Noise Enclosures at Gascoigne Road Flyover
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
T and Analysis of Walkability in Hong Kong
Measurement and Analysis of Walkability in Hong Kong By: Michael Audi, Kathryn Byorkman, Alison Couture, Suzanne Najem ZRH006 Measurement and Analysis of Walkability in Hong Kong An Interactive Qualifying Project Report Submitted to the faculty of the Worcester Polytechnic Institute In partial fulfillment of the requirements for Degree of Bachelor of Science In cooperation with Designing Kong Hong, Ltd. and The Harbour Business Forum On March 4, 2010 Submitted by: Submitted to: Michael Audi Paul Zimmerman Kathryn Byorkman Margaret Brooke Alison Couture Dr. Sujata Govada Suzanne Najem Roger Nissim Professor Robert Kinicki Professor Zhikun Hou ii | P a g e Abstract Though Hong Kong’s Victoria Harbour is world-renowned, the harbor front districts are far from walkable. The WPI team surveyed 16 waterfront districts, four in-depth, assessing their walkability using a tool created by the research team and conducted preference surveys to understand the perceptions of Hong Kong pedestrians. Because pedestrians value the shortest, safest, least-crowded, and easiest to navigate routes, this study found that confusing routes, unsafe or indirect connections, and a lack of amenities detract from the walkability in Hong Kong. This report provides new data concerning the walkability in harbor front districts and a tool to measure it, along with recommendations for potential improvements. iii | P a g e Acknowledgements Our team would like to thank the many people that helped us over the course of this project. First, we would like to thank our sponsors Paul Zimmerman, Dr. Sujata Govada, Margaret Brooke, and Roger Nissim for their help and dedication throughout our project and for providing all of the resources and contacts that we required. -
NR700 Destinations: Shan King Estate – Hung Hom Station Routeing
Residents’ Service Route No.: NR700 Destinations: Shan King Estate – Hung Hom Station Routeing (Shan King Estate – Hung Hom Station): via Shan King Estate access road, Ming Kum Road, Tsing Wun Road, Wong Chu Road, Tuen Mun Road, Tsuen Wan Road, Kwai Chung Road, Lai Chi Kok Road, Cheung Mou Street, Cheung Shun Street, Tai Nan West Street, Cheung Yee Street, Cheung Lai Street, Lai Chi Kok Road, Tung Chau Street, West Kowloon Corridor, Prince Edward Road West, Lai Chi Kok Road, Shanghai Street, Jordan Road, Canton Road, Salisbury Road, Chatham Road South and Cheong Wan Road. Stopping Places: Pick Up: 1. Shan King Estate access road Set Down: 1. Cheung Shun Street near its junction with outside King Lok House Cheung Lai Street 2. Shanghai Street near its junction with Fife Street 3. Jordan Road outside King George V Memorial Park 4. Canton Road outside House No. 74 5. Chatham Road South near Mody Road 6. Hung Hom Station, Public Vehicle Carpark Departure Time: Mondays to Fridays (except Public Holidays) Saturdays (except Public Holidays) 1. 7.30 a.m. 1. 7.40 a.m. 2. 7.45 a.m. 2. 8.00 a.m. 3. 8.00 a.m. 3. 8.20 a.m. 4. 8.15 a.m. 5. 8.30 a.m. Routeing (Kowloon Park Drive – Shan King Estate): via Kowloon Park Drive, Peking Road, Ashley Road, Middle Road, Kowloon Park Drive, Canton Road, Ferry Street, Waterloo Road, Reclamation Street, Argyle Street, Cherry Street, West Kowloon Corridor, Lai Chi Kok Road, Kwai Chung Road, Tsuen Wan Road, Tuen Mun Road, Tuen Hi Road, Tuen Mun Road, San Tak Street, San Wo Lane, Tuen Mun Heung Sze Wui Road, Choi Yee Bridge, Shek Pai Tau Road and Shan King Estate access road. -
Head 60 — HIGHWAYS DEPARTMENT
