0 10 Millimetres 100 Plotted: Mar 30, 2018 - 4:43pm by: UKSMY600 DO NOT SCALE

+062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU #5.16J

Í A9 TO TO A9 #5.16J

RET. POND ZA RIVER 2018 . All rights

#5.16I

#5.16J

#5.16B YA POND RET.

(SCALE 1:12500) Í A9 TO INVERNESS TO A9 KEY PLAN #5.16I

RET. POND XA

#5.16H #5.16B

RET. POND 9A

TOMATIN SOUTH #5.16H

JUNCTION

Í

B9154 TO DAVIOT TO B9154

A9 TO PERTH TO A9 Î

RET. POND 8A #5.16G JUNCTION LYNEBEG

INF. BASIN 7B

RET. POND 7A

#5.16G #5.16F (SCALE 1:12500) KEY PLAN

RET. POND 6A&B MOY RAIL

BRIDGE #5.16F

#5.16K

œ œ œ œ RET. POND 5A&B

œ MOY SOUTH

JUNCTION

#5.16E #5.16D DALMAGARRY FUNTACK BURN

C1121

#5.16D #5.16C NORTH JUNCTION

C1121 #5.16E PROPOSED RUTHVEN LINK ROAD

C1121

A9 TO PERTH TO A9 Î Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 1. N AS SHOWN # OTES Location A1 KEY PLAN. ONLY PLAN SHEET EXTENTS ARE SHOWN ON THE Project X_ZZZZZ_ZZ - DR DE 0516 DENOTES SHEET NUMBER Drawn / Des A9P12 - AMJ HGN RC Date Designed / Drawn 30/03/18 Type RC DRAINAGE PLAN SHEET 0 OF 10 Originator FINAL FIGURE 5.16A Checked SHEET AREA AT 1:1250 SCALE Date Checked GA 30/03/18 Role GA Approved Date Approved Volume RB 30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 SB B 0 10 Millimetres 100 Plotted: Mar 30, 2018 - 4:45pm by: UKSMY600 DO NOT SCALE

+062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU

Í A9 TO PERTH TO A9 2018 . All rights

HIGHLAND MAIN LINE RAILWAY

œ œ

œ

œ

œ

œ

œ TOMATIN SOUTH JUNCTION PLAN (SCALE 1:1250) (SCALE 1:1250) PLAN

x

U2856

A9 TO INVERNESS

Î Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH LINED DITCH FILTER DRAIN PLUNGE POOL CELLULAR STORAGE CULVERT STRUCTURE GRASSED CHANNEL COMBINED KERB DRAIN CARRIER DRAIN SWALE TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 1 OF 10 Originator FIGURE 5.16B Checked Date Checked GA ------SHEET PLAN 30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B 0 10 Millimetres 100 Plotted: Mar 30, 2018 - 4:47pm by: UKSMY600 DO NOT SCALE +062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU

Í

299.9m

A9 TO PERTH

STATION COTTAGES C1121 2018

. All rights GENERAL WADE'S MILITARY ROAD MILITARY WADE'S GENERAL (EXTEND EXISTING) UNDERPASS TOMATIN HOUSE A9 1240

ISSUES

MODHACHAIDH DRAIN

UNDERPASS

ISSUES

(DISUSED)

Î x

PIT

SANDSIDE

ISSUES

DRAIN x

A9

PORTER'S LODGE

x

ISSUES

297.2m

x

x

x

x

x x x TOMATIN JUNCTION

x x (SCALE 1:1250)

