Social Monitoring Report

Project Number: 36505 December 2007

PRC: Hai River Basin Pollution Control Project

Prepared by Shandong Construction Development Research Institute Shandong Province, PRC

For Shandong Provincial Project Management Office

This report has been submitted to ADB by the Shandong Provincial Government Project Management Office and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB.

Asian Bank Loan Project Shandong Haihe Basin Pollution Control Project

Monitoring and Evaluation Report of Immigrant Resettlement

(No. 2)

December 15, 2007

Immigrant Resettlement External Monitoring Group,

Shandong Construction Development Research Institute

Contents Foreword …………………………………………………………………………1 I. Monitoring and Evaluation Overview………………………………………….2 1.1. Purpose of monitoring and evaluation ………………………………………2 1.2. Contents and methods of monitoring and evaluation ………………………..3 1.3. Organization and implementation of monitoring and evaluation ……………4 II. Monitoring and evaluation of land requisition progress ………………………5 2.1. Monitoring of land requisition progress ………………………………….….5 2.2. Evaluation of land requisition progress ………………………………….…..5 III. Monitoring and Evaluation of Immigration Resettlement and Compensation Progress ………………………………………………………………….………12 IV. Monitoring and evaluation of fund settlement and use………………………12 4.1. Monitoring of fund settlement and use………………………………...……12 4.2. Evaluation of fund settlement and use……………………………...……….15 V. Monitoring and evaluation of production and living conditions of immigrant villages ………………………………………………………………………..…15 5.1. Typical households in immigrant monitoring…………………..…………...15 5.2. Monitoring of production and resettlement of immigrants and affect villagers………………………………………………………………...…...... …15 5.3. Monitoring of immigrant living resettlement ……………………….....…..24 5.4. Evaluation of production, living resettlement and income level of affected villagers ………………………………………………………………..……25 VI. Monitoring and evaluation of public participation……………..……...……26 6.1. Monitoring of public participation ……………………….………...... …26 6.2. Evaluation of public participation ………………………….……...... …27 VII. Monitoring and evaluation of operation and efficiency of immigration mechanism ……………………………………………………………...………27 7.1. Monitoring of immigrant resettlement mechanism ………………...... ……27 7.2. Monitoring and evaluation of operation and efficiency ……..……...... …30 VIII. Conclusion and suggestions ……………………………………..…….…31 8.1. Conclusion ……………………………………………….……...... ……31 8.2. Suggestions …………………………………………………..…...... …32

Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Foreword

According to requirements of Asian Development Bank, this is No. 2 monitoring and evaluation report prepared by the monitoring and evaluation group of

Shandong Construction Development Research Institute.

Entrusted by Shandong Province Asia Bank Project Office and City No.

2 Sewage Treatment Plant and Reclaimed Water Utilization Project,

County Domestic Wastes Treatment Project, City Comprehensive Sewage

Treatment Plant Project, Linqing City Urban Domestic Wastes Treatment Project,

Linyi County Urban Domestic Wastes Treatment Project, Shanghe County Urban

Sewage Treatment Plant Project and Sewage Treatment Plant, and confirmed by officials of Asian Bank Shandong Haihe Basin Pollution

Control Project ,Shandong Construction Development Research Institute, as an independent external monitoring and evaluation institution for Asian Bank projects, has carried out the monitoring and evaluation of Shandong Haihe Basin

Pollution Control Project immigrant resettlement work and composed for Asian

Development Bank and Shandong Province Project Office the "Asian

Development Bank Loan Project: Shandong Haihe Basin Pollution Control

Project Immigrant Resettlement External Monitoring and Evaluation Report".

During August 15 to September 11 and November 10 to November 30, 2007, based on the base investigation report (No. 1 Monitoring and Evaluation Report) in April of 2007, Shandong Construction Development Research Institute

------1------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, , Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Immigrant Resettlement External Monitoring Group (hereinafter referred to as

Monitoring Group) carried out project immigrant resettlement monitoring for the above mentioned 7 sub-projects respectively, and, as requested by the policy guide of Asian Development Bank, composed the "Asian Development Bank

Loan Project: Shandong Haihe Basin Pollution Control Project Immigrant

Resettlement Base Investigation No. 2 Monitoring and Evaluation Report".

Shandong Construction Development Research Institute

Immigrant Resettlement External Monitoring and Evaluation Group

2007-12-15

I. Monitoring and Evaluation Overview

According to requirements of Asian Development Bank (ADB), all immigrant resettlement under ADB loan projects shall be regularly monitored by the immigrant resettlement external monitoring and evaluation group during execution. Therefore, Shandong Construction Development Research Institute

Immigrant Resettlement External Monitoring and Evaluation Group worked out specific programs for immigrant resettlement external independent monitoring and evaluation and implemented in actual operation.

