Analysis of major impacts and mitigation measures 4.2.1 Ecological environmental impacts and mitigation measures 1. Analysis of ecological environmental impacts During construction period, major means of ecological environmental impact and damage include main works occupying land; altering the nature of land utilization; destroying vegetation; reducing the arable land along the line; low rate of coverage of vegetation. Earth and stone works causes debris flow; works activities disrupt natural ecological balance, leading to negative impact on the survival of organisms along the line. All subprojects under SSTDP do not cover any natural reserve, scenic area or forest park, except for that Environmental Treatment Subproject of Hongya County (Hongchuan Town) crosses the construction control zone of Zhoujiaci provincial heritage conservation unit and it has been approved by local relic protection authorities (HWTF [2009] No. 29). The works, earth and stone amount as well as works land occupied are all relatively small, posing little damage to vegetation and exerting little impact on debris flow. Through ecological protective slope in latter works stage and planting of more trees, this problem can be alleviated. The works of environmental treatment works in Hongya County (Hongchuan Town), and waterway treatment works in Xiaoshanzi River Downtown Section of Jialing District of Nanchong City belong to the issues of environmental treatment, which revolves around river channel dredging and ecological treatment. The works implementation will dramatically improve our ecological environment. 2. Mitigation measures of ecological environment (1) Measures of vegetation protection and restoration During the process of construction, mellow soil on the surface of arable farmland of permanently land acquisition or temporarily used land shall be kept and preserved. After construction is completed, the mellow soil shall be covered back on it as soon as possible to recover vegetation. Particularly after works is over, efforts shall be made to recover vegetations for temporarily utilized land and trees shall be planted in temporary shed slashes.

54 In selection of plant species for either side of the road, apart from taking the quick growing species of trees into consideration, shrubs from identical regions shall be transplanted to ensure the high rate of survival, blending with the nature and at the same time, heading off the invasion of plants, reliving the true color of nature. Efforts shall be made to increase the biodiversity of plant species in the corridor region; boosting the capability of fighting against diseases and pests and strengthening the stability of corridor. Besides, the selection of sprouts of tree types has been subject to strict inspection and vaccination to prevent invasion of pests. (2) Animal protection 1) Propagation of laws and regulations on protection of wild animals and crackdown of behaviors of hunting wild animals Intensify propagation of laws and regulations on protecting wild animals so as to inculcate the importance of protecting wild animals in construction workers; educating the public not to hunt wild animals; wild animals, if caught, shall be moved elsewhere away from roads. 2) Reasonable selection of construction period and process to minimize the impact on animals 3) Prevention of pollutions to zootope Strengthen all sorts of sanitary management for construction workers (such as personal hygiene, excrement and domestic wastewater); prevent direct discharge of domestic wastewater; reduce water pollution; make efforts in restoration of ecological environment after construction is over to reduce the negative impact of damaged vegetation and debris flow on water quality and aquatic organisms. Meanwhile, equal attention shall be paid to prevention and vaccination of people and livestock in non-assessment region as a result of damage done by animals. (3) Measures for prevention of invasion of exotic species There has been no mature means of preventing invasion of exotic species during construction and operation periods of the project. In light of works characteristics, the following measures are suggested to be adopted to prevent invasion of foreign species: intensify advertising efforts to construction workers about the damage of foreign species and means of transmission; strict inspection shall be conducted on imported fruits, seeds and flowers to determine if some quarantined diseases or pests have been brought into the works zone; for current existing exotic species, utilize the opportunities of works construction to burn plants that bear fruits on the site to prevent dispersal of seeds; some forest-cutting slashes are most vulnerable to invasion of foreign species and greening efforts shall be made in temporarily used regions (4) Protective measures of aquatic organisms Ordinary protective measures are: intensify protection of aquatic environment to prevent the occurrences of eutrophication in some aquatic regions along the line; minimizing the impact on the environment of habitat for aquatic organisms. The following measures are suggested by EIA (Environmental Impact Assessment) to be adopted to protect aquatic organisms. 1) Protective measures for aquatic organisms during construction period

55 The piling of materials used for construction shall be away from water source or other water bodies; site that can be hardly washed by torrential runoff is ideal. If some construction materials are piled up near the bridge, ditches shall be dug up in the perimeter of the site where materials are piled up and retaining walls shall be erected to prevent torrential runoff from entering the water body and affecting water quality. All sorts of materials shall be equipped with facilities that shelter rain. 2) Protective measures of aquatic organisms during operation period include the following aspects: Vehicles that carry coal, lime and cement that are not covered are banned from traveling on road; freight containers and overloaded trucks that have oil leak or material leak are banned from traveling on roads; stick to measures guaranteeing the safety of vehicles transporting dangerous stuff and regarding handling of accidents Reasonably organize construction procedures and construction machineries; strictly carry out drainage design and implementation according to road construction standards and conduct education to construction workers regarding necessary protection of ecological environment Complete restoration of ecological environment after the project is completed to reduce the impact of vegetation damage and debris flow on aquatic organisms 3. Water and soil conservation measures (1) Preventive measures for water and soil erosion in the area of main works Before construction of excavation of side slope of main works, protective measures shall be adopted for the top of side slope. Tentative drainage ditch shall be set in place in the perimeter of excavation region and sand trap shall be installed along the drainage ditch. After temporary drainage ditch is used, it shall be refilled and forests are planted. During the construction of dam filling, temporary torrent gutter shall be installed along both sides of subgrade so that rainwater can be discharged to the outside of subgrade along the torrent gutter to prevent washing of side slopes. Masonry works of excavation and refilling side slope shall be timely protected and built as the design of side slope is stable. Meanwhile, slope surface and slope foot drainage system shall be done so that construction and masonry reinforcement can be done in an orderly manner. Measures including grid protective slope, masonry facing wall and planting grass between grid and arch shall be adopted for side slope of subgrade of the section of excavation and filling. Water and soil can be effectively preserved while planting grass and trees on side slopes. Given the land conditions, within the range of protected land on both sides of the roads, arbor – shrub method shall be adopted in planting in the sense that a row of shrubs can be planted amidst evergreen arbor. To prevent debris flow as a result of loose revealing of road surface within the protected region at the initial phase of planting arbor and shrubs, some quick-growing grasses shall be grown at the same time to form a comprehensive colonial system of ecology. (2) Preventive measures for water and soil erosion in construction occupied ground

56 Temporary drainage ditch and sand trap shall be installed on the lower side before field works and utilization of temporary construction sites; after construction is complete, structures on the road surface and hardened road surface that are no longer needed shall be removed and demolished promptly and advancing to the next phase of vegetation restoration. The excavation of borrowing site shall prevent the formation of extremely steeped side slope; ensuring drainage ditch is dug up every time before excavation. After excavation is over, earth shall be refilled to recover vegetation. The filling volume of this project is substantially greater than the excavation volume. Hence, the waste soil of the construction can be directly used for backfill and utilization of the site, reducing the land occupied by waste soil. Table 4.2-1 Analysis of ecological environmental impact and assessment of each subprojects under SSTDP Name of S/N Ecological environmental impact Description of measures subproject Permanent land acquisition from Group 1 to Group 5 in Xilong Village of Puxing Town is 793.08mu of which arable farmland accounts for 620mu gardens occupy 33mu; forests account for 64mu; 45mu of land that is returned to grain plots to forestry; housing land occupies an area of 31.08mu The ecological Strengthen propaganda and education Subproject of environment of project region is mainly works of ecological environmental Puxing protection, pay attention to vegetation 1 agricultural farmland; the area covered by Town, Xinjin restoration and construction of new forests is not large and categorized by the County greenbelt in excavation slope protection type of vegetation damaged, it mainly and reinforcement area of the Project. consists of artificial secondary forest; excluding precious protective vegetation; debris flow in the region is 12,260 tons, of which 9,180 tons were newly added amount of debris flow and the amount of debris flow of the original terrain is 3,080 tons. 1 Protect water and soils by blocks by stages: Minimize excavation area and reduce slope of excavation surface. Transport filler just before compression and reduce storage quantity of loose soils. Take full advantage of demolished building wastes and reduce new water and Rainwater and soil erosion caused by transportation of Wastewater The area of land permanently occupied by 4 2 building wastes. Set a sedimentation basin Pipe Network the works is 18.27×10 m ; area of of drainage ditch around the selected site & Road permanently land acquisition is 60.1mu and carry out oil removal and Reconstruction works site will damage vegetation, sedimentation treatments upon 2 Subproject in disrupt road surface and thus cause debris construction wastewater for at least 2 Daying flow. The total amount of debris flow hours and monitor and discharge them County caused during the works construction upon compliance with standard. (Penglai period is approximately 700t. 2 Greening measures: Plants with Town) ornamentation are preferred to highlight landscape effect under the premise of meeting the required functions. 3 Protections to ancient trees: Protect the two ancient trees on Qiqiang Road East according to existing road bypass proposal. Barriers shall be set outside the ancient tree protection fences during

57 construction and protection warning sign shall be set. 4 Transplant street trees at two sides of the road. Strictly control temporary occupied area. Restore in time upon completion of the Project the vegetations damaged by temporary facilities such as spoils during construction. This project occupies a land measuring 300mu in total and the land is utilized for urban construction, belonging to newly land acquisition. The type of newly land acquisition is mainly farmland, as well as some housing lands, forests and flood Reasonably plan soil and stone land. The project occupies a relatively allocation and transportation, reduce smaller area and does not account for temporary occupied ground. Ecology or basic protection zone of agricultural cultivation of all grounds temporarily farmland. It is in line with the overall occupied shall be restored upon Infrastructure layout of land utilization in the urban completion. Construction planning. After the construction is Strengthen propaganda works of Subproject of completed, it will help to better the construction workers’ environmental Yingxi Town, 3 functions of the city. protection awareness. Shunqing During construction period, the total area Road greening and greening works District, of land used for construction is 2.0mu and along banks of Yingxi River shall employ Nanchong the types of land occupied are mostly local plants adapted to local climate and City farmland and flood land. During soil conditions. Trees impacted by land construction period, the accumulated acquisition within the Project boundary, if amount of debris flow of works is in good growth status without pests, shall estimated to be 1610.4 t; among which be transplanted. the newly added amount of debris flow is Prohibit introducing exotic species. 1006.5t. After the project is completed, through road surface hardening and vegetation restoration, regional debris flow can be effectively controlled.

1 Collect and store surface mature soils as many as possible during construction and cover mature soils in time upon completion of construction for vegetation restoration. 2 Construction materials shall be stacked far away from water source and other water body. Some construction materials, Binjiang Road Vegetation is mainly a handful of arbor if stacked near the bridge site, shall be (Southern and huge areas of shrubs; mostly weeds excavated with open ditch around and set Section) Road (protective slope and flood land. There is with barricade etc. Each type of material and a small area of farmland. According to shall be equipped with rain-proof and Wastewater data of land occupied by construction, shedding facilities. 3 Protective measures to aquatic 4 Interception based on analysis of diagram of organisms during operation period: Subproject of vegetation type, the area occupied by Prohibit vehicles transporting Fengming each type of vegetation is 4.3×104m2, uncovered bulk cargos such as coals, Town, biomass loss is 98.03t/a. limes and cements to get onto the road, Pengshan There are rare plants in the scope of prohibit tank trucks with oil or material County assessment of the proposed project. leakage and overloaded trucks to get onto the road, and implement protective measures for hazardous material transportation truck to pass safely and treatment of accidents. Reasonably organize construction procedures and machines and carry out necessary propaganda and education of ecological environmental protection upon

58 construction workers. Restore ecological environment upon completion of the Project to reduce impacts upon aquatic organisms by vegetation damage and water and soil erosion. Rainwater and wastewater distributaries and waterway treatment works has approximately 109.27mu of permanently land acquisition; of which arable farmland is 74.81mu; construction 1 Temporary occupied ground for occupies an area of 34.46mu; tentative construction which is left upon land area is approximately 60mu; the total completion of construction shall be volume of earth and stone is leveled and its vegetations shall be Environmental 11.44×104m3; of which excavation is restored. 2 Greening protection shall be Treatment 10.12×104m3 and filling is 1.32×104m3 carried out at two sides of riverbank to Subproject of and waste is 8.80×104m3, posing reduce water and soil erosion and beatify 5 Hongya them. 3 Underwater constructions such as insignificant impact on ecological County earth and stone excavation of riverbed environment. The green area along the (Hongchuan (including waterway desilting) as well as line as a result of digging new river Town) dry pebble paving must be carried out channels is roughly 3600m2; about 135 during dry season and must be constructed trees are relocated, generating small to above flood control level prior to flood volume of earth and stone as a season to control water and soil erosion of consequence of disrupting road surface as riverbank works. well as debris flow. The area of works disturbance is 0.11km2 and major works during construction period will cause a total of 75.9t of debris flow. Construction of waterway treatment works includes excavation and filling of earth and stone as well as excavation of laying works of drainage pipes, causing Waterway regional debris flow or adding the amount 1 Prepare complete construction plan, treatment of soil erosion. Through reasonable reasonably arrange construction period Project in scheduling of construction procedures, and reduce water and soil erosion. 2 Xiaoshanzi expediting progress of construction and Reduce exposure period of loose ground River promptly refilling earth and stone, the during construction. Protection works for 6 Downtown phenomenon of debris flow is effectively excavation slope and backfilling slope Section of controlled. After the construction of shall be carried out immediately upon Jialing District waterway treatment works, the area of design of stabilized slope. 3 Strengthen of Nanchong forestation along river banks is water and soil conservation and vegetation City 30,198m2; ecological revetment is restoration of spoil ground. measured 10,006 meters, which can effectively improve the ecological environmental quality along both river banks. This project occupies an area of (1) Reasonably plan and well do 306.13mu, of which arable farmland has longitudinal allocation and transportation of soils and stones to minimize temporary an area of 291.86 mu; forest land is Northern occupied ground; (2) Reasonably arrange 2.57mu; water pond is 0.4 mu and other Outer Ring construction schedule and minimize lands occupy an area of 11.3mu. The land Road excessive construction area and reduce occupied by road works will alter the Construction period for use of temporary occupied layout of land utilization, affecting land ground; (3) Spoils of the Project shall be 7 Works of biomass and productivity, and reducing removed in time to avoid water and soil Zhonglong amount of food output. Works has little erosion in rainy season and surface mature Town of effect on plant biodiversity; barely any soils shall be collected for land Zizhong direct impact on mammals and bird reclamation; (4) Do not dump wastes County species and certain direct impact on produced during construction at will and place them at specified location; (5) amphibians and reptiles. A total amount Greenbelt restoration and compensation of 319t of debris flow will be caused by measures; (6) Measures for mitigation of h i k d i i 59 the main works during construction street extension at both sides of the road; period. (7) Cover temporary dreg-stacking yard with dust-cover as per water and soil erosion prevention proposal and clean the yard and restore the greening immediately upon completion of construction. (1) Reasonably plan and well do longitudinal allocation and transportation of soils and stones to minimize temporary The proposed project has a permanent occupied ground; (2) Minimize occupied area of 9.6hm2 (of which arable farmland ground under the premise that the construction site scope meets construction occupies an area of 7.06hm2; housing requirements of the Project; (3) Maintain land is 0.67hm2; urban infrastructure land mature soils as many as possible; (4) has an area of 1.87hm2). The temporary Infrastructure Underwater construction of flood control area of land occupied is 4.07hm2 (of Construction embankment works shall be carried out which arable farmland is 3.01hm2 and Subproject of during dry season for retaining, so as to 8 urban infrastructure land has an area of prevent waste slags from dropping into the Miyi County 1.06hm2). The permanent land occupied river and to avoid fish breeding period in (Panlian by the works will destroy vegetation, spring (Feb. to May) at the same time; (5) Town) disrupt road surface, and cause debris Reasonably use temporary occupied flow. During construction period, the total ground and reduce occupation period, restore ground functions in time upon amount of debris flow caused is 3,600t completion of the Project; (6) Do not and newly added amount of debris flow is dump wastes produced from construction; 3,450t. (7) Greenbelt restoration and compensation measures; (8) Measures for mitigation of street extension at both sides of the road. 4.2.2 Analysis and assessment of noise environmental impact 1. Analysis and mitigation measures of acoustical environmental impact during construction period (1) Analysis of acoustic environmental impact during construction period The noise during construction period mainly refers to noise generated during the process of operations of all sorts of construction machineries, equipments and works transport vehicles. According to works characteristics, different constructions require different machineries. There are relatively many works under SSTDP, mostly all sorts of mechanical equipments required for road works and construction noise is the most evident. So far, commonly used machines mainly include: excavator, shovel loader, tire roller, paver and blender. It can be divided into fixed source and mobile source of noise. Fixed source refers mainly to construction machineries and mobile source of noise is mainly vehicles transporting materials. The intensity of noise source of construction machineries falls in the range of 80- 100dB (A). The noise generated by construction machineries during construction period of the project can basically meet the requirements of standards during day “Noise Limit for Construction Site” (GB12523-90) at a distance of 60 meters; meeting the requirements for night standard at a distance of 300 meters. Most of subprojects under SSTDP are located in construction regions of the city and peripheral regions. There are certain numbers of noise-sensitive structures in residential regions within a distance of 300 meters. The construction period is affected somehow. (2) Mitigation measures of acoustic environmental impact during construction period 1) The Constructor must choose construction machineries that meet relevant national standards; it would be best to choose low-noise construction

60 machineries or processes and reduce noise source and sound source in a fundamental manner. 2) Require project construction to reasonably schedule construction time; carry out construction according to the requirements of site management of construction; steam hammer, large-scale crane equipments, concrete blender and other high-noise equipments are banned from use during night (22:00- 6:00) to guarantee the health and rest of people in the surrounding of the construction zone. Construction camp shall be as far away from school and densely populated regions as possible so that construction shall be scheduled on weekends or in times of holidays. 3) Pay attention to maintenance of construction machineries so that machineries can maintain their best working conditions and noise can be kept to the lowest level; monitoring is carried out on the noise level of sensitive construction spots. 4) Carry out monitor on noise in sensitive regions and adopt tentative noise- lowering measures according to the situation 5) Reduce the flow of construction vehicles at night and erect speed limit sign in residential areas, attached enterprising zone and cross-roads where traffic flow is high; reasonably schedule running time and transportation lines 2. Analysis and mitigation measures of acoustic environmental impact during operation period (1) Analysis of acoustic environmental impact during operation period The noise impact during the operation period of each subproject under SSTDP is mainly reflected through operating noise of road traffic and wastewater treatment plant (equipment); noise impact is pretty much minimal for waterway treatment and pipe network construction 1) Road traffic noise Subproject of Puxing Town, Xinjin County According to project characteristics, prediction of roads that are measured 30 meters by 24 meters shall be considered. See Table 4.2-2 for prediction results. Table 4.2-2 Project traffic noise prediction (day) dB (A) Distance to road center(m) 40 60 80 100 120 140 160 180 200 Road specification 30 68.1 65.1 63.0 61.4 60.3 59.5 58.6 57.9 57.4 24 67.8 64.8 62.6 60.8 59.8 58.9 58.1 57.5 56.8 Rainwater and Wastewater Pipe Network & Road Reconstruction Subproject of Daying County (Penglai Town) There are five residential areas, three schools and two hospitals in the scope of assessment. See Table 4.2-3 for prediction results of recent environmental noise at noise sensitive points.

