1 Abri Ar.P Dibang Valley ROR 1365 120 1 Site Identified 2 Achumpari Ar

Total Page:16

File Type:pdf, Size:1020Kb

1 Abri Ar.P Dibang Valley ROR 1365 120 1 Site Identified 2 Achumpari Ar ARUNACHAL PRADESH IDENTIFIED FUTURE PROJECTS Sl no. Name of Name of Name of Category Name of Capacity Head Discharge Remarks Project State District of Proj river/ in in in * canal kW m m3/sec 1 Abri Ar.P Dibang valley ROR 1365 120 1 Site Identified 2 Achumpari Ar.P W Siang ROR 186 80 0.3 Site Identified 3 Aha Pani Ar.P Dibang valley ROR 541 120 1 Site Identified 4 Ahi Ar.P Dibang ROR Ahi 7000 80 4 Site Identified 5 Ahun Ar.P Dibang ROR Ahun 2500 80 3 Site Identified 6 Ali Ar.P Upper Subansiri ROR 532 30 Site Identified 7 Amu Pani Ar.P Dibang valley ROR 262 80 0.5 Site Identified 8 Andu Pani Ar.P Dibang ROR Andu Pani 6000 80 4 Site Identified 9 Angang Ar.P W.Siang ROR Angang 4000 80 2 Site Identified 10 Angguing Ar.P W Siang ROR 601 120 1 Site Identified 11 Ankling Ar.P W.Kameng ROR 50 40 Site Identified 12 Anno Pani Ar.P ROR Anno Pani 8000 150 Site Identified 13 Apop Ar.P L.Subansiri ROR 30 55 Site Identified 14 Apop Sango Ar.P L.Subansiri ROR 30 40 Site Identified 15 Atru Pani Ar.P Dibang ROR Atru Pani 6000 120 2 Site Identified 16 Ayalin Ar.P Dibang valley ROR 254 80 0.4 Site Identified 17 Ayu Pani Ar.P Dibang ROR Ayu Pani 6000 380 1 Site Identified 18 Balu Kho Ar.P W Kameng ROR 90 80 0.1 Site Identified 19 Barab Ju Ar.P Tirap ROR 1516 30 Site Identified 20 Bate N Ar.P Lower Subansiri ROR 964 120 1 Site Identified 21 Beyo N Ar.P Upper Subansiri ROR 748 80 1 Site Identified 22 Bhalu Ar.P Lower Subansiri ROR Bhalu/Kurung 4000 120 1 Site Identified 23 Bhiku Ar.P ROR Parsen.kamla 2500 40 Site Identified 24 Bhilu Ar.P Lower Subansiri ROR Parsen 846 40 3 Site Identified 25 Bichhari-I Ar.P W.Kameng ROR Bichhari Kho 3000 80 1 Site Identified 26 Bichhari-II Ar.P W.Kameng ROR Bichhari Kho 2500 60 2 Site Identified 27 Bishum-I Ar.P W.Kameng ROR Bishum Chu 3000 80 2 Site Identified 28 Bishum-II Ar.P W.Kameng ROR Bishum-II 4000 80 2 Site Identified 29 Bome Siko Ar.P Lower Subansiri ROR 282 120 0.3 Site Identified 30 Brei Ar.P Luhit ROR Brei 1088 80 2 Site Identified 31 Bubiya Pabung Ar.P Lower Subansiri ROR 1326 100 2 Site Identified 32 Buru Ju Ar.P Tirap ROR 348 100 0.4 Site Identified 33 Chai Ril Ar.P Changlang ROR 561 80 1 Site Identified 34 Chamchin Ar.P W Kameng ROR 213 120 0.2 Site Identified 35 Chamjyoaong Ar.P W.Kameng ROR Unnamed Nallah 2500 160 1 Site Identified 36 Changparang Ri Ar.P W Kameng ROR 40 50 0.1 Site Identified 37 Changte Ar.P ROR Panya/Kurung 10000 120 Sl no. Name of Name of Name of Category Name of Capacity Head Discharge Remarks Project State District of Proj river/ in in in * canal kW m m3/sec 38 Chanrat Ar.P ROR 20000 39 Chemba Ar.P ROR Tenga pani 12000 140 Site Identified 40 Chemnak Ar.P W Kameng ROR 160 200 0.1 Site Identified 41 Chetum Ju Ar.P Tirap ROR 10 20 9 Site Identified 42 Chi Chi Pani Ar.P Dibang ROR Chi Chi Pani 2500 200 1 Site Identified 43 Chinjam Nal Ar.P Upper Subansiri ROR 298 30 Site Identified 44 Chowa Ti-I Ar.P ROR Chowa Ti 4000 160 Site Identified 45 Chowa Ti-II Ar.P ROR Chowa Ti 4000 160 Site Identified 46 Churkur-I Ar.P W.Kameng ROR Churkur 3000 80 2 Site Identified 47 Churkur-II Ar.P W.Kameng ROR Churkur 3000 40 4 Site Identified 48 Chuyyu-I Ar.P Dibang ROR Chuyyu 3500 80 2 Site Identified 49 Chuyyu-II Ar.P