100 Í A9 TO INVERNESS SHEET AREA AT 1:1250 SCALE # DENOTES SHEET NUMBER NOTES 1. ONLY PLAN SHEET EXTENTS ARE SHOWN ON THE Millimetres KEY PLAN. #5.16J RET. POND ZA POND RET. Í B9154 TO DAVIOT 10 #5.16J #5.16I RET. POND XA POND RET. 0 RET. POND 9A POND RET. RET. POND YA POND RET. #5.16I #5.16H DO NOT SCALE #5.16H RET. POND 8A POND RET. #5.16J LOCH MOY INF. BASIN 7B BASIN INF. #5.16G 7A POND RET. LYNEBEG #5.16G JUNCTION MOY RAIL BRIDGE RET. POND 6A&B POND RET. FUNTACK BURN #5.16F MOY SOUTH RET. POND 5A&B POND RET. JUNCTION #5.16F DALMAGARRY #5.16E #5.16E #5.16K PROPOSED RUTHVEN LINK ROAD P01 RC GA RB 30/03/18 FIRST ISSUE Rev Drawn / Des Checked Approved Date #5.16D Description Drawing Status Suitability FINAL B Client Í A9 TO INVERNESS #5.16D #5.16B C1121 C1121 TOMATIN SOUTH Drawing Title FIGURE 5.16A JUNCTION #5.16C RIVER FINDHORN DRAINAGE PLAN SHEET 0 OF 10 TOMATIN NORTH A9 TO PERTH Scale Designed / Drawn Checked Approved Authorised A9 TO PERTH JUNCTION AS SHOWN RC GA RB SB #5.16B C1121 Î Original Size Date Date Date Date A1 30/03/18 30/03/18 30/03/18 30/03/18 Î Drawing Number Revision KEY PLAN KEY PLAN Project Originator Volume A9P12 - AMJ - HGN - P01 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI (SCALE 1:12500) (SCALE 1:12500) +062&URZQFRS\ULJKWDQGGDWDEDVHULJKW2018. All rights X_ZZZZZ_ZZ - DR - DE - 0516 Plotted: Mar 30, 2018 - 4:43pm by: UKSMY600 UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU Location Type Role Number 100 NOTES: 1. ALL WORKS TO BE IN ACCORDANCE WITH THE SPECIFICATION FOR HIGHWAY WORKS (SHW). 2. DESIGN SUBJECT TO CHANGE. 3. RETENTION POND/INFILTRATION BASIN NUMBERING ALSO RELATES TO DRAINAGE NETWORKS. CARRIER DRAIN FILTER DRAIN Ð Ð TYPE A CHANNEL COMBINED KERB DRAIN Millimetres x x LINED DITCH x x REGRADE DITCH GRASSED CHANNEL ®¬ SWALE FILTER STRIP 10 CULVERT STRUCTURE U2856 0 CELLULAR STORAGE ATTENUATION POND PLUNGE POOL DO NOT SCALE WATERCOURSE MODIFICATION HIGHLAND MAIN LINE RAILWAY x ABBREVIATIONS: Î RET. POND - RETENTION POND A9 TO INVERNESS INF. BASIN - INFILTRATION BASIN Í A9 TO PERTH TOMATIN SOUTH JUNCTION PLAN (SCALE 1:1250) SHEET PLAN (NTS) ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- P01 RC GA RB 30/03/18 FIRST ISSUE Rev Drawn / Des Checked Approved Date Description Drawing Status Suitability FINAL B Client Drawing Title FIGURE 5.16B DRAINAGE PLAN SHEET 1 OF 10 Scale Designed / Drawn Checked Approved Authorised AS SHOWN RC GA RB SB Original Size Date Date Date Date A1 30/03/18 30/03/18 30/03/18 30/03/18 Drawing Number Revision Project Originator Volume PLAN A9P12 - AMJ - HGN - 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI (SCALE 1:1250) P01 +062&URZQFRS\ULJKWDQGGDWDEDVHULJKW2018. All rights X_ZZZZZ_ZZ - DR - DE - 0516 Plotted: Mar 30, 2018 - 4:45pm by: UKSMY600 UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU Location Type Role Number The Earn The 100 NOTES: LARCHWOOD 1. ALL WORKS TO BE IN ACCORDANCE WITH THE STATION COTTAGES SPECIFICATION FOR HIGHWAY WORKS (SHW). 2. DESIGN SUBJECT TO CHANGE. 