61 Table 4.2-3 Prediction results of environmental noise during the operation period Predicted value of Value of road noise Out of limits dB Location of environmental Standard dB (A) Impact dB (A) (A) Sensitive point measuring noise dB (A) points Day Night Day Night Day Night Day Night Resettlement The first row of Community of 75.0 65.6 75.1 65.6 70 55 5.1 10.6 residences Longsheng Street Middle School of Teaching Up to the Up to the 57.6 45.0 58.9 47.1 60 50 Daying County building standard standard 1m in front of Canton Hospital 74.9 65.6 75.0 65.6 60 50 15.0 15.6 the building Penglai School of Teaching Up to the Up to the 50.3 39.8 55.7 44.5 60 50 Daying County building standard standard Splendid Penglai The first row of Up to the Up to the Residential 63.5 54.0 63.7 54.3 65 55 residences standard standard Community Daying Union Multi-purpose 61.8 52.3 62.2 52.8 60 50 2.2 2.8 Hospital building Daying Middle Teaching Up to the Up to the School, Penglai 45.5 34.6 57.3 48.0 60 50 building standard standard Campus Residential The first row of Up to the Up to the Community of 62.1 52.6 62.4 53.0 65 55 residences standard standard Qilin Street Residential houses on both The first row of 73.2 63.6 73.2 63.6 70 55 3.2 8.6 sides of Keguan residences Street Residential houses on both The first row of 74.6 65.3 74.6 65.3 70 55 4.6 10.3 sides of Lower residences Jiaotong Street Residential houses on both The first row of 72.7 63.4 72.8 63.5 70 55 2.8 8.5 sides of Luogui residences Road According to Table 4.2-3, in Zone 4, all of the first rows of residences along the street within the scope of assessment on both sides of the road exceed the standard value and all in Zone 3 has met the standard. All of the prediction results of acoustic environment of the school within the scope of assessment on both sides of the road have met the standard requirements and prediction result of acoustic environment of Canton Hospital and Union Hospital along both sides of the streets within the scope of assessment have invariably exceeded the standard. Infrastructure Construction Subproject of Yingxi Town, Shunqing District, Nanchong City

62 Table 4.2-4 Prediction results of traffic noise Traffic noise value at different horizontal distances from the borderline Time Name Year of motor vehicle lane dB (A) section 20 40 60 80 100 120 160 200 Day 62.15 60.8 59.85 59.09 58.46 57.92 57.01 56.27 2010 Night 53.36 52.01 50.05 49.67 47.48 45.75 45.05 43.21 Day 64.66 62.32 60.5 59.23 58.95 58.23 57.72 56.81 2015 Night 55.17 53.13 50.91 50.25 47.96 45.96 45.15 44.56 Binhe Road Day 71.25 65.66 62.06 59.85 59.01 58.69 58.01 57.12 2020 Night 55.75 54.66 53.06 50.85 50.01 49.69 49.01 48.12 Day 73.15 66.76 63.10 60.05 59.11 58.88 58.44 57.22 2025 Night 56.05 54.26 53.36 51.00 50.25 49.79 49.00 48.30 Based on the noise prediction result during the operation period, we can conclude that: prediction result on Binhe Road: noise value can Up to the standard of Category 4a in “Environmental Quality Standard for Noise” (GB3096-2008) at a distance of more than 40 meters away from the border of motor vehicle lane of the road in both day and night; noise value can Up to the standard of Category 2 in “Environmental Quality Standard for Noise” (GB3096-2008) at a distance of more than 80 meters away from the border of motor vehicle lane of the road in day and 100 meters in night. This project in Binhe Road is the newly built road and the west side of the road is adjacent to Yingxi River; relatively far away from residential points on the other side of the river and exerting barely any impact on this region; the east side of the road is the proposed “staff garden”; currently, the area within the site is mainly agricultural environment; mostly agricultural fields and slopes; some few farmers’ residences inside the site are being demolished and relocated and there is no environment-sensitive points that require special protection. Binjiang Road (Southern Section) Road and Wastewater Interception Subproject of Fengming Town, Pengshan County Table 4.2-5 Prediction results of traffic noise in south section of Binjiang Road Predicted value of traffic noise at different distances from the road Distance up to the standard(m) Operating period Time section axis dB(A) Category Category 20 40 60 80 100 120 140 160 180 200 4a 2 Day 58.6 54.0 50.6 48.3 46.4 45.0 43.9 43.0 42.2 41.5 <10 16 2012 Night 52.9 48.5 44.9 42.4 40.5 38.9 37.6 36.4 35.4 34.5 15 32 Day 61.7 57.3 54.1 52.0 50.4 49.1 48.0 47.1 46.4 45.7 <10 27 2020 Night 56.9 52.4 49.1 46.7 44.8 43.5 42.4 41.5 40.6 39.9 26 55 Day 66.9 63.5 60.2 58.1 56.6 55.5 54.3 53.4 52.6 51.9 14 62 2030 Night 59.6 55.0 51.6 49.4 47.7 46.3 45.2 44.3 43.5 42.8 40 75 Table 4.2-6 Prediction results of noise sensitive point Distance Predicted value of sensitive point Predicted value of sensitive point to in implementing Standard in implementing Standard Name and bound category 4a category 2 Prediction S/N central ary result 2012 2020 2030 2012 2020 2030 chainage limit of Day Night Day Night Day Night Day Night Day Night Day Night road time time time time time time Time time time time time time (m)

63 Distance Predicted value of sensitive point Predicted value of sensitive point to in implementing Standard in implementing Standard Name and bound category 4a category 2 Prediction S/N central ary result 2012 2020 2030 2012 2020 2030 chainage limit of Day Night Day Night Day Night Day Night Day Night Day Night road time time time time time time Time time time time time time (m) 12m to Predicted 63.1 54.8 65.9 58.6 68.5 61.7 Starting the right value Point of of the 1 Residential road, Out of / / / 3.6 / 6.7 Building broadside limits on 64m to Predicted Pengshan 57.4 42.5 58.3 45.6 62.3 47.8 the right value Vocational 2 of the High School Out of road, right / / / / 2.3 / Dorm limits on 80m to Predicted 56.1 43.0 57.0 46.0 61.1 48.3 the right value Tongjiangli of the 3 Residential road, Out of Community / / / / 1.1 / broadside limits on Group 2, 25m to Predicted 60.0 52.5 62.3 56.1 66.5 58.8 Shuangxuan the right value 4 Village of of the Out of Lingshi road, right / / / 1.1 / 3.8 limits Town on There are two standard regions implementing Category 4a in the project, which are starting point of residential building and Group 2 in Shuangxuan Village of Lingshi Town. In recent operations (2012), the predicted value of two sensitive points of residential areas mentioned above can all meet the requirements of Category 4a value limit in “Environmental Quality Standard for Noise” in both day and night There are two Category 2 standard regions implemented for this project, which are Pengshan Vocational High School and Tongjiangli Residential Area. The two sensitive points mentioned above in recent period (2012) and medium-run period of operation (2020) can both meet the requirements of Category 2 value limit of “Environmental Quality Standard for Noise” in both day and night. Northern Outer Ring Road Construction Subproject of Zhonglong Town, Zizhong County Table 4.2-7 Table of prediction results of environmental noise in Outer North Ring Road Predicted value of traffic noise at different distances from the road Distance up to the Time axis dB(A) standard (m) Year- section Category Category 20 40 60 80 100 120 140 160 180 200 4a 2 Day 70.2 65.9 63.7 62.1 61.0 60.1 59.3 58.6 58.1 57.7 <20 120 2015 Night 67.1 61.8 58.9 56.8 55.5 54.5 53.6 52.9 52.3 51.8 110 280 Day 73.2 69.0 66.8 65.2 63.8 63.0 62.3 61.8 61.3 60.8 34 240 2025 Night 70.0 65.4 62.9 61.3 60.2 59.3 58.6 57.9 57.3 56.8 290 850

64 Table 4.2-8 Table of environmental impact for noise during the operation period (2015) Predicted value, acoustic environment and Distance exceeded value Unit: dB (A) Name of from Standard of Time Background Predicted Predicted Predicted S/N sensitive the implementation section value point road value of value of Exceeded value – axis(m) traffic environmental value background noise noise Value Day 54.3 61.2 62.0 2.0 7.7 1 Qing’s Court 97 2 Night 42.7 55.7 55.9 5.9 13.2 Zhou’s Day 56.7 66.7 67.1 7.1 10.4 2 35 2 Court Night 43.2 62.8 62.8 12.8 19.6 Day 52.1 70.2 70.3 0.3 18.2 3 Zhangjiabian 20 4a Night 44.6 67.1 67.1 12.1 22.5 Day 51.9 70.2 70.3 0.3 18.4 4 Xiaoyuanzi 20 4a Night 42.1 67.1 67.1 12.1 25.0 Through comparison and analysis of predicted value above and current monitoring result, after the implementation of works, because of impact of road traffic noises, both noise values in day and night exceed the standard. The exceeded value is 0.3-7.1dB (A) in day and 5.9-12.8dB (A) in night. Take necessary soundproof window measures for residents near the road according to specific noise monitoring results upon completion and acceptance of the road. Reserve 400m2 soundproof windows for 54 households at 4 sensitive points where noises exceed the standard at the cost of 0.2 million and install them according to over-standard situation of actual noise monitoring result upon completion of the Project. Infrastructure Construction Subproject of Miyi County (Panlian Town) Table 4.2-9 Prediction results of road traffic noise Predicted value of traffic noise at different distances Distance up to Road Operation Time from the road axis dB(A) standard (m) section period section Category Category 20 40 60 80 100 120 140 160 180 200 4 2 Day 65.5 60.1 57.1 54.9 53.3 51.9 51.0 50.3 49.6 49.0 <20 41 2015 Xihuan Night 59.0 53.4 50.1 47.8 45.9 44.7 43.6 42.8 42.0 41.3 33 61 Road Day 66.9 61.7 58.8 56.7 55.4 54.4 53.6 52.9 52.3 51.8 <20 51 2025 Night 60.1 54.4 51.0 48.7 47.2 45.9 44.9 44.0 43.3 42.6 37 68 Day 65.2 60.1 57.3 55.3 54.1 53.1 52.2 51.5 50.9 50.4 <20 41 2015 Beiqiao Night 58.9 53.1 49.8 47.5 46.0 44.7 43.7 42.9 42.1 41.5 32 59 Road Day 67.2 62.6 60.1 58.5 57.3 56.4 55.7 55.0 54.4 53.9 <20 61 2025 Night 60.1 54.4 51.2 49.2 47.7 46.5 45.6 44.7 44.0 43.4 37 72 Day 62.4 57.0 54.0 51.9 50.2 48.9 47.7 46.9 46.2 45.6 <20 27 2015 Landscape Night 57.5 51.8 48.6 46.3 44.5 43.0 41.9 41.0 40.2 39.5 27 50 Avenue Day 63.7 58.2 55.1 53.0 51.3 50.2 49.3 48.6 47.9 47.3 <20 32 2025 Night 57.8 52.1 48.7 46.3 44.7 43.4 42.4 41.5 40.7 40.1 28 51 Shuidian 2015 Day 60.4 54.6 51.2 49.1 47.6 46.3 45.3 44.5 43.7 43.1 <20 21 R d d

65 Predicted value of traffic noise at different distances Distance up to Road Operation Time from the road axis dB(A) standard (m) section period section Category Category 20 40 60 80 100 120 140 160 180 200 4 2 Road and Night 53.5 47.5 44.0 41.5 39.5 38.0 36.6 35.5 34.4 33.5 <20 30 Xin’er Street Day 62.0 56.8 53.8 51.7 50.1 48.8 47.5 46.7 46.1 45.5 <20 26 2025 Night 56.4 50.8 47.6 45.4 43.6 42.1 41.1 40.2 39.5 38.8 24 45

Table 4.2-10 Prediction results at noise sensitive points in recent operation period Distance Predicted Standard from Height value of Name of Location of value Exceeded value dB(A) the differen noise S/N sensitive measuring dB(A) road ce dB(A) point points axis (m) Day Night Day Night Day Night (m) Floor 1 of the first row of 20 -5 65.9 60.1 70 55 Up to the standard 5.1 residential houses Type-4 Zone Hexi 1 Residential 43 -4 60.8 54.5 70 55 Up to the standard Up to the standard Community Houses Category 2 Zone 58 -3 59.1 52.6 60 50 Up to the standard 2.6 Residential Houses The 1st row of residential 22 -4 65 59.3 70 55 Up to the standard 4.3 houses Type-4 Zone Commune Residential 41 -3 60.5 54.5 70 55 Up to the standard Up to the standard 2 2, Shuitang Houses Village Category 2 Zone 56 -2 58.4 52.3 60 50 Up to the standard 2.3 Residential Houses The 1st row of residential 20 -3 65.4 65.8 70 55 Up to the standard 10.8 houses Type-4 Zone Commune Residential 45 -2 60.2 59.3 70 55 Up to the standard 4.3 3 3, Shuitang Houses Village Category 2 Zone 82 -2 56.7 54.7 60 50 Up to the standard 4.7 Residential Houses The 1st row of residential 16 4 62.9 59.9 70 55 Up to the standard 4.9 houses Type-4 Zone Group 8, Residential 40 4 57.4 52.6 70 55 Up to the standard Up to the standard 4 Qingpi Houses Village Category 2 Zone 55 4 56.1 50.4 60 50 Up to the standard 0.4 Residential Houses

66 Distance Predicted Standard from Height value of Name of Location of value Exceeded value dB(A) the differen noise S/N sensitive measuring dB(A) road ce dB(A) point points axis (m) Day Night Day Night Day Night (m) The 1st row of residential 20 3 61 57.9 70 55 Up to the standard 2.9 houses Type-4 Zone Group 8, Residential 45 3 55.9 51.3 70 55 Up to the standard Up to the standard 5 Qingpi Houses Village Category 2 Zone 55 3 55 49.8 60 50 Up to the standard Up to the standard Residential Houses Standard region where Category 4a standard is implemented; the predicted value of noise in day at resident-sensitive points in Type-4 regions including Hexi Community, Second Community in Shuitang Village, Third Community in Shuitang Village, Qingpi Village and a total of five places can all meet the requirements of Category 4a value limit in “Environmental Quality Standard for Noise” in recent period of project operations (2015). Night noise exceeds standard value by different extents; exceeded value falls in the range of 10.8 dB(A) - 2.9dB(A); the total population affected in the five sensitive point mentioned above (exclusive of Category 2 Zone Residents) amounts to 31 households and 110 people. Standard region where Category 2 standard is implemented; the predicted value of noise in day at resident-sensitive points in Category 2 regions including Hexi Community, Second Community in Shuitang Village, Third Community in Shuitang Village, Qingpi Village and a total of five places can all meet the requirements of Category 2 value limit in “Environmental Quality Standard for Noise” in recent period of project operations (2015). Night noise exceeds standard value by different extents; exceeded value falls in the range of 0.4 dB(A) - 4.7dB(A); the total population affected in the five sensitive point mentioned above (exclusive of Type-4 Zone Residents) amounts to 106 households and 484 people. Total 536m2 soundproof windows at 5 places for 67 households shall be reserved and installed at total cost of 0.268 million yuan under Infrastructure Construction Subproject of Miyi County (Panlian Town). Soundproof windows shall be installed according to actual noise monitoring results upon completion of the road. 2) Noise at plant area Only Subproject of Puxing Town, Xinjin County under SSTDP includes factory building – wastewater treatment plant. Please see Table 4.2-10 for predicted result of noise impact during the operation period.

67 Table 4.2-11 Noise monitoring result dB (A) Day Night No. of measuring L (Background L (Background points eq Predicted value Aeq Predicted value value) value) 1 50.6 50.9 44.8 45.1 2 52.1 52.5 47.6 48.0 3 56.2 56.4 47.8 48.0 4 52.7 53.2 45.2 45.7 (GB3096-93)Category 2 ≤60 ≤50 The predicted value at noise prediction point of the proposed project in both day and night can all meet the requirements of Category 2 Standard in “Standard of Environmental Noise of Urban Area (GB3096-93)” and cause obvious impacts on the assessment region. 3) Noise at fixed-point source Waste lift pump is installed in Pengshan Wastewater treatment Plant by Road and Wastewater interception Works in Southern Segment of Binjiang Road in Fengming Town of Pengshan County under each subproject under SSTDP. The intensity of noise source of water pump is 70dB-80dB; meanwhile, because water pump is installed in the inside of the pump house. Through soundproofing of pump house and distance, noise can be reduced. According to noise prediction at noise source, at a distance of 30 meters from water pump, noise can meet Category 2 standard of Environmental Quality Standard for Noise (GB3096-2008). In this project, pump house can be built inside wastewater treatment plant. It meets 100m sanitary protection distance of wastewater treatment plant (greater than 50m sanitary protection distance in pump house lay down by EIA (Environmental Impact Assessment). There are no residents within the range of 100 meters, which is why pump house will not pose any visible impact on the surrounding acoustic environment. (2) Mitigation measures and suggestions of acoustic environment 1) Reasonable urban planning, structural layout and control of land occupation on both sides of road In light of the fact that the both sides of newly built road is poorly developed, it is suggested that while the land functions on both sides of the road is reasonably planned, construction department, particularly in the project of real estate development, efforts shall be made to strengthen architectural layout and soundproof design, guaranteeing the interior environment of the sensitive architectures can meet the requirements of functions. A row of houses is suggested to be built along the roads and buildings of more than three-storey high that are intended for non-scientific and residential purposes are suggested to be built. In this way, it can better meet the requirements of shortage of land in cities and at the same time, block out some traffic noises for architectures in the rear row. 2) Intensification of greening Because the land is in urban regions, therefore, the land resources are scarce and very expensive. Hence, it is unlikely that a large green belt can be established along the road. Sidewalk trees are suggested to be planted and composite, three-dimensional greening is adopted to reduce the noise impact on the environment along both sides of the road. It is suggested that real estate developers may build green belts with a certain width along one side of

68 the road so as to lower the noise, prevent dust and improve the landscape in the neighborhood. 3) Reduction of sound source noise radiation Implement management of vehicles into the city at night and restrict speeding at night in sensitive road segments Strengthen management of vehicle horning and set up signs that prohibit horning and speed slowing on both sides of schools and hospitals Strengthen maintenance and management of roads in the city; promptly repair damaged road surface and restrict the traffic of speeding, overloaded trucks. 4) Protection of noise affected point For the works of construction works of North Outer Ring Road in Zhonglong Town of Zizhong County, adopt necessary soundproofing window measures for residents along the road based on concrete monitoring results upon the inspection and acceptance of road project completion. Reserve 2000m2 of soundproofing windows at four sensitive points where noise exceeds the standard value. The price is 1 million. Installation is done based on value exceeded for actual noise monitoring result after the project is completed Total 536m2 soundproof windows at 5 places for 67 households shall be reserved and installed at total cost of 0.268 million yuan under Infrastructure Construction Subproject of Miyi County (Panlian Town). Soundproof windows shall be installed according to actual noise monitoring results upon completion of the road. 5) Efforts shall be intensified on monitoring regions including hospitals, schools and other sensitive regions during the operation period. If there is an exceeded value monitored, viable measures shall be adopted in a timely manner. 4.2.3 Analysis and assessment of water environmental impact 1. Analysis of water environmental impact during construction period (1) Analysis of domestic wastewater impact During construction period, the major source of domestic wastewater is the domestic wastewater and excrement generated when construction workers have meals and wash dishes, which mainly include plant and animal fat, detergent and other organic matters. (2) Analysis of production wastewater impact Wastewater discharged by gravel material processing system. The screening process of gravel material processing system requires washing with water and dust fall, which will generate wastewater. The major pollutant in the wastewater is SS and the concentration of suspended sediment in similar works wastewater is approximately 25000mg/L. The wastewater from concrete mixing system originates from washing of concrete drum and charging bucket. In comparison with similar projects, the PH-value in the wastewater is approximately 11 and concentration of suspended solids in the wastewater is roughly 500-1000mg/L. Because of limited amount of wastewater, it poses barely any impact on the quality of river water.

