TENDER DRAWINGS I (Volume- Rv) I I I SEPTEMBER2016 I I I T

Total Page:16

File Type:pdf, Size:1020Kb

TENDER DRAWINGS I (Volume- Rv) I I I SEPTEMBER2016 I I I T I c'l6le \q-eq - 1o16 Sca4 I vC+24--g I I RSuvrt&wAr NATIONALHIGHWAY AUTHORITY I MINISTRY OF COMMUNICATIONS I GOVERNMENTOF PAKISTAN I I CONSTRUCTION OF LAHORE EASTERN BYPASS PROJECT t PACKAGE-II t FROM KALA KHATATROAD TO LAHORE-STALKOTMOTORWAY (LSM) I INCLUDING KALA KHATAI INTERCHANGE I I I TENDER DRAWINGS I (voLUME- rV) I I I SEPTEMBER2016 I I I t I I.AHOREEASTERN BYPASS PROJECT I PACKAGE- II FROM KALAKHATAI ROAD TO TAHORE-SIALKOTMOTORWAY (LSM) INCTUDING KATA KHATAIINTERCHANGE I LISTOF DRAWINGS (1oF2) Description DrawingNo. Srf Description DrawingNo. I 0 list of Drawings Ntl A/ TD / GE N / 1l\OOLa, b MiscellaneousDetails I GeneralDrawings MedianBarrier Detail NHAnD/GEN/1A060,06r I GeneGlNotes NHA//TDlG E N/1AOO2 GuardRail NHA/rDlGEN/1A062a'62b NHA/ITDlG E N/1AOO3 Reflectors/Studs & Delinaeators NHA/TTDIG EN/1A063 I NHAfiDlG EN/1AOO4 NHA/TDIG E N/1A064 SymbolsAnd Abbrevations NHA/I D/GE N/1AOO5 StrainedWirc Fence& DuctDerail NHMD/GEN/1A065 ListOfTraverse Points & BenchMark NHA/TDlGEN/1A006 HeadLight Glarc Screen NHA/TD/GEN/r4066a-66b I 2 TypicalCrossSections Detailsof serviceDucts NHMD/GEN/14067 MainCaniageway (except River Khader) NHA/TTD/G EN/1AOO7A curband Side walk Details NHMDlG EN/1A068 I Kalakhatai Interchange NHA/TD/GEN/1AOO7D PavementMarkang NHMrD/GEN/1A069a-69c LSMInterchange NHA/TDlGEN/IAOO7E 7 Interchanges TypicalSuperelevation Details KalaKhatai (KK) Interchange NHA/TDlINT/o2 I SuperelevationData NHA/TDIGEN/1AOO9&B Lahore'Sialkot Moto&ay (LSM)Interchange NHA//ID/INT/03 TrafficSignage 8 Plan& Protile I TrafficSigns NHA,/TDIGEN/1A020a-20e MainLink: KK Road - LSM NHA/P.P/LRR.LSM.ML/16-22 LetteringDetails For Directional Signs NH AAD/GE N/1A021 SL-3:KSK TO KKRarnp NHA/P-PIKSK-KK-RAMP/01-06 TypicalPlacment Of RordSigns NHA/TDlGEN/1A022 SL-5:KK - KSKRamp NHAlPP/KK.KSK-RAMP/01-03 I TypicalPlacrnent Of RoadSigns NHA/TD/GEN/1A022b RoadSign Fixation Details NHAAD/GEN/1AO23a'23c I GeneralAnangement of OverheadSigns NHA/rD/GEN/1A024a-24s SignagePlan Key NHA/TDlGEN/1A025 SignagePIan (5-9 & 12) NHMD/GEN/1AO25E-I,1AO25L I Drainage& ErosionProtection MedianDrainage Along Concrete Barier NHA/TD/CEN/1AO1O t concretechutes Nfra/rTDlGEN/1A011,012 TvoicalEmbankment & CulvertProtection Details 014 I NHA/'TDlGEN/1A013, I .1:.n":d Nh lA GovERNi,rENTOF PAKTSTAN n- 6 LANEHIGHWAY fROM KATASHA}I IGKU LIST OF DRAWINGS ,Ui- FFI MINISTRYOF COMMUNICATIONS IO LAHORERIXG ROAD ,I NATIONALHIGHWAY AUTHORITY (LAHOREEASTERI{ BYPASS) I ..ra- NHA]ID/GEN/lAOOIa t I I LAHOREEASTERN BYPASS PRO.IECT PACKAGE- II l FROM KALAKHATAI ROADTO LAHORE-SIALKOT MOTORWAY (LSM) INCLUDING KAI.AKHATAI INTERCHANGE IISTOF DRAWINGS I 12oF2l Sr# Description DrawingNo, Srf Description DrawlngNo. ScheduleOfStru.tur€s 1t RCCRetaining Walls I ScheduleOf Structu.es NHMO/STR/1A001,0O2 RetaininsWall ConcreteOutline & Reinforcernent NHA/TD/srR/1E001 10 BrldgesNo.4-5 & 9-12 12 Underpasses I GeneralNotes NHA/TD/STR/1BOO1 UndemassGeneral Arrangement and Reinforcement NHMrD/STR/1Fo01003 KeyP{ans: Bridges 3 - 5 NHA/TD/STR/lDOOOA 12 CattleCreeps KeyPlans: Bridges 8 - 13 NHA/TDISTR/lDOOOB CattleCreep Genera I Arra ngement and Reinforcement NHA/ID/STR/1G001-003 I GeneralArrangementPlan& Elevation):Bridges 