Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South 1 Valiya 132/66KV Valia 50-70 2 Bharuch Valiya 66KV Daheli 40-50 3 Bharuch 66KV Netrang 4 Bharuch Netrang 66KV Datt Nagar 5 Bharuch Netrang 66KV Petiya 6 Bharuch Netrang 66KV Bitada 132 KV -- 7 Bharuch Netrang 66KV Mauza (Chasvad) Valia 30-40 8 Narmada Dediapada 66KV Dediapada 9 Narmada Dediapada 66KV Saddapani 10 Narmada Dediapada 66KV Chikda 11 Umargam 66KV Chimipatal (Satvan) 12 Narmada Dediapada 66KV Bal (Mozda) 13 Bharuch Ankleshwar 132/66KV Ankleshwar 50-70 14 Bharuch Ankleshwar 66KV Ankleshwar GIDC-A 50-70 15 Bharuch Ankleshwar 66KV Ankleshwar GIDC-B 132 KV 16 Bharuch Ankleshwar 66KV Ankleshwar (Urban) Ankleshwar -- 17 Bharuch Hansot 66KV Hansot 50-70 18 Bharuch Ankleshwar 66KV Panoli GIDC 19 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-40 20 Surat Choryasi 132/66KV Bhestan 50-70 21 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 132 KV 22 Surat Choryasi 66KV Bhagwati Bhestan -- 23 Surat Choryasi 66KV Bhestan-B 30-40 24 Surat Choryasi 66KV Bhestan(Eklera) 25 Valsad Atul 220/132/66KV Atul 50-70 26 Valsad Dharampur 66KV Dharampur 27 Valsad Dharampur 66KV Nani Vahiyal 28 Valsad Valsad 66KV Atak Pardi (Valsad) 29 Valsad Dharampur 66KV Piprol 30-40 220 KV 30 Valsad Valsad 66KV Valandi (Navera) Atul -- 31 Valsad Valsad 66KV Magod (Meh) 32 Valsad Valsad 66KV Gundalav GIDC 33 Valsad Pardi 66KV Khadki Dungri 30-40 34 Valsad Pardi 66KV Kolak 35 Valsad Valsad 66KV Valsad City 30-40 36 Valsad Umargam 220/66KV Bhilad 50-70 37 Valsad Umargam 66KV Umargam 38 Valsad Umargam 66KV Sarigam GIDC 220 KV 39 Valsad Umargam 66KV Sanjan 30-40 -- Bhilad 40 Valsad Umargam 66KV Vangam(Umargam-II) 41 Valsad Umargam 66KV Palgam 42 Valsad Umargam 66KV Bhilad 30-40

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 1/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 43 Navsari Chikhli 220/66KV Chikhli (Ambheta) 50-70 44 Dang Vaghai 66KV Waghai 45 Dang Ahwa 66KV Ahwa 46 Dang Ahwa 66KV Saputara 47 Navsari Chikhli 66KV Tankal 48 Navsari Chikhli 66KV Butlav 30-40 49 Navsari Chikhli 66KV Limzar 50 Navsari Vansda 66KV Vansda 51 Navsari Vansda 66KV Ankalachh 52 Navsari Tapi 66KV Chunavadi 53 Navsari Vansda 66 KV Mahuwas (Kevadi) 220 KV 54 Navsari Chikhli 66KV Chikhli -- Chikhli 55 Navsari Khergam 66KV Khergam 56 Navsari Chikhli 66KV Fadvel (Matwad) 57 Navsari Chikhli 66KV Rankuwa (Manekpor) 58 Navsari Chikhli 66KV Rumla (Amadhra) 30-40 59 Navsari Chikhli 66KV Godthal 60 Navsari Chikhli 66KV Anaval 61 Surat Mahuva 66KV Vaheval 62 Navsari Vansda 66KV Bhinar 63 Valsad Valsad 66KV Dungri (Valsad) 64 Valsad Valsad 66KV Untadi(Malvan Bigri) 30-40 65 Navsari Chikhli 66KV Balwada (Wagaldhara) 66 Surat Choryasi 220/66KV Ichhapore 50-70 67 Surat Olpad 66KV Veluk 68 Surat Olpad 66KV Olpad 69 Surat Olpad 66KV Saroli 50-60 70 Surat Olpad 66KV Karamla (Varod) 71 Surat Choryasi 66KV Pala 72 Surat Surat City 66KV Adajan 220 KV -- 73 Surat Choryasi 66KV SVNIT Icchapore 30-40 74 Surat Choryasi 66KV Gujarat Hira Bourse 75 Surat Choryasi 66KV Pal 76 Surat Choryasi 66KV Bhatha ( Pal-2) 30-40 77 Surat Choryasi 66KV Variav 78 Surat Choryasi 66KV Kosad (Amroli) 30-40 79 Surat Choryasi 66KV Ichhapore 30-40 80 Surat Mandvi 220/66KV Kim 50-70 81 Surat Kamrej 66KV Kamrej 30-40 82 Surat Kamrej 66KV Velanja 83 Surat Kamrej 66KV Karjan 50-70 220 KV -- 84 Surat Mangrol 66KV Pipodara 40-50 Kim 85 Surat Mangrol 66KV Pipodara-II 40-50 86 Surat Mandvi 66KV Karanj 30-40 87 Surat Mandvi 66KV Areth (Nogama) 88 Surat Mangrol 66KV Fair deal Text Park 30-40

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 2/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 89 Surat Mandvi 66KV Umarkhadi (Maldha) 90 Surat Mangrol 66KV Vankal 15-20 91 Surat Mangrol 66KV Zankhvav 92 Surat Mangrol 66KV Mosali (Mangrol) 220 KV -- 93 Surat Mangrol 66KV Palod (Kim) Kim 94 Surat Olpad 66KV Vadoli 30-40 95 Surat Olpad 66KV Mindhi 96 Surat Mangrol 66KV Palod-2 30-40 97 Surat Bardoli 220/66KV Mota (Bardoli) 50-70 98 Surat Bardoli 66KV Bardoli 99 Surat Bardoli 66KV Sarbhon (Bardoli) 100 Surat Bardoli 66KV Afva(Dungar) 101 Surat Mahuva 66KV Bamaniya 30-40 102 Surat Mahuva 66KV Singod 103 Surat Mahuva 66KV Gopla (Kharvan) 104 Surat Mahuva 66KV Mahuva 105 Surat Bardoli 66KV Kadod 106 Surat Bardoli 66KV Madhi 30-40 107 Surat Mandvi 66KV Mandvi 108 Surat Bardoli 66KV Mota 30-40 109 Surat Kamrej 66KV Sampura 30-40 110 Surat Mandvi 66KV Kasal 220 KV 111 Surat Kamrej 66KV Parab (Mankna) 50-70 Mota -- 112 Tapi Vyara 66KV Vyara (Bardoli) 113 Tapi Vyara 66KV Borakhadi 114 Tapi Vyara 66KV Rupwada 30-40 115 Tapi Vyara 66KV Chikhalvav 116 Tapi Vyara 66KV Magarkui 117 Tapi Vyara 66KV Vyara-2 118 Tapi Valod 66KV Bhimpor (Kanjod) 119 Surat Bardoli 66KV Manekpore 120 Tapi Valod 66KV Valod 121 Tapi Valod 66KV Virpor (Pathakwadi) 30-40 122 Tapi Valod 66KV Karanjkhed 123 Tapi Vyara 66KV Dolvan 124 Tapi Vyara 66KV Mangaliya (Chimer) 125 Tapi Vyara 66KV Kalakva 126 Navsari Navsari 220/66KV Navsari 50-70 127 Navsari Gandevi 66KV Billimora 128 Navsari Gandevi 66KV Gandevi 129 Navsari Gandevi 66KV Amalsad 30-40 130 Navsari Jalalpore 66KV Sultanpur(Dandi) 220 KV 131 Navsari Gandevi 66 KV Chhapar (Kotha) -- Navsari 132 Navsari Jalalpore 66KV Eroo 133 Navsari Navsari 66KV Chhapra (Navsari -B) 30-40 134 Navsari Navsari 66KV Navsari city 135 Navsari Jalalpore 66KV Maroli 30-40 136 Navsari Navsari 66KV Vesma 30-40 D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 3/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 137 Surat Choryasi 220/66KV Popada 50-70 220 KV 138 Surat Choryasi 66KV SUSM-1 -- 30-40 Popda 139 Surat Choryasi 66KV Bhatia 140 Surat Choryasi 220/66KV Sachin (Talangpore) 50-70 141 Surat Choryasi 66KV Sachin -B 142 Surat Choryasi 66KV Vanz (Susml) 143 Surat Palsana 66KV Erthan (Lingad) 30-40 144 Surat Choryasi 66KV Kharvasa 145 Surat Palsana 66KV GETP 146 Navsari Jalalpore 66KV Mangrol 30-40 147 Surat Choryasi 66KV Khajod (Magadalla) 220 KV 148 Surat Choryasi 66KV Jiyav (Bamroli) 30-40 Sachin -- 149 Surat Choryasi 66KV Vadod (Talangpor 150 Surat Choryasi 66KV Vesu e) 151 Surat Choryasi 66KV Vesu-2 (Magdalla) 40-50 152 Surat Choryasi 66KV Dumas 153 Surat Choryasi 66KV Pandesara 30-40 154 Surat Choryasi 66KV Jiav (Pandesara-II) 155 Surat Choryasi 66KV Sachin -A 156 Surat Choryasi 66KV Sachin-D 30-40 157 Surat Choryasi 66KV Sachin ‘C 158 Bharuch Wagra 220/66KV Rahiyad 50-70 220 KV 159 Bharuch Wagra 66KV Samatpore (Sambheti) 50-70 Suva -- 160 Bharuch Wagra 66KV Galenda 50-70 (Rahiyad) 161 Bharuch Wagra 66KV Suva 30-40 162 Bharuch Wagra 220/66KV Dahej 50-70 163 Bharuch Wagra 66KV Dahej 164 Bharuch Wagra 66KV Luna 220 KV -- 165 Bharuch Wagra 66KV Vadadala (Dahej) 30-40 Dahej 166 Bharuch Wagra 66KV Jolva 167 Bharuch Wagra 66KV Bhesali 168 Valsad Vapi 220/66KV Vapi 50-70 169 Valsad Dharampur 66KV Motaponda (Kakadkopar) 170 Valsad Pardi 66KV Paria 171 Valsad Pardi 66KV Chival (Dhagadmal) 172 Valsad Pardi 66KV Nimkhal 173 Valsad Pardi 66KV Kherlav 30-40 174 Valsad Vapi 66KV Kocharava(Rata Koparali) 220 KV 175 Valsad Kaparada 66KV Kaparada -- Vapi 176 Valsad Kaparada 66KV Astol 177 Valsad Kaparada 66KV Sutharpada 178 Valsad Kaparada 66KV Shahuda 179 Valsad Umargam 66KV Damanganga GIDC 180 Valsad Umargam 66KV Karembele (Nahuli) 40-50 181 Valsad Vapi 66KV Chandor 182 Valsad Vapi 66KV GIDC -Vapi 30-40