69 The source of mud water in construction is from excavation of foundation pit in the pipe, pier foundation construction and waterway treatment foundation. The major pollutant is SS and direct discharge will increase the concentration of suspended sediments in nearby rivers during construction period, affecting river water quality and sedimentation basin shall be installed to collect it for sedimentation. After sedimentation treatment, maintenance and repair of vehicles during construction period will produce wastewater that contains oil. If oil-containing wastewater is directly discharged into the river, it will form an oil slick on the water surface, affecting restoration of dissolved oxygen and river quality. Therefore, discharge is required after the treatment meets the standard. 2. Analysis of water environmental impact during operation period The fever of each subproject under SSTDP can be attributed to road, waterway treatment, pipe network construction and wastewater treatment. During the operation period, apart from rainwater that is directly discharged into the water during the initial phase of road works that affect water environment, other works includes wastewater interception, emission reduction, environmental treatment and environmental improvement and there are no pollutants discharged. After road is completed, a minuscule amount of dust, oil pollutant and rubbish is sprayed over the road surface during the transportation process. In times of precipitation, it is then washed off the road surface to surface waters, polluting surface waters to a certain extent. 3. Summary of analysis and mitigation measures of water environmental impact of each subproject Table 4.2-12 Summary of analysis and mitigation measures of water environmental impact for each subproject under SSTDP Construction period Analysis of impact Name of S/N Analysis of during the operation subproject Type Measures impact period

70 Construction period Analysis of impact Name of S/N Analysis of during the operation subproject Type Measures impact period The concentration of suspended solids in wastewater of gravel material The majority of SS in the processing Because of supplementary wastewater for gravel material system is construction of pipe processing system, concrete mixing relatively low facilities, all sorts of system and machine washing, after and poses wastewater in collection sedimentation and filtering evident project region are treatment, is recycled for cleaning impacts on collected to improve the the site and washing gravel Water Body status quo of disorganized aggregate and only an insignificant Five; concrete discharge of wastewater Manufacturing proportion is discharged by system before project Wastewater standard. The wastewater wastewater; construction. It will help petroleum for washing machines is amount of to improve the Subproject of controlled according to GB8978- 1 Puxing Town, wastewater environment of surface 1996 level-1 standard 10mg/L; the Xinjin County wash is waters in Puxing Town. rate of oil removal is more than approximately The initial estimate is 90%. After the treatment, 1.2m3; oil- according to 6800 m3/d of production wastewater is recycled containing long-term wastewater and reutilized and discharge is wastewater; amount, discharge of prohibited. the amount of COD 744.6t/a and BOD5 wastewater 474.5t/a to Yangliu River discharged will be reduced every during peak year, dramatically period is improving the approximately environment. 4.0m2/h. Simple septic tank treatment is adopted and can be used for Household agricultural irrigation and 25m3/d Water forestation in the proximity. Direct discharge into surface waters is banned and water discharge is zero.

71 Construction period Analysis of impact Name of S/N Analysis of during the operation subproject Type Measures impact period Build sedimentation basin in gravel quarry and carry out sedimentation treatment of silt produced as a result of washing sand and stone materials before discharge; after production wastewater as a result of concrete maintenance, construction machine washing and pipe pressure Piers in water tests is collected, it will be subject Wastewater during the are not to oil removal and sedimentation operation period is mainly installed, treatment before recycle so that no road surface runoff which external discharge is done; waste generated as a result of substantially oil, asphalt and other solid wastes washing road surface by minimizes the in construction are banned from rainwater during rainy disturbance of Production being dumped or thrown into the season. The road surface bridge wastewater river and banned from piling up runoff for this project is Rainwater and construction near the waters; they shall be mainly a small amount of Wastewater Pipe on waters. transported to designated location sand and stone. The Network & Road Mud 2 Reconstruction timely or dealt with according to rainwater at the initial wastewater Subproject of relevant regulations; construction stage is collected by city and machine Daying County of Hongqi Bridge piers shall be rainwater and pollutant (Penglai Town) oil-containing scheduled during dry period so as pipe network before being wastewater to reduce direct disturbance on discharged into surface waters. During construction of waters. During project bridge piers, foundation pit operation period, the contains sand and stone wastewater impact on water that should be pumped to the coast environment has been and subject to sedimentation and improved a great deal. discharge.

After domestic wastewater discharged by construction workers Amount of is subject to treatment of septic Domestic Domestic tank, supernatant can be used for wastewater wastewater is agricultural irrigation and surface 4 - 6.4t/d. sediment is subject to treatment of anaerobic composting.

72 Construction period Analysis of impact Name of S/N Analysis of during the operation subproject Type Measures impact period Wastewater of construction site is mixing Construction wastewater: wastewater, temporary sedimentation basin is equipment and built at each construction site; vehicle temporary sedimentation basin is washing from 10 to 20m3; oil removal sump water, shall be set up at equipment wastewater of washing points; equipment washing washing and water shall be subject to oil The wastewater during the maintenance removal before going into operation period is mainly of working sedimentation basin; construction road surface runoff plane. The wastewater shall be subject to oil generated as a result of concentration removal or sedimentation rainwater washing at the of suspended treatment. After construction initial stage of rainy solids in this wastewater is subject to season. After road surface wastewater is sedimentation treatment for over 12 Production runoff passes through Works of relatively hours, it can be recycled. wastewater drainage ditch, suspended Infrastructure higher; pH Construction wastewater is banned solids and silt in the water Construction value is from being discharged into the are subject to degradation in Yingxi slightly surface waters. or sedimentation. 3 Town of alkaline and it 2. Water seepage in silt: Drainage Therefore, the impact of Shunqing contains a ditch is set up around the perimeter its concentration on river District of small amount of silt airing site and sedimentation flow is lowered; road Nanchong of oil tank is built at the site of management is City pollutant. congregation of drainage ditch, strengthened during the Cofferdam collecting wastewater produced operation period; construction during the airing process. The pollutants that are sprayed wastewater; airing wastewater is subject to on road surface by water seepage sedimentation in sedimentation transportation vehicle occurs for silt tank before being pumped to shall be cleaned promptly as a Yingxi River by water pump. to keep road surface clean consequence of river desilting. Domestic wastewater produced by construction workers: collected and Amount of treated by public washroom in the Domestic Domestic proximity; posing insignificant wastewater is wastewater impact on surrounding roughly environment. 3m3/d. Mitigation measures of water pollution are viable. Production During the operation wastewater Road and period, pollutant pipe produced at All of the production wastewater Wastewater network in southern construction produced at construction site is Interception region of Binjiang has site. There is a recycled for reutilization and no Works of already been improved. small amount external emission is caused, which South Section Domestic wastewater in Production of mechanical is why it poses no impact on the 4 of Binjiang the city can be discharged wastewater oil pollutants surrounding waters. During the Road in into Pengshan wastewater produced construction of pile foundation, a Fengming treatment plant via during tiny amount of mechanical oil Town of wastewater pipe network. construction pollutants may enter waters through Pengshan Each year, the weight of of pile rainfall runoff or leak, posing County discharge of pollutants in foundation barely any impact on waters wastewater into Minjiang work. River can be considerably 73 Construction period Analysis of impact Name of S/N Analysis of during the operation subproject Type Measures impact period River can be considerably reduced; the amount The inappropriate treatment of reduced for CODCr, domestic wastewater at BOD5, SS and TP is construction site will cause certain 600t/a, 324.8t/a, 512.2t/a, pollution to the surrounding waters. 5t/a and NH3-N This project will not require respectively. Because of building construction camps. Local different water control Domestic farmer’s houses will be leased and Tiny Amount indices, the amount wastewater existing dry pail latrine is utilized reduced is 55.5t/a and for treatment. In this way, the tiny 38.0t/a respectively. The amount of domestic wastewater building of drainage pipe produced can be subject to simple network for this project treatment before being used for will positively improve agricultural fertilizers or irrigation. water quality in Mao

River and Minjiang River.

Assessment suggestions shall Equipment reasonably set up sedimentation Works of washing After the project is into tank; cofferdam construction mud Environmental Production water; operation period, it will shall be subject to sedimentation Treatment wastewater cofferdam bring positive social treatment before being discharged Works in construction benefits. This project is 5 to surface waters or utilized as Hongya mud non-pollution and there is works waters County basically no discharge of Calculation (Hongchuan Simple septic tank is installed so pollutants after the project Domestic based on 100 Town) that domestic wastewater can be is completed wastewater people, used for agricultural irrigation 15m3/d Sedimentation basin and filter This project of waterway Production Washing chamber are set up in construction treatment works belongs Waterway wastewater Wastewater site; recycled after production to hydraulic works Treatment wastewater is treated construction project. Project for There is no management Xiaoshanzi zone after project is 6 Hecheng completed and therefore District of Local existing wastewater during the operation Domestic Jialing District Tiny Amount treatment facilities are used to treat period, it does not involve wastewater of Nanchong domestic wastewater. pollution discharge and City problems of environmental impacts.

Construction mud water is After road works is collected according to sections of completed and subject to construction. After sedimentation Works of Construction operations, road surface treatment, the clean water on the Construction mud water runoff will be formed. upper surface is recycled or works of and oil After it is collected by sprayed. The maintenance of North Outer pollutants as a supplementary rainwater Production concrete, washing of construction 7 Ring Road in result of drainage ditch on both wastewater machineries and pipe pressure tests Zhonglong washing of sides of the road, it is then and other production wastewater Town of construction discharged to agricultural shall be collected before being Zizhong machineries ditch on the project zone, subject to oil removal, County by rainwater posing minimal impact to sedimentation treatment and water environment in the recycle so that no discharge is project zone. caused.

74 Construction period Analysis of impact Name of S/N Analysis of during the operation subproject Type Measures impact period The construction site can be chosen near agricultural houses and after domestic wastewater by Domestic Tiny Amount construction workers is treated wastewater through simple septic tank and eventually used as fertilizers by local farmers. Production wastewater produced at the construction site mainly contains pollutants including SS and petroleum, which are treated by installing oil removal sump and After the operations, road temporary sedimentation tank on surface runoff is formed the site and recycled, causing no and collected by rainwater external discharge. The foundation collection system installed pit water containing suspended Dike on both sides of the roads. solids as a result of excavation of excavation The suspended solids, pipe ditches is extracted and treated mud sand and stones in the before being used for production, Production wastewater; a water are degraded or dust fall or greening on the site and wastewater tiny amount of subject to sedimentation. recycled without external Infrastructure oil-containing The impact of its discharge. Construction production concentration on the river Underwater construction of Flood Subproject of wastewater is pretty much minimal. 8 Control Dam Works shall be Miyi County The dike on the east coast carried out in times of dry period, (Panlian of Anning River within reducing the amount of mud Town) the range is beautified and discharged and blocking and water environment is protective measures shall be taken greatly improved. to prevent architectural residues Environmental from being poured into the river management shall be channels, which may worsen strengthened during the pollution and block river channels. operation period and There will be no new construction rubbish is banned from sites built for this project; local Amount of being poured into the farmers’ houses shall be leased and discharge of river. Domestic modern septic tanks are utilized and household wastewater the small amount of domestic water is wastewater produced shall be 3m3/d treated before being used as fertilizer or for irrigation purpose.

4.2.4 Analysis and assessment of atmospheric environmental impact 1. Analysis and assessment of atmospheric environmental impact during construction period Subproject under SSTDP can be summed up as road, river treatment, pipeline construction and wastewater treatment plant. Atmospheric environmental impact during construction period mainly comes from construction dust, mechanical exhaust, and asphalt fumes. (1) Construction dust 1) Impact of dust from relocation

75 During the relocation, due to overhead work and broad working surface, the dust pollution produced by the collapse of dry construction materials is particularly prominent. The quantity of dust generated is related with such factors as quantities of relocation, area of construction, wind speed during construction and method of relocation, etc. 2) Impact of dust from earthwork and foundation During the course of subgrade excavation, land leveling, subgrade filing, foundation excavation for water plant and construction, if heavy wind blows, air pollution will be caused by the fine dust and dust. 3) Dust caused by wind in open storage yard and bare yard Due to construction requirement, some building materials is stacked in the open air, and excavated earthwork and construction garbage is piled up on some construction points temporarily, which can produce dust in dry and windy days. 4) Dust generated by the material transporting vehicle running on the road and construction site Dust prediction is related to the vehicle speed, vehicle weight, dust deposited on the road surface. The more deposited dust is, the more serious dust flying will be. Under same degree of cleanliness of the road surface, the higher the vehicle speed is, the larger the quantity of dust will be; At the same speed, the more dirty the road is, the larger the quantity of dust will be. Therefore, it is an effective way to reduce dust by limiting the driving speed and keeping roads clean. During construction period, TSP pollution is serious. During loading, unloading, transportation and construction of the earthwork, and transportation of stone materials, the area affected by road construction is 200m from the both sides of the site, and the area affected by plant construction will be 100m outside of the boundary. (2) Mechanical exhaust At the construction site, the large and medium sized equipment is mainly powered by diesel, gasoline, when running such air pollutants as NO2, SO2, smoke etc will produce. During earthwork construction, a large number of exhausts from vehicles, excavators, bulldozers will cause the center area of the construction site waste air polluted, and make the ambient air quality declined. However, the exhaust from the construction equipment and vehicles is only a small part of the total amount, it will not have a great impact on the surrounding environment air by strengthening equipment maintenance and controlling the emission of black smoke not completely combusted. (3) Asphalt fumes Roads and bridges are both asphalt concrete pavement, during placement there will be asphalt smoke evaporation. According to the actual investigation of asphalt concrete pavement, if not build the asphalt concrete mixing station, only adopts commercial asphalt concrete, then the impact arrange by the volatilization of asphalt smoke will be within 10m. The road of the subproject under SSTDP is to use commercial concrete. No asphalt concrete mixing station is set, so the impact by the asphalt smoke is little. Fence is provided for separation during the construction. Therefore, the impact is acceptable.

76 (4) Atmospheric environment mitigation measures during construction period 1) When removing buildings, closing net like dust proof net shall be provided around to relief the impact of dust. 2) During the construction, the roadbed shall be compacted layer by layer, and care shall be taken to reduce dust by watering. For the vehicles carrying bulk materials with dust shall be as far as possible covered with a tarpaulin, for the vehicles transporting aggregate, overload should be limited to avoid leakage along the road, so as to reduce the fine dust pollution. 3) Powdered materials such as cement, lime, etc. should be canned, bagged, bulk transportation is prohibited, if stacking, it should be covered with tarpaulin. A tank car shall be provided to the main road, sand and gravel quarry and construction sites, regularly and in time watering is required. In this way it can effectively adsorbed the dust generated from handling, transport of the aggregate. 4) It is suggested that the construction site should be watered frequently to keep the ground wet and clean. The place where decoration materials is stacked, canvas cover shall be provided to prevent dust flying; For the truck transporting bricks and decoration materials, it will be washed when driving in and out the work yard to avoid take the dust out, and pollute road, consequently causing second dust. 5) To resume road traffic as soon as possible, avoid traffic congestion, and reduce pollution of the nearby atmospheric environment by dust from excavation, construction in rush hours should be avoided. In heavy traffic intersection, if pipe crosses the street, pipe jacking method should be used. Pipe should be laid as far as possible in sections and backfilled in time. 6) During construction period, most of transportation vehicles are fueled by gasoline (diesel), exhaust gas output and pollutants are relatively high, in order to reduce the exhaust impacting the surrounding environment, transport routes shall not cross the concentrated residential areas. 2. Analysis and assessment of atmospheric environmental impact during operation period (1) Analysis of atmospheric environmental impact during operation period Subproject under SSTDP can be summed up as road, river treatment, pipeline construction and wastewater treatment plant. The atmospheric environmental impact during operation period mainly comes from vehicle exhaust, noxious odors from wastewater treatment plants and wastewater pump. The project is municipal works. Air pollution is mainly from vehicle exhaust emissions and dust during vehicle running. The main pollutants are CO, NOx, THC and TSP. With the increase of traffic volume in the region, pollutant emissions will gradually increase, which will increase the local air pollution along both sides of the road. Under the effect of anaerobic bacteria, wastewater treatment plants, wastewater lift pump, wastewater will produce odor substances, and due to the pump mixing, odor substances from the water will spill to the atmospheric environment. The main ingredients are hydrogen sulfide, methyl mercaptan, ammonia, trimethylamine and so on.