1.1 Purpose of monitoring and evaluation According to requirements of Asia Bank and PMO, external monitoring and evaluation must be carried out for immigrant resettlement work under Asia Bank loan projects. External monitoring and evaluation shall be activities of a ------2------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank third party independent from project owners and immigration implementation organs. It is to provide objective and fair evaluation of the immigrant resettlement by carrying out field tracing investigation and periodic monitoring of related data and information, so as to locate existing or potential problems, put forward rationalization proposals, report the evaluation results and related proposals to Asia Bank, PMO, project owners and related authorities as an important basis for Asia Bank loan project examination, in order to improve the implementation of immigrant resettlement. 1.2 Contents and methods of monitoring and evaluation 1.2.1 Basic contents and important contents of monitoring and evaluation 1.2.1.1 Basic contents 1. Land requisition progress; 2. Immigrant resettlement progress; 3. Fund provision and use; 4. Immigrant production and living arrangement and livelihood restoration; 5. Public participation; 6. Immigration organs operation and efficiency. 1.2.1.2 Important contents For difference conditions of various subprojects and evaluation convenience, we divided affected persons in all subprojects into two categories : (1) rural affected population, and (2) urban affected population (the classification is not based on project contents). (1) Rural affected population For rural affected population, refer to "Base Investigation Report" (No. 1 monitoring and evaluation report). In "Base Investigation Report" (No. 1 monitoring and evaluation report), we deem Lixiaohai Village in Binzhou, Tongjiadaokou Village in Shanghe and Xipu Village in Gaotang as rural keypoints,

------3------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank because the three village are quite typical: First, the number of affected population is high in the three villages (79 for Binzhou project, 222 for Shanghe project and 79 for Gaotang project), representing the actual economic conditions of the project affected area in different aspects. Secondly, most of the affected villagers in the three villages are half farmers and half industrial employees, with a certain comparability. (2) Urban affected population For urban affected population, refer to "Base Investigation Report" (No. 1 monitoring and evaluation report). 1.2.2 Methods of monitoring and evaluation According to the involuntary resettlement principles and policy objectives of ADB, Shandong Construction Development Research Institute Immigrant Resettlement External Monitoring and Evaluation Group carried out the monitoring and evaluation with methods of sociological documentation, typical survey, direct visit, field inspection, discussion and questionnaires. First, typical survey method was used to determine Lixiaohai Village, Tongjiadaokou Village and Xipu Village as keypoints for rural monitoring. Secondly, direct visit method was used with the affected villagers in the above mentioned three villages as investigation subjects. According to ADB requirements on monitoring proportion, all affected households were deemed as basic subjects of the monitoring and evaluation. 1.3 Organization and implementation of monitoring and evaluation According to Shandong Haihe Basin Pollution Control Project Immigrant Resettlement Plan optimized and renewed by project executing units, During August 15 to September 11 and November 10 to November 30, 2007, based on the base investigation report (No. 1 Monitoring and Evaluation Report) in April of

------4------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank 2007, Shandong Construction Development Research Institute Immigrant Resettlement External Monitoring Group (hereinafter referred to as Monitoring Group) carried out project immigrant resettlement monitoring for the above mentioned sub-projects and tracing to typical households. In the report, personal information of related villagers are provided by villagers themselves and the specific compensation amounts are confirmed against the compensation distribution sheets with personal signatures. Detailed data and information on land requisition progress, project progress, fund settlement and use, resettlement progress and immigration organ operation were obtained from project units and concerned authorities of /town governments.

II. Monitoring and evaluation of land requisition progress 2.1 Monitoring of land requisition progress According to field inspection and investigation by the monitoring and evaluation group, up to December 15, 2007, when the report was submitted,Binzhou Subproject achieved a permanent land requisition of 65.6 mu (including 62.2 mu in Binzhou Economic Development Zone Dudian Office Lixiaohai Village and 3.4 mu in Shangji Town Shaogouqianhan Village), with all compensation settled and civil work commenced in June 25, 2007; Shanghe Subproject achieved a permanent land requisition of 65 mu (including 23 mu in Shanghe Town Tongjiadaokou Village, 40 mu in Zhangfang Township Zhanglaozhuang Village and 2 mu of collective ditch land), with all compensation settled (civil work commenced in November 2007); Gaotang Subproject achieved a permanent land requisition of 81.54 mu (Xipu Village), with all compensation settled and civil work commenced in August 2007; Temporary pipe network construction started at the same time. 2.2 Evaluation of land requisition progress

------5------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank 2.2.1 Permanent land requisition 2.2.1.1 The permanent land requisition for Binzhou City No. 2 Sewage Treatment Plant and reclaimed water utilization project, Shanghe Sewage Treatment Plant project and Gaotang Sewage Treatment Plant Phase 2 and reclaimed water utilization project has been completed as planned. The civil work of Binzhou City No. 2 Sewage Treatment Plant and reclaimed water utilization project has been commenced on June 25, 2007. The works on the permanent requisition land are shown in the photos below.

Fig. 1. Work site of Binzhou City No. 2 Sewage Treatment Plant and reclaimed water utilization project

------6------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank

Fig. 2. Work site of Gaotang Sewage Treatment Plant Phase 2 Project

Fig. 3. Work site of Shanghe Sewage Treatment Plant

2.2.1.2 The land for Linqing Domestic Wastes Treatment Plant Project was for a kiln of Xianfeng Office. The kiln was closed. The land is state owned. Land use license has been approved. For closing the kiln, 26 temporary workers were compensated with RMB 2000 yuan each according to "Immigrant Resettlement Plan". The compensation has been finished in June 2005 (refer to compensation sheet).