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 4/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 183 Valsad Vapi 66KV GIDC Vapi -III rd. Ph. 184 Valsad Vapi 66KV Dungra 30-40 185 Valsad Vapi 66KV GIDC Vapi - IV th Ph. 220 KV -- 186 Valsad Vapi 66KV GIDC -Vapi Ph.-II 30-40 Vapi 187 Valsad Vapi 66KV Morai 30-40 188 Valsad Vapi 66KV Morai-2 189 Surat Kamrej 220/66KV Vav 50-70 190 Surat Kamrej 66KV Kosmada 40-50 191 Surat Choryasi 66KV Godadara 192 Surat Palsana 66KV Kadodara 193 Surat Palsana 66KV Palsana 194 Surat Palsana 66KV Tatithaiya 30-40 195 Surat Palsana 66KV Jolva 196 Surat Choryasi 66KV Punakumbharia 220 KV -- 197 Surat Kamrej 66KV Laskan 30-40 Vav 198 Surat Kamrej 66KV Laskana -2 199 Surat Kamrej 66KV Vav 30-40 200 Surat Olpad 66KV Sivan (Sayan west) 30-40 201 Surat Olpad 66KV Delad 202 Surat Palsana 66KV Niyol (Kadodara-2) 30-40 203 Surat Choryasi 66KV Deladva 204 Surat Choryasi 66KV Sarthana 30-40 205 Bharuch Wagra 220/66KV Wagra 50-70 206 Bharuch Wagra 66KV Vilayat 220 KV 30-40 -- 207 Bharuch Bharuch 66KV Kukarwada Wagra 208 Bharuch Bharuch 66KV Sayakha 30-40 209 Surat Mangrol 400/220/66KV Kosamba 50-70 210 Bharuch Ankleshwar 66KV Panoli GIDC-2 50-70 400 KV -- 211 Surat Mangrol 66KV Kosamba 30-40 Kosamba 212 Surat Mangrol 66KV Kharach (Tarsali) 213 Tapi Songadh 66KV Borda 214 Tapi Songadh 66KV Bhogvad 30-40 215 Tapi Songadh 66KV Sagbara 216 Tapi Nizar 66KV Nizar 217 Tapi Nizar 66KV Kelani (Kukarmunda) 218 Tapi Nizar 66KV Balda/Nimbhora 30-40 219 Tapi Uchchhal 66KV Rumkitalav 220 Tapi Uchchhal 66KV Uchchhal 221 Tapi Uchchhal 66KV Vadpada(Naranpur) 222 Tapi Songadh 66KV Chikhali Bheshrot (Khodtalav) 220 KV -- 223 Tapi Songadh 66KV Vadi Bhesrot 30-40 Ukai Hydro 224 Tapi Songadh 66KV Sisor (Panchpipla) 225 Tapi Songadh 66KV Ukai 226 Tapi Songadh 66KV Songadh 227 Tapi Songadh 66KV Kavla 228 Tapi Songadh 66KV Kumkuva 30-40 229 Tapi Songadh 66KV Jamkhadi (Hindala) 230 Tapi Songadh 66KV Vadpada (Tokarva) 231 Dang Ahwa 66KV Malangdev 232 Dang Subir 66KV Subir D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 5/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 1 Chhota Udaipur Chhotaudepur 132/66KV Chhota Udepur (Vasedi) 50-70 2 Chhota Udaipur Chhotaudepur 132/66 KV Zoz 40-50 3 Chhota Udaipur Chhotaudepur 66KV Vanar 30-40 4 Chhota Udaipur Bodeli 66KV Bodeli 5 Chhota Udaipur Bodeli 66KV Patiya (Ranbhun) 132 KV 6 Chhota Udaipur Bodeli 66KV Uchapan Chhota -- 7 Chhota Udaipur Bodeli 66KV Kharedivav 30-40 Udepur 8 Chhota Udaipur Pavi-Jetpur 66KV Vadoth (Vasedi) 9 Chhota Udaipur Pavi-Jetpur 66KV Pavi-Jetpur 10 Chhota Udaipur Pavi-Jetpur 66KV Dev Mori (Rangli chokdi) 11 Chhota Udaipur Chhotaudepur 66KV Lehvant (Rangpur Sadli) 30-40 12 Chhota Udaipur Chhotaudepur 66KV Judavant 13 Chhota Udaipur Kawant 220/66KV Kawant 50-70 14 Chhota Udaipur Kawant 66KV Bhekhadiya (Bhaka) 15 Chhota Udaipur Naswadi 66KV Sengpur (Khanda) 30-40 220 KV 16 Chhota Udaipur Naswadi 66KV Ratanpur -- Kawant 17 Chhota Udaipur Naswadi 66KV Vaghach (Gadhboriyad) 18 Chhota Udaipur Kawant 66KV Panvad 30-40 19 Chhota Udaipur Kawant 66KV Rendi (Manka) 20 Dahod Dahod 132/66KV Dahod 50-70 21 Dahod Dahod 66KV Kharedi (Chhapri) 22 Dahod Dahod 66KV Kharod (Chhapari) 30-40 23 Dahod Dahod 66KV Kathala 24 Dahod Dahod 66KV Navagam 132 KV -- 25 Dahod Zalod 66KV Karath (Limdi) Dahod 26 Dahod Zalod 66KV Zalod 30-40 27 Dahod Zalod 66KV Gultora 28 Dahod Garbada 66KV Garbada (Nalvai) 30-40 29 Dahod Garbada 66KV Vajelav (Jesavada) 30 Dahod Limkheda 132/66KV Limkheda 40-50 31 Dahod Devgadh Bariya 66KV Devgadh-Baria 32 Dahod Limkheda 66KV Mota Ambaliyara (Randhikpur) 30-40 132 KV 33 Dahod Devgadh Bariya 66KV Piplod -- Limkheda 34 Dahod Devgadh Bariya 66KV Dabhwa (Fangiya) 35 Dahod Dhanpur 66KV Singavali (Pipero) 30-40 36 Dahod Limkheda 66KV Limkheda 30-40 37 Vadodara 220/132/66KV Gotri 50-70 38 Vadodara Padra 66KV Samiyala (Tandalja) 39 Vadodara Padra 66KV Padra 50-70 40 Vadodara Padra 66KV Mahuvad 41 Vadodara Vadodara 66KV Bhayli 50-70 42 Vadodara Vadodara 66KV Koyali 50-70 132 KV 43 Vadodara Vadodara 66KV Sherkhi -- Gotri 44 Vadodara Vadodara 66KV Vasana 50-70 45 Vadodara Vadodara City 66KV Vidhyutnagar 46 Vadodara Vadodara City 66KV Atladra 50-70 47 Vadodara Vadodara 66KV Gotri-B 48 Vadodara Vadodara City 66KV Subhanpura 30-40 49 Vadodara Vadodara City 66KV Gorwa

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 6/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 50 Kheda Mehemdabad 132/66KV Mahemdabad 50-70 51 Kheda Kheda 66KV Kheda 52 Kheda Kheda 66KV Matar 53 Kheda Kheda 66KV Samadra 30-40 54 Kheda Matar 66KV Limbasi 55 Kheda Vaso 66KV Vaso 132 KV 56 Kheda Mehemdabad 66 KV Wathwadi Mahemdab -- 30-40 57 Kheda Mehmedabad 66KV Jinjar ad 58 Kheda Mehmedabad 66KV Haldarwas 59 Kheda Mehmedabad 66KV Varsola (Devki Vansol/Vamali) 60 Kheda Mahutha 66KV Shehri (Alina) 30-40 61 Kheda Mahutha 66KV Ruppura 62 Kheda Mahutha 66KV Mahudha 63 Vadodara Savli 132/66KV Manjusar 50-70 64 Vadodara Desar 66KV Desar 132 KV 65 Vadodara Savli 66KV Savli -- 30-40 Manjusar 66 Vadodara Savli 66KV Tundav 67 Vadodara Savli 66KV Alindra(Manjusar) 68 Kheda Nadiad 132/66KV Nadiad 50-70 69 Anand Anand 66KV Samarkha 70 Kheda Galteshwar 66KV Vadad 30-40 71 Kheda Nadiad 66KV Chaklasi 132 KV 72 Kheda Nadiad 66KV Malarpura (Chaklasi Party) -- Nadiad 73 Kheda Nadiad 66KV Palaiya 74 Kheda Nadiad 66KV Kamla (Nadiad City) 30-40 75 Kheda Nadiad 66KV Dabhan 76 Kheda Mehemdabad 66KV Sandhana 30-40 77 Vadodara Vadodara 132/66KV Nandesari 50-70 78 Vadodara Savli 66KV Rania (Moxi) GIDC 79 Vadodara Vadodara 66KV Nandesari-I 30-40 132 KV -- 80 Vadodara Savli 66KV Poicha Nandesari 81 Vadodara Vadodara 66KV Nandesari-III 50-60 82 Vadodara Vadodara 66KV Ranoli GIDC 30-40 83 Anand Anand 132/66KV Ode 50-70 84 Anand Anand 66KV Vasad 30-40 85 Anand Anand 66KV Sarsa 86 Anand Umreth 66KV Sureli 30-40 132 KV 87 Kheda Thasra 66KV Nesh -- Ode 88 Kheda Thasara 66KV Thasra 89 Anand Anand 66KV Bhalej 30-40 90 Anand Umreth 66KV Umreth 91 Kheda Thasara 66KV Rakhiyal 92 Dascroi 132/66KV Narol 50-70 93 Ahmedabad Dascroi 66KV Jetalpur 30-40 132 KV 94 Ahmedabad Dascroi 66 KV Navagam -- Narol 95 Ahmedabad Dascroi 66KV Lambha (Kamod) 15-20 96 Kheda Kheda 66KV Bidaj (Vanch) 30-40

