O. Additional Information

O.1 Developing the Plan

The LTP has been developed thorough a series of structured workshops, consultation and discussions. These discussions have helped shape and inform the production of the Provisional Plan, set our targets, inform and assist our accessibility planning work and shape this final document.

O.1.1 Workshops and discussions

These workshops included one with our QTP, which includes transport operators – ferry, motorcycle, bus, rail, taxi and freight, transport users, including motoring groups, cycle and bus, Transport 2000, Friends of the Earth, representatives from the Chamber of Commerce, Federation of Small Businesses, Tourism and Planning. Plus a number of other workshops involving colleagues from Health, Education, IWEP, Planning, Tourism, Job Centre+ and LA21 were also staged. We used internal workshops involving officers from Engineering Services to help establish our targets, delivery and spending programmes.

O.1.2 Accessibility planning

Our accessibility planning work has also been assisted by the use of structured workshops,

to which were invited a broad range of local representatives, plus transport users, transport Additional Information operators, officers, and Elected Members. We will continue using this consultative process to develop and deliver our Accessibility Action Plans.

O.1.3 Consultation and feedback

We made every effort to make the PLTP as widely available as possible. Over 300 copies of the Plan were printed and Section A of this Plan explains how these were distributed and made available for inspection at local libraries, council offices and on the Internet.

This final Plan has been revised to take account of this process, the SEA and the important feedback from Government Office, DEFRA and others.

This Section therefore includes:

• The notes from external workshops and discussions. • Notes from internal workshops and discussions. • Notes taken following accessibility workshop. • Subsequent accessibility planning meetings. • Comments made during the PLTP consultation period. • Action taken in response to the points made in the GOSE Decision Letter. • LTP Annex C. • A map illustrating our traffic and cycle monitoring points. • Jargon buster. • Location map.

Isle of Wight Local Transport Plan - Section O: Additional Information 1 26183_IOW CouncilLTP-pt219/10/0613:44Page Additional Information 2 Section O:AdditionalInformation - . QTPworkshop notes(IdentifiedbyLGA shared O.3 O.2.1 Workshop notes O.2 • • • • • Walking Increase accessibility by: Accessibility priority) Included below are notestaken attheseworkshops. programmes. from EngineeringServices; thesewere usedtohelpestablish targets, delivery andspending Tourism, Jobcentre+ andLA21were alsostaged. Plusinternalworkshops involved officers A numberofotherworkshops involved colleagues from Health,Education,IWEP,Planning, Federation ofSmallBusinesses, Tourism andPlanning. bus, Transport 2000,Friends oftheEarth,representatives from theChamberofCommerce, motorcycle, bus,rail, taxiandfreight, transport users, includingmotoringgroups, cycle and The workshops includedonewithourQTP,whichincludestransport operators –ferry, provisional LTP submittedinJuly 2005. and discussions. Thesediscussions have helpedshapeandinform theproduction ofthe The provisional planwasdeveloped thorough aseriesofstructured workshops, consultation • • • • • Cycling Consultation anddiscussions Racks. Cycle signage. Publicity -e.g.working withGPs topromote healthbenefits. Incentives -e.g.assistance withbike purchase. Shared surfaces. More information onwalking–e.g.routes, intown signage,healthbenefits. Upgrading public rightsofway. Maintaining footways. Crossings –more convenient &friendly. Pedestrian priority. Isle ofWightLocalTransport Plan 26183_IOW CouncilLTP-pt219/10/0613:44Page3 Bus • • • • • • • • • Powered Two Wheelers • • • • • • • • • • • • • • • • • • • • • • • • Freight Ticketing &Integration Taxi andPHVs Train Aim toreduce product miles. Trailer park. Can have detrimentaleffect onbusinesses. Affected byboattimes. SV timetable toinclude alloperator services. Rover tickets for useonallbuses. Interchanges. Better integration between modes. PTW strategy. Appropriate parkinge.g.concrete parkingstrips. Education andawareness. Promotion e.g.image. Regulation ofvoluntary sectorvehicles –e.g.qualifications,CRBchecks,medicals,training. Accessible vehicles. Increased use. Ability totaxishare. Promotion. Improved station signageandfootpaths. Establishment ofaCRP. Improved frequency (30mins)–needBrading loop (£1/2m). Park andride. Accessible vehicles -e.g.low floor busesandappropriate infrastructure. Publicity &advertising –e.g.fare information. Improved customer service -e.g.betterdrivers. In town routes -e.g.Newport. Safety andcomfort. Making busquicker thancar. Reduced journey times–e.g.fast commuter services. Improved frequency. Ticketing andtimetables. Free/concessionary fares. Bus priority–e.g.junctions,buslanes. Park andride. Isle ofWightLocalTransport Plan Section O:AdditionalInformation - 3

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page4 Additional Information 4 Section O:AdditionalInformation - • • Coaches • • • • • • Travel Planning Address congestion by: Congestion • • • • • • • • • • • • • • • • Demand Solutions Reduce NeedtoTravel Car Sharing Mobility Impaired Crime not free butsubsidised,effective useofparking. Parking –e.g.control availability, cost, highlightingtopublictruecost ofparkingi.e. Unsure aboutroad pricing– could consider town charges orwork place parkingcharging? No outoftown retail developments. Consider allmodestransport inplanningdecisions. Better planning-e.g.create sustainable communities. Promote viaworkplaces andschools –e.g.partoftravel plans. Island carsharingdatabase–e.g.WightRide. Consider alternatives tomotorcar –e.g.educationandpromotion. safe routes toschoolinitiatives. School travel plans–sticks required, address parkingaround school gates,linksto Workplace travel plans–LAshouldtake lead. Need toworking withhealthproviders. Kerbs -e.g.footways andfor access tosuitable vehicles. Disabled bays. Reduced fares. Accessible vehicles. Safety ofpublictransport drivers. Consider appropriate lighting–e.g.style oflighting,bulbs,vandal proof. CCTV. Drug abuseinpublicplaces –e.g.interchanges. Education. Increased policing. Is itfear of? Proposed landingcharge mayhitpoorest tourists. New tourismplan. Isle ofWightLocalTransport Plan 26183_IOW CouncilLTP-pt219/10/0613:44Page5 . Internalworkshop notes(byRegeneration area) O.4 Supply Solutions • • including: planning,AONB, health,IWEconomic Partnership andeducation. Council staff andcolleagues from anumberof partner organisations Notes taken duringaseriesofinternalstructured workshops involving • • • Address environment issues by: Environment • • Address safety issues by: Safety • • Highway Maintenance back vegetation). Signs –remove oldsigns,utiliseposts, remove unusedposts, maintenance (egcut Street furniture –appropriate tolocality andwell positioned. Need gooddesign. Education. Look atlocation &typeofaccidents. Need tomaintainexisting –PFI? Strategic routes (freight, coaches) –needtosignfrom ferry. notification ofworks, advertising otheroptions(e.g.train). Co-ordination ofworks onthehighway–timing(seasonal,offpeak),advance Existing lights–key congestion pointse.g.5ways,CoppinsBridge,HeightsatLake. Isle ofWightLocalTransport Plan Section O:AdditionalInformation - 5

