November/December 2018 Vol. 31, No. 6

A Bimonthly Publication of the International Concrete Repair Institute OJE C R T P

A S Project of the Year: W A R D 8 THE EDISON 2 0 1 BATTERY BUILDING

Before Compensation and Benets for the Concrete Repair Industry Explored for the First Time 300+ firms throughout the United States surveyed.

2 “Stay competitive in this tough labor market with 0 knowledge of compensation 1 changes and trends!” 8

INTERNATIONAL CONCRETE REPAIR INSTITUTE

ComBpeennesfiattsio Snu arvnedy

Visit www.icri.org Concrete Repair Bulletin November/December 2018 is published bimonthly by: Vol. 31, No. 6 International Concrete Repair Institute, Inc. 1000 Westgate Drive, Suite 252 St. Paul, MN 55114 www.icri.org For information about this publication or about membership in ICRI, write to the above address, FEATURES phone (651) 366-6095, fax (651) 290-2266, or email [email protected]. The opinions expressed in 14 2019 ICRI Project of the Year Awards Concrete Repair Bulletin articles are those of the authors and do not necessarily represent 15 The Edison Battery Building the position of the editors or of the International Project of the Year Concrete Repair Institute, Inc. 20 Smithfield-Liberty Helix Ramp Rehabilitation ISSN: 1055-2936 Finalist Copyright © 2018 International Concrete Repair Institute, Inc. (ICRI). All rights reserved. 24 Goedehoop Collieries Block 7 Project Finalist

Editor Jerry Phenney 28 Awards of Excellence Design/Production Sue Peterson • Baltimore Garage Restoration Executive Director Mike Levin • The Phoenician Resort—Post Tension Garage Repair Associate Executive Director Gigi Sutton 36 Awards of Merit Technical Director Ken Lozen Chapter Relations Dale Regnier • The Philadelphian Certification Steven Bruns • Old St. George Church Conventions Danielle Adams • Delayed Coking Unit Chute Slab Repair & Protection Sponsorship/Ad Sales Blake Finger • Evaluation and Repair of Natural Draft Cooling Tower Membership Jason Acord • Innovative Repairs Preserve 40-Year-Old Cooling Tower at Coal Creek Power Station • Sunshine Skyway Bridge Marketing Rebecca Wegsheid • Façade Rehabilitation of Callahan Tunnel Vent Building #13 Professional Development Rachel Dicks • Jardin de Chine (Montréal Botanical Garden): Restoration of a Thematic Garden • Historic Dam Structural Repairs ICRI Administrative Committee Chairs ICRI Board of Directors & Executive Committee DEPARTMENTS Ralph C. Jones, PE 2 President’s Message 62 People on the Move Structural Engineering Associates Inc. 4 TAC Talk 64 Chapter Meetings & Events Awards Elena Kessi 8 Secretariat Update 66 Chapter News Aquafin Building Product Systems 10 ICRI Supporting Members 71 Chapters Committee Chair’s Letter 46 Volunteer Thank-You Certification Tom Donnelly 72 Product Innovation 52 Concrete Repair Calendar Sika Corporation 77 New ICRI Members 54 Industry News 80 Index of Advertisers Chapters Michelle Nobel 58 Association News Sika Corporation Coordination Rick Edelson Edelson Consulting Group LLC NOTE FROM THE EDITOR Education Brian Daley C.A. Lindman of South Florida, LLC e ICRI year is rapidly ending. e upcoming year will be one of Fellows Peter Golter change for ICRI with many new programs, guideline updates and 3M other changes taking place. It will start out with the Annual ICRI Finance John McDougall Kick-o Party. On the national level, this year’s festivities are being Baker Roofing Co., Inc. held at the Chateau Paris at Paris Las Vegas Hotel in Las Vegas on Marketing Jessi Meyer January 21, 2019. Stay tuned for more updates as the year starts! Cortec Corporation Meetings & Conventions Ingrid Rodriguez is issue is a wrap-up of the 2018 Fall Conference in Omaha and JSS Property Professionals, Inc. the Annual ICRI Project Awards. Stories will highlight the 2019 Membership Jeff Barnes Project of the Year, Project of the Year Finalists and other projects Barnes Consulting Group, LLC from around the world that were found to have merit. Publications Jerry Phenney MAPEI Corporation I hope you have all had a successful and safe construction season! Technical Activities Fred Goodwin BASF Construction Chemicals Jerry Phenney, Editor, CRB MAPEI Corporation

CRB EDITORIAL DEADLINES March/April 2019 Issue—January 2, 2019 July/August 2019 Issue—May 1, 2019 ON THE COVER: This photo shows the rehab- Theme: Resilency: Above and Beyond Concrete Theme: Strengthening ilitated bell towers at The Chapel at Bowdoin Restoration September/October 2019 Issue—July 1, 2019 College in Brunswick, ME. For more information May/June 2019 Issue—March 1, 2019 Theme: Waterproofing with Aesthetics: Theme: Corrosion Making it Dry and Appealing to the Eye onON thisTHE COVER:project, 2018see theICRI articleProject onof the page Year—The 20. Edison Battery Building. See page 15 for the full article. NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 1 PRESIDENT’SMESSAGE Thank You, Merci, Gracias!

­is is the last Concrete Repair Bulletin issue of friendship and hard work. To the Board of Directors, thank you the year, so it is also my last President’s Message for your diligence, your dedication to ICRI and the spirited discus- of the year. sion on important issues. To TAC and all of the technical com- mittee members, I thank you for sharing your knowledge with the Over the last year we have talked about several industry and for your dedication and hard work to improve concrete new initiatives that ICRI has started. We have repair methods. discussed the new Women in ICRI group, the RALPH C. JONES Young Professionals of ICRI task group and the To the Past Presidents of the last 30 years, thank you for your new Global Task Force. We have discussed the leadership and direction to bring ICRI to the point we are today. new Membership Committee and discussed how our membership To all of the administrative committee members, thank you for is worldwide. We have also talked about the Secretariat and the keeping the organization running smoothly, and to the sta of dozens of new initiatives that are being developed and advanced ICRI, thank you for all of the hours of behind-the-scenes work in ICRI. and direction.

­ese are only a few of the exciting new things ICRI has under- It is impossible for me to thank everyone that deserves recognition taken this year. In addition to all of the new initiatives that are in a letter such as this. ­ere are just too many people who make being developed, ICRI has continued to do what it has consistently meaningful contributions to ICRI. Later in this edition of the done for 30 years; Promote best practice in concrete repair. Our Concrete Repair Bulletin (pg. 46) you will see a personal thank-you technical committees have continued to develop and update to the hundreds of members that have contributed to a successful meaningful technical documents. ­e Technical Activities Com- year for ICRI. Some have contributed at the national level, some mittee (TAC) has continued to review and guide the development have contributed at the chapter level and some have contributed of technical content for the organization. ­e Administrative at both levels. Committees have continued to make sure the organization oper- ates šscally responsibly and provides activities that promote ICRI’s In closing, I want to o er my most sincere thanks to all of you image in a positive manner. who have contributed to the success of ICRI over the last year and all of the kind words of encouragement I have received from so To operate a volunteer organization such as this requires a tremen- many people. It has been my honor to serve as President of ICRI dous amount of support and e ort from its members. Everything this year. ­ank you! is not accomplished by the Executive Committee and the members of the Board of Directors. It takes tremendous dedication and It has certainly been an exciting time to be the president of ICRI. work by its volunteer members. Without the support of all of the members of this organization, ICRI could not be successful and meaningful to the concrete repair industry.

I must take this opportunity to thank many people. To my fellow Ralph C. Jones, PE Executive Committee members, thank you for your support, 2018 ICRI President

The leading resource for education and information to improve the quality of repair, restoration, and protection of concrete. Visit www.icri.org.

2 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG

TACTALK The Future of Concrete Repair

One of my favorite sayings is “Do unto your office, then typically concrete is repaired when cracks appear, often future before your future does unto you.” Like with rust staining from corrosion. This is analogous to a visit to the many other things, this is true of concrete repair. emergency room or perhaps even hospice care. The medical Another way of saying this is, “The most profession long ago realized that it is much more cost-effective to successful concrete repair is the one never done.” proactively address health issues through preventative care than to I cannot find attribution for either of these wait until the patient is in distress.13 Likewise, when one purchases quotations, but nevertheless they are true, so I an automobile, it comes with an inspection schedule and maintenance 14 FRED GOODWIN will lay claim to them. plan.

Concrete is the most durable man-made construction material. One A maintenance plan for concrete repair is discussed in ACI 562-16, could argue that masonry from natural stone has a longer history Code Requirements for Assessment, Repair, and Rehabilitation of Existing (think of the pyramids), but this is taking an existing material and Concrete Structures and Commentary and anticipated maintenance is adapting its use by joining pieces together. The oldest concrete required in the selection of repair materials and methods.15 A structures that I can find are a floor from Yiftahal, Israel, that has companion document has recently been approved by the American been dated to around 8000 BC,1 followed by cisterns from Syria2 Concrete Institute (ACI), ACI 563-18, Specifications for Repair of estimated to have been constructed about 6500 BC, then by Lepensky Structural Concrete in Buildings, it should be published shortly. ACI Vir3 in Serbia from 5600 BC. Concrete usage became more 563 states that maintenance requirements are to be submitted along widespread from about 3000 BC in Egypt, Assyria, Babylon, and with shop drawings to the Architect/Engineer. Progress is slowly China, but the most famous concrete structure is likely the Pantheon being made in acceptance by the industry of these documents, but in Rome, built around 120 AD.4 All of these early concretes consisted their requirements and concepts will greatly improve and standardize of natural pozzolans, sometimes mixed with calcined lime, sand, and our industry. stone. Modern Portland cement’s invention is credited to Joseph Aspdin, who filed a patent on his material in 1824.5 With such a Going into greater detail for repairs, ISO 16311-1,Maintenance and history of durability, then why do we have so many issues with today’s Repair of Concrete Structures- Part 1: General Principals presents the concrete? framework and general principles for maintenance and repair of all kinds of existing concrete structures including un-reinforced and Reinforcement in concrete using steel is usually thought to have reinforced concrete, prestressed concrete and steel-concrete composite begun with a French gardener, named Joseph Monier, wanting to structures, or their structural members.16 ISO 16311-2 describes improve his concrete flowerpots, eventually resulting in several patents general requirements and procedures for the assessment of concrete and his invention featured at the 1867 Paris Exhibition.6 Steel structures.17 ISO 16311-3 specifies repair and prevention design reinforcement improves the tensile strength of reinforced concrete, principles, and strategies for defects and ongoing deterioration has a similar coefficient of thermal expansion, and is passivated in including: a) mechanical actions, e.g. impact, overloading, movement the highly alkaline environment of concrete. Although compatible caused by settlement, blast, vibration, and seismic actions; b) chemical with concrete, this is when many of our modern construction and biological actions from environments, e.g. sulfate attack, alkali- problems began. Thermodynamically, steel will rust and when it aggregate reaction; c) physical actions, e.g. freeze/thaw, thermal does, the expansive oxide formation expands internally in the concrete cracking, moisture movement, salt crystallization, fire, and erosion; causing cracking and further corrosion. Corrosion of reinforcing d) reinforcement corrosion; and e) original construction defects that steel is by far the biggest durability issue for reinforced concrete remained unaddressed from the time of construction.18 ISO 16311-4 structures.7 Furthermore, the evolution of early strength development gives requirements for substrate condition before and during in cement manufacture is also thought to contribute to a greater application, including structural stability, storage of materials, the likelihood of cracking in concrete.8 The combination of cracking and preparation and application of products and systems for the reinforcement corrosion in concrete along with the concept of protection and repair of concrete structures, including quality control deferred maintenance has significantly contributed to the deteriorated and qualifications of personnel, maintenance, health and safety, and state of our infrastructure.9 the environment.19 These documents are relatively unknown in the repair community yet provide a wealth of guidance about repair While many of our members make their living from concrete repair, strategies. the success of many concrete repairs remains less than satisfactory, as indicated in both the U. S. Army Corps of Engineers (USACE) So where is the Concrete Repair Industry going in the future? Trends study REMR-CS-210 listed in Vision 202011 as well as the likely to develop include increased use of robotics beginning with CONREPNET12 study from the Building Research Establishment inspection, then surface preparation. Robotics will develop around (BRE). If one were to compare concrete repair to a visit to the doctor’s risky tasks (such as accessing difficult portions of the structure with

4 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG drones or climbers) and evolve into better investigative techniques. resistance, and rapid hardening.23 Advancements in polymers Imagine a crawling/climbing robot equipped with ground penetrating continue to provide better chemical resistance for coatings and radar (GPR) to detect reinforcement locations and delaminations especially exciting developments in “engineered cementitious that can measure resistivity of the concrete as it goes along, while composites” (ECC) for mortars and concrete that can provide also providing a photographic record or even provide corrosion ductility to our current binders producing multitudes of very fine mapping with connectionless electrical pulse response analysis cracks instead of one big crack when loaded to failure and - (CEPRA).20 Robots also do not have to operate as separate units, Reinforced Polymer (FRP) grid-concrete composites.24,25 Both ECC they can link and interactively “swarm” to rapidly collect data.21 Lasers and FRP grids have the potential to eliminate conventional steel are already beginning to be explored for surface preparation to reinforcement which solves the corrosion issue discussed previously. minimize dust and operate as a non-contact surface removal The developments in self-healing concrete are also very exciting.26 application, and there is no need for a secondary medium that The concrete repair industry has little to worry about for an easy contributes to waste streams.22 solution to reinforcing steel corrosion as there is more than enough rusting rebar to keep everyone employed for the foreseeable future. New materials also have promise. Geopolymer binders and other alkali activated binders can provide advantages over conventional The quantity of concrete (or at least cement production) is increasing Portland cement such as reduced CO2 footprint, higher temperature more rapidly than the world gross domestic product (GDP) and

Continued on page 6

Concrete Surface Prole Chips and Guidelines

Available at www.icri.org

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 5 TACTALK Continued from page 5

rapidly accelerating as our standard of living improves. (Fig. 1and Fig. 2 27, 28, 29) In my opinion, the concrete repair industry needs to evolve into a real profession, rather than remain as an auxiliary to new concrete construction. The most excitement in civil engineering is towards new construction, yet the volume of existing concrete is much greater than new construction and as previously pointed out, our infrastructure continues to deteriorate. We need to convince the owners and specifiers that protection and maintenance of concrete is a better investment over the life cycle of a structure than waiting for rust coming out of cracks.30 n

Fred Goodwin is chair of the ICRI Technical Acivities Committee (TAC) Fig. 1: World Gross Domestic Product growth since 1 AD (CE)27, 28, 29

References 1 A. Ronen, A. Bentur, I. Soroka, “A Plastered Floor from the Neolithic Village, Yiftahel (Israel),” Paléorient Année, 1991, 17-2, pp. 149-155, https://www.persee.fr/doc/paleo_0153-9345_1991_num_17_2_4559 2 B. Mason, “Principles of Geochemistry,” John Wiley and Sons, New York, 1966, p. 160. As cited by J. Davi- dovits http://nabataea.net/cement.html 3R. Buueckner, P. Lambert, “Assessment of historic concrete structures,” pp 75-86C. 4D. Moore, “The Roman Pantheon: The Triumph of Concrete,” MARC/CCEOP, University of Guam Station, 1995. 5E. C. Eckel, “Portland Cement Materials and Industry in the United States,” Volume 522, U.S. Government Printing Office, 1913. 6T. Hartford, “50 Inventions that Shaped the Modern Economy,” Penguin, 2017, p. 262. 7K. R. Larsen, “Corrosion Effects on the Durability of Reinforced Concrete Structures,” Materials Performance, NACE International, Houston TX, Nov. 2015. http://www.materialsperformance.com/articles/material-selection- design/2015/12/corrosion-effects-on-the-durability-of-reinforced-concrete-structures 8R. W. Burrows, “Concrete Durability: Is American Portland cement inferior to European cement?” Concrete Construction, Hanley Woods Media, Washington DC, Nov. 2012. https://www.concreteconstruction.net/how-to/ materials/concrete-durability_o Fig. 2: Percentage growth of World GDP, GDP per capita, world population and cement production in the second half of the 20th century27, 28, 29 9Infrastructure Report Card, American Society of Civil Engineers, Baltimore, MD, https://www.infrastructurereportcard.org/ 10J. McDonald, R. Campbell, “Technical Report REMR-CS-2 The Condition of Corps of Engineers Civil Works 21 Concrete Structures,” Department of the Army, Waterways Experiment Station, Vicksburg, MS, 1985 “Autonomous artificial swarms of robots could enable new approaches for search and rescue missions, http://wri.usace.army.mil/remr/technical_reports/concrete/REMR-CS-2.pdf construction efforts, environmental remediation, and medical applications,” Wyss Institute, Harvard University https://wyss.harvard.edu/technology/programmable-robot-swarms/ 11Vision 2020, A Vision for the Concrete Repair Protection and Strengthening Industry, SDC, American Concrete 22 Institute, Farmington Hills, MI, 2004 www.concrete.org/Committees/GetAgendaMinutes.aspx?DocID=11138 L. YI, “Surface glazing of concrete using a 2.5 kW high power diode laser and the effects of large beam geometry,” Optics & Laser Technology, Volume 31, Issue 8, November 1999, pp 583-591, https://www.scien- 12CONREPNET Outputs Issue 3, May 2004, Building Research Establishment (BRE), BRE Watford, Bucknalls cedirect.com/science/article/pii/S0030399200000037 Lane, Watford, Herts, WD25 9XX http://projects.bre.co.uk/conrepnet/pdf/newsletter3.pdf 23Wikipedia, Geopolymer concrete https://en.wikipedia.org/wiki/Geopolymer_cement 13Public Health, Houston, TX, https://www.publichealth.org/public-awareness/preventive-care-schedule/ 24V.C. LI, “On Engineered Cementitious Composites (ECC), a Review of the Material and Its Applications,” Invited 14Car Care Council, Bethesda, MD http://www.carcare.org/car-care-service-schedules/general-service- paper, Journal of Advanced Concrete Technology, Vol. 1 No. 3, Nov. 2003, Japan Concrete Institute https://www. schedule/ jstage.jst.go.jp/article/jact/1/3/1_3_215/_pdf 15ACI Committee 562, “Code Requirements for Assessment, Repair, and Rehabilitation of Existing Concrete 25F.A. Tavarez, L.C. Bank, M.E. Plesha, “Analysis of Fiber-Reinforced Polymer Composite Grid Reinforced Structures and Commentary,” ACI 562-16, American Concrete Institute, Farmington Hills, MI, 2016 https:// Concrete Beams”, ACI Structural Journal, Vol. 100 Issue 2, pp 250-258, American Concrete Institute, www.concrete.org/store/productdetail.aspx?ItemID=56216&Language=English&Units=US_Units Farmington Hills, MI, https://www.concrete.org/publications/internationalconcreteabstractsportal/m/details/ id/12489 16ISO 16311-1:2014, “Maintenance and repair of concrete structures—Part 1: General principles,” International Organization for Standardization, Geneva, Switzerland, 2014, pp 19 https://www.iso.org/standard/56144.html 26S. Deb, “Self-Healing Concrete,” The Masterbuilder, July 2012, pp 202-206, MB Publishers Pvt. Ltd., Chennai, TamilNadu 600008 India, https://www.masterbuilder.co.in/data/edata/Articles/July2012/202.pdf 17ISO 16311-2:2014, “Maintenance and repair of concrete structures—Part 2: Assessment of existing concrete structures,” International Organization for Standardization, Geneva, Switzerland, 2014, pp 44 https://www.iso. 27K. Takewaka, Y. Kaneko, “Maintenance of Concrete Structures and its Future Strategy,” Japan Society of Civil org/standard/56499.html Engineers (JSCE) – Korean Society of Civil Engineers (KSCE) Concrete Committees’ Joint Seminar 2006, JSCE Concrete Committee, Yotsuya 1-chome, Shinjuku-ku, Tokyo, JAPAN 160-0004, http://www.jsce.or.jp/committee/ 18ISO 16311-3:2014, “Maintenance and repair of concrete structures —Part 3: Design of repairs and preven- concrete/e/newsletter/newsletter07/KSCE_Takewaka.pdf tion,” International Organization for Standardization, Geneva, Switzerland, 2014, pp 22 https://www.iso.org/ standard/56500.html 28 M. Roser, “Economic Growth,” Our world in data https://ourworldindata.org/economic-growth, (consulted in 2017) 19ISO 16311-4:2014, “Maintenance and repair of concrete structures—Part 4: Execution of repairs and preven- tion,” International Organization for Standardization, Geneva, Switzerland, 2014, pp 49 https://www.iso.org/ 29K. Van Bruegel, “Modeling in the Service of Sustainable Construction,” Delft University of Technology, Keynote standard/56501.html Address, 72nd RILEM Week Proceedings, 2018, Delft, Netherlands. 20A. Fahim, P. Ghods, O.B. Isgor, M.D.A. Thomas, “A critical examination of corrosion rate measurement techniques 30K. Van Bruegel, “Circularity: A new avenue for mitigating the footprint of ageing infrastructure?” Proc. 9th applied to reinforcing steel in concrete,” Materials and Corrosion Wiley Online Library, 2018, WILEY-VCH Verlag International Symposium on Cement and Concrete (ISCC 2017), Wuhan, 2017 GmbH & Co. KGaA, Weinheim https://onlinelibrary.wiley.com/doi/abs/10.1002/maco.201810263

6 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Type 304 Stadium Seats Type 316 Coastal Railings

Type 304 Breweries Type 316 Water Treatment Plants

Type 304 Kitchens Type 316 Bridges

Stainless-steel anchorage for any application.

Our code-listed Titen HD® heavy-duty screw anchor is now available in Types 316 and 304 stainless steel to resist corrosion and maintain the structural integrity of concrete. Type 316 is the optimal choice for applications in corrosive or Cracked severe environments such as near chemicals or salt water. Type 304 is a cost-effective Concrete solution for less extreme applications, including in wet, moist or damp environments. CODE LISTED 3 1 5 3 To learn more about the Titen HD (available in ⁄8", ⁄2", ⁄8" and ⁄4" diameters) visit go.strongtie.com/titenhdss and download our guide or call (800) 999-5099.

© 2018 Simpson Strong-Tie Company Inc. 304316THD18 SECRETARIATUPDATE

In the September/October issue of the Concrete Repair Bulletin, Mark Nelson focused on the submittal of ideas, especially from those who cannot attend our national conventions. All ideas are important, and we encourage everyone to get involved. Thus far in 2018, we have had 13 ideas submitted with many of them becoming initiatives. RICK EDELSON Some of these have been concerning the operation of ICRI and others involving technical committee activities. information on the status of all committee activities within ICRI. We have a master table showing all committee This month I will focus on something entirely different. As initiatives with milestones and project completion dates. Its chair of the Secretariat (each Secretariat member performs purpose is to allow our administrative committees, especially the chair duties for one year), the Executive Committee has marketing and education, as well as our staff, to plan for asked me to also chair the Coordination Committee. So, what dissemination of ICRI products to the repair industry. is, and who are the members of the Coordination Committee? As stated on the ICRI website, “the Coordination Committee So, what does this mean for ICRI? is made up of the current president-elect and the sitting TAC Remember seeing this graphic of the chair as vice-chairs, all ICRI administrative committee chairs, four pillars of the strategic plan? By all ICRI technical committee chairs, and members of the coordinating the work of all technical activities committee. This committee is designed to Committees, we are tying the four facilitate harmonization of document development and pillars together. committee operation process between ICRI committees.” The board members, the executive committee members, the This also completes a picture. First, one of you, our members, Secretariat, and staff also participate on this committee. We has an idea. The Secretariat guides the idea through ICRI, meet six times per year—a month before each convention, at and when the idea comes to fruition through a coordinated each convention, and a month after each convention. effort, our four pillars of the strategic plan shine through. n

The Coordination Committee is neither a technical nor an Rick Edelson is an ICRI Secretariat, member of the administrative committee. It is a conglomeration of the chairs Technical Activities Committee (TAC), and past- of all ICRI committees with the goal of exchanging president of ICRI.