------7------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Compensation Sheet of Linqing Xianfeng Office Kiln

Name Gender Age Native Amount Signature Remarks place Yang Male 35 Jiangxi 2000.00 √ Fangjiang Zhang Male 48 Jiangxi 2000.00 √ Jingui Hou Male 55 Jiangxi 2000.00 √ Wangchun Qi Weida Male 39 Jiangxi 2000.00 √ Zhang Male 54 Jiangxi 2000.00 √ Jinquan Zhang Male 35 Jiangxi 2000.00 √ Jinhua Hu Male 45 Jiangxi 2000.00 √ Guangcheng Wu Xingfen Female 32 Jiangxi 2000.00 √ Tang Female 38 Hebei 2000.00 √ Chunxia Xu Guoying Male 50 Jiangxi 2000.00 √ Zhang Male 51 Jiangxi 2000.00 √ Zhenlong Zhao Ziping Male 46 Jiangxi 2000.00 √ Han Male 39 Jiangxi 2000.00 √ Zhenguo Han Male 53 Jiangxi 2000.00 √ Xiaoying Zhao Male 37 Jiangxi 2000.00 √ ZiZhong Ma Jinshan Male 34 Jiangxi 2000.00 √ Guo Yong Male 33 Jiangxi 2000.00 √ Wang Male 46 Jiangxi 2000.00 √ Zhiqiang Chen Male 44 Jiangxi 2000.00 √ Mingpei Yu Yajing Female 47 Jiangxi 2000.00 √ Dong Lei Male 50 Jiangxi 2000.00 √ Wang Male 52 Jiangxi 2000.00 √ Weiguo

------8------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Liu Male 55 Hebei 2000.00 √ Zhenfeng Liu Deyuan Male 55 Hebei 2000.00 √ Wang Male 49 Jiangxi 2000.00 √ Pengju Liu Male 38 Jiangxi 2000.00 √ Zhenhua Total 52000.00 √

At the same time, resettlement compensation of RMB 170,000 yuan and subsidy of RMB 52,000 yuan were paid to the kiln owner on June 1, 2005 (refer to the receipt). 2.2.1.3 The land for Wastes Treatment Plant is allocated be the State free of expense, with the "land use license" approved in October 2005. The project involves no immigration. 2.2.1.4 The land for Zouping Wastes Treatment Plant is state owned with compensation. A land transfer fee of 5.477 million yuan was paid to Zouping County Financial Bureau on July 27, 2007. The land for the project was original Zouping No. 723 Farm, involving resettlement of 25 farm staff members. According to "Immigrant Resettlement Plan", the newly built wastes treatment plant shall provide training and jobs to the above mentioned staff. As the project just entered civil work construction stage, the monitoring of employment of the original No. 723 farm staff will be covered in the next report. 。 For farm staff members, refer to the following table.

Registration form of staff of Zouping Agricultural Experiment Farm

December 28, 2006

No. Name Gender Date of birth Age Date of first

------9------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank employment 1 Li Hongling Male 1965.3.10 42 1988.7 2 Wang Yu Female 1970.3.27 37 1993.11 3 Chen Female 1966.3.24 41 1986.12 Junling 4 Li Yanhong Female 1978.10.2 29 1995.9 5 Hua Weiguo Male 1972.1.7 35 2002.8 6 Yang Female 1971.9.1 36 2002.8 Maorong 7 Li Guohong Female 1968.5.21 39 1984.12 8 Yu Jun Male 1970.6.13 37 1991.8 9 Wang Feng Male 1979.11.10 28 2001.12 10 Gao Yinlu Male 1981.3.8 26 2000.12 11 Han Jikun Male 1962.9.16 45 2001.12 12 Han Ping Female 1984.9.14 23 2001.12 13 Zhang Hua Female 1962.12.28 45 1997 14 Zhang Jiying Female 1959.2.1 48 1994 15 Gao Ju Female 1969.1.19 38 2001.12 16 Zhao Female 1965.1.16 42 2001.12 Wenying 17 Zhao Female 1960.4.7 47 1995 Fengjuan 18 Wang Yanxi Male 1956.4.1 51 1977.9 19 Chang Male 1963.2.24 44 1984.7 Cuigui 20 Wang Yi Male 1963.7.2 44 1984.7 21 Jia Hongyu Female 1965.6.28 42 1988.7 22 Wang Male 1954.9.22 53 2001.12 Jianhua 23 Gao Huazi Male 1967.2.20 40 1983.9 24 Yan Maoyun Female 1966.9.28 41 2000.12 25 Li Jie Female 1958.4 49 1977.4

2.2.1.5 The land for Linqing City Sewage Treatment Project is a state owned land for transfer. The land use license was approved on December 25, 2006. The project involves no immigration. 2.2.2 Temporary land use ------10------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank 2.2.2.1 Temporary land use mainly involves the spaces for sewage pipe line, temporary construction facilities and materials storage. According to investigation, up to the end of November 2007, Binzhou Project, Gaotang Project and Shanghe Project had begun to involve temporary land use for pipe network construction.

Fig. 4. Pipe work site of Binzhou City No. 2 Sewage Treatment Plant and reclaimed water utilization project

Fig. 5. Pipe work site of Gaotang Project

------11------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank

Fig. 6. Pipe work site of Shanghe Project 2.2.2.2 Linqing City Domestic Wastes Treatment Plant Project, Linyi County Wastes Treatment Plant and Zouping County Wastes Treatment Plant Project involve no temporary land use. The pipe work has not been commenced for Linqing City Sewage Treatment Project due to plan optimization. The monitoring of temporary land use for pipe network of the project will be covered in the next report. III. Monitoring and Evaluation of Immigration Resettlement and Compensation Progress Monitoring of immigration resettlement progress No immigrant resettlement is involved in all the 7 subprojects.