Dibang ROR Chuyyu 4000 80 2 Site Identified 50 Dabyo N Ar.P Lower Subansiri ROR 430 100 1 Site Identified 51 Dache Bung Ar.P E Kameng ROR 901 80 1 Site Identified 52 Dadang N Ar.P Lower Subansiri ROR 217 100 0.3 Site Identified 53 Daktehoj Ar.P L.Subansiri ROR 10 75 Site Identified 54 Darjiling Ar.P W.Siang ROR Dutangahu 2500 80 1 Site Identified 55 Deki camp Ar.P Yingkiong ROR 18 57 Site Identified 56 Deyang-I Ar.P W.Kameng ROR Deyang Bung 3000 80 2 Site Identified 57 Deyang-II Ar.P W.Kameng ROR Deyang Bung 4500 120 2 Site Identified 58 Dhowa Ti-I Ar.P Luhit ROR Dhowa Ti 1408 160 1 Site Identified 59 Dhowa Ti-II Ar.P Luhit ROR Dhowa Ti 1472 160 1 Site Identified 60 Dhushu N Ar.P W Kameng ROR 137 120 0.1 Site Identified 61 Didale Ar.P L.Subansiri ROR 60 40 Site Identified 62 Difya Ar.P W.Kameng ROR Difya 2000 160 0.5 Site Identified 63 Digrang Ri Ar.P W Kameng ROR 152 120 0.2 Site Identified 64 Dinang-I Ar.P W.Kameng ROR Dinang Bru 2500 80 1 Site Identified 65 Dinang-II Ar.P W.Kameng ROR Dinang Bru 4500 120 2 Site Identified 66 Dinang-III Ar.P W.Kameng ROR Dinang Bru 5000 100 2 Site Identified 67 Dinang-IV Ar.P W.Kameng ROR Dinang Bru 4500 80 2 Site Identified 68 Diyun Ar.P Luhit ROR Diyun 3000 40 3 Site Identified 69 Djrang Ar.P W.Kameng ROR Sangti 6000 80 4 Site Identified 70 Dojam Ar.P Lower Subansiri ROR 354 30 Site Identified 71 Dooa Ar.P W.Kameng ROR Digen 1700 60 4 Site Identified 72 Doom Ar.P ROR Digen 4000 60 Site Identified 73 Duliang Ar.P ROR 25000 74 Dungma Ar.P W.Kameng ROR Dungma Chu 2000 80 1 Site Identified 75 Dunuk Kho Ar.P W.Kameng ROR Dunuk Kho 2000 80 1 Site Identified 76 Dutiddiuj II Ar.P ROR 22000 77 Echi Ar.P Dibang ROR Echi 7000 160 2 Site Identified 78 Edza-I Ar.P ROR Edza 15000 80 Site Identified Sl no. Name of Name of Name of Category Name of Capacity Head Discharge Remarks Project State District of Proj river/ in in in * canal kW m m3/sec 79 Edza-II Ar.P ROR Edza 14000 40 Site Identified 80 Ela Ar.P ROR Ela 10000 150 Site Identified 81 Emme Pani Ar.P Dibang valley ROR 795 360 0.3 Site Identified 82 Enno Pani Ar.P Dibang valley ROR 428 120 0.5 Site Identified 83 Gangpara Ar.P Lohit ROR 826 30 Site Identified 84 Gangt Ar.P L.Subansiri ROR 5 25 Site Identified 85 Gap Ar.P Luhit ROR Ui & Val 3000 80 2 Site Identified 86 Gasheng Ar.P W Siang ROR 393 80 1 Site Identified 87 Gatte Ar.P W Siang ROR 1396 160 1 Site Identified 88 Gida Ar.P L.Subansiri ROR 10 25 Site Identified 89 Glaikanu Ar.P Lohit ROR 1054 30 Site Identified 90 Gorjo-I Ar.P W.Kameng ROR Gorjo Chu 2500 120 1 Site Identified 91 Gorjo-II Ar.P W.Kameng ROR Gorjo Chu 2000 80 1 Site Identified 92 Gorong Ar.P ROR Gorong Chu 4000 80 Site Identified 93 Gotpu Ar.P L.Subansiri ROR 60 40 Site Identified 94 Hali Ar.P ROR Hali 10000 80 Site Identified 95 Hama Nala Ar.P ROR HamaNala /Kamla 4000 40 4 Site Identified 96 Haning Ar.P Upper Subansiri ROR 376 240 0.2 Site Identified 97 Hatum N Ar.P Lohit ROR 1545 240 1 Site Identified 98 Herin Ar.P Lower Subansiri ROR Herin 4000 80 2 Site Identified 99 Hetchi Pabung Ar.P Lower Subansiri ROR 577 160 0.5 Site Identified 100 Hiba and Nibi Ar.P L.Subansiri ROR 30 20 Site Identified 101 Hirit Ar.P ROR Hirit Korong 10000 80 Site Identified 102 Hiru Ar.P W.Siang ROR Hiru Korang 3000 80 1 Site Identified 103 Hoj Ar.P Lower Subansiri ROR 151 60 0.3 Site Identified 104 Hote Ar.P L.Subansiri ROR 5 45 Site Identified 105 Hpophang Ar.P