PLAN x

RET. POND 1A

x

DRAIN x

x

x x

UNDERPASS TOMATIN JUNCTION

A9 1245

x

x

x TRACK x

x

x

The Earn The

x x LARCHWOOD

PINEWOOD

MOSS VILLA

x

CULVERT ALLT NA FRITHE A9 1250 x

FREEBURN

TRACK COTTAGE

œ

FOOTBRIDGE A9 1245 F x ALLT NA FRITHE NA ALLT

TANK x x FORD DRAIN

FB x A9 x DRAIN

TRACK

x CUT LINE CUT

x SHINGLE x

CUT LINE

RIVER FINDHORN RIVER 293.2m

x

®¬ RET. POND 2A

x

C1121

A9 TO INVERNESS TO A9

DRAIN Í

x

x Î

x Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH LINED DITCH FILTER DRAIN PLUNGE POOL CELLULAR STORAGE CULVERT STRUCTURE GRASSED CHANNEL COMBINED KERB DRAIN CARRIER DRAIN SWALE TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 2 OF 10 Originator FIGURE 5.16C Checked Date Checked SHEET PLAN GA ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B 293.2m 0 10 Millimetres 100 Plotted: Mar 30, 2018 - 4:49pm by: UKSMY600 A9 DO NOT SCALE +062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU

Í CUT LINE TIGH AN ALLT A9 TO PERTH

COTTAGE

x

x C1121 x

x CUT LINE CUT Í

x

A9 TO PERTH CUT LINE CUT

PATH Í CUT LINE

x

x

® ¬ x

Î

SHINGLE

œ

RIVER FINDHORN RIVER

x MP 100

2018

x œ . All rights

RET. POND 2A

x

x

œ x

POND

x x

POND DRAIN

x x

x œ

x

x x

œ

x

x

œ

x

x

x x

GP

œ x

DRAIN LAY-BY Í

GP x x

œ

x x DRAIN

x

POND x

x

® ¬

x x

DRAIN MAIN LINE RAILWAY LINE MAIN HIGHLAND

x

x

x x

x

x x

x x x

x

x

x x

x

A9

x x

x x x MP x

x x x x

x 289.6m

x x x

x

LAY-BY

¬

x ® LAY-BY (SCALE 1:1250) (SCALE 1:1250) x x PLAN PLAN

x

x

x x

CYCLE PATH CYCLE x x

x x x

x x

x SILVER BIRCHES

x x

RET. POND 3A

x

x

x

x

x x

POND

x x

x

x

x x CULVERT ALLT DUBHAIG

A9 1250 C25

x

x C1121

DRAIN x x

x x x

ALT DUBH x x x x

x x x

x x x x

x

INVEREEN FARM x

ASHGROVE x

TIGH AN ALLT x x COTTAGE x x x x

x x WOODLAND HOUSE

x x x DRAIN

CULVERT TIGH AN ALLT x

DRAIN x

BELLHOUSE

x

x

CUT LINE LINE CUT

A9 TO INVERNESS TO A9

x x

PATH 294.4m

x

x

CUT LINE CUT

x

x

A9 TO INVERNESS x

Î

x

x

x x

x œ CUT LINE

Î œ

x

x œ

x LAY-BY Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH FILTER DRAIN LINED DITCH PLUNGE POOL GRASSED CHANNEL CELLULAR STORAGE CULVERT STRUCTURE SWALE COMBINED KERB DRAIN CARRIER DRAIN TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 3 OF 10 Originator FIGURE 5.16D Checked Date Checked GA SHEET PLAN ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B 0 10 Millimetres 100 Plotted: Mar 30, 2018 - 4:52pm by: UKSMY600 DO NOT SCALE x

+062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU x x

Î x

Í

A9 TO PERTH

x x

CUT LINE

x

x x

TRACK

DALMAGARRY Í

A9 TO PERTH TO A9

QUARRY x x

CUT LINE CUT x

CUT LINE CUT

CYCLE PATH CYCLE

x x

2018 x

. All rights

RUTHVEN ROAD x

x

x

x

x

x

œ x

x

x œ x LAY-BY

RET. POND 4A

MP 100.5 x

DALMAGARRY BURN CUT LINE

œ

x x x

x œ

HIGHLAND MAIN LINE RAILWAY x

œ x

x

œ x

x x

x œ

x

x œ x

x

x x œ

x

Î

¬ ® x

x

œ x

® ¬

x x

œ

œ ¬

® x x

CYCLE PATH œ CUT LINE

x œ

x MP 100.75

œ œ

x œ œ x TRACK œ A9 TO INVERNESS

x œ

x œ

œ x œ HIGHLAND MAIN LINE RAILWAY LINE MAIN HIGHLAND

(SCALE 1:1250) CUT LINE CUT x

SIDE ROAD CULVERT x

PLAN Î œ œ

DALMAGARRY 1 x x x

®¬ œ x

DALMAGARRY 1 x (SCALE 1:1250)