IV. Monitoring and Evaluation of Fund Settlement and Use 4.1 Monitoring of Fund Settlement and Use 4.1.1 Monitoring of Fund Settlement and Use for Binzhou City No. 2 Sewage Treatment Plant and Reclaimed Water Utilization Project According to investigation, up to December 15, 2007, the funds for permanent land requisition, crop compensation, resettlement fees and above-ground attachment compensation were settled for Binzhou City No. 2 Sewage Treatment Plant and Reclaimed Water Utilization Project. The amounts of RMB 1592320 ------12------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank yuan were paid for land compensation and population resettlement and RMB 140400 yuan for crop compensation of Binzhou Economic Development Zone Dudian Office Lixiaohai Village, totaling RMB 1732720 yuan; The amounts of RMB 87040 yuan were paid for land compensation and population resettlement and RMB 8840 yuan for crop compensation of Bincheng District Shangji Town Shaotouhanqian Village, totaling RMB 95880 yuan (all compensation payments were settle on December 1, 2006. For details refer to the receipt). Funds use of Binzhou City No. 2 Sewage Treatment Plant and Reclaimed Water Utilization Project Funds Amount (RMB 10,000) Remarks Permanent land 159.2320 requisition Crop compensation 14.0400 Total 173.2720

As verified through investigation, the criteria for land and crop compensation of Binzhou City No. 2 Sewage Treatment Plant and Reclaimed Water Utilization Project are the same as specified in the "Immigrant Resettlement Plan". 4.1.2 Monitoring of Fund Settlement and Use for Gaotang Sewage Treatment Plant Phase 2 and Reclaimed Water Utilization Project According to investigation, by December 15, 2007, the funds for permanent land requisition, crop compensation, resettlement fees and above-ground attachment compensation were fully settled and distributed to affected villagers of Xipu Village (Gaotang Xipu Co. Ltd.). The sum was RMB 2,186,962 (the date of compensation settlement is January 29, 2007. For details refer to related formalities).

------13------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Funds use of Gaotang Sewage Treatment Plant Phase 2 and Reclaimed Water Utilization Project Description Amount Remarks Permanent land requisition + 2,186,962 crop compensation

4.1.3 Monitoring of fund settlement and use of Shanghe Sewage Treatment Plant Project According to investigation, up to December 15, 2007, the funds for permanent land requisition, crop compensation, resettlement and above-ground attachment compensation were settled for Shanghe Sewage Treatment Plant Project. The land requisition involves 43290 M2 (or 65 mu), with land compensation of 1638000 yuan and crop compensation of 5400 yuan for 9 mu of cotton farmland (other land was not farmed since relevant notice was issued). The total compensation was RMB 1643400 yuan (the date of compensation settlement is September 30, 2007. For details refer to related formalities). Funds use of Shanghe Sewage Treatment Plant Project Description Amount For Tongdaokou Zhanglaozhuang Village Village Permanent land 1638000.00 1048068.00 589931.00 requisition Crop 5400.00 4728.00 672.00 compensation Total 1643400.00

------14------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank As verified through investigation, the criteria for land and crop compensation of Shanghe Sewage Treatment Plant are the same as specified in the "Immigrant Resettlement Plan".

4.2 Evaluation of fund settlement and use According to project implementation plan and fund settlement, it is observed that: First, the permanent land requisition and related compensation funds were settled before project commencement, meeting the requirements of construction progress. Secondly, as compared to immigrant resettlement action plan, the compensation criteria were raised in varying degrees and timely distributed to related villages, protecting the benefits of affected villages.

V. Monitoring and evaluation of production and living conditions of immigrant villages 5.1 Typical households in immigrant monitoring Totally 91 typical households from three typical villages affected by the project were taken for monitoring. For details, refer to Part 2.

5.2 Monitoring of production and resettlement of immigrants and affect villagers 5.2.1 Binzhou subproject: Lixiaohai Village land requisition compensation Through field investigation, it is found that, Lixiaohai Village and Shaotouqianhan Village received payments for land compensation, above-ground attachment and crop compensation from Binzhou City No. 2 Sewage Treatment Plant according to "Immigrant Resettlement Manual" by Asia Bank. According to "Immigrant Resettlement Report", relevant regulations by the Chinese government and compensation agreement signed with villagers, the criteria were

------15------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank 25600 yuan per mu for land compensation and 5200 per mu for crop compensation, and the payments were made to affected households. According to related stipulations of "Immigrant Resettlement External Monitoring and Evaluation" by Asia Bank, Lixiaohai Village was chosen as a typical village for monitoring and evaluation. For details, refer to the Table below.