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page6 Additional Information 6 Section O:AdditionalInformation - Investment Programme –Workshop 2-28/04/2005 Investment Programme –Workshop 1-21/04/2005 raPolmSolution Problem Area Solution Problem Area Area oe Multi-stay parking(StMary’s RoadCarPark) Trailer Park –Racecourse roundabout Freight Cowes Project SEEDA –New RedJetTerminal Ferries –RedJet Cowes CoppinsBridge–Traffic Flow –Study/Traffic CapacityofCoppinsBridge Newport Acpal’lvlprigUseofSomertonPark &Ride ‘Acceptable’ level parking akn:Provision for commuters Parking: Park andRide-5years + Car Ferry – RealTimeInformation –Buses Vehicle /Pedestrian safety Modelling Accessibility –Newport Town Centre • • • aaiyDesignatedfreight route (Gordon Road)-then residents parking– double yellow linesover Capacity Commuter vehicular Residential access Isle ofWightLocalTransport Plan BAE Systems sitefor P&Rexpansion residential roads allowing parkingonbothsidesdown New Ferry Services (20years) CCTV Strategic Transport (PPP) Fares, Infrastructure Quality BusPartnership (QBP)–Contract, School Travel Plans(STP) Workplace Travel Plans(WTP) East Cowes –RedJet Distribution depot –West Cowes River Traffic Strategic Signing–Part of6 Variable Message Signing Walking –Audit Cycling: Cross Town Link Traffic Management(II)–Modelling Park &Ride–Staplers –Pan –Study Pan BusGate–Furrlongs –Study Newport Quay–BusLinkStudy St Mary’s Roundabout–BusGate On approach roads –Part of6 signing –urbanroutes cycleway eastern bankofRiver –Study 26183_IOW CouncilLTP-pt219/10/0613:44Page7 Islandwide igtnLinkstopossible bridgesite(levels?) HomeZones Newport Investigate aspartofProject Cowes RoutetoE.CowesKingston –capacity E. Cowes aeyAcdnsRemedialStudy–Routes Rights ofWay Improvement Strategy Accidents Safety Overall Strategy Footway SpeedStrategy HighStreet /UnionStreet –Mike Wheeler Highnumberofpedestrians / Rural raPolmSolution Problem Area oe mlyet Dependsonbusiness type Employment Cowes ue +Fairlee toNewport Town Centre SEEDA proposals measures inWest &East Cowes peak) –Floating bridge Newport busysouse(summer/ Buses Red Jet er radw VMS–location -Whippingham/allferries Ferry breakdown lse ie iiihn routes basis–signage-policy Cluster sitesdiminishing Draft RoadSafety Plan Speed aey–rtrnigHousingAssociation –consult HomeZones? Junctions/Green Street –HighStreet) Network hascapacity Stationworks –pedestrian access -footpath Safety –rat running Oakfield –access Smallbrook –railway /stadium Interchange –RydePier Though routes • • aaiyCastle /Ferry –Westlands (solution?problems?) Capacity Access Isle ofWightLocalTransport Plan Consider needfor buspriority Study Cowes –Newport Cycleway residents parkingpolicyE.Cowes Parking problems move toE.Cowes instead ofCowes Terminal 30% ofpassengers would prefer touseE.Cowes work withoperators Medina Bridge(investigated byArups) usage –peaktimes link East toWest Roads–linkstoNewport Study Community /RydeDevelopment Trust Strategic Signage&BusPriorityRoutes Ryde Interchange –assist invehicular movements Strategic route creation (Pellhurst Road Section O:AdditionalInformation - 7

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page8 Additional Information 8 Section O:AdditionalInformation - Investment Programme –Workshop 3-04/05/02005 raPolmSolution Problem Area a a ak aesd ie CarPark enhancements CarParks – waterside sites Coachparkswithfacilities &CCTV Bay Coachparking–safety &security RydeInterchange Cycle access Ryde nomto VMS Direct routes for commuters Information Bus access for commuters New routes Lack ofroutes a ak eil eetinsft CCTV Car parks-Vehicle /Pedestrian safety u roiyBuspriority@junctions Develop Bembridgeairport investigate options Hovercraft Sandown – North ofShanklin Southern Shanklin– Bus priority Signing OpenasCycle way Access Water access Cliff Path StJohnsRoad–Brook Road–CarRoute Improvements /signingtraffic lights Cycle access revetment Traffic managementplan Sandown Shanklin Rail station enhancements Shanklin toLake route Traffic congestion Isle ofWightLocalTransport Plan Ryde circular route Monkton Mead–Transport Corridor Railway land–Northto South toBembridge Ryde toSeaview signing Fishbourne toRyderoutes Spencer Roadsigning Traffic management New airportlocation Develop Sandown airport Water bus– Windsor Drive –Blythe Way –BusGate At carparks Ryde Town Centre Fishbourne –Ferry /RydePier Limited stops Ryde toNewport Signing Environmental Coach facilities CCTV 26183_IOW CouncilLTP-pt219/10/0613:44Page9 Investment Programme –Workshop 4–20/05/2005 raPolm Solution Problems Area taei rih lnQaiyBsPrnrhp(B)Roads QualityBusPartnership (QBP) Strategic Freight Plan General Information ua cesblt Partnership Accessibility Rural raPolmSolution Problem Area akRa rvlt okCoachmap Freight map Re-classification Travel towork Commuterroutes Signing Usecapital /SouthernVectis Park Road Agreement /TROs Identify strategic routes Freight Partnership u cesMaintainOptioservice beyond 06 Improved disusedrailway lines New routes toRailway stations Shanklin toVentnor Winford /ApseHeath Bus access rih oce Strategic routes – Accident database –RoadSafety Plan Education&Training Majorbid(£5million+) Increase visibility atrural junctions Safety vs Accessibility – / QuietLanes (advisorylimit–success?) Freight /Coaches ExpansionofROW network –ROWIP Road stability (coastal roads) clusters? –allidentified Feeder service (bus& cycle) Accidents –severity (actual orperception) lanes &rural villages Traffic speed Routes22(+access to) Hedges (footpaths behind=crime) Linkservices torailway stations Footpaths (lackof)/safety Walking ExpandWightbus Lack ofoffroad routes Cycling - now kickstart Rural bussubsidies Demandresponsive -notcommercial Bus Network –villages,hamlets Isle ofWightLocalTransport Plan Shanklin Interchange Cycle hire atShanklin Coach routes Quality Freight Partnership Cycle storage atbusstops Promotion –(revenue) Shelters atstops Service -cost Driver training Other vehicles route alongside road /Rew lane use tunnel - limitedtake up one way–road safety /stability Section O:AdditionalInformation - 9

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page10 Additional Information 10 Section O:AdditionalInformation - . Commentsreceived duringprovisional lTP O.5 Comments Transport intheWiderContext Introduction Transport Issues andOpportunities No. of upr o okPaeTae ln.Supportnoted Supportnoted–includedin Supportfor powered two wheelers asameans to To beconsidered aspart of Commentthatdemandresponsive services are 1 Supportfor Work Place Travel Plans. To berevised byoperator April Is 1 Commentsuggesting thatastrategic planis needed Notedandtobediscussed. 1 Noted–tobeactionedsee Commentsonconcessionary fares andacentral 1 Supportfor de-zoningtaxiesontheIsland. 2 CommentaboutTimetables. IncludedinSectionsB, M, N 1 Commentthatthere shouldbedirect references New timetable andtravel 1 1 Objectionstoincreased competition between Busnetwork toberevised / 2 Commentregarding thepresent busnetwork. 1 Discussed andagreed with Commentthatthere shouldbedirect references To bedealtwithaspartof 2 l are We CommentaboutTransport Interchanges ontheIsland. CommentaboutlanduseontheIsland. 1 1 Transport Plan(LPTP) Comments received duringconsultation onProvisional Local consultation euecneto.SectionC review of services. Transport. reduce congestion. required ontheIsland. subsidiestobeintroduced April for Cross Solent travel. control centre for taxis. andelsewhere. to theTourism Development Plan. bus providers. inSectionsEandI. about environmental areas, speciesandstatistics. asaresult furtheremphasised EnglishNature andothers and Management Plan,andmore information provided made totheAreas ofOutstanding Natural Beauty omn ActionTaken UpdatedinthisfinalPlan No comments received Comment Isle ofWightLocalTransport Plan Section C 06 onwards onwards. improved byoperator –April06 investment. Newport through private interchange –Rydeunderway, development ofIslandPlan 06 onwards. sue for discussion withSolent ooking toimprove 26183_IOW CouncilLTP-pt219/10/0613:44Page11 Comments Five Year Strategy Long Term Strategy No. of omn htdtissol eicue bu Now Commentthatdetailsshouldbeincludedabout Now included. Commentthatmore detailisrequired withinthe 1 Noted Commentthat powered two wheelers produce lower Roadsafety isrecognised asa 1 Commentthatroad safety ingeneral needtobe Already notedinPlan. 1 Commentthatbettertraining andawareness of 1 Importance oftravel byfoot Commentregarding therole ofpedestrians within 1 Noted. Supportnoted. Commentaboutthetargets withintheaccessibility 1 Supportfor the targets intheaccessibility section. Notedandrecognised inPlan. Supportnoted. 1 Fares Commentaboutpowered tobereduced two wheelers (April07) beingan 1 Commentaboutthefares andpunctualityofbuses Supporttoimproving accessibility onbuses 1 1 1 Planseekstosetstretching but Discussed withCounty Commentthatmore references shouldbeincluded Noted–operational issue. Commentabouttheachievability oftheplan. 1 Commentthatdropping offstops andmore Travel costs tobereduced 1 1 Commentonbusfares ontheIsland. Noted.To beaddressed aspart Noted.To beaddressed by 1 Commentthatthrough ticketing shouldbemore CommentthattheIslandmust minimisethe Currently beingrevised by 1 CommentabouttheBusNetwork ontheIsland. 1 1 mrvd highpriorityinPlan. recognised inPlan. plan aboutclimatechange. admissions thancars. improved. powered two wheelers isrequired. the accessibility section. section. accessible form oftransport. Archaeologist andincludedin about thehistorical environment . ofbusrevisions andpossible parking for coaches are required. c readily available. migration ofyoung people from theIsland. Outstanding Natural BeautyManagementPlan. the statutory dutiesoutlinesintheAreas of ActionTaken Comment Isle ofWightLocalTransport Plan achievable targets. beneficial flatfare in2007. over) Planstointroduce Scholars andresidents 60and through Councilsupport.(Island operator (April06) more detailinSectionI rail franchise improvements. ommunity andasanLDFissue. Section O:AdditionalInformation - included inrevised SectionI. and supported. 11