ROR 16000 106 Hpungan Ar.P ROR Hpungan 14000 40 Site Identified 107 Huduri-I Ar.P W.Kameng ROR Huduri 2500 200 1 Site Identified 108 Huduri-II Ar.P W.Kameng ROR Huduri 2000 120 1 Site Identified 109 Ibu Ar.P ROR Ibu 8000 280 Site Identified 110 Ichi Pani Ar.P Dibang valley ROR 458 80 1 Site Identified 111 Ikte N Ar.P Upper Subansiri ROR 1098 120 1 Site Identified 112 Imu Ar.P Dibang ROR Imu 4000 160 1 Site Identified 113 Imu Ar.P Dibang valley ROR 1404 80 2 Site Identified 114 Injen Ar.P Luhit ROR Injen Hka 6000 80 4 Site Identified 115 Ipni Pani Ar.P Dibang valley ROR 640 120 1 Site Identified 116 Ithi Pani Ar.P Dibang ROR Ithi Pani 5000 80 3 Site Identified 117 Iyancha N Ar.P Lower Subansiri ROR 2205 240 1 Site Identified 118 Iyanga Sekko Ar.P Lower Subansiri ROR 318 30 Site Identified 119 Jinum-I Ar.P Upper Subansiri ROR Jinum 5000 120 2 Site Identified Sl no. Name of Name of Name of Category Name of Capacity Head Discharge Remarks Project State District of Proj river/ in in in * canal kW m m3/sec 120 Jinum-II Ar.P Upper Subansiri ROR Jinum 8000 160 2 Site Identified 121 Jubang Ju Ar.P Tirap ROR 834 40 3 Site Identified 122 Junsa Ju Ar.P Tirap ROR 1227 80 1 Site Identified 123 Kaleng N Ar.P E Kameng ROR 1512 200 1 Site Identified 124 Kamo N Ar.P E Kameng ROR 104 100 1 Site Identified 125 Karoun Ti Ar.P Lohit ROR 888 30 Site Identified 126 Karwai Ar.P ROR Karwai Hka 15000 180 Site Identified 127 Kate N Ar.P Lower Subansiri ROR 469 140 0.4 Site Identified 128 Kawa Bung Ar.P E Kameng ROR 128 120 0.1 Site Identified 129 Kede Ar.P Lower Subansiri ROR Kede/Kamla 3000 120 1 Site Identified 130 Kesing Kro Ar.P Upper Subansiri ROR 240 120 0.3 Site Identified 131 Kevi Nalla Ar.P Lower Subansiri ROR 974 80 2 Site Identified 132 Keyate N Ar.P Lower Subansiri ROR 351 60 1 Site Identified 133 Keynia Ar.P E.Kameng ROR Keynia 762 80 1 Site Identified 134 Keynia Ar.P ROR Keynia 2000 80 Site Identified 135 Khasho Ri Ar.P W Kameng ROR 230 160 1 Site Identified 136 Khel Ar.P L.Subansiri ROR 20 80 Site Identified 137 Khrang Ar.P Lohit ROR 1054 30 Site Identified 138 Khroati Ar.P Lohit ROR 171 30 Site Identified 139 Khyate Ar.P L.Subansiri ROR 12 25 Site Identified 140 Kibithu Ar.P Lohit ROR 25 50 Site Identified 141 Kid N Ar.P Lower Subansiri ROR 478 60 1 Site Identified 142 Kinan Ar.P ROR 23000 143 Kini N Ar.P Lower Subansiri ROR 650 120 1 Site Identified 144 Kishop -I Ar.P ROR Kishop 10000 120 Site Identified 145 Kishop-II Ar.P ROR Kishop 14000 80 Site Identified 146 Kiyi Ar.P ROR Kiyi/Panyor 7500 80 Site Identified 147 Kobu Ar.P ROR Kobu 10000 240 Site Identified 148 Koroyl Ar.P L.Subansiri ROR 30 50 Site Identified 149 Koter N Ar.P Upper Subansiri ROR 1900 220 1 Site Identified 150 Kra Sam-I Ar.P Luhit ROR Kra Sam 4500 40 5 Site Identified 151 Kra Sam-II Ar.P Luhit ROR Kra Sam 5000 40 6 Site Identified 152 Krusam Ar.P Lohit ROR 307 120 0.3 Site Identified 153 Kulung Ar.P Lower Subansiri ROR Niyarpung/ Panyor 2500 40 6 Site Identified 154 Kumchai Ar.P Luhit ROR Kumchai Hka 2000 60 2 Site Identified 155 Kumchai Hka Ar.P Changlang ROR Kumchai Hka 1284 40 4 Site Identified 156 Kunchi Abu Ar.P W Siang ROR 110 80 0.1 Site Identified 157 Kupin Ar.P Upper Subansiri ROR Sippi 9000 65 6 Site Identified 158 La Ti Ar.P ROR La Ti 10500 40 Site Identified 159 Lachha N Ar.P E Kameng ROR 132 60 0.3 Site Identified 160 Lai Ar.P E.Kameng ROR Lai 2500 100 1 Site Identified Sl no.