Lixiaohai Village Land Requisition Compensation

------16------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank

Households No. of Original Requisition Existing Household Land Crop Above-ground Total persons land land land income compensation compensation attachment compensation before compensation land requisition Li 3 8 2 8 21500 51200 5200 56400 Dongshun Li 3 7 1 6 18700 25600 2600 28200 Dongling Li Yuangui 2 17 3 14 11000 76800 7800 84600 Li Guifang 1 3 2 1 2400 51200 5200 56400 Li Fuli 3 11 4 7 11000 102400 10400 112800 Li Lizhen 3 9 2.5 6.5 28000 64000 6500 70500 Li Yanzhen 3 11 5 6 31000 128000 13000 141000 Li Daoyou 4 8 2.5 5.5 2200 64000 6500 70500 Li 4 12 2 10 28000 51200 5200 56400 Fengnian Li Yanmin 3 14 0.5 13.5 55600 12800 1300 14100 Li Shengli 4 9 2 7 35600 17920 1820 19740 Li Limin 4 6 1.2 4.8 23000 30720 3120 33840 Li Taiquan 3 7 2 5 15000 51200 5200 56400 Li 4 8 2 6 22800 51200 5200 56400 Tongtang Li Lianzhu 4 10 2 8 37000 51200 5200 56400 Li Yanlu 3 15 3 12 12000 76800 7800 84600 Li Lixiang 3 10 2 8 15000 51200 5200 56400 Li 3 9.6 2 7.6 20000 51200 5200 56400 Shuangling Li Yanqi 3 11 2 9 10300 51200 5200 56400 Li Pinggui 4 7 2 5 10700 51200 5200 56400 Li 4 10 4 6 24500 102400 10400 112800 Xinzhong Li Lianen 4 10 2.6 7.4 14700 66560 6760 73320 Li Weiqing 4 6 2 4 20700 51200 5200 56400 Li Qinggui 3 8 2 6 12800 51200 5200 56400

5.2.2 Shanghe subproject: Tongdaokou village land requisition compensation

------17------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank We chose Tongdaokou village of Shanghe Subproject as a typical village. According to investigation, the compensations for permanent land requisition, crop and above-ground attachments were settled as required by the "Immigrant Resettlement Plan" of the project. As the village will re-divide the land after land requisition, the land requisition compensation payments were shared equally by every villager. Refer to the following table.

Tongdaokou Village Land Compensation Table 1

Above-g round Household Crop No. of Original Requisiti Existing Land attachme Total Households income before compens persons land on land land compensation nt compensation land requisition ation compens ation Xiao 4 8.60 0.24 8.36 18000 5999.40 5999.40 Yongjun Xiao 4 8.60 0.24 8.36 15000 5999.40 5999.40 Zhensheng Xiao 6 12.90 0.36 12.54 20000 8999.90 8999.90 Zhenqing Xiao Delu 4 8.60 0.24 8.36 18000 5999.40 5999.40 Zhang 3 6.45 0.18 6.27 8000 4499.55 4499.55 Jiming Xiao 5 10.75 0.3 10.45 25000 7499.25 7499.25 Desheng Xiao 3 6.45 0.18 6.27 15000 4499.55 4499.55 Deliang Ma Jiliang 4 8.60 0.24 8.36 18000 5999.40 5999.40 Xiao 4 8.60 0.24 8.36 15000 5999.40 5999.40 Zhenzhong Xiao 2 4.30 0.12 4.18 10000 2999.70 2999.70 Youliang Ma Jiwen 5 10.75 0.3 10.45 20000 7499.25 7499.25 Li 5 10.75 0.3 10.45 20000 7499.25 7499.25 Jiangping Ma Jiming 4 8.60 0.24 8.36 15000 5999.40 5999.40

------18------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Xiao 5 10.75 0.3 10.45 20000 7499.25 7499.25 Zhenguang Zhang 2 4.30 0.12 4.18 5000 2999.70 2999.70 Jisheng Sun 1 2.15 0.06 2.09 2000 1499.95 1499.95 Xiuyun Collection 61 131.15 3.66 127.49 91491.75 91491.75

Tongdaokou Village Land Compensation Table 2

Household Land Crop Above-ground No. of Original Requisit Existing income before Households compensati compens attachment Total compensation persons land ion land land land on ation compensation requisition Bian 4 6.36 0.2 6.16 16000 4824.60 4824.60 Pengzhong Zhang 6 9.54 0.3 9.24 24000 7236.90 7236.90 Tianhe Zhang 6 9.54 0.3 9.24 25000 7236.90 7236.90 Tianyong Zhang 2 3.18 0.1 3.08 8000 2412.30 2412.30 Qizhen Zhang 3 4.77 0.15 4.62 15000 3618.45 3618.45 Tiancai Zhang 4 6.36 0.2 6.16 15000 4824.60 4824.60 Tianhua Zhang 3 4.77 0.15 4.62 15000 3618.45 3618.45 Tiansheng Zhang 3 4.77 0.15 4.62 16000 3618.45 3618.45 Jifeng Zhang 5 7.95 0.25 7.7 24000 6030.75 6030.75 Tianli Zhang 3 4.77 0.15 4.62 15000 3618.45 3618.45 Qixiang Zhang 3 4.77 0.15 4.62 15000 3618.45 3618.45 Tiangao Zhang 4 6.36 0.2 6.16 14000 4824.60 4824.60 Qizhong Zhang Jili 2 3.18 0.1 3.08 5000 2412.30 2412.30 Zhang 4 6.36 0.2 6.16 18000 4824.60 4824.60 Binggang

------19------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Bian Fawu 7 11.13 0.35 10.78 30000 8453.05 8453.05 Zhang 5 7.95 0.25 7.7 26000 6030.75 6030.75 Tianping Zhang 4 6.36 0.2 6.16 18000 4824.60 4824.60 Tiangui Wang 4 6.36 0.2 6.16 15000 4824.60 4824.60 Yanyong Wang 3 4.77 0.15 4.62 15000 3618.45 3618.45 Yanquan Yang 5 7.95 0.25 7.7 25000 6030.75 6030.75 Dongsheng 96502.0 Collection 80 127.20 4 123.2 96502.00 0 Tongdaokou Village Land Compensation Table 3