3,4,5 & 8 NHA/TDISTR/1DOO1A Culvert5 GeneralArrangementPlan& Elevation)rBridges 9, 10 & 11 NHA/TD/STR/1DOO1B CulvertsG e nera I Arfangernents and Reinforcement NHA/rTDISTR/CUr/001-010 I GeneralArrangementPlan& Etevaiion):Bndges 12 & 13 NHA/rDISTR/1D001C GeneralArrangementCrossS€ctions): Bridges 3, 4 5 & 8 NHA/ID/sIR/1DOO24 I GenemlAfrangementCrossSections): Bridges 9, 10 & 11 NHMID/STR/1DOO2B GeneralAnangementcrossSections): Bridges 12 & 13 NHMD/STR/1DOO2C GirderOutline NHA/ITDI5TR/1DOO4 I GirderReinforce ment NHA/TD/STR/1DOO5 AbutmentOutline NHMrD/5IR/1DOO7 I AbutmentReinforcement NHA/TD/STR/1DOO8 PierOutline: Bridges 12 & 13 NHA/TDlTR/1DO10 PierReinforcement; Bridges 12 & 13 NHA/TD/STR/1D011 I DeckSlab NHA/TDlsIR/1D014 Test Pile:concrete & Reinforcement NHA/TD/STR/1DO20 I PrecastPanels for Deckslab NHA/TDlsTR/1D022 Expansionloint Details NHA/TD/STR/1D024 I I I I GOVERNT4ENTOF PAKISTAN A 5 LANE fiIG WAY FROM KALA SHAH XAKU LISTOF DRAWNGS lFlt MINISTRYOF COMMUNICATIONS TO LAHORE RING ROAD NATIONALHIGHWAY AUTHORIW '--rT-A (LAhON' EASIERNAYPASS) I NHA'ID/GEN/1AOO1b l CONSTRUCTIONOF LAHOREEASTERN BYPASS PROJECT PACKAGE.II GENERALDRAWINGS GENERALNOTES 1.GENERAL SPECIFICATIONS OFNATIONAL HIGHWAY AUTHORITY TO BE FOLLOWED 2,ALL DII\,4ENSIONS SHOWN ON PLAN & PROFlLEDRAWINGS ARE IN METERS. 3,ALL ANGULAR IVIEASUREIVENTS AREIN DEGREES, I\,4INUTES AND SECONDS (360" TO A CIRCLE), 4, EACHDRAWING SHALL BE REAO IN CONJUNCTION WITH OTHER DRAWINGS. ANDTOPOGRAPHY REPRESENT CONDITIONS ATTHE Tll\,'lE OF SURVEY i.e JUNE 2016. 5,CO-ORDINATES FOR SURVEY WERE REFERENCED TOTHE SURVEY OF PAKISTAN (SOP) BENCHIiIARKS LOCATED ALONG THE PROJECT. EXISTING LEVELS, DIMENSIONS 6, NOTESGIVEN ON DRAWINGS ADJACENT TO A SECTIONPERTAIN TO THE PARTICULAR DETAIL, 7, LOCALCHANGES IN HORIZONTAL/VERTICAL ALIGNMENT MAY BE DONE WITH PRIOR APPROVAL OF IHE ENGINEERAS PER SITE REQUIREIVENTS. 8,STRUCTURES SHOWN ON PLAN/PROFILE ARE SYMBOLIC, FOR DETAIL OF STRUCTURES AND PROTECTION WORKS SEE RELEVANT DRAWINGS BY NAMELY PROPOSED GUNDA BUND, PROPOSEDCTJNETTE , T.SPUR ALONG RIGHT FLOOD BUND,INVERTED HOCKEY SPUR ALONG RIGHT FLOOD BUND & BANKSOPENING OF 09 ABANDONED (ONE LEFT SIDE& 8 RIGHTSIDE)SHALL BE APPROVED BY IRRIGATION DEPT GOVT OF PUNJAB PRIOR TO EXECUTION AT SITE. 9. FORPAVEIVIENT MARKING AND ROAD SIGNS. CONTRACTOR SHALL SUBMIT DETAILED SHOP DRAWINGS FOR APPROVAL OF THE ENGINEER. 10.LOCATION OF UNDERGROUND CAELES/UTILITIES SHOWN ON PLANS ARE APPROXII\,IATE. EXACT LOCATION SHALL BE DETERMINEDBY THE CONTRACTOR AT HISOWN COST. 11.ANY DAI/AGE DONE TO THE UTILITIES DURING EXCAVATION/EXECUTION OFWORK SHALL BE IMMEDIATELY REPAIRED TO THE SATISFACTION OFCONCERNED AGENCY BY THECONTRACTOR AT HISOWN COST. 12.THE ENGINEER IV1AY VARY THE CUT SLOPES, FOUNDATIONS AND OTHER FEATURES OF DESIGN AS DEEIVED NECESSARY TO CONFORM TO THE VARYING SITE CONDITIONS DURINGTHE EXECUTION OF WORKOR AS MAYBE D'SCOVERED FROM THE STAKE OUT SURVEY. ALL SUCH CHANGES SHALL BE GOVERNED BY THE RELEVANT CONTRACT CONDITIONS. 13.THE LENGTHS, SLOPES AND INVERT LEVELS OF CULVERTS, AS SHOWN IN SCHEDULE OF STRUCTURES ARE TENTATIVE. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS AT EACHCULVERT LOCATION AND SHALL SUBI\4IT FOR APPROVAL TO THE ENGINEER PRIOR TO CONSTRUCTION. 