• Repair Mortars • Concrete Sealers INDEPENDENT LABORATORY • Epoxies • Admixtures • Grouts • Exterior Coatings TESTING SERVICES • Joint Sealants • Waterproofing Membranes

[email protected] Phone: (630) 501-0230 | www.nelsontesting.com

8 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Waterproofing & Protection with MPC Park Deck

Two-component, polymer-modified, cementitious traffic-deck waterproof coating

U Concrete slabs on-grade U Concrete decks over metal pan U Concrete topping slabs over sandwich membranes U Precast concrete parking structures U Ramps and helixes U Excellent for use on parapets, columns and vertical surfaces U Concrete toll booth lanes U Truck loadings docks and aprons

Please visit our website for more information on MPC Park Deck. miracote.com

Crossfield Products Corp. | miracote.com | 800.692.3502 | [email protected] SUPPORTINGMEMBERS

Norcross, Georgia Saint Paul, Minnesota www.whitecap.com www.3m.com Jessup, Maryland www.calindman.com

West Seneca, New York Baltimore, Maryland www.kempersystem.com www.concretecpr.com Harmony, Pennsylvania www.advpolytech.com

Attleboro, Massachusetts Elkton, Maryland www.contractingspecialists.com www.aquafin.net Vancouver, BC, Canada www.kryton.com

Saint Paul, Minnesota www.cortecvci.com Atlantic Beach, Florida www.lymtal.com

Shakopee, Minnesota www.buildingsystems.basf.com

Cleveland, www.euclidchemical.com Deerfield Beach, Florida www.mapei.com

Hollywood, Florida Georgetown, Kentucky www.bengoaconstruction.com www.minovaglobal.com Parsippany, New www.protectosil.com

Kapolei, Hawaii www.bondedmaterials.net A Division of Crossfield Products Corporation Minneapolis, Minnesota Rancho Dominguez, California www.graco.com www.miracote.com

10 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG SUPPORTINGMEMBERS

Baltimore, Maryland www.restorationeast.com Dallas, Texas www.neogard.com Houston, Texas www.ssicm.com

Riyadh, Saudi Arabia Mount Airy, North Carolina www.saveto.com www.ncfi.com , Ohio www.ssrg.com

Florence, Alabama www.hpsubfloors.com Columbia, Maryland Clearwater, Florida www.structural.net www.ppg.com

Cleveland, Ohio www.swconcretecoatings.com

Aurora, Illinois www.prospec.com Lawrenceville, Georgia www.tecservices.com

Lyndhurst, New Jersey www.sikausa.com

Columbia, Maryland www.pullman-services.com Winnipeg, Manitoba, Canada www.vector-corrosion.com

Pleasanton, California www.strongtie.com

Atlanta, Georgia www.quikrete.com Hampshire, Illinois www.wrmeadows.com

ICRI would like to thank its Supporting Members, whose dedication to ICRI is greatly appreciated. Your continued support greatly enhances programs both within ICRI and the concrete repair industry as a whole.

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 11

BLUE COLLAR GOLD STANDARD

™ TerraThane is the hardest working, highest quality Geotechnical Polyurethane Foam (GPF) in the world.

Lighter, more rugged and durable, less costly GPF for residential, commercial, infrastructure repair, and pipeline solutions. Backed by NCFI’s more than 50 years of industry-leading science and innovation, and legendary technical support.

BLUE COLLAR GOLD STANDARD TerraThane.com OJE C R T P

A S W A R D 8 2 0 1

PROJECT OF THE YEAR

Finalist (Longevity)

Finalist (Special Projects)

Project of the Year ...... 15 Finalists...... 20 Awards of Excellence ...... 28 Awards of Merit ...... 36 2018 PROJECT OF THE YEAR 2 HISTORIC CATEGORY 0 The Edison Battery Building 1 8 WEST ORANGE, NJ SUBMITTED BY SIKA CORPORATION P R O J E C T

O F The Edison Battery Building

he Edison Storage Battery Complex is located industrial complex and were the de ning buildings T on a single city block in the town of West in the town from the 1880s to 1970s. is industrial TOrange, New Jersey. ese factory buildings are complex comprised of four buildings became the H the last surviving structures of Thomas Edison’s epicenter of industrial development at the turn of the century. It is also remembered as the mainstay for omas Alva Edison’s activities as one of the greatest E American inventors and marketer of his self-created new technologies and inventions. HISTORY Y omas Edison moved to West Orange in 1886. e following year, Edison built a new laboratory complex on what he believed would be a perfect site for an E industrial complex. From 1906 to 1914, Edison built a one-million square foot (92,900 square meter) A industrial complex (Fig. 1). Of the many buildings, the Battery Building was made entirely of reinforced R Portland cement and steel. Few people in our industry would know how much omas Edison believed in concrete as a building material. Concrete structures Fig. 1: Edison’s industrial empire in West Orange, NJ (Credit: The New York Times, Dec. 21, 2017) became the material of his choice for all buildings

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 15 that were built as a part of his industrial empire. In his words e complex has 14 ft (4.3 m) and 16 ft (4.9 m) ceiling heights for concrete as a building material, with thousands of openings consisting of “oversized” multi- panel industrial windows. e pinkish-tan structure is utilitarian “Wood will rot, stone will chip and crumble, bricks disintegrate, but in nature, made of unadorned reinforced concrete with column a cement and iron structure is apparently indestructible. Look at and beam construction. e lack of ornamentation reinforces some of the old Roman Baths. ey are still as solid as when they the mass and solidity of the building. e longest façade were built.” stretches 635 ft (194 m) and the columns are evenly spaced at - omas Edison 15 ft (4.6 m) on center.

e Edison Battery Building was a manufacturing facility for alkaline storage batteries for light delivery vehicles, automobiles, railroad signals, industrial applications and mining equipment (Fig. 2). Edison practiced what he preached. It is a well-known historical fact that omas Edison preferred direct current over the more popular electric current. e Battery Building, prior to renovations starting in 2016, had and lighting running o‰ the original direct current system.

e Battery Building ceased operation in 1965. Today, the Battery Building is on the National Register of Historic Places, the New Jersey Register of Historic Places, and designated locally by the Township of West Orange as a historic site. Fig. 2: Inside the Edison Battery Building (Credit: The New York Times, Dec. 21, 2017) PROBLEMS THAT PROMOTED REPAIRS Weathering over the last 100 years had taken its toll on the Edison Battery Building, and being vacant for the last decade did not help the cause (Fig. 3). From spalling concrete, corrosion due to the lack of concrete cover over reinforcing steel, cracking, leaking joints, and unsuccessful concrete repair attempts over the years, the 130,000 sf (12,075 sm) concrete façade of this iconic structure was in a dilapidated condition (Fig. 4), a direct result of an aging structure and lack of adequate maintenance of the building. e building, however, was in good structural condition. RESTORATION OBJECTIVE e Edison Battery Building was to be repurposed to a boutique residential building, including luxury lofts with a —tness lobby, swimming pool and sky lounge overlooking the NYC skyline with the following objectives: Fig. 3: From an iconic structure to a dilapidated building • the building had to be restored to its original look; • the look should be contemporary and historical; and • the look should appear fresh and new as it would when built the —rst time.

e Edison Battery Building restoration project was part of the complete Edison Village Downtown Redevelopment project, developed over a ten-year period. is redevelopment plan was originally adopted in 2003. e scope of the entire project was to redevelop Block 66, Lots 1, 5 and 7 (the “Edison Battery Building”) and to construct: • 334 residential rental units; • 16,000 sf (1485 sm) of retail space; • approximately 31,700 sf (2945 sm) of amenity support space; • parking structure containing approximately 635 parking spaces; and Fig. 4: Existing building façade prior to repairs • public infrastructure (e.g. roads, utilities, sidewalks).

16 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG RESTORATION PROGRAM

Concrete Spall Repairs Hand-Applied Repairs Repair areas that were 1 in (25 mm) or less in thickness used a single component, hand-applied non-sag mortar. e repair area was mechanically prepared with a chipping hammer and saw cuts completed to dene the repair perimeter (Fig. 5). A Concrete Surface Prole (CSP) 5-6 was achieved to make sure that adequate preparation was performed for the repair material to bond to the parent concrete.

Additionally, a bonding agent was used to supplement the mechanical bond, and the reinforcing steel was protected with the same material. A total of 2,500 sf (232 sm) of the façade was repaired using this technique. Fig. 5: Hand-applied repair Form and Pour Repairs Deeper spalls were repaired with the form and pour technique, and were primarily performed to repair the window sills (Fig. 6). Concrete preparation was completed in accordance with the guidelines of the International Concrete Repair Institute. Prior to forming up the area, the steel was cleaned and primed and the concrete was coated with a reinforcement protection coating. A form and pour, ˆowable concrete mix was poured in the forms which were stripped after seven days. In very few cases where the depth of the concrete was very deep, rebar splicing was done to make sure that the repair areas were tied to the original spiral bar. A total of 7,500 sf (697 sm) of the façade was repaired with this technique.

Crack Repairs Cracks on the building were initially identied for repair with epoxy. However, after determining that most of the cracks were non-moving, cracks were saw cut into rectangular joints and repaired with the same non-sag mortar used for spall repairs. Fig. 6: Form and pour repair is procedure would ensure that the crack repair lines would not show through the nal nish on the façade. Some cracks were repaired with gravity fed resin or crack injection.

Leveling Coat e concrete façade had to be leveled to prepare the surface with a parging material. A factory proportioned polymer modied material was used to parge the entire 130,000 sf (12,075 sm) of the façade (Fig. 7). e leveling material was instrumental in getting the concrete to a nish on which a waterproong acrylic coating could be successfully used.

Façade Coating After the leveling coat, a waterproong coating was installed for aesthetics and protection (Fig. 8). A coating with crack bridging was selected to coat the entire building façade. To meet the requirements of the historical commission, a textured base coat was selected to cover the blemishes and maintain some of the look of the old concrete. No less than twenty color samples were installed on the building as mock-ups for approval by the historical commission. e selected nal color, Capitol Tan, also Fig. 7: Section of the building that received a parge coat happened to be the rst color that was installed as a sample.

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 17 Window Replacement A specialty contractor was contracted to duplicate the large 10 x 4 ft (3 x 1.2 m) and 8 x 4 ft (2.4 x 1.2 m) windows that dened the façade of the structure. An exact replica in design that could meet the new energy standards was the target of the project team. New extrusions were created to match the original as approved by the West Orange Historical Preservation committee. ƒis target was achieved and a total of 2450 windows were replaced (Fig.9). ƒe perimeter caulk color had to be matched to the original construction. A single component silicone factory tinted custom green color was used to caulk all perimeter joints.

Roof Replacement Fig. 8: Finished exterior with the iconic Edison water tower in the A ƒermoplastic Polyolen (TPO) single-ply roong system background was selected to replace the existing roof (Fig. 10). ƒe roong scope of the work totaled 70,000 sf (6500 sm). REPAIR PROCESS EXECUTION For quality assurance, a third-party oversight consulting rm was engaged to keep track of progress and make recommendations to the project team on unforeseen conditions during repair. ƒis control helped deliver quality repairs with recommendations that were adequate for non-standard details. This iconic structure was restored in 30 months and completed on time and on budget (Fig. 11).

(a)

Fig. 9: New windows on building

(b)

Fig. 10: Roof of the Edison Battery Building before construction Fig. 11: The Edison Battery Building before repairs (a) and after repairs (b)

18 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Fig. 12: From a structure that de ned human civilization in the 1900s, to a residence building that will de ne the living space in the 21st century (Credit: edisonlofts.com)

CONCLUSION We are living in times where an exponential rise of direct current batteries is being observed in many machines that we operate The Edison Battery Building on a daily basis. What omas Edison believed a century ago is starting to come to some form of reality in a full circle. Not SUBMITTED BY only that, the choice of his construction material also proved to Sika Corporation be accurate. He believed in concrete and with minimal Lyndhurst, NJ maintenance, the structure that he built is now being repurposed OWNER for a state-of-the-art housing project (Fig. 12)—sustainability DGP Urban Renewal and preservation at its best. omas Edison may have discovered Bloomfield, NJ sustainability and the relevance of concrete repair before our PROJECT ENGINEER/DESIGNER times. Prism Construction Management Bloomfield, NJ e concrete repair industry stands tall and proud of being able REPAIR CONTRACTOR to restore and repurpose an iconic structure built by an American Eastern Concrete Restoration legend. Sustainability continues to be a trend-setting word in Stevensville, MD today’s world and what the concrete repair industry is able to MATERIALS SUPPLIERS/MANUFACTURERS achieve, few other industries would be able to match the impact n Airguard Windows that this industry is able to deliver, time and again. Astoria, NY Acknowledgements Sika Corporation Information in this article has been obtained from the following Lyndhurst, NJ sources: 1. U.S. Department of the Interior & Condos 2. New York Times article by Ronda Raysen, published April 15, 2016

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 19 FINALIST - 2018 PROJECT OF THE YEAR A LONGEVITY CATEGORY W Smithfield-Liberty Helix Ramp A Rehabilitation PITTSBURGH, PA R SUBMITTED BY CARL WALKER CONSTRUCTION, INC. D O F E X C E L L Fig. 1: Smitheld-Liberty Helix Ramp he rehabilitation of the Smitheld-Liberty cantilevered from a conventionally reinforced E TParking Garage was undertaken in 1997 and, concrete cylinder. ƒe post-tensioning system for over 20 years later, the structure exhibits no the structure is composed of solid bar reinforcing additional deterioration (Fig. 1). Exposed to several encased in a grouted conduit. ƒe solid bars have N hundred cars each day, this critical structure was plates at each end to provide compressive force rehabilitated using materials and methods designed transfer into the slab. ƒe primary visible distress of C and installed to provide a long-term service life. ƒe the structure was exposed, corroding post-tensioned success of the project is best evidenced by the fact bar anchor plates at the perimeter of the ramp. ƒis that no additional structural repairs or rehabilitation circular ramp provides the only means of exit from E have been required since the work was completed. the top six levels of the attached seven-story parking The design and construction processes used to structure, so it was decided that conventional complete this project in the late 1990s is a testament rehabilitation project delivery methods would not to the longevity that the project has enjoyed. Based work for this rehabilitation. on its current state of performance, it is expected that the ramp will likely experience another 20-year EVALUATION AND DIAGNOSIS extension of service life without the need for any In late 1996, an evaluation of the helix ramp was signicant attention. performed to establish the cause of the observed distress in the structure. ƒe evaluation included a HISTORY condition assessment of the structure to record Originally constructed in 1964, the helix ramp of visible surface defects including cracks, spalling, and the Smitheld-Liberty parking garage in downtown exposed corroding steel elements (Fig. 2); concrete Pittsburgh, Pennsylvania, is six levels of post- material testing including petrographic analysis, tensioned concrete slab with perimeter knee walls concrete compressive strength testing, acid-soluble

20 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG chloride ion testing, and carbonation testing; corrosion testing, including electrical continuity testing, half-cell potential testing, corrosion rate testing, and reinforcing steel location and cover measurements; a review of existing structural drawings; and a thorough structural analysis.

After evaluating the results, the cause of the distress in the structure, consisting of delamination and spalling with exposed reinforcing steel, was determined and three primary causes for the observed distress were identied:

1. e distress recorded on the top of the ramp slabs was determined to be caused by high chloride ion levels in the lower ve levels of the six-level ramp. On these levels, Fig. 2: Original slab edge deterioration chloride contents exceeding the threshold amount necessary to induce corrosion of the reinforcing steel were found in the top 2.5 in (64 mm) of the slab. 2. e distress observed on the underside of the ramp slabs was caused by cracking at old repair areas in the top slab. 3. For the deterioration occurring on and below the concrete knee walls, insufficient concrete cover on the steel reinforcing and plates was identied as the cause of the distress. SOLUTION ANALYSIS Solutions were developed to address the causes of distress in consideration of alternative service life expectations.

Chloride Ion Content To address the chloride ion content problem with the ramp slabs, removal and replacement of the top 2.5 to 3 in (64 to 76 Fig. 3: Demolished ramp slab surface with supplemental post-tension reinforcing installed throughout central cylinder mm) of the concrete ‡oor slab was selected to oˆer a long-term service life expectation. is solution represented a potential structural problem, however, given that the slab was post- tensioned. Prior to being able to recommend that the top portion of the slab be removed, a structural analysis was necessary to determine the post-tensioned reinforcing forces on the original slab section, the reduced slab section (once the top portion of the slab was removed), and the nal slab section (with the original slab and new topping slab). Upon completion of the analysis, it was determined that the top slab section could be removed if the perimeter of the ramp was shored and supplemental post-tensioned cables were added to the nal cross-section (Fig. 3 and 4).

Supplemental Post-Tensioned Cables e requirement for the supplemental post-tensioned cables Fig. 4: Exposed post-tensioned tendon anchor heads at central cylinder influenced the decision to recommend a high quality conventional concrete material with a compressive strength of 6,000 psi (41 MPa) to closely match the existing concrete in conjunction with the application of a hybrid polyurethane strength. In addition, the use of a shrinkage-compensating ‡uid-applied membrane with epoxy wear course and specialized admixture was recommended to minimize cracking in the new aggregate on the ramp top surface. The repair material topping slab. recommended for the underside slab repairs was a polymer- modied cementitious material to facilitate use of the form- Underside Slab Condition and Water Infiltration and-pump repair technique (Fig. 5 and 6). e repair material Problems was selected to have compressive stiˆness characteristics that To address the underside slab condition and water inltration closely matched that of the existing concrete. is was necessary problems, conventional partial-area repairs were recommended to provide uniform compressive stress distribution throughout

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 21 the concrete slab when stressing supplemental post-tensioned reinforcement.

Concrete Cover Issues To address the concrete cover problem on the post-tensioned reinforcing anchor plates on the perimeter of the ramp, a new concrete cap was installed to provide suitable cover for the plates. In addition, a drip edge was provided to prevent water from running down the underside of the ramps (Fig. 7). Although this repair detail reduced the depth of the reveal at the slab perimeter, the architectural appearance of the ramp was not signicantly changed. To address the concrete cover problem on the existing reinforcing steel in the knee walls (Fig. 8), the repair areas were slightly over-built to obtain suitable concrete Fig. 5: Slab edge soft demolition and formwork cover on the reinforcing steel. REHABILITATION e repair solutions described above were incorporated into the contract documents and issued for bidding by experienced repair contractors. e successful bidder was awarded the contract in the summer of 1997 and the work was immediately scheduled to be completed in under 10 weeks during the summer to coincide with the garage’s oƒ-peak season.

Garage Ergonomics Prior to beginning repairs, the tra c in the garage required re-routing as the helix was the only means of exit for the upper levels of the garage and closing the garage was not an option. After considering alternate scenarios to solve this dilemma, a solution was developed to convert the one-way tra c ‡ow into two-way tra c. To accommodate the two-way tra c on the upper six levels, turn around areas were established on alternating levels to facilitate cars changing direction. Although the turnaround areas resulted in a reduction in parking spaces, the tra c ‡ow was not signicantly hampered and the disruption to patrons was minimized.

Fast-Tracked Construction Once parking tra c was re-routed, the helix ramp was closed, and construction commenced. Given the aggressive construction schedule and limited work area, methods to expedite the repair Fig. 6: Slab edge formwork and shoring process were implemented. e primary time-saving measure utilized during the rehabilitation was hydrodemolition, which is a process utilizing water under very high pressure (about 10,000 psi [69 MPa]) to demolish concrete (Fig. 9). is method was used in lieu of conventional jackhammers to remove the top section of chloride-contaminated concrete on the ramp slabs and resulted in signicant time savings.

Completion Following industry standard concrete repair practices and incorporating state-of-the-art materials, the rehabilitation of the ramp was completed on schedule. One of the most important reasons for the success of the project was that the process involved experienced parties for identifying and addressing the causes of the distress in the structure and developing and implementing a repair approach aimed at providing a long-term Fig. 7. Completed slab soft repair with integral drip edge service life extension.

22 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Fig. 8: Knee wall vertical repair demolition Fig. 9: Hydrodemolition of upper concrete layer at ramp slab

PAST, PRESENT & FUTURE Prior to implementing the rehabilitation described above, a previous repair of the helix ramp had been undertaken. Partial- area repairs completed during that project were found to be deteriorated at the time of the condition assessment performed in 1996.

Given this situation, the concern becomes whether past repair methods and materials addressed the cause(s) of the distress in the structure. Unfortunately, past evaluation and testing techniques fall short of the standards today. e lack of specialized knowledge about the corrosion process and practice of engaging an inexperienced contractor are primary reasons that past repairs are more prone to premature failure than repairs completed today. Project Drawing

Today, knowledge in the field of concrete structures and Smithfield-Liberty Helix Ramp corrosion mechanisms is steadily growing through experience Rehabilitation and research. Experienced contractors are more prevalent, as are SUBMITTED BY experienced engineers and material specialists. Present day Carl Walker Construction, Inc. materials and products are being produced to provide a higher Pittsburgh, PA quality product. It is expected that these trends toward more specialized experience and product quality will continue. OWNER Pittsburgh Parking Authority Pittsburgh, PA Although it is difficult to predict the future of concrete rehabilitation, the continued expansion of knowledge and PROJECT ENGINEER/DESIGNER experience in the eld is all but guaranteed. Continued research Atlantic Engineering Services should expand the understanding of the corrosion process and Pittsburgh, PA corrosion control mechanisms. is, in turn, will lead to the REPAIR CONTRACTOR development of materials and products that can better control Carl Walker Construction the corrosion process and facilitate longer lasting concrete Pittsburgh, PA repairs. n MATERIALS SUPPLIER/MANUFACTURER BASF Cleveland, OH

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 23 FINALIST - 2018 PROJECT OF THE YEAR A SPECIAL PROJECTS CATEGORY W Goedehoop Collieries Block 7 A Project SOUTH AFRICA R SUBMITTED BY KRYTON INTERNATIONAL, INC. D O F E X C E L L E N C

E Fig. 1: View from the top of the shaft during the site inspection. The extreme water ingress points are evident all the way down the ventilation shaft. The base of the ventilation shaft was lled with water for 35 years.

BACKGROUND the mine to the working areas. The primary South Africa has a long history when it comes to ventilation system consists of an intake (downcasts) mining. It is an industry that forms the backbone of through which the fresh air passes to the mine the South African economy. e client of this project workings, and an exhaust (or upcasts) where the air has been a key catalyst to help create a stronger, safer, passes after having been ventilated. Any interference healthier, and more sustainable South Africa since with the ventilation system would have an impact 1917. on operations and safety.

One of the key requirements in mining is to ensure e Goedehoop Colliery Block 7 mine ventilation adequate ventilation in a mine, and provisions are downcast shaft is approximately 200 ft (60 m) deep made for suitable airways for the air to ow down and was constructed in the 1980s. e shaft consists

24 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Fig. 2: Major water penetration points were blasting masses of water 12 in (300 mm) wide across the 23 ft (7 m) diameter of the shaft. The extreme pressure of the water was causing damage to the shaft structure and made the repair a very dangerous project. of a segmented ring liner arrangement with an interlocking joint shaft, there was no access to these areas, which therefore required connection between the di erent shaft segments. e shaft had the manufacture and installation of elaborate custom-made access experienced the ingress of water over the last 35 years with a equipment for both personnel and equipment. notable increase in the last couple of years through the joint interface, posing potential unsafe conditions, ooding, and A solution to the ingress of water from the positive to negative deterioration to the existing concrete shaft liner (Fig. 1). e path (from outside the shaft into the shaft opening) was required. excessive leakage was pumped out on a daily basis as part of a In addition, there was no access to the positive side (being routine operation which was required for the normal running of underground). Even after extensive panel tests by various the mine. contractors, none were able to apply a product that could withstand the immense negative pressure exerted by the water Over the years, the underground water levels increased, in the mine shaft. exacerbating the potential for signi­cant leakage and ooding of the mining levels. Early in 2017, the underground build-up After an in-depth site evaluation, it was noted that the mine was of water broke through the concrete ventilation shaft, allowing under approximately 65 ft (20 m) of water and the repair of a excessive water penetration into the mine, threatening the safety water penetration point at this level posed many di’culties and of the miners. risks. Numerous tests were carried out to ascertain the best procedures to access the mine, to investigate the concrete damage A solution to the excessive water penetration into the shaft below water level, and to con­rm structural integrity and safety. (approximately 1850 gallons [7000 liters] per minute) was required. If the excessive water penetration solution failed, it was THE SOLUTION inevitable that the a ected shafts woud close. e ingress pressure e scope of work focused on the main water ingress points of the water was immense, shooting water torrents approximately which were in urgent need of concrete repair, jointing, and surface 12 in (300 mm) wide across the 23 ft (7 m) diameter shaft (Fig. waterproo­ng. It was critical that the entire structure be correctly 2). Numerous water ingress points occur along the full depth of rejuvenated, repaired and waterproofed using crystalline the shaft, with the primary water ingress area located between technology, which has a proven success record in similar case 62 and 82 ft (19 and 25 m) below ground level. Being a ventilation studies worldwide for the past 40 years.