3. RETENTION POND/INFILTRATION BASIN NUMBERING ALSO RELATES TO DRAINAGE NETWORKS. MOSS VILLA CARRIER DRAIN FILTER DRAIN Ð Ð TYPE A CHANNEL FREEBURN COMBINED KERB DRAIN Millimetres COTTAGE x x LINED DITCH DRAIN x x REGRADE DITCH A9 1245 F GRASSED CHANNEL TOMATIN DISTILLERY FOOTBRIDGE ®¬ SWALE FILTER STRIP 10 x CULVERT STRUCTURE FB 0 x CELLULAR STORAGE PIT PINEWOOD 299.9m (DISUSED) ATTENUATION POND PLUNGE POOL DO NOT SCALE C1121 x WATERCOURSE MODIFICATION GENERAL WADE'S MILITARY ROAD ABBREVIATIONS: x RET. POND - RETENTION POND x INF. BASIN - INFILTRATION BASIN x SANDSIDE MODHACHAIDH 293.2m ISSUES 297.2m C1121 x PORTER'S LODGE ALLT NA FRITHE CUT LINE x A9 1245 TOMATIN JUNCTION A9 1250 UNDERPASS ALLT NA FRITHE CULVERT x x SHEET PLAN x x x x (NTS) DRAIN x A9 TO INVERNESS ---- ---- ---- ---- ---- x UNDERPASS x Î x ---- A9 ---- ---- ---- ---- ---- A9 ---- ---- ---- ---- ---- ---- ---- x ---- ---- ---- ---- ---- x ¬ x ® ---- Î x x A9 TO PERTH A9 1240 x ---- ---- ---- ---- ---- Í x x FORD TOMATIN HOUSE x TRACK ---- x x UNDERPASS x Í (EXTEND EXISTING) P01 RC GA RB 30/03/18 x x DRAIN FIRST ISSUE x Rev Drawn / Des Checked Approved Date TRACK TANK x Description x CUT LINE CUT Drawing Status Suitability x x x ISSUES FINAL B x Client ISSUES x RET. POND 2A x RIVER FINDHORN ISSUES TRACK DRAIN SHINGLE DRAIN RET. POND 1A Drawing Title FIGURE 5.16C DRAINAGE PLAN SHEET 2 OF 10 DRAIN Scale Designed / Drawn Checked Approved Authorised AS SHOWN RC GA RB SB Original Size Date Date Date Date A1 30/03/18 30/03/18 30/03/18 30/03/18 Drawing Number Revision TOMATIN JUNCTION Project Originator Volume A9P12 - AMJ - HGN - 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI PLAN P01 +062&URZQFRS\ULJKWDQGGDWDEDVHULJKW2018. All rights (SCALE 1:1250) X_ZZZZZ_ZZ - DR - DE - 0516 Plotted: Mar 30, 2018 - 4:47pm by: UKSMY600 UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU Location Type Role Number 100 NOTES: SILVER BIRCHES 1. ALL WORKS TO BE IN ACCORDANCE WITH THE SPECIFICATION FOR HIGHWAY WORKS (SHW). 2. DESIGN SUBJECT TO CHANGE. 3. RETENTION POND/INFILTRATION BASIN NUMBERING ALSO RELATES TO DRAINAGE NETWORKS. 293.2m CARRIER DRAIN C1121 ALT DUBH FILTER DRAIN 289.6m C1121 RET. POND 3A ASHGROVE Ð Ð TYPE A CHANNEL MP GP COMBINED KERB DRAIN Millimetres x x LINED DITCH x x REGRADE DITCH WOODLAND HOUSE GRASSED CHANNEL ®¬ SWALE x FILTER STRIP x x 10 x CULVERT STRUCTURE x x x 0 LAY-BY CELLULAR STORAGE CUT LINE CUT BELLHOUSE DRAINx x ATTENUATION POND LAY-BY x PLUNGE POOL x x x DRAIN DRAIN x x DO NOT SCALE x x x Í A9 TO PERTHx GP x x WATERCOURSE MODIFICATION ® ¬ x 294.4m x x x x x x DRAIN x x x x x x ® ¬ x x x CUT LINE x x x A9 TO INVERNESS ABBREVIATIONS: x x x x RET. POND - RETENTION POND x A9 x INF. BASIN - INFILTRATION BASIN x DRAIN x x Î x ® ¬ A9 1250 C25 ALLT DUBHAIG CULVERT x x x x x x DRAIN x x x RET. POND 2A x CUT LINE x PATH x RIVER FINDHORN x CUT LINE CUT x TIGH AN ALLT COTTAGE SHINGLE x x PLAN (SCALE 1:1250) x SHEET PLAN (NTS) MP 100 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- CUT LINE CUT POND ---- ---- ---- ---- ---- ---- CUT LINE CUT ---- ---- ---- ---- ---- ---- ---- A9 TO PERTH P01 RC GA RB 