œ x CULVERT

®¬ PLAN x

DALMAGARRY x œ QUARRY

x œ RET. POND 4B x x œ

x

œ A9

x

œ

RET. POND 4A GENERAL WADE'S MILITARY ROAD MILITARY WADE'S GENERAL

œ

RUTHVEN ROAD

œ TRACK

¬ œ ® ® ¬

œ STRATHDEARN CYCLE TK DALMAGARRY BURN

œ DALMAGARRY 2

œ CULVERT

œ DALMAGARRY 2 SIDE ROAD CULVERT A9 1250 C935

REALIGNED DALMAGARRY BURN DALMAGARRY REALIGNED TRACK

œ

œ œ FUNTACK BURN (RAC)

TCP

A9 TO INVERNESS TO A9

œ

LAY-BY

œ

œ

Î

œ

œ

œ œ Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH LINED DITCH FILTER DRAIN PLUNGE POOL CELLULAR STORAGE CULVERT STRUCTURE GRASSED CHANNEL COMBINED KERB DRAIN CARRIER DRAIN SWALE TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 4 OF 10 Originator FIGURE 5.16E Checked Date Checked GA SHEET PLAN ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B 0 10 Millimetres 100

Plotted: Mar 30, 2018 - 4:55pm by: UKSMY600 DO NOT SCALE

x +062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI Í UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU

