Appendix a - Cost Estimates
Cynwyd Spur Trail Feasibility Study Appendix A - Cost Estimates Page 43 Cynwyd Heritage Trail Spur- Phase 1 & 2 (w/ Retaining Walls) Preliminary Construction Cost Estimate Length Width Trail Feature Item Number Description Quantity Unit Cost/Unit Total Cost (ft) (ft) Section 1: O'Neill property line to bridge crossing Superpave asphalt mixture design, HMA 0409-0385 wearing course, PG64-22, <0.3 million ESALS, 9.5 mm mix, 1.5" depth, SRL-L 1050 12 1400 SY $19 $ 26,600 12' Paved Shared Use Superpave asphalt mixture design, HMA base Path 0309-0320 course, PG64-22, <0.3 million ESALS, 25.0 mm mix, 3" depth 1050 12 1400 SY $26 $ 36,400 0703-0024 Subbase 6" Depth (No. 2A) 1050 12 233 CY $62 $ 14,467 0212-0014 Geotextile, Class 4, Type A 1050 12 1400 SY $4 $ 5,040 Shoulder 0703-0024 Subbase 6" Depth (No. 2A) 1050 4 78 CY $62 $ 4,822 0203-0001 Excavation - Class 1 (pavement box only) 1050 12 389 CY $32 $ 12,534 Trail Clearing/Excavation 0203-0001 Excavation - Class 1 for grading 1050 16 856 CY $32 $ 27,575 0201-0001 Clearing and grubbing 1 LS $20,000 $ 20,000 Railroad Bridge Rehab RR bridge for trail users 1 LS $75,000 $ 75,000 Signing 0931-0111 Post-mounted signs, type B 60 SF $36 $ 2,134 Right-of-way fence under 76 and along railroad 0624-0001 600 LF $21 $ 12,660 Fencing bridge 0624-0300 End posts for chain-link fence 8 EA $194 $ 1,551 0624-0400 Corner posts for chain-link fence 6 EA $199 $ 1,193 0804-0011 Seeding and soil supplement - formula B 15 LB $60 $ 881 Seeding 0803-0001 Placing stockpiled topsoil 77 CY $26 $ 2,031 Walking Trail along Clearing and grubbing 1 LS $10,000 $ 10,000 waterfront 0703-0021 AASHTO No.
[Show full text]