M/s. SUNNY CHEMICALS., ANKLESHWAR

1.0 EXECUTIVE SUMMARY M/s. Sunny chemical,. is located at plot no:-6811, GIDC Estate, Ankleshwar, Dist- , . Unit is having valid CCA-AWH-98146 for the manufacturing Synthetic Organic Chemicals. Now unit wants to increase production, hence unit is going to apply for the EC on plot no - 6811 Ankleshwar, Dist- Bharuch. A detail of existing product is mentioned in below Table No.1.

TABLE: 1

LIST OF PRODUCTS

Production Capacity, TPM Sr. No. Code Name of Product CAS Number Existi Proposed Final ng Change Group- 1 Meta Nitro 99-09-2 1 MNA 3 27 Aniline 30 4- Chloro 2- 95-85-2 2 4-CAP 0 30 Amino Phenol Group - 2 Meta Amino 102-28-3 3 MAA 3 47 Acetanilide 50 Para Amino 122-80-5 4 PAA 0 50 Acetanilide Group - 3 3-(Phenyl Acetilation Sulfonyloxy ) Sulphonation 5 MBSA 0 10 Acetanilide(MBS A) Meta Amino 22987-10-6 10 6 MAP 1 9 Propionanilide N N Diethyl Meta ethylation NNDE 7 Amino 1 9 MAP Propionilide Group - 4 Benzene 98-11-3 8 BSA Sulphonic Acid 0 20 20 Meta Amino 591-27-5 9 MAP-1 Phenol Group - 5

1 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

Dispersing Agent Polymerization (Sunny 045- SUNN 10 Sodium Salt of 20 20 40 Y-045 Polynaphthalene Sulphonic Acid) Group - 6 2-6- 2,6, Di Bromo Bromination 11 DBPT Para Toluidine 2-6- 2,6, Di Bromo Bromination 12 DBPN Para Nitro A Aniline BCPN BromoCyno Para Bromination 13 A Nitro Aniline 0 40 40 6- 6, Bromo 2,4, Di 1817-73-8 Bromo- Nitro Aniline 14 2-4- DNA 3-B- 3-Bromo 4- Bromination 15 4MP Methyl Pyridone Group - 7 NNDE N, N Diethyl 91-67-8 16 0 40 MT Meta Toluidine N, N,Diethyl ethylation NNDE Meta Amino 17 0 40 MAMS Methane 40 Sulponilide N N Diethyl Meta ethylation NNDE 18 Amino 3 37 MAA Acetanilide Group - 8 N-Butyl 3-Cyno Condensation 4-Methyl 6- 19 BP Hydroxy 2- Pyridone N-Methyl 3-Cyno Condensation 4-Methyl 6- 20 MP 0 20 Hydroxy 2- 20 Pyridone N-Ethyl 3-Cyno Condensation 4-Methyl 6- 21 EP Hydroxy 2- Pyridone NENC N Ethyl N Cyano 148-87-8 22 1 19 EA Ethyl Aniline Total 250 2 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

1.1 COST OF PROJECT

The expansion will be carried out at existing plot in GIDC Estate, Ankleshwar Gujarat. The total cost of the unit after proposed expansion is Rs 102.5 lacs.

1.2 FUEL AND ELECTRICITY CONSUMPTION

Existing Agro waste/Briquette permission is 110 kg/Hr. which will be reached at 260 kg/Hr. Unit is consuming 20 HP electricity in existing condition which will be reached to 75 HP after proposed expansion.

1.3 WATER CONSUMPTION

Unit can use 4 KL/Day fresh water as per existing CCA-H-98146. Unit is using 1 KLD water for domestic and 3 KLD water for industrial purpose as per CCA. After expansion unit will use Total 15.1 KLD Fresh water. In which 12.1 KLD water use for the industrial purpose and 6 KLD water used for the domestic purpose.

The water consumption for the domestic purpose will be 5 KLD and for the gardening purpose will be 1 KLD. A detail of water consumption & water balance diagram is attached as Annexure – 7 of Form I .