Í œ A9 TO PERTH TO A9 MP 101.5

A9 TO PERTH x CUT LINE CUT

œ x

x œ

œ

LINK ROAD BRIDGE RUTHVEN MOY A9 1260 SRB1 TRACK CUT LINE x œ Î Ð

®¬ K SHEET SEE

œ 2018

x ®¬ . All rights x œ

œ LINE CUT

œ FB

œ œ ISSUES x œ

x

œ

œ

–

Î –

x

œ –

x

–

¬

DALMAGARRY ® x –

– FARM

x – œ SHEEP WASH

SHEILING –

TRACK œ THE x

x

Ð

CULVERT STRATHDEARN 2 A9 1260 C65

¬ CYCLE TK ® SIDE ROAD CULVERT STRATHDEARN 2 A9 1260 C65 Ð

HIGHLAND MAIN LINE RAILWAY x

COTTAGE HIGHLAND MAIN LINE RAILWAY LINE MAIN HIGHLAND THE Ð

x x

x AND NMU UNDERPASS DALMAGARRY FARM Ð BRIDGE DALMAGARRY A9 1260

x

CUT LINE

Ð x

Ð

x

x

SEE SHEET K

Ð

B9154 x

x

Ð

x ISSUES

Ð x

x

A9 x

x

Ð

x

x Ð

x

x CULVERT SOUTH MOY RAILWAY A9 1260 CNR1 MP 101.75 Ð

x

x

x

x Ð MP 101.25

LEFT-OUT JUNCTION PLAN Ð MOY SOUTH LEFT-IN/

x

x

Î x (SCALE 1:1250) (SCALE 1:1250) MOY CULVERT

A9 1260 C94 Ð PLAN

x

TRACK

x Ð

x x MOY RAIL BRIDGE

A9 1270 Ð

LEFT-OUT JUNCTION MOY SOUTH LEFT-IN/ x

ROAD CULVERT MILLENIUM SIDE A9 1260 C25 S

¬

® x

Ð

x

® ¬ Ð

x MILLENIUM CULVERT A9 1260 C25

x –

x

®¬

x

x

–

x

x

– x

x

x x

–

x

–

® ¬ –

A9

– x

–

– x

x

® ¬ –

CULVERT NORTH MOY RAILWAY A9 1270 CNR2

–

–

Ð

x FB – CULVERT MOY SIDE ROAD

A9 1260 C945

x –

–

Ð

DRAIN

–

x

x

– – STRATHDEARN 1 SIDE ROAD CULVERT

x A9 1260 C35 S

– Ð

x

–

–

x

¬ ® Ð

Ð

– –

x

ISSUES x

Ð

– Ð – ¬ ® CULVERT STRATHDEARN 1 A9 1260 C35

B9154 x

x

x x Ð

Ð

x

x x Ð

Ð x

x x RET. POND 5A&B Ð

Ð

x x

x x Ð

Ð

B 9154 B x Ð Ð

x x Ð

Ð

x x

x

Ð

Ð x

®¬ x

x x MP 101.5

x

x CUT LINE LINE CUT

CUT LINE CUT

x x

A9 TO INVERNESS

x x

RET. POND 6A&B

A9 TO INVERNESS TO A9

x

x TRACK CUT LINE

x

B9154 x

Î

x

x

Î x Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH LINED DITCH FILTER DRAIN PLUNGE POOL CELLULAR STORAGE CULVERT STRUCTURE GRASSED CHANNEL COMBINED KERB DRAIN CARRIER DRAIN SWALE TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 5 OF 10 Originator FIGURE 5.16F Checked Date Checked GA SHEET PLAN ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B

¬ ® 0 10 Millimetres 100 Plotted: Mar 30, 2018 - 4:58pm by: UKSMY600 DO NOT SCALE ®¬

+062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU

x x x

Í CUT LINE

A9 TO PERTH TO A9

CUT LINE CUT

® ¬ x

Í

CUT LINE CUT A9 TO PERTH

x x ® ¬

RET. POND 6A&B

x Track x

x x CUT LINE

®¬ x x x 2018

®¬ x

. All rights

HIGHLAND MAIN LINE RAILWAY LINE MAIN HIGHLAND x

x

x

® ¬ x

x

x

x

x

x

x

® ¬ x

SIDE ROAD CULVERT CULVERT 6

B9154

x

x

x

x ®¬

x x

x

® ¬

x x

®¬

®¬ ®¬

x x

x

CULVERT 3 SIDE ROAD CULVERT A9 1270 C35S

x UNDER RAILWAY SERVICE TUNNEL x

x

® ¬

NEW POND

x

® ¬

CULVERT 6 A9 1270 C80 x

x

x

x x

SCHOOL

x

x

Î

CARAVAN x PARK

CULVERT 3 A9 1270 C35 x

x CAOCHAN NA H-EAGLAIS

HIGHLAND MAIN LINE RAILWAY

® ¬

x

¬ ® x

DRAIN ®¬

x Î

x x

DRAIN

® ¬ x x

x x

DRAIN x ®¬ x

ISSUES x LEFT-OUT JUNCTION PLAN (SCALE 1:1250) POND LYNEBEG LEFT-IN/

x PLAN (SCALE 1:1250)

TANK

x x

WELL

¬

RET. POND 7A ® x

x x

x

® ¬ B9154

x x

SIDE ROAD CULVERT

CULVERT 4 B9154

x

x

x

Fearnach

x x x CATTLE

GRID

MOYBEG

x x

x x

UNDERPASS LYNEBEG RAIL

x x x

x UNDERPASS LYNEBEG A9 1273

CULVERT 4 A9 1270 C50

A9

® ¬

® ¬

(DISUSED) x COTTAGE MOYBEG QUARRY POND

LEFT-OUT JUNCTION LYNEBEG LEFT-IN/

x

x x INF. BASIN 7B

x SIDE ROAD CULVERT CULVERT 5 CULVERT 5 A9 1270 C60

x

® ¬ x

x

x

x x

CATTLE

x GRID ®¬

x

®¬ x

x x

®¬

x

Î A9 TO INVERNESS TO A9 SOUTH CULVERT LYNEBEG A9 1273 C5 LYNEBEG

x CUT LINE x

®¬

®¬ x

CUT LINE CUT x

CUT LINE CUT

Î Î

x A9 TO INVERNESS

x

x CUT LINE

® ¬

® ¬

x

Î

Drawing Number Drawing Title Client Drawing Status

Original Size Scale Description Rev FIRST ISSUE P01 ------x AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH LINED DITCH FILTER DRAIN PLUNGE POOL CELLULAR STORAGE CULVERT STRUCTURE GRASSED CHANNEL COMBINED KERB DRAIN CARRIER DRAIN SWALE TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 6 OF 10 Originator FIGURE 5.16G Checked Date Checked GA SHEET PLAN ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B 0 10 Millimetres 100