30/03/18 Í Í x HIGHLAND MAIN LINE RAILWAY FIRST ISSUE x Rev Drawn / Des Checked Approved Date x x x x TIGH AN ALLT Description Í x x Î CULVERT LAY-BY x Drawing Status Suitability x x Î FINAL B x x Client A9 TO INVERNESS x x x x x x x x x x x x A9 CYCLE PATH x PATH x x LAY-BY x x x x x x x x x x CUT LINE x x x x x x x x x x x x x x x x x x x x x x x x DRAIN x x POND x x x CUT LINE POND x x x x x x Drawing Title TIGH AN ALLT x x COTTAGE x FIGURE 5.16D x x x x INVEREEN FARM DRAINAGE PLAN SHEET 3 OF 10 POND Scale Designed / Drawn Checked Approved Authorised AS SHOWN RC GA RB SB Original Size Date Date Date Date A1 30/03/18 30/03/18 30/03/18 30/03/18 Drawing Number Revision Project Originator Volume A9P12 - AMJ - HGN - 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI PLAN P01 +062&URZQFRS\ULJKWDQGGDWDEDVHULJKW2018. All rights (SCALE 1:1250) X_ZZZZZ_ZZ - DR - DE - 0516 Plotted: Mar 30, 2018 - 4:49pm by: UKSMY600 UHVHUYHG2UGQDQFH6XUYH\/LFHQFHQXPEHU Location Type Role Number ®¬ 100 x NOTES: x ¬ x ® 1. ALL WORKS TO BE IN ACCORDANCE WITH THE CUT LINE CUT Î SPECIFICATION FOR HIGHWAY WORKS (SHW). 2. DESIGN SUBJECT TO CHANGE. x x 3. RETENTION POND/INFILTRATION BASIN NUMBERING ALSO RELATES TO DRAINAGE NETWORKS. x CARRIER DRAIN A9 TO INVERNESS FILTER DRAIN x FUNTACK BURN x Ð Ð TYPE A CHANNEL COMBINED KERB DRAIN Millimetres x x x x LINED DITCH x x REGRADE DITCH MP 100.5 x x x GRASSED CHANNEL RET. POND 4A SWALE CYCLE PATH x x ®¬ FILTER STRIP 10 HIGHLAND MAIN LINE RAILWAY x x CULVERT STRUCTURE 0 CELLULAR STORAGE x x CUT LINE CUT x CUT LINE x ATTENUATION POND TRACK x PLUNGE POOL DO NOT SCALE x x WATERCOURSE MODIFICATION DALMAGARRY x QUARRY RUTHVEN ROAD x x ABBREVIATIONS: RET. POND - RETENTION POND x x INF. BASIN - INFILTRATION BASIN x x x x x STRATHDEARN x x x Í A9 TO PERTH LAY-BY TRACK x x x x x x x DALMAGARRY BURN DALMAGARRY CUT LINE PLAN (SCALE 1:1250) SHEET PLAN (NTS) ---- ---- ---- ---- ---- Í A9 TO PERTH ---- CUT LINE ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- x CYCLE PATH ---- ---- ---- ---- ---- ---- Î x ---- ---- ---- ---- ---- ---- x x P01 RC GA RB 30/03/18 GENERAL WADE'S MILITARY ROAD x FIRST ISSUE MP 100.75 Rev Drawn / Des Checked Approved Date x Description x HIGHLAND MAIN LINE RAILWAY Drawing Status Suitability TRACK FINAL B TRACK x x DALMAGARRY 2 Client x x CULVERT x DALMAGARRY 1 CULVERT CYCLE TK A9 TO INVERNESS x x x Î CUT LINE CUT x x x LAY-BY x x A9 (RAC) TCP x x x x x x x x x DALMAGARRY ¬ QUARRY ® ® ¬ ¬ ® REALIGNED DALMAGARRY BURN Î ¬ ® Drawing Title RET. POND 4A FIGURE 5.16E ¬ ® DRAINAGE PLAN A9 1250 C935 DALMAGARRY 1 SHEET 4 OF 10 SIDE ROAD CULVERT DALMAGARRY 2 SIDE ROAD CULVERT Scale Designed / Drawn Checked Approved Authorised RET. POND 4B AS SHOWN RC GA RB SB Original Size Date Date Date Date A1 30/03/18 30/03/18 30/03/18 30/03/18 RUTHVEN ROAD Drawing Number Revision Project Originator Volume DALMAGARRY BURN A9P12 - AMJ - HGN - 5HSURGXFHGE\SHUPLVVLRQRI2UGQDQFH6XUYH\RQEHKDOIRI PLAN P01 +062&URZQFRS\ULJKWDQGGDWDEDVHULJKW2018.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages11 Page
-
File Size-