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 7/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 97 Ahmedabad Dascroi 66KV Barejadi 98 Ahmedabad Dascroi 66KV Vinjol (Gatrad) 99 Ahmedabad Dascroi 66KV Bhuvaldi 100 Ahmedabad Dascroi 66KV Bilasiya 132 KV 101 Ahmedabad Dascroi 66KV Vehlal 30-40 -- Narol 102 Ahmedabad Dascroi 66KV Kanbha 103 Ahmedabad Dascroi 66KV Hirapur 104 Ahmedabad Dascroi 66KV Dhamatwan 105 Ahmedabad Dascroi 66 KV Nenpur 106 Kadi 400/220/66KV Vadavi 50-70 107 Ahmedabad Ahmedabad 66KV Sarkhej (Shela) 400 KV 108 Ahmedabad Dascroi 66KV Bopal 40-50 Vadavi 109 Ahmedabad Dascroi 66KV Science City 110 Ahmedabad Dascroi 66KV Bhadaj 111 Ahmedabad Ahmedabad 132/66KV Sabarmati 50-70 -- 112 Gandhinagar 66KV Adalaj 30-40 113 Gandhinagar Gandhinagar 66KV Sargasan 132 KV 114 Ahmedabad Ahmedabad City 66KV Traghad Sabarmati 115 Ahmedabad Dascroi 66KV Khoraj (shaligram) 30-40 116 Ahmedabad Dascroi 66 KV Goderej City 117 Narmada Tilakwada 132/66KV Tilakwada 50-70 118 Chhota Udaipur Bodeli 66KV Chalamali (Vanadha) 119 Chhota Udaipur Bodeli 66KV Koshindra 30-40 120 Chhota Udaipur Naswadi 66KV Naswadi 121 Narmada Nandod 66KV Navagam 122 Narmada Nandod 66KV Amadla (Nandod) 50-70 132 KV -- 123 Narmada Nandod 66KV Garudeshwar (Devaliya) Tilakwada 124 Narmada Tilakwada 66KV Limpura (Utavdi) 30-40 125 Narmada Tilakwada 66KV Soikuva 40-50 126 Vadodara Dabhoi 66KV Chandod 127 Vadodara Dabhoi 66KV Pisai (Sathod) 30-40 128 Vadodara Sinor 66KV Simli (Segwa) 129 Bharuch Zagadiya 220/132/66KV Achhalia 50-70 130 Bharuch Zagadiya 66KV Rajpardi 131 Bharuch Zagadiya 66KV Zagadia 30-40 132 Bharuch Zagadiya 66KV Bhalod (Govali) 133 Bharuch Zagadiya 66KV Panetha 30-40 134 Narmada Nandod 66KV Rajpipla 220 KV -- 135 Narmada Nandod 66 KV Anijara (Lachhras) Achhalia 136 Narmada Nandod 66KV Bhacharwada 25-30 137 Narmada Nandod 66 KV Amletha 138 Narmada Nandod 66KV Pratapnagar (Umalla) 139 Narmada Nandod 66 KV Rajuwadiya 50-70 140 Narmada Nandod 66KV Ori 141 Ahmedabad Sanand 220/66 KV Bhat 50-70 142 Ahmedabad Sanand 400/220/66 KV Chharodi 50-70 220 KV 143 Ahmedabad Sanand 66KV Vinchhiya (Mankol) 40-50 -- Bhat 144 Ahmedabad Dascroi 66KV Bhat (Bavla) 30-40 145 Ahmedabad Sanand 66KV Changodar

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 8/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 146 Ahmedabad Sanand 66KV Sanathal 147 Ahmedabad Dascroi 66KV Visalpur 148 Ahmedabad Sanand 66KV Chharodi 149 Ahmedabad Viramgam 66KV Thuleta 220 KV 30-40 -- 150 Ahmedabad Sanand 66KV Madhavnagar Bhat 151 Ahmedabad Sanand 66 KV Shella 152 Ahmedabad Sanand 66 KV Ambali 153 Ahmedabad Sanand 66KV Sanand GIDC 154 Panchmahal Halol 220/66KV Chandrapura 50-70 155 Panchmahal Ghoghamba 66KV Ghoghamba 156 Panchmahal Ghoghamba 66KV Simaliya (Rinchhvani) 157 Panchmahal Halol 66KV Shivrajpur 158 Panchmahal Ghoghamba 66KV Ranjitnagar 30-40 159 Panchmahal Ghoghamba 66KV Kantu (Bor) 220 KV 160 Panchmahal Halol 66KV GIDC Halol B Chandrapu -- 161 Panchmahal Halol 66KV Tarkhanda (Panchdevla) ra 162 Panchmahal Halol 66KV GIDC - Halol 30-40 163 Panchmahal Kalol 66KV Madhwas 30-40 164 Vadodara Savli 66KV Ankaliya (Nharpura) 165 Panchmahal Halol 66KV Baska 30-40 166 Panchmahal Halol 66KV KhaKharia 167 Panchmahal Godhra 220/132/66KV Godhra 50-70 168 Panchmahal Kalol 66KV Vejalpur 169 Panchmahal Kalol 66KV Kalol 30-40 170 Panchmahal Kalol 66KV Bhukhi (Gangadiya) 171 Panchmahal Kalol 66 KV Bhadroli Khurd 172 Panchmahal Godhra 66KV Lilesara 30-40 173 Panchmahal Godhra 66KV Santroad 174 Panchmahal Morvahadaf 66KV Rajayata 175 Panchmahal Morvahadaf 66KV Chandpur 30-40 220 KV -- 176 Panchmahal Morvahadaf 66KV Mota Amalia Godhra 177 Panchmahal Godhra 66KV Jafrabad (Govindi) 178 Panchmahal Godhra 66KV Timba 179 Panchmahal Godhra 66KV Tuva(kankanapur) 30-40 180 Panchmahal Morvahadaf 66KV Gokulpur (Morwa Raina) 181 Panchmahal Shehra 66KV Shehera 182 Panchmahal Shehra 66KV Nandarva 30-40 183 Panchmahal Shehra 66KV Panam Dam 184 Panchmahal Shehra 66KV Padardi 185 Vadodara Vadodara 220/132/66KV Jambuva 50-70 186 Vadodara Dabhoi 66KV Dabhoi 187 Chhota Udaipur Sankheda 66KV Sankheda 30-40 188 Chhota Udaipur Sankheda 66KV Bhatpur 189 Vadodara Vadodara 66KV Indrapuri 50-70 220 KV 190 Vadodara Vadodara City 66KV Waghodia Road -- Jambuva 191 Vadodara Vadodara 66KV Gajrawadi 30-40 192 Vadodara Vadodara City 66KV Motibaug 193 Vadodara Vadodara City 66KV Tarsali 194 Vadodara Vadodara City 66KV Makarpura-GIDC-B 50-70 195 Vadodara Vadodara City 66KV Makarpura GIDC-A D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 9/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 196 Vadodara Padra 220/66KV Gavasad 50-70 197 Bharuch Jambusar 66KV Sarod (Hamodpore-Kanthariya) 40-50 220 KV 198 Vadodara Padra 66KV Karkhadi -- Gavasad 199 Vadodara Padra 66KV Gavasad 50-70 200 Vadodara Padra 66KV Mobha 201 Bharuch Zagadiya 220/66KV Jhagadia 50-70 220 KV 202 Bharuch Zagadiya 66KV Randedi 50-70 -- Jhagadia 203 Bharuch Zagadiya 66KV Dadheda (Zagadia GIDC) 30-40 204 Bharuch Bharuch 132/66KV Bharuch 50-70 132 KV Bharuch -- 205 Bharuch Bharuch 220/132/66KV Haldarwa 50-70 206 Bharuch Amod 66KV Samni (Kurchan) 207 Bharuch Bharuch 66KV Palej 208 Bharuch Bharuch 66KV Zanor (Nabipur) 209 Bharuch Wagra 66KV Muller 15-20 210 Bharuch Bharuch 66KV Bharuch -B 220 KV 211 Bharuch Bharuch 66KV Bori (Hingala) -- Haldarwa 212 Bharuch Wagra 66KV Wagra 213 Bharuch Bharuch 66KV Panchbatti 214 Bharuch Bharuch 66KV Kadod 30-40 215 Bharuch Bharuch 66KV Haldarva 30-40 216 Vadodara Karjan 66KV Rarod (Nareshwar) 30-40 217 Vadodara Karjan 66KV Saring 218 Kheda Kapadvanj 220/66KV Kapadwanj 50-70 219 Kheda Kapadvanj 66KV Kapadwanj GIDC 30-40 220 Kheda Kapadvanj 66KV Nirmali 221 Kheda Kapadvanj 66KV Attarsumba 30-40 222 Kheda Kapadvanj 66KV Hamirpura (Bhailakui) 223 Kheda Kapadvanj 66KV Torna 224 Kheda Kathalal 66KV Aral 30-40 225 Kheda Kathlal 66KV Chhipadi (Khalal) 226 Kheda Kathlal 66KV Kathlal 220 KV 227 Kheda Mahmedabad 66KV Aklacha -- 30-40 Kapadwanj 228 Kheda Kapadvanj 66KV Vyas Vasna 229 Kheda Kathlal 66KV Apruji 230 Kheda Kathlal 66KV Anara 30-40 231 Kheda Thasra 66KV Chetarsumba 30-40 232 Mahisagar Balasinor 66KV Jorapura 233 Mahisagar Balasinor 66KV Relia 234 Kheda Galteshwar 66KV Sevalia 30-40 235 Kheda Balasinor 66KV Rozva 236 Mahisagar Balasinor 66KV Balasinor 237 Ahmedabad Dascroi 220/66KV Khanpur 50-70 220 KV 238 Ahmedabad Dascroi 66KV Kuha -- 30-40 Khanpur 239 Ahmedabad Dascroi 66 KV Bahiyal 240 Anand Anand 220/66KV Mogar 50-70 220 KV Mogar -- 241 Bharuch Amod 220/66KV Amod 50-70 242 Bharuch Amod 66KV Sarbhan 220 KV -- 243 Bharuch Amod 66KV Ochhan (Telod -Ikhar) 30 Amod 244 Vadodara Karjan 66KV Handod