1.4 WASTEWATER GENERATION Total process effluent generation after proposed expansion will be 9 KL/Day, In which High COD effluent(5.4 KLD ) Send to CMEE BEIL.and remain 3.6 KLD low cod effluent is send to the ETP.0.3 KLD waste water from boiler, washing effluent (0.5 KLD), Cooling tower blow down ( 0.2 KLD), and Other (0.1 KLD) will be treated into ETP. Thus total 4.4 KLD waste water will be treated into in-house ETP and send to ETL.

1.5 FLUE GAS EMISSION Existing flue gas emission machineries is Boiler (400 kg/Hr.) Unit will install additional D.G.SET (60 KVA)

3 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

1.6 PROCESS GAS EMISSION At the condition of existing, There is no process gas emission. And the after proposed expansion Install Reaction Vessel -1.

1.7 HAZARDOUS WASTE MANAGEMENT

Hazardous waste generation from the unit is ETP sludge, discarded bag/liners, Used/Spent oil, spent carbon, spent catalyst and other process residue.

4 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

2. INTRODUCTION 2.1 THE PROJECT M/s. Sunny chemicals proposes expansion for manufacturing Synthetic organic chemicals at Plot No. 6811, GIDC Estate, GIDC, Ankleshwar, District: Bharuch-393002, Gujarat. Total Existing production capacity of the unit is 35.5 MT/Month. Unit is applying EC for manufacturing of 250 MT/Month of Synthetic Organic Chemicals. Total cost of the project is Rs 102.5 lacs. Plant layout of the unit is attached as ANNEXURE-3.

2.2 PROJECT PROPONENT M/s. Sunny chemicals proposes expansion for manufacturing Synthetic organic chemicals at Plot No. 6811, GIDC Estate, GIDC, Ankleshwar, District: Bharuch-393002, Gujarat. Unit is having valid CCA-H-98146 for the Synthetic Organic Chemicals. Unit falls in category 5 (f). The promoters have well experienced in this field. Now to meet the market demand promoters want to increase the production capacity of the unit. The plant boasts of contemporary infrastructure facilities with advanced machinery and automated processes. They are conscious of environment protection measures and from the conception stage itself necessary care has been taken. The unit believes in sustainable development and equally concern about environment preservation and pollution control. The unit has already provided adequate Environment Management System to meet desired norms of effluent discharge as per the statutory recruitment and also propose to expand its continuous endeavor for the pollution prevention and betterment of environment. A vision, a mission and a will to succeed are the basic ingredients in the foundation of the company. A team of well-qualified engineers and financial experts supports the company. Main promoters as well as staff of the company have very good industrial as well as business experience. QUALITY POLICY The company’s commitment is to manufacturing of bulk drug & intermediates. The company has in house testing facility with modern testing equipments to ascertain the quality of raw materials as well as finished products. Continued emphasis towards process and technology up gradation is

5 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR being done effectively to enrich the product quality. R & D with initiative & innovative ideas had resulted into excellent performance in respect of quality products. ENVIRONMENTAL POLICY The unit is committed to execute all operations, products and services by environmental protection activities to the extent possible. As a means of achieving these, the unit pledge to company with the legal & other requirements to their core and focus on continually improving products, systems & operations TABLE: 3 CONTACT DEAILS OF PARTNERS

Sr. Name of the Address Contact No. No. Director 1. GOPAL . A. “Deep” 303/C/10,Tulsikunj Society, +91- VEKARIA Near:-Marathi School,B/H Shubhlaxmi 9714911044 Society,New colony,G.I.D.C, Ankleshwar-393002 2. ARAJANBHAI . H. “Deep” 303/C/10,Tulsikunj Society, +91- VEKARIA Near:-Marathi School,B/H Shubhlaxmi 9714911044 Society,New colony,G.I.D.C, Ankleshwar-393002 3. ASHA . G. “Deep” 303/C/10,Tulsikunj Society, +91- VEKARIA Near:-Marathi School,B/H Shubhlaxmi 9714911044 Society,New colony,G.I.D.C, Ankleshwar-393002 4. LABHUBEN. A. “Deep” 303/C/10,Tulsikunj Society, +91- VEKARIA Near:-Marathi School,B/H Shubhlaxmi 9714911044 Society,New colony,G.I.D.C, Ankleshwar-393002

The partners of the company have good experience in handling the production management, financial management.