Above-gro Household und No. of Original Requisiti Existing income Land Crop Households attachment Total compensation persons land on land land before land compensation compensation compensati requisition on Wang 4 4.26 0.75 3.51 14000 18958.14 18958.14 Xianfu Wang 6 8.52 1.4 7.12 25000 37916.28 37916.28 Kegui Wang 4 5.68 1 4.68 16000 25277.52 25277.52 Shijie Wang 5 7.10 1.25 5.85 20000 31596.90 31596.90 Kefang Wang 4 5.68 1 4.68 20000 25277.52 25277.52 Kesheng Zhang 4 5.68 1 4.68 18000 25277.52 25277.52 Jijiang Zhang 6 8.52 1.4 7.12 20000 37916.28 37916.28 Tianfa Zhang Jihe 5 7.10 1.25 5.85 18000 31596.90 31596.90 Zhang 2 2.84 0.49 2.35 5000 12688.76 12688.76 Xiaoxia Zhang 3 4.26 0.75 3.51 8000 18958.14 18958.14 Jehai Wang 4 5.68 1 4.68 18000 25277.52 25277.52 Shizhu

------20------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Wang 4 5.68 1 4.68 18000 25277.52 25277.52 Shishen Wang 7 9.94 1.75 8.19 35000 44235.66 44235.66 Shibin Wang 2 2.84 0.49 2.35 1000 12688.76 12688.76 Keyin Wang 3 4.26 0.75 3.51 15000 18958.14 18958.14 Kebao Wang 5 7.10 1.25 5.85 18000 31596.90 31596.90 Shihua Wang 4 5.68 1 4.68 15000 25277.52 25277.52 Shiye Bian 7 9.94 1.75 8.19 30000 44235.66 44235.66 Faxiang Wang 5 7.10 1.25 5.85 18000 31596.90 31596.90 Fengchang Bian 6 8.52 1.4 7.12 25000 37916.28 37916.28 Youbang Wang 4 5.68 1 4.68 15000 25277.52 25277.52 Shiguo Wang 5 7.10 1.25 5.85 1800 31596.90 31596.90 Shifu Collection 98 139.16 24.18 114.98 619399.24 619399.24

Tongdaokou Village Land Compensation Table 4

Above-gro Household Requis Crop und No. of Original Existing income Land Households ition compensati attachment Total compensation persons land land before land compensation land on compensati requisition on Zhang 5 6.00 0.65 5.35 25000 16045.00 16045.00 Jisheng Zhang 6 7.20 0.78 6.42 20000 19254.00 19254.00 Jiping Sun Fugui 7 8.40 0.91 7.49 25000 22463.00 22463.00 Zhang 4 4.80 0.52 4.28 15000 12836.00 12836.00 Dehua Zhang 5 6.00 0.65 5.35 18000 16045.00 16045.00 Delu

------21------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Zhang 5 6.00 0.65 5.35 20000 16045.00 16045.00 Derong Zhang 4 4.80 0.52 4.28 15000 12836.00 12836.00 Deqiang Zhang 2 2.40 0.26 2.14 1000 6418.00 6418.00 Binghe Zhang Deli 4 4.80 0.52 4.28 15000 12836.00 12836.00 Zhang 2 2.40 0.26 2.14 1000 6418.00 6418.00 Binglu Zhang 3 3.60 0.39 3.21 15000 9627.00 9627.00 Jiafeng Zhang 4 4.80 0.52 4.28 15000 12836.00 12836.00 Jiqing Li Yulan 2 2.40 0.26 2.14 8000 6418.00 6418.00 Zhang 2 2.40 0.26 2.14 10000 6418.00 6418.00 Hengqing Zhang 3 3.60 0.39 3.21 12000 9627.00 9627.00 Bingyin Zhang 5 6.00 0.65 5.35 20000 16045.00 16045.00 Tiansheng Zhang 3 3.60 0.39 3.21 12000 9627.00 9627.00 Jilong Zhang 4 4.80 0.52 4.28 15000 12836.00 12836.00 Tianyi Zhang 5 6.00 0.65 5.35 18000 16045.00 16045.00 Jixing Collection 75 90.00 9.75 80.25 240675.00 240675.00 41.5 1048067.9 Total 314 487.51 445.92 1048067.99 9 9

5.2.3 Gaotang subproject: Xipu Village land requisition compensation According to field investigation, the permanent land requisition in Xipu Village was 81.54 mu, affecting 79 persons in 19 households. The compensations for land and crops were RMB 25300 yuan per person per mu, and all paid to affected villagers in January 2007. The remaining land of requisition was owned collectively by the Village. According to comparison, the compensation criteria

------22------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank executed for Gaotang project were higher than "Immigrant Resettlement Plan", which stipulates 22400 yuan per mu for permanent land requisition, 400 yuan per mu of wheat seedlings, 800 yuan per mu of wheat and 1000 yuan per mu of cotton. For compensation conditions, refer to the following table.