Recommended publications
  • Shri Dorjee Khandu Hon’Ble Chief Minister Arunachal Pradesh
    SPEECH OF SHRI DORJEE KHANDU HON’BLE CHIEF MINISTER ARUNACHAL PRADESH AT THE 54TH NDC MEETING AT VIGYAN BHAVAN New Delhi December 19, 2007 54TH NDC MEETING SPEECH OF SHRI DORJEE KHANDU HON’BLE CHIEF MINISTER ARUNACHAL PRADESH 2 Hon’ble Prime Minister and the Chairman of NDC, Hon’ble Deputy Chairman, Planning Commission, Hon’ble Union Ministers, My colleague Chief Ministers, Distinguished members of the Planning Commission, Senior Officers, Ladies and Gentlemen. It is indeed a proud privilege and honour for me to participate in this 54th NDC meeting. This meeting has been convened essentially to consider and approve the Draft 11th Five Year Plan (2007-2012). The visionary and comprehensive Eleventh Five Year Plan envisions to steer the process of development through rapid reduction of poverty and creation of employment opportunities, access to essential services like health and education specially for the poor, equality of opportunity, empowerment through education and skill development to meet the objectives of inclusiveness and sustainability . However, I would like to share our views on some of the important issues and recommendations highlighted in the agenda. 2) Let me start with reiterating what our Hon’ble Prime Minister has stated in his Independence Day address on 15th August 2005. “ in this new phase of development, we are acutely aware that all regions of the country should develop at the same pace. It is unacceptable for us to see any region of the country left behind other regions in this quest for development. In every scheme of the Government, we will be making all efforts to ensure that backward regions are adequately taken care of.
    [Show full text]
  • Download Full Report
    P�R�E�F�A�C�E� 1.� This�Report�has�been�prepared�for�submission�to�the� Governor under Article 151 of the Constitution.� 2.� Chapters�I�and�II�of�this�Report�respectively�contain�Audit� observations�on�matters�arising�from�examination�of� Finance�Accounts�and�Appropriation�Accounts�of�the�State� Government for the year ended 31 March 2010.� 3.� Chapter�III�on�‘Financial�Reporting’�provides�an�overview� and�status�of�the�State�Government’s�compliance�with� various�financial�rules,�procedures�and�directives�during� the current year.� 4.� Audit�observations�on�matter�arising�from�performance� audit�and�audit�of�transactions�in�various�departments� including�the�Public�Works�department,�audit�of�stores�and� stock,�audit�of�autonomous�bodies,�Statutory�Corporations,� Boards�and�Government�Companies�and�audit�of�revenue� receipts for the year ended 31 March 2010 are included in a� separate Report.� 5.� The�audit�has�been�conducted�in�conformity�with�the� Auditing�Standards�issued�by�the�Comptroller�and�Auditor� General of India. CHAPTER I Finances of the State Government Pr o f i l e of th e St a t e Area-wise, AR U N A C H A L PR A D E S H , which became a full-fledged state on February 20, 1987, is the largest state in the north-eastern region. Till 1972, it was known as the North- East Frontier Agency (NEFA). It gained the Union Territory status on January 20, 1972 and was renamed as Arunachal Pradesh. The State, being one of the Special Category State, is dependent on central assistance for plan investment because of poor resource base.