14.THE CONTRACTOR SHALL BE RESPONSIBLE TO CATERFOR ALL TEMPORARY TRAFFIC DIVERSIONS BEFORE START OFCONSTRUCTION OF THE ROAD TO THE SATISFACTION OF ENGINEERINCLUDING DETOUR ROAD AND ITS IVAINT.ENANCE, SPRINKLING OF WATER, GRADING AND COMPACTION ASAND WHERE REQUIRED AT HIS OWN COST. 15.RETAINING/BREASTiPARAPET WALLS, GUARD RAILS, CONCRETE KERB STONES, FOOTPATHS, REFLECTIVE MIRRORS, PAVEI\4ENT STUDS AND OTHERANCILLARY ITEI/S SHALL BE PROVIDEDAS PER DRAWINGS OR AS DIRECTED BY THE ENGINEER. 16.ANY ADJUSTIVIENT iN LAYOUT / LEVELS OF BRIDGES THAT MAY BE REQUIRED AT SITE,SHALL BE MADE AS PER THEINSTRUCTIONS OF THE ENGINEER. 17,WATER COURSES LINED OR UNLINED, WITHIN THE R,O,W, LIMITS SHALL BE RELOCATED BY THE CONTMCTOR AS PER SITE REQUIREMENTS AND DIRECTIONS OFTHE ENGINEER. 18.EACH lTEl\,1 OF DISIVANTLED MATERIAL FROM THE EXISTING ROAD SHALL BE AND I,lEASURED SEPAMTELY lN CASEBASE MATERIAL FALLS OUT OF THE SPECIFICATION Lll\,1lTS, ITSHALL BE MIXED AND REUSED IN IHE PROJECT,OTHERWISE ITSHOULD BE HANDED OVERTO NHAAUTHORITIES BYTHE CONTMCTOR. 19,SUEGRADE MATERIAL SHALL HAVE A MINIMUI\,,ICBR OF 8% AT 95% M.D.D AASHTO T-180, 20,EI\,lBANKMENT MATERIAL SHALL HAVE A I\4INII\,1UMCBR OF 8% AT 95%M.D,D AASHTO T-180, ZONES BELOW SUBGRADE SHALL BE COMPACTED AS GIVENIN THE SPECIFICATIONS. 2'1,THE EXISTING ASPHALTIC SURFACE WILL BE SCARIFIED TO THE DEPTH AND WIDTH AS REQUIRED/APPROVED BYTHE ENGINEER AFTER SCARIFICATION, THE EXISTING PAVEI\,1ENTSTRUCTURE/IVIATERIAL SHALL BE PLOUGHED AND COI\,IPACTED UNDER ITEM .RE(REUSEOF EXISTING PAVEMENT MATERIAL AS SUBBASE) AND IN LINEWITH THEGENERAL SPECIFICATIONAND TO THE SATISFACTION OF THE ENGINEER 22,IF THE DIFFERENCE OF LEVELSBETWEEN THE PROPOSED P.G.L AND TOP OF EXISTING ROAD IS LESS THEN THE THICKNESS OF PAVEMENT (ASPHALT, AGGREGATE BASE & SUB.EASE),THEN THE EXISTING ROAD WLL BEEXCAVATED TO A IEVELSO THAT FULL THICKNESS OF PAVEMENTCAN BE LAID, EXPOSED SUB GRADE SHALL CONFORM TOTHE REQUIREMENTS OFSPECIFICATIONS OFROAD IN CUT. 23.THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEIVPOMRY ROAD WORKS FOR TRAFFIC DIVERSION (|TEM 705) CONTROL PROTECTION OF TRAFFIC OTEM 706) & PROVIDING & INSTALLING2 NOS, PROJECT SIGN BOARDS OTEM 711) OF GENERAL SPECIFICATIONS AT HIS OWN COST. NO SEPARATE PAYI\,4ENTS SHALL BE MADE AGAINSTTHESE ITEI\,4S, 24.THE CONTRACTOR SHALL PERFORI/ EARTHWORK lN ORDINARYSOIL FOR E|\,1BANKN.4ENTS i/c PLOUGHING AND lvllXlNG WITH BLADE GRADE, COI/PLETE lN ALLRESPECT: 95% TO1OO% MAXII\4UM MODIFIED AASHTO DRY DENSITY WITH 5 IVILELEAD IN THE SPACE BETWEEN DMINS & PROPERTYLINE AS PER THE DIRECTION OF ENGINEER. I GOVERN}IENTOF PAKISTAN -":r,.." 5 LANEHTGHWAY fAOM (ALA SHAII (AI(U GENERALNOTES MII{ISTRYOF COMMUNICATIONS - / llBat1\ \ l\ \ IO LAHOR'RING ROAD e.E!l ()E k NATIONALHIGHWAY AUTHORIW AillAll & Atsocl.tg 4l (LAHOREEASTERN'YPASS) NHP'/TD/GEN/1A00; I I I N I Link Description Packaqe I |\ain Link LRRto LSM(KM 0+000 - 11+113) 1 .\ lvlainLink LRRto Lslvl(KM 11+1,| - \ 3 16+058) 2 I + I sL-1' KSK UCto LSM Yc 2 t sL-2- KSK fo LSM Ramp I I sL3 KSK to KK Ramp 2 t.sl'll sL4' LSM to KSK Ramp 2 soP I t l- KK to KSKRamp sL-6. KSK l/C 2 rl KK I'C 2 E!.1 IB I sL{ LRR I/C 1 rF LSM l= Key INTERCHANGE I I LRR
Recommended publications
  • Estimates of Charged Expenditure and Demands for Grants (Development)
