Recollections of a Railway Enthusiast Thomas L
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
RAIL INFRASTRUCTURE and IMPROVED PASSENGER SERVICE COMMITTEE INTERIM REPORT March 2006
RAIL INFRASTRUCTURE AND IMPROVED PASSENGER SERVICE COMMITTEE INTERIM REPORT March 2006 RAIL INFRASTRUCTURE AND IMPROVED PASSENGER SERVICE COMMITTEE INTERIM REPORT March 2006 If you would like further copies of this report or a version in the following formats (large print, Braille, audio cassette or compact disk), please contact: Leanne Hatcher Rail Infrastructure and Improved Passenger Services Committee National Assembly for Wales Cardiff Bay CF99 1NA Tel: 029 2089 8429 E-mail: [email protected] Committee Members John Marek AM (Chair) Wrexham Leighton Andrews AM Rhondda Eleanor Burnham AM North Wales Rosemary Butler AM Newport West Janet Davies AM South Wales West Lisa Francis AM Mid & West Wales Carl Sargeant AM Alyn & Deeside Secretariat Chris Reading Committee Clerk Sarah Bartlett Deputy Clerk Leanne Hatcher Team Support Contents Page Number 1. Introduction 1 2. Roles and Responsibilities 2 3. Strategic Planning 8 4. Key Issues 9 5. What happens next? 14 Annexes 1. Schedule of Committee Papers 2. Verbatim Record of Committee Meetings 3. Consultation Letter 4. Schedule of Organisations Consulted 5. Summary of Consultation Responses 6. Structure of Welsh Rail Passenger Industry 7. Map of Rail Network 1. Introduction Background 1.1 The committee was established, in accordance with Standing Order 8.1, by a motion (NDM2735) that was approved by plenary on 6 December 2005. This motion set parameters for committee membership, terms of reference and various other matters; including the requirement to report to the National Assembly by the end of March and to terminate on 19 May 2006. 1.2 The committee held its inaugural meeting on 1 February 2006 to agree various procedural matters, including the election of the Chair. -
The Evolution of Train Services on the Met and Gc Line
THE EVOLUTION OF TRAIN SERVICES ON THE MET AND GC LINE by Eric Stuart (Readers may find reference to the Four-Tracking article in the July 2018 issue of Underground News helpful) After the Great Central (GC) arrived at Quainton Road and the service south thereof became established, both the GC and the Metropolitan Railway (Met.) provided services. However, the personalities at the heads of the two companies did not enjoy the best of relationships. Matters came to a head when a GC train crashed when failing to reduce speed over the (then) reverse curve into Aylesbury station in 1904. About that time, both the leaders retired and a period of better relations between the companies began. On 2 April 1906, the Metropolitan & Great Central Joint Railway (MGCJR) was created. This latter took over the lines of the Metropolitan Railway north and west of Harrow South Junction, with the exception of the branch to Uxbridge. These included the main line between Harrow-on-the-Hill and Verney Junction and the branch from Chalfont & Latimer to Chesham. The MGCJR was created under the terms of the Metropolitan & Great Central Railway Act, which received Royal Assent on 4 August 1905. At the same time, the Great Central and Great Western Joint Railway was formed, covering the lines south of Aylesbury via Princes Risborough to Northolt Junction. This was the result of a new line that aided the GC by partly avoiding congestion on the Met. and also giving the Great Western a shorter route to Birmingham1. One curiosity was that a Joint Committee was set up to manage a new Aylesbury station, jointly owned by two joint railways! Some points on terminology: The new line was commonly called just ‘The Joint Line’ and, even in later LT days, some staff still belonged to a particular class that made them feel superior to others2. -
Rail Station Usage in Wales, 2018-19