    [Show full text]
  • Rainfall Distribution and Weather Activity: 26.08.2021 to 01.09.2021
    Govt. of India / भारत सरकार Ministry of Earth Sciences / पृ镍वी ववज्ञान मंत्रालय India Meteorological Department / भारत मौसम ववज्ञान ववभाग Regional Meteorological Centre /क्षेत्रीय मौसम कᴂद्र Guwahati – 781 015/ गुवाहाटी - ७८१०१५ Weekly Weather Report for Arunachal Pradesh, Assam& Meghalaya, Nagaland- Manipur-Mizoram & Tripura for week ending on 29.09.2021 Synoptic Feature: “Monsoon Trough” persisted and passed through Jaisalmer, Chittorgarh,Tikamgarh, Sidhi, Ambikapur, Jharsuguda,Puri and thence SE-wards to EC-Bay of Bengal on 23rd.It persisted and passed through Jaisalmer,Ajmer,Nowgong,Daltonganj,Jamshedpur,Digha and thence SE-wards to EC-Bay of Bengal on 24th.It persisted and passed through Jaisalmer, Kota, Mandla, Sambhalpur, Paradeep and thence ESE –wards to the centre of Deep Depression over NW & adjoining WC-Bay of Bengal on 25th.It persisted and passed through Bikaner,Kota,Sagar,Pendra Road,Jharsuguda and thence ESE-wards to the centre of Cyclonic Storm “Gulab” over Northwest & adjoining WC-Bay of Bengal on 26th.It persisted and passed through Jaisalmer,Udaipur,Akola,Chandrapur,centre of Deep depression over south Odisha & adjoining south Chattisgarh,Vishakapatnam and thence ESE- wards to EC-Bay of Bengal on 27th.The monsoon Trough at mean sea level has become disorganized on 28th. The Deep Depression over north and adjoining central Bay of Bengal moved westwards with a speed of 14 kmph in last 6 hours and lay centred at 0830 hrs IST of 25th September,over northwest and adjoining WC_Bay of Bengal near Lat.18.4°N and Long 89.3°E, about 470 km ESE of Gopalpur(Odisha) & 540 km ENE of Kalingapatnam(Andhra Pradesh).It is likely to intensify in to a Cyclonic Storm during next 06 hours.
    [Show full text]
  • Arunachal Pradesh
    Census of India 2011 ARUNACHAL PRADESH PART XII-B SERIES-13 DISTRICT CENSUS HANDBOOK ANJAW VILLAGE AND TOWN WISE PRIMARY CENSUS ABSTRACT (PCA) DIRECTORATE OF CENSUS OPERATIONS ARUNACHAL PRADESH ARUNACHAL PRADESH DISTRICT ANJAW H KILOMETRES 5 0 5 10 15 I I K Ta C T a m l l B a o p n R R . N . D u E r I t e t n Kala o n R g R. N. * K a zo Go M m K iyu hu u u o C Ch m r Th i T an D A e M N a c . h i . CHAGLAGAM D i R la e D KIBITHOO i I T o achi . r M a a R r u K a a H I N D Thu D shi I A R. S METENGLIANG Se Ti GOILIANG Y t a rei R. p B ak Ti WALONG J R a T n g S N h . N e - t n HAYULIANG u T T d i a u D m a G n u R d n T i T id T i d i i . n N g i R. U I A T h a H R S c - a li a e c C a Chik m u MANCHAL T h H i b T i L T oh l i i a t or i T m ellu T R . T Kam i i P u n T u n . g R la Ti L g HAWAI M n a w O o g Ti T an ith a K R.
