2003-04 Public Sector Asset >> Investment Program

Budget Information Paper No.1 Presented by the Honourable John Brumby MP Treasurer of the State of The Secretary Department of Treasury and Finance 1 Treasury Place MELBOURNE VICTORIA 3002 AUSTRALIA

Telephone: +61 3 9651 5111 Facsimile: +61 3 9651 5298 Website: www.dtf.vic.gov.au

This publication makes reference to the 2003-04 Budget Paper set which includes: Budget Paper No 1 - Treasurer's Speech Budget Paper No 2 - Budget Statement Budget Paper No 3 - Budget Estimates Budget Overview.

Published by the Department of Treasury and Finance Copyright State of Victoria 2003

This book is copyright. No part may be reproduced by any process except in accordance with the provisions of the Copyright Act. ISSN 1 441-3787 Published September 2003 by authority

Public Sector Public Sector Public Sector Asset Investment Program Asset Investment Program Asset Investment Program 2003-04 2003-04 2003-04

Presented by Presented by Presented by The Honourable John Brumby, M.P. The Honourable John Brumby, M.P. The Honourable John Brumby, M.P. Treasurer of the State of Victoria Treasurer of the State of Victoria Treasurer of the State of Victoria for the information of Honourable Members for the information of Honourable Members for the information of Honourable Members

Budget Information Paper No. 1 Budget Information Paper No. 1 Budget Information Paper No. 1

TABLE OF CONTENTS TABLE OF CONTENTS TABLE OF CONTENTS

Introduction ...... 1 Introduction ...... 1 Introduction ...... 1 Coverage...... 1 Coverage...... 1 Coverage...... 1 Assets ...... 2 Assets ...... 2 Assets ...... 2 Chapter One: Public Sector Asset Investment Program 2003-04 – Summary ...... 3 Chapter One: Public Sector Asset Investment Program 2003-04 – Summary ...... 3 Chapter One: Public Sector Asset Investment Program 2003-04 – Summary ...... 3 2003-04 asset investment initiatives...... 3 2003-04 asset investment initiatives...... 3 2003-04 asset investment initiatives...... 3 General government sector asset investment ...... 6 General government sector asset investment ...... 6 General government sector asset investment ...... 6 Major public non-financial corporations asset investments ...... 14 Major public non-financial corporations asset investments ...... 14 Major public non-financial corporations asset investments ...... 14 Private sector investment in State infrastructure...... 17 Private sector investment in State infrastructure...... 17 Private sector investment in State infrastructure...... 17 Chapter Two: General Government Sector Asset Investment Program 2003-04...... 19 Chapter Two: General Government Sector Asset Investment Program 2003-04...... 19 Chapter Two: General Government Sector Asset Investment Program 2003-04...... 19 Department of Education and Training ...... 19 Department of Education and Training ...... 19 Department of Education and Training ...... 19 Department of Human Services...... 38 Department of Human Services...... 38 Department of Human Services...... 38 Department of Infrastructure...... 41 Department of Infrastructure...... 41 Department of Infrastructure...... 41 Department of Innovation, Industry and Regional Development...... 47 Department of Innovation, Industry and Regional Development...... 47 Department of Innovation, Industry and Regional Development...... 47 Department of Justice ...... 48 Department of Justice ...... 48 Department of Justice ...... 48 Department of Premier and Cabinet ...... 52 Department of Premier and Cabinet ...... 52 Department of Premier and Cabinet ...... 52 Department of Primary Industries...... 54 Department of Primary Industries...... 54 Department of Primary Industries...... 54 Department of Sustainability and Environment...... 56 Department of Sustainability and Environment...... 56 Department of Sustainability and Environment...... 56 Department of Treasury and Finance ...... 59 Department of Treasury and Finance ...... 59 Department of Treasury and Finance ...... 59 Department for Victorian Communities...... 60 Department for Victorian Communities...... 60 Department for Victorian Communities...... 60 Parliament ...... 61 Parliament ...... 61 Parliament ...... 61 Country Fire Authority ...... 62 Country Fire Authority ...... 62 Country Fire Authority ...... 62 Metropolitan Fire and Emergency Services Board...... 65 Metropolitan Fire and Emergency Services Board...... 65 Metropolitan Fire and Emergency Services Board...... 65 Chapter Three: Major Public Non-Financial Corporations Asset Investment Chapter Three: Major Public Non-Financial Corporations Asset Investment Chapter Three: Major Public Non-Financial Corporations Asset Investment Program 2003-04 by Agency ...... 67 Program 2003-04 by Agency ...... 67 Program 2003-04 by Agency ...... 67 Gippsland and Southern Rural Water Authority...... 67 Gippsland and Southern Rural Water Authority...... 67 Gippsland and Southern Rural Water Authority...... 67 Goulburn-Murray Rural Water Authority ...... 71 Goulburn-Murray Rural Water Authority ...... 71 Goulburn-Murray Rural Water Authority ...... 71 Office of Housing...... 79 Office of Housing...... 79 Office of Housing...... 79 Regional Urban Water Authorities ...... 82 Regional Urban Water Authorities ...... 82 Regional Urban Water Authorities ...... 82 Sunraysia Rural Water Authority ...... 119 Sunraysia Rural Water Authority ...... 119 Sunraysia Rural Water Authority ...... 119 Wimmera Mallee Water Authority...... 121 Wimmera Mallee Water Authority...... 121 Wimmera Mallee Water Authority...... 121 Appendix A: Contact Addresses and Telephone Numbers ...... 123 Appendix A: Contact Addresses and Telephone Numbers ...... 123 Appendix A: Contact Addresses and Telephone Numbers ...... 123 General Government Sector...... 123 General Government Sector...... 123 General Government Sector...... 123 Public Trading Enterprises ...... 124 Public Trading Enterprises ...... 124 Public Trading Enterprises ...... 124 Appendix B: Location Index...... 127 Appendix B: Location Index...... 127 Appendix B: Location Index...... 127

i i i

INTRODUCTION INTRODUCTION INTRODUCTION

COVERAGE COVERAGE COVERAGE The 2003-04 Public Sector Asset Investment Program – Budget Information Paper No. 1 The 2003-04 Public Sector Asset Investment Program – Budget Information Paper No. 1 The 2003-04 Public Sector Asset Investment Program – Budget Information Paper No. 1 (BIP1) lists major asset investments in 2003-04 for the general government sector and (BIP1) lists major asset investments in 2003-04 for the general government sector and (BIP1) lists major asset investments in 2003-04 for the general government sector and major public non-financial corporations (PNFCs). For each entity, projects are listed as major public non-financial corporations (PNFCs). For each entity, projects are listed as major public non-financial corporations (PNFCs). For each entity, projects are listed as either ‘existing projects’ or ‘new projects for commencement in 2003-04’. either ‘existing projects’ or ‘new projects for commencement in 2003-04’. either ‘existing projects’ or ‘new projects for commencement in 2003-04’. The general government sector asset investment projects published in this document The general government sector asset investment projects published in this document The general government sector asset investment projects published in this document support the outputs detailed in 2003-04 Budget Estimates – Budget Paper No. 3 and support the outputs detailed in 2003-04 Budget Estimates – Budget Paper No. 3 and support the outputs detailed in 2003-04 Budget Estimates – Budget Paper No. 3 and reflects the machinery of government changes announced in December 2002. Projected reflects the machinery of government changes announced in December 2002. Projected reflects the machinery of government changes announced in December 2002. Projected asset investment expenditure on individual projects for 2003-04 and beyond takes into asset investment expenditure on individual projects for 2003-04 and beyond takes into asset investment expenditure on individual projects for 2003-04 and beyond takes into account estimated investment activity to 30 June 2003. account estimated investment activity to 30 June 2003. account estimated investment activity to 30 June 2003. Asset investment listings are provided for asset intensive PNFCs. Summary information Asset investment listings are provided for asset intensive PNFCs. Summary information Asset investment listings are provided for asset intensive PNFCs. Summary information is provided for a number of significant corporations. Major public sector asset investment is provided for a number of significant corporations. Major public sector asset investment is provided for a number of significant corporations. Major public sector asset investment projects being delivered under Partnerships Victoria during 2003-04 are summarised in projects being delivered under Partnerships Victoria during 2003-04 are summarised in projects being delivered under Partnerships Victoria during 2003-04 are summarised in Chapter 1, Public Sector Asset Investment Program 2003-04 – Summary. Chapter 1, Public Sector Asset Investment Program 2003-04 – Summary. Chapter 1, Public Sector Asset Investment Program 2003-04 – Summary. Minor asset investments, where the total estimated investment is less than $100 000 or Minor asset investments, where the total estimated investment is less than $100 000 or Minor asset investments, where the total estimated investment is less than $100 000 or where projects are funded from ongoing minor works allocations, are not listed. The where projects are funded from ongoing minor works allocations, are not listed. The where projects are funded from ongoing minor works allocations, are not listed. The exclusion of these means that the sum of agency investment totals in this document may exclusion of these means that the sum of agency investment totals in this document may exclusion of these means that the sum of agency investment totals in this document may differ from total general government sector fixed asset investment, as reported in the differ from total general government sector fixed asset investment, as reported in the differ from total general government sector fixed asset investment, as reported in the 2003-04 Budget Statement – Budget Paper No. 2 and summarised in Chapter 1 of this 2003-04 Budget Statement – Budget Paper No. 2 and summarised in Chapter 1 of this 2003-04 Budget Statement – Budget Paper No. 2 and summarised in Chapter 1 of this document. document. document.

Public Sector Asset Investment Program 2003-04 Introduction 1 Public Sector Asset Investment Program 2003-04 Introduction 1 Public Sector Asset Investment Program 2003-04 Introduction 1

ASSETS ASSETS For the purposes of this publication, assets are non-current physical assets, typically For the purposes of this publication, assets are non-current physical assets, typically infrastructure assets. Infrastructure assets provide services used in the production of final infrastructure assets. Infrastructure assets provide services used in the production of final services or products. services or products. The State’s road and technology networks, railway systems, school facilities and hospital The State’s road and technology networks, railway systems, school facilities and hospital complexes are all examples of infrastructure assets. Also included in the State’s asset complexes are all examples of infrastructure assets. Also included in the State’s asset portfolio are water storage and distribution infrastructure, correctional centres, portfolio are water storage and distribution infrastructure, correctional centres, courtrooms, certain heritage assets (e.g. historic museum collections) and other public courtrooms, certain heritage assets (e.g. historic museum collections) and other public assets such as reserves, parks and public open spaces. assets such as reserves, parks and public open spaces.

2 Introduction Public Sector Asset Investment Program 2003-04 2 Introduction Public Sector Asset Investment Program 2003-04

CHAPTER ONE: PUBLIC SECTOR ASSET INVESTMENT CHAPTER ONE: PUBLIC SECTOR ASSET INVESTMENT CHAPTER ONE: PUBLIC SECTOR ASSET INVESTMENT PROGRAM 2003-04 – SUMMARY PROGRAM 2003-04 – SUMMARY PROGRAM 2003-04 – SUMMARY

The public sector asset investment program includes projects that will either increase the The public sector asset investment program includes projects that will either increase the The public sector asset investment program includes projects that will either increase the service capacity or sustain the existing service capacity of assets to meet the priority service capacity or sustain the existing service capacity of assets to meet the priority service capacity or sustain the existing service capacity of assets to meet the priority needs of all Victorians. This chapter highlights major strategic asset investments, outlines needs of all Victorians. This chapter highlights major strategic asset investments, outlines needs of all Victorians. This chapter highlights major strategic asset investments, outlines the specific allocation of the Growing Victoria infrastructure reserve, summarises the the specific allocation of the Growing Victoria infrastructure reserve, summarises the the specific allocation of the Growing Victoria infrastructure reserve, summarises the asset investments of the general government sector and major public non-financial asset investments of the general government sector and major public non-financial asset investments of the general government sector and major public non-financial corporations and highlights public-private partnership projects. corporations and highlights public-private partnership projects. corporations and highlights public-private partnership projects.

2003-04 ASSET INVESTMENT INITIATIVES 2003-04 ASSET INVESTMENT INITIATIVES 2003-04 ASSET INVESTMENT INITIATIVES The 2003-04 Budget invested in Victoria’s future, delivering high living standards, high The 2003-04 Budget invested in Victoria’s future, delivering high living standards, high The 2003-04 Budget invested in Victoria’s future, delivering high living standards, high quality jobs and strong economic growth. quality jobs and strong economic growth. quality jobs and strong economic growth. The 2003-04 Budget provided funding for the commencement of new infrastructure The 2003-04 Budget provided funding for the commencement of new infrastructure The 2003-04 Budget provided funding for the commencement of new infrastructure investment projects with a total estimated investment (TEI) of $1 244 million (including investment projects with a total estimated investment (TEI) of $1 244 million (including investment projects with a total estimated investment (TEI) of $1 244 million (including $180 million announced in the 2002-03 Budget Update). This includes funding (with a $180 million announced in the 2002-03 Budget Update). This includes funding (with a $180 million announced in the 2002-03 Budget Update). This includes funding (with a TEI of $540 million) to meet the Government’s Labor’s Financial Statement 2002 TEI of $540 million) to meet the Government’s Labor’s Financial Statement 2002 TEI of $540 million) to meet the Government’s Labor’s Financial Statement 2002 election commitments. election commitments. election commitments. The scale of the 2003-04 infrastructure program, and the scope and nature of projects The scale of the 2003-04 infrastructure program, and the scope and nature of projects The scale of the 2003-04 infrastructure program, and the scope and nature of projects approved, demonstrates the Government’s commitment to promoting economic, social approved, demonstrates the Government’s commitment to promoting economic, social approved, demonstrates the Government’s commitment to promoting economic, social and environmental development across the whole State. Over the next two years and environmental development across the whole State. Over the next two years and environmental development across the whole State. Over the next two years expenditure on infrastructure investment is expected to total over $5.0 billion. expenditure on infrastructure investment is expected to total over $5.0 billion. expenditure on infrastructure investment is expected to total over $5.0 billion.