Head 60 — HIGHWAYS DEPARTMENT Controlling officer: the Director of Highways will account for expenditure under this Head. Estimate 2019–20 .................................................................................................................................... $4,175.7m Establishment ceiling 2019–20 (notional annual mid-point salary value) representing an estimated 2 378 non-directorate posts as at 31 March 2019 rising by 71 posts to 2 449 posts as at 31 March 2020 .......................................................................................................................................... $1,319.2m In addition, there will be an estimated 37 directorate posts as at 31 March 2019 and as at 31 March 2020. Commitment balance.............................................................................................................................. $19.1m Controlling Officer’s Report Programmes Programme (1) Capital Projects This programme contributes to Policy Area 21: Land and Waterborne Transport (Secretary for Transport and Housing) and Policy Area 23: Environmental Protection, Conservation, Power and Sustainable Development (Secretary for the Environment). Programme (2) District and Maintenance This programme contributes to Policy Area 21: Land and Works Waterborne Transport (Secretary for Transport and Housing) and Policy Area 24: Water Supply, Drainage and Slope Safety (Secretary for Development). Programme (3) Railway Development This programme contributes to Policy Area 21: Land and Waterborne Transport (Secretary -
Islands District Council Traffic and Transport Committee Paper T&TC
Islands District Council Traffic and Transport Committee Paper T&TC 41/2020 2020 Hong Kong Cyclothon 1. Objectives 1.1 The 2020 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 15 November 2020. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2020 Hong Kong Cyclothon, with the aim to obtain the District Council’s continuous support. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past years, the event attracted more than 20,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by the Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event. -
DDC Location Plan Mar-2017 Mon Tue Wed Thu Fri Sat Sun 1 2 3
WWF - DDC Location Plan Mar-2017 Mon Tue Wed Thu Fri Sat Sun 1 2 3 4 5 Team A Lai King MTR Exit A Tai Wo Hau MTR Exit B apm apm apm CWB Yun Ping Road (Near Hang Team B Ma Tau Wai Road (near HSBC) Plaza Hollywood Plaza Hollywood Plaza Hollywood Seng Bank) Wing On Hse (Bank of China), Team C Bellagio, Sham Tseng Bellagio, Sham Tseng Wing On Hse (Bank of China), Central Wing On Hse (Bank of China), Central Central Team D iSquare, TST iSquare, TST Island Creast, Sai Wan Island Creast, Sai Wan Island Creast, Sai Wan Team E Heng Fa Chuen MTR Station Heng Fa Chuen MTR Station Fortress Hill MTR Station Exit B Fortress Hill MTR Station Exit B Fortress Hill MTR Station Exit B Team F Kwai Fong MTR Station Exit D Kwai Fong MTR Station Exit D Greenfield Gdn, Tsing Yi Greenfield Gdn, Tsing Yi Greenfield Gdn, Tsing Yi Team G Kwun Tong HSBC Kwun Tong HSBC Cheung Sha Wan Plaza Cheung Sha Wan Plaza Cheung Sha Wan Plaza Hang Hau Residence Oasis Tower Team H Hang Hau Residence Oasis Tower 1 On Ting Light Rail Station On Ting Light Rail Station On Ting Light Rail Station 1 Team I Tuen Mun Town Plaza Tuen Mun Town Plaza Tai Hang, CWB Tai Hang, CWB Tai Hang, CWB Chung Sing Path (Chung Sing Path Chung Sing Path (Chung Sing Path Chung Sing Path (Chung Sing Path Team J Wanchai HSBC Wanchai HSBC Playground) Playground) Playground) Team K Diamond Hill MTR Station Exit A1 Diamond Hill MTR Station Exit A1 Yau Ma Tei MTR Station Exit A2 Yau Ma Tei MTR Station Exit A2 Yau Ma Tei MTR Station Exit A2 Team L Wing On, Jordon Wing On, Jordon Tram Terminus, Kennedy Town Tram -