77 (2) Mitigation measures for atmospheric environmental impact during operation period New model of urban public buses using environment-friendly fuels such as electricity and natural gas shall be given priority to control emission of pollutants. For automobiles powered by fuel, the quality of fuel shall be strictly controlled. Fuel with good quality shall be used, so as to reduce emission of pollutants. For automobiles with poor performance or to be eliminated, exhaust gas purification device is needed. Exhaust emission shall be regularly checked by competent authorities of transport and communications. For vehicles of which the exhaust discharge is not up to the standards, they are not allowed to run on the road. Exhaust emission inspection regulations shall be strictly implemented. Vehicles with excessive exhaust emissions and overloading slag transporting vehicles are forbidden to run on the road. A professional team of road maintenance, reparation and cleaning shall be established to keep roads clean and in good operation. In rainless days, tank cars shall be used to spray water to reduce dust, increase the binding force of loose soil, water stability and reduce dust. In combination of water conservation measures, road greening shall be conducted. Street trees shall be planted to reduce dust. (5) Control measures for odor pollution and plant area greening To avoid odor, sanitary protection distance should be defined, 100m range outside the plant boundary shall be designated as protect zone, in this area, no settlement points can be built in the future, Within boundary and the plant, attention should be paid to kill the mosquito, flies, and transport of the sludge in time so as to reduce the odor impact. In greening design, it is suggested to strengthen boundary greening, making it form a "green barrier". In this way, it can not only reduce the odor impact, but also improve the image of Puxing Town as a small town and make the town more beautiful. Table 4-2-13 Summary of atmospheric environmental impact analysis of subproject under SSTDP Atmospheric environmental impact analysis and S/N Name of subproject Description of measures assessment during operation period Roads, for CO, in static wind, under class D and E weather conditions, roads outside (50m) can meet the relevant standards; when in small wind, the forecasted value is not exceeded. For NO when in small wind, it is not exceeded X, Reduction and control of outside of the road (200m). When in static wind, it excavated dusts from will not be out of limits outside of the road (50m). excavation; reduction and Subproject of Puxing From overall analysis, in some local areas, due to 1 control of dusts of sand Town, Xinjin County increasing traffic flow, results in vehicle exhaust aggregates and concrete emissions increased, which increases the impact on system; reduction and ambient air quality along the road. Since the control of fuel oil exhausts. implementation of works improves the road network structure in the region, increase driving speed and reduce the waiting time in the intersection, automobile exhaust emissions is reduced from the macro view.

78 Atmospheric environmental impact analysis and S/N Name of subproject Description of measures assessment during operation period For wastewater plant, according to sanitary protection distance calculation, the distance L is 100m, so the range of 100m around the plant area is Prevention measures of foul designated as sanitary protection zone. According to pollution and greening in investigation, there is no sensitive target in the plant area. region at present, In the future with the development of Puxing Town, no house shall be built in the protection area. During operation period, the main atmospheric pollution source is the vehicle exhaust emission on the road The main pollutants from the exhaust is CO, CO2, smoke, hydrocarbons. The types of pollution source are dispersed and floating, and discharging height is not high, so the dispersion range of Strictly execute exhaust pollutants is small. emission inspection system, Rainwater and Before implementation of the works, transportation prohibit vehicles whose Wastewater Pipe network in the area is existed. After Implementation, exhaust emissions exceed Network & Road the road layout has some change, and paved with the standard to get onto the 2 Reconstruction asphalt, which improves the driving environment, let road; scientifically organize Subproject of Daying the vehicle engines in good condition. Due to transportation lines of County (Penglai Town) regional traffic flow remaining the same before and vehicles; and prohibit after implementation of the project, the general overlimit slag trucks to get vehicle exhaust emissions is slightly decreased onto the road. comparing with before staring the project Implementation of the project does not pollute the atmospheric environment, but reduce the automobile exhaust pollution load to the regional atmospheric environment. As for buses in towns and cities, new types of vehicles with environment- friendly fuels such as electricity and natural gas are preferred to control pollutant emission quantity. Automobile exhaust pollutants are concentrated in As for cars with fuel the traffic line. With the increasing of the distance oils, strictly control quality from the road margin, the diffusion predicted Infrastructure of oil products, use high- concentration of pollutants in ambient air shall Construction Subproject quality fuel oil to reduce decrease gradually. According to analogy, it is 3 of Yingxi Town, emission quantity of obtained that the CO concentration to road center Shunqing District, pollutants. line of about 0.27-1.21mg/m3, THC concentration of Nanchong City Cars with bad performances about 0.0275-0.3687mg/m3, NOX concentration of or to be scrapped shall be 0.032-0.078mg/m3.,which meets the limit value of added with exhaust purifiers level 2 in the "Ambient Air Quality Standards". and regularly monitored by traffic authorities for exhaust emissions. Vehicles whose exhaust cannot meet the standard shall be strictly prevented from getting onto the road.

79 Atmospheric environmental impact analysis and S/N Name of subproject Description of measures assessment during operation period 1 Execute vehicle inspection and prohibit vehicles with over-standard exhaust emission to get onto the Road, during operation period, the dust and exhaust road; 2 Provincial relevant produced by the running vehicle will cause air departments force to add pollution, the main pollutants is TSP, CO, NOX and exhaust purifiers and single- THC. The road of the works is paved with asphalt, vehicle pollutant emission dust pollution is less. But with the increasing of shall comply with relevant traffic flow, the automobile exhaust emission will requirements; 3 have an increasing trend, which increases the Environment management atmospheric environment pollution along the road, shall be strengthened. The therefore, it is proposed that the Authority strengthen road management management, strictly implement notional vehicle department shall establish emissions standards, to reduce pollutants in vehicle an environment exhaust emissions, and fulfill the greening of the management mechanism road well so as to clean the air. and entrust the environment monitoring unit to regularly monitor ambient airs at monitoring points specified in the EIA report. Binjiang Road (Southern 1) Remove grille residues Section) Road and intercepted by grilles in time 4 Wastewater Interception (EIA requires to remove them on the same day when Subproject of Fengming they are produced) and Town, Pengshan County stains; avoid long-period stacking of any solid waste Wastewater lift pump, wastewater under anaerobic in the pump house; 2) Seal bacteria will produce odor substances, due to the transportation vehicles. mixing of pump, odor substances will spill from the Sensitive target such as water to the atmospheric environment, the main human settlement shall not ingredients of hydrogen sulfide, methyl mercaptan, be carried out within 50m ammonia, trimethylamine and so on. from fouling source of the Generally the impact area of pup room odor is pump house. The report within 50m of the resources, In the works, the pump shall be send to the planning room is arranged in yard where wastewater is department to put on records treated, which is in accordance with sanitary upon approval, so as to meet distance of 100m, in the range, there is no resident, sanitary protection odor impact to the resident beyond 100m is very requirements. 3) In small. combination with ambient landscape, plant shrubs and arbors with good anti- fouling capacity such as oleander, palm and privet which not only can beatify the environment but also can reduce fouling. Environmental Treatment Subproject of 5 No air pollutant emissions / Hongya County (Hongchuan Town)

Infrastructure Construction Subproject 6 No air pollutant emissions / of Yingxi Town, Shunqing District, Nanchong City

80 Atmospheric environmental impact analysis and S/N Name of subproject Description of measures assessment during operation period Strictly execute exhaust emission inspection system, After the project is open for traffic, many vehicles prohibit vehicles whose run on it. The main pollutants during operation exhaust emissions exceed period are exhaust emission of vehicles. the standard to get onto the The prediction of total emission of air pollutants: CO road; scientifically organize Northern Outer Ring 4023.4t/a, NOx 254.2t/a and THC 1205.9t/a. transportation lines of Road Construction Before starting of the works, no direct access 7 vehicles; and prohibit Subproject of Zhonglong between Zian Road and Zitai Road, it is connected overlimit slag trucks to get Town, Zizhong County by 10km bypass way. After completion, the driving onto the road. Strengthen distance and time is shortened, pollutant emission is road management and largely decreased. This works, to some extent, has pavement curing, maintain improve the air quality along the road, it is an roads in good operation environmental positive benefit status and reduce traffic jams. During operation period, the main atmospheric pollution source is the vehicle exhaust emission on the road The main pollutants from the exhaust is CO, CO2, smoke, hydrocarbons. The types of pollution source are dispersed and floating, and discharging Recommend relevant height is not high, so the dispersion range of departments to strengthen pollutants is small. Since the traffic flow is change in management, strictly day time and night time. Generally, pollution in the execute car exhaust Infrastructure day is more serious. emission standard specified Construction Subproject 8 The road of the works is asphalt pavement, dust by the state, reduce emission of Miyi County (Panlian pollution is less. But with the increasing of traffic quantity of car exhaust Town) flow, the automobile exhaust emission will have an pollutants and plant increasing trend, which increases the atmospheric greenbelts outside gutters at environment pollution along the road, therefore, it is two sides of the road for air proposed that the Authority strengthens purification. management, strictly implements national vehicle emissions standards, to reduce pollutants in vehicle exhaust emissions, and fulfill the greening of the road well so as to clean the air. 4.2.5 Analysis and assessment of environmental impact of solid wastes 1. Impact analysis of solid wastes and measures during construction period The construction spoils, building wastes and domestic wastes will be generated during construction period. Construction workers will generate a certain amount of domestic wastes, mainly including the coal ashes, slag bricks, glasses, plastics, waste paper, peels, etc., wherein, the inorganic substances like coal ashes and slag bricks constitute the major part, while the organic substances like canteen wastes, plastics and paper scrapes constitute the minor part. As for the demolition of buildings and structures, the demolition and construction wastes generated per square meter of building area shall be calculated by empirical data of 0.1 m3. The solid wastes generated by demolition mainly include abandoned building slag, waste wood, plastics, metals, domestic wastes, etc., wherein, the abandoned building slag constitutes the major part, accounting for about 70 - 80%. The building wastes and domestic wastes generated during construction period, without disposal, will affect the soil, air and water environment as well as landscape in partial areas of the project. Table 4.2-14 Summary of solid waste analysis and measures during construction period of each subproject Subproject Solid waste analysis during S/N Mitigation measure name construction period

81 Subproject Solid waste analysis during S/N Mitigation measure name construction period The project involved in the demolition of Part of building wastes can be used for backfilling, civilian houses will Building waste while another part will be delivered to the slag generate a great landfill. amount of building wastes Reuse the spoils to the fullest extent possible during construction period, pile the spoils that can not be Subproject of reused at suitable places nearby, and meanwhile, 1 Puxing Town, Construction No spoil is generated. take the corresponding blocking and protective Xinjin County spoil measures in case of new soil erosion and environmental pollution. The piling site shall make use of the wasteland, instead of farmland. The project shall set the domestic waste collection facilities at appropriate places and entrust local Domestic 200kg/d sanitation departments to sent such wastes to waste Chengdu urban domestic waste treatment plant for sound treatment. Building waste 4657.4m3 Try to recover and use the useful part of building wastes generated. Reasonably allocate earthwork, Rainwater and Construction and deliver the discard and remaining building Wastewater Pipe 10001m3 spoil wastes to Daying Industrial Park for filling; random network & Road piling or placing shall be forbidden. 2 Reconstruction The domestic wastes generated by workers during Subproject of construction period will be included in the existing Daying County Domestic A small amount domestic waste collection treatment system within (Penglai Town) waste the area; enhance the health education for workers; random dumping shall be forbidden. The total dredging The silt shall be delivered to the drying field through Silt volume is closed canning vehicle, and after being dried, shall 4.536×104m3 be used for greening and filling. Construction None spoil Infrastructure Adopt the category management for domestic Construction wastes, set up the temporary small waste piling Subproject of point nearby the construction site, hire personnel to 3 Yingxi Town, deliver the wastes to the urban waste treatment plant About 30kg of Shunqing for treatment on a regular basis, and avoid the domestic wastes will District, Domestic spilling in the course of delivery. In the meantime, be generated during Nanchong City waste pay special attention to the maintenance and the peak period of management of temporary waste piling point, avoid construction the waste scattering caused by the random piling, and spray the disinfection and insecticide solutions on the piling point on a regular basis in order to reduce the breeding of mosquitoes and bacteria. Binjiang Road Set up the temporary waste bins for concentrated 4 (Southern Building waste collection and deliver to the building waste piling Section) Road site nearby in a timely manner. and Wastewater Construction None Interception spoil

82 Subproject Solid waste analysis during S/N Mitigation measure name construction period Subproject of Classify and clean up the domestic wastes at the Fengming Town, construction site, and entrust local sanitation Pengshan department to deliver to the urban waste treatment County plant for treatment. Enhance the maintenance and Domestic management of waste piling point, avoid the waste scattering caused by random piling, and meanwhile spray the disinfection and insecticide solutions on the piling point on a regular basis in order to reduce the breeding of mosquitoes and bacteria. Building waste 0.8×104m3 Reasonable allocate the discard which shall be Construction delivered to the designated spoil site in Hongya Environmental spoil County; Treatment Set up the waste bins for concentrated collection and Subproject of Domestic 5 A small amount delivered to local environmental department for Hongya County waste treatment. (Hongchuan Town) It is recommended to employ the closed canning Silt Dredging vehicles to deliver silt to the temporary piling site for drying and then for greening. As for building wastes, the bricks and steel can be recovered, while other building wastes shall be Building waste delivered to the designated building waste piling site. The spoils generated in the course of construction shall be delivered to the designated spoil site in Construction Waterway Huanglianwan area for piling; the spoil site shall be spoil Treatment leveled in a timely manner, with vegetation planted Project and slash restored. (Hecheng The domestic wastes shall be collected at designated 6 Section) of Domestic places and will delivered to local sanitation 30kg/d Xiaoshanzi in waste departments for treatment, together with a small Jialing District, amount of construction spoils. Nanchong City The silt will be generated in the course of dredging. No temporary piling site will be set up along the line. The silt can be piled on one side of waterway, Silt Dredging which, after being dried, will be delivered t the designated spoil site. The silt will be used as humus soil for greening construction of this project and other projects in the city. Try to recover and use the useful part of building wastes generated, and deliver the remaining wastes Building waste 0.76×104m3 to the sanitation department in Zizhong County for treatment and filling in Gutianba area; random Northern Outer piling or placing shall be forbidden. Ring Road Construction Discard The discard shall be used for filling in Gutianba Construction spoil 2.54×104m3 area. 7 Subproject of The construction site and construction camp shall Zhonglong set sanitation facilities like waste bins in a rational, Town, Zizhong unified and appropriate manner for concentrated County Domestic collection and then deliver to the urban waste

waste treatment plant in Zizhong County for filling on a regular basis; random dumping shall be forbidden, in case of contaminating the local environment or affecting the landscape.

83 Subproject Solid waste analysis during S/N Mitigation measure name construction period Try to recover and use the useful part of building wastes generated, and deliver the remaining wastes Building waste 0.17×104m3 to the sanitation department in Miyi County for treatment and filling in the southern new area; random piling or placing shall be forbidden. Infrastructure The discard is in a large amount. The construction Construction Construction Discard spoil generated by this project will be totally 8 Subproject of spoil 6.71×104m3 delivered to Miyi Planning and Construction Bureau Miyi County for filling in southern new area. (Panlian Town) The domestic wastes generated by workers during construction period will be included in the existing Domestic A small amount domestic waste collection treatment system within waste the area; enhance the health education for workers; random dumping shall be forbidden. 2. Predication and measures of solid wastes impact during operation period The solid wastes during operation period mainly come from the road project and wastewater treatment plant. The wastes generated in the course of road sweeping and maintenance, in a small amount, will be collected intensively and delivered to the municipal sanitation departments for unified treatment; thus they have low impacts on the environment. Only one wastewater treatment plant shall be established for Xinjin County Subproject of SSTDP Project, with produced sludge quantity of 400t/d. Dewatered sludge can be transported to landfill for treatment based on actual condition of Puxing Town, Xinjin County that Xinjin County already has landfill. 4.2.6 Analysis and assessment of social environmental impact 1. Adverse impacts on local social environment during construction period The adverse impacts on local social environment during construction period are mainly reflected by the land acquisition and resettlement, traffic congestion and population health. (1) Land acquisition and resettlement The land occupation by the project results in the loss of land and resettlement of residents. However, with the resettlement planning and implementation, as well as changing from rural residents to urban residents, re-employment training, reasonable compensation and other appropriate measures, the living standard of the affected residents will soon get back to normal and even higher than before. (2) Impact on traffic The project will have direct or indirect impacts on the existing traffic system in the construction area. During construction period, the number of transportation vehicles will increase, which will result in the congested traffic conditions, and may even lead to traffic jams and damages to roadway facilities, bring out traffic accidents, and thus cause traffic inconvenience. (3) Impact on population health During construction period, external workers will enter the site; the frequent movement of personnel may introduce exogenous diseases. Construction workers coming from high occurrence areas of infectious diseases may also bring in the infectious diseases and thus result in the spread of acute infectious diseases like malaria.