    GOVERNMENT OF THE PUNJAB ESTIMATES OF CHARGED EXPENDITURE AND DEMANDS FOR GRANTS (DEVELOPMENT) VOL - II (Fund No. PC12037 – PC12043) FOR 2020 - 2021 TABLE OF CONTENTS Demand # Description Pages VOLUME-I PC22036 Development 1 - 968 VOLUME-II PC12037 Irrigation Works 1 - 49 PC12041 Roads and Bridges 51 - 294 PC12042 Government Buildings 295-513 PC12043 Loans to Municipalities / Autonomous Bodies, etc. 515-529 GOVERNMENT OF THE PUNJAB GENERAL ABSTRACT OF DISBURSEMENT (GROSS) (Amount in million) Budget Revised Budget Estimates Estimates Estimates 2019-2020 2019-2020 2020-2021 PC22036 Development 255,308.585 180,380.664 256,801.600 PC12037 Irrigation Works 25,343.061 18,309.413 18,067.690 PC12041 Roads and Bridges 35,000.000 41,510.013 29,820.000 PC12042 Government Buildings 34,348.354 14,827.803 32,310.710 PC12043 Loans to Municipalities/Autonomous Bodies etc. 76,977.253 28,418.359 29,410.759 TOTAL :- 426,977.253 283,446.252 366,410.759 Current / Capital Expenditure detailed below: New Initiatives of SED for imparting Education through (5,000.000) - (4,000.000) Outsourcing of Public Schools (PEIMA) New Initiatives of SED for imparting Education through (19,500.000) - (18,000.000) Private Participation (PEF) Daanish School and Centres of Excellence Authority (1,500.000) - (1,000.000) Punjab Education Endowment Funds (PEEF) (300.000) - (100.000) Punjab Higher Education Commission (PHEC) (100.000) - (50.000) Establishment of General Hospital at Turbat, Baluchistan - - (50.000) Pakistan Kidney & Liver Institute and Research Center (500.000) -
    [Show full text]
  • For Promoting Private Sector Investment in Infrastructure
    ADB DEVELOPING BEST PRACTICES FOR PROMOTING PRIVATE SECTOR INVESTMENT IN INFRASTRUCTURE ROADS Asian Development Bank The views, conclusions, and recommendations presented here are those of the study consultants, and should not be considered to represent the official views of the Asian Development Bank or its member governments. © Asian Development Bank 2000 ISBN No. 971-561-280-6 Stock No. 010300 Published by the Asian Development Bank P.O. Box 789, 0980 Manila, Philippines For more information on ADB, visit http:\\www.adb.org FOREWORD This report is one of a series of five commissioned by the Asian Development Bank (ADB) to identify and recommend best practices to be followed and specific steps to be taken, by ADB’s developing member countries in order to encourage both private sector investment and competition in infrastructure development. The study was financed through a $600,000 regional technical assistance grant - RETA 5753: Developing Best Practices for Promoting Private Sector Investment in Infrastructure. This report focuses on the road sector; the other reports cover the power, water supply, airport and air traffic control, and port sectors. Transport is central to achieving prosperity and the quality of life, to which all countries aspire. Transport policy has pervasive impacts: on economic performance; on the shape and structure of human settlements through its impact upon physical development and economic structures; on the distribution of income; and on the environment. This report develops best practices for promoting private sector investment in the road sector. It defines the objectives of private sector participation, reviews experiences of private sector participation in Asia and elsewhere, examines the degree of success that has been achieved to date, and identifies the key issues that provide the basis for determining best practices.