Land requisition compensation for typical households of Xipu Village Unit: 10,000 yuan Households No. of Land before Land after Total persons requisition requisition compensation Zhao 5 6.5 5.5 2.53 Chuanhai Zhao Junjia 3 3.9 2.4 3.795 Zhang 5 6.5 4 6.325 Jinxiang Zhao 3 3.9 2.4 3.795 Meixiang Zhao Qun 4 5.2 2.8 6.072 Zhao 5 6.5 3.5 7.59 Chuangping Zhao 2 2.6 1.4 3.036 Chuanzheng Zhao Jiafu 6 7.8 4.2 9.108 Zhao Jialing 5 6.5 3.5 7.59 Zhao Jiaquan 5 6.5 3.5 7.59 Zhao 2 2.6 1.6 2.53 Chuanwei Zhao 2 4.8 2.4 6.072 Chuanshen Zhao Zihou 6 7.8 4.8 7.59 Liu Yuqing 4 3.9 2.1 4.554 Li Fenglian 5 6.5 4 6.325 Luo Qunfang 6 7.8 4.8 7.59 Xu Jiayu 5 6.5 3 8.855 Zhao Jiafeng 4 5.2 2.8 6.072

------23------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Zhao 2 3.6 2.4 3.036 Chuanhai

5.3 Monitoring of immigrant living resettlement 5.3.1 Basic conditions of typical households for immigrant monitoring According to related policy guide by Asian Bank and proposals by Project Unit and village commission, we selected typical households from affected villages for monitoring: Typical households from Binzhou Lixiaohai Village are Li Zhugui, Li Yanzhen, Li Pinggui, Li Dongling and Li Chunnian (the names of the household heads); Typical households from Shanghe Tongjiadaokou Village are Xiao Yongjun, Zhang Tianfa, Xiao Zhensheng, Zhang Deqiang, Xiao Deliang, Zhang Jicheng and Wang Shizhen (the names of household heads); Typical households from Gaotang Xipu Village are Zhang Jinxiang, Zhao Chuantao, Zhao Jiarong, Yang Jinlan, Zhao Chuanwei and Zhao Chuanzheng (the names of household heads). Through household investigation, we found that, among all the typical households from the above mentioned three villages, none of them was completely depending on agricultural income as the main financial source. They were in a semi-farming status and the main household incomes came from doing casual labor jobs outside. For example, the affected villagers of Binzhou Lixiaohai Village could get jobs from the labor market of the economic development zone, with an income of RMB 40-50 yuan per man/day. The affected villagers of Shanghe Tongdaokou Village mainly engaged with construction market, working for building teams as long term or temporary labors. Most of farm works were done by women.

------24------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Most of the affected villagers of Gaotang Xipu Village work for Quanlin Paper temporarily or on monthly base. Farm works were done by women.

5.3.2 Disadvantaged groups among affected villagers According to our investigation, there was no disadvantaged group in affected villagers of all subprojects (the two households of disadvantaged groups mentioned in the "Immigrant Resettlement Plan" of Shanghe Project refer to women laborers). 5.4 Evaluation of production, living resettlement and income level of affected villagers In view of the monitoring results, the land requisition compensation was completed well for all villagers affected by the subprojects, without any lingering problem. 5.4.1 Compensatory payments All payments for land compensation, above-ground attachment compensation and crop compensation were paid to villagers affected by various subprojects. The livelihood restoration plan and its implementation according to "Immigrant Resettlement Plan" will be covered in No. 3 monitoring and evaluation report. 5.4.2 Evaluation of living standard of affected villagers In fact, no affected villager was completely depending on agricultural income as the main financial source. All of them were in a semi-farming status, with the main household incomes coming from doing casual labor jobs outside. The monitoring and evaluation of living standard of affected villagers will be covered in No. 3 monitoring and evaluation report. 5.4.3 Evaluation of income level of affected villagers As the work of permanent land requisition was just concluded and the construction of various subprojects has been carried out for a short time, the

------25------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank impacts to immigrant income may show up in year 2008. The monitoring and evaluation of immigrant income level will be covered in No. 3 report. VI. Monitoring and evaluation of public participation 6.1 Monitoring of public participation According to investigation, all subprojects of Shandong Haihe Basin Pollution Control Project using loans from Asian Bank attach importance to participation of and consultation with immigrants (affected persons) and widespread public mobilization was carried out to immigrants and affected villagers. The specific embodiments are as follows: First aspect: For affected villagers 1) Affected villagers covered by the investigation basically know the contents of project. 2) Affected villagers covered by the investigation basically know the policies, regulations, compensation criteria and resettlement plan relating to the project. 3) Affected villagers covered by the investigation know that, if they have any doubt or discontent to the related policies, regulations and compensation criteria, they can consult or appeal to concerned governmental authorities through village commission. Second aspect: For all subproject implementation units: Binzhou City No. 2 Sewage Treatment Plant, Shanghe Sewage Treatment Plant and Gaotang Sewage Treatment Plant 1) Convened meetings participated by representatives of affected villagers, village cadres and disadvantaged groups (women) to introduce project progress and carefully collect their comments and proposals. 2) Sent workgroups to affected villages, together with village commission members, to explain the related policies, regulations, compensation criteria and resettlement program to villagers.

------26------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank 3) During immigrant resettlement, responsible leaders of cities/counties (responsible deputy mayors / deputy county heads and chief of construction committees) act as leaders of immigrant resettlement leading groups and held meetings of immigrant resettlement officers to discuss problems in resettlement, and answer and resolve practical problems. 4) Contact cards were made and distributed by Shanghe County Sewage Treatment Project Preparation Office to collect feedback on immigrant resettlement. 6.2 Evaluation of public participation During visiting typical households, we found that, all villagers investigated basically know the project size, compensation criteria and related policies/regulations, and content with the compensation criteria, compensation program and immigrant resettlement plan. Up to the date when the report is submitted, there was no complaint or appeal by affected households / persons against the compensation criteria or compensation program. This explains that: Binzhou City No. 2 Sewage Treatment Plant, Shanghe Sewage Treatment Plant and Gaotang Sewage Treatment Plant did effective work in public participation, satisfied the requirements and basic desires of affected villagers and immigrants and achieved the anticipated targets, so as to make it possible for the resettlement plan to be carried out. Suggestion: Project units shall continue to take care of reflections of affected villagers and resolve any problems in immigrant resettlement according to Asia Bank policies. VII. Monitoring and evaluation of operation and efficiency of immigration mechanism 7.1 Monitoring of immigrant resettlement mechanism