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page12 Additional Information 12 Section O:AdditionalInformation - Comments Implementation Programme Performance Indicators No. of omn htmr eeecssol eicue Now Commentthatmore references shouldbeincluded Supportnoted. Supportfor thetargets withintheairqualityand 1 1 beto otepooe u aea oe od Noted. Objectiontotheproposed busgateatNodes Road Noted–for consideration . CommentthataHomeZoneinNorthwood should Spendingreconsidered to 1 Commentthatspendingshouldbereconsidered 1 Noted.We are working with 1 Supportfor theoutlinedspendoncycle tracks. SEAprocess willhelpimprove 1 Commentthatmore targets shouldbeincluded Noted–seeabove. 1 Commentthatdecreasing thenumberofbuseson Busnumbers andquality is 1 Commentthatincreasing thenumberofbuseson Planseekstoreduce congestion Commentthatlower congestion targets are needed. Noted. To beimproved aspartofplan 1 Supportnoted. Commentabouttheneedtoimprove pedestrian 1 Commentaboutcongestion onIslandroads. Underconsideration aspartof 1 Supporttheideaofreducing congestion on 1 Supportfor the introduction ofPark andRide 1 Noted. Commentthatreducing spaces andincreasing costs Noted. 2 Commentthatalteringtheroad network would Noted–limitedfunding.Major 1 Supportfor buildingaby-pass around Newport. 1 Supportnoted. Supportfor Work Place Travel Plansasameansof Supportnoted. 1 Supportfor maintainingtheIslandspresent air 2 2 omn ActionTaken Comment environment section. about thehistorical environment. o h yeae.supportIslandPlan. Northwood. be considered. delivery andaccountability. for theRydearea. process andPFIbid. relating totheenvironment. improving. Fares are tobe Plan.SeeSectionD. the Islandwould helptackle congestion. the Islandwould helptackle congestion. facilities. Island roads. schemes. within carparkswould easecongestion. reduce congestion. reducing congestion. quality. Isle ofWightLocalTransport Plan focus spendingoncycling. CycleWight andSUSTRANSto – seesectionJ. bid seekstoaddress issues. reduced. included inrevised sectionI. 26183_IOW CouncilLTP-pt219/10/0613:44Page13 Comments General Comments Major Bids No. of omnsta oedti ftepooe Consultationwilltake place as Commentsthatmore detailoftheproposed 2 omn htteanxswr l elsrcue.Welcomed –Annexes further Welcomed. Commentthattheannexes were allwell structured. Welcomed Commentlooking forward toworking withthe 1 Supportingtheconcepts andcontent ofLTP2. Schemeremoved from bid 1 Noted–Realignmentof 2 ObjectiontoRealignmentoftheA3055Ventnor. 1 ObjectionstothePan LinkRoad. Noted–schemeremoved from 22 Supportfor the Pan LinkRoadbutonly ifitthe Noted–seeSectionI 1 Commentthatwhenpriorityranking schemesair NotedaspartofSEAprocess. 1 Commentthatnon-statutory partnerships should Commentthatstreet lightingisnotsuitable 1 1 Environmental issues tobe Commentthatwhenpriorityranking schemesthe 1 Improvements toRedFunnel regarding Comment therelocation ofRedFunnel. Noted. Commentregarding thecost ofimplementing the 1 1 beto omitiigbigst 0tnelaig Maint Objectiontomaintainingbridgesa50tonneloading. Noted Objectiontotheconstruction oftraffic calmingin 1 1 schemes wasrequired along withfurtherconsultation. ecniee hnpirt akn cee.willbeundertaken aspartof be considered whenpriorityranking schemes. council inthefuture. SeeSectionE route could berestricted tobusesandresidents only. quality shouldbeconsidered. everywhere. considered aspartofformal historical environment shouldbeconsidered. schemes withintheplan. omn ActionTaken Comment Baring Road,Cowes. Isle ofWightLocalTransport Plan impact inrural areas. regeneration andmayreduce improve freight access and scheme development. development. part ofSEAandscheme revised andimproved. approval. Undercliff Drive hasplanning PLTP following consultation aspartof The fullest possible consideration East Cowes. part ofSEEDA development at terminal tobecarriedoutas part ofPLTP bid following consultation as See SectionsEandI discussion /consultation process. Section O:AdditionalInformation - aining bridgeswillhelp 13

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page14 Additional Information 14 Section O:AdditionalInformation - Comments No. of omn htrfrne hudb aet Noted thatreferences Comment shouldbemadeto 1 omnsaotteueo ehia agae Councilhastriedtomake Plan Commentsabouttheuseoftechnicallanguage 1 upr o h edblt ftepa.Welcomed Corrected infinalPlan. Seeabove. Commentthattheplanincludedgrammatical and Commentsregarding thereadability oftheplan. Supportfor the readability oftheplan. 2 3 4 Welcomed r cost – Noted Commentsregarding thecost andqualityof theplan. Notedandtobeimproved. Supportingfor theoverall qualityoftheplan. 3 Parking charges recently Commentthatbetteruseshouldbemadeof 1 Notedandtobeconsidered as 1 Commentsthatresidents parkingschemesare Commentsaboutcarparkcharges. Now includedinPlan. 2 Commentthattheprovisions atportsshouldbe 2 Notedandupdated. Commentsthatmore information isneededabout 1 Notedanddiscussed in Plan Commentthatthere shouldbeanew ferry service 2 1 omn htteewsrptto ihntepa.Not Commentthatthere wasrepetition withintheplan. 1 ihntepa.aseasytoread aspossible. within theplan. typographical errors. partofongoingreview / 106 agreement monies. extended inRyde andCowes. andSolent Transport Annex considered. the usagesofferries. from RydetoSouthampton. omn ActionTaken Wootton BridgeTraffic andTransport Plan Comment Isle ofWightLocalTransport Plan available ondisc. costs andnumbers. More tobe document, byreducing print Section O.(seebelow) Jargon buster includedin reviewed. SeesectionJ. discussions. to beread onitsown. required toallow eachsection ed, butelement ofduplication educed inthis 26183_IOW CouncilLTP-pt219/10/0613:44Page15 . Inviteestoaccessibility workshops O.6 Workshops aspartofthedevelopment ofourAccessibility Strategy. The Councilinvitedthefollowing organisations toparticipateinAccessibility • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Isle ofWightCouncil–Housing Isle ofWightCouncil-Health Scrutiny Isle ofWightCouncil-Environment Services Isle ofWightCouncil-Environmental Health Isle ofWightCouncil-EngineeringServices Isle ofWightCouncil-EducationandCommunityDevelopment Isle ofWightCouncil-CountrysideSection Isle ofWightCouncil-Corporate Services Isle ofWightCouncil-ConsumerProtection Isle ofWightCouncil–Coastal Unit Isle ofWightCollege Isle ofWightChamberCommerce Isle ofWightBusUsers Group Island 2000 Institute ofAdvanced Motorists Ltd HMP AlbanyPrison Wildlife Trust GOSE -DrugsTeam GOSE Friends oftheEarth Freight Transport Association Footprint Trust Fire andRescue Federation ofSmallBusinesses Environment Agency CycleWight Chamber ofCommerce British Horse Society BIFFA AONB Unit Isle ofWightEconomic Partnership Isle ofWightDisabilityAction Group Isle ofWightCouncil-Transport Policy Isle ofWightCouncil-Social Services Isle ofWightCouncil-RydeProject Manager Isle ofWightCouncil-Policy Unit Isle ofWightCouncil–Planning Services Isle ofWightCouncil–Public Transport Isle ofWightLocalTransport Plan Section O:AdditionalInformation - 15

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page16 Additional Information 16 Section O:AdditionalInformation - • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • St Mary’s Hospital SEEDA Safer CommunitiesPartnership Ryde HighSchool Ryde Development Trust Rural Transport Partnership Rural Community Council Road HaulageAssociation Ferries Rail Passenger Council Quality Transport Partnership Primary Care Trust Police Authority NHS Newport Police Station National Treatment AgencySE National Probation Service Motorcycle ClubTraining Scheme Local Strategic Partnership –allmembers oftheSafer IslandThemeGroup Local Strategic Partnership –allmembers oftheLeisure IslandThemeGroup Local Strategic Partnership –allmembers oftheHealthyIslandThemeGroup Local Strategic Partnership –allmembers oftheExecutive Local Strategic Partnership –allmembers oftheEducatedIslandThemeGroup Local Strategic Partnership –allmembers oftheConnectedIslandThemeGroup Local Strategic Partnership –allmembers oftheAttractive IslandThemeGroup LIFT -LocalInitiatives for Transport Learning SkillsCouncil Job Centre Plus Isle ofWightYouth Trust Isle ofWightWomen’s Refuge Isle ofWightTourism Isle ofWightTaxi Proprietors Association Isle ofWightPolice Isle ofWightOlderVoices Isle ofWightHousingAssociation Isle ofWightHealthcare NHSTrust Youth Offending Team Wight Track Wight Leisure Voluntary Sector Transport 2000 SUSTRANS Steve Porter Transport Isle ofWightLocalTransport Plan 26183_IOW CouncilLTP-pt219/10/0613:44Page17

0.7 Notes from accessibility workshops

O.7.1 Notes from the accessibility workshop - 24/11/2005.