Public Sector Asset Investment Program 2003-04 Chapter One 3 Public Sector Asset Investment Program 2003-04 Chapter One 3 Public Sector Asset Investment Program 2003-04 Chapter One 3

Major strategic asset investments announced in the 2003-04 Budget include: Major strategic asset investments announced in the 2003-04 Budget include: S $357 million TEI, to ensure the provision of high quality, accessible health and S $357 million TEI, to ensure the provision of high quality, accessible health and

community services, including; community services, including; - $139 million for upgrading and integrating ICT systems across public hospitals - $139 million for upgrading and integrating ICT systems across public hospitals and agencies; and and agencies; and - $29 million for new radiotherapy equipment; - $29 million for new radiotherapy equipment; S $273 million TEI, to grow and link all of Victoria through building effective road, S $273 million TEI, to grow and link all of Victoria through building effective road, rail, bus and port infrastructure, including; rail, bus and port infrastructure, including;

- $121 million towards the construction of the Pakenham Bypass; - $121 million towards the construction of the Pakenham Bypass; S $137 million TEI, to value and invest in lifelong education, including; S $137 million TEI, to value and invest in lifelong education, including;

- $107 million for new schools and upgrades across the State; - $107 million for new schools and upgrades across the State; S $121 million TEI, to promote sustainable development and protect the environment S $121 million TEI, to promote sustainable development and protect the environment for future generations, including; for future generations, including;

- $53 million to conserve water resources through the Victorian Water Trust; and - $53 million to conserve water resources through the Victorian Water Trust; and S $56 million towards facilities for the 2006 Commonwealth Games. S $56 million towards facilities for the 2006 Commonwealth Games.

Growing Victoria Infrastructure Reserve Growing Victoria Infrastructure Reserve The Government recognises that building effective infrastructure is essential for The Government recognises that building effective infrastructure is essential for delivering improved services and promoting growth across the whole State. In line with delivering improved services and promoting growth across the whole State. In line with this objective, in the 2000-01 Budget the Government established the $1 billion Growing this objective, in the 2000-01 Budget the Government established the $1 billion Growing Victoria infrastructure reserve. Since then, the Government has allocated an additional Victoria infrastructure reserve. Since then, the Government has allocated an additional $575 million to the Growing Victoria infrastructure reserve to fund investments of $575 million to the Growing Victoria infrastructure reserve to fund investments of considerable social, economic and environmental benefit to the State. Asset investment considerable social, economic and environmental benefit to the State. Asset investment financed from the Growing Victoria infrastructure reserve will significantly boost financed from the Growing Victoria infrastructure reserve will significantly boost infrastructure development in the medium term from a strong base level. infrastructure development in the medium term from a strong base level. The primary focus of the Growing Victoria infrastructure reserve has been on: The primary focus of the Growing Victoria infrastructure reserve has been on: S major transport infrastructure projects – Linking Victoria; S major transport infrastructure projects – Linking Victoria; S significant modernisation programs in education and training – Skilling Victoria; and S significant modernisation programs in education and training – Skilling Victoria; and S Information and Communication Technology facilities and capabilities – Connecting S Information and Communication Technology facilities and capabilities – Connecting Victoria. Victoria. The specific allocation of the Growing Victoria infrastructure reserve is detailed in The specific allocation of the Growing Victoria infrastructure reserve is detailed in Table 1.1. Table 1.1.

4 Chapter One Public Sector Asset Investment Program 2003-04 4 Chapter One Public Sector Asset Investment Program 2003-04

Table 1.1: Growing Victoria infrastructure reserve – funding by project Table 1.1: Growing Victoria infrastructure reserve – funding by project Table 1.1: Growing Victoria infrastructure reserve – funding by project ($ million) ($ million) ($ million) Project 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 TEI (a) Project 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 TEI (a) Project 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 TEI (a) Actual Revised Budget Estimate Estimate Estimate from GV Actual Revised Budget Estimate Estimate Estimate from GV Actual Revised Budget Estimate Estimate Estimate from GV

Linking Victoria Linking Victoria Linking Victoria Fast rail links to regional centres Fast rail links to regional centres Fast rail links to regional centres 3.0 110.9 398.0 56.9 4.5 .. 573.3 3.0 110.9 398.0 56.9 4.5 .. 573.3 3.0 110.9 398.0 56.9 4.5 .. 573.3 (DOI) (b) (DOI) (b) (DOI) (b) Total allocated to Linking Total allocated to Linking Total allocated to Linking 3.0 110.9 398.0 56.9 4.5 .. 573.3 3.0 110.9 398.0 56.9 4.5 .. 573.3 3.0 110.9 398.0 56.9 4.5 .. 573.3 Victoria Victoria Victoria

Skilling Victoria Skilling Victoria Skilling Victoria Modernisation/upgrade of facilities Modernisation/upgrade of facilities Modernisation/upgrade of facilities 53.0 ...... 110.0 53.0 ...... 110.0 53.0 ...... 110.0 – schools (DE&T) (c) – schools (DE&T) (c) – schools (DE&T) (c) Innovating Victoria: Enhanced Innovating Victoria: Enhanced Innovating Victoria: Enhanced learning environments – schools 23.7 50.5 15.8 ...... 90.0 learning environments – schools 23.7 50.5 15.8 ...... 90.0 learning environments – schools 23.7 50.5 15.8 ...... 90.0 (DE&T) (DE&T) (DE&T) Innovating Victoria: Enhanced Innovating Victoria: Enhanced Innovating Victoria: Enhanced learning environments – TAFE 4.8 13.3 25.0 1.9 .. .. 45.0 learning environments – TAFE 4.8 13.3 25.0 1.9 .. .. 45.0 learning environments – TAFE 4.8 13.3 25.0 1.9 .. .. 45.0 (DE&T) (DE&T) (DE&T) Education precinct in Gippsland Education precinct in Gippsland Education precinct in Gippsland .. 1.2 9.3 ...... 10.5 .. 1.2 9.3 ...... 10.5 .. 1.2 9.3 ...... 10.5 (DE&T) (DE&T) (DE&T) Ballarat Vocational Education and Ballarat Vocational Education and Ballarat Vocational Education and .. 0.4 4.6 ...... 5.0 .. 0.4 4.6 ...... 5.0 .. 0.4 4.6 ...... 5.0 Training Centre (DE&T) Training Centre (DE&T) Training Centre (DE&T) Modernisation of facilities – Modernisation of facilities – Modernisation of facilities – Maryborough education precinct 0.1 0.4 0.1 ...... 0.6 Maryborough education precinct 0.1 0.4 0.1 ...... 0.6 Maryborough education precinct 0.1 0.4 0.1 ...... 0.6 (DE&T) (DE&T) (DE&T) Australian College of Wine (DE&T) 3.6 1.5 2.3 ...... 7.4 Australian College of Wine (DE&T) 3.6 1.5 2.3 ...... 7.4 Australian College of Wine (DE&T) 3.6 1.5 2.3 ...... 7.4 Bacchus Marsh Science and Bacchus Marsh Science and Bacchus Marsh Science and .. 0.2 3.8 ...... 4.0 .. 0.2 3.8 ...... 4.0 .. 0.2 3.8 ...... 4.0 Technology Centre (DE&T) Technology Centre (DE&T) Technology Centre (DE&T) Gene Technology Access Centre Gene Technology Access Centre Gene Technology Access Centre 0.1 1.5 2.6 ...... 4.2 0.1 1.5 2.6 ...... 4.2 0.1 1.5 2.6 ...... 4.2 (DE&T) (DE&T) (DE&T) Space Science Education Centre Space Science Education Centre Space Science Education Centre 0.2 0.1 6.1 ...... 6.4 0.2 0.1 6.1 ...... 6.4 0.2 0.1 6.1 ...... 6.4 (DE&T) (DE&T) (DE&T) Science innovation and education Science innovation and education Science innovation and education precincts across regional Victoria 5.1 22.2 22.7 ...... 50.0 precincts across regional Victoria 5.1 22.2 22.7 ...... 50.0 precincts across regional Victoria 5.1 22.2 22.7 ...... 50.0 (DPI) (DPI) (DPI) Total allocated to Skilling Total allocated to Skilling Total allocated to Skilling 90.6 91.3 92.3 1.9 .. .. 333.1 90.6 91.3 92.3 1.9 .. .. 333.1 90.6 91.3 92.3 1.9 .. .. 333.1 Victoria Victoria Victoria

Connecting Victoria Connecting Victoria Connecting Victoria E-Government – redevelopment of E-Government – redevelopment of E-Government – redevelopment of 1.0 1.0 2.0 ...... 4.0 1.0 1.0 2.0 ...... 4.0 1.0 1.0 2.0 ...... 4.0 vic.gov.au portal (DOI) vic.gov.au portal (DOI) vic.gov.au portal (DOI) Modernisation of school facilities Modernisation of school facilities Modernisation of school facilities 21.1 16.4 2.5 ...... 40.0 21.1 16.4 2.5 ...... 40.0 21.1 16.4 2.5 ...... 40.0 to incorporate ICT (DE&T) to incorporate ICT (DE&T) to incorporate ICT (DE&T) Broadband ICT delivery Broadband ICT delivery Broadband ICT delivery 4.6 14.4 ...... 19.0 4.6 14.4 ...... 19.0 4.6 14.4 ...... 19.0 infrastructure for TAFE (DE&T) infrastructure for TAFE (DE&T) infrastructure for TAFE (DE&T) Regional telecommunications Regional telecommunications Regional telecommunications .. 2.7 0.3 ...... 3.0 .. 2.7 0.3 ...... 3.0 .. 2.7 0.3 ...... 3.0 infrastructure (DSE) infrastructure (DSE) infrastructure (DSE)

Public Sector Asset Investment Program 2003-04 Chapter One 5 Public Sector Asset Investment Program 2003-04 Chapter One 5 Public Sector Asset Investment Program 2003-04 Chapter One 5

Table 1.1 (cont): Growing Victoria infrastructure reserve – funding by project Table 1.1 (cont): Growing Victoria infrastructure reserve – funding by project ($ million) ($ million) Project 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 TEI (a) Project 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 TEI (a) Actual Revised Budget Estimate Estimate Estimate from GV Actual Revised Budget Estimate Estimate Estimate from GV Bridging the Digital Divide Bridging the Digital Divide 16.2 3.7 3.1 ...... 23.0 16.2 3.7 3.1 ...... 23.0 (DE&T) (DE&T) Information and communication Information and communication technology strategy for health 7.6 8.6 13.8 ...... 30.0 technology strategy for health 7.6 8.6 13.8 ...... 30.0 care (DHS) care (DHS) Land titles automation project Land titles automation project 10.5 .. 7.7 ...... 18.2 10.5 .. 7.7 ...... 18.2 (DSE) (DSE) Information technology Information technology document management centre 0.7 4.1 ...... 4.8 document management centre 0.7 4.1 ...... 4.8 (DSE) (DSE) Total allocated to Connecting Total allocated to Connecting 61.7 50.9 29.4 ...... 142.0 61.7 50.9 29.4 ...... 142.0 Victoria Victoria

Other asset projects (d) .. 315.0 211.6 ...... 526.6 Other asset projects (d) .. 315.0 211.6 ...... 526.6 Total Growing Victoria Total Growing Victoria 155.3 568.1 731.3 58.8 4.5 .. 1 575.0 155.3 568.1 731.3 58.8 4.5 .. 1 575.0 allocation to date (b) allocation to date (b) Unallocated .. Unallocated .. Total Growing Victoria Total Growing Victoria 1 575.0 1 575.0 infrastructure reserve infrastructure reserve Source: Department of Treasury and Finance Source: Department of Treasury and Finance Notes: Notes: (a) Total estimated investment. (a) Total estimated investment. (b) Total allocation for Growing Victoria exceeds TEI ($556.9 million) due to savings generated beyond (b) Total allocation for Growing Victoria exceeds TEI ($556.9 million) due to savings generated beyond 2005-06. 2005-06. (c) Total estimated investment includes $57 million expenditure in 2000-01. (c) Total estimated investment includes $57 million expenditure in 2000-01. (d) Allocated to fund projects approved as part of the asset program generally. (d) Allocated to fund projects approved as part of the asset program generally.

GENERAL GOVERNMENT SECTOR ASSET INVESTMENT GENERAL GOVERNMENT SECTOR ASSET INVESTMENT The Victorian Government manages an extensive range of public assets, valued at The Victorian Government manages an extensive range of public assets, valued at $46.5 billion at 30 June 2002. The 2003-04 Budget revised estimate for net assets at $46.5 billion at 30 June 2002. The 2003-04 Budget revised estimate for net assets at 30 June 2003 is $47.4 billion. The projected increase in total assets of $944 million is 30 June 2003 is $47.4 billion. The projected increase in total assets of $944 million is mainly due to significant increases in infrastructure expenditure (including projects to be mainly due to significant increases in infrastructure expenditure (including projects to be funded by the Growing Victoria infrastructure reserve), partly offset by reductions in funded by the Growing Victoria infrastructure reserve), partly offset by reductions in financial assets held. financial assets held.