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 25 e very rst obstacle to overcome was access down the 23 ft With information gathered by visuals, a swelling waterstop had (7 m) diameter shaft riddled with leaks. After numerous to be introduced to the positive side to reduce the water ow to discussions and on-site tests, the appointed access company a manageable condition (Fig. 4 and 5). In order to prepare the devised a cradle system to safely lower workers into the shaft site for the application of crystalline waterproong products, (Fig. 3). e cradle also needed to be stabilized against the sides the damaged sections of concrete had to be cleaned and prepared of the shaft to reduce movement for the work at hand. using dustless sandblasting and ultra-high pressure cleaning. Concrete cutting machines and chisels were used to chip chases e inspection and preparation of the site were imperative for along the entire length of all water ingress points, construction this project. A borehole had to be sunk to the depth of the major joints and cracks. Running water was stopped by the use of a water ingress and camera equipment sunk into the borehole to rapid-setting hydraulic cement and a swelling waterstop (Fig. accurately investigate the ingress from the positive side. A scan 6). Chased cold joints were lled with a repair grout (specially of the concrete in the a­ected areas by ground penetrating radar mixed dry-mix). (GPR) equipment was conducted to ensure that the safety and integrity of the structure was still intact.

Fig. 5: The waterproong specialists tested the swelling waterstop on the ingress points to ensure the waterstop would swell to its maximum capacity to alleviate water pressure to continue with the crystalline leak repair system.

Fig. 3: Access to the shaft was a huge safety and logistical concern. The access specialists were able to supply a custom-built cradle to lower workers into the shaft. This cradle was anchored to the sides of the shaft to ensure no movement during the high-pressure cleaning and sandblasting.

Fig. 6: Using a rapid-setting hydraulic cement and a swelling waterstop, the waterproong specialists were able to successfully contain the ow of water to a single Fig. 4: Swelling waterstop being tested with shaft water vs tap water. access point, thus making the water more manageable.

26 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG (a) (b)

Fig. 7: After the water was fully contained using a rapid-setting hydraulic cement and a swelling waterstop, the surface area was prepared and a crystalline repair grout (a) and crystalline surface waterproong (b) applied.

Fig. 9: The base of the shaft had not been seen or dry for over 35 years. This was the rst time that workers were able to stand at the base of the shaft. Fig. 8: View from the bottom of the shaft once the project was complete

Waterproong crystalline surface-applied cementitious concrete compounds were applied to the surface in a slurry form in Goedehoop Collieries Block 7 Project accordance with manufacturer’s specications (Fig. 7). e application over the entire surface of the concrete structure SUBMITTED BY resulted in the growth of crystals throughout the concrete mass Kryton International, Inc. preventing any further water or air ingress into the concrete, Vancouver, BC, Canada thus transforming the concrete itself into a waterproof barrier. OWNER Anglo American Coal e growth of these crystals into the concrete and subsequent South Africa waterproong of the concrete will retard any further deterioration PROJECT ENGINEER/DESIGNER of the concrete structure from water ingress and will therefore Semane Consulting Engineers substantially lengthen the lifespan of the structure. e overall Johannesburg, Gauteng, South Africa n result is a safe, dry and usable structure (Fig. 8 and 9). REPAIR CONTRACTOR Sanika Waterproofing Specialists Johannesburg, Gauteng, South Africa MATERIALS SUPPLIER/MANUFACTURER Kryton International Vancouver, BC, Canada

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 27 PARKING STRUCTURES CATEGORY A Baltimore Garage Restoration W DETROIT, MI A SUBMITTED BY PULLMAN SST, INC. R D O F

Fig. 1: Baltimore Parking Garage after repairs and showcasing a new exterior mural

E OVERVIEW included minimal bonded slab reinforcing steel to Built in 1964, the Baltimore Garage is a 270,000 sf supplement the primary structural support provided X (25,084 sm) split-level button head post-tensioned by the slab PT tendon system, and increased the (PT) garage located in Detroit’s New Center signiŽcance of the failures of the slab PT tendons. C neighborhood (Fig. 1). With recent revitalization of The conventionally reinforced concrete in the the area, including a new light rail system and structure was also signiŽcantly deteriorated. Œe E construction of the Detroit Pistons practice facility, cast-in-place ramps were in poor condition with there was an influx of activity and demand for approximately 25% of the concrete –oor surfaces parking. New owners of the garage recognized the having corrosion related damage. Extensive concrete L renewed demand and solicited design-build proposals spalling and exposed corroded reinforcing steel was to address years of deferred maintenance, improve visible at the underside of ramp slabs. Œe slab-on- L the appearance, and quickly bring the restored grade levels were in fair condition, but some sections parking to market. had up to 12 in (305 mm) of settlement. Widespread E corrosion-induced deterioration was evident on Œe parking structure has Žve elevated PT concrete concrete columns and haunches (Fig. 2). Column slabs, each approximately 60 ft (18 m) wide and 615 haunch deterioration reduced tee stem bearing at N ft (188 m) long, with the length divided by a central several locations that required several stories of expansion joint and two intermediate construction shoring to grade. Corrosion of shallow reinforcing C joints on each side of the expansion joint. Each slab steel and abandoned embedded conduit caused less is supported by 26 precast single-tee beams spaced structurally significant damage, but produced E at 25 ft (7.6 m). Œe 27 unbonded slab tendons unsightly near-surface concrete deterioration consist of eight ¼-in (6.4 mm) diameter button throughout the parking deck. Poor drainage and headed wires, anchored at the ends of each slab and failed expansion joints and sealants signiŽcantly at the construction joints. Lack of maintenance at contributed to the concrete deterioration. Additional the construction joints and expansion joint allowed scope included lighting, signage, handrail replacement water and deicing salts into the slab concrete causing or repair, and upgrades to the Žnishes. corrosion to unbonded tendon and anchorage hardware. SLAB AS-BUILT CONDITION, ASSESSMENT AND DESIGN EXISTING CONDITION Œe PT slabs were investigated using the drag-chain Œe 52-year-old PT one-way slab and beam structure method to identify areas of concrete delamination, exhibited structural degradation, damage and under- and scanned using ground penetrating radar to locate reinforced elements, ranging in severity from PT tendons. Unsound concrete regions were immediate safety hazards to modest aesthetic excavated for inspection, and it was discovered that concerns. The structure’s PT concrete design tendons were frequently severely corroded at, or near,

28 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG the end and intermediate anchorages. Section loss of each wire in a tendon was measured, and the in-situ tension in each wire was evaluated using the screwdriver penetration testing method.

e assessment, conducted simultaneously with initial repair construction, identified a much larger number of severely corroded tendons than indicated by the preliminary visual assessment (Fig. 3). Initial structural analysis also indicated less ‘add tendon’ reinforcing of the end spans than provided by current design practice. is condition increased the number of slab PT repairs.

To develop an economic repair plan (as construction was continuing), the slab concrete was cored and tested to determine the in-situ concrete compressive strength instead of using assumed values. en, an elasto-plastic nite element analysis was conducted for the slab. is advanced analysis utilized moment redistribution within the indeterminate structure, resulting in a more accurate (higher) calculated capacity of the structural system than provided by typical simplied elastic examination methods. Based on the results from the advanced investigation, 234 critical corroded tendon locations in the slabs were repaired to provide su„cient capacity to support the required loads (Fig. 4). is more precise repair plan saved the Fig. 2: Existing condition discovered at an interior column owner almost US $1.2 million. SINGLE-TEE BEAM AS-BUILT CONDITION, ASSESSMENT AND DESIGN A total of approximately 130 precast single-tee beams are used to support the ve elevated parking slabs. ese beams are typically reinforced with eight ½-in (12.7 mm) diameter straight bonded prestressed strands and two draped twenty-wire unbonded post-tensioning tendons. e unbonded PT tendons exit the beam ends above the beam ‘ange (within the concrete topping), where they connect to threaded anchorage rods that extend through the reinforced concrete columns to anchor at the outer face of the column. is anchorage system allows negative bending moment to develop at beam ends and provides structural integrity at the beam-to-column connections. e unbonded tendon ends and anchorage rods at the beam ends were encased within a shallow grout pocket, which were typically found to be cracked and debonded from the substrate (Fig. 5).

Unsound grout pockets in the beams were opened for inspection, Fig. 3: Many beams were observed to have and the unbonded wires were often found to be severely corroded, completely corroded through tendons with a large proportion of wires completely failed. In-situ de‘ections of the beams were measured to correlate the condition of the tendons to the measured de‘ections of the beams. Based on the developed correlation, sound grout pockets at beams that exhibited a measured de‘ection exceeding the developed critical de‘ection threshold were opened for inspection, as well as beams that were next to slab drains (i.e. likely often exposed to ponding water), and beams that were located to adjacent distress. As a result, emergency shoring was provided for 20 beams and a total of 32 beams were repaired due to signicant tendon section loss. e beam repair design was subject to multiple constraints, including structural integrity requirements at beam-column connections, fire-protection, and construction accessibility Fig. 4: Placement of new PT anchors

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 29 constraints, along with nancial and scheduling concerns. Evaluating many repair options, it was decided to abandon the existing failed tendons and replace them with two external draped tendons (each consisting of four 0.6-in [15.2 mm] diameter strands) placed (a) symmetrically on both sides of the beam web. e new external tendons were connected to the existing threaded anchorage rods and post-tensioned from the top side (Fig. 6). The external tendons were also embedded in HDPE conduits that were fully grouted to Fig. 6: External PT beam repair prior comply with fire-resistance to running tendons through conduit (b) requirements. To further extend the life of the beams and structure, the water management system Fig. 5: (a) Many grout pockets on the roof were delaminated and some was repaired to ensure no standing water would occur on the had vegetation growing, and (b) Grout pocket after concrete removal and concrete deck. To protect the existing and newly installed PT cleaning tendons, waterproof membranes were installed over anchorage zones. DESIGN-BUILD SUCCESS e Baltimore Garage is a showcase of what the design-build process can accomplish when the team collaborates eŠectively (Fig. 7 and 8). Upon award of the project, construction started concurrently with the design phase. e design-build team successfully displayed the ability to provide turnkey engineering support using the elasto-plastic finite element analysis to determine the minimum number of repairs needed to su’ciently support the deck. is process uncovered the need for over double the amount of PT slab and beam repairs than originally anticipated; however, it only added six weeks to the project. n

Fig. 7: Ramp and staircase area at end of construction Baltimore Garage Restoration

SUBMITTED BY Pullman SST, Inc. Trenton, MI OWNER The Platform Group Detroit, MI PROJECT ENGINEER/DESIGNER Wiss, Janney, Elstner Associates, Inc. Bingham Farms, MI REPAIR CONTRACTOR Pullman SST, Inc. Trenton, MI MATERIALS SUPPLIER/MANUFACTURER Structural Technologies Columbia, MD Fig. 8: Completed repairs to beams and columns, updated drainage system, and painting observed during nal project walkthrough

30 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Find the Best! Be the Best!

The International Concrete Repair Institute offers certi cation as a… Concrete Slab Moisture Testing Technician

Your solution to floor moisture issues!

• Improve the performance of concrete slab moisture testing

• Report more consistent, accurate, and reliable test results

• Make better decisions on when a concrete slab is ready for a oor covering installation

Visit www.icri.org for more information on this certification program. PARKING STRUCTURES CATEGORY A The Phoenician Resort— W Post Tension Garage Repair A SCOTTSDALE, AZ R SUBMITTED BY TADJER-COHEN-EDELSON ASSOCIATES, INC. D O F E X C E

L Fig. 1: Phoenician Resort

L PROPERTY OVERVIEW that extends in front of the main building has an e Phoenician Resort is a luxury resort located in elevated post-tension concrete slab above the parking E Scottsdale, Arizona. e property is situated on 250 level with approximately 6 ft (1.8 m) of soil, acres (101 hectares) at the base of Camelback landscaping and event space concrete pads above the Mountain (Fig. 1). e resort was opened in 1988 and buried slab. e post-tension slab is 15 in (381 mm) N is approximately 30 years old. e property contains thick, approximately 62.5 ft (19 m) wide and runs the 643 guest rooms, 11 restaurants, 9 swimming pools, length of the crescent shaped building—approximately C spa facility, 16 tennis courts and a 27-hole golf course. 900 ft (274 m). e post-tension cables are 0.5 in In plan, the main hotel consists of two large curved (12.7 mm) diameter, monolithic, unbonded cables E structures with a connecting segment near the consisting of seven (7) wire strands wrapped in plastic midpoint and low-level ballrooms between the sheathing. e center segment below the restaurant buildings. e hotel is oriented facing in the southwest extends almost to the nearby swimming pools. On direction with the nearby Camelback Mountain on the south end of the garage, the post-tension slab is the north side. e main hotel buildings are primarily supported on a 10 in (254 mm) wide reinforced conventionally reinforced concrete structures concrete foundation wall that extends to the bedrock supported on a foundation containing a combination below the garage. On the north end, the post-tension of grade beams, pilasters, spread footings, foundation slab is supported by concrete beams and columns along walls, and columns and walls bearing directly on the expansion joint. bedrock. EXISTING CONDITIONS GARAGE STRUCTURE Prolonged water migration into the subgrade garage A single-level subgrade parking garage is located below caused deterioration of post-tension components and the hotel with the south side of the garage extending conventionally reinforced concrete beams, columns beyond the main hotel structure (Fig. 2). e segment and foundation walls in the structure. While the desert

32 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG climate in the Scottsdale area generates low annual rainfall, the landscaping irrigation system deposits water above the garage on a regular basis. Leakage occurred along the south end of the structure where the stressing end of the post-tension slab bears on the foundation wall. Leakage also occurred along the expansion joint prompting the hotel sta to install a network of collecting pans and drain lines below the garage ceiling to alleviate water stains on cars and dripping water on hotel guests below. e garage started experiencing ruptured post-tension tendons and large cracks on the bottom surface of the slab in recent years. CONDITION SURVEY e structural issues prompted an engineering condition survey to evaluate the subgrade garage structure with ndings used to develop a repair program. e survey included visual examination of the entire garage structure with exploratory openings within the overburden above the garage in order to ascertain the condition of the concealed structural and water resisting components. An Fig. 2: Overhead view of subgrade garage exploration pit at the south end of the garage exposed a portion of the stressing end of the post-tension slab and top of the foundation wall. At this location, the existing surface-adhered “peel and stick” cold-applied sheet membrane was debonded and beyond its useful service life. e membrane conditions allowed water to reach and corrode the stressing anchors. Water also traveled within the protective sheathing causing corrosion and subsequent rupture of the post-tension tendons that was observed in the garage below (Fig. 3).

An exploration pit at the north end of the garage exposed the expansion joint. e same type of sheet membrane was revealed, exhibiting similar conditions. Spalling concrete was observed on the large concrete beams and columns directly below this leaking (a) (b) expansion joint. Fig. 3: (a) Corroded post-tension anchor, and (b) Ruptured tendon REPAIR PROGRAM A repair program was developed to address garage leakage and restore structural components to their intended original integrity. The most concerning aspect was determining the extent of deterioration that had already occurred to concealed post-tension components. Assessing the entire slab edge and stressing anchors could not take place without removing 6 ft (1.8 m) of overburden and existing waterproong for the entire length of the structure. e original structural drawings were reviewed to understand the layout and quantity of tendons. e repair program required ongoing evaluation and repair determination during the construction phase, which was scheduled for summer of 2017 to coincide with the replacement of the swimming pools and spa facility at the hotel. e repair program consist of three main components: stressing end repairs, expansion joint repairs, and concrete repairs to members within the garage.

Stressing End Repairs e project included removal of overburden to expose the stressing end of the slab and foundation wall (Fig. 4). e existing debonded sheet membrane and grout pockets were removed for engineer assessment of the stressing anchors, and components were repaired accordingly (Fig. 5). Corroded anchors required slab openings, Fig. 4: Section detail at stressing end and foundation wall (repair drawing) locking o the existing tendon, replacement of the anchor, splicing

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 33 to the existing tendon, placing concrete, stressing, and placing new non-shrink grout at the stressing pockets prior to installing new hot applied reinforced membrane on the slab and foundation wall. By the end of the project, over 1,000 stressing anchors were exposed, evaluated and 364 repairs required. Due to the reconstruction of the adjacent swimming pools and spa facility, space to excavate and store soil was limited. In addition, storing soil above the garage utilizing shoring was not feasible due to the hotel using the garage for parking. ­erefore, the excavation and repairs had to be performed in four consecutive phases.

Expansion Joint Repairs ­is component included removal of overburden to expose the expansion joint and dead end of the slab adjacent to the main hotel building. ­e existing membrane and joint seals were removed Fig. 5: Post-tension repairs in progress (stressing end) for engineer assessment of the slab and identi€cation of required repairs. A new sloped concrete topping and drainage system were installed to reduce water on the expansion joint. ­e drainage system included drain pipe cleanouts in the drain piping below the slab and extensions above the drains to allow regular maintenance and clearing at the landscaped area.

­e waterproo€ng repairs included new expansion joint seals and looped ƒashing sheets over the joint, and hot applied reinforced waterproo€ng membrane and counter ƒashings at the slab and building wall (Fig. 6). Upon completion of waterproo€ng repairs, a drainage layer, expanded polystyrene (foam) blocks, and a 2.5 ft (0.8 m) layer of soil were placed over the slab (Fig. 7). ­e foam blocks were used to reduce the load on the structure and provide easier access to the expansion joint for future serviceability. Fig. 6: New membrane and ashing along the expansion joint and building wall PROJECT CHALLENGES Various challenges were addressed during the repair project and included restraints from site conditions, strict schedule requirements for completion within a four-month period, the magnitude of repairs, scope complexity, and unforeseen conditions. ­e completed project is shown in Figure 8. n

The Phoenician Resort— Post Tension Garage Repair SUBMITTED BY Fig. 7: Foam blocks and backlling in progress after completion of Tadjer-Cohen-Edelson Associates, Inc. waterproong repairs along the expansion joint Silver Spring, MD OWNER Host Hotels & Resorts, Inc. Bethesda, MD PROJECT ENGINEER/DESIGNER Tadjer-Cohen-Edelson Associates, Inc. Silver Spring, MD REPAIR CONTRACTOR Complete Property Services Inc. Tampa, FL MATERIALS SUPPLIER/MANUFACTURER Henry Company Fig. 8: Completion of repairs with new landscaping in front of the hotel El Segundo, CA building

34 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Waterproofing with Aesthetics Making it Dry and Appealing to the Eye

2019 ICRI Spring Convention April 8-10, 2019 | Jacksonville, FL Who attends ICRI Conventions? Enhance Your Knowledge. Build Your Career. Grow Your Network.

ATTEND. EXHIBIT. SPONSOR . Visit www.icri.org HIGH-RISE CATEGORY A The Philadelphian W PHILADELPHIA, PA A SUBMITTED BY SIKA CORPORATION e Philadelphian, completed in 1963, is a massive Alarms sounded when a 6 in (152 mm) cube of R condominium near downtown Philadelphia. ere concrete from a balcony edge fell from the ninth are 21 oors with 1.3 million sf (120,774 sm), oor onto the loading dock roof. D making this the largest single-building condominium in Pennsylvania. There are 776 units with 656 e project scope included balcony repairs, handrail balconies. There are also two swimming pools, strengthening, and balcony waterprooŠng. Work ground oor retail space and a parking garage. e started in the spring of 2016. e size of the project O beams, columns, slabs and balconies are reinforced required numerous swing stages with work concrete. e façade consists of marble cladding on performed on all elevations simultaneously. Another oors 1 and 2 with brick and CMU backup on the signiŠcant scope increase resulted when old, poorly F remaining oors. completed repairs became loose during concrete removal and surface preparation. Several balconies required full shoring during repairs. e project took 3 years to M complete. orough quality assurance and quality control happened E throughout the project. Sequencing this large project with many drops required R excellent owner coordination. A full system of concrete repair and protection completed to high industry standards I will ensure long-lasting durable repairs. Brand new balconies and waterprooŠng T along with completely restored handrails will enable the owners to enjoy this space for many years to come.

e owner has done a good job maintaining this building. In 2013, a façade inspection indicated cracks and concrete spalls in some of the balconies, eyebrows and columns. Further evaluation of the balconies indicated the handrails were structurally The Philadelphian deŠcient due to post pockets containing gypsum grout. is dramatically increased the scope of work. SUBMITTED BY Sika Corporation Lyndhurst, NJ OWNER The Philadelphian Owners Association Philadelphia, PA PROJECT ENGINEER/DESIGNER Simpson Gumpertz & Heger New York, NY REPAIR CONTRACTOR Joseph Dugan, Inc. Erdenheim, PA MATERIALS SUPPLIER/MANUFACTURER Sika Corporation Lyndhurst, NJ

36 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG HISTORIC CATEGORY Old St. George Church A CINCINNATI, OH W SUBMITTED BY SSRG, STRUCTURAL SYSTEMS REPAIR GROUP A Constructed by renowned architect Samuel charred towers. ‚e carbon buildup melted away, Hannaford, Old St. George Church has been a xture leaving the historic façade shining through. R in Cincinnati for over 140 years. In 2008, a three- alarm re charred its façade and forced the removal ‚e project also included the repair and reinforcement D of its iconic steeples. After the fire, the church of both the friary and chapel roof by installing remained empty for years. ‚rough the eƒorts of significant steel and wood to the structure. Crossroads Community Church, the church once Reinforcement of the heavy timber trusses posed again became a place of worship in August 2016. signicant challenges that were met with creative O solutions, completing the work quickly and cost eƒectively. F Reaching consensus on repair materials, assemblies, and the cleaning process was one of the earliest challenges in the project. ‚e project team met several M times a week in the rst six weeks to review cleaning products, brick samples, E mortar samples, stone samples, and multiple mock-ups. Cleaning mockups R were conducted using over 10 diƒerent products throughout the façade to see which would be most successful at I removing the heavy carbon buildups from the re damage as well as at eld T locations unaƒected by the re. Two products were selected to be used at the diƒerent locations. ‚e restoration consisted of 24,000 sf (2230 sm) of exterior elevation cleaning, full re-pointing of brick masonry, stone repair, and the replacement of nearly 2,500 deteriorated bricks. Challenges included accessing the 100 ft (30 m) tall south bell towers Old St. George Church and eƒectively removing the carbon buildup on the façade. A 150 ft (46 m) boom lift and citric-based SUBMITTED BY gentle restoration cleaner was used to restore both SSRG, Structural Systems Repair Group Cincinnati, OH OWNER Crossroads Cincinnati, OH PROJECT ENGINEER/DESIGNER Model Group Cincinnati, OH REPAIR CONTRACTOR SSRG, Structural Systems Repair Group Cincinnati, OH MATERIALS SUPPLIER/MANUFACTURER Western Hills Building Supply Cincinnati, OH

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 37 INDUSTRIAL CATEGORY A Delayed Coking Unit Chute Slab W Repair & Protection A SUBMITTED BY STRUCTURAL GROUP

R Delayed coking units are critical in oil reneries. ese plate design replaced the carbon steel plates with units sit on large reinforced concrete tabletop structures stainless steel and removed the embedded anchors. D that support large vessels. A common conguration of Moving the new 40,000 lb (18,145 kg) stainless steel these structures includes an angled chute slab that slide plates into their nal position on the chute slabs conveys processed coke from the drum to a collection was the most complex portion of the project. Due to area. Many coking units have utilized steel plates to the overhead restrictions of the coking unit, the moving O protect the chute from repeated impact of hot coke and lifting was engineered to be executed in multiple product. phases. is method also allowed the steel plates to expand and contract separately from the concrete and F be easily removed during future concrete inspections and/or plate replacement.

A detailed plan was developed to perform M the repairs and plate installation in a short duration turnaround. With an emphasis E on performing the work safely, this was the rst repair of its kind and has proven to R signicantly lengthen the service life of the unit. After one year of operation, the plates I were tested and showed no major T deterioration.

Over years of operation in this intense environment, the coking unit in a renery in the United States was experiencing deterioration of both the steel plates and the approximate 64 x 33 ft (20 x 10 m) x 3.5 ft (1 m) thick concrete chute slab. After a comprehensive condition assessment, testing showed cracks and warps Delayed Coking Unit Chute Slab in the coking unit due to expansion of the embedded Repair & Protection steel anchors for the plate. Although minor repairs were made in the past to the plates, an innovative †oating SUBMITTED BY Structural Group Anaheim, CA OWNER Anonymous PROJECT ENGINEER/DESIGNER Brindley Engineering Lisle, IL REPAIR CONTRACTOR Structural Preservation Systems, LLC Anaheim, CA MATERIALS SUPPLIER/MANUFACTURER Structural Technologies, LLC Columbia, MD

38 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG INDUSTRIAL CATEGORY Evaluation and Repair of A Natural Draft Cooling Tower W MID-ATLANTIC REGION OF US A SUBMITTED BY WISS, JANNEY, ELSTNER ASSOCIATES, INC.