Issue Problems Opportunities Barriers Partners / Resources

Education and Young People School Premises Access to schools School Travel Plans Lack of pavements in rural areas Head Teachers, (particularly Carisbrooke (individual schools and clusters) Teachers,

Isle ofWightLocalTransport Plan cluster) Safe Routes to Schools Governers, Better use of buses Parents, Improved ticketing (eg Smart Cards) IW Council (including School The “school run” Encourage walking, cycling or use of Often part of linked trips (eg school Travel Plan public transport and onto work) Advisor, Vehicle exclusion zones around Road Safety Dept. school gates Traffic Section, Implications should the Early discussions Decisions may be made on educational Transport Section, number of schools be not transport needs Education Dept, reduced Property Services), Out of hours use of facilities Dual use of facilities (eg for wider Security IW Youth Trust, community) Access to transport Police, Section O:AdditionalInformation - School Selection Transport not always first Extend school free transport eligibility Cost – if funded by LA other areas Transport consideration resulting in to all may suffer? Operators increased car use Extended & church schools Availability of vehicles to deliver – may result in reduction of other services during peak hours Special schools Consider needs of users Availability of appropriate vehicles School Hours Schools starting at same time Consider altering school start/finish Need agreement of others puts pressure on school times transport and wider system 17

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page18 Additional Information 18 Section O:AdditionalInformation -

Issue Problems Opportunities Barriers Partners / Resources

Timing of public transport Discuss timetables with operators Integration with onward services Young People Full fare at age 14 on buses Youth Mover Awareness and limitations Different ages for different Work with operators National levels set on railway transport modes Awareness and limitations Better promotion in schools Cost of promotion of Youth Mover scheme Extend age range Funding

Isle ofWightLocalTransport Plan ‘Aspiration’ of car ownership Educate on alternatives. Links to Car ownership often linked to social status wider Island vision Problem accessing youth Work with public transport operators. - clubs and leisure facilities – Youth Mover cost and access to public Encourage walking and cycling. transport Provision of racks & lockers. Employment Location Disperse or concentrate Local jobs for local people Difficult to ensure vacancies are filled IW Council (including development? by local people Engineering, Planning, Work based travel planning – Medina Valley – capacity for future Education), Chamber of target major employers & clusters development? Commerce, Federation of Limited road network Small Businesses, IW Company buses Economic Partnership, Jobs focussed in Newport Provision of Park and Ride sites Availability of suitable sites? business associations, LSC, and Cowes results in Focus development on main corridors Bus stuck in same traffic as cars Job Centre +, transport increased congestion and increase public service provision and freight operators. on these routes – use of mini /midi buses? Wight Wheels Funding issues Success in these areas would - increase confidence for similar schemes in other areas. 26183_IOW CouncilLTP-pt219/10/0613:44Page19

Issue Problems Opportunities Barriers Partners / Resources

Cross Solent Good Solent links Commuter parking (solutions: park and ride, residents parking?) Cost of travel Type Type of employment Locate certain types of employment Market forces in key areas Working Patterns Shift working Workplace travel plans Unpredictable working hours Lack of transport choice Availability of early/late night public

Isle ofWightLocalTransport Plan transport services Helps alleviate peak time congestion - Home working Little or no transport implications Access to email/internet Increased use of email and internet Broadband coverage in rural areas Journey Patterns Short journeys Opportunities for walking, cycling or Encouraging modal shift public transport use Linked trips Wages Low paid/ unemployed Local aspiration to promote economic Could be long term delivery? prosperity and regeneration including increasing wages Cost of public transport for Concessionary fare schemes Funding issues those on low wages Wight Wheels

Section O:AdditionalInformation - Qualifications Qualified staff Match jobs to local skills Difficult to ensure vacancies are filled by local people Training Ensure appropriate training available Viable numbers locally Freight Delivery vehicles increase Co-ordinate deliveries Timings of deliveries influenced by ferry local congestion and business opening times Freight vehicles using Increased signing for freight vehicles - inappropriate roads Quality Freight Partnership Agreement of all local operators 19

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page20 Additional Information 20 Section O:AdditionalInformation -

Issue Problems Opportunities Barriers Partners / Resources

Health Location Location of services in Use data and software to inform - NHS, PCT, Rural Community relation to public transport - future locations Council, Transport transport often last Operators, Patient consideration when locating Groups, IW Council

Isle ofWightLocalTransport Plan services (including planners) St Mary’s hospital inaccessible Perception or fact? Not all forms transport suitable for all by public transport Could only be problem of publicity? Lack of co-ordination/ Better utilisation of vehicles Resources availability of car services RCC minibus brokerage scheme Publicity and resources Services Lack of local services More information to patients on If services too far away used less transport and access by patients Specialist services not Work with Trusts/ Hospitals/transport Cost of travelling available on Island and mainland providers Limited nature of transport support Lack of local dentists - Mobile dentists Current backlog - 9,000 residents patients stick with dentist without a dentist when moving house resulting Dentists recruited from abroad in more journeys (including mainland) Timing of Services Surgeries not open at Change/extension to opening times Resources convenient times to accommodate patients Timing of appointments – Work with health providers Transport problems not necessarily particularly mainland. considered in pre-arranged appointments Consultant appointments given on priority of need basis 26183_IOW CouncilLTP-pt219/10/0613:44Page21

Issue Problems Opportunities Barriers Partners / Resources

Shopping Location Local shops should be Reduces transport needs Difficult to compete with larger Shop owners, business supported Promotes sustainability supermarkets and shops associations, Chamber Can reduce product miles of Commerce, Retail focussed on Newport Increased choice Can be to detriment of local shops Federation of Small Discourages people from shopping - Businesses, transport on mainland operators, IW Economic Isle ofWightLocalTransport Plan Traffic congestion in Newport Park and Ride Carrying shopping Partnership, IW Council Use of public transport, walking (particularly land use planners) or cycling Mainland shopping Increased choice Takes money off Island Good cross Solent links Expensive ferry fares Access to ferry terminals (including parking) Large All shopping done at one Reduces travel Reduces choice Supermarkets location Impact on local economy Demise of specialist shops Section O:AdditionalInformation - Internet / Home Delivery/freight vehicles using Increased signage - Delivery unsuitable roads Reduces need to travel for customers Impact on local economy Availability of internet and broadband Necessity or Shopping has become a Central shopping locations Detriment of local shops Hobby? hobby rather than necessity, Encourage use of public transport, Carrying shopping resulting in increased trips walking or cycling 21

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page22 Additional Information 22 Section O:AdditionalInformation -

Issue Problems Opportunities Barriers Partners / Resources

Leisure and Recreation Location “Honey pot” sites attract Tourism and leisure major part of Often only seasonal and weather IW Tourism and touurism multiple visitors but don’t Island’s economy dependant (eg beaches) industry, IW Council, Rights always benefit from good Site travel plans Resources of Way Improvement Plan, public transport links resulting Ensure future developments can be - Transport Operators

Isle ofWightLocalTransport Plan in increased car trips and full accessed by public transport, car parks walking and cycling Countryside Driving to countryside So much available on doorstep Lack of information and signposting Encourage walking and cycling regarding walking/cycling from home from home to countryside (ie urban to rural) Drive & walk / drive & cycle Improve safety and new routes Major Events Often only car access Encourage access by public transport, Need to consider early in planning process considered walking & cycling Event travel plans – condition of use? (IW Act) Others Public Transport Cost of public transport Introduction of a smart card system Resources Transport Operators, Affordability for people on Promotion/introduction of concessionary User Groups, IW low wages fare schemes eg youth mover, free Council, Rural pensioner travel, £1 flat fare Community Council (Perceived?) cost of public Increased publicity on “real” costs transport vs cost of running of motoring a car Lack of operator choice Work with current operators to Limited number of operators equals improve service limited competition 26183_IOW CouncilLTP-pt219/10/0613:44Page23