6 Chapter One Public Sector Asset Investment Program 2003-04 6 Chapter One Public Sector Asset Investment Program 2003-04

In the 2003-04 Budget, total general government sector investment in the purchase of In the 2003-04 Budget, total general government sector investment in the purchase of In the 2003-04 Budget, total general government sector investment in the purchase of fixed assets, including capital contributions to public trading enterprises, was fixed assets, including capital contributions to public trading enterprises, was fixed assets, including capital contributions to public trading enterprises, was $2 130 million. Since the 2003-04 Budget, investment in purchase of fixed assets has $2 130 million. Since the 2003-04 Budget, investment in purchase of fixed assets has $2 130 million. Since the 2003-04 Budget, investment in purchase of fixed assets has been adjusted for project funding carryovers from 2002-03 and is now estimated at been adjusted for project funding carryovers from 2002-03 and is now estimated at been adjusted for project funding carryovers from 2002-03 and is now estimated at $2 211 million in 2003-04. $2 211 million in 2003-04. $2 211 million in 2003-04. The composition of total general government sector infrastructure investment by The composition of total general government sector infrastructure investment by The composition of total general government sector infrastructure investment by departments in 2003-04 is summarised in Chart 1.1. departments in 2003-04 is summarised in Chart 1.1. departments in 2003-04 is summarised in Chart 1.1.

Chart 1.1: Composition of asset investment by department 2003-04 Chart 1.1: Composition of asset investment by department 2003-04 Chart 1.1: Composition of asset investment by department 2003-04

Sustainability and Primary Other General Sustainability and Primary Other General Sustainability and Primary Other General Environment Industries Justice Government Environment Industries Justice Government Environment Industries Justice Government 5% 4% 8% Sector Agencies 5% 4% 8% Sector Agencies 5% 4% 8% Sector Agencies 3% 3% 3% Education and Education and Education and Training Training Training 21% 21% 21%

Infrastructure Infrastructure Infrastructure 33% 33% 33% Human Services Human Services Human Services 18% Other(a) 18% Other(a) 18% Other(a) 8% 8% 8%

Source: Department of Treasury and Finance Source: Department of Treasury and Finance Source: Department of Treasury and Finance Note: Note: Note: (a) Includes asset investments by the Department of Premier and Cabinet, Department of Treasury and (a) Includes asset investments by the Department of Premier and Cabinet, Department of Treasury and (a) Includes asset investments by the Department of Premier and Cabinet, Department of Treasury and Finance, Parliament, Department of Innovation, Industry and Regional Development and the Finance, Parliament, Department of Innovation, Industry and Regional Development and the Finance, Parliament, Department of Innovation, Industry and Regional Development and the Department for Victorian Communities. Department for Victorian Communities. Department for Victorian Communities.

Public Sector Asset Investment Program 2003-04 Chapter One 7 Public Sector Asset Investment Program 2003-04 Chapter One 7 Public Sector Asset Investment Program 2003-04 Chapter One 7

Table 1.2 summarises projected investment in 2003-04 on direct additions to public Table 1.2 summarises projected investment in 2003-04 on direct additions to public assets by department. The table covers both new projects announced in the 2003-04 assets by department. The table covers both new projects announced in the 2003-04 Budget and projects previously underway. It includes those projects which are funded by Budget and projects previously underway. It includes those projects which are funded by way of State and Commonwealth funds. The table excludes projects under $100 000 but way of State and Commonwealth funds. The table excludes projects under $100 000 but includes certain capital contributions to other government sectors, particularly rail, and includes certain capital contributions to other government sectors, particularly rail, and therefore the total estimated expenditure for 2003-04 differs from total infrastructure therefore the total estimated expenditure for 2003-04 differs from total infrastructure investment of $2 211 million illustrated in Chart 1.1. Details of these projects by investment of $2 211 million illustrated in Chart 1.1. Details of these projects by department are set out in Chapter 2, General Government Sector Asset Investment department are set out in Chapter 2, General Government Sector Asset Investment Program 2003-04. Program 2003-04.

Table 1.2: General government asset investment program 2003-04 – summary(a) Table 1.2: General government asset investment program 2003-04 – summary(a) ($ million) ($ million) Department Total Estimated Estimated Remaining Department Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Investment 30.6.2003 (b) 2003-04 Investment 30.6.2003 (b) 2003-04 Education and Training Education and Training Existing Projects 541.2 287.2 240.0 14.0 Existing Projects 541.2 287.2 240.0 14.0 New Projects (c) 210.5 19.8 109.5 81.3 New Projects (c) 210.5 19.8 109.5 81.3 Human Services Human Services Existing Projects 883.5 447.1 216.6 219.8 Existing Projects 883.5 447.1 216.6 219.8 New Projects 356.7 .. 87.4 269.3 New Projects 356.7 .. 87.4 269.3 Infrastructure Infrastructure Existing Projects (d) (e) 1 795.1 605.1 576.8 613.1 Existing Projects (d) (e) 1 795.1 605.1 576.8 613.1 New Projects 471.2 .. 108.9 362.3 New Projects 471.2 .. 108.9 362.3 Innovation Industry and Regional Development Innovation Industry and Regional Development Existing Projects 197.2 23.6 65.8 107.8 Existing Projects 197.2 23.6 65.8 107.8 New Projects 21.9 .. 7.2 14.7 New Projects 21.9 .. 7.2 14.7 Justice Justice Existing Projects (d) (e) 523.2 233.2 122.6 167.4 Existing Projects (d) (e) 523.2 233.2 122.6 167.4 New Projects 124.3 .. 30.2 94.1 New Projects 124.3 .. 30.2 94.1 Premier and Cabinet Premier and Cabinet Existing Projects 748.9 597.9 93.1 57.9 Existing Projects 748.9 597.9 93.1 57.9 New Projects 6.2 .. 6.2 .. New Projects 6.2 .. 6.2 .. Primary Industries Primary Industries Existing Projects (d) 181.0 40.2 111.4 29.4 Existing Projects (d) 181.0 40.2 111.4 29.4 New Projects ...... New Projects ...... Sustainability and Environment Sustainability and Environment Existing Projects (d) 185.9 47.3 70.2 68.4 Existing Projects (d) 185.9 47.3 70.2 68.4 New Projects (c) 116.3 2.7 29.7 83.9 New Projects (c) 116.3 2.7 29.7 83.9

8 Chapter One Public Sector Asset Investment Program 2003-04 8 Chapter One Public Sector Asset Investment Program 2003-04

Table 1.2 (cont): General government asset investment program 2003-04 – Table 1.2 (cont): General government asset investment program 2003-04 – Table 1.2 (cont): General government asset investment program 2003-04 – summary(a) summary(a) summary(a) ($ million) ($ million) ($ million) Department Total Estimated Estimated Remaining Department Total Estimated Estimated Remaining Department Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Investment 30.6.2003 (b) 2003-04 Investment 30.6.2003 (b) 2003-04 Investment 30.6.2003 (b) 2003-04 Treasury and Finance Treasury and Finance Treasury and Finance Existing Projects 143.2 128.4 11.1 3.7 Existing Projects 143.2 128.4 11.1 3.7 Existing Projects 143.2 128.4 11.1 3.7 New Projects (c) 6.3 0.3 2.0 4.0 New Projects (c) 6.3 0.3 2.0 4.0 New Projects (c) 6.3 0.3 2.0 4.0 Victorian Communities Victorian Communities Victorian Communities Existing Projects (d) 59.6 4.6 33.5 21.5 Existing Projects (d) 59.6 4.6 33.5 21.5 Existing Projects (d) 59.6 4.6 33.5 21.5 New Projects (c) 76.1 1.1 26.5 48.5 New Projects (c) 76.1 1.1 26.5 48.5 New Projects (c) 76.1 1.1 26.5 48.5 Parliament Parliament Parliament Existing Projects 1.3 1.0 0.3 .. Existing Projects 1.3 1.0 0.3 .. Existing Projects 1.3 1.0 0.3 .. New Projects ...... New Projects ...... New Projects ...... Country Fire Authority Country Fire Authority Country Fire Authority Existing Projects 38.4 24.9 12.5 1.0 Existing Projects 38.4 24.9 12.5 1.0 Existing Projects 38.4 24.9 12.5 1.0 New Projects (c) 17.9 0.1 13.6 4.2 New Projects (c) 17.9 0.1 13.6 4.2 New Projects (c) 17.9 0.1 13.6 4.2 Metropolitan Fire and Emergency Services Board Metropolitan Fire and Emergency Services Board Metropolitan Fire and Emergency Services Board Existing Projects 90.5 18.1 37.7 34.8 Existing Projects 90.5 18.1 37.7 34.8 Existing Projects 90.5 18.1 37.7 34.8 New Projects ...... New Projects ...... New Projects ...... Total Existing Projects 5 389.0 2 458.7 1 591.4 1 338.9 Total Existing Projects 5 389.0 2 458.7 1 591.4 1 338.9 Total Existing Projects 5 389.0 2 458.7 1 591.4 1 338.9 Total New Projects 1 407.3 24.0 421.1 962.2 Total New Projects 1 407.3 24.0 421.1 962.2 Total New Projects 1 407.3 24.0 421.1 962.2 Total Projects 6 796.3 2 482.7 2 012.5 2 301.0 Total Projects 6 796.3 2 482.7 2 012.5 2 301.0 Total Projects 6 796.3 2 482.7 2 012.5 2 301.0 Source: Department of Treasury and Finance Source: Department of Treasury and Finance Source: Department of Treasury and Finance Notes: Notes: Notes: (a) Summary of expenditure for projects listed in Chapter 2. (a) Summary of expenditure for projects listed in Chapter 2. (a) Summary of expenditure for projects listed in Chapter 2. (b) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (b) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (b) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003 and departments as at 4 September 2003. Includes preliminary unaudited information 29 August 2003 and departments as at 4 September 2003. Includes preliminary unaudited information 29 August 2003 and departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. for 2002-03 financial year. for 2002-03 financial year. (c) Includes new projects with expenditure commencing prior 30 June 2003. (c) Includes new projects with expenditure commencing prior 30 June 2003. (c) Includes new projects with expenditure commencing prior 30 June 2003. (d) Recipient of a Machinery of Government asset transfer. Recipient departments reflect the Total (d) Recipient of a Machinery of Government asset transfer. Recipient departments reflect the Total (d) Recipient of a Machinery of Government asset transfer. Recipient departments reflect the Total Estimated Investment, Expected Expenditure to 30.06.2003, Estimated Expenditure 2003-04 and Estimated Investment, Expected Expenditure to 30.06.2003, Estimated Expenditure 2003-04 and Estimated Investment, Expected Expenditure to 30.06.2003, Estimated Expenditure 2003-04 and Remaining Expenditure for the transferred asset. Remaining Expenditure for the transferred asset. Remaining Expenditure for the transferred asset. (e) Excludes new projects to be delivered through Partnerships Victoria as TEI will not be disclosed until (e) Excludes new projects to be delivered through Partnerships Victoria as TEI will not be disclosed until (e) Excludes new projects to be delivered through Partnerships Victoria as TEI will not be disclosed until after completion of the tender process. after completion of the tender process. after completion of the tender process.

Public Sector Asset Investment Program 2003-04 Chapter One 9 Public Sector Asset Investment Program 2003-04 Chapter One 9 Public Sector Asset Investment Program 2003-04 Chapter One 9

Funding general government sector asset investments Funding general government sector asset investments Preserving the level of capital stock used to deliver services is achieved by ensuring that Preserving the level of capital stock used to deliver services is achieved by ensuring that investment in refurbishing and replacing assets is at least equivalent to the expected investment in refurbishing and replacing assets is at least equivalent to the expected depreciation of the asset stock during the year. depreciation of the asset stock during the year. The Government has maintained ongoing investment in infrastructure of over one per The Government has maintained ongoing investment in infrastructure of over one per cent of Gross State Product (GSP). In addition to this, the Government also created the cent of Gross State Product (GSP). In addition to this, the Government also created the $1.6 billion Growing Victoria infrastructure reserve to provide a major boost to the $1.6 billion Growing Victoria infrastructure reserve to provide a major boost to the State’s infrastructure. State’s infrastructure. The sources of funding applied to deliver the asset investment program in the general The sources of funding applied to deliver the asset investment program in the general government sector include: government sector include: S financial assets accumulated by departments; S financial assets accumulated by departments; S annual appropriations for additions to departments’ net asset base; S annual appropriations for additions to departments’ net asset base; S annotated appropriations representing net retained receipts from approved asset sales; S annotated appropriations representing net retained receipts from approved asset sales; and and S own-source non-public account revenue of individual public agencies including S own-source non-public account revenue of individual public agencies including retained earnings and revenue generated from donations and fund raisings. retained earnings and revenue generated from donations and fund raisings.

Table 1.3: General government asset investment program 2002-03 and 2003-04 – Table 1.3: General government asset investment program 2002-03 and 2003-04 – funding sources funding sources ($ million) ($ million) 2002-03 Budget 2003-04 2002-03 Budget 2003-04 (a) Budget (a) Budget Financial Assets (attributable to 976.9 1 017.0 Financial Assets (attributable to 976.9 1 017.0 depreciation expense) depreciation expense) Appropriation for increases in net asset 830.5 1 087.4 Appropriation for increases in net asset 830.5 1 087.4 base (b) base (b) Retained Asset Sales Receipts 14.8 16.4 Retained Asset Sales Receipts 14.8 16.4 Non-Public Account and Other (including 105.1 9.9 Non-Public Account and Other (including 105.1 9.9 retained earnings) retained earnings) Total general government sector purchase 1 927.3 2 130.7 Total general government sector purchase 1 927.3 2 130.7 of fixed assets of fixed assets Source: Department of Treasury and Finance Source: Department of Treasury and Finance Notes: Notes: (a) Original budget estimate. (a) Original budget estimate. (b) Includes asset investment funded by own source revenue in schools, TAFEs and hospitals. (b) Includes asset investment funded by own source revenue in schools, TAFEs and hospitals.