Constructed in 1974, a 400 ft (122 m) tall reinforced characterize its structural health and plan an aggressive R concrete hyperbolic shell natural draft cooling tower in repair strategy. the Mid-Atlantic region of the United States began D exhibiting concrete deterioration after approximately a Evaluation of concrete properties, corrosion rate, and decade of service. Over time, the deterioration progressed, desired repair objectives were considered in the decision including large areas of concrete delamination and to utilize impressed current cathodic protection (ICCP) spalling at the shell exteriors, areas of concrete and galvanic cathodic protection (GCP) as part of the O delamination at the shell interiors, and cracking and repair program that included an engineered demolition, corrosion staining in the supporting X-columns. rebuild of the upper one-third of the tower, and localized concrete repairs of the lower two-thirds. “e F ICCP system is comprised of 48 individual zones, each with four embedded reference electrodes to monitor the polarization of the steel reinforcement. “ree types of ICCP M systems were used at di‹erent sections of the shell, including over 4,300 discrete E titanium suboxide ceramic tube anodes, mixed metal oxide-coated titanium ribbon R anodes, and over 6 miles of ribbon mesh anode. I Despite signi‡cant technical challenges due to the scale of the structure and deterioration, T the design-build project was completed without any lost-time injuries, and the Beginning in 2006, structural and materials engineers in-place cathodic protection systems remain operational performed multiple condition assessments of the tower and remotely monitored for performance. to characterize deterioration mechanisms, assess structural integrity, and develop repairs to meet owner-de‡ned repair objectives, including a 25-year service life extension —all while maintaining the tower in an operationally Evaluation and Repair of Natural ready state throughout construction. Condition Draft Cooling Tower assessment of the cooling tower was challenging due to SUBMITTED BY its size, geometry, and operational constraints, but careful Wiss, Janney, Elstner Associates, Inc. investigation provided critical knowledge to e‹ectively Northbrook, IL OWNER Anonymous PROJECT ENGINEER/DESIGNER Wiss, Janney, Elstner Associates, Inc. Northbrook, IL REPAIR CONTRACTOR International Chimney Corporation Williamsville, NY MATERIALS SUPPLIER/MANUFACTURER Vector Corrosion Services Tampa, FL

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 39 INDUSTRIAL CATEGORY A Innovative Repairs Preserve 40-Year-Old W Cooling Tower at Coal Creek Power Station UNDERWOOD, ND A SUBMITTED BY VECTOR CONSTRUCTION INC. Coal Creek Station operates two late 1970s vintage lumber and sheet metal structure, 2) Concrete R generators with three mechanical draft cooling towers, rehabilitation, and 3) Installation of the new ‡eld- each 42 ft (13 m) high and 225 ft (69 m) in diameter. erected exterior fiber-reinforced polymer (FRP) D After 40 years of use, cooling tower #91 was showing structure. its age. If the entire cooling tower was demolished and rebuilt, it would be very costly and require a long To preserve the structure, the concrete repair scope of downtime. work included: O • Delaminated and spalled concrete removal at Fall of 2016, the tower was shut down for one week beams, columns and walls and replacement with to inspect and pre-plan an e†cient shutdown the high performance concrete; F • Type 1A alkali-activated embedded galvanic anode installation to mitigate repair accelerated corrosion; • Precast concrete joint repair and M waterproo‡ng; • Removal of severely deteriorated E precast concrete beams and replacement with new beams constructed with high R performance concrete; • Vertical joint repair between the cold- water basin wall and the –ume wall; I • Epoxy injection to bond and seal cracks; • Installation of new reinforced concrete T pedestals into the cold-water basin and trench to support the new FRP structure; and following May. A visual inspection and sounding • Installation of epoxy coating on hot survey was conducted to identify defects, estimate water basin and vertical directional ‡ns. quantities of repair, develop a repair strategy, and to create a detailed project schedule. Innovative Repairs Preserve Accordingly, 40-Year-Old Cooling Tower at an extensive Coal Creek Power Station restoration and rebuild of SUBMITTED BY Vector Construction, Inc. the cooling West Fargo, ND tower was planned OWNER during a 6.5 Great River Energy week Underwood, ND shutdown in REPAIR CONTRACTOR May 2017. Vector Construction, Inc. Rebuilding the West Fargo, ND cooling tower MATERIALS SUPPLIERS/MANUFACTURERS required the Knife River Materials following Bismarck, ND steps: 1) Ergon Armor Demolition of Jackson, MO the exterior

40 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG LONGEVITY CATEGORY Sunshine Skyway Bridge A W TAMPA BAY, FL SUBMITTED BY SIKA CORPORATION A e Sunshine Skyway Bridge is one of the most e Sunshine Skyway Bridge is comprised of the recognized structures in the United States. With its main span, the high level approach, and the low R signature bright yellow stay cables, the bridge level trestle spans. Shear cracking was observed resembles a sailboat, with its towers holding up the during routine inspections of the trestle span girders. D triangular sails across Tampa Bay. Repairs included epoxy injection of all cracks having a width exceeding 0.012 in (0.3 mm), At the time of construction, it was the longest bridge repairing spalls, and ‘lling uneven surfaces with a in the world that has a cable-stay main span. e leveling mortar and all bugholes and smaller cavities O overall length is 5.5 miles (8.9 km), the main span with an epoxy paste. A clear protective sealer was is 1,200 ft (366 m), and the vertical clearance is over applied to protect the concrete further from moisture and chloride intrusion. It was F also determined that the deficient girders needed to be structurally strengthened to carry additional loads and a carbon ‘ber system was installed. M

Despite diˆcult working conditions as E a result of having to work o“ a barge, often under very hot and humid R conditions, the project was a success. e repairs were made underneath the bridge without having to take out even I one lane of traˆc during the entire process. T

190 ft (58 m). Built at a cost of US $244 million, it opened to traˆc in 1987. e current cable stay bridge is a replacement for the previous steel, cantilevered truss bridge that was tragically struck by a freighter back in 1980 when a 1,200 ft (366 m) span collapsed into Tampa Bay, killing 35 people. Sunshine Skyway Bridge It took seven years before a signature replacement bridge could be built. SUBMITTED BY Sika Corporation Lyndhurst, NJ OWNER Florida Department of Transportation Tallahassee, FL PROJECT ENGINEER/DESIGNER SDR Engineering Consultants, Inc. Tallahassee, FL REPAIR CONTRACTOR Intron Technologies, Inc. Jacksonville, FL MATERIALS SUPPLIER/MANUFACTURER Sika Corporation Lyndhurst, NJ

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 41 MASONRY CATEGORY A Façade Rehabilitation of Callahan W Tunnel Vent Building #13 A BOSTON, MA SUBMITTED BY SIMPSON GUMPERTZ & HEGER, INC.

R e Callahan Tunnel Vent Building #13 is a four- degrees, such as outward bowing, cracking, and water story building constructed around 1961. e building in‡ltration. D is approximately 98 ft (30 m) high, with story heights of approximately 23.5 ft (7.2 m). e building is Two general alternatives to rehabilitate the façade situated directly above, and provides ventilation for, were evaluated: repair/stabilization and replacement. the Callahan Tunnel located beneath Boston Harbor. e replacement option was selected and schematic O e building structure consists of concrete slabs designs and cost estimates prepared for the various supported by concrete-encased steel framing. e replacement options. Brick veneer with reinforced original building enclosure consisted of composite CMU walls was selected as the replacement option. F New reinforced concrete curbs were constructed at the base of the CMU backup wall and dowelled into the existing concrete slab with vertically slotted steel inserts to M provide vertical adjustability for the relieving angles. New hot-dip galvanized steel relieving angles were installed to E vertically support the new brick veneer. Due to the large story heights, high-lift R grouting techniques were used for the new CMU wall. Concrete repairs were I performed at the deteriorated concrete encasements. A new brick masonry veneer was constructed matching the T original architectural jogs in the façade and preserving the aesthetics of the original façade to match the surrounding masonry walls with an inner wythe of cinder-block historic brick masonry buildings. masonry extending from –oor to –oor, and an outer wythe of clay-brick masonry extending the full height of the building. Facade Rehabilitation of Callahan Tunnel Vent Building #13 In 2009, a section of brick masonry at the west façade fell off the building, prompting a condition OWNER assessment of the façade that included visual and 3D Massachusetts Department of Transportation laser scanning surveys. In general, the exterior Highway Division masonry walls exhibited signs of distress to varying Boston, MA PROJECT ENGINEER/DESIGNER Simpson Gumpertz & Heger Inc. Waltham, MA REPAIR CONTRACTOR G.V.W. Incorporated East Boston, MA MATERIALS SUPPLIER/MANUFACTURER Costa Brothers Masonry Fairhaven, MA ARCHITECT Fennick McCredie Architecture LTD Boston, MA

42 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG SPECIAL PROJECTS CATEGORY Jardin de Chine (Montréal Botanical A Garden): Restoration of a Thematic Garden W MONTRÉAL, QUEBÉC, CANADA A SUBMITTED BY MAPEI, INC.

The Jardin Botanique de Montréal (Montréal plus the ability to withstand Quebéc’s harsh winter R Botanical Garden) is considered one of the most weather conditions were key selection criteria. €e important botanical gardens in the world, thanks project included reconstructing areas of the roofs D to its collection of more than 20,000 dierent types and garden walls, repairing and setting terracotta of plants and cultivars, 10 greenhouses and 30 tiles on the roofs and providing a protective coating. thematic gardens open to the general public. €e garden extends over an area of 185 acres (75 Speci‘cally, the roofs were rebuilt by applying a 1 O hectares) and, in 2008, was o†cially designated a in (25 mm) coat of a fiber-reinforced one- National Historic Site of Canada. component repair mortar, resistant to tensile loads and abrasion, directly on the metal F sheeting of the roofs. Terra-cotta tiles imported directly from China were then installed over the surface using a medium-build, two-component, M polymer-modified and fast-setting mortar. €e jutting gutters around the E roofs, typical of Chinese architecture, were installed in some of the roof areas R as well as the border tiles, using rapid and extremely-rapid setting and medium-build mortars. Finally, a high- I yield acrylic finish coat was used to decorate and protect the surfaces. T

More than 20 years after it was ‘rst created, the Jardin de Chine needed to be restored, starting with the roofs of the buildings in the garden. €e same artisans who created the original garden in the 1990s returned from China to help with the Jardin de Chine: Restoration of a restoration work. €e schedule for the restoration Thematic Garden work had to be strictly adhered to, so a great deal of importance was given to choosing the products SUBMITTED BY MAPEI, Inc. used. Fast-setting properties, ease of application, Laval, Quebéc, Canada OWNER Ville de Montréal-Space for Life-Montréal Botanical Garden Montréal, Quebéc, Canada PROJECT ENGINEER/DESIGNER Beaupré Michaud et Associés Montréal, Quebéc, Canada REPAIR CONTRACTOR Independent Installers from China China MATERIALS SUPPLIER/MANUFACTURER MAPEI, Inc. Laval, Quebéc, Canada

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 43 WATER STRUCTURES CATEGORY A Historic Dam Structural Repairs W NORTH CAROLINA A SUBMITTED BY PREMIER CORROSION PROTECTION SERVICES, INC. e project was to repair a 325 ft (99 m) long ICRI Guidelines for concrete repair. Additional R concrete walkway at a 95-year-old dam that had reinforcing for the beams was provided using serious concrete spalling and numerous cracks carbon fiber, which was installed in stirrup D throughout its entire surface. Upon mobilization fashion at all the beam-ends. e cracks in the and further inspection, it was found that many buttresses were lled with epoxy. Carbon ber of the structural components were in need of “anchors” were dowelled and embedded with immediate repair. ese components consisted of epoxy into the adjacent wall and splayed over the O both transverse and lateral beams, structural side of the buttress, giving the carbon ber- buttresses, as well as the underside of the walkway reinforced polymer (CFRP) a “mechanical itself. e underside of the walkway had multiple anchor.” CFRP was then installed over the F anchors and wrapped over the four sides of the buttress. Upon completion, two coats of Class 5 coating were applied. New forms where installed M along the sides of the walkway as well as the sides of the beams and archway. E e archway was placed from the top R with dowels extending into the slab. e repair and strengthening of this 95-year-old dam will ensure many I more years of use. is project was completed with no accidents or T recordable incidents, and on time and under budget.

areas of overhead concrete spalling, failure of arch support, as well as failure at three concrete beams. One of the four main buttresses had signi cant cracking transversing the entire buttress. Historic Dam The physical aspects of this project were Structural Repairs challenging due to con ned spaces, the severity of the structural damage, and strict environmental SUBMITTED BY regulations. e contractor completed surface Premier Corrosion Protection Services, Inc. preparation for the slab repair in accordance with Tampa, FL OWNER Duke Energy Hayesville, NC PROJECT ENGINEER/DESIGNER B2 Engineering Cherry Hill, NJ REPAIR CONTRACTOR Premier Corrosion Protection Services, Inc. Tampa, FL MATERIALS SUPPLIER/MANUFACTURER MAPEI Corporation Deerfield Beach, FL

44 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG MEMBERSHIP

NETWORKING COMMITTEE ACTIVITIES

INDUSTRY RECOGNITION CONVENTIONS/EVENTS

FREE & DISCOUNTED PRICING ONLINE MEMBERSHIP ON TECHNICAL GUIDELINES DIRECTORY

EDUCATION & CERTIFICATION CONCRETE REPAIR BULLETIN CONTACT ICRI

651-366-6095 [email protected] A Personal Thank-You from the ICRI President ank you to everyone who has made a contribution to ICRI during the last year. As 2018 ICRI president, I have been amazed by the dedication and contributions made by the hundreds of members of our organization. I have attempted to assemble a list of the members that have made a contribution to ICRI this past year. As you see, the list is extensive. If I have overlooked anyone, please forgive me. You can each know that your e orts have contributed to advancing the concrete repair industry and concrete repair technology. ese e orts improve concrete repair for everyone: the clients we work for, the society that utilizes the structures we repair, and each of us that is involved in the repair industry. Our e orts yield results well beyond the limits of our own cities, states and countries. I trust you will continue in your dedication to ICRI and the concrete repair industry. ank you. Ralph C. Jones PE, ICRI President 2018

STAFF CURRENT BOARD Kevin Michols – Voting Member Mike Levin – Executive Director Chris Lippmann – President-Elect Patrick Winkler – Voting Member Gigi Sutton – Associate Executive Director Mark LeMay – Vice President Ken Lozen – Technical Director Elena Kessi – Secretary Committee 130 - Procurement Methods and Steven R. Bruns – Certi‘cation Manager John McDougall – Treasurer Relationship Arrangements Dale Regnier – Director of Chapter Relations Fred Goodwin – Technical Activities Chair Je rey Carlson – Committee Co-Chair Jason Acord – Membership Director Je rey Barnes – At Large Michael Saulnier – Committee Co-Chair Sue Peterson – Communication & Website Manager Jason Coleman – At Large Bob Swan – TAC Liaison Danielle Adams – Conventions Jon Connealy – Region 5 Representative Michael Davis – Voting Member Emma Penzenstadler – Conventions Assistant Paul Farrell – Region 2 Representative David Karins – Voting Member Blake Finger – Sales Manager Andy Garver – At Large James Smith – Voting Member Rachel Dicks – Professional Development Manager Julius Hader – At Large Donald Whiteley – Voting Member Amanda Ewald – Chief Financial O•cer Pete Haveron - Region 7 Representative Bryan Wood – Voting Member Tommy DeMartino – Accounting Manager Adam Hibshman – At Large Kathie Pugaczewski – Marketing David Marofsky - Region 6 Representative Committee 160 - Life Cycle and Sustainability Rebecca Wegscheid – Public Relations Brian MacNeil - Region 8 Representative Peter DeNicola – Committee Chair Cameron Frost – Social Media Brian T. McCabe - Region 3 Representative Jim Fadellin – Co-Chair, Secretary Gerard Moulzolf – At Large Ashish Dubey – TAC Liaison PAST PRESIDENTS Kevin Robertson - Region 4 Representative Frank Apicella – Voting Member David L. Barton – 1988-89 Ingrid Rodriguez - Region 1 Representative Eric Edelson – Consulting Member Jack Morrow – 1990 Dan Wald - Region 9 Representative H. Peter Golter – Voting Member Chuck Pfahl – 1991 Joshua Hollis – Consulting Member Steve Royer – 1992 TECHNICAL COMMITTEES Meghdad Hoseini – Voting Member Fred Hightower – 1993 Committee 110 - Guide Specications Graeme Jones – Voting Member Robert Terpening – 1994 Liying Jiang – Committee Chair John Kennedy – Voting Member Peter Emmons – 1995 Horace Willis – Committee Secretary Terry McGovern – Consulting Member Peter Craig – 1996 Matthew Hansen – Consulting Member Jessi Meyer – Voting Member Joe Solomon – 1997 Matthew Hickey – Voting Member Timothy Montgomery – Consulting Member Wayne Benitz – 1998 William Mahler – Voting Member Christopher Perego – Consulting Member James McDonald - 1999 Shawn McCormick – Consulting Member Bryan Smith – Voting Member Rick Edelson – 2000 James McDonald – Consulting Member Paul Tourney – Voting Member Ken Currence – 2001 Kevin Michols – Consulting Member Stephan Trepanier – Consulting Member Robert axton – 2002 Timothy Montgomery – Voting Member Donald Whiteley – Voting Member Allen Roth – 2003 Jerry Phenney – Voting Member David Whitmore – Voting Member Robert Johnson – 2004 Karl Rickert – Voting Member Patrick Winkler – Consulting Member Robert Pusheck – 2005 David Rodler – Voting Member Marty Sobelman – 2007 Matt Sherman – Consulting Member Committee 210 – Evaluation Monica Rourke – 2008 John Weisbarth – Voting Member Todd Allen – Committee Co-Chair Randy Beard – 2009 Dennis Wipf – Committee Co-Chair Chuck Knight – 2010 Committee 120 - Environmental Health & Safety David Rodler – Committee Secretary Don Ford – 2011 Paul Farrell – Committee Chair Chris Ball – Voting Member Garth Fallis – 2012 William Brickey – Voting Member Eric Edelson – Voting Member William “Bud” Earley – 2013 David Caple – Voting Member Garth Fallis – Voting Member Michael Tabassi – 2014 Don Caple – Voting Member John Grill – Voting Member Katherine Blatz – 2015 Sam Dickson – Consulting Member Vladimir Ivanov – Voting Member Keith Harrison – 2016 Scott Greenhaus – Voting Member Peter Kolf – Voting Member Brian Daley – 2017 Adam Hibshman – Consulting Member Shawn McCormick – Consulting Member

46 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Kevin Michols – Voting Member Aamer Syed – Voting Member Frank Apicella – Voting Member Charles Mitchell – Voting Member David Wingard – Voting Member JeŽrey Barnes – Voting Member Larry Olson – Voting Member Kevin Yuers – Consulting Member Kevin Buck – Voting Member Matt Sherman – Voting Member Peter Craig – Voting Member Tara Toren-Rudisill – Voting Member Committee 330 - Strengthening and Stabilization David Dorsch – Voting Member Patrick Winkler – Voting Member Tarek Alkhrdaji – Committee Chair Ashish Dubey – Voting Member Gregg Blaszak – Voting Member William “Bud” Earley – Voting Member Committee 310 - Surface Preparation ’omas Donnelly – Consulting Member Lee Eliseian – Voting Member Pete Haveron – Committee Chair Garth Fallis – Voting Member Matt Eller – Consulting Member Shawn McCormick – Committee Secretary Hazem Jadallah – Voting Member Pierre Hebert – Voting Member Aamer Syed – TAC Liaison Chris Kelley – Consulting Member Jacob Holland – Voting Member Dan Anagnos – Voting Member Mark Kennedy – Voting Member Michel Jalbert – Voting Member Randal Beard – Voting Member Ed Kluckowski – Voting Member Liying Jiang – Voting Member Sam Dickson – Voting Member Joshua Lloyd – Consulting Member Chris Kelley – Voting Member Ashish Dubey – Voting Member David Marofsky – Voting Member Alfred Kessi – Voting Member Eric Edelson – Voting Member Patrick Morrissey – Voting Member Elena Kessi – Voting Member Matt Eller – Voting Member Johnnie Rice – Consulting Member Mark LeMay – Voting Member Andrew Fulkerson – Voting Member Monica Rourke – Consulting Member Terry McGovern – Consulting Member Terry McGovern – Consulting Member Brian Stratman – Consulting Member Sean Meracle – Voting Member Kevin Michols – Voting Member Dave White – Voting Member Gregory Mercurio – Voting Member Charles Mitchell – Voting Member Charles Mitchell – Voting Member Johnnie Rice – Consulting Member Committee 410 - Masonry Tom Murphy – Voting Member Roland Vierra – Consulting Member Patrick Morrissey – Committee Chair Mark Nelson – Voting Member Patrick Winkler – Voting Member John Wathne – Committee Chair JeŽ Ohler – Voting Member Jason Coleman – Committee Secretary Bill Phillips – Voting Member Committee 320 - Concrete Repair Daniel Allen – Consulting Member Monica Rourke – Voting Member Materials and Methods Constantin Berenghi – Voting Member William Slama – Voting Member Ashish Dubey – Committee Chair Robert Charles – Voting Member David Slick – Voting Member Frank Verano – Committee Secretary Michael Davis – Consulting Member Dan Wald – Voting Member Alireza Amjad – Consulting Member Stephen Franks – Voting Member John Ziebell – Voting Member Ray Andrews – Consulting Member Luc Genest – Voting Member Lorella Angelini – Consulting Member Eric Hammarberg – Voting Member ADMINISTRATIVE COMMITTEES Mark Ashcraft – Consulting Member Roy Ingra“a – Voting Member Awards Committee Richard Braun – Consulting Member Nathaniel Jones – Consulting Member Elena Kessi - Chair Joe Daley – Voting Member Mark Leeman – Voting Member Brian MacNeil – Vice Chair Peter DeNicola – Consulting Member William Mahler – Consulting Member Brian McCabe Mark DeStefano – Voting Member Michael O'Malley – Voting Member JeŽ Barnes William “Bud” Earley – Consulting Member Michelle Perez – Voting Member Gerard Moulzolf David Flax – Voting Member Sara Peters – Consulting Member David Karins Etien Frett – Consulting Member Karl Rickert – Voting Member John Weisbarth Andrew Fulkerson – Consulting Member David Rodler – Consulting Member Matthew Carter Steven Geiger – Voting Member Steven Royer – Voting Member Kevin Robertson Timothy Gillespie – Consulting Member Alex Somohano – Consulting Member Charles Hanskat – Voting Member Tara Toren-Rudisill – Consulting Member Certication Committee Pierre Heber – Voting Member Horace Willis – Voting Member Tom Donnelly - Chair Matthew Hickey – Consulting Member Fred Goodwin Benjamin Immonen – Voting Member Committee 510 - Corrosion Ed Baum Michel Jalbert – Consulting Member Jorge Costa – Committee Chair John McDougall Westin Joy – Voting Member Peter DeNicola – Committee Secretary Scott Greenhaus David Karins – Voting Member Frank Apicella – Consulting Member Dave Marofsky Chris Kelley – Consulting Member Chris Ball – Consulting Member Ashish Dubey Mark Kennedy – Voting Member Randal Beard – Voting Member Jim Spiegel Peter Kolf – Voting Member Katherine Blatz – Consulting Member Pete Haveron Joshua Lloyd – Consulting Member Timothy Gillespie – Voting Member Shawn McCormick – Voting Member Graeme Jones – Voting Member Chapters Committee Terry McGovern – Consulting Member Paul Lambert – Voting Member Michelle Nobel – Chair Kevin Michols – Voting Member Richard McGuire – Voting Member Brian MacNeil – Vice Chair Brian Mintz – Voting Member Jessi Meyer – Voting Member Dave Marofsky (Region 6) Charles Mitchell – Voting Member Kevin Michols – Consulting Member Steven Bruns (Region 9) Matthew Mowrer – Voting Member Matt Sherman – Voting Member Brian McCabe (Region 3) Tom Murphy – Consulting Member Brian Stratman – Consulting Member Gerard Moulzolf Mark Nelson – Voting Member Tara Toren-Rudisill – Consulting Member Brian MacNeil (Region 8) JeŽ Ohler – Consulting Member Paul Tourney – Voting Member Julius Hader Joseph Rizzo – Consulting Member Gerard Vaerewyck – Voting Member Jon Connealy (Region 5) Kevin Robertson – Voting Member Robert Walde – Voting Member Paul Farrell (Region 2) Jean-Francois Rondeau – Voting Member Patrick Watson – Consulting Member Ingrid Rodriguez (Region 1) Monica Rourke – Consulting Member Kevin Robertson (Region 4) Bob Swan – Voting Member Committee 710 - Coatings and Waterproong Pete Haveron (Region 7) H. Peter Golter – Committee Chair Jean-Francois Rondeau