Issue Problems Opportunities Barriers Partners / Resources

Access to up to date travel Traveline Needs more promotion information (routes and Traveline mobile text option Older people less likely to use/have timetables) Internet access to technology Introduction of real time information Cost Direct connections to Only a few operators, all know Congestion – particularly in Newport destinations/integration/links each other to other modes Access to Newport Congestion in Newport - Introduction of car sharing schemes Resources IW Council, business

Isle ofWightLocalTransport Plan particularly at peak times (community & businesses) associations, Chamber of Encourage walking and cycling Commerce, Federation of including infrastructure improvements Bus held up in car traffic Small Businesses, transport Improve bus services – frequency, operators, ticketing, timing. Vehicle availability at school times Economic Partnership, Better use of existing roads and Infrastructure already at capacity at Rural Community Council, junctions (including Coppins Bridge) peak times? Rights of Way Improvement Build a ring road Resources Plan, Cyclewight, SUSTANS Land ownership Transport Operators, Environmental issues

Section O:AdditionalInformation - Major services all located in Opportunity to prioritise one key Could be to detriment of other areas Newport (eg shopping, college, destination 2 high schools, hospital, Encourage development in other More long term aim employment). locations eg via Local Development Could create other accessibility Framework, working with key partners problems Increase in Car More households owning a Not car ownership but car use Difficulty in encouraging modal shift IW Council, business Ownership car/multiple cars and changing journey patterns associations, Chamber of 23

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page24 Additional Information 24 Section O:AdditionalInformation -

Issue Problems Opportunities Barriers Partners / Resources

Education Resources Introduction of car sharing schemes Commerce, Federation of (community & businesses) Small Businesses, transport Cost of driving Needs more publicity Operators, Islw of Wight Economic Partnership, Rural Community Council

Isle ofWightLocalTransport Plan Access for Infrastructure Town centre audits Possible visual impact of infrastructure IW Council, IW Society for mobility impaired Provision of dropped crossings, parking – particularly in conservation areas Blind, IW Disability Action spaces, bays and appropriate Group, Mothers Union infrastructure Working in partnership with others 26183_IOW CouncilLTP-pt219/10/0613:44Page25 It islikely thatanyimprovements willbephased. . Notesfrom Accessibility Workshop -Carisbrooke O.8 u tp Upgrade existing stops tomake disabled friendly Marketing –leafleting inpartnership withSVectis? Obtain&analyse accident data SVectis currently considering timetable improvements – Public transport awareness Bus stops Infrequent busservice Accidents Origin&destination survey todetermineactualor Changedouble yellow tobuildouts Linkstoplanningmapanyfuture sitesandensure Impact ofnew andfuture developments 20mphzone-signsdesignedbylocal children? Rd asresult ofchangetotraffic calming Speedsurveys Possible Action? Speeding traffic –particularly Fieldfare School Travel Plans Rat running Parking Impact ofschooltraffic Problem any consultation willidentifydifferent issues for different timesofthedaysincluding: Need toidentifykey problems anddistinguish facts from perceptions. Itisanticipatedthat and various members ofthe publicconcerning accessibility related problems inthearea. The Councilhashadseveral discussions withtheLocalMember,Councillor Whittaker, Issues been suggested thataLAAPcould bedeveloped around theCarisbrooke Park Estate area. end ofMarch 2006andmust includeatleast oneLocalAccessibility ActionPlan(LAAP).Ithas The Council’s fullLocalTransport Plan2(LTP2) needstobesubmittedGovernment bythe Introduction Park Estate Isle ofWightLocalTransport Plan Personalised travel planning particularly inlightoffree over 60travel. Infrequent busservice Upgrading ofzebra topelican–probably nobenefit Consider impactofnew road adjKitbridgeMiddle School? Securing anduseofSection106money included infuture LDF Safeguarding ofapproximate NCNroute 22–ensure adequate walking&cycling provision Introduction ofonewayroads perception Enforcement –introduction of decrimparkingmayassist Safe RoutestoSchoolscheme(s) Section O:AdditionalInformation - 25

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page26 Additional Information 26 Section O:AdditionalInformation - rnt ideAtvl okn ih3Yes No–scheme Yes Yes 2 3 Yes 0 Yes 4 STPexpected laterinyear 0 4 Newport CofEPrimary Actively working with Actively working withbut Noresponse todate St ThomasofCanterbury Unable tomake progress as Primary Carisbrooke CofE Actively working with Trinity Middle ABK Middle Carisbrooke High colTae lnIdentifiedfor SRTS Travel Plan School the 6schools,5have beenidentifiedfor possible Safe RoutestoSchool(SRTS)schemes. There are 6schoolsinthearea, allatdifferent stages withtheirSchoolTravel Plans.Of Schools • • • Potential for ModalShift gain firmcommitments atthis time. ABK andStThomascurrently donothave Headteachers andtherefore maybedifficultto curriculum. Schoolwould therefore supportonroad cycle improvements. School hasalsoachieved SportsCollege Statusandprovide cycling aspartofschool The Council’s Cycling Officer hasmadegoodlinkswithCarisbrooke HighDeputyHead. 4 =settingupworking group; 5=hadinfo pack 1 =fullplan;2draft plan;3=pupilsurvey done,inconsultation; timetable. other accessibility work (especially SchoolTravel Plans)whichmayresult indelaystothis summer holidays(tominimisedisruption).Importanttotie SRTSschemesinwithany public consultation atoneoftheschoolsduringMayhalf-termandimplementation during Consideration hasbeengiven toprogressing all 5SRTSintandemduring2006/07including Safe RoutestoSchool(SRTS) high bususage. Trinity pupils brought bycarbutlive reasonably close. St Thomas Carisbrooke and and ABK - notmuchpotentialmost bus/walkalready. tg Level* Stage currently noheadteacher currently noheadteacher Carisbrooke CofE Isle ofWightLocalTransport Plan may have potentialbutbeingdenominationalschoolswillmaintain probably have most potentialfor modalshiftas already completed 26183_IOW CouncilLTP-pt219/10/0613:44Page27 In additionmightwanttoconsider additionaldataincluding: schools, publictransport, residents? bring inrepresentatives whenrequired. Coulddevelop anumberofsubgroups eg It would notbefeasible tomeetallatthesametimeandmaybemore appropriate to • • • • • • • • • • • • • Need tolook atinformation currently available including: Next steps • • • • • • • • • • • • • • • Essential thatwe develop aProject Team towork todeliver theproject suggestions include: Project Team Approximate NCNroute 22location. Future development sites; Journey timestoNewport; Bus stops andfrequency; Junction turningmovement surveys; Traffic speeddata; Traffic flow data; Accidents; Head Teachers School Governors Legal Representative Representative from eachoftheEmergency Services SUSTRANS Newport Forum representative Carisbrooke Forum representative Planning Quality Transport Partnership Cycle Wight Healthy SchoolsCo-ordinator Wightbus Southern Vectis Home toSchoolTransport Local Members School travel data. Bus ridership; Resident perception studies; Foot fall; Origin anddestination surveys; Isle ofWightLocalTransport Plan Section O:AdditionalInformation - 27