Plotted: Mar 30, 2018 - 4:59pm by: UKSMY600 DO NOT SCALE

x Ð x

+062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU

x

Í

x A9 TO PERTH TO A9

Í

Ð

A9 TO PERTH

x CUT LINE CUT x

x CUT LINE Ð x

CUT LINE CUT

x

x Ð x

CUT LINE Ð x

LYNEBEG SOUTH CULVERT A9 1273 C5

Ð x GENERAL WADE'S MILITARY ROAD

NORTH SIDE ROAD CULVERT ALLT NA SLANAICH A9 1273 C18 ALLT NA Ð 2018

x

x

. All rights

®

¬ x

Ð

Ð

® ¬

® ¬

® ¬

x Ð

® ¬

Ð

x

Ð

Ð

x

Ð Ð

®¬ Ð

®¬ NORTH CULVERT ALLT NA SLANAICH A9 1273 C18

x

x x

x

x

MOIRE CULVERT ALLT NA LOINNE x A9 1273 C8

LAY-BY

PROPOSED SOUTHBOUND

x

x x x

x x

x

x Ð

x x ¬

®¬ ®

x Ð x

x

Ð

Î

x ¬ RET. POND 8A ®

x

Ð

Î x

x

Ð

x x

Ð x

ALLT NA SLANAICH SIDE ROAD CULVERT A9 1273 C22 S x

x

Ð

x $//71$/2,11(02ғ,5( x (SCALE 1:1250) (SCALE 1:1250)

x Ð x

x PLAN PLAN

x x

Ð

x x Ð

® ¬

x

® ¬

Ð DAM

x

x x

Ð

x x ®¬ Ð CULVERT ALLT NA SLANAICH A9 1273 C22

x œ x Ð

®¬ x x

Ð œ

x

x

Ð œ

x Ð GROUSE BUTTS

x x

Ð

x x

x Ð

RET. POND 9A

® ¬

x Ð x

x

Ð

® ¬

x

Ð DRAIN x x

x

® ¬ DRAIN Ð

x

x x x

®¬ Ð œ CULVERT 7 A9 1273 C24 x Ð

x

œ x x x

Ð œ

x

x

Ð x

œ œ

A9

Ð x

x x œ

œ x

Ð œ x

x œ

Ð x

x

œ œ

x Ð

A9 TO INVERNESS

x œ x

x

œ Ð

œ x x

Ð œ

x A9 TO INVERNESS

x œ

Ð

x œ Î

x CUT LINE œ

CUT LINE x

Ð

œ CUT LINE CUT

Ð x

CUT LINE CUT

x

œ x

Î Ð

Drawing Number Drawing Title Client Drawing Status Original Size Scale œ Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH LINED DITCH FILTER DRAIN PLUNGE POOL CELLULAR STORAGE CULVERT STRUCTURE GRASSED CHANNEL COMBINED KERB DRAIN CARRIER DRAIN SWALE TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 7 OF 10 Originator FIGURE 5.16H Checked Date Checked GA SHEET PLAN ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B 0 10 Millimetres 100 Plotted: Mar 30, 2018 - 5:02pm by: UKSMY600 DO NOT SCALE +062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU