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 47 Conventions Committee Catherine Maloney Karl Rickert – Voting Member Ingrid Rodriguez – Chair Jessi Meyer Monica Rourke – Voting Member Jacques Bertrand Alex Somohano Matt Sherman – Voting Member Michelle Nobel Bob Swan – Voting Member Jean-Francois Rondeau Publications Committee Aamer Syed – Voting Member Rob Flynn Jerry Phenney – Chair Andy Garver Matthew Carter TAC A - Technical Programs Alex Somohano Steve Bradway H. Peter Golter – Chair Jon Connealy Brian McCabe Frank Apicella – Voting Member Jim Fadelin Julius Hader Fred Goodwin – Consulting Member Zelina Johnson David Rodler Ralph Jones – Voting Member Mark LeMay Kevin Michols – Voting Member Education Committee Bradley Rogers Brian Daley – Chair Bill Mahler CHAPTER LEADERS Dave Marofsky – Vice Chair Paul Farrell Arizona Chapter Tom Donnelly Joe Sanchez – Acting 2018 President Horace Willis Women in ICRI Rose Dooley – Vice President Bryan Heery Monica Rourke – Chair Mac King – Treasurer Jon Connealy Katherine Blatz Kori Krichko – Secretary Adam Hibshman Shannon Bentz Ray Russ – Past President Andy Garver Rosa Dooley Earl Lucas – Director Brad Rogers Susie Edelson Tony Valdez – Director Jason Coleman Zelina Johnson JeŽ Starling – Director Elena Kessi John Leos – Director Fellows Committee Jessi Meyer Jason Savage – Director Peter Golter – Chair RaeJean Nicholl Dylan Schweigert – Director Peter Kolf Michelle Nobel Mark Nelson Sara Peters Baltimore-Washington Chapter David Whitmore Ingrid Rodriguez Robert A. RadcliŽ, PE – President Mike O'Malley Tara Toren-Rudisill Kevin Kline, EIT – Vice President George Reedy Sara Wolfe Brian J. Radigan – Secretary Jacques Bertrand Brian Baker – Treasurer Don Ford Nominating Shannon Bentz, PE – Past President Tim Gillespie Keith Harrison – Chair Paul Askham – Director Randy Beard Brian Daley – Vice Chair Rich Barrett – Director Michael Breetz David W. Bickel Sr. – Director Finance Committee Jessi Meyer Brian Heil – Director John McDougall – Chair Larry Mroz Philip Heisel – Director Chris Lippmann Mark DeStefano Nicholas M. Henn, PE – Director Mark LeMay Peter Golter Adam Hibshman – Director David Huggins Alex Somohano Justin Long, PE – Director Andy Garver Michael Payne, PE – Director Julius Hader Global Task Force Brad Aderhold – Administrator Elena Kessi Garth Fallis – Chair Brandon Carter Randy Beard British Columbia Chapter Jason Coleman Mo Ehsani Meghdad Hoseini – President Pierre Hebert Dave Bishop – Vice President Marketing Committee Ryan Kaelin Jon Woo – Treasurer Jessi Meyer – Chair Ed Kluckowski Paul Farkas – Director Ed Kluckowski – Secretary John McDougall Daryl Heppner – Director Chris Lippman Jessi Meyer Brian MacNeil – Director Brian MacNeil Oscar Valenzuela Bob Matich – Director Tom Ouska Sylvie Mercier – Director John McDougall Secretariat Dave Randall – Director Julius Hader Eric Edelson – Chair John Rehmann – Director Pat Gallagher Mark Nelson – Secretary Cristina Zanotti – Director JeŽ Barnes JeŽrey Barnes Curtis Barkley Fred Goodwin – Consulting Member Chico State Student Chapter Jon Connealy Pierre Hebert Jessica Burns – President Alex Somohano Meng Her – Secretary Adam Hibsham Technical Activities Committee Elias Magana – Treasurer Fred Goodwin – Committee Chair Damien Bonis – Past President Membership Committee Mark Nelson – Committee Vice Chair Johnathan Lopez – Director JeŽrey Barnes – Chair Peter DeNicola – Voting Member Curtis Barkley Ashish Dubey – Voting Member Carolinas Chapter ‘omas Donnelly Eric Edelson – Voting Member Robert McDowell – President Julius Hader Paul Farrell – Voting Member Bruce Stoerkel – Vice-President Adam Hibshman Peter Kolf – Voting Member Steven Moore, PE – Secretary Chris Lippmann James McDonald – Secretary Bob Crosser – Treasurer Brian MacNeil Kevin Michols – Voting Member Hayes ‘ompson – Immediate Past President

48 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG John Ammons – Director Mark Meighan – Director Gulf South Chapter Bill Brickey - Director Bill Phillips – Director Danny Horn – President Alex Campbell – Director Paul Uhrig – Director John English – Vice President Courtney Green – Director Lou Verdecchio – Director Charles Marriaga – Secretary Mike Jarman – Director Don Yarbrough – Treasurer Je Welty – Director Florida First Coast Chapter Steve Lemay – Past-President Brad Aderhold – Administrator David Poulter – President Freddie Boudin – Director Ashly Ellison – Vice President Michael "Josh" Dogan – Director Central Florida Chapter Shawn Hutson – Secretary Missy Ellis – Director Tamer Mercho – President Robert Herndon – Treasurer Wesley Lowman – Director William Novack – Vice President Jason Bousquet – Past President Steve Schoonover – Director Jennifer Houck – Secretary Baker Berg – Director Jerey ’eo – Director Craig Stoughton – Treasurer Michael Grimes – Director Walter Hanford – Director Lee Holland – Director Houston Chapter Bradley Kempthorne – Director Bo McFall – Director Chris McDaniel – President David Poulter – Director Tim Moore – Director Jack Moore – Vice President Jean-Francois Rondeau – Director Matt Pali – Secretary Hector Velazquez Abreu – Director Florida West Coast Chapter Kurt Tyler – Treasurer Amy Zdrowak – Director Je Walker – President Michael Pocock – Past President Steve Raleigh – Vice President Ben Dow – Director Central Ohio Chapter Kelsey Romao – Secretary David Hoevker – Director Jay Cheney – President Joe Trocano – Treasurer Alex Kindshu – Director Terry Nye – Vice President Tim Price – Past President Josh Larsen – Secretary Mike Biller – Director Indiana Chapter Nathan Sketch – Treasurer Tom Bu‘ngton – Director Ryan Hill – President Ray Paul – Director Brian Keiter – Director Dan Calabrese – Vice-President Anthony Howes – Director Jake McDonald – Director Ryan McCreery – Secretary/Treasurer Gene Shevchenko – Director Donny Morelock – Director Mark Antoskiewicz – Director Dave Marofsky – Director Clayton Prescott – Director Tyler Gilpin – Director Troy Testerman – Director Dan Reed – Director Brad Lacy – Director Steve Tryon – Director Chicago Chapter Tom White – Director Iowa/Illinois Chapter Jim Fadellin – President George Rucker – President Tom Lawler – Vice President Georgia Chapter Greg Ward – Secretary Michael Wiscons – Secretary Joshua Lloyd – President ’omas Karlson – Treasurer Sean Meracle – Treasurer ’omas Andrews – Vice President Christopher Kottra – Past President Joshua Caron – 2nd Vice President Metro New York Chapter Steve Genovese – Director Evan Moore – Secretary Kirk Stauer – President Tom Lavin – Director James Dunlap – Treasurer Dennis Orozco – President-Elect Victor Ligocki – Director Philip Bender – Treasurer-Elect Marjorie Lynch – Vice President Kurt Moehlamann – Director Bryan Heery – Past President Domingo Diaz – Secretary George Mulholland – Director Susan Kline – Administrator Alex Somohano – Treasurer Chris White – Director Brandon Davis – Board Member Stephen Franks – Past President Andrew Overcash – Board Member Alyssa Somohano – Administrator Connecticut Chapter Niko Podeszwa – Board Member Yasmine Elrashidy – Director Lawrence E. Keenan – President Charles (C.W.) Webb – Board Member Herminio Estrella – Director Tammy Gaherty – Vice President Scott Wilson – Board Member Jasen Geraghty – Director Paul Nixon – Treasurer Andrew Macko – Director Liam McGowan – Secretary Great Plains Chapter Bill McGloin – Director David Carlson – Director Jon Connealy – President Connie Mugno – Director David Mastay – Director Mike Raerty – Vice President Derek Robertson – Director Bill McGloin – Director Matthew Carter – Secretary Tina Tapinekis – Director John Morin – Director Brandon Carter – Treasurer Peter Wenz – Director Patrick Morrissey – Director Curtis Barkley – Past President/Director Sara Wolfe – Director Monica Rourke – Director James Bouckaert – Director John Ryan – Director Mike Dickey – Director Michigan Chapter Craig Steuernagel – Director Ray Jaegers – Director Andrew Lobbestael, PE – President Joe McGill – Director James Keena – Vice President Delaware Valley Chapter Chris Swanson – Director John R. Kosnak, PE – Secretary Pat Gallagher – President Douglas J. Barron – Treasurer Jason Coleman – Vice President Greater Cincinnati Chapter Hayder Al-Hilal – Director Van Burriss – Secretary Rick Graman – President Gary Bell – Director Dave Marofsky – Treasurer Keith Dugan – Vice President Richard Schneider – Director Matt Mowrer – Immediate Past President Buddy Stanford – Secretary Mike Vennix – Director Michael Alloway – Director Greg Wirthlin – Treasurer Eric Wood – Director Tom Donnelly – Director Tim Bennett – Director John Lukens – Director Glenn Dillho – Director Rob Mahan – Director Bill Roebel – Director Joe Markert – Director

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 49 Mid-South Chapter Northern Ohio Chapter Brian Schwab – Past President Glenn Yeargan – President Tom Lavelle, Sr. – President Casey Klepper – Director Ron Shirley – Vice President Jerry Phenney – Vice President John Posenecker – Director Charles E. Kelley – Secretary Sara Peters – Secretary Allison Lea – Director Dale Sloman – Treasurer Matt Krauss – Treasurer Frank Caspio, Jr. – Director Southeast Florida Chapter Minnesota Chapter Mike Childress – Director Kristen Foreman – President Kim Deibel – President Mark Churpek – Director Steven B. Lesser – Vice President David Grandbois – Vice President Edward DeTullio – Director JR Hopf – Secretary Matt Drew – Secretary Kevin Kasner – Director Alessandra Bianchini – Treasurer Rick Elsner – Treasurer Jim Wamelink – Director Evan Swaysland – Immediate Past President Andy LeBarron – Past President Louie Cimino – Director Terry Babcock – Board Member At-Large Pacic Northwest Chapter Jim Cox – Director Brian Farmer – Director Joe HoŒman – President Brian Kurnick – Director Rick Gruye – Director Jesse M. Roe – Vice President Patrick Lewis – Director Jason Ledy – Secretary Southern California Chapter Jessi Meyer – Director Jim Sullivan – Treasurer Eric Brown – President Brandon ƒiele – Director Ian Murphy – Vice President PJ Vaughan – Director Pittsburgh Chapter Heather Caya – Treasurer Lisa Viker – Director Marie Fallon – President Elaine ƒomson – Secretary JeŒ Konkle – Vice President Ben Ball – Past President New England Chapter Phillip Elgin – Secretary Kash Aminibadi – Director Timothy M. Montgomery, PE – President Michael D. Wuerthele – Treasurer Chris Cordero – Director Peter Hals – Vice President Robert Mason – Past-President Cesar Carillo – Director Catherine Maloney – Secretary Patrick Allen – Director Matthew Mead – Treasurer Mike Konkle – Director Southwest Florida Chapter Todd Neal, PE, SECB – Past President Joe White – Director Tree Tietsort – President Dan Clark – Director Vic Dudash – Vice President Sean Davis – Director Province Chapter Jason Swanson – Secretary Sarah Frankenberger – Director Eric Bellerose – President Joe Clark – Treasurer Chris French – Director Baltazar Basabe – Vice President Kurt Brown – Director Jennifer Grubb – Director Liam Ireland – Vice-President QP a‘liated Chapter Rafael Diaz – Director Michael Harris – Director Roxanne Ouellet – Secretary Richmond Huseman – Director Shane Imonetti – Director Jean Francois Rondeau – Treasurer Gerry Maron – Director Matthew Swirbalus – Director Pascal Beliveau – Director Jim McKiney – Director Etienne Crepault – Director Michelle Nobel – Director North Texas Chapter Paul Deram – Director R. W. Smith – President Paul-Francis Jacques – Director Toronto Chapter Stephen Grelle – President-Elect Hamza Ouziame – Director David Huggins – President Clay Broyles – Vice President Stephan Trepanier – Secretary Eddie De Haro – Secretary Rocky Mountain Chapter David Huggins – Treasurer Pete Haveron – Treasurer Angela Echols – President Stephen Franks – Past President Julie Bolding, PE – Past President Mike Devlin – Vice President Andrew Moad – Director Abhishek Aggarwal – Director Adam Hercher – Secretary Francis Mongeon – Director Jon Carrier – Director Terry McGovern – Treasurer Stacia Van Zetten – Director Bryan Payne – Director Kim West – Past President Justin Ward – Director Craig Cowan – Director Northern California Chapter Chad Grote – Director Virginia Chapter Cruz Carlos – President James Lake – Director Dick Frederick – President Ashok M. Kakade – Vice President Dave Reis – Director Keith Simpson – Vice President Christine Diosdado – Secretary Kim West – Director Bob Hill – Secretary Lee Woolsey – Treasurer Chris Yoder – Director Dan Watkins – Treasurer George Lee – Past President Jon Hunger – Past President Brad Kamin – Director South Central Texas Chapter Vince Beyer – Director Rob Kirschbaum – Director Tim Badilla – President Kevin Higgins – Director Emile Kishek – Director Chad Eades – Vice President Sean Murphy – Director Stephanie Tsen, PE – Secretary Billy Rose – Director Donald W. Hendrix – Treasurer Neil Savitch – Director Lincoln Swineford – Director

ICRI Committees Taking part in ICRI committees gives you the opportunity to play a vital role in the direction of the repair and restoration industry, and ICRI as an organization. Whether your interests are in organizational marketing or technical aspects of the industry, ICRI has a committee to fit your talents. • Administrative committees report directly to the ICRI Board of • Participation on Technical committees and subcommittees increases your Directors. These committees lay the groundwork for the knowledge in almost every area of concrete repair and restoration, and organization and work to ensure its continued growth and success enables you to stay on the leading edge of best industry practices. All committees meet in person twice a year at the ICRI Spring and Fall Conventions and all are open to anyone to attend. Visit www.icri.org for more Information on ICRI committees.

50 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Certification Program Development Resulting from Industry Demand and Code Language

• Competency-based program using current best practices for training and evaluation

• Includes ve online training modules, an SME Demonstration online knowledge exam, and performance exam Performance Exam Video (video recorded or live at an on-site location)

• Qualies individual to perform pre- and post- placement inspections and testing

The International Concrete Repair Institute offers certication as a… Concrete Surface Repair Technician

Your qualification in concrete surface repair!

Visit www.icri.org for more information on this certification program. CONCRETE REPAIRCALENDAR

JANUARY 21, 2019 JANUARY 23-24, 2019 APRIL 8-10, 2019 ICRI Kick-O Party ICRI Concrete Slab Moisture Testing 2019 ICRI Spring Convention In conjunction with World of Concrete Certi­cation Omni Hotel & Resorts Jacksonville Chateau Paris at Paris Las Vegas Hotel ‘e International Surface Event (TISE) Jacksonville, Florida Las Vegas, Nevada Mandalay Bay Convention Center Website: www.icri.org Website: www.icri.org Las Vegas, Nevada Website: www.intlsurfaceevent.com INTERESTED IN SEEING YOUR EVENT JANUARY 22-25, 2019 LISTED HERE? World of Concrete FEBRUARY 24-26, 2019 Las Vegas Convention Center Shotcrete Convention & Technology Events can be emailed to [email protected]. Las Vegas, Nevada Conference Content for the January/February 2019 Website: www.worldofconcrete.com Omni Amelia Island Plantation Resort issue is due by December 1, 2018 and Fenandina Beach, Florida content for the March/April 2019 issue is JANUARY 22-25, 2019 Website: www.shotcrete.org due by February 1, 2019. e International Surface Event (TISE) Mandalay Bay Convention Center Las Vegas, Nevada CORRECTION September/October 2018 Website: www.intlsurfaceevent.com Concrete Repair Bulletin JANUARY 23-24, 2019 On page 12, State of the Institute article, the Company ICRI Concrete Slab Moisture Testing Member Demographic pie chart Contractor Certi­cation Manufacturers was labeled incorrectly. World of Concrete Equipment Contractor was listed twice in Engineers Las Vegas Convention Center Unspecied the key and Engineers was left out. ICRI Las Vegas, Nevada sincerely apologizes for this error. Website: www.worldofconcrete.com Fig. 1: 2018 Company Member Demographics

Become a ICRI needs YOUR articles and ideas for upcoming themes!

2019 EDITORIAL SCHEDULE

March/April 2019 Resilency: Above and Beyond Concrete Restoration: Editorial Deadline: January 2, 2019

May/June 2019 Corrosion: Editorial Deadline: March 1, 2019

July/August 2019 Strengthening: Editorial Deadline: May 1, 2019

September/October 2019 Waterproofing with Aesthetics: Editorial Deadline: July 1, 2019

If you are interested in submitting an article for publication in the Concrete Repair Bulletin, please contact ICRI for more details and for a copy of our Publication Guidelines: (651) 366-6095 | www.icri.org

52 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG Repair Concrete Solutions

EUCOREPAIR SCC FAST is a self-consolidating concrete repair mortar that combines ease of placement with structural strength to produce fast, durable concrete repairs. NEW!

• Excellent consolidation without vibrating • Strip forms in less than two hours • Micro ber reinforced • Polymer modi ed for excellent bond • Pump or pour full depth without extending • Contains an integral corrosion inhibitor

euclidchemical.com | 800.321.7628

See us at booth C4249 at World of Concrete 2019.

Distributed by: Brokk Inc. | Monroe WA | 1-360-794-1277 | [email protected] | www.brokk.com

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 53 INDUSTRYNEWS

JQ ENGINEERING MOVES LOCAL tion, Levelland, Texas (in design phase); Management has been an amazing OFFICE TO LUBBOCK’S LANDMARK and Frazier Pavilion Addition, Texas Tech partner.” PIONEER BUILDING University Alumni Association, Lubbock, JQ announced that it has completed the Texas. Previous auction items have included relocation of its Lubbock o ce to new concrete mixer trucks, cement, skid steers, space located in the historic Pioneer Says Lucy, “JQ is known for its expertise concrete saws, drills, mixers, vibrators, Building in the heart of downtown Lub- in preservation and renovation of historic sca’olding, safety equipment, screeds, bock, according to JQ’s CEO Stephen H. properties, and we were pleased to be ¦ber transport systems, dust collectors, Lucy, P.E. e new o ce location is 1204 welcomed by the McDougall Companies NDT equipment, decorative concrete Broadway, Suite 204, Lubbock, Texas. whose renovation of this building is an tools, water meters, pumps, generators, excellent example of adaptive reuse that training sessions, reference books, adver- Originally built in 1925 as the Pioneer retains the historic Renaissance Revival tisements, laptop computers, mobile Hotel, the McDougall Companies bought style of architecture and blends it with the computers, sports memorabilia, sports the property in 2005 and completed major demands of today’s market.” travel packages, golf packages and vaca- renovations in 2012. The 11-story tion travel packages. building is now home to a pocket hotel, CONCRETE INDUSTRY condominiums, restaurants and office MANAGEMENT PROGRAM SEEKS ose interested in making a donation space. DONATIONS FOR 2019 AUCTION should contact CIM Auction Committee AT WORLD OF CONCRETE Chairman Mike Philipps at mike. “We are excited to be in this historic and The Concrete Industry Management [email protected] or (832) 472-2314. iconic building,” says Lucy. “ e mixed- (CIM) program—a business intensive use aspect of the property appealed to us program that awards students with a four- MAPEI JOINS AEC CARES 2018 very much and o’ers sta’ the ability to year Bachelor of Science degree in Con- ANNUAL PROJECT live, work and play in the same building crete Industry Management—is seeking On October 5, MAPEI partnered with if they so choose. When we were con- donations for their 2019 CIM Auction to the charity organization AEC Cares for sulted as the structural engineer for the be held at World of Concrete. e auction “ProjectHouston,” donating time and rehabilitation and redevelopment of the is scheduled for Wednesday, Jan. 23 at the materials in order to help improve condi- building, we were honored to work with Las Vegas Convention Center. e silent tions at Santa Maria Hostel in Spring the McDougall Companies,” adds Lucy. auction will be held from 11 a.m. to 1 p.m. Branch, which is a neighborhood of “There is a lot of energy around this and the live auction begins at 1 p.m. Houston, Texas. Santa Maria Hostel is a building and the larger downtown rede- residential addiction treatment and velopment taking place in the city.” “ e proceeds from the 2019 CIM Auc- housing facility that is home to approxi- tion will benefit the CIM National mately 100 women and their children. Steering Committee (NSC) and support the current CIM programs at Middle According to Nadine Scamp, hostel CEO, Tennessee State University, New Jersey “ e mission of Santa Maria Hostel is to Institute of Technology, Texas State Uni- empower women and their families to versity and California State University - lead healthy, successful, productive and Chico, the Executive MBA program, as self-fulfilling lives. We provide a full well as help fund scholarships,” said Mike continuum of care to meet each individual Philipps, Chairman of the CIM Auction or family where they are on their recovery Committee. journey, from community-based preven- tion and intervention programs, to out- Once again, the CIM Auction organizers patient and residential treatment for are hoping for another record event in substance use disorders, to long-term JQ’s project manager in the o ce is Brian 2019. According to CIM Marketing housing and recovery support.” Robertson, P.E., a Texas Tech University Committee Chairman Brian Gallagher, alumni who previously worked on the the 2018 auction was the best ever, raising Hit hard by recent hurricanes, the renovation of the building and is well- a record-breaking $1.1 million in gross building and surrounding grounds were known within Lubbock and the larger revenue. in need of their own recovery. Conse- West Texas community. Currently, JQ is quently, AEC Cares adopted Santa Maria working on the Agricultural Sciences “ e annual CIM Auction is a critical Hostel as the program’s 2018 “blitz build,” Complex, West Texas A&M University, funding mechanism for the CIM NSC,” a daylong building project. MAPEI has Canyon, Texas; New Lint Room, PYCO said Gallagher. “We’ve been blessed with been a participating sponsor in every Industries, Lubbock, Texas; SPARTAN tremendous support from the concrete AEC Cares project since the ¦rst one in Transportation Additions and Renova- industry and the World of Concrete Show 2007. Mike Granatowski, MAPEI’s

54 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG INDUSTRYNEWS

Director of Architectural and Commer- GSSI COLLABORATES WITH was a huge success. “We found more than cial Projects, has been instrumental in JAMESTOWN REDISCOVERY could be expected of the town,” said organizing MAPEI’s involvement with FOUNDATION Givens, “it was a needle in a stack of AEC Cares events. He described this GSSI, the world leading manufacturer of needles.” ˆe results of the survey not only year’s project as “the most successful one ground penetrating radar (GPR) equip- clearly defined numerous buildings, yet. Working together over the course of ment, is continuing their partnership with boundary ditches, and post holes, but it one day, architects, engineers, contractors the Jamestown Rediscovery Foundation. also added critical information on how and manufacturers’ representatives reno- GSSI archaeologists Dan Welch and the town was laid out. vated the hostel’s conference room, inte- Peter Leach brought new GPR equip- rior training area, dining room, children’s ment to remotely sense what lies beneath Building on the success of the work on playground, garden and green area. As Jamestown. the †rst Africans, Dan and Peter returned always, it was a great day’s work for a to Jamestown this summer to help solve worthwhile cause.” Jamestown—known for being the †rst a new problem: the site of the †rst Gen- permanent English settlement in the New eral Assembly in the New World. ˆis site In support of AEC Cares ProjectHouston, World—will be commemorating the is located inside the Memorial Church, a “ MAPEI supplied 70 bags of Planiprep™ 400th-anniversary of the †rst representa- brick structure built over the original SC, our †ber-reinforced, cement-based tive government and arrival of the †rst foundation in 1906. Under the ‰oor of skimcoating compound,” Granatowski Africans in 2019. To honor these two the modern church were at least three continued. “ˆe Planiprep SC created a events, the Jamestown Rediscovery Foun- iterations of churches, all built on top of smooth, even ‰oor surface in the interior dation is excavating two sites where these an original timber-framed structure con- rooms. ˆe rapid-setting compound is events took place in 1619. structed in 1617. It was in this church that perfect for use in a blitz-build installation, the democratic experiment of representa- as ‰ooring can be installed 30 to 60 min- Last spring, Dan and Peter joined Senior tive government †rst met in 1619. ˆe utes after application. And, when you only archaeologist Dave Givens to help de†ne goal of the archaeologists is to de†ne the have one afternoon, speed and durability the landscape of the †rst Africans. ˆe 1617 church and the location where the count.” Angela site, named after one of the †rst Angolans to arrive GEAR UP FOR THE WINTER in 1619, is located in PIGSKIN LEATHER 35-MIL PVC-POLY 50 LB. BAG DRIVER WITH RED 3-PIECE RAINSUIT POLAR MELT the “town” portion FLEECE LINING of Jamestown, a GLOVES 40-acre landscape that remains largely unexplored. Located 8 6POLRMLT5 on National Park 223125 L 22637 14XL Service (NPS) RIPSTOP LIME CLASS 3 N-FERNO® 6821 TRADESMAN FORCED- BOMBER JACKET BALACLAVA AIR KEROSENE HEATER property, the site consists of seven Left to right, MAPEI’s Steven Day, Mike Grana- acres of garden, towski, Jennifer Kramer, Sean Leich, Victoria domestic quarters Hearn, James Bissler, and Scott Page took part and storehouses all in AEC Cares ProjectHouston on October 5, 121JS13 XL 34316821 235K21 2018. belonging to Ange- PREMIUM BRILLIANT N-FERNO® 96W DUAL LED la’s owner, wealthy SERIES® BOMBER WARMING PACKS WORK LIGHT TRIPOD Founded in 2011, AEC Cares is a 501(c) Jamestonian Cap- JACKET (3) non-pro†t organization composed of tain William Pierce. architects, engineers and contractors, as “Our goal is to AVAILABLE well as manufacturers’ representatives who de†ne the lost 17th- IN M-5XL assemble teams of professionals once a century landscape in 121JS119XL 34316992 135 729 year from the United States to donate which Angela lived,” HIGH-VIS TREX™ 6300 ICE CONCRETE TRACTION DEVICE CURING time and products in order to renovate an said Givens. KNIT BEANIE BLANKETS at-risk facility. For more information, visit Archaeologists from www.aeccares.com. GSSI, NPS and Jamestown Redis- covery conducted a GPR survey in part 1212826 34316755 113MCW6 of the town, which Whitecap.com 1.800.944.8322

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 55 INDUSTRYNEWS

assembly met prior to the space being converted into a museum in the spring of 2019. Introducing Dan and Peter brought a GPR system PRO-Tekt that isn’t normally used in archaeology— High Performance Traffic Coating System the StructureScan Mini XT with the Palm XT antenna. e Mini XT is often used in the remote sensing of rebar, post- tension cables and conduits. is high- frequency GPR system was suspected to be able to give higher resolution of local areas in the church to define activity spaces related to the ƒrst representative VISIT US AT government in 1619.