    [Show full text]
  • Annual Operating Plan 2009-10 Outlay and Expenditure of Centrally Sponsored Schemes Including Fully Funded by Govt
    GOVERNMENT OF ARUNACHAL PRADESH ANNUAL OPERATING PLAN 2009 - 10 INDEX SL.NO CONTENTS PAGE-NO. 1 Basic features i - v 2 Abstract of Outlay and Expenditure 1 - 2 3 Outlay and Expinditure on Direction and Administration under Plan 3 4 Specific schemes with various components 4 5 District wise break up of Outlay 5 6 Physical Targets and Achievement 6 7 District wise break up of Physical targets and Achievement 7 8 Achievement of tenth Plan and Targets for Annual plan 2009-10 8 9 Statement of staff strength of the Department 9 - 10 10 Statement on proposal for New Posts 11 - 12 11 Expenditure and Outlays for salaries and wages 13 12 Statement on Vehicles 14 13 Details of on going scheme 15-35 14 Proposal for new schemes / services 36-70 15 Outlay & Expenditure of loan linked schemes 71-74 16 Earmarked schemes by Planning Commissioning 75-78 17 Centrally Sponsored Schemes (Financial) 79-83 18 Centrally Sponsored Schemes (Physical) 84-89 19 Furnishing information relaeted NEC, NLCPR scheme 90-92 20 On-going incomplete Projects funded under PM's Package 93-97 21 Details of Assets 98-99 GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER ANNUAL OPERATING PLAN FOR 2009 – 10 BASIC FEATURES The Plan Outlay of the Department of Power as allocated by State Planning Department for the financial year 2009-10 is Rs 5000.00 lakh (Rupees Five Thousand Lakh ) only including the earmarked schemes. The projected minimum resource requirement of the Department of Power for 2009-10 is Rs.37079.04 (Rupees Thirty Seven Thousand Seventy Nine Lakh and Four Thousand) only.
    [Show full text]
  • Annual Operating Plan 2008-09 Outlay and Expenditure of Centrally Sponsored Schemes Including Fully Funded by Govt
    GOVERNMENT OF ARUNACHAL PRADESH NO.CE(P)/EEZ/SP&C/AOP/08-09/4697-720 Dated 03/03/2009 ANNUAL OPERATING PLAN 2008 - 09 INDEX SL.NO CONTENTS PAGE-NO. 1 Basic features i - vi 2 Abstract of Outlay and Expenditure 1 - 2 3 Outlay and Expinditure on Direction and Administration under Plan 3 4 Specific schemes with various components 4 5 District wise break up of Outlay 5 6 Physical Targets and Achievement 6 7 District wise break up of Physical targets and Achievement 7 8 Achievement of tenth Plan and Targets for Annual plan 2008-09 8 9 Statement of staff strength of the Department 9 - 10 10 Statement on proposal for New Posts 11 - 18 11 Expenditure and Outlays for salaries and wages 19 12 Statement on Vehicles 20 13 Details of on going scheme 21-40 14 Proposal for new schemes / services 41-77 15 Outlay & Expenditure of loan linked schemes 78 - 81 16 Earmarked schemes by Planning Commissioning 82 - 85 17 Centrally Sponsored Schemes (Financial) 86 - 89 18 Centrally Sponsored Schemes (Physical) 90 - 95 19 Furnishing information relaeted NEC, NLCPR scheme 96 - 98 20 On-going incomplete Projects funded under PM's Package 99 - 103 21 Details of Assets and allocation under Maintenance 104-105 CE(P), EEZ, DoP, ITANAGAR GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER ANNUAL OPERATING PLAN FOR 2008 – 09 BASIC FEATURES The Plan Outlay of the Department of Power for financial year 2008 - 09 allocated by State Planning Department is Rs 12019.49 lakh (Rupees Twelve thousand Nineteen hundred lakh Forty Nine thousand) against the minimum requirement of Rs.
    [Show full text]
  • ORF Occasional Paper#42
    EARCH S F E O R U R N E D V A R T E I O S N B ORF OCCASIONAL PAPER #42 O MAY 2013 Sino-Indian Border Infrastructure: An Update Rajeswari Pillai Rajagopalan Rahul Prakash OBSERVER RESEARCH FOUNDATION Sino-Indian Border Infrastructure: An Update Rajeswari Pillai Rajagopalan Rahul Prakash OBSERVER RESEARCH FOUNDATION About the Authors Dr. Rajeswari Pillai Rajagopalan is Senior Fellow at the Observer Research Foundation (ORF), New Delhi. Dr. Rajagopalan joined ORF after an almost five-year stint at the National Security Council Secretariat (2003-2007), where she was an Assistant Director. Prior to joining the NSCS, she was Research Officer at the Institute of Defence Studies and Analyses, New Delhi. She was also a Visiting Professor at the Graduate Institute of International Politics, National Chung Hsing University, Taichung, Taiwan in early 2012. She is the author of three books: Clashing Titans: Military Strategy and Insecurity Among Asian Great Powers; The Dragon's Fire: Chinese Military Strategy and Its Implications for Asia; and Uncertain Eagle: US Military Strategy in Asia. Rahul Prakash is a Junior Fellow at Observer Research Foundation. His research interests include technology and security, Chemical, Biological, Radiological and Nuclear (CBRN) issues and security developments in Asia. He has co-authored a report on Chemical, Biological and Radiological Materials: An Analysis of Security Risks and Terrorist Threats in India, an outcome of a joint study conducted by ORF and the London-based Royal United Services Institute. He has also published Issue Briefs on China’s Progress in Space and Rise of Micro Blogs in China.