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page28 Additional Information 28 Section O:AdditionalInformation - . Actiontaken inresponse tothepointsmadein O.9 rtraCmetResponse/Action Comment Criteria 1:Context Criteria Criteria 2:Analysis n rgamswt I atclrhwtepormewl Planincontext andillustrate Inparticularhow theprogramme will the widerpolicyand between sectionssoastoshow and programmes with More clarityonhow thevarious components oftheplanlinktogether. plan’s objectives, targets The consistency ofa lnigcnet totheachievement oftargets. planning context. potnte.through. opportunities. andthatrelevant issues are followed inthe plantoensuretransport problems itisallrelevant and More c sound analysis oflocal The Planisbuiltona .Arrange meetingofProject Group(s) todiscuss best waytoprogress project. 8. Continuetowork oncycling initiatives includingNCNroute 22. 7. Follow upwork withschoolsonSchoolTravel Plans. 6. MeetwithSouthernVectis andWightbustodiscuss busprovision. 5. MeetwithLocalMembers. 4. Identifyoutstanding dataandarrange surveys. 3. Locateandmapcurrent data. 2. Compile andcirculate notesofmeeting. 1. Actions December 2005settlement letter from theGovernment Office for theSouthEast. The following table explains how we have responded tothecomments madeinthe the 2005settlement letter help deliver thestrategy andcontribute h eeomn fteLF process anddelivery Planrevised toshow Sharpening theregeneration focus. now embeddedinPlan- the development oftheLDF. will have onland useplanningand Emerging LDF“IslandPlan” More detailontheinfluence theLTP iiu cnro M.2.2.(Investment Programme) throughout thePlan. Funding Allocations arrangements. have taken account ofthenew Regional Discussed inSectionsM.4, SectionJ.7.(Congestion) and Evidence thatassumptions for majors minimum scenario. of alternative solutionsandado IncludedinSectionE.3.6as partofSEA process, plus schemes includingsomeconsideration IncludedinExec Summaryand More detailonthecasefor majors from LTP1 More reference toexperiences Isle ofWightLocalTransport Plan onsideration ofthedataincluded Plan revised toimprove linkages delivery against targets. Plan revised toensure synergy. key local andcorporate aim. importance ofregeneration as M.11.1. 26183_IOW CouncilLTP-pt219/10/0613:44Page29 given thelikely availability Criteria 4:Involvement Response/Action Criteria 3:MaximisingValue from Resources Comment Criteria novmn fsaeodr s involvement ofstakeholders oslainad o hs nenladetra strengthened andimproved the how theseinternalandexternal Further discussions have Buildonthisstrong start byshowing consultation and The effectiveness of Table inN.23. W Explored inM.14.5andM.15.10 Further work onTAMP aspromised. Evidence ofconsiderations ofVFM transport services. infrastructure and current state of of publicfundsandthe Form toincludeacost\VFM element. D best possible results, Possible expansion ofPriorityRanking The Planwilldeliver the nlcltasot eeomn ftefl ln SectionEexplains outcome of development ofthefullplan. in local transport. taey rewritten inpartnership with Fully detailed throughout the impacted onthePlan. Detail onhow SEAprocess has SectionsEandIhave been strategy. Strengthening oftheenvironment eeu n h sadapoc o SectionM. More detailsincludedin budgeting andcost control. revenue andtheIslandapproach to reviewed andcharges for More consideration oftherole of P in managingdemand. Consideration of therole ofparking and alternative solutionsfor major bids. rcue aeifune h Planandprocesses. Revised tructures have influenced the Isle ofWightLocalTransport Plan consultants. separate report produced by Plan –notably SectionEandas and comments received. take account ofSEAprocess English Nature andothers to Section J-J4.4for details. parking tobeintroduced. See as aresult. Decriminalised occasional parking increased – Effective Management. Update includedinSectionK.7. for development ofPFIbid. possible efficiencysavingsand of thisPlantohelpidentify Required asessential element Considered inSectionN– Difficult toquantifyandachieve. elsewhere. and D.15,D.16,D17 included inSectionsB.8.1.B.8.6 Reference toemerging LDF regarding environment. partnership discussions arking charging policyrecently iscussed withGOSEandothers. ork onTAMP progressing well. Section O:AdditionalInformation - 29

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page30 Additional Information 30 Section O:AdditionalInformation - rtraCmetResponse/Action Criteria 5:Performance Management Comment Criteria Criteria 6:Priorities The robustness andquality agt n rjcoisrerevisions. discuss andevaluate potential aspectofthestrategy are appropriate. targets andtrajectories Table includedinSectionNto and monitoringlocal relating totheRegeneration andVFM of theprocess for setting n h dniidqaiy andAccessibility ActionPlan. SectionsEandIcompletely Strengthening theconsideration of objectives andtargets. Detailsofrecently revised (ieparkingrestraint andcharging). LTP delivery programme, the development ofthe Further consideration oftherole of life issues, have driven and theidentifiedquality Strat identified shared priorities, F The extent towhichthe hp h ulpa.Over 300PLTPs madeavailable, consultation anddiscussions. shape thefullplan. to theprovisional planhave helped FinalPlanshapedbyongoing Show how theconsultation responses Consideration ofwhetherlocal target maintenance. trajectories. reliability, cycling, traffic growth and particularly for train punctuality& robustly justify targets and trajectories oftargets for thefullplan SectionNrevised tomore Robust justification for thelevels and n lmt hne.highlightimportance of and climatechange). EnglishNature andothers to revised inpartnership with landscape, biodiversity, publicspaces in environmental issues intheplan(ie parking charges policyincluded rhrdvlpeto h cesblt Re urther development oftheAccessibility Isle ofWightLocalTransport Plan g o h ulpa.detailsofAccessibility Strategy. egy for thefullplan. elsewhere inthisSection. consultation process included presence. Responsestoformal plus press coverage andweb Section Nrevised andimproved. environment andSEAprocess. Section J. vised SectionFincludesfull 26183_IOW CouncilLTP-pt219/10/0613:44Page31 .0LTP Assessment (Annex cchecklist) O.10 flf olclcmuiis year strategy fitswithinourlonger-term aspirations. willdealwiththeseissues over thelonger term.The of life tolocal communities. table attheendofSectionD–D18shows how thefive- opportunities todeliver abetterquality opportunitiesthatexist tohelpsolve them.Whilst emerging problems, andthe S supportourlocal economy. transport problems, butalsotopossible relating notonly toexisting local SectionCexplains ourtransport problems and sustainable communities andhelpreduce theimpacton The Plancontains appropriate analysis and economic development. theenvironment. SectionKillustrates how thisplanwill environment, sustainable communities, LTP fitswithandwillhelpdeliver theLDFanddevelop networks andtheirusers, the nationalplans and policies.SectionDexplains how the as they relates tostrategic transport SectionBsetsouthow theLTP fitswithotherrelevant national-level policies-inparticular The Planisconsistent withrelevant LDFcore transport policiesare now included inSection regional level. D17 – D development strategies produced andshares atthe common areas ofdevelopment work. The spatial planningandeconomic will influence thedevelopment of, The Planisbroadly consistent with,and SectionsB,C,D&F. accessibly are beingdeveloped withpartners. See and socialservices. includingAccessibility Planningand SEA.Issues of economic development, education example, inhousing,planning, the area “IslandPlan”.Bothplansshare covered common areas bytheLTP -for ThePlanisbasedonCommunityStrategy andisbeing developed atthesametimeasemerging LDF– other decisionsoflocal authoritiesin therefore bebroadly consistent with, The Planwillinfluence, andwill plans). strategies andBest Value performance (e.g. corporate plans,community supporttheseaims. wider local corporate planningframework Comments and objective andtheoutputsof targets setoutinSectionNare consistent withand with thefullrange oflocal policyaims explains ourlocal policy,aimsandobjectives. TheLTP SectionsBsetstransport inthewidercontext. SectionD objectives andtargets, are consistent The delivery programme, andLTP consistent withthatvision. and along-term local transport strategy local authoritiesserving theplanarea, The Planreflects thelong-term visionof Criteria Government criteriafor assessing LocalTransport Plans. Isle ofWightLocalTransport Plan strategy. Sections E-Lthensetsoutindetailourfive-year The Planisbeingdeveloped alongside theemerging LDF vision for 5years andbeyond. Section Dsetsoutourlong-term strategy andtransport ection Dsetsoutthelong-term strategy andhow we Section O:AdditionalInformation - 31