84 2. Analysis on positive effects of social environment All subprojects under SSTDP are included in the range of urban municipal projects, including road construction, (environment) waterway treatment, wastewater interception pipe network, establishment of wastewater treatment plant, etc. The implementation of projects could help facilitate the local social and economic development, improve the environment and raise the quality of life. The positive effects are significant. (1) Impact of the implementation of projects on promoting the regional economic development After the completion of this project, the functional layout structure in southern area will become more scientific and reasonable, the matching facilities will become more complete, the road traffic system will become more convenient and efficient, the urban investment environment will get greatly improved, the living environment will get upgraded, and conditions for investment attraction and real estate development will become more mature, which could not only facilitate the urban construction and development, but also achieve land assessment resulting from the improvement of traffic and living environment, and thus maximize the efficiency of land resources. (2) Improvements of QOP (quality of life) of local residents and surface water environment quality in the region With the completion and operation of municipal infrastructure, the environment within the area will get beautified, the traffic conditions will get improved, people’s living standard will get enhanced gradually, and communications, culture & entertainment, education and health care will also develop rapidly; while in return, social causes also promote the rise of people’s cultural and living level, and thus facilitate the construction of material and spiritual civilization. Drainage works and wastewater treatment plant of the Project shall be established to improve wastewater pipe network, collect pollution sources and realize the effects of centralized treatment, drainage upon compliance with standard, wastewater interception and discharge reduction and thereby to improve surface water environment quality of the region. Table 4.2-15 Summary of beneficial scope and pollutant discharge reduction of each subproject Number of Beneficial Pollutant discharge S/N Name of subproject Content of subproject beneficial area reduction quantity people Pollutant discharge Road works, bridge works, reductions of the region pipeline works (rainwater, upon establishment of wastewater and water supply), the wastewater Subproject of Puxing Puxing Town, 150 1 lighting works, traffic works, treatment plant: BOD5: Town, Xinjin County Xinjin County thousand greening works, waterway 144.5t/a, CODcr: renovation works and wastewater 260.4t/a, SS: 219.6t/a, treatment plant works. NH4+-N: 37.4t/a, T-N: 34.3t/a, T-P:2.68t/a Reduce direct discharge Rainwater and of 2500m3/d domestic Wastewater Pipe Reconstruction of roads and wastewater from Network & Road rainwater and wastewater Penglai Town, 86 Qijiang Road and 2 Reconstruction pipelines, reconstruction of pipe Daying thousand Luogui Road Subproject of Daying network to septic-tank of the County inhabitants into water County (Penglai urban area. body and lead it into Town) wastewater treatment

85 Number of Beneficial Pollutant discharge S/N Name of subproject Content of subproject beneficial area reduction quantity people plant for treatment and discharge it upon compliance with standard. The wastewater pipe network, once completed, can collect Dredging works for 2.75km directly discharged Infrastructure waterway of Yingxi River, LB-M wastewater to realize Construction ecological slope protection centralized treatment Subproject of Yingxi works, new 3 Yingxi Town 19000 and discharge upon Town, Shunqing 2.661km pipeline along Binjiang compliance with District, Nanchong Road at left bank of Yingxi River standard in the City and 4.7km intercepting main wastewater treatment along both banks of the river. plant and can reduce pollutant discharge quantity. Binjiang Road of 2.18km, Urban area, 79 Greatly reduce rainwater and wastewater Fengming thousand discharge load of Binjiang Road pipeline and covered channel of Town, pollutants in (Southern Section) 5.271km, crown emergency Pengshan wastewater to Minjiang Road and Wastewater access of 2.178m and road slope County River and reduction 4 Interception Subproject protection of 46693m2. quantities of CODCr, of Fengming Town, BOD5, SS and TP are Pengshan County 600t/a, 324.8t/a, 512.2t/a and 5t/a respectively. New main waterway of about Hongchuan More than The wastewater pipe 4.4km, dredged moat waterway Town, 42.1 network, once of about 4.8km; new walkway at Hongya thousand completed, can collect the two sides of channel County directly discharged revetment of about 8.8km; new wastewater to realize greenbelt at the two sides of centralized treatment Environmental channel revetment of about and discharge upon Treatment Subproject 8.8km; wastewater main along compliance with 5 of Hongya County the two sides of waterway of standard in the (Hongchuan Town) about 18.76km. wastewater treatment plant and can reduce pollutant discharge quantities as follows: CODcr 1679t, BOD5 730 t, SS 1762t, NH4+- N 90t. Dredging and reconstruction of Duweiba Around The wastewater pipe the existing waterway, Block and 200 network, once construction of branch Huanglianwan thousand. completed, can collect waterways, construction of Block in directly discharged Waterway Treatment walkways and greenbelts at the Jialing wastewater to realize Project of Xiaoshanzi two river banks, construction of District, centralized treatment River (Downtown small bridges over the river, Nanchong and discharge upon 6 Section) in Jialing drainage work, construction of City compliance with District, Nanchong intercepting pipeline of 7210m in standard in the City total. wastewater treatment plant and can reduce pollutant discharge quantities as follows: COD: 365t/a, BOD5:

86 Number of Beneficial Pollutant discharge S/N Name of subproject Content of subproject beneficial area reduction quantity people 146t/a, NH4-N: 36.5t/a Northern outer ring road with the Zhonglong 102 designed length of 3290m, Town, thousand planned width of road boundary Zizhong Northern Outer Ring limits of 40m, each equipped County Road Construction with one water supply, rainwater 7 Subproject of / and wastewater pipeline Zhonglong Town, respectively and provided with Zizhong County road lamps, greening, traffic works and other municipal pipelines along the whole line. Infrastructure Municipal road work, flood Panlian Town, 39 Construction control dam work and pipe Miyi County thousand 8 Subproject of Miyi network matched with them. / County (Panlian Town) (3) Impact on the traffic After being completed, the project will greatly improve the regional traffic conditions, and impose positive impacts on perfecting the road network layout, as well as urban residents’ travel conditions and transport conditions. (4) Impact on urban flood control The project constructed in conjunction with Binhe Road and embankment and the waterway treatment can control the flood, and thus could effectively guarantee the development of the region and residents’ life and property, as well as facilitate the development of the county. (5) Impact on the landscape Most of projects are located in urban areas. The design shall fully consider the coordination of urban landscape, with plenty of flowering shrubs, groves and graceful isolated trees planted within the project site, which could wonderfully improve the landscape environment, widen the road, and make flowers and gardening plants greener and more brilliant, as well as the water cleaner. 3. Local social environment measures during construction period (1) Resettlement plan 1) Land acquisition and resettlement Ensure the sources of incomes and living standards of residents affected by land acquisition are not lower than before through monetary compensation, land adjustment, industrial development and employment promotion. 2) Demolition and resettlement The affected residents will be resettled at concentrated places through unified planning and construction. (2) Mitigation measures for traffic impact during construction period The road construction contractors shall conduct in-depth field investigations regarding impacts of related roads on increasing traffic pressure and combine with relevant road transportation capacity in order to prepare scientific and reasonable construction transport management plan, for instance, the transportation of bulk materials and equipment should avoid the rural fair trade

87 day or market road, the entrance-exit of section under reconstruction should be equipped with prominent bypass road signs, the speeding and overloading traffic should be forbidden, select the transport route reasonably, try to avoid acoustic environmentally-sensitive areas like schools, hospitals and concentrated residential areas, set transport vehicle washing facilities at the exit of construction site, bulk materials should be transported in a covered state, etc. In the course of road construction, set the “no passing” signs at the entrance and exit of road under construction, and lead vehicles to normal passing at the nearest places. The road construction principles stipulate that, the road shall be constructed without prejudice to the normal operation of traffic within the region. Pay attention to pedestrians in case of the occurrence of accidents. As for the construction nearby sensitive points, without prejudice to normal construction, people should travel by designated access; the pavement should keep flat in order not to affect people’s travel, and the corresponding indicative marks should be set when the access changes its directions, for purpose of ensuring people’s safety. The section subject to a large amount of works should be equipped with protective facilities such as forbidden line, forbidden lamp, pile sign, etc. Construction workers are obliged to warn people to take notice of safety and instruct them to pass by designated route. Cross-trench bridges should be secure and reliable, with railings set on both sides. (3) Protective measures for population health Strengthen the health prevention measures, safety knowledge publicity as well as environmental supervision and management. Chapter V Public Consultation and Information Disclosure 5.1 Purpose of public consultation The purpose of the public consultation is to obtain opinions of the public directly affected by the project-affected area, to allow decision-making departments to immediately find potential problems and make timely changes as well as perfect the design programs, allowing issues reflected by the public to be resolved fundamentally, therefore, making the project's process design, environmental protective measures and environmental monitoring & management tends to be more complete and reasonable and striving to make the construction of the Project achieve optimal uniform in the environmental benefits, social benefits and economic benefits. 5.2 Approaches for public participation EIA engineers and the client will make detailed introductions on the basic situations and the main conclusions of the EIA of the proposed project to the public in the would-be affected area, including project size, the long-term and short-term impacts on the public and the environment in the construction period and the running period after the completion of project, etc, to learn the attitude, requirements and recommendations of the public on the proposed project. The public consultation methods mainly include: Issue public notification on information in the networks and newspapers; Visit the areas affected by the construction of the Project and put up a notice; Have interactive talks with the public and distribute the public participation questionnaire Individual interviews, household interviews and group interviews (discussion meetings); Focus on sensitive areas to visit and negotiate.

88 Table 5.2-1 Summary of time and approaches of information notification of each subproject Information issue Web page screenshot and newspaper scanning Name of Information S/N EIA stage and brief Time Location subproject issuer introduction Notify the basic information of the Project such as the Xinjin Public Information Client, Oct. 10-25, Website After receiving environmental 2009 (http://www.xinjin.gov.cn/) the EIA assessment and commission, construction units on completing the network. environmental School of screening and Notify the basic Environment finalizing EIA information of the Subproject of Science and outline and Project such as the 1 Puxing Town, Engineering, Re-publish EIA public proposal. Client, Xinjin County Southwest Oct. 26, 2009 notification of the Project on environmental Jiaotong Xinjin Daily. assessment and University construction units on the newspapers.

After completion Notify EIA of the EIA draft, conclusions and Xinjin Public Information Feb. 20 – conduct further environmental Website Mar. 5, 2010 negotiations with protection reports on (http://www.xinjin.gov.cn/). the public. the network. After receiving Rainwater and the EIA Conduct the first Wastewater Pipe commission, public notification China Railway Sichuan Economic Daily and Network & Road completing on the Project Eryuan the website of China Railway 2 Reconstruction environmental overview and EIA Oct. 14, 2009 Engineering Eryuan Engineering Group Subproject of screening and related information Group Co., Ltd. Co., Ltd. Daying County finalizing EIA via newspaper and (Penglai Town) outline and network. proposal.

89 Information issue Web page screenshot and newspaper scanning Name of Information S/N EIA stage and brief Time Location subproject issuer introduction

Notify EIA After completion conclusions and Sichuan Economic Daily and of the EIA draft, environmental Nov. 12, the website of China Railway conduct further protection reports on 2009 Eryuan Engineering Group negotiations with the newspapers and Co., Ltd. the public. network.

The public participated in public notification School of Environment After receiving (for the first time) on Science and the EIA Infrastructure Infrastructure Engineering, commission, Construction Construction Southwest completing Oct. 29 – Nanchong Shunqing Subproject of Subproject of YingxiJiaotong 3 environmental Yingxi Town, University & Nov. 10, Government Network website screening and Town, Shunqing Shunqing District, China Huaxi 2009 http://www.shunqing.gov.cn/ finalizing EIA District, Nanchong Nanchong City Engineering outline and City under Sichuan Design & proposal. Small Towns Construction Development Co.,Ltd, Project by WB Loans

90 Information issue Web page screenshot and newspaper scanning Name of Information S/N EIA stage and brief Time Location subproject issuer introduction The public participated in public notification (for the second time) on Infrastructure Construction Nanchong Shunqing Subproject of Yingxi Nov. 11, Government Network website Town, Shunqing 2009 http://www.shunqing.gov.cn District, Nanchong City under Sichuan Small Towns Development Project by WB Loans Conduct a public After completion notification on of the EIA draft, location to read the Mar. 26, conduct further Nanchong Daily Project EIA 2010 negotiations with documents on the public. Nanchong Daily. After receiving Notify the basic Binjiang Road the EIA School of (Southern information of the commission, Environment Section) Road Project such as the completing Science and Pengshan People’s and Wastewater Client, 4 environmental Engineering, Interception Oct. 12, 2009 Government Network screening and environmental Southwest Subproject of http://www.scps.gov.cn finalizing EIA assessment and Jiaotong Fengming Town, outline and construction units on University Pengshan County proposal. the network.

91 Information issue Web page screenshot and newspaper scanning Name of Information S/N EIA stage and brief Time Location subproject issuer introduction Notify EIA After completion conclusions and of the EIA draft, Pengshan People’s environmental Dec. 17, conduct further Government Network protection reports on 2009 negotiations with http://www.scps.gov.cn the newspapers and the public. network. Notify the basic After receiving the EIA information of the commission, Project such as the completing Client, environmental environmental Sep. 30, 2009 Sichuan Economic Daily Environmental screening and assessment and Treatment finalizing EIA construction units on China Railway Subproject of outline and Eryuan 5 the newspaper (for Hongya County proposal. Engineering (Hongchuan the firs time). Group Co., Ltd. Town) Notify EIA After completion conclusions and Sichuan Economic Daily and of the EIA draft, environmental Nov. 12, the website of China Railway conduct further protection reports on 2009 Eryuan Engineering Group negotiations with the newspapers and Co., Ltd. the public. network. After receiving Waterway the EIA Conduct a first School of Treatment Project commission, public notification Environment of Xiaoshanzi completing Science and Nanchong Jialing People’s on Nanchong Jialing 6 River (Downtown environmental Engineering, Oct. 20, 2009 Government Network People’s Section) in Jialing screening and Southwest (www.Jialing.gov.cn) District, finalizing EIA Government Jiaotong Nanchong City outline and Website. University proposal.

92 Information issue Web page screenshot and newspaper scanning Name of Information S/N EIA stage and brief Time Location subproject issuer introduction Conduct a second public notification Nanchong Jialing People’s After completing on Nanchong Jialing Nov. 20, Government Network EIA draft. People’s 2009 (www.Jialing.gov.cn) Government Website.

Notify the basic After receiving information of the the EIA Project such as the commission, Client, Sichuan Economic Daily and completing environmental the website of China Railway environmental Sep. 30, 2009 screening and assessment and Eryuan Engineering Group Northern Outer finalizing EIA construction units Co., Ltd. Ring Road outline and via newspaper and China Railway Construction Eryuan 7 proposal. network (for the firs Subproject of Engineering Zhonglong Town, time). Group Co., Ltd. Zizhong County Notify EIA After completion conclusions and Sichuan Economic Daily and of the EIA draft, environmental Nov. 12, the website of China Railway conduct further protection report 2009 Eryuan Engineering Group negotiations with (simplified edition) Co., Ltd. the public. on the newspapers and network.

93 Information issue Web page screenshot and newspaper scanning Name of Information S/N EIA stage and brief Time Location subproject issuer introduction Notify the basic After receiving information of the the EIA Project such as the commission, Client, Sichuan Economic Daily and completing environmental the website of China Railway environmental Oct. 14, 2009 screening and assessment and Eryuan Engineering Group Infrastructure finalizing EIA construction units Co., Ltd. China Railway Construction outline and via newspaper and Eryuan 8 Subproject of proposal. network (for the firs Engineering Miyi County time). Group Co., Ltd. (Panlian Town) Notify EIA After completion conclusions and Sichuan Economic Daily and of the EIA draft, environmental Nov. 12, the website of China Railway conduct further protection report 2009 Eryuan Engineering Group negotiations with (simplified edition) Co., Ltd. the public. on the newspapers and network. Table 5.2-2 Summary of time schedule and approaches of public consultation on various subprojects Brief introduction on information S/N Name of subproject EIA progress stage notification & public Investigator Time Location participations After receiving EIA Conducted a questionnaire survey School of Environment Subproject of Puxing Town, commission, environmental by visiting households Science and Engineering, Sept. 10, 2009 - Puxing Town, Xinjin 1 Xinjin County screening, and confirming Southwest Jiaotong Sept. 25, 2009 County Posted notification EIA outline and plan University Rainwater and Wastewater Pipe After receiving the EIA Distributed public participation China Railway Eryuan Project construction Network & Road Reconstruction commission, environmental 2 survey list, and investigated by Engineering Group Co., Oct. 2009 area: Penglai Town, Subproject of Daying County screening, and confirming visiting households randomly Ltd. Daying County (Penglai Town) EIA outline and plan

94 Brief introduction on information S/N Name of subproject EIA progress stage notification & public Investigator Time Location participations Distributed public participation Further negotiations with the survey list, and investigated by Feb. 24, 2010 public after completion of the visiting households randomly; 3 Feb. 26, 2010 EIA draft public participated symposiums

Infrastructure Construction After receiving the EIA Distributed public participation China Huaxi Engineering Yingxi Town, Subproject of Yingxi Town, commission, environmental 3 survey list, and investigated by Design & Construction Dec. 2009 Shunqing District, Shunqing District, Nanchong screening, and confirming visiting households randomly Co., Ltd, Nanchong City City EIA outline and plan

After receiving the EIA Distributed public participation Binjiang Road (Southern commission, environmental Fengming Town, survey list, and investigated by School of Environment Oct. 2009 Section) and Sewage screening, and confirming Pengshan County visiting households randomly Science and Engineering, 4 Interception Subproject in EIA outline and plan Southwest Jiaotong Fengming Town, Pengshan Further negotiations with the Distributed public participation University Fengming Town, County public after completion of the survey list, and investigated by Dec. 2009 Pengshan County EIA draft visiting households randomly Conducted a questionnaire survey (Hongchuan Town, at the project site and posted the Sept. 2009 After receiving the EIA Hongya County Environmental Treatment survey results. China Railway Eryuan commission, environmental 5 Subproject of Hongya County Engineering Group Co., screening, and confirming New Hongchuan (Hongchuan Town) Ltd. EIA outline and plan Town, Village 2 public participated symposiums Sept. 23, 2009 Community in Hongchuan

Waterway Treatment Project After receiving the EIA School of Environment (Downtown Section) of commission, environmental Conducted a questionnaire survey Science and Engineering, Jialing District, 6 Oct. 2009 Xiaoshanzi River, in Jialing screening, and confirming at the project site Southwest Jiaotong Nanchong District, Nanchong City EIA outline and plan University

95 Brief introduction on information S/N Name of subproject EIA progress stage notification & public Investigator Time Location participations

After receiving the EIA Conducted a questionnaire survey commission, environmental Zhonglong Town of at the project site and posted the Oct. 2009 screening, and confirming Zizhong County Northern Outer Ring Road survey results. EIA outline and plan China Railway Eryuan Construction Subproject of 7 Engineering Group Co., Zhonglong Town of Zizhong Ltd. Meeting Room on County Further negotiations with the Public participated symposium Nov. 15, 2009 6F of Government of public after completion of the Zhonglong Town EIA draft Conducted a questionnaire survey Zhonglong Town of Nov. 2009 at the project site Zizhong County

Conducted a questionnaire survey Panlian Town, Miyi After receiving the EIA at the project site and posted the Nov. 2009 Infrastructure Construction China Railway Eryuan County commission, environmental survey results. 8 Subproject of Miyi County Engineering Group Co., screening, and confirming (Panlian Town) Ltd. EIA outline and plan Office of Public participated symposium Nov. 6, 2009 Government of Panlian Town

96 5.3 Summary of main opinions Table 5.3-1 Summary of public opinions

Statistics of related questions (%)à Copies of survey S/Nà Name of subprojectà Questionsà à à à à à list (copy) Do you belong to the group of relocation for Èà Èà à à à à à à land acquisition of this project? ÀÃ