Visit : Yau Ma Tei Vernacular Solution for Architecture [Student Notes]
Design and Applied Technology Teaching kit for Senior Secondary Curriculum Visit : Yau Ma Tei Vernacular Solution for Architecture [Student notes] Organizer Sponsor Research Team 1 Contents Design and Applied Technology | Design and Applied Technology Preamble Learning plan i Visit: Yau Ma Tei - Vernacular Solutions for Architecture 1.1 Itinerary for the Visit 01 1.2 Brief History of Yau Ma Tei 02 1.2.1 What is Localization? 03 1.2.2 What is Vernacular Architecture? 03 Solutions for Architecture - Vernacular Ma Tei Yau Visit: 1.3 Checkpoints 1 Public Square 04 2 Temple Street 05 3 Mido Cafe 07 4 Yau Ma Tei Car Park Building and Gascoigne Road Flyer 08 5 Prosperous Garden 09 6 Man Wah Sun Chuen, Man Sing Street 10 7 Shanghai Street No. 313-315 11 8 Yau Ma Tei Wholesale Fruit Market 13 9 Yau Ma Tei Theatre 15 Summary, Key words and Further reading 17 Create Hong Kong of the Government of the Hong Kong Special Administrative Region provides funding support to the project only, and does not otherwise take part in the project. Any opinions, findings, conclusions or recommendations expressed in these materials/events (or by members of the project team) do not reflect the views of the Government of the Hong Kong Special Administrative Region. © 2012 Hong Kong Institute of Architects Topic 10 Visit: Yau Ma Tei - Vernacular Solutions for Architecture Major teaching areas Design and Applied Technology: Strand 1 Design and Innovation • Design in practice | Design and Applied Technology • Design consideration Strand 2 Technology Principles • Nature -
TRAFFIC ADVICE Introduction of CTB Route No. A20 (Hung Hom Station
TRAFFIC ADVICE Introduction of CTB Route No. A20 (Hung Hom Station – Airport (Ground Transportation Centre)) Members of the public are advised that Citybus route no. A20 (Hung Hom Station – Airport (Ground Transportation Centre)) will be introduced with effect from 20 March 2017 (Monday) with service details as follows: A. Routeing From Hung Hom Station to Airport (Ground Transportation Centre): via Cheong Wan Road, Chatham Road South, Salisbury Road, Kowloon Park Drive, Canton Road, Salisbury Road, Nathan Road, Cheung Sha Wan Road, Lai Chi Kok Road, Kwai Chung Road, Tsuen Wan Road, Tsing Tsuen Road, Tsing Yi North Coastal Road, North West Tsing Yi Interchange, Lantau Link, North Lantau Highway, Airport Road, Cheong Hong Road, Sky Plaza Road, Cheong Lin Road, Airport South Interchange, Cheong Lin Road and Ground Transportation Centre bus terminus. From Airport (Ground Transportation Centre) to Hung Hom Station: via Ground Transportation Centre bus terminus, Cheong Lin Road, Airport South Interchange, Airport Road, North Lantau Highway, Lantau Link, North West Tsing Yi Interchange, Tsing Yi North Coastal Road, Tsing Tsuen Road, Tsuen Wan Road, Kwai Chung Road, Cheung Sha Wan Road, Nathan Road, Salisbury Road, Chatham Road South, Cheong Wan Road, On Wan Road, Hung Hom Station Bus Terminus. B. Service Hours From Hung Hom Station Headway From Airport (Ground Headway (minutes) Transportation Centre) (minutes) Daily 6.30 a.m. to 9.30 p.m. 60 11.00 a.m. to 12.00 midnight 60 C. Fare Airport (Ground Transportation Ground) Bound: Full fare: $33.0 per single journey Section Fare: From Lantau Link Toll Plaza to Airport (Terminal One) or Airport(Ground Transportation Centre) - $17.0 Section Fare: From Airport (Terminal One) to Airport (Ground Transportation Centre) - $4.0 Hung Hom Bound: Full fare: $33.0 Section Fare: From Lantau Link Toll Plaza to Kwai Chung Road near Kwai Chung Interchange or Hung Hom Station - $26.0 Section Fare: From Lantau Link Toll Plaza to Hung Hom Station - $8.0 D. -
When Is the Best Time to Go to Hong Kong?