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page32 Additional Information 32 Section O:AdditionalInformation - etpsil au o oe.identifyvalue for money solutionsandonce completed, ensure best value for money. TheSEAhashelped best possible value for money. and schemesthatwould deliver the and prioritisethelocal transport policies The Plananalysis hassoughttoidentify impact onit.SectionEexplains how thedevelopment of theSEAhashelpedshapePlanandis importance ofthe environment andhow transport can Strategic Environmental Assessment.) withEnglishNature andothers tobetterreflect the analysis produced insupportofa through theinclusionofselected to improve theenvironment (e.g. and thattheLTP willtake opportunities LTP andemerging LDFshare common elements and policieshasbeenfully considered environmental impactofPlanschemes The Plandemonstrates thatthe withandsupportourhighwaynetwork. horse riding. motorcycling, wheelchair useand ofwaynetwork andtheappendedRightsofWay of publicservice vehicles, coach travel, travel, distribution offreight, theuse We are looking tomake themost ofourextensive rights considers howpublic transport, travel taxisandprivate hire bythesemodescanbeimproved. includestransport operators andusers andSectionC including cartravel, walking,cycling, transport modesusedinthearea - hasbeendeveloped inpartnership withtheQTP,which ThePlanseekstoimprove transport for allmodesand opportunities across thefullrange of The Planaddresses problems and onpast trends ¤t performance. accessibility planning.We have usedtheconsultation includesfully fundedschemesandprojects. andwasdeveloped usingstructured workshops, withthe QTPandothers basedaroundand businesses affected bythePlan. theshared prioritiesand ThePlanis soundly basedontheCommunityStrategy people, communities, publicservices consideration ofthefullrange of The Plananalysis isinformed by Comments supported byevidence. thedelivery ofthePFIbidandmajorschemesonly Seeabove. ThePlanisevidence basedandapartfrom assumptions thatare notnecessarily The Plan’s analysis avoids making and others. Performance indicators includedinSectionNare based population,employment, travel patternsetc.The past experience ofthePlanauthorities SectionCexplains thecurrent situation,including existing evidence base,includingthe SectionB,sets transport inthewidercontext and opportunities isfully informed bythe The Plan’s analysis ofproblems and Criteria Isle ofWightLocalTransport Plan possible efficiencysavings. the TAMP willfurtherhelpthisprocess byidentifying ranking system ensures compliance withtheAIFandwill The LTP prioritisespoliciesandschemesourpriority included asanAnnex tothedocument. and SectionIhasbeenextensively revised inpartnership environment isoneoftheIsland’s most importantassets including SEAandaccessibility modelling.The Improvement Plansetsouthow theROW network canfit Partnership tohelpshapethefinalPlan.SeeSectionA.3. local business groups andHampshire Economic the LSP,Solent Transport, SECSIG,adjoiningAuthorities, carried outonthePLTP, emerging LDF,discussions with 26183_IOW CouncilLTP-pt219/10/0613:44Page33 ore.M.8indicateshow willuserevenue support. SectionsM.3.2.illustrates otherforms offundingwhilst sources. –K.9.detailsourimportantPFIbid. explains progress towards developing aPFIbid. partnership fundingfrom non-LTP importance ofdelivering ontimeandbudget and control ofcosts, andthesecuringof effective approach tobudgeting,the SectionK“Effective Management”recognises the The Planwillimplement arobust and unfunded aspirations. outlineoftwo majorbidsinSectionM,whilst SectionK include anyunfundedaspirations butdoesincludethe the Department-anddoesnotcontain following reduction ofITblock. ThePlandoesnot (andelsewhere) discusses thelocal disappointment the ‘planningguidelines’ provided by funding from allsources -including Delivery isbasedonthefundingallocated. Para K.2.7 consistent witharealistic view of supporttable. tackle congestion The Planisframed inawaythatis revenuethe effective useofrevenue support.Paragraph M.8.1includesarevenue budgets. M.4.identifiesourplannedspendandM.8.indicates ThePlanrecognises theimportance ofmakingthebest improve transport outcomes through useoffinances available andparagraph M.3.2.Section how opportunitieswillbetaken to investment plan,butdemonstrates we are doingthisandSectionJ.4shows how we hopeto The Planisnotjust acapital SectionK.2.6. in“Effective Management”setsouthow transport networks. maximise thevalue ofexisting efficiently andeffectively manageournetwork. Withalimited road network itisessential thatwe implemented inawaythatwill Network Managementdutywillbe The Plandemonstrates how the canimprove AirQualityandtheEnvironment. behaviour. travel byroad andinfluencingtravel helpreduce congestion. AndSection Iexplains how we SectionHexplains how we canimprove road safety and health.SectionJsetsoutmethodsbywhichwe will benefits through managingdemandfor congestion, pollutionandroad safety highway asset andwillbekey tothedevelopment ofour of potentialoptionsfor delivering opportunitiesandhow we caninfluence travel behaviour. context oflocal circumstances) arange SectionCexamines transport problems and The Planadequately considers (inthe ourTransport Asset ManagementPlan.TheTAMPobjectives andtargets. will helpusunderstand betterthecondition andvalue ofour maintenance willbeinformed byLTP Comments SectionKgives detailsofprogress towards completing cost-effective way,andthatasset The Planwould maintainassets ina infrastructure. partnerships. SeeSectionsC.13andK.2 benefits ofnew orupgraded inpartnership withothers through QTPandother infrastructure andtomaximisethe avoid theneedfor new orupgraded infrastructure and putinplace improvements byworking the best useofexisting assets, bothto TheLTP seekstomake thebest useofexisting Every opportunitywillbetaken tomake Criteria Isle ofWightLocalTransport Plan submitted by10Sept2006.SeeSectionK.9.for details. PFI bid,theexpression ofinterest for whichistobe Section O:AdditionalInformation - 33

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:44Page34 Additional Information 34 Section O:AdditionalInformation - rtraComments Criteria services). freight operators, operators ofcoach delivery agencies,rail industry bodies, the HighwaysAgency,otherDfT the otherresponsible agencies(e.g. networks have beendeveloped with impacts onstrategic transport The Plan'spoliciesandschemeswith Partnerships). Partnerships, Rural Transport planning bodies(e.g.LocalStrategic use ofexisting consultative and groups -andwhere possible makes communities andspecial interest businesses, local public services, local transport services, otherlocal including companies delivering interested local stakeholders - active involvement ofawiderange of The Planhasbeendeveloped withthe administrative boundaries. needs andopportunitiesacross that fully addresses local transport The Planhasbeendeveloped inaway within local authorities. all relevant departmentsordivisions relevant tiers oflocal government and full andactive participationofall The Planhasbeendeveloped withthe Isle ofWightLocalTransport Plan B for context. limited impactonstrategic road network. SeeSection rail andfreight. Internaltransport operations have Our QTPincludestransport operators includingferry, and workshop notescontained inSectionO. local interest groups andassociations. SeeSectionA.3. involving QTP–transport operators andusers, LSP, The Planhasbeendeveloped usingworkshop approach Action Plan City Councilandothers, seeSectionF-Accessibility mainland healthcare inpartnership withSouthampton Bucks andKent.We are looking toimprove access to which includesHampshire, West andEast Sussex, of SouthEast CountiesService Improvement Group, and inform Planpreparation. Councilisalsomember Partners at fortnightly meetings,established tohelp issues identifiedanddiscussed withSolent Transport The Plantakes fully intoconsideration cross boundary notes from ourworkshops. sets outtheconsultation process. SectionOincludes Senior Managers andAssistant Directors. SectionA.3. has beendeveloped through discussions, including the LSPandIslandFutures SupportGroup. Accession workshop meetings.ThePlanhasbeendiscussed at including active participationofStrategic Director at All tiers ofLAhave beeninvolved inpreparation ofLTP, 26183_IOW CouncilLTP-pt219/10/0613:45Page35 rtraComments Criteria wider local policyandplanningagenda. congestion levels isaddressed bythe ensures thattheneedtoaddress there are nosuchproblems), and (or provides convincing evidence that problems usingarange ofpolicytools current andemerging congestion The Planconvincingly addresses and planningagenda. are addressed bythewiderlocal policy ensure thosestrategies andobjectives deliver accessibility objectives, andwill developing accessibility strategy will The Plancontains evidence thatthe how thoseriskswillbemanaged. the achievement ofthetargets, and targets willbeachieved, thekey risksto The Plantargets identifyhow the those trajectories. and monitoringperformance against be inplace for settingthesetrajectories trajectories, andarobust process will where possible byyear byyear The Plantargets willbeaccompanied mandatory targets andindicators. The Planwillincludeallrelevant outcomes. outputs demonstrably related to outcomes directly, ormeasure The Plantargets willmeasure will remain, realistic andchallenging. LTP targets toensure they are, and about arobust system for reviewing Development ofthePlanhasbrought transport investment programme. (for example) apredetermined policy andplanningcontext, instead of authorities involved, andthewider and objectives ofthelocal authorityor way thatreflects thetransport aims The Plantargets have beensetina Isle ofWightLocalTransport Plan problems inourcounty town. Section Mseekstoaddress congestion andaccessibility management. OurMajorbidfor Newport includedin emphasises theimportance ofmaintainingoureffective illustrates how thelimitednature ofourroad network nevertheless animportantlocal issue. SectionJ Although notofnationalsignificance, congestion is education, Jobcentre+, NHSandYouth MP. developed withpartners from planning,health, and planningagenda.Thisprogramme hasbeen plans willfitwithandhelpdeliver thewiderlocal policy work andshows how ourplannedaccessibility action Section Fgives detailsofouraccessibility planning methodology, risksandriskmanagement. Section Nincludessupportingtext explaining the and illustrates year byyear trajectories. Section Nsetsoutperformance indicators, outcomes indicators toreflect local circumstances. Section Nincludesallmandatoryindicators, pluslocal outcomes. Section Nsetsoutourperformance indicators and system ofreviewing targets anddelivery. management” andSectionsMNincludearobust Section Ksetsouthow we willensure effective set outintheCommunityStrategy andemerging LDF. approach andreflects thetransport aimsandobjectives in SectionMhave beendeveloped usingworkshop in SectionNandimplementation programme included emerging LDF–SeeSectionL.2.Thetargets included Our delivery programme willnow take account of Section O:AdditionalInformation - 35