2.3 NATURE OF PROJECT Unit falls in category 5 (f).Unit is located in notified industrial area so it a B category project.

2.4 MARKET FEASIBILITY Proposed expansion shall bring in additional quantity for domestic market. 6 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

3.0 PROJECT DESCRIPTION 3.1 TYPE OF PROJECT The proposed expansion project is for manufacturing of Synthetic Organic Chmiecals.

3.2 PROJECT LOCATION M/s. Sunny Chemicals is located at plot no:-6811, GIDC Estate, Ankleshwar, Dist- Bharuch, Gujarat. Unit is having valid CCA-H-98146 for the manufacturing of Bulk Drug & Intermediates. Unit falls in category 5 (f). The approximate geographical positioning of the project site is at Latitude: 21°37'4.54"N , Longitude: 73° 2'36.38"E. The location of the project site can be identified from the location map shown in Figure no.1&2. The salient features of the project site are presented in below Table-No.4.

TABLE: 4 SALIENT FEATURES OF THE PROJECT SITE Particulars Details Distance from Site Villages Ankleshwar 3 KM Approx. Geographical Latitude: 21°37'4.54"N positioning Longitude: 73° 2'36.38"E Nearest City Ankleshwar 3 KM Bharuch 15 KM Nearest Railway line/ Ankleshwar 3 KM Railway station Domestic Airport 94 KM

FIGURE -1 LOCATION OF THE PROJECT SITE

7 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

8 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

Ankleshwar

9 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

FIGURE: 2

AERIAL VIEW OF THE 10 KM RADIAL PERIPHERY FROM THE PROJECT SITE

10 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

3.3 SITE SELECTION The project proponent did not consider any other alternative site for proposed project.

3.4 NEIGHBORING INDUSTRIES The industry is located in an area, which is already industrialized. The industries in the vicinity of the proposed project are given in the table-5 below:

TABLE: 5 DETAILS OF NEIGHBORING INDUSTRIES Sr. No. Name of Industry Address Directions 1. The Ankleshwar Plot.no.6720, GIDC, Ankleshwar.393002 North Polydyestuff Pvt.Ltd. 2. Solar Dyes Plot.no.6825, GIDC, Ankleshwar.393002 South 3. Ocean Chemicals Plot.no.6810, GIDC, Ankleshwar.393002 West 4. Haridwar Chemo Plot.no.6812, GIDC, Ankleshwar.393002 East Pharma

3.5 SIZE OF PROJECT M/s. Sunny Chemicals is located at plot no:-6811, GIDC Estate, Ankleshwar, Dist- Bharuch, Gujarat. Unit is having valid CCA-H-98146 for the manufacturing Synthetic Organic Chemicals. The unit has proposed to modify effluent treatment plant which will be maintained as per requirements. The break-up of the proposed project cost is given in below Table No. 6. TABLE: 6

CAPITAL COST PROJECTION

Sr. No. Purpose TOTAL (Rs. In Lacs) 1. Building 30.00 2. Plant and Machinery 60.00 3. QC and R&D 5.00 4. Environment Protection & Safety I) Effluent Treatment Plant 5.00 II) Safety Equipment 1.00 III) Green Belt Development 0.50 IV) Air Pollution Control 0.50 V) Hazardous waste Management 0.50 Total 102.5

11 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

3.6 PROCESS TECHNOLOGY Unit is involving in the manufacturing of Bulk drug & intermediates. These are characterized for their physicochemical properties. Process details like Process description, chemical reactions and mass balance for each product is attached as Annexure-6 of FORM-I. 3.7 RAW MATERIAL Unit is involving in the manufacturing of Synthetic Organic Chemicals. Detail of Raw material consumption is attached as Annexure-5 of FORM-I. 3.8 RESOURCE REQUIREMENTS 3.8.1 LAND The total plot area of the unit is 703.95 Sq. m. Unit has allotted 181.71 Sq. m. for green belt development. 3.8.2 FUEL For production activity, fuel requirement and Power consumption is as per below table 7 and table 8.