Page 1 of 98 Chris’ Copyrights @ 2011 When Is The Best Time To Go To Hong Kong? Winter Season (December - March) is the most relaxing and comfortable time to go to Hong Kong but besides the weather, there's little else to do since the "Sale Season" occurs during Summer. There are some sales during Christmas & Chinese New Year but 90% of the clothes are for winter. Hong Kong can get very foggy during winter, as such, visit to the Peak is a hit-or-miss affair. A foggy bird's eye view of HK isn't really nice. Summer Season (May - October) is similar to Manila's weather, very hot but moving around in Hong Kong can get extra uncomfortable because of the high humidity which gives the "sticky" feeling. Hong Kong's rainy season also falls on their summer, July & August has the highest rainfall count and the typhoons also arrive in these months. The Sale / Shopping Festival is from the start of July to the start of September. If the sky is clear, the view from the Peak is great. Avoid going to Hong Kong when there are large-scale exhibitions or ongoing tournaments like the Hong Kong Sevens Rugby Tournament because hotel prices will be significantly higher. CUSTOMS & DUTY FREE ALLOWANCES & RESTRICTIONS • Currency - No restrictions • Tobacco - 19 cigarettes or 1 cigar or 25 grams of other manufactured tobacco • Liquor - 1 bottle of wine or spirits • Perfume - 60ml of perfume & 250 ml of eau de toilette • Cameras - No restrictions • Film - Reasonable for personal use • Gifts - Reasonable amount • Agricultural Items - Refer to consulate Note: • If arriving from Macau, duty-free imports for Macau residents are limited to half the above cigarette, cigar & tobacco allowance • Aircraft crew & passengers in direct transit via Hong Kong are limited to 20 cigarettes or 57 grams of pipe tobacco. -
Register of Public Payphone
Register of Public Payphone Operator Kiosk ID Street Locality District Region HGC HCL-0007 Chater Road Outside Statue Square Central and HK Western HGC HCL-0010 Chater Road Outside Statue Square Central and HK Western HGC HCL-0024 Des Voeux Road Central Outside Wheelock House Central and HK Western HKT HKT-2338 Caine Road Outside Albron Court Central and HK Western HKT HKT-1488 Caine Road Outside Ho Shing House, near Central - Mid-Levels Central and HK Escalators Western HKT HKT-1052 Caine Road Outside Long Mansion Central and HK Western HKT HKT-1090 Charter Garden Near Court of Final Appeal Central and HK Western HKT HKT-1042 Chater Road Outside St George's Building, near Exit F, MTR's Central Central and HK Station Western HKT HKT-1031 Chater Road Outside Statue Square Central and HK Western HKT HKT-1076 Chater Road Outside Statue Square Central and HK Western HKT HKT-1050 Chater Road Outside Statue Square, near Bus Stop Central and HK Western HKT HKT-1062 Chater Road Outside Statue Square, near Court of Final Appeal Central and HK Western HKT HKT-1072 Chater Road Outside Statue Square, near Court of Final Appeal Central and HK Western HKT HKT-2321 Chater Road Outside Statue Square, near Prince's Building Central and HK Western HKT HKT-2322 Chater Road Outside Statue Square, near Prince's Building Central and HK Western HKT HKT-2323 Chater Road Outside Statue Square, near Prince's Building Central and HK Western HKT HKT-2337 Conduit Road Outside Elegant Garden Central and HK Western HKT HKT-1914 Connaught Road Central Outside Shun Tak -
For Central Kowloon Route
Appendix 7.2 Construction and Demolition Materials Management Plan (C&DMMP) for Central Kowloon Route Highways Department Agreement No. CE 43/2010 (HY) Central Kowloon Route – Design and Construction Updated Construction and Demolition Material Management Plan (C&DMMP) 217722-REP-023-01 Issue 4 August 2012 This report takes into account the particular instructions Arup-Mott MacDonald Joint Venture and requirements of our client. ArupArup----Mott MacDonald Level 5 Festival Walk It is not intended for and should not be relied upon by 80 Tat Chee Avenue any third party and no responsibility is undertaken to any Kowloon Tong third party. Joint Venture Kowloon Hong Kong www.arup.com Highways Department Agreement No. CE 43/2010 (HY) Central Kowloon Route - Design and Construction Updated Construction and Demolition Material Management Plan Contents Page 1 Introduction 1 1.1 Background 1 1.2 Scope