The Solar Energy Transformation Program (SETuP) saw the rollout of 10MW of power to benefit 25 remote communities. The program was completed in 2019.

94 million litres Estimated savings of 94 million litres of diesel will be achieved over the life of the program

1MW solar with $59 million 2MWh battery Total program cost Flagship project at Daly funded by the Australian River allowing 100% of solar Renewable Energy Agency energy use during the day (ARENA) and the Northern Territory Government

50% 250,000 15% 25 years Diesel savings Average reduction Estimated life of tonnes the program for Daly River CO2 emissions saved over in diesel reliance the life of the program overall across 24 sites without battery The Solar Energy Transformation Program is delivering cleaner, greener energy to remote Aboriginal communities across the Northern Territory.

Warruwi (175kW) Pirlangimpi Milikapiti Minjilang (100kW) Maningrida Milingimbi Galiwinku (1175kW) (400kW) (750kW) Gunbalanya Wurrumiyanga (675kW) (1075kW) Gunyangara Ramingining Yirrkala Darwin (500kW) Belyuen Jabiru Gapuwiyak Acacia Larrakia (425kW) NORTHERN Daly River Milyakburra (1000kW) REGION (100kW) Weemol

Kybrook Farm Umbakumba Bulman Angurugu (100kW) Peppimenarti Jodetluk Wadeye Numbulwar Nganmarriyanga Manyalluk Katherine Barunga Rockhole Beswick Rittarangu Binjari Jilkminggan Ngukurr (400kW)

Minyerri Timber Creek KATHERINE (275kW) Gudabijin REGION Borroloola Daly Waters

Amanbidiji Yarralin

Pigeon Hole Mungoobada

Daguragu Kalkarindji Elliott BARKLY

Lajamanu REGION (400kW)

Tennant Creek

Mungkarta Wutunugurra Orwaitilla SOUTHERN Imangara Alpurrurulam REGION Willowra Tara Ampilatwatja Wilora SETuP Program Ti Tree Arlparra Nturiya (450kW) Solar Communities Yuelamu Pmara Jutunta

Yuendumu Laramba Tranche 1 (500kW) Engawala Nyirripi Tranche 2 (200kW) Atitjere (225kW) Solar with Battery Ikuntji Mount Liebig Kintore Diesel Power Station (50kW) Iwupataka (225kW) Ntaria Diesel Power Station / Solar Santa Teresa Areyonga Gas (100kW) IES Grid / Solar Impanpa (400kW) Power and Water Grid Yulara (100kW) Private Grid Apatula (100kW)

For more information about the program, go to www.powerwater.com.au/setup