TABLE: 7 FUEL CONSUMPTION Sr. Stack attached Stack Type of APCM Parameter Permissible No. to height in fuel limit meter Existing 1. Boiler (400 15 Agro Cyclone + PM 150 mg/NM 3 3 kg/hr) waste/ Water SO X 100 mg/NM 3 Briquettes scrubber NO X 50 mg/NM Proposed 2. D. G. set* 5 Diesel Not PM 150 mg/NM 3 3 (60 KVA) Applicable SO X 100 mg/NM 3 NO X 50 mg/NM

12 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

3.8.3 POWER CONSUMPTION TABLE: 8 POWER CONSUMPTION

SR. POWER QUANTITY QUANTITY TOTAL NO (As per proposed QUANTITY

expansion) 1. Electricity 20 HP 55 HP 75 HP

3.8.4 WATER Existing water and Proposed water consumption is incorporated in Table No:-9

TABLE: 9 WATER CONSUMPTION Existing Proposed Total Fresh Sr. Water Fresh Water Water Particulars No Consumption Consumption Consumption KL/ Day KL/Day KL/Day 1. Domestic 1 4 5 GIDC water 2. Gardening 0 1 1 GIDC water 3. Industrial 5.5 8 - 1) Process 2.5 (4.3 water + (6.8 water + 1.2 Ice) 1.2 Ice) 2) Washing 0.0 0.5 0.5 Fresh 3) Boiler 0.25 1.75 2.00 Fresh 4) Cooling 0.25 1.25 1.50 Fresh 5) Scrubber 0.0 0.1 0.1 Fresh Total [1] 3 9.1 12.1 -- Total [1+2+3] 4 11.1 15.1 --

3.8.5 WASTEWATER MANAGEMENT The category-wise bifurcation of the wastewater generation is given in Table 10. TABLE: 10 WASTE WATER GENERATION Existing Proposed Total Waste Sr. Waste Water Waste Water Water Particulars Remarks No Generation Generation Generation KL/ Day KL/day KL/Day

13 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

1. Domestic 0.2 0.8 1 Send to the soak pit. 2. Industrial Process 1.4 7.6 9.0 -- Washing 0 0.5 0.5 -- 0.3 KLD blow down will be used in water Boiler 0.05 0.25 0.3 scrubber followed by ash-quenching Cooling 0.05 0.15 0.2 -- Other 0.0 0.1 0.1 -- Total Industrial 1.5 8.6 10.1 -- Total Waste Water Generation 1.7 9.4 11.1 -- (Domestic + Industrial)

14 M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR M/s. SUNNY CHEMICALS., ANKLESHWAR

TOTAL FRESH WATER REQUIREMENT (15.1 KL/DAY)

INDUSTRIAL FRESH WATER DOMESTIC FRESH WATER REQUIREMENT REQUIREMENT (12.1 KLD) (6 KLD)

Process water Washing water Boiler Cooling Scrubber Domestic Gardening (8KLD) (0.5 KLD) 2 KLD 1.5 KLD 0.1 KLD (5 KLD) (1 KLD) (6.8 KLD + 1.2 Ice) Loss 8 Loss (1.5 KLD) Water from Dilute Chemicals Washing waste (1.2 KLD) Loss (0.2 Sewage 0.8 KLD water (0.5 Blow Down KLD) Scrubbed (1 KL D) KLD) (0.3 KLD) Blow Down solution.

(0.2 KLD) (0.1 KLD) Process waste Soak Pit water Water Scrubber (9 KL D) attached to boiler 0.3 KLD Ash Handling High COD Low COD effluent Loss (3.6 KLD) (0.1 KLD) effluent (5.4 KL D) Send to ETP 4.4 KLD To ETL 4.4 KLD To CMEE of BEIL

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 15 M/s. SUNNY CHEMICALS., ANKLESHWAR

3.8.5.1 WASTEWATER CHARACTERISTICS Existing & proposed effluent characteristic before treatment and after treatment in ETP is covered in Annexure-7 of FORM I.