10 Chapter One Public Sector Asset Investment Program 2003-04 10 Chapter One Public Sector Asset Investment Program 2003-04

Commonwealth programs Commonwealth programs Commonwealth programs The Commonwealth Government provides capital funds to the State on terms and The Commonwealth Government provides capital funds to the State on terms and The Commonwealth Government provides capital funds to the State on terms and conditions aimed at achieving particular objectives. In accepting these grants the conditions aimed at achieving particular objectives. In accepting these grants the conditions aimed at achieving particular objectives. In accepting these grants the Victorian Government seeks to ensure that: Victorian Government seeks to ensure that: Victorian Government seeks to ensure that: S all asset investments are subject to the same evaluation criteria as those that are S all asset investments are subject to the same evaluation criteria as those that are S all asset investments are subject to the same evaluation criteria as those that are State-funded; State-funded; State-funded; S State contributions are linked to output provision rather than input matching, and S State contributions are linked to output provision rather than input matching, and S State contributions are linked to output provision rather than input matching, and take account of whether they can be accommodated within the State’s fiscal plans; take account of whether they can be accommodated within the State’s fiscal plans; take account of whether they can be accommodated within the State’s fiscal plans; and and and S asset investment planning and implementation complement and reinforce State S asset investment planning and implementation complement and reinforce State S asset investment planning and implementation complement and reinforce State investment requirements wherever practicable. investment requirements wherever practicable. investment requirements wherever practicable.

Table 1.4: Commonwealth supported projects – 2003-04(a) Table 1.4: Commonwealth supported projects – 2003-04(a) Table 1.4: Commonwealth supported projects – 2003-04(a) ($ million) ($ million) ($ million) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Investment 30.6.2003 (b) 2003-04 Investment 30.6.2003 (b) 2003-04 Investment 30.6.2003 (b) 2003-04 Housing Projects Housing Projects Housing Projects Existing Projects 315.5 149.9 131.7 33.9 Existing Projects 315.5 149.9 131.7 33.9 Existing Projects 315.5 149.9 131.7 33.9 New Projects 168.4 .. 99.2 69.2 New Projects 168.4 .. 99.2 69.2 New Projects 168.4 .. 99.2 69.2 Road Projects Road Projects Road Projects Existing Projects 352.3 92.4 99.0 160.9 Existing Projects 352.3 92.4 99.0 160.9 Existing Projects 352.3 92.4 99.0 160.9 New Projects 206.0 .. 21.4 184.6 New Projects 206.0 .. 21.4 184.6 New Projects 206.0 .. 21.4 184.6 TAFE Institutes TAFE Institutes TAFE Institutes Existing Projects 16.4 3.4 5.8 7.2 Existing Projects 16.4 3.4 5.8 7.2 Existing Projects 16.4 3.4 5.8 7.2 New Projects 73.5 19.8 44.7 9.0 New Projects 73.5 19.8 44.7 9.0 New Projects 73.5 19.8 44.7 9.0 Total Existing Projects 684.1 245.7 236.4 202.0 Total Existing Projects 684.1 245.7 236.4 202.0 Total Existing Projects 684.1 245.7 236.4 202.0 Total New Projects 447.8 19.8 165.2 262.8 Total New Projects 447.8 19.8 165.2 262.8 Total New Projects 447.8 19.8 165.2 262.8 Total Projects 1 132.0 265.4 401.7 464.8 Total Projects 1 132.0 265.4 401.7 464.8 Total Projects 1 132.0 265.4 401.7 464.8 Source: Department of Treasury and Finance Source: Department of Treasury and Finance Source: Department of Treasury and Finance Notes: Notes: Notes: (a) Includes Commonwealth and Commonwealth-State funded projects listed in Chapters 2 and 3. (a) Includes Commonwealth and Commonwealth-State funded projects listed in Chapters 2 and 3. (a) Includes Commonwealth and Commonwealth-State funded projects listed in Chapters 2 and 3. (b) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (b) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (b) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003 and agencies as at 29 August 2003. Includes preliminary unaudited information for 4 September 2003 and agencies as at 29 August 2003. Includes preliminary unaudited information for 4 September 2003 and agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 2002-03 financial year. 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Chapter One 11 Public Sector Asset Investment Program 2003-04 Chapter One 11 Public Sector Asset Investment Program 2003-04 Chapter One 11

Dedicated funds Dedicated funds Funding for certain categories of asset investments is provided from dedicated sources, Funding for certain categories of asset investments is provided from dedicated sources, either under legislation or as a consequence of Government policy. Planning for these either under legislation or as a consequence of Government policy. Planning for these investments is subject to the same evaluation procedures as other budget sector projects, investments is subject to the same evaluation procedures as other budget sector projects, but annual expenditure on them is dependent on the availability of funding from these but annual expenditure on them is dependent on the availability of funding from these dedicated sources. dedicated sources. The Better Roads Victoria (BRV) program provides funding for the maintenance and The Better Roads Victoria (BRV) program provides funding for the maintenance and upgrading of Victoria’s metropolitan and regional roads system. One third of the funding upgrading of Victoria’s metropolitan and regional roads system. One third of the funding from the program is allocated to regional roads, one third to outer metropolitan roads, and from the program is allocated to regional roads, one third to outer metropolitan roads, and one third to metropolitan roads. Specific projects that form the BRV program are one third to metropolitan roads. Specific projects that form the BRV program are identified in Chapter 2, General Government Sector Asset Investment Program 2003-04. identified in Chapter 2, General Government Sector Asset Investment Program 2003-04. The proceeds from the sale of surplus education assets are made available for The proceeds from the sale of surplus education assets are made available for re-investment in education facilities. This re-investment includes the improvement and re-investment in education facilities. This re-investment includes the improvement and refurbishment of existing school and TAFE facilities and the enhancement of education refurbishment of existing school and TAFE facilities and the enhancement of education services with new technology. services with new technology. The Community Support Fund (CSF) is established under the Gaming Machine Control The Community Support Fund (CSF) is established under the Gaming Machine Control Act 1991 (the Act). Under the Act, funds in the CSF may be applied for community Act 1991 (the Act). Under the Act, funds in the CSF may be applied for community enhancement in the areas of sport and recreation, community services, arts and tourism. enhancement in the areas of sport and recreation, community services, arts and tourism. Funds may be used either for asset investment or to meet output provision costs. Budget Funds may be used either for asset investment or to meet output provision costs. Budget sector proposals for CSF financed asset initiatives follow the normal planning and sector proposals for CSF financed asset initiatives follow the normal planning and appraisal processes for approval. appraisal processes for approval. Table 1.5 summarises 2003-04 asset investments that are committed against ‘dedicated’ Table 1.5 summarises 2003-04 asset investments that are committed against ‘dedicated’ funds on projects listed in Chapter 2, General Government Sector Asset Investment funds on projects listed in Chapter 2, General Government Sector Asset Investment Program 2003-04. Program 2003-04.

12 Chapter One Public Sector Asset Investment Program 2003-04 12 Chapter One Public Sector Asset Investment Program 2003-04

Table 1.5: Dedicated funds – asset investment projects – 2003-04 Table 1.5: Dedicated funds – asset investment projects – 2003-04 Table 1.5: Dedicated funds – asset investment projects – 2003-04 ($ million) ($ million) ($ million) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Investment 30.6.2003 (a) 2003-04 Investment 30.6.2003 (a) 2003-04 Investment 30.6.2003 (a) 2003-04 Better Roads Better Roads Better Roads Existing Projects 386.5 280.1 70.4 35.9 Existing Projects 386.5 280.1 70.4 35.9 Existing Projects 386.5 280.1 70.4 35.9 New Projects 178.8 .. 46.0 124.8 New Projects 178.8 .. 46.0 124.8 New Projects 178.8 .. 46.0 124.8 Education Sector Education Sector Education Sector Existing Projects ...... Existing Projects ...... Existing Projects ...... New Projects (b) 11.0 .. 11.0 New Projects (b) 11.0 .. 11.0 New Projects (b) 11.0 .. 11.0 Community Support Fund .. Community Support Fund .. Community Support Fund .. Existing Projects 22.9 11.9 7.0 4.0 Existing Projects 22.9 11.9 7.0 4.0 Existing Projects 22.9 11.9 7.0 4.0 New Projects .. .. 2.5 7.5 New Projects .. .. 2.5 7.5 New Projects .. .. 2.5 7.5 Total Existing Projects 409.4 292.0 77.4 39.9 Total Existing Projects 409.4 292.0 77.4 39.9 Total Existing Projects 409.4 292.0 77.4 39.9 Total New Projects 199.8 .. 59.5 132.3 Total New Projects 199.8 .. 59.5 132.3 Total New Projects 199.8 .. 59.5 132.3 Total Projects 609.2 292.0 136.9 172.2 Total Projects 609.2 292.0 136.9 172.2 Total Projects 609.2 292.0 136.9 172.2 Source: Department of Treasury and Finance Source: Department of Treasury and Finance Source: Department of Treasury and Finance Notes: Notes: Notes: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. (b) The $11.0 million has been provided in the 2003-04 Budget for the purposes of: (b) The $11.0 million has been provided in the 2003-04 Budget for the purposes of: (b) The $11.0 million has been provided in the 2003-04 Budget for the purposes of: - school refurbishment and improvement projects mainly financed from the proceeds of sales of - school refurbishment and improvement projects mainly financed from the proceeds of sales of - school refurbishment and improvement projects mainly financed from the proceeds of sales of surplus assets ($8.5 million); and surplus assets ($8.5 million); and surplus assets ($8.5 million); and - technical and further education projects from the proceeds of sales of surplus assets ($2.5 million). - technical and further education projects from the proceeds of sales of surplus assets ($2.5 million). - technical and further education projects from the proceeds of sales of surplus assets ($2.5 million).

Public Sector Asset Investment Program 2003-04 Chapter One 13 Public Sector Asset Investment Program 2003-04 Chapter One 13 Public Sector Asset Investment Program 2003-04 Chapter One 13

MAJOR PUBLIC NON-FINANCIAL CORPORATIONS ASSET MAJOR PUBLIC NON-FINANCIAL CORPORATIONS ASSET INVESTMENTS INVESTMENTS The investment program of the major public non-financial corporations (PNFCs) includes The investment program of the major public non-financial corporations (PNFCs) includes the asset investment programs of corporatised PNFCs, other authorities such as the the asset investment programs of corporatised PNFCs, other authorities such as the non-metropolitan urban and rural water businesses and the Office of Housing. These non-metropolitan urban and rural water businesses and the Office of Housing. These agencies are accountable for managing public assets valued at $28.6 billion as at 30 June agencies are accountable for managing public assets valued at $28.6 billion as at 30 June 2002. The 2002-03 Budget revised estimate for PNFCs total assets as at 30 June 2003 is 2002. The 2002-03 Budget revised estimate for PNFCs total assets as at 30 June 2003 is $29.8 billion. $29.8 billion. Financing for these projects may include private sector contributions, for example from Financing for these projects may include private sector contributions, for example from developers in the water sector, and from Commonwealth Government specific purpose developers in the water sector, and from Commonwealth Government specific purpose payments. Other financing may include the take-up of private equity interests. payments. Other financing may include the take-up of private equity interests. Table 1.6 provides a summary of major new and ongoing asset investment projects in Table 1.6 provides a summary of major new and ongoing asset investment projects in asset intensive non-general government sector agencies (see Chapter 3, Major Public asset intensive non-general government sector agencies (see Chapter 3, Major Public Non-Financial Corporations Asset Investment Program 2003-04 for details). Minor asset Non-Financial Corporations Asset Investment Program 2003-04 for details). Minor asset investments, where the total estimated investment is less than $100 000, are not listed. investments, where the total estimated investment is less than $100 000, are not listed.

Table 1.6: Major Public Non-Financial Corporations asset investment program Table 1.6: Major Public Non-Financial Corporations asset investment program 2003-04 – summary (a) 2003-04 – summary (a) ($ million) ($ million) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (b) 2003-04 Project Description Investment 30.6.2003 (b) 2003-04 Gippsland and Southern Rural Water Gippsland and Southern Rural Water Existing Projects 19.3 13.8 4.2 1.4 Existing Projects 19.3 13.8 4.2 1.4 New Projects 15.3 .. 4.7 10.6 New Projects 15.3 .. 4.7 10.6 Goulburn-Murray Rural Water Goulburn-Murray Rural Water Existing Projects 175.4 50.6 28.3 96.4 Existing Projects 175.4 50.6 28.3 96.4 New Projects 59.5 .. 14.9 44.6 New Projects 59.5 .. 14.9 44.6 Office of Housing Office of Housing Existing Projects 315.5 149.9 131.7 33.9 Existing Projects 315.5 149.9 131.7 33.9 New Projects 168.4 .. 99.2 69.2 New Projects 168.4 .. 99.2 69.2 Regional Urban Water Authorities Regional Urban Water Authorities Existing Projects 1 242.7 306.8 239.2 696.7 Existing Projects 1 242.7 306.8 239.2 696.7 New Projects 313.2 .. 29.5 283.7 New Projects 313.2 .. 29.5 283.7 Sunraysia Rural Water Sunraysia Rural Water Existing Projects 16.0 5.7 3.2 7.1 Existing Projects 16.0 5.7 3.2 7.1 New Projects 17.4 .. 4.0 13.4 New Projects 17.4 .. 4.0 13.4

14 Chapter One Public Sector Asset Investment Program 2003-04 14 Chapter One Public Sector Asset Investment Program 2003-04

Table 1.6 (cont): Major Public Non-Financial Corporations asset investment Table 1.6 (cont): Major Public Non-Financial Corporations asset investment Table 1.6 (cont): Major Public Non-Financial Corporations asset investment program 2003-04 – summary (a) program 2003-04 – summary (a) program 2003-04 – summary (a) ($ million) ($ million) ($ million) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (b) 2003-04 Project Description Investment 30.6.2003 (b) 2003-04 Project Description Investment 30.6.2003 (b) 2003-04 Wimmera-Mallee Rural Water Wimmera-Mallee Rural Water Wimmera-Mallee Rural Water Existing Projects 348.6 59.2 15.9 273.5 Existing Projects 348.6 59.2 15.9 273.5 Existing Projects 348.6 59.2 15.9 273.5 New Projects ...... New Projects ...... New Projects ...... Total Existing Projects 2 117.6 586.0 422.5 1 109.1 Total Existing Projects 2 117.6 586.0 422.5 1 109.1 Total Existing Projects 2 117.6 586.0 422.5 1 109.1 Total New Projects 573.7 .. 152.3 421.5 Total New Projects 573.7 .. 152.3 421.5 Total New Projects 573.7 .. 152.3 421.5 Total Projects 2 691.3 586.0 574.8 1 530.6 Total Projects 2 691.3 586.0 574.8 1 530.6 Total Projects 2 691.3 586.0 574.8 1 530.6 Source: Department of Treasury and Finance Source: Department of Treasury and Finance Source: Department of Treasury and Finance Notes: Notes: Notes: (a) Summary of investment for projects listed in Chapter 3. (a) Summary of investment for projects listed in Chapter 3. (a) Summary of investment for projects listed in Chapter 3. (b) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (b) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (b) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Chapter One 15 Public Sector Asset Investment Program 2003-04 Chapter One 15 Public Sector Asset Investment Program 2003-04 Chapter One 15

For the major corporatised PNFCs and public financial corporations (PFCs), the asset For the major corporatised PNFCs and public financial corporations (PFCs), the asset investment programs operate in accordance with their three-year corporate plans. investment programs operate in accordance with their three-year corporate plans. Information on total investment undertaken by corporatised PNFCs and PFCs is provided Information on total investment undertaken by corporatised PNFCs and PFCs is provided in summary form in Table 1.7 below. in summary form in Table 1.7 below.