Í

x

A9 TO PERTH

x

Í

CUT LINE CUT CUT LINE A9 TO PERTH TO A9

x

x

x 2018

. All rights x

x

x

x

x

x

x

x

BADACHREAM CULVERT A9 1273 C40

Ð Ð

CULVERT 8 A9 1273 C28

Ð

Ð Ð

ACCESS ROAD CULVERT A9 1273 C315

Ð

Ð

Ð

Ð

Ð

Ð

x

Ð

Ð

Ð

Ð

Ð

x

Ð

Ð

Ð Ð

PROPOSED NORTHBOUND LAY-BY

Ð EXISTING FORESTRY ACCESS CLOSED x

Ð

Ð

Ð

Ð

Ð

x

Ð

Ð

Ð

Ð

x

Ð Ð MIDLAIRGS BURN CULVERT A9 1273 C43

CULVERT 9 A9 1273 C31

Ð

Ð

Ð

x

Ð

Ð Ð (SCALE 1:1250)

A9 (SCALE 1:1250) Ð

PLAN

Ð

x Ð

PLAN

Ð

SEE SHEET J SHEET SEE

Ð

Ð

CUT LINE CUT

¬

x ®

® ¬

® ¬

® ¬

x

x x SUDS ACCESS ROAD CULVERT ALLT CREAG BHEITHIN A9 1213 MCY0 C1

x ®¬

x RET. POND YA

x

x

x

CUT LINE

x

SEE SHEET J

x

TRACK TIE-IN TO EXISTING DUAL CARRIAGEWAY x

x

x ALLT CREAG BHEITHIN

A9 TO INVERNESS

x

x

Î A9 TO INVERNESS TO A9

x

x Î Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH LINED DITCH FILTER DRAIN PLUNGE POOL CELLULAR STORAGE CULVERT STRUCTURE GRASSED CHANNEL COMBINED KERB DRAIN CARRIER DRAIN SWALE TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 8 OF 10 Originator FIGURE 5.16I Checked Date Checked SHEET PLAN GA ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B 0 10 Millimetres 100

Plotted: Mar 30, 2018 - 5:04pm by: UKSMY600

x DO NOT SCALE +062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI x UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU BADACHREAMH

Í

FORESTRY ACCESS ROAD CULVERT 1 A9 1273 MCY0 C1 x

A9 TO PERTH

x

x

® ¬ ®¬

¨

A9(T)

œ

x

œ CUT LINE CUT

2018 CUT LINE

œ ACCESS FORESTRY / WINDFARM

. All rights TRACK

x

œ LEFT-IN/LEFT-OUT FORESTRY / WINDFARM

x

®¬ ®¬ œ

RET. POND ZA ®¬ ®¬

x ®¬ FORESTRY ACCESS ROAD CULVERT 2 A9 1273 MCY0 C2 FORESTRY ACCESS ROAD CULVERT 3 A9 1273 MCR1 C1 JUNCTION PLAN (SCALE 1:1250)

x

x ¬

x ® x x

® ¬

CLEARING x

x x

x x

x

x

® ¬

x

® ¬

® ¬

® ¬

® ¬

x

x

¬ ® ®¬

® ¬

x ® ¬

x

x x

® ¬

® ¬

x

x

® ¬

MIDLAIRGS BURN MIDLAIRGS

® ¬ x

Í

A9 TO INVERNESS TO A9 A9 TO PERTH ® ¬ x œ

œ

(SCALE 1:1250)