WORLD OF CONCRETE A speciƒc part of this survey included burials located in areas that denoted high status. Jamestown records indicate that Indoor Booth: #S10555 one burial of interest may be the remains of Sir George Yeardly. e StructureScan Outdoor Demos: #B51715 Mini XT and Palm XT were used to create high-resolution imagery of the skeletal remains prior to excavation. “ is Join us at an exclusive lunch is the ƒrst time that we have imaged a human skeleton in such detail with GPR. presentation highlighting It's a big deal because it’s not supposed to be possible. I’m excited to see where this “PRO-Tekt technology.” type of survey can be used in the archae- ology and forensic ƒelds,” Leach stated. Email marketing@aquafin.net Following excavation of the remains, the FBI and Professor Turi King will conduct to reserve a space. DNA tests on the teeth and skeletal remains. Jamestown Rediscovery will continue their research and archaeological dig of the site.

For more information on GSSI, visit www.geophysical.com.

INTERESTED IN SEEING YOUR NEWS IN THIS COLUMN?

Email your 150-200 word industry news to [email protected]. Content for the January/ February 2019 issue is due by December 1, 2018, and content for the March/April 2019 issue is due by February 1, 2019. ICRI reserves the right to edit all submissions. www.aquafin.net

56 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG full coverage LymTal International, Inc. total protection

TRAFFIC COATING • EXPANSION JOINTS • URETHANE SEALANTS • SILANE SEALERS

4150 S. Lapeer Rd - Lake Orion - Michigan - 48359 - Phone: 248-373-8100 - www.lymtal.com

Allentown Shotcrete Putzmiester Gary Carlson Equipment Pumps and Guns Shotcrete Pumps Rental and sales for grouting and wet and dry shotcrete equipment ***Available Nationwide***

Chemgrout Mixers Pumps and Plants

Sullivan Air Compressors Gary Carlson Equipment Co. and Tools

Rentals - Sales - Service - Delivery

1380 County Rd C West, Roseville, MN Reed Shotcrete Systems 10720 Mankato St., Blaine, MN Pumps and Guns Phone 763.792.9123 Colidal Mixers

http://www.garycarlsonequip.com

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 57 ASSOCIATIONNEWS

AMERICAN CONCRETE INSTITUTE Further goals include collaborating with Spain. is award is given annually to one LAUNCHES NEW SEMINAR SERIES other ACI committees to disseminate project that demonstrates excellence in The American Concrete Institute additive manufacturing information and concrete innovation and technology and announces the launch of a series of determining ways additive manufacturing stands out above all other entries. seminars hosted at ACI Headquarters in may be integrated into the concrete com- Farmington Hills, MI, USA, that will munity; collaborating with technical A new high-speed rail line is under con- enable concrete industry professionals to organizations to facilitate and coordinate struction between Madrid and the receive valuable information on a variety information sharing; fostering discussion Extremadura, a western Spanish region of topics. on research needs and challenges pre- bordering Portugal. e line will cross venting additive manufacturing from wide over the River Almonte on a 996 m (3270 e seminars will allow attendees to earn adoption in the concrete construction ft) long viaduct—a concrete arch bridge PDHs/CEUs, an increasing requirement community; and developing guidelines to with a main span of 384 m (1260 ft). to retain PE status. Highly recognized evaluate materials and technology for Designed to carry 350 km/h (218 mph) speakers will oƒer face-to-face interac- additive manufacturing. rail tra©c, the viaduct had to meet rig- tion, and free resources and referencing orous dynamic, serviceability, and safety tools will be distributed for use both ACI will also host a webinar through ACI criteria; and it required complex, staged during and after the seminar. University on advancing the art of 3-D calculations based on nonlinear material printing in concrete construction on and nonlinear geometry behaviors. Nev- e rst seminar, “ACI 562: Assessment, November 13, 2018. Details at ACIUni- ertheless, it is aerodynamic and slender, Repair, and Rehabilitation of Existing versity.com. Learn more about ACI largely due to key design features, Concrete Structures,” was held October resources on 3-D printing at www.con- including a four-legged arch con gura- 30, 2018. e one-day seminar helped crete.org. tion; 80 MPa (11,603 psi) high-perfor- attendees learn how to use the ACI 562 ACI ANNOUNCES WINNERS OF mance concrete; an efficient erection code; learn about a design-basis code; and ANNUAL EXCELLENCE IN method, with temporary towers and stays; understand the diƒerent load combina- CONCRETE CONSTRUCTION and an innovative monitoring system. tions and reduction factors in ACI 562. AWARDS e viaduct’s 384 m (1260 ft) main span Upcoming public seminar topics include: Viaduct Over River Almonte in Garrovillas makes it the largest railway bridge in Concrete Slabs-on-Ground; Trouble- de Alconétar, Cáceres, Extremadura, Spain, Spain and the world’s largest concrete shooting Concrete Construction; and Awarded Highest Honor arch bridge for high-speed rail service. Its design combines structural e©ciency, out- Troubleshooting Concrete Forming and e American Concrete Institute (ACI) of-plane stability, improved response Shoring. e seminars will be held at ACI announced the winners of the 2018 against cross wind eƒects, and aesthetics. Headquarters, in Farmington Hills, MI, Excellence in Concrete Construction The design is also environmentally USA. Learn more about ACI public Awards, who were honored during the friendly, as the bridge comprises durable seminars at concrete.org/education/pub- Institute’s Concrete Convention & Expo- materials, has been designed for expedient licseminars. sition, October 15, 2018, in Las Vegas, maintenance, and will include a bespoke NV, USA. ACI FORMS COMMITTEE TO barrier that will force birds to soar upward ADDRESS 3-D PRINTING and above the overhead mast line. e e highest honor was presented to Via- bridge arch comprises high-performance, The American Concrete Institute duct Over River Almonte in Garrovillas self-consolidating concrete. e complex announces the formation of a new com- de Alconétar, Cáceres, Extremadura, mittee whose mission is to develop and report information on three-dimensional printing (3-D) printing and additive manufacturing with inorganic cementi- tious materials.

Chaired by Scott Jones, ACI Committee 564, 3-D Printing with Cementitious Materials, aims to develop publications relating to additive manufacturing with cement-based materials. Publications would focus on impact and challenges, and another on construction applications.

58 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG SCS Structural Column Strengthening

A Value Engineered By Azon Structurally Enhanced FRP Jacket System

REPAIR STRENGTHEN PROTECT “Virtually All In One” www.WarstoneInnovations.com

Azo-Grout™ by Azon, is a diverse family of polyurethane-based waterstop products used for concrete crack repair, stopping water infiltration and soil stabilization

call 1-800-788-5942 azogrout.com

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 59 ASSOCIATIONNEWS erection procedure required the develop- Mid-Rise Buildings Students: José Miguel Yataco Huamán, ment of singular construction devices. e 1st Place: 1200 Intrepid Avenue in Phila- Ronald Bryan Valderrama Castro, Junior bridge was constructed using a ground- delphia, Pennsylvania, USA Juan Carlos Ricaldi Estrella, Jhonnathan breaking instrumentation and monitoring Franck Lazo Carhuaz, José Luis Ramos system that provides information Repair & Restoration Delgado, Eduardo Raul Alarcon Bastidas, regarding the behavior of the structure 1st Place: Provo City Center Temple in Jean Pierre Gomez Perez, Angel Fermín during construction and service. Provo, Utah, USA. Román Jiménez Advisor: Carlos Alberto Villegas Mar- e ACI Excellence in Concrete Con- e winning project details can be found tínez struction Awards were created to honor at ACIExcellence.org. Entries for the the visions of the most creative projects 2019 Excellence in Concrete Construc- Winners of the Concrete Projects Com- in the concrete industry, while providing tion Awards are being accepted now petition were also announced at the ACI a platform to recognize concrete innova- through April 2, 2019. Visit ACIExcel- Convention. tion, technology, and excellence across the lence.org for more information. globe. To be eligible for participation in Concrete Projects Competition the Excellence Awards, projects needed AMERICAN CONCRETE INSTITUTE 1st Place: e E¦ect of Rock and to be winners at a local ACI Chapter level ANNOUNCES WINNERS OF Curing on Some Properties of Ferroce- and submitted by that Chapter or chosen PERVIOUS CONCRETE CYLINDER ment Mortar by one of ACI’s International Partners. STUDENT COMPETITION Authors: Aseel Sami Najaf and Safa Jasim The American Concrete Institute Khudhair, University of Technology, Iraq An independent panel of esteemed announces the winners of its 2018 Per- Faculty Advisor: Asst. Lecturer, Ziyad industry professionals judged projects and vious Concrete Cylinder Student Com- Majeed Abed selected winners based on architectural petition. and engineering merit, creativity, innova- ACI is currently accepting applications tive construction techniques or solutions, Teams were challenged to apply sustain- for the Concrete Construction Competi- innovative use of materials, ingenuity, ability concepts and to use their knowl- tion and James Instrument NDT Com- sustainability, resilience, and functionality. edge of concrete mixture design by petition. e Eco Concrete Competition producing pervious concrete that bal- and Mortar Workability Competition will Additional winning projects were selected anced permeability and splitting tensile be held at the next ACI Convention in from among several possible categories, strength. Teams were additionally chal- Québec City, Québec, Canada, March and included: lenged to develop a mixture design that 24-28, 2019. demonstrated cementitious efficiency; Decorative Concrete that is, maintaining the overall perfor- For more information on ACI’s Student 1st Place: Roo‚ng of the Montpellier- mance of the mixture with the lowest Competitions, please visit concrete.org South of France TGV Station in Mont- amount of cementitious material. pellier, Herault, France. Cylinder Performance Category High-Rise Buildings 1st Place: University of Sherbrooke 1st Place: Reston Station OB1 Tower in (Canada) INTERESTED IN SEEING YOUR Reston, Virginia, USA. Students: Cedric Gauthier, Philippe NEWS IN THIS COLUMN? Dubois, Anthony Côté, Sebastien Infrastructure Cloutier, Raphael Gosselin, Antoine Email your 150-200 word association news 1st Place: Viaduct Over River Almonte in Lamontagne-Dalphond to [email protected]. Content for the January/ Garrovillas de Alconétar, Cáceres, Advisor: Ammar Yahia February 2019 issue is due by December 1, Extremadura, Spain. 2018, and content for the March/April Cementitious Eciency Category 2019 issue is due by February 1, 2019. ICRI Low-Rise Buildings 1st Place: Universidad Nacional de Ingeni- reserves the right to edit association news 1st Place: University of Iowa Visual Arts ería (Peru) submissions. Building, in Iowa City, Iowa, USA.

www.icri.org

60 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG in WOMEN ICRI “ We empower one another by supporting and helping one another. ” address barriers that may be controversial regarding growth and participation in policy making and industrial leadership ADVANCE ADVANCE KNOWLEDGE

network

Recognize the challenges and successes of women who share a place in the concrete repair industry.

ICRI is pleased to offer this dynamic forum for its female constituents and members. If you are interested in participating in this forum, contact: • Katherine Blatz, [email protected] • Monica Rourke, [email protected] • Gigi Sutton, [email protected] PEOPLEONTHEMOVE

KING CONSTRUCTION PRODUCTS Groom previously worked at CTL for will accelerate the advancement of the GROUP APPOINTS TECHNICAL 21 years. He started as a sta™ engineer concrete industry globally. SALES ENGINEER (EIT) and rose quickly to become Vice Presi- e King Construc- dent and Principal Engineer of Mhanna will assist in establishing and tion Products group CTL| ompson Materials Engineers, nurturing regional strategic relationships is pleased to announce Inc. He left in 2007 to gain additional with members, chapters, companies, the appointment of international experience, after managing governmental bodies, educational insti- Jackson Rand to the the —rm’s infrastructure projects for the tutions, partners, and other construction position of Technical Department of Defense in Diego Garcia industry organizations. Mhanna will also Sales Engineer —a tiny island in the Indian Ocean build upon recent partnership agree- JACKSON RAND (EIT). Jackson will be where bombers headed for Iraq and ments and increase ACI activity in the will be responsible for Afghanistan refueled—and on the Mar- region. the promotion and technical support of shall Islands. For the past four years, the Construction Products line, pri- Groom has worked on the island of Mhanna will be based at the ACI marily as it applies to the engineering Guam for GHD, Inc., managing gov- Middle East Regional Office, to be community. He will also be retaining the ernment-funded infrastructure projects. located in the Dubai World Trade responsibility for technical support and Center, Dubai, United Arab Emirates. promotion of the Ultra-High Perfor- He returns to CTL as Senior Principal mance Concrete (UHPC) product line Engineer with speci—c oversight of the An ACI member and civil engineer, for . cement/¤y ash/concrete materials engi- Mhanna has wide-ranging experience in neering and testing laboratory. concrete and construction materials Jackson started his career as a Summer testing, analysis, and applications. Student with the King Paving & Con- A recognized expert in concrete and Mhanna holds multiple ACI certi—ca- struction group in 2012. After com- concrete aggregates, Groom helped tions and has served as an ACI Certi—ca- pleting is Bachelor’s Degree in Civil create norms for national testing and tion examiner. Engineering at Queen’s University in speci—cation of concrete and concrete May 2016, Jackson joined King’s Engi- aggregates for the American Society of Mhanna received his Bachelor’s degree neering Services Team where he acquired Testing and Materials (ASTM). He is a in civil engineering from University of a strong knowledge of many product recognized examiner for the ACI Inter- Jordan, and an MS in Emerging Tech- technologies. During his time with national Certification program and nologies for Construction from Univer- Engineering Services, he also contrib- former president of the American Con- sity of Naples Federico II, Italy. He also uted to the development of several new crete Institute, Rocky Mountain Chapter. obtained an Infrastructure Renewal products and gained significant field For the past 13 years, he has been a Engineering Certi—cate from University skills, working with customers on proj- speaker at the World of Concrete and is of Missouri-Rolla, MO, USA. ects around the GTA. a published author of journal articles in Concrete Construction, Masonry Construc- For more information on ACI’s activities MATERIALS EXPERT RETURNS TO tion, and the American Society of Civil in the Middle East region visit concrete. CTL THOMPSON Engineers’ Journal of Materials in Civil org/MiddleEast. Former Principal Engineer Jeffrey Engineering. Groom returns to CTL as Senior Prin- cipal Engineer after gaining invaluable ACI ANNOUNCES NEW MIDDLE international experience. EAST REGIONAL DIRECTOR The American Concrete Institute is Denver-based geotechnical engineering pleased to announce Ahmad Mhanna as INTERESTED IN SEEING YOUR —rm CTL| ompson is welcoming back the Institute’s Middle East Regional PEOPLE IN THIS COLUMN? one of its former principals and one of Director. Colorado’s foremost materials experts, Email your 150-200 word People on the Je™rey Groom. CTL, which operates one In this new sta™ position, Mhanna will Move announcements to [email protected]. of the most sophisticated testing labora- focus on ACI’s comprehensive plan to Content for the January/February 2019 tories in the country, recruited Groom increase knowledge-sharing throughout issue is due by December 1, 2018 and to provide his experience and expertise the Middle East. e great innovation content for the January/February 2019 to its clients, mentor the firm’s new occurring now in the region combined issue is due by December 1, 2018. ICRI generation of leaders and train future with ACI’s 100-plus years of consensus- reserves the right to edit the length of recruits to work in this highly technical based knowledge is a partnership that People on the Move submissions. environment.

62 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG AASHTO ACCREDITED • USACE VALIDATED

Providing quality assurance for your projects through Petrography, Physical Testing and Chemistry services (800) 972-6364 WWW.AMENGTEST.COM

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 63 CHAPTERMEETINGS&EVENTS

BALTIMORE-WASHINGTON GREATER CINCINNATI NEW ENGLAND November 1, 2018 November 19, 2018 December 11, 2018 OUTSTANDING REPAIR PROJECT 2018 CHAPTER MEETING CHAPTER HOLIDAY SOCIAL AWARDS BANQUET Topic: Union Terminal Overview Granite Links Golf Club Maggiano’s Little Italy Cincinnati, OH Quincy, MA McLean, VA GULF SOUTH January 8, 2019 December 6, 2018 November 29, 2018 JOINT CSI EVENT 2018 FALL TECHNICAL SEMINAR JOINT CHAPTER MEETING Topic: Avoiding Litigation on Construction CP&R’s Headquarters Oce Meeting with SEAofAL Projects Baltimore, MD AGC Oces Granite Links Birmingham, AL Quincy, MA CHICAGO November 20, 2018 METRO NEW YORK NORTH TEXAS CHAPTER DINNER MEETING December 6, 2018 November 15, 2018 Topic: FRP Strengthening Systems CHAPTER HOLIDAY PARTY MEMBERSHIP MEETING Westwood Tavern District Social Topic: Concrete Petrography Schaumburg, IL New York, NY Presenter: Gerard Moulzolf, American Engineering Testing November 30, 2018 MID-SOUTH Pappasito’s Cantina HOLIDAY SOCIAL November 7, 2018 Dallas, TX Location: TBA FALL CHAPTER MEETING Topic: Concrete Repair Presentation PACIFIC NORTHWEST DELAWARE VALLEY Middle Tennessee State University November 7, 2018 November 13, 2018 Murfreesboro, TN CHAPTER MEETING AND SOCIAL HOUR NOVEMBER DINNER MEETING McMenamins Six Arms Philadelphia Marriott West MICHIGAN Seattle, WA Conshohocken, PA November 8, 2018 ANNUAL MEETING FOR 2018 QUEBEC PROVINCE FLORIDA FIRST COAST Topic: Concrete Surface Preparation November 1, 2018 December 13, 2018 Speaker: Rampart Hydro Services ANNUAL DINNER CONFERENCE CHRISTMAS DINNER Motor City Casino Sheraton Laval Coopers Hawk Detroit, MI Laval, Quebec Jacksonville, FL MINNESOTA SOUTH CENTRAL TEXAS FLORIDA WEST COAST January 10, 2019 November 15, 2018 November 2, 2018 MEGA DEMO DAY CHAPTER MEMBERSHIP LUNCHEON SPORTING CLAYS TOURNAMENT Topic: Moisture in Concrete NXNW Restaurant & Brewery Tampa Bay Sporting Clays Cement Masons Local 633 Austin, TX Land O Lakes, FL Minneapolis, MN

“As someone relatively new to the concrete restoration industry, one of the very rst things I did after starting my new job was join my local ICRI chapter. It immediately gave me access to best-in-class training documents (especially the ICRI Guidelines). ICRI also offered informational videos and a peer network that accelerated my knowledge and con dence out of the gate. I highly recommend membership to anyone new thinking about entering the eld.” Jeff Konkle, MAK Construction Products Group

FOR UP-TO-DATE CHAPTER ACTIVITIES AND FULL DETAILS ON THOSE LISTED HERE, VISIT WWW.ICRI.ORG.

64 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG ICRI Young Professionals Mentorship Program

Are you a potential mentor? Share your ideas on how your experience can benefit young professionals

Are you a potential mentee? Share what you would like to learn from a mentor and where you feel you could benefit

ICRI is developing a Mentorship Program geared toward young professionals within ICRI to help build leadership skills and guide career growth. The program will involve activities and interactions at the National and Local Chapter level. Get involved and help drive it forward.

Contact Elena Kessi, elena@aquafin.net, to get involved.

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 65 CHAPTERNEWS

NORTH TEXAS HOLDS 17TH ANNUAL GOLF CLASSIC On a 90-degree, sunny, breezy afternoon, the North Texas Chapter held its 17th Annual Jesse Points Memorial Golf Classic at Waterchase Golf Club in east Fort Worth. ‚e tournament is named for NTX Charter Member Jesse Points, who chaired the rst 15 golf Third Place BASF Team: Don Moore, Shane tournaments for the chapter before his Bryant, Patrick Jorski, and Eli Babb passing in 2015. ‚e hot Texas weather North Texas Board Members Patrick Jorski, was equaled by some sizzling scores. Pete Haveron and Stephen Grelle welcome the ‚ree team scores of 56 were not good golfers prior to announcing the winners enough to best a 20-under par score of 52 posted by the Euclid Chemical team of James and Jon Robbs, Nick Perry and David Rupley. Second place went to the Western Specialty Contractor team of Bob Scheelar, Josh Rinn, Teddy Wil- liams, and Chris Blair. BASF’s “A” team took home third-place honors, thanks to Patrick Jorski, Don Moore, Eli Babb and Shane Bryant. BASF’s “B” Team (Eddie “Most Honest” BASF Team: Bobby Sansonetti, Eddie DeHaro, Bill Daily and Tom Hart (not DeHaro, Tom Hart, Bobby Sansonetti, First Place Euclid Chemical Team: Jon Robbs, pictured) and Bill Daily), however, was not to be James Robbs, David Rupley, Nick Price denied, coming in with the “Most Honest” score of 77, taking home the “Dead-Ass Last” trophy for the second year in a row.

Other winners included Chris Blair and Shane Gri›n for their monster drives, and Bob Scheeler (2 holes), Brian Whited and Jason Ball for their closest- to-the-pin shots. Proceeds from the tournament fund the chapter’s student scholarship program and the chapter’s annual scholarship donation to the Uni- ICRI Executive Committee members Elena Kessi (Secretary) and Mark LeMay (VP) join ICRI versity of Texas Arlington’s Civil Engi- Second Place Western Specialty Contractor Board Members Gerard Moulzolf and Pete neering Department. Team: Chris Blair, Josh Rinn, Bob Scheelar and Haveron at the NTX Golf Classic Teddy Williams (not pictured)

ICRI has 39 chapters, including 2 student chapters, in metropolitan areas around the world. Chapters hold technical presentations, educational meet- ings, symposia, and local conventions on repair-related topics.

Chapters also provide an outstanding opportunity to meet and build relation- ships with repair specialists in your area. In addition to the technical meetings, chapters also host golf outings, social evenings, dinner cruises, and other networking events.

66 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG CHAPTERNEWS

SOUTHERN CALIFORNIA HOSTS TECHNICAL DINNER TORONTO HOSTS SEMINAR ON STADIUMS e Southern California Chapter of ICRI held a technical On Tuesday, October 9, 2018, the Toronto Chapter hosted a dinner seminar at Steven’s Steakhouse in Commerce, CA, technical seminar on stadiums and public structures. At Steam on September 27, 2018. e theme of the event was Epoxy Whistle Brewing, guest speaker Gabriel A. Jimenez, PhD, PE, and Polyurethane Injections, When and Where to Specify from Walter P. Moore took the stage to help attendees under- and Use Each. ere were a wide variety of attendees from stand and learn the best practices and discover key case studies Architects, Engineers, Contractors, to Manufacturers and in the rehabilitation and restoration of iconic stadiums and Distributors. All attendees had a great time as well as learned structures, such as the Rogers Centre. His main question: “Do much about this aspect of concrete repair that has much you really know what keeps these structures in good condition, confusion. e evening began with the chapter honoring two considering the modern requirements we all expect?” of the founding members, Stephan Claus and Kevin omson, for their years of service.