of Project Works 1 2 Purpose and Objective of this Construction & Demolition Material Management Plan (C&DMMP) 3 2.1 Purpose and Objective of the C&DMMP 3 2.2 Implementation Programme and Works Packaging 4 3 Development Constraints 5 3.1 Constraints 5 3.2 Alignment Constraint and Trunk Road Connections 5 3.3 Slip Road Connections 5 3.4 Existing Buildings 5 3.5 Existing Railway Lines 6 3.6 Adjacent Major Infrastructures 6 3.7 Kowloon City PTI 7 3.8 Ma Tau Kok Public Pier 7 3.9 HKCG Ma Tau Kok Gas Work Plant 7 3.10 Geological Constraint in Bored Tunnel Section 8 3.11 Traffic Impact 8 3.12 Environmental Issues 8 3.13 Demolition and Reprovisioning 8 4 -
History&Perspectives
2012 CHINESE AMERICA History&Perspectives THE JOURNAL OF THE CHINESE HISTORICAL SOCIETY OF AMERICA CHINESE AMERICA HISTORY & PERSPECTIVES The Journal of the Chinese Historical Society of America 2012 CHINESE HISTORICAL SOCIETY OF AMERICA Chinese America: History & Perspectives — The Journal of the Chinese Historical Society of America Chinese Historical Society of America Museum & Learning Center 965 Clay Street San Francisco, California 94108 chsa.org Copyright © 2012 Chinese Historical Society of America. All rights reserved. Copyright of individual articles remains with the author(s). ISBN-13: 978-1-885864-47-5 ISBN-10: 1-885864-47-7 Design by Side By Side Studios, San Francisco. Permission is granted for reproducing up to fifty copies of any one article for Educa- tional Use as defined by the Digital Millennium Copyright Act. To order additional copies or inquire about large-order discounts, see order form at back or email [email protected]. Articles appearing in this journal are indexed in Historical Abstracts and America: History and Life. About the cover image: Lum Ngow with his parents in China, 1925. Photo courtesy of Lee Show Nam. 10 9 8 7 6 5 4 3 2 1 Contents THINGS MATTER Chinese American Culture Work and the Gods of Marysville 1 Jonathan H. X. Lee and Vivian-Lee Nyitray LIFE IN A CHINATOWN COLD WATER TENEMENT BUILDING 7 Lyle Jan HISTORY OF TRADITIONAL CHINESE MEDICINE IN CALIFORNIA A Perspective through the Stories of Four Acupuncturists 11 Emily S. Wu “We WERE REAL, SO THERE waS NO NEED TO BE AFRAID” Lum Ngow’s Long Detention on Angel Island 19 Judy Yung THE TWENTY-FIRST-CENTURY CHINESE AMERICA Growth and Diversity 27 Wei Li and Wan Yu About the Contributors 33 About the Editorial Committee 35 Guidelines for Manuscript Submission 37 Chinese Historical Society of America Membership Form 39 iii Things Matter Chinese American Culture Work and the Gods of Marysville Jonathan H. -
Administration's Paper on "Measure to Address Noise Impact of Existing
For discussion on 15 December 2000 LEGISLATIVE COUNCIL Panels of Environmental Affairs and Transport Measures to Address Noise Impact of Existing Roads INTRODUCTION This paper supplements the Legislative Council brief issued to Members on 18 November 2000 concerning a new policy to address the noise impact of existing roads on nearby residents. A copy of the brief is at Enclosure 1. THE NEW POLICY 2. The new policy to address the noise impact of existing roads on residents in the neighbourhood is as follow - (a) engineering solutions, by way of retrofitting of barriers and enclosures, and resurfacing with low noise material, should be implemented where practicable at existing excessively noisy roads in accordance with the guiding principles set out in paragraphs 7 and 13 of the Legislative Council brief; and (b) Non-engineering solutions, such as traffic management measures, should be explored on a case-by-case basis and implemented where practicable at roads where engineering solutions are impracticable or where engineering solutions alone are inadequate in reducing the noise to an acceptable level. PAGE 2 SUPPLEMENTARY INFORMATION Roads exceeding noise limit 3. According to the assessment of the Environmental Protection Department (EPD), 655 out of 3,000 existing roads in Hong Kong are currently generating noise in excess of the noise limit for new roads of 70dB(A). This does not mean, however, all flats near these 655 roads are exposed to high noise levels. This is because the degree of noise impact would depend on factors including height and location of the flats and any structure that screens the line-of-sight to the road.