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 10/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 245 Vadodara Karjan 220/66KV Karjan 50-70 246 Vadodara Dabhoi 66KV Karvan (Kayavarohan) 247 Vadodara Karjan 66KV Simali 30-40 220 KV 248 Vadodara Sinor 66KV Sadhali -- Karjan 249 Vadodara Sinor 66KV Sinor 250 Vadodara Karjan 66KV Kashipura (Ramangamdi) 30-40 251 Vadodara Karjan 66KV Lakodara 30-40 252 Anand Anand 220/66KV Karamsad 50-70 253 Anand Anand 66KV Anand 254 Anand Anand 66KV Gopalpura 30-40 255 Anand Anand 66KV Anand Agri. University 256 Anand Anand 66KV Boriavi (Jol) 257 Anand Anand 66KV V.V. Nagar 30-40 258 Anand Anand 66KV Vithal Udyognagar 259 Anand Petlad 66KV Mahelav 260 Anand Petlad 66KV Changa 30-40 261 Kheda Nadiad 66KV Uttarsanda 262 Kheda Nadiad 66KV Akhdol 220 KV 263 Anand Anand 66KV Karamsad 30-40 Karamsad / 264 Anand Anklav 66KV Anklav -- 220 KV 265 Anand Anklav 66KV Bhetasi 266 Anand Anklav 66KV Navakhal (Khedasa) Mogar 267 Anand Borsad 66KV Borsad 30-40 268 Anand Borsad 66KV Shinglav 269 Anand Anand 66KV Navli 270 Anand Anklav 66KV Khadol (Haldari) 271 Anand Borsad 66KV Ras 30-40 272 Anand Petlad 66KV Virsad 273 Anand Petlad 66KV Nar 274 Anand Cambay 66KV Timba 30-40 275 Anand Petlad 66KV Petlad 276 Anand Sojitra 66KV Kasor 30-40 277 Ahmedabad Ahmedabad 220/132/66KV Ranasan 50-70 278 Ahmedabad Ahmedabad 66KV Naroda 279 Ahmedabad Ahmedabad 66KV Odhav 30-40 220 KV 280 Ahmedabad Ahmedabad 66KV Kathvada -- Ranasan 281 Gandhinagar Gandhinagar 66KV Muthia 30-40 282 Ahmedabad Dascroi 66KV Chandkheda 30-40 283 Ahmedabad Dascroi 66 KV Bhat 284 Vadodara Waghodiya 400/220/66KV Asoj 50-70 285 Vadodara Vadodara 132/66KV Fertilizarnagar 50-70 286 Vadodara Savli 66KV Khakhariya 30-40 287 Vadodara Savli 66KV Pratapnagar (Godampura) 288 Vadodara Waghodiya 66KV Asoj (Paldi) 400 KV 289 Vadodara Waghodiya 66KV Vyankatpura -- Asoj 290 Vadodara Waghodiya 66KV Jarod 30-40 291 Vadodara Vadodara 66KV Amaliyara 292 Vadodara Vadodara City 66KV Chhani-A 293 Vadodara Vadodara City 66KV Chhani -B 294 Vadodara Vadodara City 66KV Sama D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 11/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 295 Mahisagar Lunawada 220/66KV Savdasna Muvada 50-70 296 Mahisagar Lunawada 66KV Lunawada 297 Mahisagar Santrampur 66KV Movasa 298 Mahisagar Lunawada 66KV Kothamba 299 Mahisagar Lunawada 66KV Ved(vardhadari) 30-40 300 Mahisagar Santrampur 66KV Santrampur 301 Mahisagar Santrampur 66KV Valakhedi (Gothib)Vaneda 302 Dahod Fatepura 66KV Lakhanpur 303 Dahod Fatepura 66KV Sarasva 304 Mahisagar Kadana 66KV Ditvas 220 KV 30-40 305 Mahisagar Khanpur 66KV Bakor (Lavana) Savdasna -- 306 Mahisagar Khanpur 66KV Motakhanpur 307 Mahisagar Virpur 66KV Virpur Mauda 308 Mahisagar Balasinor 66KV Pandava (Parbia) 309 Mahisagar Lunawada 66KV Limbadiya 30-50 310 Mahisagar Virpur 66KV Salaiya 311 Mahisagar Virpur 66KV Debhari 312 Mahisagar Lunawada 66KV Budhajina Tekra 30-40 313 Aravalli Malpur 66KV Helodar 30-40 314 Mahisagar Santrampur 66KV Limda Muvadi (Moti Sarsan) 315 Mahisagar Santrampur 66KV Mora 30-40 316 Mahisagar Santrampur 66KV Malvan 317 Ahmedabad Bavla 220/66KV Salejada 50-70 318 Ahmedabad Bavla 220/66KV Bagodara 50-70 319 Ahmedabad Bavla 66KV Juval rupavati 320 Ahmedabad Bavla 66KV Kerala 30-40 321 Ahmedabad Sanand 66KV Zamp 322 Ahmedabad Sanand 66KV Daduka (Rethal) 323 Ahmedabad Bavla 66KV Bavla Maximum 50-70 324 Ahmedabad Sanand 66KV Nani Devti MW RE 325 Ahmedabad Sanand 66KV Rajoda injection 326 Ahmedabad Sanand 66KV Moraiya feasible 327 Ahmedabad Sanand 66KV Vendor Park 30-40 328 Ahmedabad Sanand 66KV Bol-2(GIDC) 329 Ahmedabad Sanand 66KV Sanand-2 220 KV 330 Ahmedabad Bavla 66KV Bol-1(GIDC) Salejada 331 Ahmedabad Bavla 66KV Kesardi 332 Ahmedabad Bavla 66KV Kalyangadh 333 Ahmedabad Dholka 66KV Dholka City 30-40 334 Ahmedabad Dholka 66KV Koth 335 Ahmedabad Dholka 66KV Raipur 336 Ahmedabad Dholka 66KV Simej 30-40 Maximum 50-70 337 Ahmedabad Dholka 66KV Walthera MW RE 338 Ahmedabad Dholka 66KV Ingoli road injection 339 Ahmedabad Dholka 66KV Dholka GIDC feasible 340 Ahmedabad Dholka 66KV Pisawada 30-40 341 Ahmedabad Dholka 66 KV Shetra 342 Kheda Nadiad 66KV Navagam (Nyka) 30-40 343 Vadodara Waghodiya 220/66KV Vyankatpura 40-50 344 Panchmahal Halol 66KV Madar (Koprej) 30-40 220 KV 345 Vadodara Waghodiya 66KV Rustampura 30-40 Vyankatpur -- 346 Chhota Udaipur Bodeli 66KV Surya a 347 Vadodara Vadodara 66KV Khatamba 40-50 348 Vadodara Vadodara City 66KV Harni D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 12/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 1 Ahmedabad Viramgam 220/66KV Viramgam 40-50 Maximum 70- 2 Ahmedabad Viramgam 66KV Jakhawada 30-40 220 KV 100 MW RE 3 Ahmedabad Viramgam 66KV Thori Mubarak 30-40 Viramgam injection 4 Ahmedabad Sanand 66KV Chharodi 30-40 feasible 5 Ahmedabad Viramgam 66KV Thuleta 6 Gandhinagar Gandhinagar 132/66KV Chiloda 50-70 7 Gandhinagar Gandhinagar 66KV Unava 8 Gandhinagar Dehgam 66KV Sadra 9 Gandhinagar Mansa 66KV Pethapur 30-40 132 KV -- 10 Sabarkantha Prantij 66KV Kamalpur Chiloda 11 Gandhinagar Mansa 66KV Manekpur (Grambharti) 12 Gandhinagar Gandhinagar 66KV Shahpur 10-15 13 Gandhinagar Gandhinagar 66KV Dabhoda 30-40 14 Banaskantha Deesa 132/66KV Deesa 50-70 15 Banaskantha Deesa 66KV Bhildi 16 Banaskantha Deesa 66KV Lorwada 30-40 17 Banaskantha Deesa 66KV Balodhar 132 KV -- 18 Banaskantha 66KV Manekpura Deesa Deesa 30-40 19 Banaskantha 66KV Juna Deesa 20 Banaskantha 66KV Ranpur Deesa 30-40 21 Banaskantha 66KV Kant 400 KV 22 Patan Radhanpur 400/220/66KV Charanka 50-70 Charanka -- 23 Patan Patan 132/66KV Patan 40-50 24 Patan Harij 66KV Dunawada 25 Patan Patan 66KV Dudharampura (Varetha) 15-20 132 KV 26 Patan Patan 66KV Anawada -- Patan 27 Patan Patan 66KV Kamliwada 30-40 28 Patan Saraswati 66KV Kansa 15-20 29 Patan Shihori 66KV Anganwada 30 Patan Sidhpur 132/66KV Siddhpur 50-70 31 Banaskantha Vadgam 66KV Basu 30-40 32 Banaskantha Vadgam 66KV Kakoshi 33 Banaskantha Vadgam 66KV Chhapi 30-40 132 KV 34 Mehsana Unjha 66KV Kahoda 30-40 -- Siddhpur 35 Patan Sidhpur 6KV Khali 30-40 36 Patan Unjha / Mehsana 66KV Tundav 37 Patan Sidhpur 66KV Mudana 30-40 38 Patan Sidhpur 66KV Sujanpur 39 Sabarkantha 132/66KV Talod 50-70 40 Sabarkantha 66KV Prantij 41 Sabarkantha Prantij 66KV Talod GIDC 132 KV 30-40 -- 42 Sabarkantha 66KV D'Muvadi Talod 43 Sabarkantha 66KV Tajpur 44 Sabarkantha Talod 66KV Harsol 30-40