    [Show full text]
  • Government of the Punjab
    GOVERNMENT OF THE PUNJAB ESTIMATES OF CHARGED EXPENDITURE AND DEMANDS FOR GRANTS (DEVELOPMENT) VOL - II (Fund No. PC12037 – PC12043) FOR 2015 - 2016 TABLE OF CONTENTS Demand # Description Pages VOLUME-I PC22036 Development 1 - 1053 VOLUME-II PC12037 Irrigation Works 1 - 58 PC12038 Agricultural Improvement and Research 59 - 62 PC12040 Town Development 63 - 67 PC12041 Roads and Bridges 69 - 274 PC12042 Government Buildings 275 - 644 PC12043 Loans to Municipalities / Autonomous Bodies, etc. 645 - 658 GOVERNMENT OF THE PUNJAB GENERAL ABSTRACT OF DISBURSEMENT (GROSS) (Amount in million) Budget Revised Budget Estimates Estimates Estimates 2014-2015 2014-2015 2015-2016 PC22036 Development 216,595.841 193,548.096 220,715.467 PC12037 Irrigation Works 47,975.188 35,470.869 48,681.493 PC12038 Agricultural Improvement and Research 190.551 194.776 58.150 PC12040 Town Development 500.000 408.228 500.000 PC12041 Roads and Bridges 31,710.000 40,836.883 69,491.707 PC12042 Government Buildings 48,028.420 19,903.878 60,553.183 PC12043 Loans to Municipalities/Autonomous Bodies etc. 13,546.444 16,058.201 11,350.590 TOTAL 358,546.444 306,420.931 411,350.590 Current / Capital Expenditure detailed below: Punjab Education Foundation (PEF) (7,500.000) - (10,500.000) Daanish School System (2,000.000) - (3,000.000) Punjab Education Endowment Fund (PEEF) (2,000.000) - (2,000.000) Lahore Knowledge Park (500.000) - (1,000.000) Health Insurance Card etc (4,000.000) - (2,500.000) Population Welfare (500.000) - (150.000) PMDGP/PHSRP WB, DFID Sponsored (2,000.000) - (1,000.000)
    [Show full text]
  • MAS Residencia Catalog-Design
    LAHORE Lahore is the capital city of the province of Lahore is a main cultural center of the Punjab, the second largest metropolitan Punjab region and Pakistan, and is the area in Pakistan and the 18th most populous largest Punjabi city in the world. Lahore city in the world. It is an important historical remains an economic, political, transpor- center in South Asia. With a rich history tation, entertainment, and educational dating back over a millennium, hub of Pakistan. Lahore is referred to as the cultural heart of Pakistan as it hosts most of the arts, cuisine, festivals, music, film-making, gardening and intelligentsia of the country. The city has always been a center for publications where 80% of Pakistan's books are published, and it remains the foremost center of literary, educational and cultural activity in Pakistan. It is also home to hundreds of temples, mosques, churches and shrines. An estimate in January 2015 gave the population of the Lahore agglomeration as 10,052,000. LAHORE RING ROAD The Lahore Ring Road (LRR) is an 85-km long 6-lane high-speed limited-access or controlled-access. orbital motorway around Lahore, Pakistan. It is linked to the M-2 Motorway and the N5 National Highway. The LRR circles Lahore over a circumference of 85 km. The route of the Lahore Ring Road is from 95% of the northern loop of LRR is now BabuSabu to Saggian Interchange, Lahore, complete. There will be one emergency Niazi Chowk, and then stretching straight up lane on both the sides of the road.