x

Î x

PLAN œ

x

œ

x

œ

x SEE SHEET I SHEET SEE œ

x

x

œ CUT LINE CUT

x

x

x

x

FORESTRY ROAD

x

® ¬

x

® ¬

¬

® x ® ¬

UAIGH AN DUINE-BHEO x x

x

x x

x

x x

x

x x SUDS ACCESS ROAD CULVERT

®¬ ALLT CREAG BHEITHIN A9 1213 MCY0 C1 x

RET. POND YA

x

x

x

x

x x x

(SCALE 1:1250) x

x x

PLAN

x

x

CUT LINE x

x x

x x FORESTRY ACCESS ROAD CULVERT 1 A9 1273 MCY0 C1

FORD

x x

SEE SHEET I

x

x

x

x x

FORESTRY ACCESS ROAD A9 1273 MCY0 C2 CULVERT 2

x x

BADACHREAMH x

x x

TRACK x

GENERAL WADE'S MILITARY ROAD

A9 TO INVERNESS TO A9

® ¬ ®¬

ALLT CREAG BHEITHIN

®¬

œ x

Î

œ CUT LINE CUT

CUT LINE

œ

x

œ Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH LINED DITCH FILTER DRAIN PLUNGE POOL CELLULAR STORAGE CULVERT STRUCTURE GRASSED CHANNEL COMBINED KERB DRAIN CARRIER DRAIN SWALE TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN Originator SHEET 9 of 10 FIGURE 5.16J Checked Date Checked GA SHEET PLAN ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B 0 10 Millimetres 100 Plotted: Mar 30, 2018 - 5:06pm by: UKSMY600 DO NOT SCALE +062‹&URZQFRS\ULJKWDQGGDWDEDVHULJKW 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU

2018 FUNTACK BURN FUNTACK . All rights SIDE ROAD CULVERT DALMAGARRY 2 A9 1250 C935

AND NMU UNDERPASS DALMAGARRY FARM REALIGNED DALMAGARRY BURN DALMAGARRY REALIGNED

SHEEP WASH

œ

Í A9 TO PERTH TO A9

LINK ROAD BRIDGE RUTHVEN MOY A9 1260 SRB1 œ œ

DALMAGARRY 2 œ

CULVERT DALMAGARRY

FARM œ

TCP

(RAC)

œ

œ

LAY-BY COTTAGE œ

THE œ (SCALE 1:1250)

SHEILING

PLAN œ

x THE

œ œ œ

®¬ œ

œ BRIDGE DALMAGARRY œ A9 1260

MP 101 œ œ

œ FB

œ –

œ

– – x –

œ

– –

–

x œ

– Ð

® ¬

CYCLE TK CYCLE Ð

¬

TRACK œ ®

Ð

Ð

œ

Ð SEE SHEET F

A9 TO INVERNESS TO A9

Ð

Ð CUT LINE

Ð x Î HIGHLAND MAIN LINE RAILWAY x LINE MAIN HIGHLAND

x

x ®¬ CUT LINE CUT

®¬ COLLECTS SEE SHEET F SHEET SEE

®¬

®¬

x

®¬ TRACK

DALMAGARRY BURN

x ®¬

®¬

x TRACK

® ¬

® ¬

® ¬

x œ

x

œ

x

® ¬

x ® ¬

œ x ROAD BRIDGE DALMAGARRY ACCESS

TRACK Drawing Number Drawing Title Client Drawing Status Original Size Scale Description Rev FIRST ISSUE P01 ------AS SHOWN 1. INF. BASIN - INFILTRATION NOTES: RET. POND - RETENTION 3. 2. ABBREVIATIONS: Location x x – A1 Ð RETENTION POND/INFILTRATION BASIN NUMBERING DESIGN SUBJECT TO CHANGE. Project SPECIFICATION FOR HIGHWAY WORKS (SHW). ALSO RELATES TO DRAINAGE NETWORKS. ALL WORKS TO BE IN ACCORDANCE WITH THE ® ¬ œ X_ZZZZZ_ZZ - DR DE 0516 – x x Drawn / Des Ð A9P12 - AMJ HGN RC Date Designed / Drawn ------30/03/18 Type FILTER STRIP REGRADE DITCH FILTER DRAIN LINED DITCH PLUNGE POOL GRASSED CHANNEL CELLULAR STORAGE CULVERT STRUCTURE SWALE COMBINED KERB DRAIN CARRIER DRAIN TYPE A CHANNEL WATERCOURSE MODIFICATION ATTENUATION POND RC FINAL DRAINAGE PLAN SHEET 10 OF Originator FIGURE 5.16K Checked Date Checked GA SHEET PLAN ------30/03/18 Role GA (NTS) Approved Date Approved Volume RB ------30/03/18 Number RB Revision Date Authorised 30/03/18 Suitability 30/03/18 Date P01 ------SB B