Rail station usage in Wales, 2018-19 19 February 2020 SB 5/2020 About this bulletin Summary This bulletin reports on There was a 9.4 per cent increase in the number of station entries and exits the usage of rail stations in Wales in 2018-19 compared with the previous year, the largest year on in Wales. Information year percentage increase since 2007-08. (Table 1). covers stations in Wales from 2004-05 to 2018-19 A number of factors are likely to have contributed to this increase. During this and the UK for 2018-19. period the Wales and Borders rail franchise changed from Arriva Trains The bulletin is based on Wales to Transport for Wales (TfW), although TfW did not make any the annual station usage significant timetable changes until after 2018-19. report published by the Most of the largest increases in 2018-19 occurred in South East Wales, Office of Rail and Road especially on the City Line in Cardiff, and at stations on the Valleys Line close (ORR). This report to or in Cardiff. Between the year ending March 2018 and March 2019, the includes a spreadsheet level of employment in Cardiff increased by over 13,000 people. which gives estimated The number of station entries and exits in Wales has risen every year since station entries and station 2004-05, and by 75 per cent over that period. exits based on ticket sales for each station on Cardiff Central remains the busiest station in Wales with 25 per cent of all the UK rail network. -
East Midlands Franchise: Invitation to Tender
East Midlands Franchise Invitation to Tender 7 June 2018 1 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General email enquiries: [email protected] © Crown copyright 2018 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/version/2 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. 2 Contents Section 1: Introduction ...................................................................................................... 6 1.1 Introduction .............................................................................................................................. 6 1.2 Form of Contract -
WALES of IRELAND St John's Wales Wales and Prettytenby
Lerwick Kirkwall Dunnet Head Cape Wrath Duncansby Head Strathy Whiten Scrabster John O'Groats Rudha Rhobhanais Head Point (Butt of Lewis) Thurso Durness Melvich Castletown Port Nis (Port of Ness) Bettyhill Cellar Head Tongue Noss Head Wick Gallan Head Steornabhagh (Stornoway) Altnaharra Latheron Unapool Kinbrace Lochinver Helmsdale Hushinish Point Lairg Tairbeart Greenstone (Tarbert) Point Ullapool Rudha Reidh Bonar Bridge Tarbat Dornoch Ness Tain Gairloch Loch nam Madadh Lossiemouth (Lochmaddy) Alness Invergordon Cullen Fraserburgh Uig Cromarty Macduff Elgin Buckie Dingwall Banff Kinlochewe Garve Forres Nairn Achnasheen Torridon Keith Turriff Dunvegan Peterhead Portree Inverness Aberlour Huntly Lochcarron Dufftown Rudha Hallagro Stromeferry Ellon Cannich Grantown- Kyle of Lochalsh Drumnadrochit on-Spey Oldmeldrum Dornie Rhynie Kyleakin Loch Baghasdail Inverurie (Lochboisdale) Invermoriston Shiel Bridge Alford Aviemore Aberdeen Ardvasar Kingussie Invergarry Bagh a Chaisteil Newtonmore (Castlebay) Mallaig Laggan Ballater Banchory Braemar Spean Dalwhinnie Stonehaven Bridge Fort William Pitlochry Brechin Glencoe Montrose Tobermory Ballachulish Kirriemuir Forfar Aberfeldy Lochaline Portnacroish Blairgowrie Arbroath Craignure Dunkeld Coupar Angus Carnoustie Connel Killin Dundee Monifieth Oban Tayport Lochearnhead Newport Perth -on-Tay Fionnphort Crianlarich Crieff Bridge of Earn St Andrews SCOTLAND Auchterarder Auchtermuchty Cupar Inveraray Ladybank Fife Ness Callander Falkland Strachur Tarbet Dunblane Kinross Bridge Elie of Allan Glenrothes -
Takabout Steam Trains
TALKABOUT STEAM TRAINS Full steam ahead Long before railway innovation and effi ciency moved from Britain to Japan, France and China, speed records were set in the British countryside by trains with names such as Flying Scotsman. From the Midlands to Devon, steam train enthusiasts are trying to bring back those days of locomotive engineering grandeur. WORDS CHRIS WRIGHT Steam locomotive 38021, Llangollen Railway, Wales PHOTOGRAPHY: DAVID WILCOCK DAVID PHOTOGRAPHY: JUNE 2015 QANTAS 127 Launceston Steam Railway Severn Valley Railway on the River Severn Carrog Station, Llangollen Railway ON MODEST SECTIONS of reconditioned track in the British countryside, original stream engines and carriages chug between stations rebuilt with painstaking accuracy to refl ect the way they looked in the golden era of steam trains, the fi rst four decades of the 20th century. Most are staffed by volunteers, from engine drivers to ticket collectors to those who maintain stations and tracks. and whose staff are handing out minced pies and mulled wine. This devotion only adds to the appeal. And, mostly, any revenue is Llangollen is a town on the River Dee, a stone bridge built in 1345 ploughed back into preservation. spanning its torrents. The water is livid and foaming as it vaults a weir. Steam trains attract all ages, but there’s a certain dynamic seen A famous pub restaurant, the Corn Mill, is on the bank of the river time and again: those who can remember, keen to convey to their opposite the station, with a waterwheel spinning and some of the descendants the wonders of the steam age. -