    [Show full text]
  • Transport Network Lahore City Introduction Materials
    Pakistan Journal of Science (Vol. 64 No. 4 December, 2012) TRANSPORT NETWORK LAHORE CITY T. Jamal, F. Mazhar and I. S. Kaukab Geography Department, University of the Punjab, Lahore, Pakistan Corresponding Author E-mail: [email protected] ABSTRACT: The paper examines the adequacy and deficiency of transport planning in Lahore to recommend some measures for developing a sustainable urban transport system in the city. Urban transport is one of the most important sectors having a direct impact on sustainable development. The pattern of land use and the available transportation systems in urban areas play a critical role in determining the livability and sustainability of those urban areas. Land use planning and its integration with the transport planning is most ignored issue. Traffic management and roadway construction has not kept pace with the increased mobility needs of the society. Lahore city is being the cultural, intellectual, political and economic hub of the Punjab province, has experienced adverse impacts of traffic congestion and mismanagement. Key words: sustainable, transport system, planning, congestion INTRODUCTION Road Network of Lahore: Although each major city of Punjab has a particular character, Lahore offers more Lahore is the capital of the Punjab and is the opportunities to implement new policies because it is the second most densely populated metropolitan city of social, cultural and political hub of the country. These Pakistan. The population of Lahore is around 8 million. indicators of sustainable transport will assist in assessing The city has an international airport and railway station and evaluating the sustainability of current and future which is located in the heart of the city.
    [Show full text]
  • Development Expenditure (Volume-IV) Budget Estimates 2021-22
    For Departmental use only FEDERAL BUDGET 2021–2022 DETAILS OF DEMANDS FOR GRANTS AND APPROPRIATIONS Development Expenditure (Volume-IV) Budget Estimates 2021-22 Government of Pakistan Finance Division Islamabad PART III - DEVELOPMENT EXPENDITURE A - DEVELOPMENT EXPENDITURE ON REVENUE ACCOUNT : I - CABINET SECRETARIAT - PAGES 86 Development Expenditure of Cabinet Division 2403 87 Development Expenditure of Aviation Division 2407 88 Development Expenditure of Establishment Division 2417 89 Development Expenditure of Poverty Alleviation and Social Safety Division 2420 90 Development Expenditure of SUPARCO 2423 II - CLIMATE CHANGE, MINISTRY OF - 91 Development Expenditure of Climate Change Division 2431 III - COMMERCE, MINISTRY OF - 92 Development Expenditure of Commerce Division 2437 IV - COMMUNICATIONS, MINISTRY OF - 93 Development Expenditure of Communications Division 2443 V - DEFENCE, MINISTRY OF - 94 Development Expenditure of Defence Division 2449 95 Development Expenditure of Survey of Pakistan 2456 VI - DEFENCE PRODUCTION, MINISTRY OF - 96 Development Expenditure of Defense Production Division 2461 VII - ENERGY, MINISTRY OF - 97 Development Expenditure of Power Division 2465 (i) VIII - FEDERAL EDUCATION, PROFESSIONAL TRAINING, PAGES NATIONAL HERITAGE AND CULTURE, MINISTRY OF - 98 Development Expenditure of Federal Education and Professional Training Division 2475 99 Development Expenditure of Higher Education Commission (HEC) 2490 100 Development Expenditure of National Vocational & Technical Training Commission (NAVTTC) 2527 101
    [Show full text]
  • Punjab Development Statistics 2017 Preface
    Punjab Development Statistics 2017 Preface Bureau of Statistics has been issuing this publication since 1972. The present edition is the 43rd in the series. It provides important statistics in respect of social, economic and financial sectors of the economy at aggregate as well as sectoral levels. This publication contains data on almost all sectors of the Provincial economy with their break-up by Tehsil, District & Division as far as possible. Eight tables on Monthly Electricity and Gas Consumption, Number of Zoo, Number of Bulldozers, Small and Mini Dams, Recognized Slaughter Houses and two provisional tables on population census 2017 are also added in this issue. It includes some national data on important subjects like Major Crops, Foreign Trade, Labour Force & Employment, National Accounts, Population, Price and Transport etc. It contains a 'Statistical Abstract' which gives a comparative picture of information on almost all Socio- Economic sectors of Pakistan and the Punjab. Key findings of Multiple Indicator Cluster Servey (MICS): 2014 of some of the Socio-Economic Indicators are also included in this edition viz-a-viz Education, Health, Housing and Socio-Economic Development by district. Every effort has been made to include the latest available data in this publication. It is hoped that this publication will be useful to the policy makers, planners, researchers, govt. departments and other users of Socio-Economic data in public as well as private sector. I am thankful to various Provincial Departments / Agencies / Federal Ministries / Divisional/District offices for supplying the required data. Without their co-operation, it would have not been possible to release this publication in time.