3.8.5.2 WASTEWATER TREATMENT & DISPOSAL

A detail of existing & proposed effluent treatment plant (ETP) is covered in Annexure-7 of FORM I. 3.9 MITIGATION MEASURES & EMP Based on overall manufacturing & operation activities, the mitigation measures have been proposed by the company for the control of the anticipated pollution load. 3.9.1 GASEOUS EMISSIONS & CONTROL 3.9.1.1 FLUE GAS EMISSION Existing flue gas emission and proposed flue gas emission is mentioned in Table No: 11. TABLE: 11 FLUE GAS EMISSION Sr. Stack attached Stack Type of APCM Parameter Permissible No. to height in fuel limit meter Existing 1. Boiler (400 15 Agro Cyclone + PM 150 mg/NM 3 3 kg/hr) waste/ Water SO X 100 mg/NM 3 Briquettes scrubber NO X 50 mg/NM Proposed 2. D. G. set* 5 Diesel Not PM 150 mg/NM 3 3 (60 KVA) Applicable SO X 100 mg/NM 3 NO X 50 mg/NM

3.9.1.2 PROCESS EMISSIONS

Existing process gas emission and proposed flue gas emission is mentioned in Table No: 12.

TABLE:-12 PROCESS GAS EMISSION

Sr. Stack attached to Stack height APCM Parameter Permissible No. in meter limit Existing There is no process emission.

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 16 M/s. SUNNY CHEMICALS., ANKLESHWAR

Proposed 1. Reaction Vessel 11 Water Scrubber HCl 20 mg/NM 3 3 (fugitive HBr 20 mg/NM emission)

3.9.2 HAZARDOUS WASTE MANAGEMENT

The following types of hazardous wastes are being generated during the operational activities. All the wastes are being stored separately in a designated storage area. The details of hazardous waste are below given Table 13.

TABLE 13 DETAILS OF HAZARDOUS WASTE Sr. Name of Source Category Existing Proposed Total Mode of No. Hazardous Quantity Quantity Quantity Disposal Waste MT/Year MT/Year MT/Year 1. Empty Packing 33.1 6 30 36 Collection, barrels/ storage, and containers/ Disposal by liners selling to autherised contaminated Decontamination with facility/ recycler hazardous or reuse or send back to supplier. chemicals/ wastes 2. Used/spent Lubrication 5.1 0.00 0.03 0.03 Collection, Oil storage, transportation and disposal by reuse in plant and machinery as lubricant or selling to Registered Re- refiners recycler. 3. Iron sludge 4- Chloro 2- 26.1 14.4 85.6 100 Collection, Amino Phenol, storage, Para Amino transportation Acetanilide, and send to

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 17 M/s. SUNNY CHEMICALS., ANKLESHWAR

Meta Amino TSDF. Propionanilide, 3-Bromo 4- Methyl Pyridone and ETP 4. Scrubbed Scrubber C2 0 36 36 Collection, Soln. storage and treatment in ETP.

3.9.3 NOISE CONTROL & ODOUR The major noise generating installation is the D.G. Set. Unit has installed it in a closed room and provided acoustic enclosure around it. Unit has also provided ear plugs to the operating person of Boiler room. Unit is following below steps to Noise control and Odour. • Raw-material feeding is being carried out by pumps. • All reactions are being taken in closed reactor system. • Roof top ventilation is installed in the entire plant area. • Regular monitoring of piping and fittings is carried out to prevent the leakages.

3.9.4 STORAGE, HANDLING AND TRANSPORT OF HAZARDOUS CHEMICALS The storage and mode of transport of chemicals are being done as per detailed MSDS and chemical hazards guide (NIOSH) for the hazardous chemicals. Few chemical to be used in the proposed activities are listed as ‘Hazardous Chemicals’ as per the Schedule-1 of the MSIHC Rules, as amended in 2000.