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 13/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 45 Banaskantha Lakhani 220/66KV Agathala 50-70 46 Banaskantha 66KV Rantila 47 Banaskantha Lakhni, Deodar66KV Lakhani 30-40 -- 48 Banaskantha 66KV Agathala 49 Banaskantha 66KV Soni Deodar, Lakhani 30-40 50 Banaskantha 66KV Shergadh 220 KV 51 Banaskantha 66KV Kotda (D) Lakhani 30-40 Agathala 52 Banaskantha 66KV Chekara 53 Banaskantha Lakhani 66KV Motakapra 30-40 -- 54 Banaskantha Deesa 66KV Nesda 55 Banaskantha Deodar 66KV Jalota 30-40 56 Banaskantha Tharad 66KV Taruva 30-40 57 Sabarkantha Himmatnagar 220/66KV Agiyol 50-70 58 Sabarkantha Himmatnagar 66KV Dedhrota 59 Sabarkantha Himmatnagar 66KV Munpur 30-40 60 Sabarkantha Himmatnagar 66KV Hansalpur 61 Sabarkantha Himmatnagar 66KV Kali Dungar 62 Sabarkantha Himmatnagar 66KV Chandrani 30-40 63 Sabarkantha Himmatnagar 66KV Moti Demai 64 Sabarkantha Himmatnagar 66KV Kaniyol 65 Sabarkantha Prantij 66KV Amodara 30-40 66 Sabarkantha Himmatnagar 66KV Sonasan 220 KV -- 66KV Hajipur 67 Sabarkantha Himmatnagar 30-40 Agiyol 68 Sabarkantha Himmatnagar 66KV Dalpur 69 Sabarkantha Himmatnagar 66KV Himmatnagar-1 70 Sabarkantha Himmatnagar 66KV Parabda 30-40 71 Sabarkantha Himmatnagar 66KV Gadhoda 66KV Nikoda 72 Sabarkantha Himmatnagar 30-40 73 Sabarkantha Himmatnagar 66KV Gadhi 74 Sabarkantha Himmatnagar 66KV Gambhoi 75 Sabarkantha Himmatnagar 66KV Rupal 30-40 76 Sabarkantha Himmatnagar 66KV Himmatnagar-2 77 Patan Bechraji / Mehsana 220/66KV Bechraji 50-70 220 KV 78 Patan Chanasma 66KV Maniyari -- 15-20 Becharaji 79 Patan Bechraji / Mehsana 66KV Modhera 80 Gandhinagar Kalol 220/66KV Chhatral 50-70 Gandhinagar Kalol 66KV Pansar 81 30-40 82 Gandhinagar Kalol 66KV Chhatral GIDC Gandhinagar Kalol 66KV Borisana 83 30-40 84 Gandhinagar Kalol 66KV Vadsar 85 Gandhinagar Kalol 66KV Kalol 30-40 Gandhinagar Kalol 66KV Dhanot 220 KV 86 30-40 -- 87 Mehsana Kalol 66KV Karannagar Chhatral 88 Mehsana Kadi 66KV Khavad 89 Mehsana Kadi 66KV Sadra 30-40 90 Mehsana Kadi 66KV Rangpurda (Nanikadi) 91 Mehsana Kadi 66KV Nandasan 92 Mehsana Kadi 66KV Indrad (Ratnamani) 30-40 93 Mehsana Kadi 66KV Rajpur

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 14/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 94 Aravali Bhiloda 220/66KV Bhutiya 50-70 95 Aravali 66KV Bhiloda 96 Aravali 66KV Ubsal 97 Aravali 66KV Torada -- 98 Aravali Bhiloda, Vijaynagar66KV Bhiloda 30-40 99 Aravali 66KV Vijaynagar 100 Aravali 66KV Pal 101 Aravali 66KV Dantod 102 Aravali Bhiloda 66KV Shamlaji (Palla) 103 Aravali Bhiloda 66KV Bhetali (Mehru) 30-40 104 Aravali Bhiloda 66KV Kheradi 220 KV 105 Sabarkantha 66KV Poshina Bhutiya 106 Sabarkantha Poshina, Danta, 66KV Golwada 10-15 107 Sabarkantha Khedbrahma 66 KV Makadchampa 108 Sabarkantha 66KV Hingatiya 109 Sabarkantha Khedbrahma 66KV Tandaliya 30-40 -- 110 Sabarkantha 66KV Kundala Vijaynagar, Vadali 30-40 111 Sabarkantha 66KV Choriwad 112 Sabarkantha 66KV Chitroda Idar 30-40 113 Sabarkantha 66KV Badoli 114 Sabarkantha Idar 132/66KV Idar 50-70 115 Sabarkantha 66KV Sudarpur Idar 30-40 116 Sabarkantha 66KV Lai Ranasan 117 Gandhinagar Gandhinagar 220/66KV Jamla 50-70 118 Gandhinagar Gandhinagar 66KV Randheja 30-40 119 Gandhinagar Gandhinagar 66KV Moti Adrej 120 Gandhinagar Kalol 66KV Soja - II 121 Gandhinagar Kalol 66KV Nardipur 30-40 122 Mehsana Kadi 66KV Karjisan 220 KV 123 Gandhinagar Kalol 66KV Veda -- Jamla 124 Gandhinagar Kalol 66KV Itla 30-40 125 Mehsana 66KV Gozaria 126 Mehsana 66KV Gozariya-2 127 Mehsana Gozariya66KV Boru 30-40 128 Mehsana 66KV Charada 129 Mehsana 66KV Kharna 130 Aravali Bayad, Dhansura 220/66 KV Dhansura 50-70 131 Aravali Bayad, Dhansura 66KV Ambaliyara 30-40 132 Aravali Bayad, Dhansura 66KV Akrund(Haripura) 133 Aravali Bayad 66KV Demai 30-40 220 KV 134 Aravali Bayad 66KV Sangal (Vasnirel) -- Dhansura 135 Aravali Bayad 66KV Untarada 30-40 136 Aravali Talod 66KV Rozad 137 Sabarkantha 66KV Punsari Talod 20 138 Sabarkantha 66KV Bayal

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 15/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 139 Aravali Modasa 220/66KV Faredi 50-70 140 Aravali Modasa 66KV Modasa 141 Aravali Dhansura 66KV Rahiyol -- 142 Aravali Modasa 66KV Tiintoi 30-40 143 Aravali Modasa 66KV Medhasan 144 Aravali Modasa 66KV Nani Isrol 145 Aravali Malpur, Meghraj 66KV Malpur 146 Aravali Malpur, Meghraj 66KV Limbodara 30-40 220 KV 147 Aravali Malpur, Meghraj 66 KV Ramgadhi 148 Aravali Malpur, Meghraj 66KV Dugarwada (Kolikhad) Faredi 149 Aravali Meghraj 66KV Meghraj 150 Aravali Meghraj 66KV Relawada -- 151 Aravali Meghraj 66KV Kasana 152 Aravali Meghraj 66KV Waghpur 30-40 153 Aravali Meghraj 66KV Rajpur (Ramghadi) 154 Aravali Meghraj 66KV Navagam (isari) Kantalu 155 Aravali Meghraj 66KV Lakshmanpura (Lusadiya) 156 Banaskantha Deesa 220/66KV Jangral 50-70 157 Banaskantha 66KV Sadarpur 158 Banaskantha Deesa66KV Samau 30-40 159 Banaskantha 66KV Bhatsan 160 Banaskantha 66KV Rasana 161 Banaskantha Deesa, Palanpur66KV Aseda 30-40 162 Banaskantha 66KV Samdhi -- 163 Banaskantha 66KV Sampra 220 KV 164 Banaskantha Sihori 66KV Umbari 30-40 Jangral 165 Banaskantha 66KV Kamboi 166 Banaskantha Palanpur 66KV Gadh 30-40 167 Patan Sarasvati 66KV Mesar 30-40 168 Patan Sarasvati 66KV Dharusana 30-40 169 Patan Saraswati 66KV Jangral 30-40 170 Patan Saraswati 66KV Kimbuva 30-40 -- 171 Patan Sidhpur 66KV Kalyana 30-40 172 Gandhinagar Dehgam 66KV Rakhiyal 30-40 173 Gandhinagar Dehgam 66KV Halisa 174 Gandhinagar Dehgam 66KV Khanpur (Lihoda) 30-40 175 Gandhinagar Gandhinagar 66KV Chhala 220 KV 176 Gandhinagar Dehgam 66KV Dehgam 30-40 -- 177 Gandhinagar Dehgam 66KV Kadadar(Zak) Khanpur 178 Gandhinagar Dehgam 66KV Chiskari 30-40 179 Gandhinagar Gandhinagar 66KV Kadjodra 30-40 180 Gandhinagar Gandhinagar 66KV Bahial 30-40 181 Gandhinagar Gandhinagar 66KV Kudasana(Koba) 182 Mehsana Mehsana 220/132/66KV Mehsana 50-70 183 Patan Chanasma 66 KV Dhinoj 30-40 184 Mehsana Becharji 66KV Motap 185 Mehsana Mehsana 66KV Palavasna 30-40 186 Mehsana Mehsana 66KV Nagalpur (Mehsana-II) 220 KV 187 Mehsana Visnagar 66KV Basna -- Mehsana 188 Mehsana Visnagar 66KV Udalpur 30-40 189 Mehsana Visnagar 66KV Kamana 190 Mehsana Visnagar 66 KV Kherva 191 Mehsana Visnagar 66KV Bhandu 30-40 192 Mehsana Visnagar 66KV Valam D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 16/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 193 Mehsana Kheralu 220/66KV Kheralu 50-70 194 Mehsana Kheralu 66KV Sakari 195 Banaskantha Vadgam 66KV Panchada 30-40 196 Banaskantha Vadgam 66KV Kodram 197 Banaskantha Danta 66KV Ambaji 198 Banaskantha Danta 66KV Gorad 199 Banaskantha Danta 66KV Kuvarsi 30-40 200 Banaskantha Danta 66KV Solsanda -- 201 Mehsana Satlasana 66KV Dharoi 202 Banaskantha Danta 66KV Satalsana 203 Mehsana 66KV Kheralu 30-40 Kheralu 204 Mehsana 66KV Varetha 205 Mehsana 66KV Sudasana (Umari) 30-40 206 Palanpur Satlasana 66KV Motasada 220 KV 207 Mehsana 66KV Otalpur Kheralu 208 Mehsana Kheralu 66KV Mandali 30-40 209 Mehsana Unjha 66KV Dasaj 210 Mehsana Unjha 66KV Unjha 211 Mehsana Unjha 66KV Karali 30-40 212 Mehsana Visnagar 66KV Umta 213 Mehsana Visnagar 66 KV Thalota 214 Mehsana 66KV -- Vadnagar 215 Mehsana 66KV Undhai (Pipaldhar) 216 Mehsana 66KV Jantral 30-40 217 Mehsana Vijapur 66KV Sundarpur 218 Mehsana 66KV Ladol 219 Mehsana Vadnagar 66KV Khanpur 30-40 220 Mehsana Vijapur 66KV Techava 221 Mehsana Jotana 220/66 KV Mitha 50-70 222 Mehsana Mehsana 66KV Asjol 30-40 223 Mehsana Mehsana 66KV Balol 30-40 224 Mehsana Jotana 66KV Mitha 30-40 225 Mehsana 66KV Suraj 226 Mehsana Jotana 66KV Kasalpur (Jotana) 220 KV 30-40 -- 227 Mehsana 66KV Mudarda Mitha 228 Mehsana Detroi / Ahmedabad 66KV Katosan 229 Mehsana Mehsana 66KV Langhnaj 230 Mehsana Mehsana 66KV Linch 30-40 231 Mehsana Mehsana 66KV Mandali 232 Mehsana Mehsana 66KV Akhaj 233 Patan Radhanpur 220/66KV Radhanpur 50-70 234 Banaskantha 66KV Khariya Sihori, Kankrej 30-40 235 Banaskantha 66KV Un 66KV Sankheshwar 236 Patan Sami 220 KV 237 Patan Sami 66KV Mujpur -- 15-20 Radhanpur 238 Patan Sami 66KV Nani Chandur 239 Patan Sami 66KV Sami 240 Patan Radhanpur 66KV Bhandhvad (Dev) 30-40 241 Patan Kankrej 66KV Jakhel D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 17/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 242 Banaskantha Palanpur 220/66KV Palanpur 50-70 243 Banaskantha Amirgadh 66KV Amirgadh 244 Banaskantha Amirgadh 66KV Iqbagadh 30-40 245 Banaskantha Amirgadh 66KV Juni Sarotri (Balundra) 246 Banaskantha Amirgadh 66KV Hebatpur 247 Banaskantha Amirgadh 66KV Bhayala 248 Banaskantha Amirgadh 66KV Virampur -- 249 Banaskantha Amirgadh 66KV Malan 30-40 250 Banaskantha Amirgadh 66KV Vasan 251 Banaskantha Amirgadh 66KV Palanpur-2 252 Banaskantha Vadgam, Danta 66KV Moriya 253 Banaskantha Vadgam, Danta 66KV Jalotra 30-40 254 Banaskantha Vadgam, Danta 66KV Danta 220 KV 255 Banaskantha Vadgam, Danta 66KV Gangva Palanpur 256 Banaskantha Vadgam, Danta 66KV Gidasan 257 Banaskantha Vadgam, Danta 66KV Vadgam 30-40 258 Banaskantha Vadgam, Danta 66KV Pilucha 259 Banaskantha Vadgam, Palanpur 66KV Kanodar 260 Banaskantha Vadgam, Palanpur 66KV Lalwada 30-40 261 Banaskantha Vadgam, Palanpur 66KV Gadalwada -- 262 Banaskantha Dantiwada, 66KV Bhakar 30-40 263 Banaskantha Dantiwada, 66KV Chandisar 264 Banaskantha Dantiwada, 66KV Dantiwada 265 Banaskantha Palanpur 66KV Rajpur (Pakhanva) 30-40 266 Banaskantha Dantiwada, 66KV Bhutedi 267 Banaskantha Palanpur 66KV Palanpur-1 30-40 268 Patan Sankhari 220/66KV Sankhari 50-70