Table 1.7: Asset investment program of selected major public non-financial and Table 1.7: Asset investment program of selected major public non-financial and public financial corporations 2003-04(a) public financial corporations 2003-04(a) ($ million) ($ million) Actual Estimated Actual Estimated Investment Investment Investment Investment 2001-02 2002-03 (b) 2001-02 2002-03 (b) Melbourne Water Corporation 98.1 124.3 Melbourne Water Corporation 98.1 124.3 Yarra Valley Water Ltd 50.2 77.0 Yarra Valley Water Ltd 50.2 77.0 South East Water Ltd 36.3 57.0 South East Water Ltd 36.3 57.0 City West Water Ltd 11.9 20.6 City West Water Ltd 11.9 20.6 Melbourne Port Corporation 33.3 39.9 Melbourne Port Corporation 33.3 39.9 Overseas Projects Corporation of Victoria 0.1 0.1 Overseas Projects Corporation of Victoria 0.1 0.1 Victorian Channels Authority 2.3 5.3 Victorian Channels Authority 2.3 5.3 Urban and Regional Land Corporation 0.6 0.4 Urban and Regional Land Corporation 0.6 0.4 State Trustees Limited 1.2 3.9 State Trustees Limited 1.2 3.9 Victorian Energy Networks Corporation 6.8 6.9 Victorian Energy Networks Corporation 6.8 6.9 Transport Accident Commission 2.2 2.1 Transport Accident Commission 2.2 2.1 Total Asset Investment Program 243.0 337.5 Total Asset Investment Program 243.0 337.5 Source: Department of Treasury and Finance Source: Department of Treasury and Finance Notes: Notes: (a) Public non-financial corporations (PNFCs) are Government-owned entities which provide goods and (a) Public non-financial corporations (PNFCs) are Government-owned entities which provide goods and services for sale in a commercial market place. PNFCs meet the competitive neutrality guidelines services for sale in a commercial market place. PNFCs meet the competitive neutrality guidelines established under the National Competition Principles Agreement. One of the objectives of these major established under the National Competition Principles Agreement. One of the objectives of these major corporatised PNFCs is that they operate in an environment that aims to mirror the commercial and corporatised PNFCs is that they operate in an environment that aims to mirror the commercial and competitive disciplines facing private sector firms. It is therefore inappropriate to provide more than competitive disciplines facing private sector firms. It is therefore inappropriate to provide more than summary details of the asset investment programs for these PNFCs. summary details of the asset investment programs for these PNFCs. (b) The asset investment program shown in this table is based on the capital expenditure programs outlined (b) The asset investment program shown in this table is based on the capital expenditure programs outlined in the respective PNFCs' 2002-05 corporate planning documents. in the respective PNFCs' 2002-05 corporate planning documents.

16 Chapter One Public Sector Asset Investment Program 2003-04 16 Chapter One Public Sector Asset Investment Program 2003-04

PRIVATE SECTOR INVESTMENT IN STATE INFRASTRUCTURE PRIVATE SECTOR INVESTMENT IN STATE INFRASTRUCTURE PRIVATE SECTOR INVESTMENT IN STATE INFRASTRUCTURE Since October 1999, eight major investment projects involving the private sector in the Since October 1999, eight major investment projects involving the private sector in the Since October 1999, eight major investment projects involving the private sector in the provision of public infrastructure have reached contractual close. These projects represent provision of public infrastructure have reached contractual close. These projects represent provision of public infrastructure have reached contractual close. These projects represent total estimated capital expenditure on public infrastructure of approximately $650 million total estimated capital expenditure on public infrastructure of approximately $650 million total estimated capital expenditure on public infrastructure of approximately $650 million and include: and include: and include: S Melbourne County Court; S Melbourne County Court; S Melbourne County Court; S Wodonga Wastewater Treatment Facility; S Wodonga Wastewater Treatment Facility; S Wodonga Wastewater Treatment Facility; S Spencer Street Station Redevelopment; S Spencer Street Station Redevelopment; S Spencer Street Station Redevelopment; S Film and TV Studios; S Film and TV Studios; S Film and TV Studios; S Echuca/Rochester Wastewater Project; S Echuca/Rochester Wastewater Project; S Echuca/Rochester Wastewater Project; S Berwick Community Hospital; S Berwick Community Hospital; S Berwick Community Hospital; S Enviro Altona; and S Enviro Altona; and S Enviro Altona; and S Mobile Data Network. S Mobile Data Network. S Mobile Data Network. Procurement processes are also under way for further projects valued at approximately Procurement processes are also under way for further projects valued at approximately Procurement processes are also under way for further projects valued at approximately $2.1 billion. These include: $2.1 billion. These include: $2.1 billion. These include: S Correctional Facilities (600 bed remand centre and 300 bed prison); S Correctional Facilities (600 bed remand centre and 300 bed prison); S Correctional Facilities (600 bed remand centre and 300 bed prison); S North Ballarat and Creswick Reclaimed Water Project; S North Ballarat and Creswick Reclaimed Water Project; S North Ballarat and Creswick Reclaimed Water Project; S Emergency Alerting System; S Emergency Alerting System; S Emergency Alerting System; S Metropolitan Mobile Radio; and S Metropolitan Mobile Radio; and S Metropolitan Mobile Radio; and S Mitcham-Frankston Freeway. S Mitcham-Frankston Freeway. S Mitcham-Frankston Freeway. The Government is also investigating the possibility of delivering the following projects The Government is also investigating the possibility of delivering the following projects The Government is also investigating the possibility of delivering the following projects under the Partnerships Victoria approach: under the Partnerships Victoria approach: under the Partnerships Victoria approach: S Royal Melbourne Showgrounds Redevelopment; S Royal Melbourne Showgrounds Redevelopment; S Royal Melbourne Showgrounds Redevelopment; S Royal Women’s Hospital Redevelopment; S Royal Women’s Hospital Redevelopment; S Royal Women’s Hospital Redevelopment; S Kew Residential Services Redevelopment; S Kew Residential Services Redevelopment; S Kew Residential Services Redevelopment; S Relocatable Classrooms; S Relocatable Classrooms; S Relocatable Classrooms; S Eastern Treatment Plant Upgrade; S Eastern Treatment Plant Upgrade; S Eastern Treatment Plant Upgrade; S Werribee Plains Vision; and S Werribee Plains Vision; and S Werribee Plains Vision; and S Barwon Water – Biosolids Black Rock Treatment Plant. S Barwon Water – Biosolids Black Rock Treatment Plant. S Barwon Water – Biosolids Black Rock Treatment Plant.

Public Sector Asset Investment Program 2003-04 Chapter One 17 Public Sector Asset Investment Program 2003-04 Chapter One 17 Public Sector Asset Investment Program 2003-04 Chapter One 17

Partnerships Victoria Partnerships Victoria The Government is committed to maximising the level of infrastructure spending through The Government is committed to maximising the level of infrastructure spending through responsible use of the resources of both the public and private sectors. To this end, the responsible use of the resources of both the public and private sectors. To this end, the Government’s Partnerships Victoria policy establishes a framework for partnerships Government’s Partnerships Victoria policy establishes a framework for partnerships between the public and private sectors for the provision of public infrastructure and between the public and private sectors for the provision of public infrastructure and related ancillary services. related ancillary services. Partnerships Victoria is about creating partnerships between the Government and private Partnerships Victoria is about creating partnerships between the Government and private businesses in which improved value for money is achieved by utilising the innovation businesses in which improved value for money is achieved by utilising the innovation capabilities and skill of both to deliver performance improvements and efficiency capabilities and skill of both to deliver performance improvements and efficiency savings. The choice between public and private provision of infrastructure is based on an savings. The choice between public and private provision of infrastructure is based on an assessment of the needs of each project and is tested against a rigorous public interest assessment of the needs of each project and is tested against a rigorous public interest test. This framework ensures that investment decisions are based on merit and outcomes test. This framework ensures that investment decisions are based on merit and outcomes are judged on the public benefits obtained. are judged on the public benefits obtained.

Gateway Gateway In the 2003-04 Budget, the Government announced the Gateway initiative. The In the 2003-04 Budget, the Government announced the Gateway initiative. The Government is committed to achieving better capital investment outcomes across the Government is committed to achieving better capital investment outcomes across the Victorian budget sector by implementing the Gateway initiative. Gateway will ensure Victorian budget sector by implementing the Gateway initiative. Gateway will ensure that independent reviews of higher risk asset investment projects are undertaken at key that independent reviews of higher risk asset investment projects are undertaken at key decision points to provide assurance that the project can progress successfully to the next decision points to provide assurance that the project can progress successfully to the next development stage. Other components of the Gateway initiative include a multi-year development stage. Other components of the Gateway initiative include a multi-year investment strategy, enhanced monitoring of major projects and preparation of project investment strategy, enhanced monitoring of major projects and preparation of project life-cycle guidance material. life-cycle guidance material.

18 Chapter One Public Sector Asset Investment Program 2003-04 18 Chapter One Public Sector Asset Investment Program 2003-04

CHAPTER TWO: GENERAL GOVERNMENT SECTOR CHAPTER TWO: GENERAL GOVERNMENT SECTOR CHAPTER TWO: GENERAL GOVERNMENT SECTOR ASSET INVESTMENT PROGRAM 2003-04 ASSET INVESTMENT PROGRAM 2003-04 ASSET INVESTMENT PROGRAM 2003-04

DEPARTMENT OF EDUCATION AND TRAINING DEPARTMENT OF EDUCATION AND TRAINING DEPARTMENT OF EDUCATION AND TRAINING

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 School Education School Education School Education Alexandra Secondary College-Personal 536 .. 536 .. Alexandra Secondary College-Personal 536 .. 536 .. Alexandra Secondary College-Personal 536 .. 536 .. Development, Seminar (Alexandra) Development, Seminar (Alexandra) Development, Seminar (Alexandra) Alexandra Secondary 1 349 22 1 327 .. Alexandra Secondary 1 349 22 1 327 .. Alexandra Secondary 1 349 22 1 327 .. College-Technology, Science College-Technology, Science College-Technology, Science (Alexandra) (Alexandra) (Alexandra) Seaholme Primary School-Stage 2-Multi 561 378 183 .. Seaholme Primary School-Stage 2-Multi 561 378 183 .. Seaholme Primary School-Stage 2-Multi 561 378 183 .. Purpose facilities, Staff Administration, Purpose facilities, Staff Administration, Purpose facilities, Staff Administration, Toilets and Canteen (Altona) Toilets and Canteen (Altona) Toilets and Canteen (Altona) Seaholme Primary School-Stage 1-New 1 363 1 319 44 .. Seaholme Primary School-Stage 1-New 1 363 1 319 44 .. Seaholme Primary School-Stage 1-New 1 363 1 319 44 .. Technology Enhanced Classrooms Technology Enhanced Classrooms Technology Enhanced Classrooms (Altona) (Altona) (Altona) Altona Meadows Primary School-Stage 1 375 1 128 247 .. Altona Meadows Primary School-Stage 1 375 1 128 247 .. Altona Meadows Primary School-Stage 1 375 1 128 247 .. 1-General Purpose Classrooms x 12 1-General Purpose Classrooms x 12 1-General Purpose Classrooms x 12 upgrade (Altona Meadows) upgrade (Altona Meadows) upgrade (Altona Meadows) Ararat Primary School-General Purpose 1 607 120 1 487 .. Ararat Primary School-General Purpose 1 607 120 1 487 .. Ararat Primary School-General Purpose 1 607 120 1 487 .. Classrooms, Art/Craft, Multi-Purpose Classrooms, Art/Craft, Multi-Purpose Classrooms, Art/Craft, Multi-Purpose facilities, Administration, Canteen facilities, Administration, Canteen facilities, Administration, Canteen (Ararat) (Ararat) (Ararat) Ascot Vale West Primary 390 256 134 .. Ascot Vale West Primary 390 256 134 .. Ascot Vale West Primary 390 256 134 .. School-Multi-purpose/art/craft upgrade School-Multi-purpose/art/craft upgrade School-Multi-purpose/art/craft upgrade (Ascot Vale) (Ascot Vale) (Ascot Vale) Ascot Vale Primary School-General 649 34 615 .. Ascot Vale Primary School-General 649 34 615 .. Ascot Vale Primary School-General 649 34 615 .. Purpose Classrooms (Ascot Vale) Purpose Classrooms (Ascot Vale) Purpose Classrooms (Ascot Vale) East Gippsland Specialist School-New 2 142 1 181 961 .. East Gippsland Specialist School-New 2 142 1 181 961 .. East Gippsland Specialist School-New 2 142 1 181 961 .. School (Bairnsdale) School (Bairnsdale) School (Bairnsdale) Balmoral Consolidated School-General 1 505 343 1 162 .. Balmoral Consolidated School-General 1 505 343 1 162 .. Balmoral Consolidated School-General 1 505 343 1 162 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Purpose Classrooms, Staff Administration, Toilets (Balmoral) Administration, Toilets (Balmoral) Administration, Toilets (Balmoral) Balwyn High School-Commerce (Balwyn 399 24 375 .. Balwyn High School-Commerce (Balwyn 399 24 375 .. Balwyn High School-Commerce (Balwyn 399 24 375 .. North) North) North)