    [Show full text]
  • Annual Operating Plan 2010-11 (Plan and Proposals)
    GOVERNMENT OF ARUNACHAL PRADESH ANNUAL OPERATING PLAN 2010-11 (PLAN AND PROPOSALS) INTRODUCTION : - Consequent upon the Pre-SPB discussion held on 3rd June 2010, the State Planning Department vide its memo No.PD (P)-10/2010 Dated 12th July 2010 has communicated a revised sectoral allocation under unearmarked portion for 2010-11 for Power (T&D) sector as Rs. 12212.00 lakhs. The allocation under un earmarked portion during 2009-10 was Rs. 13903.79 lakhs against which the Department had incurred an actual expenditure of Rs.13863.47 lakhs. Allocation under SPA, ACA has also been indicated against various formats which are only indicative and has not been discussed in the SPB. Actual fund allocation shall be based on actual communication from the Planning Department during the year. The non plan allocation of the department received during 2009-10 which included one time specific allocation was Rs.14624.70 lakhs against which the Department had incurred an actual expenditure of Rs.14584.78 lakhs. The fund requirement of the Department for 2010-11 under Direction and Administration subhead of 2801 non plan is Rs. 13623.59 lakhs against which the State Planning Department vide their letter No. BT-339/2009/Pt. dated 6th April 2010 has made an allocation of Rs. 11662.66 lakhs. i The total fund allocation received during 2009-10 against Central Sector Schemes such as NLCPR, NEC, MNRE etc. was Rs.29998.28 lakhs against which the Department had incurred an actual expenditure of Rs.19123.60 lakhs. The requirement of fund by the Department towards the schemes being executed under above sub-heads during 2010-11 in order to complete the schemes within the stipulated time frame is Rs.
    [Show full text]
  • Rajya Sabha Debates
    54 Written Answers [RAJYA SABHA] to Unstarred Questions India visited the following countries : China, Bhutan, Japan, Sir Lanka, USA, France, Oman, Qatar, UK, Russian Federation, Italy, Egypt, Thailand, Trinidad & Tobago, Denmark, Saudi Arabia, Brazil, Canada, Malaysia, Vietnam, Republic of Korea, Belgium, Germany, Kazakhstan, Afghanistan, Ethiopia, Tanzania, Bangladesh, South Africa, Maldives, Indonesia and Singapore. During these visits and in his interaction with leaders of the countries concerned, the Prime Minister discussed various issues of mutual interest in the bilateral, regional and international areas. The Prime Minister also participated in multilateral and plurilateral Summits. Details of these are given in the Annexure [See Appendix 225 Annexure No. 9] Importance of Kibithu on Indo-China Border 2350. SHRI KUMAR DEEPAK DAS : Will the Minister of EXTERNAL AFFAIRS be pleased to state : (a) whether Kibithu on Indo-Chinese border in Arunachal Pradesh is the smoothest gateway to China; (b) whether Indian and Chinese armies are used to cozying up at Kibithu; (c) if so, whether there is any proposal towards affirming the mutual commitment of strengthening relations in the ongoing year of Friendship between the two nuclear nations; (d) whether Government would take any steps to develop the Tinsukia-Rima road in Yunnam province of China through Parasuramkunda, Hailayung. Walong and Kibithu for affirming the mutual commitment of strengthening friendship and commercial relation between India and China; and (e) if not, the reasons therefor?