Louis Kahn, PE, of Walter P. Moore kicked o‰ the technical portion of the event. Mr. Kahn gave an engineer’s approach to the di‰erences between epoxy and polyurethane injections as well as the reasons to use one over the other as well as combinations of both. He then gave two separate pro‹les on projects. One in which epoxy injection was used and why that system was chosen. He followed that with a synopsis of a project utilizing polyurethane injections and the reasons why polyurethane was chosen. Standing room only for the Toronto Chapter seminar on stadiums and public structures e night’s second speaker was Amir Bonakdar, Ph.D., PE. Amir gave an in-depth and detailed presentation on the GULF SOUTH HOSTS HISTORIC STRUCTURE PROGRAM features and bene‹ts of various epoxy injection materials. He On September 13, 2018, the ICRI Gulf South Chapter had 43 went into detail on some of the drawbacks to using epoxy people attend the End-of-Summer meeting titled “Restoration injections as well as notable situations where it is not the of Historic Birmingham Structures”. Attendees enjoyed dis- preferred method of repair. e ‹nal speaker of the night was cussing various means, methods, and materials for executing Jim Spiegel of Alchemy Spectec. Jim gave a wonderful pre- lasting repairs to terra cotta, brick veneer, and structural concrete. sentation on polyurethane injection systems as well as Recent repair projects on the 95-year-old Pizitz building and touching on acrylic/acrylate systems and micro‹ne cements. the historic Rickwood Field in Birmingham, AL, were reviewed Jim explained the many di‰erences in the di‰erent types of in this half-day meeting. It was a rare treat to have speakers polyurethane injection materials. with over 200 years’ experience in brick, terra cotta, and concrete repair share their hard-earned knowledge of the industry. e e Southern California Chapter of the International Con- meeting concluded with an engaging forum discussion of advan- crete Repair Institute would like to thank their generous tages/disadvantages of di‰erent means and methods than those sponsors Smalley & Co. and Aqua‹n, Inc. for their support, presented by the speakers. We would like to thank our many as well as all attendees. We look forward to seeing everyone sponsors: Coastal Construction and Grout Tech, who provided at our next event. lunch and breakfast, HOAR Construction for o‰ering their venue, and of course our table-top sponsors Sika, BASF, and Prosoco. We have an upcoming joint meeting with SEAofAL in Birmingham, AL, on November 29.

The Southern California Chapter had a full house for presentations on Attendees learned about lasting repairs to historic structures epoxy and polyurethane injections at Steven’s Steakhouse

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 67 CHAPTERNEWS

METRO NEW YORK HOSTS ANNUAL GOLF EVENT QUEBEC HOSTS On ursday, September 20, 2018, the Metro New York Chapter of ICRI hosted EVENT AND SOCIAL MIXER another sold out event with the 15th Annual Golf Classic at Cedar Hills Golf & On September 20, 2018, the Quebec Country Club in Livingston, New Jersey. e day started out as usual with registra- Chapter hosted its Fall Chapter Happy tion, driving range and full brunch with Bloody Marys and mimosas before heading Hour at the “LAB Comptoir à Cocktail” out on the course. At registration, attendees received golf balls, cigars and this year, in Montreal. Participants enjoyed the Maui Jim sunglasses. e sun was in and out and the course was a bit waterlogged LAB's various cocktails accompanied by from previous rains, but everything was good. e dinner ra‰es consisted of iPads, appetizers and oysters. In addition, we Apple watches, Yeti coolers, Sonos surround sound systems, large screen HD TVs, would like to congratulate Mr. etc. Our mainstays were still there with 1st place, 2nd place and Most Honest (“Rebar Laporte of the Structsult Group who Award”) awards and presentation of the “Concrete Cup”. “Long Drive” and “Closest- won the draw for a pair of tickets for the to-the-Pin” were back with “50/50” and cigar rollers. We were also back this year with annual conference dinner. With more the “Beat the Ladies” challenge on one of the par three holes with a ra‰e for a large than 49 attendees, the event was a great screen HD TV. New this year was our Long Drive Challenge with Mike “the Moose” success! Watson who has made four Long Drive Championship appearances. With a dona- tion, you get to use the Long Drive Champion’s drive as your drive and a chance to Before that, on August 22, 2018, the win a trip to Pebble Beach. No one won the $25,000 or other hole-in-ones this year, Quebec Chapter organized a networking but they came close. All had a good day. It would not have been possible without the event in at the baseball help and support of all the sponsors. stadium of the Quebec Capitales, CanAm Stadium. e rain stopped just at the right moment for the game and the attendees enjoyed beer and hot dogs in the Terrace Section before the game. e Capitales scored the winning run after a triple that was hit by James McCowen in the 8th inning. Final score was 4-3 in favor of the local team against the visiting .

On the “Beat the Ladies,” volunteers Long Drive Pro Mike “Moose” Lisa and Gina Antonucci are up for Watson on the Long Drive Challenge the challenge hole Happy Hour attendees enjoyed a night at LAB Comptoir à Cocktail in Montreal

Back for a repeat were the group from Skyline Warming up for the “Beat the Ladies” Challenge Restoration, including Stephan Andreatos, Rygo Foss, Doug Fenniman, and Jasen Gerrity taking home the coveted Concrete Cup again

The crowd at cocktail hour Baseball fans enjoyed the Quebec Capitales Out on the terrace for a cocktail and cigar winning over the Ottawa Champions

68 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG CHAPTERNEWS

GREAT PLAINS another is as genuine and My name is Jon Connealy, and I am the grateful as any generation prior. current President of the ICRI Great If we want our industry and Plains Chapter, looking forward to organization to continue to seeing you in Omaha in November. I œourish we will eventually need wanted you to know about a situation we to embrace these youngsters, recently had here in the Great Plains ˆnd a way to relate and take Chapter. You can hardly go a day without them under our wings. ˜at hearing or reading something about “the way they can beneˆt from our Millennials” these days, and generally it experience as they take us into is something that talks about how they the next generation. have a sense of entitlement, that they feel the world owes them more than they are getting. However, as one of the world’s oldest Millennials (born on January 1 of the year the generation began) I have always had a bit of a chip on my shoulder about the negative view the world has on my slightly younger brothers and sisters in the Millennial Camp. As much as I’d love to spend time discussing all of the social, economic, and technological reasons for the di erences in the gen- erations—this isn’t the time or place. I will, however, o er the following which serves as a validation of the good work we do at the Great Plains Chapter of ICRI and also the conˆrmation that the youth today are just ˆne. We just have to make an e ort to highlight the good ones as much as we do the crummy ones.

Every year the Great Plains Chapter issues $4,500 in scholarships to college aged students enrolled in local institu- tions. In the past, we have targeted stu- dents in engineering programs at four-year colleges, but in future years we will also be o ering these scholarships at trade schools that o er courses in the concrete trades. Carissa Moyna was one of the recipients of the 2018 Scholar- ships. She was kind enough to send our chapter a hand-written thank you note, shown here. We have invited Carissa to attend the Fall Convention in Omaha, as well as the other scholarship recipi- ents, and if they are able to attend we plan to recognize them at the ˜ursday luncheon.

So there you have it! ˜e next time you hear someone sco›ng about the lazy, entitled Millennials—please inform that person that a Millennial is the President of the Great Plains Chapter of ICRI and

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 69 CHAPTERNEWS

NORTHERN CALIFORNIA HOSTS SYMPOSIUM NTX SCHOOLED ON CORROSION MITIGATION e ICRI Northern California Chapter hosted a symposium e North Texas Chapter welcomed Jason Chodachek from on September 28, 2018, on “Repairs to Concrete Structures Vector Corrosion Technologies to the September meeting at after Earthquake & Fire.” is education, networking and Pappasito’s Mexican Cantina in Dallas. While attendees social opportunity was hosted at the Cement Masons Training feasted on beef and chicken fajitas, Jason provided a wealth of Center in Pleasanton, CA. Speakers included Tarek Alkhrdaji, information on how to determine the root causes of corrosion PhD, PE, who gave a presentation titled “Assessment & Repair problems in reinforced concrete, and the non-destructive of Fire Damaged Concrete Structures;” Kent Sasaki, S.E., on testing techniques that are available to for corrosion. “Assessment and Repair of Fire Damaged Post Tensioned Jason also described several corrosion protection systems for Parking Garage;” and Ashok Kakade, PE, FASCE, FICRI, reinforced concrete structures, including discreet and distrib- who gave a presentation on “Can the Concrete Structures be uted anodes, jacket galvanic protection, and induced cur- Saved after Devastating 2017 Sonoma Fire?” rent corrosion protection (ICCP).

Also included in the presentations were Ron Hamburger, SE, e second part of the presentation focused on the investiga- Senior Principal who gave his presentation on “A History of tion and repair of post-tensioning systems. Several case studies Building Code Development in California;” Aniket Borwankar, were highlighted that showed evaluation methods and poten- who presented on “Seismic Repair Using Fiber Reinforced tial solutions including cable drying and grease injection. Cementitious Matrix (FRCM);” and James Mendygral, PE, who talked about “Hybrid Coatings, Concrete Restoration, and Seismic Surprises: A California Case Study.”

Attendees enjoy a fajita feast and valuable networking time at The Northern California Chapter Symposium included Pappasito’s Mexican Cantina a number of technical presentations

Jason Chodachek reviews the outline for his presentation

Symposium attendees also had many opportunities to network and visit with exhibitors 2019 CHAPTER NEWS DEADLINES JANUARY/FEBRUARY 2019 November 10, 2018 MARCH/APRIL 2019 January 10, 2019 Send your Chapter News by the deadlines to Dale Regnier, Chapter Relations Director, at [email protected] Then they were treated to more networking and great food

70 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG CHAPTERNEWS CHAPTERS COMMITTEE CHAIR’S LETTER

We’re in the final • guideline/publication discounts If you’re looking to become a quali¡ed quarter of the year! • bulk CRB / publications concrete surface repair technician, the For all of us, this is • additional resource for all chapters: Concrete Surface Repair Technician the last push for • template for a chapter program (CSRT) Certi¡cation Program, the Con- 2018. It is also time tracking sheet—date, topic, speaker, crete Slab Moisture Testing Technician to start thinking company, attendance (CSMTT) Certi¡cation Program, and about the holidays • template for a chapter calendar ACI 562-16 Repair Code and Guide and all the good Videos are training programs o•ered by MICHELLE NOBEL Chapters Chair things that go along Everyone should be taking advantage of ICRI. To ¡nd out more about these pro- with them. these resources. It’s something that’s grams, please visit icri.org and go to the provided to us all by ICRI to help the Education tab at the top of the page or We had our ICRI Chapter Rountable in chapters learn and grow. contact the ICRI O©ce at (651) 366- Philly, September 17-18. It was a very 6095. productive meeting with Baltimore- The ICRI mission statement is, “The Washington, Connecticut, Delaware mission of the International Concrete –e ICRI 2019 Kick-O• Party is at the Valley, Metro New York, New England, Repair Institute is to be a leading resource Chateau Paris in Las Vegas on January Pittsburgh, Quebec and Toronto all in for education and information to improve 21, 2019. World of Concrete is at the Las attendance along with members of the the quality of repair, restoration, and Vegas Convention Center January 22-25, Executive Committee, Ralph Jones, protection of concrete and other struc- 2019 and the International Surface Event President; Chris Lippmann, President tures in accordance with consensus cri- is in Las Vegas at Mandalay Bay, January Elect; Elena Kessi, Secretary; Brian teria.” 22-25, 2019. –ere’s lots to do in Las McCabe, Region 3 Director; Jason Vegas at the end of January, so make plans Coleman, Member at Large; and ICRI –at said, we all join and support this to attend. sta• Mike Levin, Executive Director; amazing organization to make it better Dale Regnier, Chapter Director; and me. and attractive for all of us. I leave every Please remember to always be careful, Chapter Roundtable with a new sense of travel safe, and I’ll see everyone in We shared a lot of great ideas and excitement from the ideas that I’ve Phoenix for the next ICRI Chapter thoughts on how to move the chapters learned at every event. So make sure you Roundtable! forward and gain and retain new mem- plan to attend the ICRI Chapter Round- bers. Kudos to the Toronto Chapter! I was tables in your area—I promise you won’t Sincerely, impressed at the turnout at the Toronto regret it! events with it being such a new chapter. Michelle Nobel –ey’ve managed to create a buzz in their Remember to turn in your chapter events 2018 Chapters Committee Chair area that makes people want to come, so they can be listed on the ICRI website, learn and network at their higher-end and remember, events. I wish I was a little closer so I wherever you may could attend one! Metro New York has be traveling, check proven that its annual golf tournament is the ICRI website to second to none, and Baltimore-Wash- see if there’s an ington is the steady ship that we can all event in that area or learn from. reach out to the local chapter to see –ank you to all who attended; we all if they’re having an learn from each other. We also learned event while you’re in how ICRI supports every chapter. town. It’s always great to see how ICRI supports chapters with: other chapters run • chapter web pages their meetings. Like • monthly chapter updates I’ve said before, it’s • dues collection/monthly rebate like global net- check/deposit working that takes • membership record keeping networking to a • coverage in Concrete Repair Bulletin whole new level! Ralph Jones discussing an overview of ICRI to the Chapter • sta• support—any question, any time Roundtable held in Philadelphia, Sept. 17-18

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 71 PRODUCTINNOVATION

SIMPSON STRONG-TIE For more information about the BTH INTRODUCES INDUSTRY-FIRST high-performance brick tie, including BRICK TIE CAPABLE OF COST- spacing tables and design schematics, EFFECTIVELY CONNECTING visit strongtie.com/bth. VENEERS TO LIGHT-FRAME CONSTRUCTION ACROSS THREE- SIMPSON STRONG-TIE ANSWERS INCH AIRSPACES CONTRACTOR DEMAND FOR Simpson Strong-Tie, the leader in engi- COMPREHENSIVE LINE OF neered structural connectors and building OUTDOOR ACCENTS® solutions, introduces the new, high- STRUCTURAL CONNECTORS AND performance BTH brick tie, a rst-of-its FASTENERS A mainstay of Simpson Strong-Tie kind, cost-eective product capable of Simpson Strong-Tie, the leader in engi- Outdoor Accents advertisements and connecting brick and stone veneers to neered structural connectors and building brochures, the 10x10 pergola photograph light-frame construction across spans up solutions, has expanded its Outdoor has generated a steady stream of cus- to three inches, oering contractors and Accents decorative hardware line to oer tomer requests for building plans, which homebuilders an innovative solution to deck contractors, homebuilders and DIY are now available for free download for meet ever-increasing spacing require- experts a full collection of essential con- 10x10 and 25x17 pergolas. ments. nectors and fasteners that bring both design elegance and structural strength To learn more, visit strongtie.com/out- to custom outdoor living structures. dooraccents.

To celebrate the complete line of load- CORTEC® RELEASES BIOBASED rated hardware, Simpson Strong-Tie ALTERNATIVE TO sponsored the rst Outdoor Accents BANNED PAINT STRIPPERS “Give It Your Best Shot” photo contest As more retailers pull toxic paint strip- through Oct. 22. Anyone who has built pers containing methylene chloride and an outdoor living structure using Out- N-methylpyrrolidone (NMP) o the door Accents decorative hardware was shelf, Cortec® stands ready to offer invited to send in photos for a chance to greener biobased alternatives that do not Masonry veneer, often consisting of full- win an outdoor TV, YETI cooler and contain these toxic substances targeted dimensional brick and stone, is used Simpson Strong-Tie-branded items. by the voluntary ban. widely for exterior cladding, facades, foundation facings and chimneys. Introduced in 2016, the Outdoor EcoLine® 4320 and 4330 are heavy-duty, Accents collection accommodates green chemistry paint strippers designed Fabricated from 22-gauge galvanized nominal and rough lumber sizes to pro- to remove coatings, inks, and resins from steel, the BTH brick tie is eld-adjust- vide designers and installers with max- metals, concrete, and wood surfaces. ˜ey able in two places and can be installed imum flexibility when planning and do not contain any EPA-listed cancer with either side facing up, providing building custom outdoor structures. ˜e causing compounds or any California strength and versatility across varied patent-pending hex-head washer, when Prop 65 components that cause cancer, jobsite conditions and oering labor- used with the structural screw, oers the birth defects, or other reproductive harm. stressed contractors a fast and simple look of a bolted connection with sig- ˜e products are formulated with renew- solution. Additional BTH brick tie nicantly faster and easier installation able materials and recycled solvent. ˜ey features and benets include: than through-bolting. contain 50% USDA certied biobased content and are qualied products under • Embossments for added strength 2018 additions to the Outdoor Accents the mandatory federal purchasing initia- when connecting wood framing and line include joist hangers, gable plates, tive of the USDA BioPreferred® Pro- veneer across wider airspaces decorative side plates and new sizes of gram (for more information, go to http:// • Tie ends embed in the mortar a the popular APDJT joist tie, the www.biopreferred.gov). minimum of 1 ½" and connect to APDTS3 Texas star and the APDMW56 the framing with a single 0.131" x decorative washer. All Outdoor Accents EcoLine® 4320 and 4330 have a mild 2½" nail connectors and fasteners — including odor, are made with biodegradable mate- • Dual eld-bendable zones allow for screws, post bases, strap ties and angles rials, and are VOC compliant to the easy adjustment to airspaces within — are made from exterior-rated galva- California Regulation for Reducing the 2"–3" range. nized steel with a black powder-coat Emission from Consumer Products. nish for corrosion protection. They are non-flammable and do not

72 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG PRODUCTINNOVATION contain methylene chloride, NMP To learn more about EcoLine® 4320 and • Flanges that can be installed facing (n-methylpyrrolidone), chlorinated sol- 4330, please visit: inward or outward vents, toluene, or acetone. Unlike https://www.cortecvci.com/whats_new/ • Adaptability — installation on methylene chloride-based products announcements/EcoLine_4320-4330. either the outside or the inside of which dry quickly upon application, the pdf the wall is acceptable according to relatively low volatility of EcoLine® all LVL manufacturers’ installation 4320 and 4330 allows the products to SIMPSON STRONG-TIE instructions stay on the surface to soften, penetrate, INTRODUCES FIRST HURRICANE and remove the coating. TIE SPECIFICALLY DESIGNED FOR For more information about the H1.81Z ENGINEERED WOOD AND HEAVY hurricane tie, including spacing tables EcoLine® 4320 and 4330 paint strippers SNOW LOADS and design schematics, visit our product are e‚ective on a wide variety of paints Simpson Strong-Tie, the leader in engi- page. and can typically strip alkyds, acrylics, neered structural connectors and building and urethanes in 15 to 30 minutes solutions, has introduced the new SIMPSON STRONG-TIE depending on the number of layers and H1.81Z hurricane tie, designed to pro- INTRODUCES THE YIELD-LINK® the age of the coating. e products can vide stronger connections between heavy CONNECTION TO REDUCE easily remove permanent marker. Eco- engineered wood rafters and wall top STRUCTURAL STEEL FRAMING Line® 4320 and 4330 also contain a plates. Developed and tested to provide COSTS blend of corrosion inhibitor additives to lateral resistance during seismic events, Simpson Strong-Tie, the leader in engi- prevent flash rust and tarnishing the H1.81Z is also ideal for roofs with neered structural connectors and building throughout the stripping process. is is heavy snow loads or connections where solutions, has introduced a new, preci- particularly important when preparing a there are higher load demands on the sion-made Yield-Link connection to surface for recoating. structure. simplify and streamline structural steel connections made in the œeld, without EcoLine® 4320 and 4330 come in two The H1.81Z provides homebuilders, compromising structural strength. e ready-to-use versions and can be applied rooœng contractors and remodelers a Yield-Link connection requires no œeld via dipping, brushing, or rolling. Eco- cost-e‚ective solution for transferring welding, resulting in reduced onsite labor Line® 4320 is a liquid stripping product loads from heavier laminated veneer costs, licensing fees and construction with high wetting properties for even lumber (LVL) roof systems and roofs time for contractors who are already spreading across coated surfaces. It can subjected to higher snow loads. facing a massive shortage of skilled œeld be used in dip tanks and on horizontal welders. According to the American surfaces. EcoLine® 4330 is a gelled ver- Welding Society, there will be 290,000 sion that improves surface cling and unœlled welding positions in the US by dwell time for applications on large or 2020 as construction demand continues complicated objects or vertical and over- to outpace the skilled labor market. head surfaces. By eliminating œeld welding, the Yield- Cortec’s new biobased paint strippers Link connection also removes the need can be used to: e code-listed 1¾"-wide H1.81Z con- for œeld weld inspections. And because • Remove paint from metal surfaces nector also installs with half the number beams can be designed without supple- such as tanks, pipes, equipment, and of nails that would be needed for two mental lateral bracing, fewer fabricated vehicles single-sided twist straps, and it features steel elements and œeld connections are • Remove paint from cementitious a ZMAX® zinc œnish to increase resis- required. With a smaller restricted zone, and masonry surfaces such as build- tance to corrosion. Additional features MEP coordination is eased. ings, ‘oors, and stairways of the H1.81Z include the following: • Remove permanent marker ink e Yield-Link is designed to absorb • Wider seat to œt 1¾” LVL rafters forces in a seismic event, and as a bolted As safety concerns drive toxic paint strip- • Ability to connect both side faces of connection, it is easier to replace than pers containing NMP and methylene the joist for better support welded beams and posts, greatly simpli- chloride off the market, Cortec® is • Connector embossments to provide fying repairs following a natural disaster. pleased to present safer and more envi- sti‚ness in crucial areas for improved ronmentally responsible alternatives to performance Software plugins and design support do the job of paint removal. • Fastener holes sized to œt popular services are available to assist Designers, 0.148" x 1½" connector nails fabricators and erectors to incorporate

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 73 PRODUCTINNOVATION the Yield-Link connections into their through reverse air¡ow every 15 seconds. SIMPSON STRONG-TIE designs and shop details. is procedure ensures that the extractor REDESIGNS RCKW KNEEWALL is always working at maximum e¢ciency. CONNECTOR FOR GREATER e Yield-Link is a prequalied connec- CONCRETE AND STEEL tion for steel special moment frames in ANSI/AISC 358-16 and is code listed ANCHORING VERSATILITY in ICC-ES ESR-2802. For more infor- Simpson Strong-Tie, the leader in engi- mation about Simpson Strong-Tie® neered structural connectors and building Yield-Link technology, visit strongtie. solutions, has redesigned its popular com/yieldlink. RCKW rigid kneewall connector for cold-formed steel construction to pro- BOSCH GAS20-17AH WET/DRY vide a versatile, two-anchor option for DUST EXTRACTOR OFFERS contractors using 1/2"- or 3/8"-diameter PROFESSIONAL FUNCTIONALITY concrete anchors, resulting in faster and more e¢cient installation. When higher COMBINED WITH 300 CFM loads are required, the RCKW can be PERFORMANCE combined with the RCKWS stiŸener (sold separately) to provide additional The large capacity Bosch wet/dry With 17-gallon capacity and 300 CFM, capacity for maximizing overturning extractor has a water-level sensor to help this vacuum can handle the big concrete moment resistance. preclude overlling and a discharge hose cutting and surface grinding applications. for easy drainage. e easy-to-transport Fabricated from heavy-gauge, G90 gal- unit has sturdy metal castors designed to The Bosch GAS20-17AH Wet/Dry vanized steel, the RCKW and RCKWS withstand jobsite terrain, a metal frame Dust Extractor is an industrial-grade have three large holes allowing either a with a height-adjustable fold-down push powerhouse with a maximum 300 CFM one-anchor solution at the edge or center handle for easy maneuverability. e unit (cubic feet of air per minute) capacity of a slab or a two-anchor solution for features a dumping mechanism for emp- that filters fine dust, coarse dirt and applications requiring higher capacities tying convenience. liquids. The GAS20-17AH boasts at the center of the slab. e screw holes 17-gallon capacity, and auto filter and anchor holes in the stiŸener line up The Bosch GAS20-17AH Wet/Dry cleaning with HEPA lter to provide a with those in the RCKW clip, making Dust Extractor comes with a HEPA complete package in helping users move fastener and anchor installation a snap. lter, a three-layer heavy-duty lter bag toward OSHA silica dust regulation that helps protect the lter from abrasive compliance. Its auto lter-clean system materials and a 16 Ft. anti-static hose. activates every 15 seconds and the Part of the Bosch PRO+GUARD™ HEPA lter captures 99.97% of particles system, the GAS20-17AH with HEPA at 0.3 microns and larger. lter helps users move toward compli- ance with the OSHA silica dust regula- e dust extractor features a high-per- tion. With its maximum 300 CFM, it is formance 17.5-amp motor to maintain designed to handle concrete cutting and the maximum 300 CFM capacity. is surfacing with large angle grinders. is powerful dust extraction performance for heavy-duty applications, including An optional Y-Connect (sold separately) concrete cutting and surface grinding allows use of two tools at the same time, with larger 7" and 9" grinders and up to such as small (5" or smaller) angle 12” cut-oŸ tools. grinders used in surface grinding or cut- In addition, Simpson Strong-Tie has ting concrete. The Bosch GAS20-17AH Wet/Dry successfully tested the two-anchor solu- Dust Extractor meets the need for tion with 3/8"-diameter anchors, suited To learn more about the Bosch GAS20- heavy-duty dust extraction for concrete for shallower-embedment applications 17AH Wet/Dry Dust Extractor or to cutting and surface grinding applica- such as ¡uted decks. Features of the nd a local dealer, visit www.boschtools. tions. RCKW system include: com. The Bosch GAS20-17AH Wet/Dry • Unique small and large anchor-hole Dust Extractor automatic lter-cleaning patterns permit anchorage to both system self-cleans the HEPA filter concrete and structural steel.