Do you support the construction of the project? ÈÃ Ã ÈÃ ÃÃ ÃÃ ÀÃ

97 Statistics of related questions (%)à Copies of survey S/Nà Name of subprojectà Questionsà à à à à à list (copy) Ãà 8. What is your opinion on house à dismantling & relocation etc.? (1) Reasonable economic compensation (2) 65.30% 0% 29.80% 0% à à Give a newly built house (3) Improve the living conditions (4) Other 9. Which way do you think is more effective to solve the environmental problems caused by the project? (1) Complain to the Ãà Ãà environmental protection department (2) 59.70% 40.30% 0% Resort to the legal process (3) Prevent construction and operation of the project 1. What is your attitude towards the construction of the project? A. Support; B. %Ã%Ã%ÃÃÃà Oppose; C. Indifferent 2. Do you think the project will contribute to the regional economic development? A. Ã%ÃÃÃ%Ã%ÃÃÃà Yes; B. No; C. Indifferent 3. Do you think the project is beneficial to the improvement of the living %Ãà %Ã%ÃÃÃà environment and enhancement of life quality? A. Yes; B. No; C. Indifferent 4. What is your opinion on the project? A. Start as soon as possible; C. Premature; C. Ã%à %Ã%ÃÃÃà Indifferent 5. What is your opinion on the land acquisition and demolition of illegal Ã%à %Ã%ÃÃÃà buildings for the project? A. Support B. Oppose C. Indifferent Infrastructure Construction 6. Do you know the region’s demolition, ÃÃ à  ÃÃÃÃÃà à Subproject of Yingxi Town, compensation and resettlement policy? A. % % à Shunqing District, Yes; B. No Nanchong Cityà 7. What do you think about current situation of environmental quality in this area? A. %Ãà Ã%Ãà %ÃÃÃà Bad; B. General; C. Good 8. What do you think the most negative impact on the surrounding environment of the project is? A. Natural environment; B. ÃÃ%à ÃÃ%ÃÃÃ%ÃÃÃà Social environment; C. Ecological environment 9. What kind of measure do you think the project should take to mitigate the impact on the environment? A. Strengthening ÃÃ%ÃÃÃ%à %ÃÃÃà construction management; B. Reasonable alignment; C. House removal 10. What the general trend do you think the impact of the project on the local ÃÃà environment is? A. Deterioration of ÃÃ Ãà ÃÃ à Ãà à %  Ãà % environmental quality; B. No impact; C. % Improvement of the environment quality Binjiang Road (Southern 1. Are you in the range of land acquisition à ÀÃ

98 Statistics of related questions (%)à Copies of survey S/Nà Name of subprojectà Questionsà à à à à à list (copy) Ãà 5. Do you think it will play a positive role in à improving traffic conditions in Pengshan 38.90% 61.10% 0% Ãà Ãà County after the completion of the project? ÀÃ

99 Statistics of related questions (%)à Copies of survey S/Nà Name of subprojectà Questionsà à à à à à list (copy) Ãà 3. Do you think it will play a positive role in à living conditions of local residents in the 98.3%Ãà à 1.7%ÃÃÃÃà area after the completion of the project? Àà Yes; ÀÃ1RÃÀÃ0D\EH 4. Do you think it will play a positive role in local economic development of the area 83.3%Ãà à 16.7%à Ãà Ãà after the completion of the project? Àà Yes; ÀÃ1RÃÀÃ0D\EH 5. Do you think the project will play a positive role in employment of the area? 95%Ãà à 5%ÃÃÃÃà ÀÃ

100 Statistics of related questions (%)à Copies of survey S/Nà Name of subprojectà Questionsà à à à à à list (copy) Ãà 4. What do you think the beneficial effects à the project will bring? (1) Promote economic development (2) Speed up 25.70% 46.70% 26.70% 1.00% à à urban construction (3) improve the living environment (4) other; 5. What do you think the environmental pollution degree of the project might 22.50% 52.50% 25.00% Ãà Ãà cause? (1) Serious (2) Slight (3) No effect 6. What do you think the main environmental problem of the project will be? (1) Soil Erosion (2) Air pollution (3) 7.30% 31.20% 40.40% 16.50% 4.60% Noise (4) Surface water pollution (5) Landscape impact 7. Which way do you think is more effective to solve the environmental problems caused by the project? (1) Complain to the 49.30% 46.60% 4.10% Ãà Ãà environmental protection department (2) Resort to the legal process (3) Prevent construction and operation of the project 8. What do you think the impact on your life quality brought by the construction of the Ãà Ãà project will be (1) Positive (2) Negative 37.80% 28.00% 34.10% (3) No impact; 9. What is your opinion on house dismantling & relocation etc.? (1) Reasonable economic compensation (2) 43.80% 36.50% 12.50% 7.30% à à Give a newly built house (3) Improve the living conditions (4) Other 5.4 Information Disclosure Seen from the survey results, it can be concluded that there is a good public response on the project; the construction of project has received the support of most of the local people; in addition, with the increasing awareness on environmental protection, most of people have put forward that it shall play a positive role on promoting urban economy and improving the living environment after completion of the project; however, there are also some environmental problems, people hope to take corresponding mitigation measures to gain effective control. The following conclusions can be drawn from above statistic results of the survey: (1) The survey mainly focused on people living around the project area; surveyed people are characterized by representative; (2) The majority surveyed people expressed that they are willing to support construction of the project. (3) People believe that the construction of this project will play an important role in promoting urban economic development and improving infrastructure. Whereas, small portion of them think that the construction will impose negative impacts on regional acoustic environment and atmospheric environment; therefore, during the construction process, protection on facilities should be strengthened to ensure that local acoustic environment and atmosphere will not be destroyed. All in all, public sentiments and opinions reflected in the survey are of high reference value on the project construction, operation and management. 5.5 Responses on public opinions During the period of EIA and negotiation with the public, EIA staff have made detailed explanations one by one on any doubt the public had and also provided feedback to the Client and design institute on those

101 environmental issues concerned by the public in time so that they will focus and improve in the design of next stage; at the same, corresponding environmental protection requirements and measures are raised in the EIA report.

102 Chapter VI Environmental Management Plan 6.1 Environmental management institutions 6.1.1 Environmental management system and procedures Refer to Table 6.1-1 for environmental management system and procedures of the Project and to Figure 6.1-1 for frame diagram of environmental management and institutions. Table 6.1-1 Sketch of environmental management system and procedures Unit Environmental Environmental Content of implementing protection and protection and Project phase environmental mitigation management supervision protection measures department department Construction Environmental Implementing supervision institution Protection Bureau of mitigation measures and Construction and provincial and Construction period each district and handle emergent company municipal county and the Client environmental problems environmental of the project protection bureau Implementing The Client or Environmental Provincial and mitigation measures and operation and Protection Bureau of municipal Operation period environmental management each district and environmental management unit county protection bureau 6.1.2 Environmental management institution and its responsibility 1. Environmental protection management institutions Refer to Table 6.1-2 for environmental protection management institution and its responsibility. Table 6.1-2 Environmental management institutions and the main responsibility Name of the Responsibility of the institution Remarks institution There are two daily environmental protection experts. Environmental Coordinate and manage Sichuan Small Towns supervisor (engineer) is to be Development Project and ensure that arranged during construction PPMO environmental protection conforms to requirements period for supervising the whole for World Bank safeguard policies. process of mitigation measures (pursuant to EMP and construction tender document) of each bid section. Environmental Guide the Client to implement PRC Laws and Protection Department Environmental Protection Regulations on environmental protection, be of Sichuan Province Department of Sichuan Province responsible for review and approval, supervise and municipal is responsible for review and implementation of all mitigation measures, and be environmental approval of EIA reports for all responsible for review and acceptance of protection bureau of the subprojects. environmental protection. project area Be responsible for supervision and management of Traffic Bureau of the mitigation measures and facilities of road works in districts and counties the administrative areas during operation period Be responsible for supervision and management of Water Conservancy mitigation measures and facilities of waterway Bureau of the districts treatment works in the administrative areas during and counties operation period Environmental Be responsible for supervision and management of

103 Name of the Responsibility of the institution Remarks institution Protection Bureau of environmental protection of projects of WB in the the districts and administrative areas during construction period and counties operation period 6.1.2 Supervision institution Refer to Table 6.1-3 for environmental protection and supervision institutions and their responsibilities. Table 6.1-3 Environmental protection and supervision institutions and their main responsibilities Name of the institution Responsibility of the institution Remarks Be responsible for review and approval of EIA reports of the proposed projects, supervise Administrative Department of Environmental Protection implementation of all mitigation measures of the Environmental Protection Department of Sichuan proposed projects, and be responsible for review Department of Sichuan Province and acceptance of environmental protection of the Province proposed projects. Supervise and manage environmental protection of construction projects, organize and coordinate relevant institutions to serve for environmental protection, supervise implementation of project Environmental Management Plan, be responsible for completion acceptance of environmental Municipal Environmental protection facilities of the project, confirm Protection Bureaus of Chengdu Municipal environmental environmental rules and standards that shall be City, Panzhihua City, Nanchong protection bureau implemented, guide the environmental protection City, Suining City, Meishan bureaus of the districts and counties in City and Neijiang City environmental supervision and management during construction period and operation period, accept, investigate and coordinate to handle complaint from the public and supervise improvement of environmental protection facilities and measures. Accept guide from superior environmental protection departments, supervise the Client to implement Environmental Management Plan, Environmental protection implement relevant laws and regulations on bureaus of two districts: Jialing environmental management, coordinate all District and Shunqing District Eight environmental departments in environmental protection, be Environmental protection protection bureaus of the responsible for inspection, supervision and bureaus of six counties: Xinjin districts and counties management of construction, completion and County, Daying County, operation situation of environmental protection Pengshan County, Hongya facilities in the administrative areas, accept, County, Zizhong County and investigate and coordinate to handle complaints Miyi County from the public and supervise improvement of environmental protection facilities and measures. Environmental supervision in engineering preparation period mainly includes: reviewing articles about environmental protection specified in Engineering Construction Organization Plan prepared by the Construction Company, checking In next phase, the Consulting Construction supervision and confirming whether the environmental Company is determined by institution protection system established by the Construction bidding. Company is proper or not, participating in review and approval and submitting of Commencement Report of Unit Engineering, and supervising construction of all contaminant treatment works,

104 Name of the institution Responsibility of the institution Remarks and its implementation. Environmental supervision during construction period mainly includes: preparing Key Points for Environmental Protection according to construction organization design of each bid section, promoting environmental protection to the Construction Company so as to point out the sensitive issues of environmental pollution, proposing detailed mitigation measures according to main contaminants generated during construction process, reviewing Environmental Protection Schemes in Engineering Construction submitted by the Construction Company, inspecting whether the environmental protection system of the Construction Company is operating normally or not, inspecting implementation of mitigation measures and supervising measures for soil and water conservation. Environmental supervision during operation period includes: reviewing Conclusive Report of Environmental Protection in Construction prepared by the Construction Company, collecting completion documents of environmental protection, supervising environmental protection acceptance of the projects and preparing Conclusive Report of Environmental Supervision.

105

Fig. 6.1-1 Frame diagram of environmental management and supervision institutions of SSTDP project

106 6.2 Environmental Management Plan 1. Environmental management of the Client The Client shall actively develop bidding design for all mitigation measures in bidding design phase. During construction period, the Client will be responsible for environmental protection management from commencement to completion and acceptance period with main contents as follows: (1) Preparing implementation rules and management methods on environmental protection during construction period. (2) Being responsible for incorporating bidding design results on mitigation measures into tender document and contract. (3) Formulating annual environmental protection plan. (4) Reviewing and arranging annual environmental protection fees. (5) Supervising the Contractor in terms of implementation of mitigation measures. (6) Organizing and implementing mitigation measures and monitoring issues undertaken by the Client. (7) Coordinating with environmental protection department and other relevant departments. (8) Preparing annual environmental protection report, monthly, quarterly and annual statements. (9) Organizing and developing environmental protection promotion, education and training. 2. Environmental management of the Contractor The Contractor shall be responsible for environmental protection of the involved construction activities, including: (1) Formulating annual environmental protection plan. (2) Inspecting construction progress, quality, operation and detection of environmental protection facilities and handling relevant problems in implementation process. (3) Reviewing usage of annual environmental protection fee. (4) Reporting implementation of environmental protection terms and conditions in the contract. 3. Environmental management of environmental protection department and supervision department The local environmental protection bureaus of districts and counties and the Consulting Company shall be responsible for daily supervision and inspection and implementation of all mitigation measures. In addition, relevant involved departments such as traffic bureau and water conservancy bureau and so on shall also supervise said items. 6.3 Training Program 1. Training program To guarantee smooth and effective implementation of environmental protection, all staff (including constructors and so on) must be trained in terms of knowledge and skills on

107 environmental protection. In addition to explanation of importance and significance of proposed projects to all staff, different training should be performed for staff according to different posts. (1). On-the-job training of environmental management personnel On-the-job training for environmental management personnel aims to enhance environmental management during construction period and operation period and guarantee quality of environmental monitoring and effective environmental management so as to improve the quality of the project. On-the-job training can enable the environmental management personnel to recognize major problems during construction period and get the knowledge of problems and weakness in environmental management so as to report to environmental protection department in time and adopt necessary control measures. During construction period, the management institution of the project shall invite experts on environmental protection or environmental management personnel with similar management experiences to explain possible environmental problems and the solutions on site. (2) Training of construction management personnel and constructors for each project Before commencement, the management personnel and constructors for the company which has won the bid shall be trained in terms of environmental knowledge so as to avoid damage to the environment due to wrong operation. Training of contract management personnel aims to clear the environmental protection liability to be borne by the Construction Company and that to constructors aims to enhance correct operation during construction period so as to minimize and avoid harm to the environment. The training may enable the engineering management personnel to get the knowledge of its obligation on environmental protection and possible results of damage to the environment so that the constructors can have intuitionistic understanding of the degree and method for protection of environmental sensitive points. According to actual situation of the project, the constructors shall be trained for one week. (3) During project operation period, the project management institution shall hold training for the staff periodically so that the staff can get the knowledge of possible environmental problems concerning their posts and adopt necessary measures. Each staff shall be aware of environmental protection. 2 Training plan Table 6.3-1 List of training on environmental protection of subproject in Xinjin Method, personnel, and person-time of training Training Training cost Project Training content Domestic Foreign time (year) (10,000 yuan) (person) (person) Environmental protection rules, 1 technical 2005 - construction planning, environmental 2 7.0 leader 2007 monitoring principles and codes 2005 - Pipe network and Public relations 1 1 5.0 2007 road construction Pollution during construction period, 2005 - 2 1 4.0 control and management 2007 Knowledge on post environmental 2005 - 2 1 3.0 protection 2007 Subtotal 7 4 19.0

108 Table 6.3-2 Training plan on environmental protection of subproject in Daying Budget Trainee Training S/N Training target Training content Organizer Location (10,000 (person) time yuan) Staff of PMO and engineering Knowledge concerning 1 environment environmental protection and The Client 2 15 days Chengdu 0.6 protection office management (division) Staff of PMO and Learn mature environmental engineering management experience by 2 environment The Client 2 5 days / 0.2 visiting similar domestic protection office engineering project (division) Staff of PMO and Learn knowledge concerning engineering environmental protection and 3 environment management, and get the The Client 2 15 days Chengdu 0.3 protection office knowledge of content of EIA (division) report of the project Field Management Knowledge concerning Personnel of the environmental supervision, The Client Consulting Company content of the EIA report of the and 4 1 15 days Chengdu 0.3 and engineering project, and content of relevant Consulting environment environmental protection and Company supervisor design documents of the project Major Technical Management Personnel and Knowledge concerning The Client 6 Construction environmental protection and and 3 15 days Chengdu 0.9 Management management contractor Personnel of the Contractor Knowledge of the project The Client 7 Constructor concerning environmental and 150 5 days Daying 7.5 protection contractor Total / / / 9.8

Table 6.3-3 Training plan on environmental protection of subproject in Yingxi Town, Shunqing District, Nanchong City S/N Training target Training content Organizer Trainee Training Location Budget (person) time (10,000 yuan) 1 Staff of PMO and Learn knowledge The Client 2 10 days Chengdu 0.5 engineering concerning environment environmental protection office protection and (division) management, and get the knowledge of content of EIA report of the project 2 Learn mature Staff of PMO and environmental engineering management experience environment The Client 2 5 days / 0.2 by visiting similar protection office domestic engineering (division) project

109 3 Field Knowledge concerning Management environmental Personnel of the supervision, content of The Client Consulting the EIA report of the and 2 10 days Chengdu 0.5 Company and project, and content of Consulting engineering relevant environmental Company environment protection and design supervisor documents of the project 4 Major Technical Management Knowledge concerning Personnel and The Client environmental Construction and 3 5 days Chengdu 0.3 protection and Management contractor management Personnel of the Contractor 5 Knowledge of the The Client project concerning Constructor and 50 2 days Nanchong 1.0 environmental contractor protection Total / / / / 2.0 Table 6.3-4 Training plan on environmental protection of subproject of Fengming Town in Pengshan County S/N Training target Training content Organizer Trainee Training Location Budget (person) time (10,000 yuan) 1 Staff of PMO and Learn knowledge The Client 10 days Chengdu 0.5 engineering concerning environment environmental protection protection office and management, and 2 (division) get the knowledge of content of EIA report of the project 2 Learn mature Staff of PMO and environmental engineering management experience environment The Client 2 5 days / 0.2 by visiting similar protection office domestic engineering (division) project 3 Knowledge concerning Field Management environmental Personnel of the supervision, content of The Client Consulting the EIA report of the and Company and 2 10 days Chengdu 0.5 project, and content of Consulting engineering relevant environmental Company environment protection and design supervisor documents of the project 4 Major Technical Management Personnel and Knowledge concerning The Client Construction environmental protection and 3 5 days Chengdu 0.3 Management and management contractor Personnel of the Contractor 5 Knowledge of the project The Client Constructor concerning and 100 3 days Pengshan 3.0 environmental protection contractor Total / / / / 4.0

110 Table 6.3-5 Training plan on environmental protection of Hongya (Hongchuan Town) Subproject Budget Trainee Training S/N Training target Training content Organizer Location (10,000 (person) time yuan) Staff of PMO and engineering Knowledge concerning 1 environment environmental protection and The Client 2 15 days Chengdu 0.6 protection office management (division) Staff of PMO and Learn mature environmental engineering management experience by 2 environment The Client 2 5 days / 0.2 visiting similar domestic protection office engineering project (division) Staff of PMO and Learn knowledge concerning engineering environmental protection and 3 environment management, and get the The Client 2 7 days Chengdu 0.3 protection office knowledge of content of EIA (division) report of the project Knowledge concerning Field Management environmental supervision, Personnel of the The Client content of the EIA report of the Consulting Company and 4 project, and content of relevant 1 15 days Chengdu 0.3 and engineering Consulting environmental protection and environment Company design documents of the supervisor project Major Technical Management Personnel and Knowledge concerning The Client 6 Construction environmental protection and and 2 15 days Chengdu 0.6 Management management contractor Personnel of the Contractor Knowledge of the project The Client 7 Constructor concerning environmental and 100 5 days Hongchuan 5.0 protection contractor Total / / / 7.0 Table 6.3-6 Training plan on environmental protection of Subproject in Jialing District of Nanchong City Budget Training Trainee Training S/N Training target Organizer Location (10,000 content (person) time yuan) Knowledge Staff of PMO and concerning 1 engineering environment environmental The Client 2 10 days Chengdu 0.3 protection office (division) protection and management Learn mature environmental management Staff of PMO and experience by 2 engineering environment The Client 2 5 days / 0.2 visiting similar protection office (division) domestic engineering project

