Ras Tanura Re-Route Pipeline Project
Total Page:16
File Type:pdf, Size:1020Kb
Case Study WATER Location Project Kingdom of Saudi Arabia Ras Tanura Re-Route Pipeline Project End User Saudi Aramco Saudi Aramco were keen to address an ongoing issue with leakage in their existing carbon steel pipe network carrying EPC raw water. Coupled with high maintenance costs, including China Petroleum Pipeline Company coating and lining, Saudi Aramco were looking for a better solution for potable and utility water pipelines. Year 2016 What We Delivered DIAMETER PRESSURE METERS JOINTS DELIVERING 600mm Up to 35 Barg 45.6 km REKA Seal Lock Potable & Utility Joints (REKA SLJ) Water Our engineering and design teams worked to replace the existing carbon steel network with Reinforced Thermosetting Resin (RTR) Wavistrong™ Glass Reinforced Epoxy (GRE) Ras Tanura area is best known pipes. The scope of work involved the relocation of a for being home to one Saudi network of 250 kilometres of potable and utility water Aramco’s most established pipelines starting from the Desalination Plant in Rahima City and finishing in Qatif City. refineries with a crude distillation capacity of 550,000 The pipeline is designed to withstand temperatures of barrels per day. Saudi Aramco 65oC and pressures of 35 barg. FPI carried out extensive has built numerous artificial hydrotesting of the network to ensure operation at the islands for easier docking on design pressures. To ensure the pipeline does not cause waste, contamination and to deliver an appropriate the coast of Ras Tanura. The quality and standard, the line was certified via the Water area houses networks of pipes Regulations Advisory Scheme (WRAS). for the offshore oil rigs and production facilities as well as water networks. Project Case Study Ras Tanura Re-Route Pipeline Project WATER Gallery Need Please get in touch with us More Info? [email protected].