Public Sector Asset Investment Program 2003-04 Education and Training 19 Public Sector Asset Investment Program 2003-04 Education and Training 19 Public Sector Asset Investment Program 2003-04 Education and Training 19

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Balwyn High School-General Purpose 2 471 .. 2 471 .. Balwyn High School-General Purpose 2 471 .. 2 471 .. Classrooms, Arts, Personal Classrooms, Arts, Personal Development, Lockers, Toilets (Balwyn Development, Lockers, Toilets (Balwyn North) North) Balwyn North Primary School-General 969 887 82 .. Balwyn North Primary School-General 969 887 82 .. Purpose Classrooms, Multi-Purpose Purpose Classrooms, Multi-Purpose facilities, Canteen, Toilets (Balwyn North) facilities, Canteen, Toilets (Balwyn North) Baranduda Primary School-Stage 1 824 1 635 189 .. Baranduda Primary School-Stage 1 824 1 635 189 .. 2-General Purpose Classrooms, 2-General Purpose Classrooms, Art/Craft, Multi-Purpose facilities, Art/Craft, Multi-Purpose facilities, Canteen (Baranduda) Canteen (Baranduda) Barwon Heads Primary School-General 1 149 13 1 136 .. Barwon Heads Primary School-General 1 149 13 1 136 .. Purpose Classrooms, Art/Craft, Canteen Purpose Classrooms, Art/Craft, Canteen (Barwon Heads) (Barwon Heads) Bayswater Primary School-Multi Purpose 372 3 369 .. Bayswater Primary School-Multi Purpose 372 3 369 .. Room, Canteen, Site works (Bayswater) Room, Canteen, Site works (Bayswater) Bellarine Secondary College-Ocean 3 000 227 2 773 .. Bellarine Secondary College-Ocean 3 000 227 2 773 .. Grove Campus Upgrade (Bellarine) Grove Campus Upgrade (Bellarine) Belmont High School-Stage 2 (Belmont) 2 940 2 558 382 .. Belmont High School-Stage 2 (Belmont) 2 940 2 558 382 .. Benalla College-Information Technology, 543 87 456 .. Benalla College-Information Technology, 543 87 456 .. Science (Benalla) Science (Benalla) Berwick Secondary College-Redevelop to 1 367 1 327 40 .. Berwick Secondary College-Redevelop to 1 367 1 327 40 .. 1100 student number standard (tech and 1100 student number standard (tech and music) (Berwick) music) (Berwick) Berwick South Secondary College-New 4 500 4 175 325 .. Berwick South Secondary College-New 4 500 4 175 325 .. School-Stage 1 (Berwick) School-Stage 1 (Berwick) Berwick South Secondary College-New 4 500 3 405 1 095 .. Berwick South Secondary College-New 4 500 3 405 1 095 .. School-Stage 2 (Berwick) School-Stage 2 (Berwick) Berwick South Secondary College-New 4 500 1 395 3 105 .. Berwick South Secondary College-New 4 500 1 395 3 105 .. School-Stage 3 (Berwick) School-Stage 3 (Berwick) Laburnum Primary School-General 1 714 1 354 360 .. Laburnum Primary School-General 1 714 1 354 360 .. Purpose Classrooms, Physical Purpose Classrooms, Physical Education, Canteen (Blackburn) Education, Canteen (Blackburn) Boisdale Consolidated 926 815 111 .. Boisdale Consolidated 926 815 111 .. School-Staff/Administration, General School-Staff/Administration, General Purpose Classrooms Upgrade & Student Purpose Classrooms Upgrade & Student Toilets (Boisdale) Toilets (Boisdale) Box Hill Senior Secondary 1 478 391 1 087 .. Box Hill Senior Secondary 1 478 391 1 087 .. College-Science and Technology College-Science and Technology facilities (Box Hill North) facilities (Box Hill North) Bright P-12 College-Commerce, Science, 1 611 1 374 237 .. Bright P-12 College-Commerce, Science, 1 611 1 374 237 .. Technology, Library (Bright) Technology, Library (Bright) Bright P-12 College-General Purpose 1 964 .. 1 964 .. Bright P-12 College-General Purpose 1 964 .. 1 964 .. Classrooms, Personal Development, Classrooms, Personal Development, Canteen, Lockers, Student Lounge, Canteen, Lockers, Student Lounge, Toilets (Bright) Toilets (Bright) Brighton Primary School-General Purpose 880 819 61 .. Brighton Primary School-General Purpose 880 819 61 .. Classrooms (GPC`s), Staff/Admin and Classrooms (GPC`s), Staff/Admin and Student Toilet facilities (Brighton) Student Toilet facilities (Brighton) 20 Education and Training Public Sector Asset Investment Program 2003-04 20 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Buninyong Primary School-General 738 310 428 .. Buninyong Primary School-General 738 310 428 .. Buninyong Primary School-General 738 310 428 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Purpose Classrooms, Staff Administration, Student Toilets, Administration, Student Toilets, Administration, Student Toilets, (Buninyong) (Buninyong) (Buninyong) Camberwell High School-Food 1 267 23 1 244 .. Camberwell High School-Food 1 267 23 1 244 .. Camberwell High School-Food 1 267 23 1 244 .. Technology, Information Technology Technology, Information Technology Technology, Information Technology (Canterbury) (Canterbury) (Canterbury) Carrum Downs Secondary College-New 4 700 337 4 363 .. Carrum Downs Secondary College-New 4 700 337 4 363 .. Carrum Downs Secondary College-New 4 700 337 4 363 .. School-Stage 1 (Carrum Downs) School-Stage 1 (Carrum Downs) School-Stage 1 (Carrum Downs) Ceres Primary School-General Purpose 669 569 100 .. Ceres Primary School-General Purpose 669 569 100 .. Ceres Primary School-General Purpose 669 569 100 .. Classrooms, Distance Education, Toilets Classrooms, Distance Education, Toilets Classrooms, Distance Education, Toilets (Ceres) (Ceres) (Ceres) Chelsea Heights Primary School-General 1 809 259 1 550 .. Chelsea Heights Primary School-General 1 809 259 1 550 .. Chelsea Heights Primary School-General 1 809 259 1 550 .. Purpose Classrooms, Art/Craft, Staff Purpose Classrooms, Art/Craft, Staff Purpose Classrooms, Art/Craft, Staff Administration, Toilets, Multi-Purpose Administration, Toilets, Multi-Purpose Administration, Toilets, Multi-Purpose Room, Canteen & Music (Chelsea Room, Canteen & Music (Chelsea Room, Canteen & Music (Chelsea Heights) Heights) Heights) Cheltenham Secondary College-Stage 1 679 1 417 262 .. Cheltenham Secondary College-Stage 1 679 1 417 262 .. Cheltenham Secondary College-Stage 1 679 1 417 262 .. 1-GPC`s, Music/Drama, Physical 1-GPC`s, Music/Drama, Physical 1-GPC`s, Music/Drama, Physical Education, Lecture (Cheltenham) Education, Lecture (Cheltenham) Education, Lecture (Cheltenham) Education precinct in 10 500 1 234 9 266 .. Education precinct in 10 500 1 234 9 266 .. Education precinct in 10 500 1 234 9 266 .. Gippsland-Modernise facilities (Churchill) Gippsland-Modernise facilities (Churchill) Gippsland-Modernise facilities (Churchill) Cohuna Secondary College-Science, 1 078 884 194 .. Cohuna Secondary College-Science, 1 078 884 194 .. Cohuna Secondary College-Science, 1 078 884 194 .. Library (Cohuna) Library (Cohuna) Library (Cohuna) Colac South West Primary 979 626 353 .. Colac South West Primary 979 626 353 .. Colac South West Primary 979 626 353 .. School-General Purpose Classrooms, School-General Purpose Classrooms, School-General Purpose Classrooms, Art/Craft, Toilets (Colac) Art/Craft, Toilets (Colac) Art/Craft, Toilets (Colac) Corio Bay Senior College-Fire 2 342 780 1 562 .. Corio Bay Senior College-Fire 2 342 780 1 562 .. Corio Bay Senior College-Fire 2 342 780 1 562 .. Reinstatement (Corio Bay) Reinstatement (Corio Bay) Reinstatement (Corio Bay) Rangebank Primary School-General 1 499 392 1 107 .. Rangebank Primary School-General 1 499 392 1 107 .. Rangebank Primary School-General 1 499 392 1 107 .. Purpose Classrooms, Music, Toilets Purpose Classrooms, Music, Toilets Purpose Classrooms, Music, Toilets (Cranbourne) (Cranbourne) (Cranbourne) Croydon Hills Primary School-General 1 223 481 742 .. Croydon Hills Primary School-General 1 223 481 742 .. Croydon Hills Primary School-General 1 223 481 742 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Purpose Classrooms, Staff Administration, (Croydon Hills) Administration, (Croydon Hills) Administration, (Croydon Hills) Cairnlea Primary School (Deer 4 500 765 3 735 .. Cairnlea Primary School (Deer 4 500 765 3 735 .. Cairnlea Primary School (Deer 4 500 765 3 735 .. Park)-Replacement School on new site Park)-Replacement School on new site Park)-Replacement School on new site (Deer Park) (Deer Park) (Deer Park) Diamond Creek East Primary 681 329 352 .. Diamond Creek East Primary 681 329 352 .. Diamond Creek East Primary 681 329 352 .. School-General Purpose Classrooms, School-General Purpose Classrooms, School-General Purpose Classrooms, Canteen (Diamond Creek) Canteen (Diamond Creek) Canteen (Diamond Creek) East Loddon P-12 College-General 1 496 .. 1 496 .. East Loddon P-12 College-General 1 496 .. 1 496 .. East Loddon P-12 College-General 1 496 .. 1 496 .. Purpose Classrooms, Arts, Staff Purpose Classrooms, Arts, Staff Purpose Classrooms, Arts, Staff Administration, Toilets (Dingee) Administration, Toilets (Dingee) Administration, Toilets (Dingee) East Loddon P-12 College-Information 552 71 481 .. East Loddon P-12 College-Information 552 71 481 .. East Loddon P-12 College-Information 552 71 481 .. Technology, Science (Dingee) Technology, Science (Dingee) Technology, Science (Dingee) Doncaster Secondary College-General 1 581 200 1 381 .. Doncaster Secondary College-General 1 581 200 1 381 .. Doncaster Secondary College-General 1 581 200 1 381 .. Purpose Classrooms, Lockers, Toilets, Purpose Classrooms, Lockers, Toilets, Purpose Classrooms, Lockers, Toilets, Home Economics (Doncaster) Home Economics (Doncaster) Home Economics (Doncaster) Public Sector Asset Investment Program 2003-04 Education and Training 21 Public Sector Asset Investment Program 2003-04 Education and Training 21 Public Sector Asset Investment Program 2003-04 Education and Training 21