111 Learn knowledge concerning environmental Staff of PMO and protection and 3 engineering environment management, The Client 2 10 days Chengdu 0.3 protection office (division) and get the knowledge of content of EIA report of the project Knowledge concerning environmental supervision, content of the Field Management EIA report of The Client Personnel of the Consulting the project, and 4 1 10 days Chengdu 0.2 Company and engineering and content of Consulting environment supervisor relevant Company environmental protection and design documents of the project Knowledge Major Technical concerning The Client Management Personnel and 5 environmental and 3 15 days Chengdu 0.9 Construction Management protection and contractor Personnel of the Contractor management Knowledge of the project The Client 6 Constructor concerning and 80 5 days Nanchong 5.0 environmental contractor protection Total / 6.9 Table 6.3-7 Training plan on environmental protection of Subproject in Zhonglong Town of Zizhong County Budget Trainee S/N Training target Training content Organizer Training time Location (10,000 (person) yuan) Staff of PMO and Knowledge engineering concerning 1 environment environmental The Client 2 15 days Chengdu 0.6 protection office protection and (division) management Learn mature Staff of PMO and environmental engineering management 2 environment The Client 2 5 days / 0.2 experience by visiting protection office similar domestic (division) engineering project Learn knowledge Staff of PMO and concerning engineering environmental 3 environment protection and The Client 2 15 days Chengdu 0.3 protection office management, and get (division) the knowledge of content of EIA report

112 of the project Knowledge concerning Field environmental Management supervision, content of Personnel of the the EIA report of the The Client and Consulting 4 project, and content of Consulting 1 15 days Chengdu 0.3 Company and relevant Company engineering environmental environment protection and design supervisor documents of the project Major Technical Management Knowledge Personnel and concerning The Client and 6 Construction environmental 4 15 days Chengdu 1.2 contractor Management protection and Personnel of the management Contractor Knowledge of the project concerning The Client and 7 Constructor 150 5 days Zizhong 7.5 environmental contractor protection Total / / / 10.1 Table 6.3-8 Training plan on environmental protection of Subproject in Miyi County (Panlian Town) Budget Trainee S/N Training target Training content Organizer Training time Location (10,000 (person) yuan) Staff of PMO and Knowledge concerning engineering environmental 1 environment The Client 2 15 days Panzhihua 0.6 protection and protection office management (division) Learn mature Staff of PMO and environmental engineering management 2 environment The Client 2 5 days / 0.2 experience by visiting protection office similar domestic (division) engineering project Learn knowledge concerning Staff of PMO and environmental engineering protection and 3 environmental The Client 2 15 days Panzhihua 0.3 management, and get protection office the knowledge of (division) content of EIA report of the project Knowledge concerning Field Management environmental Personnel of the supervision, content of Consulting the EIA report of the The Client and 4 Company and project, and content of Consulting 1 15 days Panzhihua 0.3 engineering relevant environmental Company environment protection and design supervisor documents of the project Major Technical Knowledge concerning The Client and 6 Management environmental 3 15 days Panzhihua 0.9 contractor Personnel and protection and

113 Construction management Management Personnel of the Contractor Knowledge of the project concerning The Client and 7 Constructor 150 5 days Miyi 7.5 environmental contractor protection Total / / / 9.8 Training on environmental protection and management, which will cost all together 686,000 yuan, shall be carried out for staff of the Client, Construction Company, and Consulting Company for each subproject of SSTDP project. 6.4 Mitigation measures operation 6.4.1 Mitigation measures and expenditure budget Table 6.4-1 Mitigation measures and budget summary of each subproject Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Repair wastewater and Sedimentation and filtration before gravel screening system, being discharged in accordance with Water to be drained after 1.50 relevant standards, with some utilized pollution lowering groundwater in a comprehensive way prevention level and control Used for farming irrigation and forest Domestic wastewater of land afforestation locally after 0.20 constructors treatment in the simple septic tank Prevention Sprinkling for reducing dust, Fuel machinery against reasonable arrangement of transport vehicles and 0.80 ambient air construction procedures, and green construction dust pollution belts Prevention Traffic control measures, and sound and control Construction machinery insulation facilities and green belts for 1.20 measures on transport vehicles high-noise work areas noise Domestic wastes of Piling in a centralized way, arranging Subproject of constructors one spoil disposal area; and the wastes 1 Puxing Town, Solid wastes shall be treated by the municipal 0.20 Xinjin County Spoil environment and sanitation departments. Temporary slag yard Water conversancy measures, and 1.00 works water sprinkling and dust reduction Construction excavation, permanent Water and soil land requisition and Compensation and restoration 1.50 conservancy temporary land and ecological requisition restoration Restoration and renovation of Vegetation restoration 2.00 construction site and slag yard Ambient air monitoring, soil and water Environment Construction period 0.22 loss monitoring, noise monitoring monitoring Ambient air and traffic noise costs Operation period 0.12 monitoring Subtotal 8.72

114 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Control of water and Dust cover at the temporary piling 0.05 soil loss points for muck Ecology Reclamation and make-up planting in Vegetation restoration 0.05 the temporarily occupied land The construction schedule shall be Noise from construction rationally arranged to enforce machines management. Noise Traffic control shall be strengthened, Noise from traffic and and signs of horn prohibition and transport speed limit shall be set. After simple sedimentation and Construction slime treatment, the clean water on the upper 0.02 water layer shall be discharged into farming Water irrigation channels. pollutants Flushing water for Recycled after grease trap and 0.02 machines sedimentation Domestic wastewater Used as farmyard manure and fecal sewage Enclosed networks such as dust cover Dust from building shall be built around the building 0.10 demolition complex Rainwater and Dust cloth protection and site Wastewater Atmospheric Dust clearance shall be arranged on the 0.08 Pipe network pollutants temporary yard & Road Reconstruction Sprinkling for dust reduction, and the 2 Works in Dust from cars washing stations shall be built for 0.02 Daying arriving and departing vehicles Construction spoil The spoil shall be sent to the industrial County 4 3 0.15 (Penglai 1.0×10 m park for filling. Town) The domestic wastes shall be treated Solid wastes Domestic wastes by the environment and sanitary department. Sporadic wastes from The wastes shall be recovered or

paving timely collected locally. Construction environmental supervision system shall be implemented, and contractual system shall be adopted to incorporate relevant mitigation measures into the Environmental production quality management management system and acceptance indicator Construction period 0.20 and system of each stage. The construction monitoring dust, noise, water and soil conservancy as well as other control measures shall be supervised by designated workers, and relevant laws and regulations on environmental protection shall be promulgated. Environment Construction period and Regional ambient noise and air quality 0.10 monitoring operation period Subtotal 0.89 Sprinkling and dust control on Infrastructure Waste gas construction work surface, 3 Construction Dust 0.05 treatment construction site and construction Subproject of roads Yingxi Town,

115 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Yingxi Town, Material storage yard, sprinkling and Shunqing dust proof on the temporary storage 0.05 District, yard for spoil; the coverage stock and Nanchong dampening materials shall be adopted. City Truck transport with van; cleaning the dropped materials on the roads along 0.10 the line, and sprinkling to reduce the dust Dust screen shall be configured for structure demolition; the construction wastes and slag shall be removed and 0.05 cleared in time, with sprinkling for dust reduction Cleaning on the construction site; and 0.05 prompt greening restoration A professional maintenance and curing team shall be established, which shall Dust 0.02 be responsible for cleaning the wastes along the road in time The traffic management shall be strengthened, and the cars with excessive exhaust must be banned Car exhaust 0.02 from onto the roads; greening along both sides of the roads shall be strengthened so as to purify the air Temporary sedimentation tanks shall be built on all construction sites, and the tanks range from 10 - 20m3, grease traps shall be constructed at the 0.05 flushing points; discharge channels shall be built around the temporary Construction wastewater stock yard for slag, and sedimentation tank shall be built at the catchments. Waste water Construction management shall be treatment strengthened along the line in rainy seasons to prevent building slag 0.02 wastewater from being discharged into the river. Grids shall be arranged for water discharge in the rainwater pipe Rainwater on roads network, which shall be cleaned on a 0.02 regular basis, so as to ensure smooth drainage of the rainwater pipeline. Noise-insulation and vibration resistance measures shall be provided Noise Equipment noise for highly noisy equipment, and 0.05 treatment blocking shall be provided for construction site. The monitoring of construction site and sensitive points shall be strengthened, and the prevention and 0.05 control measures shall be adjusted based on the monitoring results.

116 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Construction management shall be enforced, and the construction layout shall be reasonably conducted. The night construction shall be prohibited for highly noisy equipment. The transportation routes shall be 0.02 reasonably specified. Measures of controlling speed and horn prohibition shall be taken, and the machinery equipment shall be repaired and maintained on a regular basis. Traffic noise along the line shall be tested regularly, and the control measures shall be adjusted and 0.10 Noise from traffic and improved combining with monitoring transport results. The layout of land requisition along

the line shall be reasonably planned. Retaining walls shall be provided for temporary piling of earthwork, and partial excavated soil must be backfilled and utilized and excessive earthwork shall be removed and Construction wastes cleaned in time. The demolished 0.05 wastes shall be sent to the designated slag dump, and the reasonable Solid waste transportation route shall be assigned. treatment The dropped materials must be cleaned. The temporary collection points shall be arranged on the construction site, Domestic wastes 0.05 and disinfection and sterilization measures shall be adopted. Wastes on the roads The highway maintenance team shall 0.02 along the line clear the wastes in time. Greening on both sides of the roads; Greening 5.00 greening on embankments An environmental management agency shall be established during the construction period, with 2 to 3 full- time staffs, and the environmental management during the operation period shall be carried out by the Environmental management and Nanchong Municipal Environmental 0.10 monitoring Protection Bureau; Nanchong Environmental Monitoring Station shall be responsible for environmental monitoring work; and construction environment supervision shall be carried out during the construction period.

117 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Ecological and environmental protection: temporarily occupied land, greening and vegetation on the construction site shall be recovered in 0.10 time. Topsoil protection shall be provided during the construction, and Others backfilling shall be carried out in time. Obeying and civilized construction management: notice boards and the 0.02 complaint hotline shall be provided. Regional heritage conservation shall be strengthened, and avoiding 0.01 measures must be taken. Subtotal 6.00 Binjiang Road Temporary Water 4 (Southern sedimentation tank on 1 0.01 pollution Section) and construction site prevention Sewage Grease trap on and control 1 0.01 Interception construction site Subproject in Temporary sound 2 0.06 Fengming barrier Town, Noise Earplugs 200 pairs 0.004 Pengshan prevention Ventilation and sound 3 0.24 County and control insulation window Reserved noise / 0.11 deduction expenses Trash bin and solid 3 0.01 Solid waste wastes transport treatment Trash bin and solid 10 0.02 wastes transport Noise dust Simple water mill 2 0.03 measures Scope of and measures for Signs of speed limit and / 0.01 environmental other information risks Measures of Measures of soil and soil and water 0.50 water conservation conservation Training of relevant Staff training 0.05 personnel Environmental Environmental supervision during the 0.09 supervision construction period Environmental monitoring during the 0.08 Environment construction period monitoring Environmental supervision during the 0.10 operation period Acceptance upon Environmental completion of protection 0.10 environmental acceptance protection project Temporary mitigation Reserved cost 0.50 measures; and

118 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Contingency measures Subtotal 1.924 A simple septic tank shall be arranged, and domestic wastewater can be used for irrigation; existing facilities near the roads shall Water be utilized for maintaining and washing the machinery and 0.02 environment equipment; the slurry of the cofferdam construction shall be discharged into the surface water after the sedimentation or reused as the process water. Noisy machinery such as generators shall be set at remote

places, far away from residential houses. Temporary fences and other noise-reduction measures shall be 0.02 offered. Construction time shall be rationally arranged. Try to avoid night construction, or low-noise construction work shall be arranged at the night. The traffic time for trucks shall be well coordinated to avoid traffic congestion. At night, measures such as speed reduction and horn prohibition must be prohibited. Construction plan shall be optimized, and the construction Noise period must be arranged reasonably. During construction pollution bidding, measures reducing noise pollution to the environmental will be incorporated into construction organization design, which shall be identified in the contract. According to the Notice on Strengthening Ambient Noise Monitoring and Supervision during the College Entrance Examination issued by State Environmental Protection Environmental Administration on Apr. 26, 1998, in addition to implementing Treatment relevant national standards on ambient noise to strictly control Subproject of various ambient noises, any construction works which will 5 Hongya generate excessive noise or disturb resident’s normal life shall County be prohibited during the examination and within half a month (Hongchuan before the examination. Town) Ecological Disposal of spoil environment Greening on both sides of waterway Strengthen promotion and education on health among the People’s people on the construction area, and educator the constructors

health how to prevent and control common infectious diseases by issuing notices or brochures. . Embankment construction site; schools, hospitals and Noise centralized residential areas are identified as construction noise 0.015 monitoring monitoring points. The Construction Company shall protect the historic relics that Protection of are near the line with the fences. During the construction period, historical 0.02 constructors, vehicles and machinery shall be prohibited from relics accessing to avoid damages to cultural relics. Sprinkling shall be done and vehicles shall be cleaned on a Atmospheric regular basis. The bulk and loss dust-contained materials shall 0.10 environment be transported with a van covered. Solid wastes Facilities to collect wastes temporarily 0.003 Substrate sludge shall be transported by the enclosure tank car. Sludge in the The substrate sludge shall be sent to the temporary dump yard 0.02 river way and used for the green belt after drying. Embankment construction site; schools, hospitals and Environment centralized residential areas are identified as construction noise 0.055 monitoring and ambient air monitoring points. Subtotal 0.253

119 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) 6 Waterway The construction plan shall be Treatment reasonably arranged to speed up Project construction schedule. The spoil shall (Downtown be removed and cleared in time and Section) of the construction land shall be restored. Xiaoshanzi The excavated sections must be River in backfilled in time based on the Jialing Ecological Measures of soil and construction progress. The temporary 0.30 District, environment water conservation stock yard must be covered by the Nanchong membranes, and a diversion channel City shall be arranged around the site. The vegetation restoration and site hardening shall be enforced in the late days of the construction. The topsoil shall be not exposed after the completion of the construction. Protection of residential The mixing plant must not be set near areas and other sensitive the protected target, and high-noise points operation shall be prohibited at night. The construction plan shall be optimized, and the temporary traffic control measures shall be implemented Social by negotiation and coordination with environment tariff departments. It is suggested that Traffic trunk line and construction and transport of the passage protection Construction Company should stagger the rush hour, and night transportation should be carried out under the premise of not disturbing the normal life of residents. Management shall be strengthened during the construction period. For the Acoustical Prevention and control densely populated area, high-noise environment measures for noise equipment must not be used for night construction. Engineering works such as excavation and filling shall be stopped when the wind velocity is greater than Degree 4; sprinkling car shall be provided for the humidification; and the place with raw materials stored in an open air shall be Measures of preventing Atmospheric covered. The transport truck shall also and controlling dust and 0.05 environment be covered. The dust shall be promptly powder cleaned on the ground of the construction, and the ground shall be humidified. The transport route shall be reasonably arranged, which shall detour the environmentally sensitive points such as hospitals and schools. Temporary sedimentation tanks and filtration tanks shall be arranged on the Prevention and control construction site, where the foundation Water of construction pit water and production wastewater 0.08 environment wastewater; treatment of shall be reused after treatment. The domestic sewage domestic wastewater shall be collected on a regular basis and transported to the outside as farmyard manure.

120 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Construction shall be carried out in low-water reasons, and drainage Flood, loss of water and Ecological channel shall be set. The exposed soil soil and ecological 0.02 environment shall be covered in time. The damage construction land shall be restored in time. Subtotal 0.45 Northern The temporary stored spoil shall be Outer Ring Control of water and covered with a dust cover, and the 7 0.07 Road soil loss wasted soil shall be used for filling the Ecology Construction paddy field and dam area Subproject of Reclamation and make-up planting in Vegetation restoration 0.05 Zhonglong the temporarily occupied land Town of The construction schedule shall be Noise from construction Zizhong rationally arranged to enforce machines County management. Necessary measures such as sound insulation windows shall be taken for residents along the road in the planned Noise residential area according to specific Noise from traffic and predicted results of the EIA noise in 1.00 transport the property development project. The four sensitive points where the noise exceeds standard stipulation shall reserve 2000m2 sound insulation windows. After simple sedimentation and Construction slime treatment, the clean water on the upper 0.08 water layer shall be discharged into farming Water irrigation channels. pollutants Flushing water for Recycled after grease trap and 0.08 machines sedimentation Domestic sewage Used as farmyard manure Fecal sewage Enclosed networks such as dust cover Dust from building shall be built around the building 0.30 demolition complex Dust cloth protection and site Atmospheric Dust clearance shall be arranged on the 0.08 pollutants temporary yard Sprinkling for dust reduction, and the Dust from cars washing stations shall be built for 0.02 arriving and departing vehicles The wastes shall be transported to the Construction spoil Sanitation Department of Zizhong Solid 4 3 0.15 2.54×10 m County, which shall be used as fill in paddy field and dam area The domestic wastes shall be treated Wastes Domestic wastes by the environment and sanitary department, Sporadic wastes from The wastes shall be recovered or

paving collected locally in time

121 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Construction environmental supervision system shall be implemented, and contractual binding system shall be adopted to incorporate relevant mitigation measures into Environmental production quality management management Construction period system and acceptance indicator 0.20 and system. The construction dust, noise, monitoring water and soil loss as well as other control measures shall be supervised by designated workers, and relevant laws and regulations on environmental protection shall be promulgated. Environment Construction period and Regional ambient noise and air quality 0.10 monitoring operation period Subtotal 2.13 Infrastructure Control of water and Retaining of soil, drainage channel and 8 0.40 Construction soil loss sedimentation tank Ecology Subproject of Reclamation and make-up planting in Vegetation restoration 0.16 Miyi County the temporarily occupied land (Panlian The construction schedule shall be Town) Noise from construction rationally arranged to enforce machines management. Sound fences shall be provided. 0.50 Sound insulation windows shall be Noise reserved for the residential area Noise from traffic and according to the predicted results of 0.268 transport the EIA noise in the property development project of the planned residential area. After simple sedimentation, the clean Construction slime water on the upper layer shall be 0.08 water reused or sprinkled locally. Production wastewater from concrete Water maintenance and curing, Recycled after grease trap and pollutants 0.08 construction machinery sedimentation washing and pipeline pressure testing Domestic wastewater Used as farmyard manure after

and fecal sewage treatment in the septic tank Dust cloth protection and site Dust clearance shall be arranged on the 0.10 Atmospheric temporary yard pollutants Sprinkling for dust reduction, and the Dust from cars washing stations shall be built for 0.04 arriving and departing vehicle The wastes shall be transported to the Construction spoil Sanitation Department of Miyi Solid 4 3 0.05 0.17×10 m County, who shall send the wastes to the dump yard. The domestic wastes shall be treated Wastes Domestic wastes by the environment and sanitary department

122 Investment Name of Item and construction S/N Type Treatment measures (million subproject content yuan ) Construction environmental supervision system shall be implemented, and contractual binding system shall be adopted to incorporate the relevant mitigation measures into Environmental the production quality management management system and acceptance indicator Construction period 0.25 and system. The construction dust, noise, monitoring water and soil conservancy as well as other control measures shall be supervised by designated workers, and the relevant laws and regulations on environmental protection shall be promulgated. Environment Construction period and Regional ambient noise, as well as 0.12 monitoring operation period waster and air quality Training of Construction period and Training for constructors and 0.098 environment operation period managers Subtotal 2.246 Total 22.613 6.4.2 Mitigation measures operation The mitigation measures shall be incorporated into Bidding Document and Contract. Moreover, construction organization and environmental management during operation period shall be strengthened so as to better implement mitigation measures in different stages. 1. Mitigation measures operation during the design stage of the project Table 6.4-2 Mitigation measures operation during the design stage Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content Optimized scheme in PPMO and Temporary stock Control of design stage, Construction yard protection, Design water and incorporated into Design Company slope protection and Institute soil loss engineering control for each drainage design measures subproject Reclamation and Ecology make-up planting Optimized scheme in within the design stage, Vegetation temporary land Design incorporated into Design restoration requisition, Institute engineering control comprehensive measures ecological treatment at the river bank The construction Reasonable measures Noise from schedule shall be and suggestive Design Noise construction rationally arranged requirements shall be Design Institute machines to enforce proposed in the design management. stage.