269 Patan Sankhari 400/220/66KV Veloda (Sankhari) 50-70 270 Patan Harij 66KV Harij 271 Patan Harij 66KV Adiya 15-20 272 Patan Harij 66KV Katra 220 KV 273 Patan Chanasma 66KV Chanasma -- 274 Patan Chanasma 66KV Kamboi 15-20 Sankhari 275 Patan Chanasma 66KV Ziliya (Keshani) 276 Patan Patan 66KV Balisana 277 Patan Patan 66KV Manud 30-40 278 Patan Patan 66KV Norta (Mandotri) 279 Patan Unjha / Mehsana 66KV Unava 280 Banaskantha Tharad 220/66KV Tharad 50-70 281 Banaskantha 66KV Runi 282 Banaskantha 66KV Rampura 220 KV -- 283 Banaskantha Bhabar, Vav66KV Tithgam 30-40 Tharad 284 Banaskantha 66KV Balodhan 285 Banaskantha 66Kv Bhabar

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 18/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 286 Banaskantha 66KV Kotarwada 287 Banaskantha 66KV Makhanu 288 Banaskantha 66KV Mera Deodar, Tharad 30-40 289 Banaskantha 66KV Chalva 290 Banaskantha 66KV Jetda 291 Banaskantha 66KV Del 292 Banaskantha 66KV Ghodasar 220 KV 293 Banaskantha 66KV Asodar -- Tharad 294 Banaskantha 66KV Rah 295 Banaskantha 66KV Pathamda 296 Banaskantha Tharad 66KV Tadav 30-40 297 Banaskantha 66KV Piluda 298 Banaskantha 66KV Dedarada Tharad 30-40 299 Banaskantha 66KV Dudhva 300 Banaskantha 66KV Tharad 301 Banaskantha Dhanera 220/66KV Thavar 50-70 302 Banaskantha 66KV Jadiyali Lakhani 30-40 303 Banaskantha 66KV Nandala 304 Banaskantha Dhanera 66KV Dhakha 30-40 305 Banaskantha Tharad 66KV Duva 306 Banaskantha 66KV Jadia 307 Banaskantha 66KV Bhatib 220 KV 30-40 308 Banaskantha 66KV Dharnodhar Thavar -- 309 Banaskantha 66KV Kuvarala (Dhanera) Dhanera 310 Banaskantha 66KV Lavara 30-40 311 Banaskantha 66KV Nanuda 312 Banaskantha 66KV Malotra 313 Banaskantha 66KV Siya 30-40 314 Banaskantha Deesa 66KV Nanameda 315 Banaskantha Dhanera 66KV Vaktapura 316 Banaskantha Mera 66KV Mera 317 Banaskantha Mera 66KV Mitha 30-40 318 Banaskantha Mera 66KV Vadiya 319 Banaskantha Deesa 66KV Ramvas 320 Banaskantha Deodar 66KV Vakha 321 Banaskantha Deodar 66KV Ravel 322 Banaskantha Deodar 66KV Chamanpura 220 KV 323 Banaskantha Kankrej 66KV Khimana Deodar -- 30-40 324 Banaskantha Deodar 66KV Khoda (Vakha) 325 Banaskantha Deodar 66KV Mithipaldi 326 Banaskantha Deodar 66KV Duchakwada 327 Banaskantha Deodar 66KV Vatam 328 Banaskantha Deodar 66KV Kotda (F) 329 Banaskantha Deodar 220/66KV Deodar 50-70 330 Banaskantha Deodar 66KV Deodar 30-40