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Dromana Primary School-General 1 788 79 1 709 .. Dromana Primary School-General 1 788 79 1 709 .. Purpose Classrooms, Art/Craft, Music, Purpose Classrooms, Art/Craft, Music, Staff Administration, Canteen (Dromana) Staff Administration, Canteen (Dromana) Dromana Secondary College-Stage 2 085 294 1 791 .. Dromana Secondary College-Stage 2 085 294 1 791 .. 2-Staff Admin, Teaching spaces, Arts, 2-Staff Admin, Teaching spaces, Arts, Personal Development (Dromana) Personal Development (Dromana) Peninsula SDS/Special 3 026 2 723 303 .. Peninsula SDS/Special 3 026 2 723 303 .. School-Replacement School in School-Replacement School in permanent buildings (Dromana) permanent buildings (Dromana) Drouin Secondary College-2 Graphics 483 389 94 .. Drouin Secondary College-2 Graphics 483 389 94 .. Rooms, Fabrics (Drouin) Rooms, Fabrics (Drouin) Edenhope P-12 College-Stage 2 128 1 208 920 .. Edenhope P-12 College-Stage 2 128 1 208 920 .. 2-Redevelopment-Arts, Primary General 2-Redevelopment-Arts, Primary General Purpose Classrooms (Edenhope) Purpose Classrooms (Edenhope) Eltham High School-Technology (Eltham) 1 477 1 258 219 .. Eltham High School-Technology (Eltham) 1 477 1 258 219 .. Etham East Primary School-General 749 409 340 .. Etham East Primary School-General 749 409 340 .. Purpose Classrooms (Eltham) Purpose Classrooms (Eltham) Glen Katherine Primary School-General 1 394 1 069 325 .. Glen Katherine Primary School-General 1 394 1 069 325 .. Purpose Classrooms, Toilets & Purpose Classrooms, Toilets & Administration upgrade (Eltham North) Administration upgrade (Eltham North) Epping Primary School-General Purpose 864 5 859 .. Epping Primary School-General Purpose 864 5 859 .. Classrooms (Epping) Classrooms (Epping) Lalor North Secondary College-Canteen 1 468 585 883 .. Lalor North Secondary College-Canteen 1 468 585 883 .. and General Purpose Classrooms and General Purpose Classrooms Upgrade, Graphics, New Music and Upgrade, Graphics, New Music and Drama (Epping) Drama (Epping) Buckley Park Secondary 1 308 1 171 137 .. Buckley Park Secondary 1 308 1 171 137 .. College-Technology, Food Technology, College-Technology, Food Technology, Science (Essendon) Science (Essendon) Wattle View Primary School-General 1 178 1 077 101 .. Wattle View Primary School-General 1 178 1 077 101 .. Purpose Classrooms, Art/Craft, Purpose Classrooms, Art/Craft, Canteen, Music, Multi-Purpose (Ferntree Canteen, Music, Multi-Purpose (Ferntree Gully) Gully) Fitzroy Secondary College-Total Upgrade 6 000 1 450 4 550 .. Fitzroy Secondary College-Total Upgrade 6 000 1 450 4 550 .. (Fitzroy) (Fitzroy) Footscray City Secondary 1 120 882 238 .. Footscray City Secondary 1 120 882 238 .. College-Technology facility (Footscray) College-Technology facility (Footscray) Footscray North Primary School-General 876 777 99 .. Footscray North Primary School-General 876 777 99 .. Purpose Classrooms, Toilet Upgrade Purpose Classrooms, Toilet Upgrade (Footscray) (Footscray) Derinya Primary School-General Purpose 2 584 1 015 1 569 .. Derinya Primary School-General Purpose 2 584 1 015 1 569 .. Classrooms, Staff Administration, Music, Classrooms, Staff Administration, Music, Art/Craft, Student Toilets, Canteen Art/Craft, Student Toilets, Canteen (Frankston) (Frankston) Frankston High School-Science, 1 371 240 1 131 .. Frankston High School-Science, 1 371 240 1 131 .. Information Technology, Library Information Technology, Library (Frankston) (Frankston) Frankston High School-Stage 1-Art, 970 770 200 .. Frankston High School-Stage 1-Art, 970 770 200 .. (Frankston) (Frankston) 22 Education and Training Public Sector Asset Investment Program 2003-04 22 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Geelong South Primary School-General 1 576 620 956 .. Geelong South Primary School-General 1 576 620 956 .. Geelong South Primary School-General 1 576 620 956 .. Purpose Classrooms (Geelong) Purpose Classrooms (Geelong) Purpose Classrooms (Geelong) Geelong East Primary School-General 1 568 933 635 .. Geelong East Primary School-General 1 568 933 635 .. Geelong East Primary School-General 1 568 933 635 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Purpose Classrooms, Staff Administration (Geelong East) Administration (Geelong East) Administration (Geelong East) James Harrison Secondary 1 196 .. 1 196 .. James Harrison Secondary 1 196 .. 1 196 .. James Harrison Secondary 1 196 .. 1 196 .. College-Technology Enhanced College-Technology Enhanced College-Technology Enhanced Classrooms (Geelong East) Classrooms (Geelong East) Classrooms (Geelong East) Tate Street Primary School 1 268 3 1 265 .. Tate Street Primary School 1 268 3 1 265 .. Tate Street Primary School 1 268 3 1 265 .. Geelong-General Purpose Classrooms, Geelong-General Purpose Classrooms, Geelong-General Purpose Classrooms, Multi-Purpose facilities, Canteen Multi-Purpose facilities, Canteen Multi-Purpose facilities, Canteen (Geelong East) (Geelong East) (Geelong East) Herne Hill Primary School-Technology 1 040 750 290 .. Herne Hill Primary School-Technology 1 040 750 290 .. Herne Hill Primary School-Technology 1 040 750 290 .. Enhanced Classrooms, Music, Drama Enhanced Classrooms, Music, Drama Enhanced Classrooms, Music, Drama facilities (Geelong North) facilities (Geelong North) facilities (Geelong North) North Geelong Secondary College-Library 1 017 985 32 .. North Geelong Secondary College-Library 1 017 985 32 .. North Geelong Secondary College-Library 1 017 985 32 .. (Geelong North) (Geelong North) (Geelong North) Gisborne Secondary College-Permanent 1 705 1 590 115 .. Gisborne Secondary College-Permanent 1 705 1 590 115 .. Gisborne Secondary College-Permanent 1 705 1 590 115 .. facilities (Gisborne) facilities (Gisborne) facilities (Gisborne) Camberwell South Primary 2 502 1 200 1 302 .. Camberwell South Primary 2 502 1 200 1 302 .. Camberwell South Primary 2 502 1 200 1 302 .. School-General Purpose Classrooms, School-General Purpose Classrooms, School-General Purpose Classrooms, Music, Art/Craft, Physical Education, Music, Art/Craft, Physical Education, Music, Art/Craft, Physical Education, Canteen, Toilets (Glen Iris) Canteen, Toilets (Glen Iris) Canteen, Toilets (Glen Iris) Glendal Primary School-General Purpose 1 105 787 318 .. Glendal Primary School-General Purpose 1 105 787 318 .. Glendal Primary School-General Purpose 1 105 787 318 .. Classrooms, Staff Administration, Toilets Classrooms, Staff Administration, Toilets Classrooms, Staff Administration, Toilets and Canteen (Glen Waverley) and Canteen (Glen Waverley) and Canteen (Glen Waverley) Box Forest Secondary College-Upgrade 401 292 109 .. Box Forest Secondary College-Upgrade 401 292 109 .. Box Forest Secondary College-Upgrade 401 292 109 .. Arts facilities (Glenroy) Arts facilities (Glenroy) Arts facilities (Glenroy) Golden Square Primary School-Upgrade 746 581 165 .. Golden Square Primary School-Upgrade 746 581 165 .. Golden Square Primary School-Upgrade 746 581 165 .. Stage 1-Technology Enhanced Stage 1-Technology Enhanced Stage 1-Technology Enhanced Classrooms (Golden Square) Classrooms (Golden Square) Classrooms (Golden Square) Specimen Hill Secondary 100 .. 100 .. Specimen Hill Secondary 100 .. 100 .. Specimen Hill Secondary 100 .. 100 .. College-Modernise facilities-Upgrade College-Modernise facilities-Upgrade College-Modernise facilities-Upgrade (Golden Square) (Golden Square) (Golden Square) Greensborough Secondary 1 120 307 813 .. Greensborough Secondary 1 120 307 813 .. Greensborough Secondary 1 120 307 813 .. College-General Purpose Classrooms College-General Purpose Classrooms College-General Purpose Classrooms Upgrade, Arts, (Greensborough) Upgrade, Arts, (Greensborough) Upgrade, Arts, (Greensborough) Grovedale Secondary College-Stage 2 1 060 924 136 .. Grovedale Secondary College-Stage 2 1 060 924 136 .. Grovedale Secondary College-Stage 2 1 060 924 136 .. (Grovedale) (Grovedale) (Grovedale) Hampton Park Secondary College-Stage 1 130 1 037 93 .. Hampton Park Secondary College-Stage 1 130 1 037 93 .. Hampton Park Secondary College-Stage 1 130 1 037 93 .. 1-Redevelopment (Hampton Park) 1-Redevelopment (Hampton Park) 1-Redevelopment (Hampton Park) Heathcote Primary School-7 General 1 670 1 201 469 .. Heathcote Primary School-7 General 1 670 1 201 469 .. Heathcote Primary School-7 General 1 670 1 201 469 .. Purpose Classrooms, Staff/Admin, Purpose Classrooms, Staff/Admin, Purpose Classrooms, Staff/Admin, Toilets (Heathcote) Toilets (Heathcote) Toilets (Heathcote) Heathmont College-Commerce, Science 927 776 151 .. Heathmont College-Commerce, Science 927 776 151 .. Heathmont College-Commerce, Science 927 776 151 .. (Heathmont) (Heathmont) (Heathmont) Heidelberg Primary School-Multi-Purpose, 265 4 261 .. Heidelberg Primary School-Multi-Purpose, 265 4 261 .. Heidelberg Primary School-Multi-Purpose, 265 4 261 .. Canteen (Heidelberg) Canteen (Heidelberg) Canteen (Heidelberg)

Public Sector Asset Investment Program 2003-04 Education and Training 23 Public Sector Asset Investment Program 2003-04 Education and Training 23 Public Sector Asset Investment Program 2003-04 Education and Training 23

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Sydenham Secondary College-New 3 880 3 840 40 .. Sydenham Secondary College-New 3 880 3 840 40 .. School-Stage 2 (Hillside) School-Stage 2 (Hillside) Horsham College-Administration, 3 950 3 286 664 .. Horsham College-Administration, 3 950 3 286 664 .. Technology, Special Developmental Technology, Special Developmental School (Horsham) School (Horsham) Ivanhoe East Primary School-General 1 344 55 1 289 .. Ivanhoe East Primary School-General 1 344 55 1 289 .. Purpose Classrooms, Art/Craft, Toilets Purpose Classrooms, Art/Craft, Toilets (Ivanhoe East) (Ivanhoe East) Kangaroo Flat Primary 3 500 113 3 387 .. Kangaroo Flat Primary 3 500 113 3 387 .. School-Replacement School (Kangaroo School-Replacement School (Kangaroo Flat) Flat) Copperfield College-Kings Park 1 280 1 167 113 .. Copperfield College-Kings Park 1 280 1 167 113 .. Campus-Fire Reinstatement (Kings Park) Campus-Fire Reinstatement (Kings Park) Kingsbury Primary School-General 761 43 718 .. Kingsbury Primary School-General 761 43 718 .. Purpose Classrooms, Art/Craft Purpose Classrooms, Art/Craft (Kingsbury) (Kingsbury) Lalor North Primary School-General 1 433 1 183 250 .. Lalor North Primary School-General 1 433 1 183 250 .. Purpose Classrooms, Canteen, Multi Purpose Classrooms, Canteen, Multi Purpose, Staff Administration and Music Purpose, Staff Administration and Music (Lalor) (Lalor) Lalor North Secondary College-Stage 1 025 968 57 .. Lalor North Secondary College-Stage 1 025 968 57 .. 1-General Purpose Classroom, Student 1-General Purpose Classroom, Student Lounge and Lecture facilities (Lalor) Lounge and Lecture facilities (Lalor) Lara Secondary College-New 3 000 135 2 865 .. Lara Secondary College-New 3 000 135 2 865 .. School-Stage 2 (Lara) School-Stage 2 (Lara) Laverton Secondary College-Science, 952 859 93 .. Laverton Secondary College-Science, 952 859 93 .. Technology (Laverton) Technology (Laverton) Leopold Primary 2 432 97 2 335 .. Leopold Primary 2 432 97 2 335 .. School-Reinstatement-Stage Two School-Reinstatement-Stage Two (Leopold) (Leopold) Leopold Primary School-Technology 1 763 153 1 610 .. Leopold Primary School-Technology 1 763 153 1 610 .. Enhanced Classrooms (Leopold) Enhanced Classrooms (Leopold) Birmingham Primary School-Technology 1 347 1 144 203 .. Birmingham Primary School-Technology 1 347 1 144 203 .. Enhanced Classrooms (Lilydale) Enhanced Classrooms (Lilydale) Macedon Primary School-General 1 494 555 939 .. Macedon Primary School-General 1 494 555 939 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Administration, Student Toilets, Administration, Student Toilets, (Macedon) (Macedon) Macleod College-Stage 505 421 84 .. Macleod College-Stage 505 421 84 .. 3-Staff/Administration Upgrade (Macleod) 3-Staff/Administration Upgrade (Macleod) Macleod College-Upgrade Food 367 330 37 .. Macleod College-Upgrade Food 367 330 37 .. Technology (Macleod) Technology (Macleod) Malvern Central School (P-9)-Library 1 650 1 493 157 .. Malvern Central School (P-9)-Library 1 650 1 493 157 .. Redevelopment and Staff Administration Redevelopment and Staff Administration facility (Malvern) facility (Malvern) Maryborough Community-Establishment 4 000 .. 4 000 .. Maryborough Community-Establishment 4 000 .. 4 000 .. of an education precinct (Maryborough) of an education precinct (Maryborough) McKinnon Secondary College-Technology 1 670 336 1 334 .. McKinnon Secondary College-Technology 1 670 336 1 334 .. (McKinnon) (McKinnon) 24 Education and Training Public Sector Asset Investment Program 2003-04 24 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Melton Secondary College-Technology, 2 060 1 875 185 .. Melton Secondary College-Technology, 2 060 1 875 185 .. Melton Secondary College-Technology, 2 060 1 875 185 .. Music, Drama facilities (Melton) Music, Drama facilities (Melton) Music, Drama facilities (Melton) Wedge Park Primary School-General 846 755 91 .. Wedge Park Primary School-General 846 755 91 .. Wedge Park Primary School-General 846 755 91 .. Purpose Classrooms (Melton) Purpose Classrooms (Melton) Purpose Classrooms (Melton) Gourlay Road Primary School-New 4 500 1 562 2 938 .. Gourlay Road Primary School-New 4 500 1 562 2 938 .. Gourlay Road Primary School-New 4 500 1 562 2 938 .. School (Melton East) School (Melton East) School (Melton East) Coburn Primary School-General Purpose 676 632 44 .. Coburn Primary School-General Purpose 676 632 44 .. Coburn Primary School-General Purpose 676 632 44 .. Classroom, Music, Physical Education, Classroom, Music, Physical Education, Classroom, Music, Physical Education, Toilets and Canteen (Melton South) Toilets and Canteen (Melton South) Toilets and Canteen (Melton South) Mentone Primary School-General Purpose 1 958 1 259 699 .. Mentone Primary School-General Purpose 1 958 1 259 699 .. Mentone Primary School-General Purpose 1 958 1 259 699 .. Classrooms, Multi Purpose, Toilets, Classrooms, Multi Purpose, Toilets, Classrooms, Multi Purpose, Toilets, Canteen & Staff Administration Canteen & Staff Administration Canteen & Staff Administration (Mentone) (Mentone) (Mentone) Middle Park Primary School-General 1 381 98 1 283 .. Middle Park Primary School-General 1 381 98 1 283 .. Middle Park Primary School-General 1 381 98 1 283 .. Purpose Classrooms, Multi Purpose Purpose Classrooms, Multi Purpose Purpose Classrooms, Multi Purpose facilities, Music, Art/Craft, Student facilities, Music, Art/Craft, Student facilities, Music, Art/Craft, Student Toilets & Staff Administration (Middle Toilets & Staff Administration (Middle Toilets & Staff Administration (Middle Park) Park) Park) Mildura Special Developmental 700 607 93 .. Mildura Special Developmental 700 607 93 .. Mildura Special Developmental 700 607 93 .. School-Stage 3-Replacement School School-Stage 3-Replacement School School-Stage 3-Replacement School (Mildura) (Mildura) (Mildura) Mill Park Primary School-Stage 950 872 78 .. Mill Park Primary School-Stage 950 872 78 .. Mill Park Primary School-Stage 950 872 78 .. 1-Classroom upgrade (Mill Park) 1-Classroom upgrade (Mill Park) 1-Classroom upgrade (Mill Park) Montmorency Secondary 1 637 1 466 171 .. Montmorency Secondary 1 637 1 466 171 .. Montmorency Secondary 1 637 1 466 171 .. College-Technology Enhanced College-Technology Enhanced College-Technology Enhanced Classrooms, Personal Development Classrooms, Personal Development Classrooms, Personal Development (Montmorency) (Montmorency) (Montmorency) Mooroolbark East Primary School-Stage 1 069 826 243 .. Mooroolbark East Primary School-Stage 1 069 826 243 .. Mooroolbark East Primary School-Stage 1 069 826 243 .. 2-GPC`s, Physical Education, Music, 2-GPC`s, Physical Education, Music, 2-GPC`s, Physical Education, Music, Canteen & Staff Administration Canteen & Staff Administration Canteen & Staff Administration (Mooroolbark) (Mooroolbark) (Mooroolbark) Mooroopna Primary School-Fire 1 476 656 820 .. Mooroopna Primary School-Fire 1 476 656 820 .. Mooroopna Primary School-Fire 1 476 656 820 .. Reinstatement (Mooroopna) Reinstatement (Mooroopna) Reinstatement (Mooroopna) Mooroopna Secondary 2 218 1 604 614 .. Mooroopna Secondary 2 218 1 604 614 .. Mooroopna Secondary 2 218 1 604 614 .. College-Technology Upgrade College-Technology Upgrade College-Technology Upgrade (Mooroopna) (Mooroopna) (Mooroopna) Moreland City College-Art, Graphics, 639 604 35 .. Moreland City College-Art, Graphics, 639 604 35 .. Moreland City College-Art, Graphics, 639 604 35 .. Music, Drama facilities (Moreland) Music, Drama facilities (Moreland) Music, Drama facilities (Moreland) Kunyung Primary School-Stage 825 784 41 .. Kunyung Primary School-Stage 825 784 41 .. Kunyung Primary School-Stage 825 784 41 .. 2-Redevelopment (Mount Eliza) 2-Redevelopment (Mount Eliza) 2-Redevelopment (Mount Eliza) Kunyung Primary School-Stage 3-Four 704 663 41 .. Kunyung Primary School-Stage 3-Four 704 663 41 .. Kunyung Primary School-Stage 3-Four 704 663 41 .. permanent General Purpose permanent General Purpose permanent General Purpose Classrooms, resiting 3 x 5 mod. Classrooms, resiting 3 x 5 mod. Classrooms, resiting 3 x 5 mod. relocatables (Mount Eliza) relocatables (Mount Eliza) relocatables (Mount Eliza) Mount Eliza Primary School-General 1 881 819 1 062 .. Mount Eliza Primary School-General 1 881 819 1 062 .. Mount Eliza Primary School-General 1 881 819 1 062 .. Purpose Classrooms, Music, Staff Purpose Classrooms, Music, Staff Purpose Classrooms, Music, Staff Administration & Student Toilets (Mt Administration & Student Toilets (Mt Administration & Student Toilets (Mt Eliza) Eliza) Eliza)