123 Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content Traffic control measures shall be Optimized scheme in strengthened, signs design stage, Traffic noise prohibiting horning incorporated into during or speed limit shall engineering control Design Design operation be arranged, and measures and Institute period sound insulation reasonable suggestions measures and and requirements may protection distance be proposed. shall be reserved. After simple sedimentation and Optimized scheme in treatment, the clean design stage, Construction water on the upper Design incorporated into Design slime water layer shall be Institute engineering control discharged into measures farming irrigation channels. Water Optimized scheme in pollutants Flushing Recycled after design stage, Design water for grease trap and incorporated into Design Institute machines sedimentation engineering control measures Reasonable measures Domestic and suggestive wastewater Used as farmyard Design requirements shall be Design and fecal manure Institute proposed in the design sewage stage. Optimized scheme in design stage, Enclosed networks incorporated into Dust from such as dust cover Atmospheric engineering control Design building shall be built around Design pollutants measures; and Institute demolition the building reasonable suggestions complex. and requirements can be proposed. Dust cloth Reasonable measures protection and site and suggestive Design Dust clearance shall be requirements shall be Design Institute arranged on the proposed in the design temporary yard stage. Sprinkling for dust Reasonable measures reduction, and the and suggestive Dust from washing stations Design requirements shall be Design cars shall be built for Institute proposed in the design arriving and stage. departing vehicles Optimized scheme in design stage, Stink from incorporated into Protection distance wastewater engineering control Design and afforestation Design treatment measures; and Institute enforcement plant reasonable suggestions and requirements can be proposed.

124 Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content Optimized scheme in design stage, incorporated into Street tree planting, engineering control Design Car exhaust Design etc. measures; and Institute reasonable suggestions and requirements can be proposed. Optimized Optimized scheme in Construction arrangement; a soil Design design stage, Design spoil yard shall be Institute incorporated into arranged. engineering control Sludge in the Soil for Design measures; reasonable Design river way afforestation Institute suggestions and Sludge of Sent to the sanitary requirements can be Design wastewater Design landfill proposed. Institute plant Solid wastes The domestic Reasonable measures wastes shall be and suggestive Domestic Design treated by the requirements shall be Design wastes Institute environment and proposed in the design sanitary department, stage. Reasonable measures The wastes shall be Sporadic and suggestive recovered or Design wastes from requirements shall be Design collected locally in Institute paving proposed in the design time. stage. Construction environmental supervision system shall be implemented, and contractual binding system shall be adopted to incorporate relevant mitigation measures into the production Reasonable suggestions Environmental quality management system and and requirements shall Design management acceptance indicator system. The Design be proposed in the Institute and monitoring construction dust, noise, water design stage. and soil loss as well as other control measures shall be supervised by designated workers, and relevant laws and regulations on environmental protection shall be promulgated. Construction Reasonable suggestions Environment period and Regional ambient and requirements shall Design Design monitoring operation noise and air quality be proposed in the Institute period design stage. 2. Mitigation measures operation during the construction period of the works Table 6.4-3 Mitigation measures operation during the operation period Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content

125 Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content Temporary stock yard PPMO and Strictly in accordance Control of protection, Construction Construction with approved EIA Construction water and slope company Company report (form) and design period soil loss protection and (contractor) for each documents drainage subproject design Reclamation or Ecology make-up planting within the temporary Strictly in accordance Construction Vegetation land with approved EIA Construction Company restoration requisition, report (form) and design period (contractor) comprehensive documents ecological treatment at the river bank The construction Strictly in accordance Noise from schedule shall Construction with approved EIA Construction Noise construction be rationally Company report (form) and design period machines arranged to (contractor) documents enforce management. After simple sedimentation and treatment, the clean water Strictly in accordance Construction Construction on the upper with approved EIA Construction Company slime water layer shall be report (form) and design period (contractor) discharged into documents farming Water irrigation pollutants channels. Strictly in accordance Flushing Recycled after Construction with approved EIA Construction water for grease trap and Company report (form) and design period machines sedimentation (contractor) documents Domestic Strictly in accordance Used as Construction wastewater with approved EIA Construction farmyard Company and fecal report (form) and design period manure (contractor) sewage documents Enclosed networks such Strictly in accordance Dust from as dust cover Construction Atmospheric with approved EIA Construction building shall be built Company pollutants report (form) and design period demolition around the (contractor) documents building complex Dust cloth protection and Strictly in accordance Construction site clearance with approved EIA Construction Dust Company shall be report (form) and design period (contractor) arranged on the documents temporary yard

126 Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content Sprinkling for dust reduction, and the Strictly in accordance washing Construction Dust from with approved EIA Construction stations shall Company cars report (form) and design period be built for (contractor) documents arriving and departing vehicles Stink from Protection Strictly in accordance Construction wastewater distance and with approved EIA Construction Company treatment greening report (form) and design period (contractor) plant enforcement documents Strictly in accordance Construction Street tree with approved EIA Construction Car exhaust Company planting, etc. report (form) and design period (contractor) documents Optimized Construction Construction arrangement; a Construction Strictly in accordance Company spoil soil yard shall period with approved EIA (contractor) be arranged report (form) and design Construction Sludge in the Soil for documents Construction Company river way greening period (contractor) The domestic wastes shall be Strictly in accordance Solid wastes Construction Domestic treated by the with approved EIA Construction Company wastes environment report (form) and design period (contractor) and sanitary documents department, The wastes Strictly in accordance Sporadic shall be Construction with approved EIA Construction wastes from recovered or Company report (form) and design period paving collected (contractor) documents locally in time. Construction environmental supervision system shall be implemented, and contractual binding system shall be adopted to incorporate relevant mitigation measures into the production quality The Client Environmental management system and The supervisor and and Construction management acceptance indicator system. Clients shall implement construction period and monitoring The construction dust, noise, all mitigation measures supervision water and soil loss as well as other control measures shall be supervised by designated workers, and relevant laws and regulations on environmental protection shall be promulgated.

127 Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content The Regional construction Implementation of Construction ambient noise company monitoring of noise, air Environment period and and air quality, (contractor), Construction as well as loss of water monitoring operation as well as loss and period and soil during the period of water and environmental construction period soil monitoring department 2. Mitigation measures operation during the operation period of the works Table 6.4-4 Mitigation measures operation during the operation period Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content Temporary Environmental stock yard The Client Control of Protection protection, (operation Operation water and Bureaus of slope protection management period soil loss each district / and drainage unit) county design Maintenance and curing Reclamation or of vegetation during the make-up Ecology operation period, planting within observation of slope the temporary The Client drainage etc. Vegetation land (operation Operation restoration requisition, management period comprehensive unit) ecological treatment at the river bank Traffic control measures shall be strengthened, signs prohibiting Traffic noise horning or In accordance with The Client during speed limit approved EIA report (operation Operation Noise operation shall be (form) and design management period period arranged, and documents unit) sound insulation measures and protection distance shall be reserved. Stink from Protection In accordance with The Client wastewater distance and approved EIA report (operation Operation treatment greening (form) and design management period plant enforcement documents unit) Atmospheric Maintenance and curing pollutants of vegetation during the The Client Street tree operation period, and the (operation Operation Car exhaust planting, etc. access of vehicles with management period the excessive speed shall unit) be restricted.

128 Item and Environmental Treatment Implementation Implemented construction Stage Supervisor elements measures description by content In accordance with The Client Sludge of Sent to the approved EIA report (operation Operation Solid wastes wastewater sanitary landfill (form) and design management period plant documents unit) The Client (operation management unit), Environmental Regional Implementation of noise Protection Environment Operation Operation ambient noise and air monitoring during Bureaus at the monitoring period period and air quality the operation period levels of district and county and environment monitoring department 6.5 Environmental monitoring plan 6.5.1 The Purpose of environmental monitoring The purpose of environmental monitoring is to carry out environmental protection well in the project area, to get the knowledge of generation and discharging of waste water, waste gas, noise and scraps during the construction period in time, as well as of the environment quality of the area assessed during the construction and operation period, to prevent impact of emergent pollution accidents on environment, and to provide a scientific basis for environment protection, pollution control, environment supervision and management during the construction and operation period. 6.5.2 Environmental monitoring plan (1) Water environment monitoring plan Table 6-5-1 Summary of Water environment monitoring plan Construction period Operation period Subproject S/N Monitoring Monitoring Monitoring Monitoring Monitoring name Monitoring point point content frequency content frequency 2 monitoring 1 time 2 monitoring Subproject of profiles, U/S 1 time respectively profiles, U/S and Puxing and D/S of SS and fossil SS and fossil respectively 1 for dry and D/S of Yangliu Town, Xinjin Yangliu River oil oil for dry and flood River in the project County in the project flood seasons seasons area area Recycled Infrastructure Monitoring section Collect 2 water treated Construction of surface water is years of data from the waste Subproject of 1 time control by routine of dry, water of Yingxi respectively monitoring profile normal and aggregate SS and fossil 2 Town, SS for dry and in the project area, flood season processing oil Shunqing flood i.e. 1 reference at the system and District, seasons profile in U/S, 1 beginning of concrete Nanchong control profile in operation batching City the D/S period system Binjiang 500m 1 time 500m upstream of 1 time SS and fossil SS and fossil 3 Road upstream of respectively wastewater respectively oil oil (Southern wastewater for dry and treatment plant for dry and

129 Construction period Operation period Subproject S/N Monitoring Monitoring Monitoring Monitoring Monitoring name Monitoring point point content frequency content frequency Section) and treatment plant flood flood seasons Sewage seasons Interception Subproject in Fengming Town, Pengshan County Infrastructure Water quality Construction 1 time monitoring of Subproject of SS and fossil respectively 4 Anning River, U/S Miyi County oil for dry and and D/S of project (Panlian flood seasons area Town) (2) Atmosphere environmental monitoring plan Table 6-5-2 Summary of atmosphere environmental monitoring plan Construction period Operation period S/N Subproject name Monitoring Monitoring Monitoring Monitoring Monitoring Monitoring point content frequency point content frequency Main school Construction and area, area near residential the road, main 1 time for Subproject of area, crowd school, and TSP, NOx, annual peak 1 time per 1 Puxing Town, centralized NOx and CO centralized and CO construction quarter Xinjin County point in the residential period economical area in the development area zone Rainwater and Wastewater Pipe 1 time for Network & Road Main TSP, NOx, annual peak 2 Reconstruction construction NOx and CO and CO construction Works in Daying site period County (Penglai Town) Environmental sensitive point Infrastructure of upwind and Construction 1 time for downwind in Main road Subproject of TSP, NOx, annual peak 1 time per 3 construction cross of NOx and CO Yingxi Town, and CO construction quarter area(1 point Binhe road Shunqing District, period for each Nanchong City construction section) Vocational High School 1 time for Binjiang Road of Fengming TSP, NOx, annual peak Vocational (Southern Section) Town, and CO construction High School and Sewage Pengshan period of Fengming 1 time per 4 Interception County NOx and CO Town, quarter Subproject in 50m, 100m, 1 time for Pengshan Fengming Town, 200m Asphalt annual peak County Pengshan County downwind of fumes construction bitumen period batching plant Environmental Road, 1 time for TSP, NOx, 5 Treatment pipeline, dike annual peak and CO Subproject of and bridge construction Hongya County construction period 130 Construction period Operation period S/N Subproject name Monitoring Monitoring Monitoring Monitoring Monitoring Monitoring point content frequency point content frequency Hongya County construction period (Hongchuan Town) site Northern Outer Residential Ring Road 1 time for area near to Construction TSP, NOx, annual peak 7 each Subproject of CO construction construction Zhonglong Town of period site Zizhong County Infrastructure Place near to 1 time for Construction each TSP, NOx, annual peak 8 Subproject of Miyi construction CO construction County (Panlian site period Town) (3) Acoustical environmental monitoring plan Table 6-5-3 Summary of acoustical environmental monitoring plan Construction period Operation period Subproject S/N Monitoring Monitoring Monitoring Monitoring Monitoring name Monitoring point point content frequency content frequency Main 1 time for construction annual peak area, area construction Equivalent Equivalent near the period, 1 time per Subproject of A weighted Main school, residential area A weighted road, main monitoring quarter , 2 1 Puxing Town, sound in the area, 1 point for each sound school and 1 day, 1 continuous days Xinjin County pressure side of Yingbin Avenue pressure centralized time per time level level residential respectively area in the for day and area night Rainwater and 1 time for Road, Wastewater annual peak pipeline, Pipe Network construction bridge Equivalent Equivalent & Road period, 1 time per construction A weighted A weighted Reconstruction monitoring quarter , 2 2 site. School, sound Road boundary sound Works in 1 day, 1 continuous days hospital and pressure pressure Daying time per time centralized level level County respectively residential (Penglai for day and area Town) night Monitoring Infrastructure one day Sensitive Construction during the point of Equivalent Equivalent Subproject of peak 1 time per construction A weighted A weighted Yingxi Town, construction Main road cross of Binhe quarter , 2 3 area sound sound Shunqing period, 1 Road continuous days boundary pressure pressure District, time per time and nearby level level Nanchong respectively area City for day and night Binjiang Road Dormitory Monitoring (Southern building of one day Equivalent Equivalent Section) and Vocational during the Dormitory building of 1 time per A weighted A weighted Sewage High peak Vocational High School, quarter , 2 4 sound sound Interception School , construction Tongjiangli residential continuous days pressure pressure Subproject in Tongjiangli period, 1 building No. 53 per time level level Fengming residential time Town, building respectively

131 Construction period Operation period Subproject S/N Monitoring Monitoring Monitoring Monitoring Monitoring name Monitoring point point content frequency content frequency Pengshan No. 53 for day and County night Monitoring one day Environmental Equivalent during the Treatment School, A weighted peak Subproject of hospital and sound construction 5 Hongya centralized pressure period, 1 County residential level sound time (Hongchuan area level respectively Town) for day and night Northern Monitoring Outer Ring one day Road Equivalent during the Equivalent Road and 1 time per Construction A weighted peak A weighted pipeline quarter , 2 7 Subproject of sound construction Road boundary sound construction continuous days Zhonglong pressure period pressure site per time Town of level level Zizhong County Infrastructure Monitoring Equivalent Equivalent Construction Road and one day 1 time per A weighted A weighted Subproject of pipeline during the quarter , 2 8 sound Road boundary sound Miyi County construction peak continuous days pressure pressure (Panlian site construction per time level level Town) period (4) Water and soil loss monitoring plan Table 6-5-4 Summary of water and soil loss monitoring plan Construction period Operation period Subproject S/N Monitoring Monitoring Monitoring Monitoring Monitoring name Monitoring content point frequency point content frequency Rain intensity, Once precipitation, respectively Each gradient of top and Each 6 years before and Result and Subproject of temporary slope side, spoil temporary after after winter stability of 1 Puxing Town, waste stacking height, waste operation, 1 season protection Xinjin County disposal volume and disposal time per during the measures area composition of area year construction spoil, erosion period amount of spoil Observe the Terrain and changes result of of temporary spoil protection Once Infrastructure disposal area and measures, the respectively Construction mud drying area, growth status 6 years Temporary before and Temporary Subproject of occupied area, of plant, and after disposal site, after winter disposal 3 Yingxi Town, quantity and area of monitor the operation, 1 mud drying season site, mud Shunqing spoil, coverage rate sediment time per yard during the drying yard District, and growth of forest charge of the year construction Nanchong City and grass, and result D/S river of period of temporary spoil disposal protection measures area and mud drying area

132 Once The result after respectively applying 6 years Scouring of before and Both banks biological after Construction excavated surface after winter of Yingxi measures and operation, 1 road and site and collapse of side season River growth of time per slope during the forest and year construction grass period 6.5.3 Report procedures for supervising and monitoring The monitoring result shall be submitted to the Environmental Protection Office of the Client in written formally twice a year (submitting to Environmental Protection Office of each Operation Unit during operation period), sorted and stored by the Client. These reports are basis for the administration department concerning environmental protection and the World Bank to evaluate the achievement of each section in environmental protection, environmental impacts, and mitigation measures to be adopted if exceeding expected results. 6.6 Pubic participation and implementation suggestions during construction period 1 Information disclosure Basic information of the project, the Client, Construction Company, and Consulting Company, as well as telephone number to receive public consultation and complaints shall be notified to the public via television, newspapers, and posts etc. before commencement of the project. 2 Handling complaint on public negotiation and environmental protection Telephones and organizations to receive public consultation and complaints shall be established during the construction period to facilitate the public to get the knowledge of mitigation measures operation and to feed back problems which are concerned by the public. Problems concerning public interests and public concerns shall be negotiated with the public so as to reach a common understanding. Chapter VII Summary Sichuan Small Towns Development Project by WB Loans, as an important part of the implementation of west development strategy and urban-rural coordinated development strategy, conforming to the overall planning for local cities and towns and the national industrial policy, is of great significance and wins support from majority public. There are no significance environmental constrains within the construction area of each subproject. EIA report (table) has put forward corresponding environmental measures and environmental management for environment impact generated during construction. The impact of project to the environment may be avoided and mitigated by implementing environmental measures proposed in EIA report (table) and strengthening environmental management during construction period, and thus, impacts of the implementation of projects on the environment can be prevented or mitigated. From the perspective of environmental protection, Sichuan Small Towns Development Project by WB Loans is feasible.