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:45Page36 Additional Information 36 Section O:AdditionalInformation - rtraComments Criteria opportunities todeliver: demonstrably take allreasonable The Planpoliciesandschemeswill policy andplanningagenda. are addressed bythewiderlocal ensures thattheroad safety objectives through arange ofpolicytools,and especially for vulnerable road users, better road safety outcomes, The Planwillconvincingly deliver policy andplanningagenda. are addressed bythewiderlocal transport related airqualityproblems problems), andensures thatlocal evidence thatthere are nosuch related tolocal transport (orprovides Quality ManagementAreas -thatare problems -especially thoseinAir current andemerging airquality The Planconvincingly addresses • • • • • • • change objectives. progress towards climate problems. fewer transport-related noise healthier communities. enhanced personal security. of landscapesandbiodiversity. protection andenhancement public spaces. enhanced, 'people-friendly' communities. sustainable andprosperous Isle ofWightLocalTransport Plan Health. covered inSectionI–Improving RoadSafety and Issues relating topersonal healthandsecurityare AIF priorityareas. and willbeputinplace alongside theLAAandLDF aims andobjectives contained intheCommunityPlan noise. Ourdelivery programme seekstodeliver the environment, climatechangeandissues relating to the importance ofmaintaining thebuiltandnatural Section 5“Air qualityandtheEnvironment” recognises Regeneration”. is includedinSectionG-“Economic Prosperity and our five-year strategy tohelpsupportlocal regeneration improvements are tobedelivered through theLDFand Aim HighChangeManagementPlanandLAA.Local established inCommunityPlanandreflected inourown The future oftheIslandisbaseduponcore policies an Annex tothisPlan. Strategy andcopy oftheRoadSafety Planisincludedas and health.TheCouncilhasrevised itsRoadSafety Section Hsetsoutourfive-year strategy onroad safety reduced. emerging LDFandSEAprocess toensure impactis have impactonairqualityandLTP isworking with environment. Thelocation ofnew development will I includeshow we willimprove thelocal airqualityand and strategies andtarget tomaintainsituation.Section The IslandhasnoAQMAs andthePlanincludespolicies 26183_IOW CouncilLTP-pt219/10/0613:45Page37 O.11 Jargon Buster T1First LTP 2002-06 www LocalTransport Planwww LocalTransport Authority LocalStrategic Partnership -Community Planwww LTP1 LearningSkillsCouncilwww LTP LTA Local LSP LimitingLong Term Illness LSC LocalGovernment Association LocalDevelopment Framework www LPSA LocalAccessibility ActionPlan–seeAccessibility Section LLTI LocalArea Agreement www LGA LocalAgenda21www LDF LocalAuthoritywww LAAP Killed orSeriously Injured LAA Isle ofWightEconomic Partnership www LA21 Issue ofInvitationtoNegotiate LA IslandFutures SupportGroup. –CommunityPlanwww KSI Isle ofWightCouncilwww Isle ofWightwww IWEP ITN Hampshire CountyCouncilwww IFSG Historic Area ActionPlan–IWCouncilwww IWC Government Office for theSouthEast www IW HCC www HEAP StudyofIsle ofWighteconomy carriedoutbyExperianinOctfor IWEP GOSE residents andvisitors www Report Departmentfor Transport www Experian Two studies carriedoutlooking attheimpactonenvironment madeby Footprint Departmentfor Environment andRural Affairs CommunityRailPartnership www Ecological DfT CountrysideandRightsofWay Actwww Comprehensive EqualityPlanwww DEFRA Best Value Performance Indicatorwww CRP Biodiversity ActionPlanwww CROW AirQualityManagementAreaCEP www (LTP) AnnualProgress Reportwww BVPI Area ofOutstandingBAP Natural Beautywww Area Investment Framework www AQMA APR AONB AIF Computersoftware usedtomeasure geographic accessibility. ACCESSION www Government .iw .mv Public Service Agreement –agreement between local andCentral ep.c a-gr o.uk oup.c Isle ofWightLocalTransport Plan .iwight.go om .io .io w .iwight.c w .go .go .iwight.go .iwight.c .bes v v .islandfutur .uk .uk .lsc.go v .iwight.c .uk tf .dft.go om/tr .hants.go ootf .seeda.c .ac om/tr .iwight.c .defr v .iwight.c v .uk orwar .uk .iwight.c orp.uk ansport om v .uk .bvpi.go es.c a.go .defr ansport .iw .c v d.c o.uk .uk .gose.go ountryside.go.uk om om ep.c o.uk/tr v .io a.go .uk om om w v .go o.uk .uk v .uk ansport v v .uk .uk .io Section O:AdditionalInformation - .io w .go w .go v .uk v .uk 37

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:45Page38 Additional Information 38 Section O:AdditionalInformation - T Workplace Travel Plan UnitaryDevelopment Planwww Train Operating Companywww Tourism Development Planwww WTP Transport Asset ManagementPlan SouthernVectisUDP www TOC TDP SchoolTravel Plan-Policy includedasAnnex tothisPlan. TAMP Sustainable Transport (Organisation) www SiteofSpecialScientificInterest www SV Single Regeneration Budget–defunctSEEDA fundingmechanism. SUSTRANS Strategic RailAuthoritywww STP SSSI SiteofInternationalNature Conservation –SeeAirQualityandEnvironment SRB SRA SouthEast EnglandRegionalAssembly www SouthEast EnglandDevelopment Agencywww SINC SouthEast Strategic CountiesService Environmental Improvement Assessment www Group SEERA SouthamptonCityCouncilwww SEEDA RegionalTransport Board –organised bySEERAwww SECSIG RoadSafety Plan-includedasanAnnex toLTP SEA SCC RightsofWay Improvement Plan–included asanAnnex tothisPlan Rural Community Council. RTB QualityTransport Partnership www RSP QualityBusPartnership -between operator andCouncil ROWIP Powered Two Wheeler RCC Pre QualificationQuestionnaire QTP QBP PlanningPolicy Guidance Note13–Transport www Provisional LocalTransport Plan–submitted inJuly 2005www PTW PunctualityImprovement Partnership Performance Indicator–SeealsoBVPI PQQ PPG13 Private Hire Vehicle PLTP PrimaryCare Trust www PIP Portsmouth CityCouncilwww PI PHV Office oftheDeputyPrimeMinister www OutlineBusiness Case PCT NationalHealthService (Trust) PCC ODPM New approach toappraisal –methodofappraising majorbidsandother OBC Second LTP, 2006-2011www NHS NATA LTP2 Section. www schemes. www Isle ofWightLocalTransport Plan .io .w w .go ebt v ag.or .islandbuses.inf .uk .io g.uk w .nhs.uk .sr .io .portsmouth.go w a.go .southampt .island-line.c .iwight.c .islandbr .go .iwight.c v v .uk .uk/tr o .english-natur om .odpm.go eaks.c ansport .odpm.go .sus on.go om/tr o.uk .southeas v .uk .seeda.c tr o.uk v ans.or ansport .uk v .uk .odpm.go v e.or .uk .southeas t-r g o.uk g.uk a.go v v .uk .uk .iwight.go t-r a.go v .uk v .uk 26183_IOW CouncilLTP-pt219/10/0613:45Page39 O.12 Traffic andCycle MonitoringPoints one ubrLocation Number Counter one etrLocation Letter Counter 7Briddlesford Road,Wootten MedinaWay, Newport BlackwaterRoad,Newport Horsebridge Hill,Newport Forest Road,Newport Yarmouth Road,Shalfleet 17 Colwell Road, 16 MilitaryRoad,Freshwater 15 Road,Luccombe 14 VictoriaAvenue, Shanklin 13 Newport Road,ApseHeath 12 Lake Hill,Lake 11 Brading Road,Rowborough 10 Eleanors Grove, Wootton 9 WhippinghamRoad,East Cowes 8 Fairlee Road,Newport 7 RollsHill,Thorness 6 5 4 3 2 1 1Bowcombe Road,Bowcombe Newport Road,Afton Ashey Downs Road,Ashey Newport Road,Godshill 21 20 19 18 Newport toSandown cycle track Freshwater toYarmouth cycle track Newport toCowes cycle track Cowes toEast D C B A Village Town Cycle CensusPoint Automatic Traffic CensusPoint C Road B Road A Road Isle ofWightLocalTransport Plan Section O:AdditionalInformation - 39

Additional Information 26183_IOW CouncilLTP-pt219/10/0613:45Page40 Additional Information 40 Section O:AdditionalInformation - .3Lcto Map O.13 Location

COWES East Cowes Gurhard Whippingham Fishbourne RYDE

Seaview Porchfield Wooton

Isle ofWightLocalTransport Plan Yarmouth Netlestone Newtown Haven Street St Helens Shalfleet Colwell Newbridge NEWPORT Brading Arreton Adgestone

Winford FRESHWATER Merstone Rockley SANDOWN Brook Lake

Godshill SHANKLIN

Wroxal

Whitwell VENTNOR Chale St Lawrence