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 19/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 331 Banaskantha Deodar 66KV Raiya 332 Banaskantha Kankrej 66KV Kuvarva 30-40 333 Banaskantha Kankrej 66KV Arniwada 334 Banaskantha Kankrej 66KV Jakhel 335 Banaskantha Deodar 66KV Jasanvada (Khandosan) 30-40 220 KV 336 Banaskantha Kankrej 66KV Terwada Deodar -- 337 Banaskantha Kankrej 66KV Jalmor (Vakha) 30-40 338 Banaskantha Sihori 66KV Sihori 339 Banaskantha 66KV Padardi 340 Banaskantha Sihori 66KV Dugrasan 30-40 341 Banaskantha 66KV Thara 342 Banaskantha Deesa 400/220/66KV Zerda 50-70 343 Banaskantha Dantiwada 66KV Jegol 344 Banaskantha Dantiwada 66KV Ganguvada 30-40 345 Banaskantha Dantiwada 66KV Panthwada 346 Banaskantha Deesa 66KV Vithodar 347 Banaskantha Lakhani 66KV Devsari 348 Banaskantha Lakhani 66KV Pechhdal 30-40 349 Banaskantha Deesa 66KV Nagfana 350 Banaskantha Deesa 66KV Malgadh 30-40 400 KV Kansari -- 351 Banaskantha Deesa 66KV Ramun 30-40 352 Banaskantha Deesa 66KV Sherpura (Zerda) 353 Banaskantha Deesa 66KV Zerda 354 Banaskantha Dhanera 66KV Bhatram 30-40 355 Banaskantha Deesa 66KV Khimat 356 Banaskantha Deesa 66KV Dama 30-40 357 Banaskantha Deesa 66KV Samsherpura 358 Banaskantha Deesa 66KV Gadha 359 Banaskantha Dantiwada 66KV Bhadli Kotha 30-40 360 Banaskantha Deesa 66KV Baiwada 361 Gandhinagar Mansa66KV Mansa 30-40 362 Gandhinagar 66KV Lodra 363 Mehsana Mansa 66 KV Vihar 364 Mehsana Visnagar 66KV Kada 30-40 365 Sabarkantha Idar 66KV Mau 366 Sabarkantha 66KV Vasai 367 Mehsana Vijapur 220/66KV Vijapur 50-70 220 KV 368 Mehsana Vijapur 66KV Pilwai (Veda) 30-40 -- 369 Mehsana 66KV Malosan Vijapur 370 Mehsana Vijapur66KV Tatosan 30-40 371 Mehsana 66KV Vadasan 372 Mehsana Visnagar 66KV Bhalak (Transwad) 30-40 373 Mehsana 66KV Ranasan 374 Mehsana Vijapur66KV Sanghpur 30-40 375 Mehsana 66KV Hirpura 376 Gandhinagar Kalol 66KV Moti Bhoyan 30-40 377 Gandhinagar Kalol 66KV Khatraj 30-40 378 Gandhinagar Kalol 66KV Santej 379 Mehsana Kadi 66KV Kadi 30-40 400 KV 380 Mehsana Kadi 66KV Laxmipura -- 381 Ahmedabad Detroj 66KV Katosan 30-40 Vadavi 382 Mehsana Kadi 66KV Meda Adraj 383 Mehsana Kadi 66KV Meda 30-50 384 Mehsana Kadi 66KV Thol D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 20/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 1 Jamkandorna 132/66KV Bhayavadar 40-50 Maximum 40-50 132 KV 2 Rajkot Upleta 66KV Arni 30-40 MW RE 3 Rajkot Dhoraji 66KV Supedi Bhayavada injection 4 Rajkot Dhoraji 66KV Moti Vavdi 30-40 r feasible 5 Rajkot Jamkandorna 66 KV Khajurada 6 Junagadh Junagadh 132/66KV Junagadh 40-50 Maximum 40-50 7 Junagadh Junagadh 66KV Bilkha 132 KV MW RE 8 Junagadh Mendarda 66KV Chiroda 30-40 Junagadh injection 9 Junagadh Junagadh 66KV Bagdu (Prabhatpur) feasible 10 Junagadh Bhesan 66KV Chhodvadi 11 Jamnagar 132/66KV Naghedi 40-50 12 Jamnagar Jamnagar 66KV Shapar (Baid) 30-40 13 Jamnagar Jamnagar 66KV Lakha Baval Maximum 40-50 14 Jamnagar Jamnagar 66KV Lal Bangalow 132 KV MW RE 15 Jamnagar Jamnagar 66KV Bedeshwar Naghedi injection 20-30 16 Jamnagar Jamnagar 66KV Saatrasta feasible 17 Jamnagar Jamnagar 66KV Hapa GIDC 18 Jamnagar Jamnagar 66KV Jamnagar-C 30-40 Devbhumi 19 Jam-Khambhaliya 66KV Vadinar 30-40 132 KV Sikka -- Dwarka 20 Gir Somnath Veraval 132/66KV Talaja 40-50 21 Gir Somnath Veraval 66KV Veraval Maximum 40-50 22 Gir Somnath Veraval 66KV Moraj 132 KV MW RE 23 Gir Somnath Veraval 66KV Adri 30-40 Talaja injection 24 Gir Somnath Talala 66KV Jepur feasible 25 Gir Somnath Veraval 66KV Ghusia 26 Rajkot Rajkot 132/66KV Vikram 40-50 27 Rajkot Rajkot 66KV Punitnagar (Rajkot-B) 28 Rajkot Rajkot 66KV Mavdi Rd. (Rajkot) 29 Rajkot Rajkot 66KV Shastri medan 30-40 30 Rajkot Rajkot 66KV Laxminagar 31 Rajkot Rajkot 66KV Mota Mava Maximum 40-50 32 Rajkot Rajkot 66KV Khokhadad 132 KV MW RE 33 Rajkot Rajkot 66KV Tramba Vikram injection 34 Rajkot Rajkot 66KV Kherdi 30-40 feasible 35 Rajkot Rajkot 66KV Faldang 36 Rajkot Rajkot 66KV Magharvada 37 Rajkot Rajkot 66KV Raj Samadhiyala 38 Rajkot Rajkot 66KV Punitnagar-II 30-40 39 Rajkot Rajkot 66KV Kotharia 30-40 40 Rajkot Rajkot 66KV Nilkanth 41 Mahuva 220/66KV Otha (Mahuva) 50-70 42 Bhavnagar Mahuva 66KV Kalsar Maximum 50-70 30-40 220 KV 43 Bhavnagar Talaja 66KV Datha MW RE 44 Bhavnagar Talaja 66KV Pithalpur Mahuva injection 45 Bhavnagar Mahuva 66KV Dudhal-2 (Otha) feasible 46 Bhavnagar Mahuva 66KV Khuntvada 30-40 47 Bhavnagar Mahuva 66KV Bila

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 21/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 48 Gir Somnath Girgadhada 220/66KV 50-70 49 Gir Somnath Una 66KV Samter (Una-II) 30-40 50 Amreli Jafarabad 66KV Timdi 51 Gir Somnath Una 66 KV Dandi 25-30 52 Gir Somnath Girgadhada 66KV Dhokadva Maximum 50-70 53 Gir Somnath Girgadhada 66KV 30-40 220 KV MW RE 54 Gir Somnath Girgadhada 66KV Rabarika 55 Gir Somnath Girgadhada 66 KV Navaugla Dhokadava injection feasible 56 Gir Somnath Una 66KV Una 30-40 57 Gir Somnath Una 66KV Tad (Paldi) 58 Gir Somnath Girgadhada 66KV 30-40 59 Gir Somnath Kodinar 66KV Adpokar/ Mitiyaz 60 Gir Somnath Una 66KV Vajadi 30-40 61 Jamnagar Jamnagar 220/66KV Jamnagar 50-70 Maximum 50-70 62 Jamnagar Jamnagar 66KV Aliabada 30-40 220 KV MW RE 63 Jamnagar Jamnagar 66KV Jamnagar-B 30-40 64 Jamnagar Jamnagar 66KV Morkanda Jamnagar injection 65 Jamnagar Lalpur 66KV Rajhans (GIDC Ph-III) 30-40 feasible 66 Jamnagar Jamjodhpur 220/66KV Moti Gop 50-60 Maximum 50-70 67 Jamnagar Jamjodhpur 66KV Sonvadia 220 KV MW RE 68 Jamnagar Jamjodhpur 66KV Ghunada 30-40 Moti Gop injection 69 Devbhumi Bhanwad 66KV Verad feasible 70 Rajkot Kotda-sangdi 220/66KV Kangasiyali 50-70 71 Rajkot Kotda-sangdi 66KV Shapar 72 Rajkot Kotda-sangdi 66KV Siddheshwar (Shapar-II) Maximum 50- 50-70 220 KV 73 Rajkot Kotda-sangdi 66KV Hirni 100 MW RE 74 Rajkot Kotda-sangdi 66KV Veraval (Rajkot) Kangashiy injection 75 Rajkot Rajkot 66KV Vavdi 30-35 ali 76 Rajkot Rajkot 66KV Kothariya (Solvant) feasible 77 Rajkot Lodhika 66KV Lodhika 30-50 78 Rajkot Rajkot 66KV Khamba 79 Junagadh Keshod 220/66KV Keshod 50-70 80 Junagadh Keshod 66KV Keshod 30-35 81 Junagadh Mendarda 66KV Patrama (Khalipipli) 82 Junagadh Keshod 66KV Sondarada 30-40 83 Junagadh Keshod 66KV Ajab 84 Junagadh Keshod 66KV Koylana 85 Junagadh Maliya Hatina 66KV Vadala (Dharampur) 30-40 86 Junagadh Maliya Hatina 66KV Amrapar 87 Junagadh Keshod 66 KV Bhat Simroli Maximum 50-70 88 Junagadh Keshod 66 KV Moti Ghasri 30-40 220 KV MW RE 89 Junagadh Mangrol 66 KV Mangrol Keshod injection 90 Junagadh Keshod 66 KV Khirsara 30-35 91 Junagadh Keshod 66 KV Ishara feasible 92 Junagadh Maliya Hatina 66KV Malia (Hatina) 93 Junagadh Maliya Hatina 66 KV Kadaya 30-40 94 Junagadh Maliya Hatina 66KV Chorwad (Gadu) 95 Junagadh Maliya Hatina 66KV Chuldi 96 Junagadh Maliya Hatina 66KV Mendarda 30-40 97 Junagadh Maliya Hatina 66KV Nani Khodiyar 98 Junagadh Mangrol 66KV Chotli Vidi 30-35 99 Junagadh Maliya Hatina 66KV Budhecha

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 22/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 100 Surendranagar Limbdi 220/132/66KV Limbdi 40-50 101 Surendranagar Chuda 66KV Chokadi 220 KV -- 102 Surendranagar Wadhwan 66KV Vastadi 15-20 Limbdi 103 Surendranagar Chuda 66KV Chachka 104 Surendranagar Muli 66KV Muli 30-40 105 Surendranagar Sayla 66KV Sayla 220 KV -- 106 Surendranagar Wadhwan 66KV Tuva (Timba) 10-15 Limbdi 107 Surendranagar Wadhwan 66KV Surendranagar 30-40 108 Rajkot Rajkot 220/66KV Nyara 50-70 109 Rajkot Lodhika 66KV Metoda 110 Rajkot Lodhika 66KV Metoda GIDC-II 50-70 111 Rajkot Lodhika 66KV Central Metoda GIDC 112 Rajkot Lodhika 66KV Khirsara 113 Rajkot Paddhari 66KV PadadhriI Maximum 50- 114 Rajkot Paddhari 66KV Sarapdad 220 KV 100 MW RE 115 Rajkot Paddhari 66KV Targhadi 30-40 Nyara injection 116 Rajkot Paddhari 66KV Mota Khijadia feasible 117 Rajkot Paddhari 66KV Nyara 118 Rajkot Lodhika 66KV Nagar Pipaliya 30-40 119 Jamnagar Kalavad 66KV Nikava 120 Rajkot Rajkot 66KV Ghanteshwar (Rajkot-D) 121 Rajkot Rajkot city 66KV University Rd. 50-70 122 Rajkot Rajkot 66KV Raiyadher 123 Junagadh Vanthali 220/132/66KV Shapur 50-70 124 Junagadh Bhesan 66KV Mendpara 125 Junagadh Junagadh City 66KV Junagadh (GIDC) 126 Junagadh Junagadh City 66KV Zanzarda (JU. City) 30-40 127 Junagadh Junagadh 66KV Choki 128 Junagadh Junagadh 66KV Majevadi Maximum 50-70 129 Junagadh Mendarda 66KV Arniyana 220 KV MW RE 130 Junagadh Vanthali 66KV Mahobatpur (Navagam) 30-40 Shapur injection 131 Junagadh Vanthali 66KV Vadala feasible 132 Junagadh Manavadar 66KV Katakpara 30-40 133 Junagadh Vanthali 66KV Shapur 40-50 134 Junagadh Vanthali 66KV Kanza 135 Junagadh Vanthali 66KV Agatrai 30-40 136 Junagadh Vanthali 66KV Bamanasa 137 Gir Somnath Kodinar 220/66KV Timbdi 50-70 138 Gir Somnath Sutrapada 66KV Moradiya 30-40 139 Gir Somnath Kodinar 66KV Sindhaj 30-40 Maximum 50-70 140 Gir Somnath Kodinar 66KV Aranej 220 KV MW RE 141 Gir Somnath Sutrapada 66KV Lodhwa (Singsar) Timbdi injection 142 Gir Somnath Sutrapada 66 KV Gorakhmadi 30-40 feasible 143 Gir Somnath Sutrapada 66KV Prashnavada 144 Gir Somnath Sutrapada 66KV Kanjotar(Barda) 145 Gir Somnath Sutrapada 66KV Singasar 30-40