3.9.5 HEALTH AND SAFETY MEASURES Few chemical to be used in the proposed activities are listed as ‘Hazardous Chemicals’ as per the Schedule-1 of the MSIHC Rules, as amended in 2000. Physical hazards may manifest as fires, explosions, excessive temperatures, or the release of large volumes of gas or toxic or flammable gases or vapors. According to Schedule 2 & 3 of MSIHC Rules,

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 18 M/s. SUNNY CHEMICALS., ANKLESHWAR

Moreover transport activity is being done through drums, so there is a manual loading and unloading and no unloading through pipe at the site. Hence, the risk of static charge generation during transfer of such chemicals is not significant. 3.9.6 MAN POWER The manpower required for the project as well as during the construction/ commissioning activities will be employed from the local area. TABLE NO:-14 MAN POWER REQUIREMENT Sr. Headings Existing Proposed Total no. 1. Technical skilled staff 2 2 4 2. Unskilled staff 6 14 20 3. Others – security, gardener, 1 3 4 etc Total 8 19 28

4.0 SITE ANALYSIS 4.1 CONNECTIVITY Ankleshwar is known for Pigment and Pharmaceutical Industry. Ankleshwar is connected by Indian National Highway 8 (Mumbai to New Delhi) and by the Western Railway Division of . The railway division runs the broad gauge train services to Rajpipla. The 133-year-old Golden Bridge connects Ankleshwar to Bharuch across the Narmada on the station front while a new bridge connects the highway, the other bridge on the highway is now ready to use. Ankleshwar railway station is centrally located at the intersection of NH8 & Station Road. Ankleshwar City Bus stand is located on Station Road (i.e. located in the City, the western section).Development projects of Ankleshwar Airport & City Bus are in last stage.

4.2 LAND USE AND LAND OWNERSHIP M/s. Sunny Chemicals. is located at plot no:-6188, GIDC Estate, Ankleshwar, Dist- Bharuch, Gujarat. Unit is having valid CCA-AWH-98146 for the manufacturing of Bulk Drug & Intermediates.

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 19 M/s. SUNNY CHEMICALS., ANKLESHWAR

4.3 EXISTING LAND USE M/s. Sunny Chemicals, is located at plot no:-6188, GIDC Estate, Ankleshwar, Dist- Bharuch, Gujarat. Unit is having valid CCA-AWH-98146 for the manufacturing of Synthetic Organic Chemicals. 4.4 EXISTING INFRASTRUCTURE The plant is located in a well-developed industrial zone, which has all essential facilities such as internal roads, arrangement for supply of water and power to industries, effluent disposal facilities, gas etc. The proposed project is relatively small in size and will be employing some skilled and unskilled people. First preference will be given to local people, so there will be no change in population pattern due to the proposed project.

4.5 SOIL CLASSIFICATION

The soil of the district can be classified as light, medium and heavy according to depth, texture and location. There is sandy loam to loamy in texture, brownish black in color.

4.6 CLIMATE DATA

Based on the meteorological data, wind rose have been prepared for the summer season period between the March-2017 to May-2017 The wind rose diagram prepared from same data is shown at Figure 3, Figure 3.1. TABLE: 15 METEOROLOGICAL DATA Month Temperature( oC) Humidity (%) Rain fall (mm) Maximum Minimum Maximum Minimum Maximum Minimum March-2017 39 25 79 4 00 00 April-2017 40 26 76 3 00 00 May-2017 42 28 72 3 00 00

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 20 M/s. SUNNY CHEMICALS., ANKLESHWAR

FIGURE: 3 WIND ROSE DIAGARM FOR PERIOD OF MARCH 2017 TO MAY 2017

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 21 M/s. SUNNY CHEMICALS., ANKLESHWAR

FIGURE: 3.1 WIND CLASS FREQUENCY DISRTIBUTION

Observation: It observed that wind is blowing mainly towards the SW direction from NE. Average wind speed was 2.38 m/s. 4.7 SOCIAL INFRASTRUCTURE As of 2011 India census, Ankleshwar had a population of 140,839. Males constitute 53% of the population and females 47%. 13% of the population is under 6 years of age. 5.0 PLANNING BRIEF

5.1 PLANNING CONCEPT:

Ankleshwar is largely an industrial area dominated by large scale industries, especially chemical Plants. Government agencies provide many basic facilities like uninterrupted water supply, power and road network.