74 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG PRODUCTINNOVATION

• Stiffened anchorage leg flanges and it’s now become an asset rather than lengths of daisy-chained cable and provide greater overturning moment a disposable. triple-tap outlets, installation times can resistance. be drastically reduced, and ¤exibility can • Large anchor holes accommodate Že key to using the various LED Jobsite be increased, with the ability to create 1/2"-diameter Simpson Strong- products together is pre-determined complex lighting patterns throughout Tie® Titen HD® heavy-duty screw lengths of cable with daisy-chains and the jobsite. anchors or Strong-Bolt® 2 wedge triple-tap outlets. Že contractor can anchors. determine the best light for an applica- BLASTCRETE EQUIPMENT’S • Additional smaller-diameter anchor tion, and it can be daisy-chained into REFRACTORY PADDLE MIXER holes enable attachment to struc- complex patterns throughout the jobsite. DELIVERS SPEED AND tural steel with #12 self-drilling RELIABILITY screws. LED Jobsite improvements do not stop Blastcrete Equipment, LLC, a long-time • RCKWS sti„eners can be secured with the suite integration. Lind updated manufacturer of shotcrete and gunite to the RCKW clip with screws, many features on existing LED Jobsite mixers and pumps, o„ers a Refractory optimizing resistance to overturning products to create an improved experi- Paddle Mixer that delivers fast mix times and rotational moments. ence by reducing the footprint, enhancing while working with mixtures that include durability, and providing lower wattage aggregates up to a half-inch (13 milli- For more information about the RCKW to improve energy e‘ciency. meters) thick. Že hydraulic machine system — including fastener pattern mixes as much as 500 pounds (227 options, installation diagrams, and tables Že exciting new product suite includes: kilograms) of refractory castable in 1.5 for allowable moment, rotational sti„- to 2 minutes and performs well in form- ness and allowable shear and tension Beacon360 Blaze – Že new Beacon360 and-pour jobs and other applications loads for both concrete and steel applica- Blaze is a powerful light with incredible involving precast shapes, mortars and tions — visit strongtie.com/rckw. versatility. grouts.

LIND EQUIPMENT INTRODUCES Beacon360 Trek – This is the little Že Refractory Paddle Mixer’s oversized, EFFICIENT, LABOR-SAVING LED brother to our best-selling patented heavy-duty, chain-and-sprocket drive TEMPORARY LIGHTING SYSTEM Beacon360 Blaze. Že Beacon360 Trek system provides years of reliable use casts light in 360° and upwards, while under harsh conditions. It also features being spaced at 25 ft apart to provide a pair of easily accessible levers to control Bye-bye stringlights. Hello industry- rst: light coverage up to 5 fc. At 60W, it the hydraulic dump and operate the An integrated, adaptable lighting system provides 7,000 lumens of bright, white system in both forward and reverse. poised to revolutionize the jobsite. light.

Lind Equipment—leaders in portable Beacon360 Spark – An exciting new LED construction lighting—announces product, the Beacon360 Spark makes a redesigned LED Jobsite suite of prod- stringlights a thing of the past. Now a ucts. Že LED Jobsite now provides a main circuit can be run throughout the complete system of temporary lighting hallways/corridors, and individual lights that greatly increases e‘ciency on the can branch o„ into individual rooms or jobsite and makes projects more pro“t- in other directions as required. able. By using LED Jobsite’s integrated solutions, contractors can easily tackle LE-HB120 LED High Bay – One of even the most challenging jobsite the latest additions to the Beacon family lighting conditions. is the LE-HB120 LED High Bay. Žis high bay is much smaller, more durable Customers can pair the 1,900-pound To maximize the total light coverage and even more energy e‘cient. It does (862-kilogram) machine with a variety across the jobsite, all products in the suite not require an external driver—allowing of electric power options for safe indoor work together as one system. Together, it to be extremely light and compact. Že use and to meet global needs. Customers these products are all built to exceed LEDs provide 13,250 lumens to illumi- have their choice of three electric motors; military-grade drop-test standards and nate 2,500 sq. ft when mounted on a a 10 horsepower (7.5-kilowatt) electric have IP65 weatherproof ratings. In short, ceiling 20 ft high. motor with starter disconnect, a 240- or LED Jobsite lights will withstand any a 480- volt, 60-hertz motor or a 380- abuse the jobsite might throw at them, With the option now to connect all these volt, 50- hertz motor. Customers also can products through pre-determined

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 75 PRODUCTINNOVATION choose to power the Paddle Mixer with and overhead tasks. ’e Bosch design cleaning process for buildings made with a 14-horsepower Kohler gas engine. allows the power cells to be arranged in multiple materials and substrates. a single layer, which adds to a smaller The 4-foot-wide (1.2-meter-wide) and lighter battery. Sure Klean ReVeal is formulated to clean Refractory Paddle Mixer’s trailer features atmospheric and carbon staining from a single axle for easy towing, or it can be most kinds of masonry and stone, skid-mounted. including architectural concrete block, concrete, „red clay, granite, sandstone, Customers can use the Paddle Mixer slate and unpolished limestone, marble with Blastcrete’s patented DustAway and travertine. It can also remove soiling system, which consists of an innovative and hard-to-remove deposits, such as bulk bag design that attaches to the Advanced Technology Cooling white scum, from window glass, and is mixer to contain dust as the mixer „lls. Bosch CoolPack 2.0 technology advances safe for use around most architectural DustAway helps businesses meet OSHA the lifetime of the battery as well, deliv- metals. ’is feature nearly eliminates the crystalline silica dust regulations by ering up to 135 percent longer life versus need to specially protect and cover many controlling dust to within OSHA per- conventional batteries without Cool- other non-masonry substrates and mate- missible exposure limits. Pack. Heat is the enemy of any battery rials during the cleaning process. and this design ensures heat dissipation For larger refractory jobs, Blastcrete also is maximized thanks to a housing that Not having to worry about covering oŠers a 1,000-pound refractory paddle completely encases each cell. ’e high- windows was a big advantage for M-A mixer-pump, the RMX-5000, and a density polyethylene material and the Building & Maintenance when it cleaned Refractory Pan Mixer that can mix as proprietary design combine to pull heat the exterior of the Halle Building in much as 2,200 pounds in less than two away from the cells for better dissipation. Cleveland, Ohio, earlier this year. minutes. In addition, the battery is designed without space gaps, which ensures any Safer and less corrosive than conventional For more information: www.blastcrete. heat produced by the cells is not stored restoration cleaners based on hydro¦uoric com. in the interior. Optimized cell connectors acid or ammonium bi¦uoride, ReVeal made of copper versus copper-coated comes in liquid form, rather than a gel, BOSCH GBA18V40 CORE18V 4.0 galvanized steel oŠer lower resistance for facilitating a shorter dwell time that lets AH BATTERY OFFERS POWER increased power output over a longer contractors „nish the job faster. AND RUNTIME OF FIRST- period of time. GENERATION PRODUCT IN Low-odor and non-fuming, ReVeal SMALLER, LIGHTER PACKAGE Bosch CORE18V batteries provide 100 restores clarity to most common ¦ush percent compatibility with all 18-volt window glass that shows streaks and 21700 Lithium-ion cell technology delivers Bosch Lithium-ion tools and chargers. damage from pollution, and water run- the right power solution for heavy-duty Bosch is developing high-power tools to down from adjacent building materials. cordless power tool applications take full advantage of CORE battery technology. ReVeal is available in 1-gallons, 5-gallon ’e only thing that can make increased pails and 55-gallon drums. It’s compliant battery power more attractive is putting To learn more about the Bosch in all jurisdictions for sale and use. Always all that additional performance in a GBA18V40 CORE18V 4.0 Ah Battery test to ensure desired results. For more smaller package. With the help of greater or to „nd dealer information, visit www. information, visit prosoco.com. power e”ciency found in 21700 Lith- boschtools.com. ium-ion cell technology, Bosch has developed the GBA18V40 CORE18V PROSOCO RELEASES NEW INTERESTED IN SEEING YOUR 4.0 Ah battery to bring all of the capa- RESTORATION CLEANER FOR PRODUCTS IN THIS COLUMN? bility of the original CORE battery into MULTIPLE SUBSTRATES a smaller, lighter package. ’e new cell Email your 150-200 word product introduces much more active battery ReVeal safely and eectively cleans masonry, information to [email protected]. Content volume in a pack that’s only slightly stone and a variety of other architectural for the January/February 2019 issue is due larger than the previous 20700 cell packs. substrates. by December 1, 2018 and content for the March/April 2019 issue is due by February ’e Bosch CORE18V40 4 Ah battery A new restoration cleaner from 1, 2019. One (1) high resolution product is designed to make day-to-day work PROSOCO simplifies the masonry photo may be included. ICRI reserves the easier, particularly repetitive applications right to edit all submissions.

76 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG NEWMEMBERS

COMPANY MEMBERS Kelowna Industries LTD Jennifer Dimig Alchemco 665 Osprey Ave Wiss Janney Elstner Associates 8590 Sanford Dr Kelowna, British Columbia V1Y 5A7 1406 Veterans Drive Suite 202 Henrico, Virginia 23228 Canada Elkhorn, Nebraska 68022 United States Jeffrey Vogel United States Mario Carvalho Email: [email protected] Email: [email protected] National Floor Services, Inc. 1775 Corporate Drive Derrik Fischer Amento Group Norcross, Georgia 30093 MAPEI Corporation 710 2nd Avenue United States 3101 N 32nd St. Seattle, Washington 98104 Luis Romero Tacoma, Washington 98407 United States Email: l.romero@nationalfloorservices.net United States Lisa Hanses Email: dfi[email protected] Email: [email protected] RWPC, Inc 14100 NW 126th Terrace STE A Kelly Getz Care Supply Co, LLC Alachua, Florida 32615 CTP, Inc 888 Elm Hill Pike United States 10422 W. 400 N. Nashville, Tennessee 37210 Gordon Bartram Michigan City, Indiana 46360 United States Email: [email protected] United States Will Lane Email: [email protected] Email: [email protected] Scanclimber by Tractel 51 Morgan Drive #1 Nicholas Heim Chem-Rez, Inc. Norwood, Massachusetts 02062 WJE 130 Commerce Blvd. United States 9655 Sweet Valley Drive Suite 3 Frankfort, Kentucky 40601 Barney Hanna Cleveland, Ohio 44125 United States Email: [email protected] United States Brad Nolan Email: [email protected] Email: [email protected] Strata Tech Products, Inc. 3601 104th Street Jamie Hudson EACO CHEM Urbandale, Iowa 50322 Wiss Janney Elstner Associates, Inc. 765 Commerce Avenue United States 800 Vinial Street Suite B301 New Castle, Pennsylvania 16101 Susan Aller Pittsburgh, Pennsylvania 15212 United States Email: [email protected] United States Justin Bowers Email: [email protected] Email: [email protected] The Miami Floors-Bath & Decor Corp 11434 SW 185 St Ron Langdana Eastern Concrete Restoration, LLC Miami, Florida 33157 Kelso Coatings 6401 Macaw Court United States United States Elkridge, Maryland 21075 Dailys Aparicio Email: [email protected] United States Email: [email protected] Zachary Gray Jeromy Magill Email: [email protected] The Mud Jacking Guy Restocon Corporation 107 Deerfield Ave 337 N. Falkenburg Road EXL Engineering, Inc. Marlton, New Jersey 08053 Tampa, Florida 33619 109-7198 Vantage Way United States United States Delta, British Columbia V4G 1K7 Michael Longo Email: [email protected] Canada Email: [email protected] Gene Lecuyer James Martin Email: [email protected] Tri-State Underlayments WSP Canada Inc. 99 Brookside Road 2611 Queensview Drive Folan Waterproofing & Construction Co. Inc Waterbury, Connecticut 06708 Ottawa, Ontario K2B 8K2 795 Washington Street United States Canada South Easton, Massachusetts 02375 Scott Franz Email: [email protected] United States Email: [email protected] MaryEllen Card Wissam Merghoub Email: office@folanwaterproofing.com MAPEI Corporation ADDITIONAL INDIVIDUALS FROM 2900 Francis-Hughes Gator Concrete and Structure Restoration MEMBER COMPANIES Laval, Quebec H7L 3J5 32027 276th Ave East Matthew Arnold Canada Foothills, Alberta T1S 4N7 Wiss, Janney, Elstner Associates Email: [email protected] Canada 10 South LaSalle Street, Suite 2600 John Tomkins Chicago, Illinois 60603 Email: [email protected] United States Email: [email protected]

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 77 NEWMEMBERS

John Rehmann Kyle Kuenstling Ken DeStefano Euclid Admixture Canada Inc. Vector Construction Ltd 1655 Suburban Station Building 20979-84 Ave United States 1617 John F. Kennedy Blvd, Langley, British Columbia V2Y 0A6 Email: [email protected] Philadelphia, Pennsylvania 19103 Canada United States Email: [email protected] Peter Lozano Email: [email protected] Lance Construction Supplies Johnnie Rice 4225 W. Ogden Ave Ufuk Dilek Rhino Carbon Fiber Chicago, Illinois 60623 2801 Yorkmont Rod Suite 100 United States United States Charlotte, North Carolina 28208 Email: jrice@rhinocarbonfiber.com Email: [email protected] United States Email: [email protected] Bryant Scudder Cody Mitchell WB Construction Products Vector Construction Ltd Thomas Fenniman United States United States One Union Square West Room 501 Email: [email protected] Email: [email protected] New York, New York 10003 United States Matthew Smith John Schuster Email: [email protected] Freyssinet PULLMAN 44880 Falcon Place 5396 N Oak Rd Clem Firlotte Sterling, Virginia 20166 Davison, Michigan 48423 1055 West Smith Rd United States United States Medina, Ohio 44256 Email: [email protected] Email: [email protected] United States Email: cfi[email protected] Peter Turnbull Thomas Slater EXL Engineering Inc. Contracting Specialists Inc. Erika Frey 109-7198 Vantage Way 453 South Main Street PO Box 1432 Delta, British Columbia V4G 1K7 Attleboro, Massachusetts 02703 Ault, Colorado 80610 Canada United States United States Email: [email protected] Email: [email protected] Email: [email protected]

Michel Viau David Frink Soprema, Inc. INDIVIDUAL MEMBERS P.O. Box 814282 1295 Newton #200 Sudhakar Bagwe Dallas, Texas 75381 Boucherville, Quebec J4B 5H2 B 11, Sahar Society, Sahar Road United States Canada Parsiwada Road, Andheri (E) Email: [email protected] Email: [email protected] Mumbai, Andheri East 400099 India Salil Gadgil ADDITIONAL INDIVIDUALS FROM Email: [email protected] Millenium Business Park, Mahape SUPPORTING MEMBER COMPANIES Navi-Mumbai 400710 Caitlin Corbitt Christopher Beaman India CP&R, Inc. 425 Chalan San Antonio PMB #1023 Email: [email protected] 2811 Lord Baltimore Drive Tamuning, Guam 96913 Baltimore, Maryland 21244 United States Julissa Hidalgo United States Email: [email protected] 26800 Amhearst Circle #210 Email: [email protected] Beachwood, Ohio 44122 Dave Berg United States Jim Derrigan 11468 New Berlin Rd Email: [email protected] BASF Construction Chemicals Jacksonville, Florida 32226 140 Grimsby Rd West United States Jamie Hudson Tonawanda, New York 14223 Email: [email protected] 800 Vinial Street Suite B301 United States Pittsburgh, Pennsylvania 15212 Email: [email protected] Nicolas Bernie United States 4090 Dahlia Street Email: [email protected] Scott Frost Denver, Colorado 80216 Titan Tool United States Steve Hume United States Email: [email protected] 3415 Blue Candle Dr. Email: [email protected] Spring, Texas 77388 Benjamin Borland United States John Kosar 710 Second Avenue Suite 400 Email: [email protected] Quikrete Seattle, Washington 98104 8 Haze Way United States Kelly Ican Phillipsburg, New Jersey 08865 Email: [email protected] 6386 Commonwealth Drive United States Weaterville, Ohio 43082 Email: [email protected] United States Email: [email protected]

78 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG NEWMEMBERS

Sarika Joshi Michael Plumb John Stuart 103-104, Monalisa CHS 650 Suffolk Street 100 Pine Street, Ste 1600 Near Hari Niwas Circle Panchpakadi Lowell, Massachusetts 01854 San Francisco, California 94111 Thane, Maharashtra 400602 United States United States India Email: [email protected] Email: [email protected] Email: [email protected] Himanshu Raje Steven Tryon Madan Kamat 206 & 207, B-ING, 2nd Floor 612 Fayette Drive North Unit No. 206, Bldg No. 6, Sector 3 New India Chambers, MIDC Andheri (E) Safetyharbor, Florida 33760 Millennium Business Park, Mahape Mumbai, Maharashtra 400093 United States Navi-Mumbai 400710 India Email: [email protected] India Email: [email protected] Email: [email protected] Salvador Villalobos Tanmay Raje 1300 W WT Harris Milind Kamat 206 & 207, B-ING, 2nd Floor Charlotte, North Carolina 28262 Unit 206, Bldg No. 6, Sector 3 New India Chambers, MIDC Andheri (E) United States Millenium Business Park, Mahape Mumbai, Maharashtra 400093 Email: [email protected] Navi-Mumbai 400710 India India Email: [email protected] Donald Whiteley Email: [email protected] ADA Compliance by Whiteley Consulting Varun Raje 7242 S. Allison Way Mike Konkle 206 & 207, B-ING, 2nd Floor Littleton, Colorado 80128 780 Marigold Ct New India Chambers, MIDC Andheri (E) United States Bridgeville, Pennsylvania 15017 Mumbai, Maharashtra 400093 Email: [email protected] United States India Email: [email protected] Email: [email protected] John Whitton 111 Rockville Pike Suite 950 Kristian Krc Jordan Robertson Rockville, Maryland 20850 1100 Walnut Suite 1825 556 Savannah Park United States Kansas City, Missouri 64106 Conroe, Texas 77302 Email: [email protected] United States United States Email: [email protected] Email: [email protected] Tony Wightman 9810 Fairbanks North Houston Rd Saniya Kulkarni Luis Romero Houston, Texas 77064 44880 Falcon Pl, 1775 Corporate Drive Suite 135 United States Sterling, Virginia 20166 Norcross, Georgia 30093 Email: [email protected] United States United States Email: [email protected] Email: l.romero@nationalfloorservices.net Joseph Wilcher 199 E. Montgomery Avenue Suite 100 Matthew Ledlow Rosemary Sangle Rockville, Maryland 20850 20 Coburn Avenue Runwal Garden City United States Orlando, Florida 32805 Thane, Maharashtra 400607 Email: [email protected] United States India Email: [email protected] Email: [email protected] Bill Wilson 880 Montclair Rd. Ste. 600 Melvin Miller Randy Semiao Birmingham, Alabama 35213-1972 246 Town Hall Lane 337 N Falkenburg Rd United States Belpre, Ohio 45714 Tampa, Florida 33619 Email: [email protected] United States United States Email: [email protected] Email: [email protected] Boyu Wang University of Victoria Pravin Patil Pradeep Shrestha 3800 Finnerty Rd 103-104, Monalisa CHS Dubai Victoria, British Columbia V8P 5C2 Near Hari Niwas Circle Panchpakadi Al Quoze 3, Dubai 0 Canada Thane (West), Maharashtra 400602 United Arab Emirates Email: [email protected] India Email: [email protected] Email: [email protected] GOVERNMENT MEMBERS Joshua Strange Glenn McAninch Richard Pleis 710 Second Ave Suite 400 Virginia Department of Transportation 220 Waterfall Road Seattle, Washington 98104 1601 Orange Road Templeton, California 93465 United States Culpeper, Virginia 22701 United States Email: [email protected] United States Email: [email protected] Email: [email protected]

WWW.ICRI.ORG NOVEMBER/DECEMBER 2018 CONCRETE REPAIR BULLETIN 79 NEWMEMBERS

RETIRED MEMBERS Sidney Monghate Gabriella Tiseo Mario E. Cambas, PE Monghate Engineering, Inc. 18634 Doris St 8501 Pasadena Blvd 3010 LBJ Freeway, Suite 1402 Livonia, Michigan 48152 Pembroke Pines, Florida 33024 Dallas, Texas 75234 United States United States United States Email: [email protected] Email: [email protected] Email: [email protected] Haoyue Xiao STUDENT/APPRENTICE MEMBERS Brian Salcedo University of CA/San Diego Raid Alrashidi University of Florida 9500 Gilman Dr University of Florida 2800 SW Williston Road La Jolla, California 92093 3611 SW 34th Street Apt 20 Gainesville, Florida 32608 United States Gainesville, Florida 32608 United States Email: [email protected] United States Email: b.ortizsalcedo@ufl.edu Email: raidalsaif@ufl.edu Thanachart Subgranon University of Florida Eddy Fairuz 3920 SW 20th Ave Apt. 1311 Sabah Sport Board Gainesville, Florida 32607 No.3A, Lorong Seri Pelangi 2, United States Taman Seri Pelangi Jln.Tuaran Bypass Email: tsubgranon@ufl.edu Kota Kinabalu, Sabah 88450 Malaysia Email: [email protected]

INDEXOFADVERTISERS

American Engineering Testing ...... 63 Aquafin ...... 56 Azon ...... 59 Brokk...... 53 Cortec Corporation ...... 59 Euclid Chemical Company ...... 53 Evonik Industries ...... 3 Gary Carlson Equipment Co...... 57 HD White Cap/ AHHarris...... 55 Larsen Products Corp...... 63 LymTal International, Inc...... 57 MAPEI...... Inside back cover Miracote Division of Crossfield Products Corp...... 9 National Waterproofing Supply ...... 63 NCFI Polyurethanes (Terrathane)...... 13 Nelson Testing Laboratories...... 8 Sika Corporation ...... Back cover Simpson Strong-Tie...... 7 Warstone Innovations, LLC ...... 59 W.R. Meadows ...... 12

1000 Westgate Drive, Suite 252 | St. Paul, Minnesota 55114 USA Phone: +1 651-366-6095 | Fax: +1 651-290-2266 Web: www.icri.org | Email: [email protected]

80 CONCRETE REPAIR BULLETIN NOVEMBER/DECEMBER 2018 WWW.ICRI.ORG MAPEI provides a world of Concrete Restoration Systems

• Concrete Repair Mortars • Epoxy Adhesives • Corrosion Protection • Decorative Toppings • Construction Grouts • Cure and Seals • Waterproofing • Densifiers • Sealants and Joint Fillers • Structural Strengthening Products • Coatings and Sealers

MAPEI offers a full spectrum of products for concrete restoration, waterproofing and structural strengthening. Globally, MAPEI’s system solutions have been utilized for bridges, highways, parking garages, stadiums, building and other structures.

Visit www.mapei.com for details on all MAPEI products.

MAPEI USA SIKA EXPANDS WITH EMSEAL EXPANSION JOINTS

6LNDDQG(06($/RŽHUDZLGHSRUWIROLRRISURGXFWVIRUDOO\RXUZDWHUSURRžQJ QHHGV)URPHSR[LHVPRUWDUVVHDODQWVDQGQRZWRH[SDQVLRQMRLQWVZHRŽHU it all!

%HVWLQFODVVSURGXFWVZLWKXQPDWFKHG7HFKQLFDO6HUYLFH

Visit emseal.com or usa.sika.comIRUPRUHLQIRUPDWLRQ

SIKA CORPORATION

201 Polito Avenue • Lyndhurst, NJ 07071 • 800.933.SIKA • usa.sika.com