Wales Network Specification: March 2017 Network Rail – Network Specification: Wales 02 Wales
Delivering a better railway for a better Britain Network Specification 2017 Wales Network Specification: March 2017 Network Rail – Network Specification: Wales 02 Wales Incorporating Strategic Routes: L: Wales and This Network Specification describes the Wales Route in its There are also a number of other supporting documents that Borders geographical context and provides a summary of the infrastructure present specific strategies including: that is available for passenger and freight operators. It identifies Scenarios and Long Distance Forecasts – published in June 2009. the key markets for passenger and freight services by Strategic • The document considers how demand for long distance rail Route Sections (SRS). The SRSs cover specific sections of the route services, both passenger and freight, might be impacted by four and are published as appendices to this document. They describe in alternative future scenarios greater detail the current and future requirements of each SRS to inform both internal and external stakeholders of our future • Electrification Strategy – published October 2009 presents a strategy. strategy for further electrification of the network. Work is ongoing to refresh the Strategy in the light of committed Control This Network Specification draws upon the supporting evidence Period 5 electrification schemes, the ‘Electric Spine’ development from the Route Utilisation Strategy (RUS) process which informs the project and the formation of a ‘Task Force’ to consider further strategy to 2019, and the emerging findings from the Long Term electrification opportunities across the North of England. Planning Process (LTPP) which looks ahead 10 and 30 years. Stations – published in August 2011. This strategy considered the As part of the LTPP, four Market Studies have been established, • pedestrian capacity of stations on the network. -
Route Utilisation Strategy November 2008 Foreword
Wales Route Utilisation Strategy November 2008 2 Foreword I am delighted to present Network Rail’s Route Principally this is in south Wales, where capacity Utilisation Strategy (RUS) for Wales. This use is at its highest. This is a result of a growth covers the entire rail network in Wales, as well in the number of trains serving Cardiff and the as some parts of the network in the English building of a number of new stations. On this border counties. part of the network, in the most populous part of the country, the RUS builds on the successful This network is extensive and diverse. past introduction of more services and the There are main line links from Wales into selective growth of the network. England, a long-distance line along the border connecting north and south Wales, a busy A major programme to renew signalling urban passenger network serving Cardiff, and equipment in the Newport and Cardiff areas branches traversing sparsely populated rural will take place in the next five to seven years, areas. Some parts of the network are subject and much of the work described in this to fluctuating demand according to the time of strategy to enhance the network is planned year, most notably on the Cambrian Coast and in conjunction with this signalling work to in the Conwy Valley. increase cost-effectiveness. The High Level Output Specification (HLOS), published in The context in which this RUS has been July 2007, contained a specific requirement to produced, as has often been the case with increase seating capacity into Cardiff during other RUSs, is one of growing demand for the morning peak. -
Epic Outdoor Adventures!