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 22 M/s. SUNNY CHEMICALS., ANKLESHWAR

5.2 POPULATION PROJECTION.

As of 2011 India census, Ankleshwar had a population of 140,839. Males constitute 53% of the population and females 47%. 13% of the population is under 6 years of age.

6.0 PROPOSED INFRASTRUCTURE 6.1 PROCESSING AREA The process area is covered plant area, raw material storage area, hazardous waste storage area, workshop and utilities . 6.2 NON PROCESSING AREA The non process area is covered Admin Building, toilet blocks, change room and security cabin. 6.3 GREEN BELT AREA M/s. Sunny Chemicals,. is located at plot no:-6811, GIDC Estate, Ankleshwar, Dist- Bharuch, Gujarat. Unit is having valid CCA-AWH-98146 for the manufacturing Synthetic Organic Chemicals.. The total plot area of the unit is 703.45 sq meter in which 181.71 sq meter is total green belt area.

6.4 SOCIAL INFRASTRUCTURE The availability of basic amenities is covered as under:

• Training & Education: All the employees are being trained and educated periodically about the hazardous nature of chemicals used in the process. Also, training for fire fighting, work permits system, first aid, safe handling of hazardous chemicals and integrating safety, in all activities.

• Medical facility: Pre-employment medical checkup at the time of employment. In order to safe guard the health of the employees, all the employees undergo periodic health checkup.

• Drinking water: Unit has provided Aqua Guard/R.O at different places to provide purified water for drinking purpose.

• Transportation: The unit is providing basic transportation facility to workers.

• Telegraph & Post: Unit has all the facilities like telephone, fax and internet for the employees.

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 23 M/s. SUNNY CHEMICALS., ANKLESHWAR

6.5 CONNECTIVITY This industrial estate is well connected to Ahmadabad/Mumbai/Vadodara through the Ankleshwar. Rail services and Road services are available in Ankleshwar.

6.6 DRINKING WATER MANAGEMENT Average daily water consumption of unit is 5 KL/day for domestic purpose. GIDC water is a source of domestic water. 6.7 INDUSTRIAL WASTE MANAGEMENT The hazardous waste management and disposal is shown in table 13. 6.8 SOLID WASTE MANAGEMENT The Solid waste management and disposal is shown in table 13. 6.9 SOURCE OF POWER DGVCL is a main source of Power. 7.0 REHABILITATION AND RESETTLEMENT(R &R) PLAN The proposed project is located in GIDC Estate, Ankleshwar. There will be no any human settlement affected by proposed project. So, there is no requirement of any R & R Plan. 8.0 PROJECT SCHEDULE & COST ESTIMATES 8.1 PROJECT IMPLEMENTATION SCHEDULE The details of project Implementation Schedule is given in below table. TABLE: 17 PROJECT IMPLEMENTATION SCHEDULE Project implementation schedule after getting NOC from GPCB Sr. No. Activity Required Period 1. Civil work Immediately after getting NOC 2. Procurement of machinery 1 month after getting NOC

3. Eraction & installation of Immediately after competition of activity no.2 machinery 4. Trial of machinery & Within 1 months after competition of activity equipment no.3 5. Commercial activity 1 months after competition of activity no.4

8.2 ESTIMATED PROJECT COST The details of Capital cost projection are given in table no. 6.

M/s. JYOTI OM CHEMICAL REASERCH CENTER PVT .LTD.,ANKLESHWAR 24 M/s. SUNNY CHEMICALS., ANKLESHWAR

9.0 ANALYSIS OF PROPOSAL

First preference will be given to local people for employment and Company will also try to provide indirect employment opportunities by availing local contract services during transportation and operational phase. The company intends to donate 2 % of the profit to agencies like NGOs or social welfare societies for projects carried out in nearby villages for their welfare and upliftment .