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 23/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 146 Gir Somnath Sutrapada 66KV Sutrapada 147 Gir Somnath Veraval 66KV Veraval (GIDC) 50-70 148 Gir Somnath Veraval 66KV Bhalka(GIS) 149 Gir Somnath Veraval 66KV Prabhas Patan 150 Gir Somnath Kodinar 66 KV Kodinar 30-40 151 Gir Somnath Kodinar 66 KV Devli 152 Gir Somnath Kodinar 66 KV Jantrakhadi 30-50 Maximum 50-70 153 Gir Somnath Kodinar 66 KV Advi 220 KV MW RE 154 Gir Somnath Veraval 66KV Bhetali 30-40 Timbdi injection 155 Gir Somnath Talala 66KV Amblash feasible 156 Gir Somnath Talala 66KV Raydi 30-40 157 Gir Somnath Talala 66KV Ankolwadi 158 Gir Somnath Talala 66KV Dhava 30-40 159 Gir Somnath Talala 66KV Jasadhar 160 Gir Somnath Sutrapada 66KV Pranchi 161 Gir Somnath Kodinar 66KV Ghantwad 30-40 162 Gir Somnath Kodinar 66KV Alidar 163 Bhavanagar Bhavnagar 220/66KV Vartej 50-70 164 Bhavanagar Bhavnagar 66KV Bandar Road 30-40 165 Bhavanagar Bhavnagar 66Kv Sardarnagar 166 Bhavanagar Bhavnagar 66KV Sidsar 167 Bhavanagar Ghogha 66KV Mamsa-2 168 Bhavanagar Bhavnagar 66KV Bhumbhali 20-30 169 Bhavanagar Bhavnagar 66KV Bhadi 170 Bhavanagar Ghogha 66KV Nathugadh 171 Bhavanagar Bhavnagar 66KV Bhavnagar Maximum 50-70 172 Bhavanagar Bhavnagar 66KV Valketgate 30-40 220 KV MW RE 173 Bhavanagar Bhavnagar 66KV Vartej-II (Chitra) Vartej injection 174 Bhavanagar Bhavnagar 66KV Nari Road feasible 175 Bhavanagar Bhavnagar 66KV Desainagar 30-35 176 Bhavanagar Ghogha 66KV Kharakdi (Samdhiyara) 177 Bhavanagar Shihor 66KV Songadh 30-40 178 Bhavanagar Shihor 66KV Sar 179 Bhavanagar Bhavnagar 66KV Navagam (Kardej) 180 Bhavanagar Shihor 66KV Shihor 30-40 181 Bhavanagar Shihor 66KV Sihor-2 182 Bhavanagar Shihor 66KV Nesda 30-40 183 Bhavanagar Shihor 66KV Ghanghali

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 24/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 184 Bhavanagar Palitana 220/66KV Sagapara (Palitana) 50-70 185 Bhavanagar Bhavnagar 66KV Tana 186 Bhavanagar Ghogha 66KV Dihor 187 Bhavanagar Bhavnagar 66KV Trapaj 188 Bhavnagar Talaja 66KV Mannar 189 Bhavnagar Ghogha 66KV Navagam (Kukad) 20-30 190 Bhavnagar Talaja 66KV Talaja Maximum 50-70 191 Bhavnagar Talaja 66KV Pasvi 220 KV MW RE 192 Bhavnagar Talaja 66KV Devalia Sagapara injection 193 Bhavanagar Ghogha 66KV Timana feasible 194 Bhavanagar Palitana 66KV Palitana-2 10-15 195 Bhavanagar Palitana 66KV Shetrunjaya Dam 196 Bhavanagar Bhavnagar 66KV Godidhal 30-40 197 Amreli Bhavnagar 66KV Nonganvadar 198 Bhavnagar Palitana 66KV 30-40 199 Bhavnagar Gariyadhar 66KV Mandvi 200 Junagadh Visavadar 220/66KV Visavadar 50-70 201 Amreli Dhari 66KV Bhader 202 Amreli Dhari 66 KV Vekariya 203 Amreli Dhari 66KV Dalkhania 204 Amreli Dhari 66KV Kagdadi (Hamapur) 30-40 205 Amreli Dhari 66KV Kubda 206 Amreli Dhari 66KV Dudhala 207 Amreli Dhari 66KV Dhari 208 Amreli Dhari 66KV Malsika 209 Junagadh Bhesan 66KV Junidhari Gundali (TadkaPipliya) 210 Junagadh Bhesan 66KV Chuda 211 Junagadh Bhesan 66KV Morvada 212 Junagadh Bhesan 66KV Chanaka 30-40 Maximum 50-70 213 Junagadh Bhesan 66KV Ishwariya 220 KV MW RE 214 Junagadh Bhesan 66KV Bhesan Visavadar injection 215 Junagadh Visavadar 66KV Mota Kotda feasible 216 Junagadh Visavadar 66KV Dhebar 217 Junagadh Visavadar 66KV Bhalgam 30-40 218 Junagadh Visavadar 66KV Navihaliyad 219 Junagadh Visavadar 66KV Ratang (Magharadi) 220 Junagadh Mendarda 66KV Itali 30-40 221 Junagadh Visavadar 66KV Baradia 222 Junagadh Visavadar 66KV Khambhaliya (Ozat) 30-40 223 Junagadh Visavadar 66KV Govindpara (Jetalvad) 30-40 224 Junagadh Visavadar 66KV Moti Monpari 30-40 225 Junagadh Visavadar 66KV Kankchiyala 30-40 226 Junagadh Visavadar 66KV Bhutdi

D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 25/26 Details of district wise substations for RE integration as on January-2020 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 227 Amreli Savarkundla 66 KV Badhada 228 Amreli Khambha 66 KV Mota Samadhiyala 229 Amreli Dhari 66 KV Devla 30-40 230 Amreli Khambha 66 KV Khambha 231 Amreli Khambha 66 KV Dedan 232 Amreli Khambha 66 KV Tataniya 233 Amreli Dhari 66KV Chalala 30-40 Maximum 40-50 234 Amreli Dhari 66KV Hudali 220 KV MW RE 235 Amreli Jafarabad 66KV Jafrabad 25-30 Savarkundl injection 236 Amreli Savarkundla 66KV Ambardi 25-30 a feasible 237 Amreli Amreli 66 KV Savarkundla 30-40 238 Amreli Amreli 220/66KV Savarkundla 50-70 239 Amreli Liliya 66 KV Liliya 30-35 240 Amreli Liliya 66 KV Gundaran 241 Bhavnagar Gariyadhar 66 KV Gariyadhar 242 Bhavnagar Gariyadhar 66 KV Virdi 10-15 243 Amreli Lathi 66 KV Damnagar 244 Amreli Amreli 400/220/66KV Amreli 50-70 245 Amreli Amreli 66KV Mota Ankadiya (Limbadia) 30-40 Maximum 50-70 246 Amreli Amreli 66KV Amreli - A 400 KV MW RE 247 Amreli Amreli 66KV Amreli - B Amreli injection 30-40 248 Amreli Amreli 66KV Jaliya feasible 249 Amreli Amreli 66KV Gavadka 250 Rajkot Jetpur 400/220/66KV Jetpur 50-70 251 Rajkot Dhoraji 66KV Jamkandorna 30-40 252 Rajkot Dhoraji 66KV Mevasa 253 Amreli Kunka-vav 66KV Vadiya 254 Amreli Kunka-vav 66KV Amrapar 30-40 255 Amreli Kunka-vav 66KV Nava Ujala (Kajuri Pipaliya) 256 Amreli Kunka-vav 66KV Tori 257 Rajkot Dhoraji 66 KV Moti Parabdi (Toraniya) 30-40 Maximum 50-70 258 Rajkot Jetpur 66KV Jetpur-A 30-40 400 KV MW RE 259 Rajkot Jetpur 66KV Dhoraji Bypass 30-40 Jetpur injection 260 Rajkot Jetpur 66KV Mandlikpur feasible 261 Rajkot Jetpur 66KV Jetalsar 30-40 262 Rajkot Jetpur 66KV Arab Timbadi 263 Rajkot Jetpur 66KV Devki Galol 264 Junagadh Bhesan 66KV Khambhaliya (Mandva) 30-40 265 Amreli Kunka-vav 66KV Hanuman Khijadiya 266 Rajkot Jetpur 66KV Jetpur-B 267 Rajkot Jetpur 66KV Jetpur (Dhareshwar) 30-40 268 Rajkot Jetpur 66 KV Amrapar (Reshamadi Galol) 30-40 269 Rajkot Rajkot 400/220/66KV Hadala 50-70 Maximum 50-70 270 Rajkot Rajkot 66KV Navagam (Rajkot - F) 30-40 400 KV MW RE 271 Rajkot Rajkot 66KV Vijaynagar (Hadala) 30-35 Hadala injection 272 Rajkot Rajkot 66KV Aji Dahisarda 30-40 feasible 273 Rajkot Rajkot 66KV Popatpara 30-40 D:\E_Drive\RE\Web-site-Update\Jan-20\RE-Integration-66KV-Jan20.xlsx 26/26