AVIATION IMPACT STATEMENT Lord Howe Island Wind Turbine Generators Prepared for the Lord Howe Island Board August 2015 AVIATION IMPACT STATEMENT Lord Howe Island Airport Wind Turbine Generators Prepared for the Lord Howe Island Board August 2015 The Airport Group – Australian Airports Association Winner 2013 Corporate Project Of The Year DOCUMENT SUMMARY Project: Proposed Wind Turbine Development Lord Howe Island Client: Lord Howe Island Board Client Contact: Andrew Logan, Manager, Infrastructure & Engineering Services Conducted By: TAG173 Pty Ltd, a Licensee of The Airport Group The Airport Group Pty Ltd Brisbane Office Unit 8/441 Nudgee Rd HENDRA QLD 4011 T: 07 3268 6300 F: 07 3628 6010 E:
[email protected] Contact: Mark Fineran, Airspace Specialist Document Version: Final Report: Version 01 Copyright & Disclaimer © The Airport Group Pty Ltd. All rights reserved. PLEASE NOTE: - The information contained in this document is provided solely and to be used only for the scope of the contract for which this document is prepared. No part of the this material may be reprinted, reproduced, removed, distributed, translated, transmitted or utilised in any form or by any electronic, mechanical, or other means without verifiable prior permission including written consent from the Directors. By default, any third party using the information contained within the TAG20150758 Aviation Impact Statement Lord Howe Island Wind Turbine Assessment August 2015 2 DOCUMENT VERSION LISTING Version Version Description Changes/ Actions Staff Date 0.1 Development draft Initial draft created MF 01/05/2015 Document review for first 0.2 Final Draft MF 25/06/2015 release LHIB comments 0.3 Document review MF 24/08/2015 incorporated 1 Final Release MF/RRR 25/082015 TAG20150758 Aviation Impact Statement Lord Howe Island Wind Turbine Assessment August 2015 3 TABLE OF CONTENTS DOCUMENT SUMMARY .......................................................................................................................