    [Show full text]
  • Request for Proposal (Rfp)
    REQUEST FOR PROPOSAL (RFP) FOR ENGINEERING, PROCUREMENT, CONSTRUCTION AND FINANCE OF LAHORE RING ROAD (SOUTHERN LOOP) UNDER BUILD–TRANSFER (BT) MODEL (Volume – I) May 2015 V12 1 Request for Proposal – Engineering, Procurement, Construction and Finance of Lahore Ring Road (Southern Loop) Disclaimer This RFP has been prepared by the Lahore Ring Road Authority (LRRA), which was formed under the Lahore Ring Road Authority Act, 2011. This invitation constitutes no form of commitment on the part of LRRA to enter into any arrangements with any person/entity. LRRA reserves the right to withdraw from the process or any part thereof or to vary any of its terms at any time without giving any reason whatsoever. No financial or other obligation, whatsoever shall accrue to LRRA in such an event. The information contained in this Request for Proposal (RFP) and attached volumes or subsequently provided to Bidders, whether verbally or in documentary or any other form by or on behalf of LRRA or any of its employees or advisors, is provided to Bidder(s) on the terms and conditions set out in this RFP and such other terms and conditions subject to which such information is provided. This RFP is not an agreement; its sole purpose is to provide interested parties with information that may be useful to them in making their offers (bids/proposals) pursuant to this RFP. This RFP includes statements, which reflect various assumptions and assessments arrived at by LRRA in relation to the Project. Such assumptions, assessments and statements do not purport to contain all the information that each Bidder may require.
    [Show full text]
  • Government of Pakistan Public Sector Development
    GOVERNMENT OF PAKISTAN PUBLIC SECTOR DEVELOPMENT PROGRAMME 2018-19 PLANNING COMMISSION MINISTRY OF PLANNING, DEVELOPMENT AND REFORM June, 2018 PEOPLE FIRST PREFACE Public Sector Development Programme (PSDP) is the most important fiscal policy tool to achieve socio economic targets as envisaged in the Vision 2025 by channelizing scarce public resources to projects having complementary and crowding in impact on economic activities. Ultimate goal of the spending under PSDP is to further strengthen physical and social infrastructure to put our country on sustainable and high growth trajectory. 2. The PSDP 2018-19 has been formulated on the basis of development priorities of the government through consultative and participatory approach with the agencies concerned. The Ministry of Planning, Development and Reform has aligned PSDP 2018-19 with Sustainable Development Goals (SDGs), Long Term Plan of CPEC and Vision 2025 goals of putting people first, sustained indigenous and inclusive growth, water, energy and food security, private sector led growth, developing competitive knowledge economy and modernization of transport infrastructure and greater regional connectivity. This multifold development package will help to achieve balanced development in the country. 3. The National Economic Council (NEC) in its meeting held on 24th April, 2018 approved National Development Programme for 2018-19 at Rs 2,043 billion, including Provincial ADPs at Rs 1,013 billion. The size of Federal PSDP for 2018-19 is set at Rs 1030 billion including foreign assistance of Rs 171 billion and Rs 100 billion financing on PPP mode. CPEC related projects have been assigned high priority for their timely completion. Water, energy and transport projects have also been given priority to address the issues of these sectors and to attract domestic and foreign investment in the country.
    [Show full text]
  • Transport Department
    JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) A GOVERNMENT OF THE PUNJAB PROJECT TRANSPORT DEPARTMENT THE PROJECT FOR LAHORE URBAN TRANSPORT MASTER PLAN IN THE ISLAMIC REPUBLIC OF PAKISTAN FINAL REPORT VOLUME I March, 2012 ALMEC CORPORATION ORIENTAL CONSULTANTS CO. LTD. Exchange Rate: USD 1.00 = PKR80.00 (2010 Prices) PREFACE In response to a request from the Government of the Punjab in the Islamic Republic of Pakistan, the Government of Japan decided to conduct “The Project for Lahore Urban Transport Master Plan in the Islamic Republic of Pakistan” and entrusted to the study to Japan International Cooperation Agency (JICA). JICA selected and dispatched a study team headed by Mr. Takashi Shoyama of ALMEC Co., LTD. and consists of ALMEC Co., LTD. and Oriental Consultants Co., LTD. between April, 2010 and March, 2012. The study team held discussions with the officials concerned of the Government of the Punjab, conducted field surveys in the study area, prepared a Lahore Urban Transport Master Plan (LUTMP) and its Action Plan, conducted a capacity development through On-the-Job-Training (OJT), and prepared this final report. The project was composed of two phases; i) Phase I to conduct a Home Interview Survey (Person Trip Survey) and other transport/ traffic surveys and develop a transport demand analysis model, and ii) Phase II to prepare a master plan and its action plan. This report is presents the study findings of both Phases. I hope that this report will contribute to the promotion of this project and to the enhancement of friendly relationship between our two countries. Finally, I wish to express my sincere appreciation to the officials concerned of the Government of the Punjab for their close cooperation extended to the study team.