------27------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Investigations show that, according to Asia Bank requirements and as needed by the project, under supervision by Shandong PMO, the governments of Binzhou, Gaotang and Shanghe established immigrant resettlement mechanisms, as follows: 7.1.1 Binzhou Project immigrant resettlement mechanism Binzhou project immigrant resettlement mechanism consists of officers from Economic Development Zone Administration Committee, Planning Bureau, Construction Bureau, Land Bureau, Financial Bureau, Civil Affair and Social Security Bureau, Project Office, Dudian Office, Shangji Township Government and affected administrative villages. Land requisition work was implemented and supervised by Development Zone Land Resource Branch Bureau and Project Immigrant Resettlement Group. For details of the organization, refer to the figure below:

Binzhou Project immigrant resettlement mechanism (Binzhou economic development zone project leading group)

——————————————————————

Sewage treatment Development zone Township / street plant project land resource branch office office

Affected village Affected village

------28------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank

7.1.2 Gaotang County immigrant resettlement mechanism For implementation of Phase 2 Project of Gaotang Water Purification Co. Ltd., Gaotang County Government established a project leading group, with a deputy county head as group leader and members from authorities of environmental protection, land resource, finance and construction. The leading group has an office (project office) in Gaotang County Environmental Protection Bureau, responsible for coordination and management of the sewage treatment project. The project office is in charge of the immigrant resettlement work. 7.1.3 Immigrant resettlement mechanism of Shanghe urban sewage treatment plant project Shanghe County established a project leading group, with the county head as group leader and officers from planning bureau, construction bureau, land bureau, financial bureau, civil affair and social security authorities, responsible for coordination during project preparation and implementation. The leading group has a project office in Shanghe County People's Government, responsible for coordination and management of the sewage treatment project. For details of the organization, refer to the figure below:

------29------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank Resettlement organization chart of Shanghe County Sewage Treatment Plant

Project

Shandong Asia Bank Project Shandong Asia Bank PMO Land requisition resettlement

Shanghe County project leading Shanghe County PMO External monitoring and Land requisition resettlement evaluation mechanism

Affected villages, affected persons The immigrant resettlement mechanisms of other four projects were set up according to "Immigrant Resettlement Plan". In view of the immigrant resettlement mechanism arrangement, it is reasonable in mechanism arrangement and clear in responsibility (for details refer to immigrant resettlement plan). In view of staff members of the resettlement mechanisms, the quality is good. Most staff members are college educated or higher, with work experiences, satisfying the demand of the actual work.

7.2 Monitoring and evaluation of operation and efficiency Since the above mentioned immigrant resettlement mechanisms were set up, the operation has been normal with high efficiency, playing an important role in land

------30------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank requisition, compensation, immigrant resettlement, personnel training, public participation and fund management, etc. At present, all immigration offices have been equipped with telephone, facsimile machine and computer, etc., established data base to strengthen information feedback, so as to enable the project leading group to command the immigrant resettlement progress and carry out timely decision making. Suggestion: Immigrant resettlement mechanisms of all subprojects shall strengthen organization and provide necessary full-time staff to improve work efficiency in immigrant resettlement.

VIII. Conclusion and suggestions 8.1 Conclusion (1) All immigration mechanisms are clear in responsibility and good in operation, capable to fulfill their duties and tasks. (2) The related policies and compensation programs in "Immigrant Resettlement Plan" were carried out during permanent land requisition with legal and correct methods, realizing justice, fair play and publicity; compensation funds were settled timely, meeting the needs for land requisition and immigrant resettlement. (3) Up to December 15, 2007, permanent land requisition of all subprojects was completed with compensation paid. Affected villagers are widely satisfied, with their family life not affected by land requisition. (4) The performance of compensation for temporary land use and restoration is different due to different work progress of various subprojects. Through field investigation, all subprojects involving temporary land use for pipe network construction were compensated and restored as designed in "Immigrant Resettlement Plan".

------31------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected] Immigrant Resettlement Monitoring and Evaluation Report for Shandong Haihe Basin Pollution Control Project Using Loans from Asia Bank (5) Affected villagers are aware of the appeal channel in case they suffer from infringement, and such channel is in good working order.

8.2 Suggestions (1) Special immigrant resettlement office shall be set up under project office and the staff members shall be kept stable. Meanwhile, strengthen immigration management and staff training to further improve efficiency and capability. (2) Establish immigrant resettlement internal monitoring mechanism and system, and regularly submit internal monitoring report according to "Immigrant Resettlement Plan". (3) Pay visit to affected villagers and typical households from time to time and resolve problems in livelihood restoration of the affected households. (4) Attach importance to information filing for immigrant resettlement. Take a good care in keeping the data of immigrant resettlement, land requisition and compensation payments, and establish immigrant resettlement records to provide basic information for project final acceptance and immigrant resettlement monitoring and evaluation.

------32------Shandong Construction Development Research Institute Address: Sanlizhuang 17, Jing 6 Lu, Jinan, China Tel: 0086-83180915 Fax: 0086-535-6371234 Email: [email protected]