    [Show full text]
  • New Easterly Locations of Impeyan Monal Lophophorus Impejanus from Arunachal Pradesh
    Kumar: Bird records on an oil exploration vessel More visitors … in is a mystery, for they are widespread residents of the Indian On day four, being the last day on the ship, I was up early and Subcontinent. was scanning the vast open seascape hoping to see pelagic birds. Later that afternoon, while waiting for the chopper to arrive The many leaf-warblers seen the previous day appeared to have for my return to the mainland, I spotted a yellow-coloured bird at gone except for a lone Greenish Leaf-Warbler that was still on around 1540 hrs, flying up from the ship and perching on top of deck. There was neither any sign of the rail nor the waterhens; a tall pole. As if the list of surprises was not enough, here was yet maybe they were still there among the heavy machinery at the another addition—a male Black-naped Oriole Oriolus chinensis, a rear end of the ship. The pipit was still there. There now appeared resident of the Andaman and Nicobar Islands, and a winter visitor to be another pipit, though slightly larger, and paler, but could to the mainland. not identify it. At around 0800 hrs a very familiar-looking bird From the number of birds recorded on the ship it appeared that flew out from the side of the ship. It was the Indian Pond Heron the ship was an important refueling point for them. I still wonder Ardeola grayii, yet another bird to the list of surprises. However, why terrestrial birds would fly 100 km into the Bay of Bengal, that was not all, a little later I heard screeching calls coming from away from the mainland, or nearly 900 km from the northern atop a tall pole near the deck.
    [Show full text]
  • Godlewski's Bunting Emberiza Godlewskii In
    SHARMA ET AL.: Godlewski’s Bunting 49 Godlewski’s Bunting Emberiza godlewskii in Arunachal Pradesh: A first breeding record for the Indian Subcontinent and review of its status in the region Manoj Sharma, Harkirat Singh Sangha & Atul Jain Sharma, M., Sangha, H. S., & Jain, A., 2014. Godlewski’s Bunting Emberiza godlewski in Arunachal Pradesh: A first breeding record for the Indian Subcontinent and review of its status in the region. Indian BIRDS 9 (2): 49–51. Manoj Sharma, Village Shankarpur, Ramnagar, District Nainital, Uttarakhand 244715, India. Email: [email protected] Harkirat Singh Sangha, B-27, Gautam Marg, Hanuman Nagar, Jaipur 302021, India. Email: [email protected] Atul Jain, D-127, Sarita Vihar, New Delhi 110076, India. Email: [email protected] Manuscript received on 28 July 2013. n 07 May 2013, at 0505 hrs we came across a bunting shows a clear-cut contrast between rufous belly and grey breast perched on an electric cable along the road from Walong (Pic.XX1), sandy-brown mantle boldly streaked with black, bright Oto Kibithu, close to Dong village (28°10’N, 97°01’E, c. chestnut scapulars, black tertials, rufous rump, and pinkish-brown 1225m asl), Anjaw district, Arunachal Pradesh, India [61].The feet (Byers et al. 1996). The tail is described by del Hoyo et al. first photographs, taken in light drizzle and poor light conditions, (2011) as, ‘blackish, central feather pair with thin rufous edges, showed it to be similar to Rock Bunting Emberiza cia. As that outer pair with white on one or both webs.’ As per Bayer et al.
    [Show full text]
  • Government of India Ministry of Environment, Forest and Climate Change
    GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO. 3187 TO BE ANSWERED ON 05.01.2018 Allocation of Funds under CAMPA 3187. SHRI NINONG ERING: Will the Minister of ENVIRONMENT, FOREST AND CLIMATE CHANGE be pleased to State: (a) whether the information on fund allocation and expenditure incurred under Compensatory Afforestation Fund Management and Planning Authority (CAMPA) scheme till last financial year is in public domain and if so, the details thereof and if not, the reasons therefor; (b) whether the Government has received the Annual Plan of Operation of Arunachal Pradesh for the last three years and if so, the details thereof and the action taken by the Government thereon; (c) the details of net Present Value amount received from Arunachal Pradesh according to the fixed rates during each of the last three years; (d) whether there is a huge difference in the net accumulation and disbursement ratio of CAMPA funds to various States / UTs and if so, the details thereof and the reasons therefor; (e) the details of amount collected under CAMPA scheme and amount spent for plantation activity and infrastructure purposes; and (f) the details / dimension of forest land area diverted for non forest purposes in Arunachal Pradesh? ANSWER MINISTER OF STATE IN THE MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE (DR. MAHESH SHARMA) (a) Yes Madam. The details of the releases are sent to the Nodal officer of State CAMPA which is a public document. (b) Yes Madam, the combined Annual Plan of Operation (APO) for the year 2014-15, 2015-16 and 2016-17 have been received with the total outlay of Rs.
    [Show full text]