    [Show full text]
  • ADP 2013-14, a Scheme to Provide “KIDS ROOMS” in 1000-Primary Schools Which Will Continue During This Financial Year As Well
    GOVERNMENT OF THE PUNJAB MTDF 2013-16 DEVELOPMENT PROGRAMME 2013-14 Annual Development Programme 2013‐14 Abstract (Million Rs.) Page No Sector Type Capital Revenue Total F. Aid Total New 28,639.882 40,763.400 69,403.282 0.000 69,403.282 Social Sectors Ongoing 7,118.140 12,332.578 19,450.718 1,941.000 21,391.718 Total 35,758.022 53,095.978 88,854.000 1,941.000 90,795.000 New 7.000 14,774.000 14,781.000 0.000 14,781.000 School Education Ongoing 24.965 694.035 719.000 0.000 719.000 Total 31.965 15,468.035 15,500.000 0.000 15,500.000 New 2,428.000 979.000 3,407.000 0.000 3,407.000 Higher Education Ongoing 2,443.294 819.706 3,263.000 0.000 3,263.000 Total 4,871.294 1,798.706 6,670.000 0.000 6,670.000 New 732.546 172.454 905.000 0.000 905.000 Special Education Ongoing 171.824 63.176 235.000 0.000 235.000 Total 904.370 235.630 1,140.000 0.000 1,140.000 New 0.000 605.000 605.000 0.000 605.000 Literacy Ongoing 0.000 1,000.000 1,000.000 0.000 1,000.000 Total 0.000 1,605.000 1,605.000 0.000 1,605.000 New 1,332.000 0.000 1,332.000 0.000 1,332.000 Sports & Youth Ongoing 623.000 20.000 643.000 0.000 643.000 Affairs Total 1,955.000 20.000 1,975.000 0.000 1,975.000 New 1,715.151 6,592.547 8,307.698 0.000 8,307.698 Health & Family Ongoing 3,784.006 4,908.296 8,692.302 0.000 8,692.302 Planinig Total 5,499.157 11,500.843 17,000.000 0.000 17,000.000 New 0.000 8,056.500 8,056.500 0.000 8,056.500 Water Supply & Ongoing 0.000 2,811.500 2,811.500 0.000 2,811.500 Sanitation Total 0.000 10,868.000 10,868.000 0.000 10,868.000 New 728.185 1,033.899 1,762.084 0.000
    [Show full text]
  • Das) of Large Cities (Lahore, Faisalabad, Rawalpindi, Gujranwala & Multan) and of Bahawalpur Development Authority (BDA) and Fort Monroe Development Authority (FDMA
    URBAN DEVELOPMENT Urban Development Sector covers development projects sponsored by WASAs and Development Authorities (DAs) of large cities (Lahore, Faisalabad, Rawalpindi, Gujranwala & Multan) and of Bahawalpur Development Authority (BDA) and Fort Monroe Development Authority (FDMA). VISION Provision of adequate and efficient urban services in cities, and harnessing their potential for making them engines of economic growth. POLICY Provincial allocation of resources to the WASAs/Development Authorities for the following works/projects keeping in view their population, level of service delivery and keysocio-economic indicators: • Laying of trunk sewers and construction of drains • Construction of new disposal stations • Construction of Sewage Treatment Plants (STP) • Construction of Flyovers, Ring roads, Bypasses and Interchanges OBJECTIVES • Supply of potable drinking water and its efficient use • Provision of effective and efficient sewerage and drainage system • Environment friendly disposal of sewage • Safe and efficient roads infrastructure • Provision of solid waste management services • Strategic planning for growth of cities on scientific lines STRATEGY • A central principle of Urban Strategy is that “density” and “agglomeration” are central to economic development, higher productivity, social equity and human development. To make Punjab competitive for investment and development, cities are going to play a vital role, because they can benefit from a large and skilled labor force, economies of urban scale, economies of agglomeration (i.e. efficiency resulting from clustering of firms in a given 437 industry or related industries), and the resulting demand for goods and services. • Further, rural-urban migration and urbanization can only lead to higher income if manufacturing and services grow fast enough to absorb the supply of labor.
    [Show full text]