51895 GDO NEW SIZE.qxp_Layout 1 18/12/2018 15:06 Page 1 Bala £ 01 North Wales Mary Jones World greatdaysoutnorthwales.co.uk Snowdonia Visit our award-winning visitor centre and discover the story of Mary Jones and the impact of the world’s best-selling book Destination to Discover on Wales and beyond. Set on the edge of Wales largest natural lake with a picnic area and children’s playground. Mary Jones World offers a great time for everybody. £1 discount off a child’s ticket when accompanied by a full paying adult. Open 1 April – 2 November 2019 Time 10am – 5pm (Last entry 4pm) Admission Check website for admission prices Llanycil, Bala, Gwynedd, LL23 7YF Phone 01678 521877 www.bydmaryjonesworld.org.uk Beddgelert £ 02 04 Sygun Coppermine Self-guided audio-visual tours allow you to explore the old workings of a Victorian Copper Mine. Discover the colourful chambers and magnificent stalactite and stalagmites. Above Ground: Museum of Antiquities, Gold Panning, Metal Detecting, Adventure Playground, Lakeside Walks and Bouncy Why not choose North Wales as your next destination to visit. It makes a big Castle. Winner of the Prince of Wales award for Tourism. impression with its spectacular views and unparalleled beauty, with its range of diverse attractions and activities – we have it all here in North Wales. 10% discount on all admissions before 10.30am Why not enjoy precious family time in the most awe-inspiring landscape Open 10th February - 10th November, 27th December - 2nd January you’re ever likely to find? Visiting elegant historic houses and gardens Time 9.30am-5pm British Summertime, 10am-4pm British Wintertime seeking out the best adrenalin activities on offer, visiting industrial sites or Beddgelert, Gwynedd, LL55 4NE simply walking, relaxing and enjoying the flora and fauna in the areas of Phone 01766 890595 www.syguncoppermine.co.uk outstanding natural beauty. -
Dev-Plan.Chp:Corel VENTURA
On Track for the 21st Century A Development Plan for the Railways of Wales and the Borders Tua’r Unfed Ganrif ar Ugain Cynllun Datblygu Rheilffyrdd Cymru a’r Gororau Railfuture Wales 2nd Edition ©September 2004 2 On Track for the 21st Century Section CONTENTS Page 1 Executive summary/ Crynodeb weithredol ......5 2 Preface to the Second Edition .............9 2.1 Some positive developments . 9 2.2 Some developments ‘in the pipeline’ . 10 2.3 Some negative developments . 10 2.4 Future needs . 10 3 Introduction ..................... 11 4 Passenger services .................. 13 4.1 Service levels . 13 4.1.1 General principles .............................13 4.1.2 Service levels for individual routes . ................13 4.2 Links between services: “The seamless journey” . 26 4.2.1 Introduction .................................26 4.2.2 Connectional policies ............................27 4.2.3 Through ticketing ..............................28 4.2.4 Interchanges .................................29 4.3 Station facilities . 30 4.4 On-train standards . 31 4.4.1 General principles .............................31 4.4.2 Better trains for Wales and the Borders . ...............32 4.5 Information for passengers . 35 4.5.1 Introduction .................................35 4.5.2 Ways in which information could be further improved ..........35 4.6 Marketing . 36 4.6.1 Introduction .................................36 4.6.2 General principles .............................36 5 Freight services .................... 38 5.1 Introduction . 38 5.2 Strategies for development . 38 6 Infrastructure ..................... 40 6.1 Introduction . 40 6.2 Resignalling . 40 6.3 New lines and additional tracks / connections . 40 6.3.1 Protection of land for rail use ........................40 6.3.2 Route by route requirements ........................41 6.3.3 New and reopened stations and mini-freight terminals ..........44 On Track for the 21st Century 3 Section CONTENTS Page 7 Political control / planning / funding of rail services 47 7.1 Problems arising from the rail industry structure . -
Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02
Long Term Planning Process Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02 Foreword 03 Executive summary 04 Chapter 1 – Strategic Planning Process 06 Chapter 2 – The starting point for the Welsh Route Study 10 Chapter 3 - Consultation responses 17 Chapter 4 – Future demand for rail services - capacity and connectivity 22 Chapter 5 – Conditional Outputs - future capacity and connectivity 29 Chapter 6 – Choices for funders to 2024 49 Chapter 7 – Longer term strategy to 2043 69 Appendix A – Appraisal Results 109 Appendix B – Mapping of choices for funders to Conditional Outputs 124 Appendix C – Stakeholder aspirations 127 Appendix D – Rolling Stock characteristics 140 Appendix E – Interoperability requirements 141 Glossary 145 Foreword March 2016 Network Rail – Welsh Route Study 03 We are delighted to present this Route Study which sets out the The opportunity for the Digital Railway to address capacity strategic vision for the railway in Wales between 2019 and 2043. constraints and to improve customer experience is central to the planning approach we have adopted. It is an evidence based study that considers demand entirely within the Wales Route and also between Wales and other parts of Great This Route Study has been developed collaboratively with the Britain. railway industry, with funders and with stakeholders. We would like to thank all those involved in the exercise, which has been extensive, The railway in Wales has seen a decade of unprecedented growth, and which reflects the high level of interest in the railway in Wales. with almost 50 per cent more passenger journeys made to, from We are also grateful to the people and the organisations who took and within Wales since 2006, and our forecasts suggest that the time to respond to the Draft for Consultation published in passenger growth levels will continue to be strong during the next March 2015. -
(Public Pack)Agenda Document For
Democratic Service Complete Agenda Swyddfa’r Cyngor CAERNARFON Gwynedd LL55 1SH Meeting CAMBRIAN COAST RAILWAY LIAISON CONFERENCE Date and Time 11.00 am, FRIDAY, 11TH NOVEMBER, 2016 Location Y Ganolfan (ger yr Harbwr), Porthmadog, Gwynedd Contact Point Glynda O'Brien (01341) 424301 [email protected] (DISTRIBUTED: 04.11.16) www.gwynedd.llyw.cymru CAMBRIAN COAST RAILWAY LIAISON CONFERENCE Cyngor Gwynedd Councillors: E. Selwyn Griffiths, Annwen Hughes, John Brynmor Hughes, Anne Lloyd Jones, Eryl Jones-Williams, Dewi Owen, Angela Russell, Eirwyn Williams, Gethin Glyn Williams ac Owain Williams. Ceredigion County Council Awaiting Nomination Powys County Council Councillor J M Williams OTHER MEMBERS: Dafydd Elis-Thomas Assembly Member for Dwyfor/Meirionnydd Liz Saville Roberts Member of Parliament for Dwyfor/Meirionnydd Dave Thomas Welsh Government Claire Britton Ffestiniog Railway Cynghorydd Trevor Roberts Shrewsbury/Aberystwyth Railway Liaison Committee Tim Bell Arriva Trains Wales Ben Davies Arriva Trains Wales Rhydian Mason Cambrian Line Partnership David Crunkhorn Arriva Trains Wales Samuel Hadley Network Rail Carl Jones Network Rail Helen Lewis Ysgol Uwchradd Tywyn Tudur O Williams Ysgol Ardudwy Pennaeth Coleg Meirion-Dwyfor Joyce Watson AM for Mid and West Wales Simon Thomas AM for Mid and West Wales Neil Hamilton AM for Mid and West Wales David Woodhouse Aberdyfi and Tywyn Tourism Tracy Parkinson Talyllyn Railway Roger Goodhew Shrewsbury/Aberystwyth Passenger Association Sgt. Karl Anderson British Transport Police Rob Newman British Transport Police Inspector Mark Armstrong North Wales Police Councillor Delwyn Evans Meirionnydd Access Group Councillor Alun Wyn Evans Meirionnydd Representative One Voice Wales Councillor Trefor Jones Dwyfor Representative One Voice Wales David L Roberts Snowdonia National Park A G E N D A 1.