Public Sector Asset Investment Program 2003-04 Education and Training 25 Public Sector Asset Investment Program 2003-04 Education and Training 25 Public Sector Asset Investment Program 2003-04 Education and Training 25

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Murrumbeena Primary School-Stage 1 042 641 401 .. Murrumbeena Primary School-Stage 1 042 641 401 .. 1-Music, Art/Craft, Student Toilet & Staff 1-Music, Art/Craft, Student Toilet & Staff Administration (Murrumbeena) Administration (Murrumbeena) Murtoa P-12 College-3 General Purpose 1 211 766 445 .. Murtoa P-12 College-3 General Purpose 1 211 766 445 .. Classrooms, Staff Administration, Toilets Classrooms, Staff Administration, Toilets (Murtoa) (Murtoa) Napoleons Primary School.-Relocation, 1 343 1 106 237 .. Napoleons Primary School.-Relocation, 1 343 1 106 237 .. Permanent Facilities (Napoleons) Permanent Facilities (Napoleons) Narre Warren P-12 College-New 4 500 932 3 568 .. Narre Warren P-12 College-New 4 500 932 3 568 .. School-Stage 3 (Narre Warren South) School-Stage 3 (Narre Warren South) Narre Warren South P-12-New 4 500 3 231 1 269 .. Narre Warren South P-12-New 4 500 3 231 1 269 .. School-Stage 2 (Narre Warren South) School-Stage 2 (Narre Warren South) Chilwell Primary School-General Purpose 1 194 .. 1 194 .. Chilwell Primary School-General Purpose 1 194 .. 1 194 .. Classrooms, Art/Craft & Multi-Purpose Classrooms, Art/Craft & Multi-Purpose Room, Toilets (Newtown) Room, Toilets (Newtown) Chilwell Primary School-Library 131 20 111 .. Chilwell Primary School-Library 131 20 111 .. (Newtown) (Newtown) Nhill College-General Purpose 579 438 141 .. Nhill College-General Purpose 579 438 141 .. Classrooms, (Nhill) Classrooms, (Nhill) Niddrie Secondary College-New Canteen 379 273 106 .. Niddrie Secondary College-New Canteen 379 273 106 .. and Upgrade part Staff Administration and Upgrade part Staff Administration facility (Niddrie) facility (Niddrie) Blackburn Lake Primary School-Fire 1 000 895 105 .. Blackburn Lake Primary School-Fire 1 000 895 105 .. Reinstatement (Nunawading) Reinstatement (Nunawading) Pakenham Secondary College-Information 194 32 162 .. Pakenham Secondary College-Information 194 32 162 .. Technology (Pakenham) Technology (Pakenham) Pakenham Secondary College-Music 230 .. 230 .. Pakenham Secondary College-Music 230 .. 230 .. Drama (Pakenham) Drama (Pakenham) Pakenham Secondary College-PE, Music 1 340 1 075 265 .. Pakenham Secondary College-PE, Music 1 340 1 075 265 .. and Drama facilities (Pakenham) and Drama facilities (Pakenham) University High-Gene technology Access 4 200 1 629 2 571 .. University High-Gene technology Access 4 200 1 629 2 571 .. Centre (Parkville) Centre (Parkville) Preston Primary School-Multi-Purpose, 485 235 250 .. Preston Primary School-Multi-Purpose, 485 235 250 .. Music and Canteen (Preston) Music and Canteen (Preston) Preston North East Primary 238 .. 238 .. Preston North East Primary 238 .. 238 .. School-Art/Craft upgrade (Preston East) School-Art/Craft upgrade (Preston East) Preston North East Primary 310 .. 310 .. Preston North East Primary 310 .. 310 .. School-Library (Preston East) School-Library (Preston East) Red Cliffs Secondary College-Stage 705 320 385 .. Red Cliffs Secondary College-Stage 705 320 385 .. 2-Upgrade (Red Cliffs) 2-Upgrade (Red Cliffs) Melbourne Girls Secondary College-Stage 805 428 377 .. Melbourne Girls Secondary College-Stage 805 428 377 .. 2-Music and Drama facility (Richmond) 2-Music and Drama facility (Richmond) Ringwood Secondary College-General 2 855 2 769 86 .. Ringwood Secondary College-General 2 855 2 769 86 .. Purpose Classroom, personal develop, Purpose Classroom, personal develop, Library, Staff administration facilities Library, Staff administration facilities (Ringwood) (Ringwood) Ringwood Secondary College-Music and 1 004 756 248 .. Ringwood Secondary College-Music and 1 004 756 248 .. Drama, General Purpose Classrooms Drama, General Purpose Classrooms (Ringwood) (Ringwood) 26 Education and Training Public Sector Asset Investment Program 2003-04 26 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Ringwood Secondary College-Stage 2 292 1 218 1 074 .. Ringwood Secondary College-Stage 2 292 1 218 1 074 .. Ringwood Secondary College-Stage 2 292 1 218 1 074 .. 3-General Purpose Classrooms, Toilets 3-General Purpose Classrooms, Toilets 3-General Purpose Classrooms, Toilets & Staff/Administration (Ringwood) & Staff/Administration (Ringwood) & Staff/Administration (Ringwood) Rosanna Primary School-General 738 320 418 .. Rosanna Primary School-General 738 320 418 .. Rosanna Primary School-General 738 320 418 .. Purpose Classrooms, Art/Craft Purpose Classrooms, Art/Craft Purpose Classrooms, Art/Craft (Rosanna) (Rosanna) (Rosanna) Viewbank College-Art, Fabrics (Rosanna) 701 400 301 .. Viewbank College-Art, Fabrics (Rosanna) 701 400 301 .. Viewbank College-Art, Fabrics (Rosanna) 701 400 301 .. Viewbank College-Technology, Food 876 568 308 .. Viewbank College-Technology, Food 876 568 308 .. Viewbank College-Technology, Food 876 568 308 .. Technology (Rosanna) Technology (Rosanna) Technology (Rosanna) Rosebud Secondary College-Commerce, 1 983 555 1 428 .. Rosebud Secondary College-Commerce, 1 983 555 1 428 .. Rosebud Secondary College-Commerce, 1 983 555 1 428 .. Science, Library (Rosebud) Science, Library (Rosebud) Science, Library (Rosebud) Roxburgh Park Secondary College-New 4 500 302 4 198 .. Roxburgh Park Secondary College-New 4 500 302 4 198 .. Roxburgh Park Secondary College-New 4 500 302 4 198 .. School-Stage 2 (Roxburgh Park) School-Stage 2 (Roxburgh Park) School-Stage 2 (Roxburgh Park) Rutherglen High School-Technology, Arts 1 040 999 41 .. Rutherglen High School-Technology, Arts 1 040 999 41 .. Rutherglen High School-Technology, Arts 1 040 999 41 .. Upgrades, General Purpose Classrooms Upgrades, General Purpose Classrooms Upgrades, General Purpose Classrooms (Rutherglen) (Rutherglen) (Rutherglen) Guthridge Primary 867 384 483 .. Guthridge Primary 867 384 483 .. Guthridge Primary 867 384 483 .. School-Staff/Administration, Music, School-Staff/Administration, Music, School-Staff/Administration, Music, General Purpose Classroom, Student General Purpose Classroom, Student General Purpose Classroom, Student Toilets (Sale) Toilets (Sale) Toilets (Sale) Sale Primary School-General Purpose 1 232 298 934 .. Sale Primary School-General Purpose 1 232 298 934 .. Sale Primary School-General Purpose 1 232 298 934 .. Classrooms, Music, Store, Canteen, Classrooms, Music, Store, Canteen, Classrooms, Music, Store, Canteen, Toilets (Sale) Toilets (Sale) Toilets (Sale) Sebastopol Secondary College-Science 1 560 1 491 69 .. Sebastopol Secondary College-Science 1 560 1 491 69 .. Sebastopol Secondary College-Science 1 560 1 491 69 .. facilities (Sebastopol) facilities (Sebastopol) facilities (Sebastopol) Albanvale Primary School-Ten new 1 408 1 247 161 .. Albanvale Primary School-Ten new 1 408 1 247 161 .. Albanvale Primary School-Ten new 1 408 1 247 161 .. Technology Enhanced Classrooms (St Technology Enhanced Classrooms (St Technology Enhanced Classrooms (St Albans) Albans) Albans) St Albans Secondary College-Stage 1 705 1 516 189 .. St Albans Secondary College-Stage 1 705 1 516 189 .. St Albans Secondary College-Stage 1 705 1 516 189 .. 1-Technology and PE facilities (St 1-Technology and PE facilities (St 1-Technology and PE facilities (St Albans) Albans) Albans) Strathmore Secondary College-Space 6 400 326 6 074 .. Strathmore Secondary College-Space 6 400 326 6 074 .. Strathmore Secondary College-Space 6 400 326 6 074 .. Science education Centre (Strathmore) Science education Centre (Strathmore) Science education Centre (Strathmore) Sunbury West Primary School-Library 194 163 31 .. Sunbury West Primary School-Library 194 163 31 .. Sunbury West Primary School-Library 194 163 31 .. (Sunbury) (Sunbury) (Sunbury) Sunbury West Primary School-Physical 905 .. 905 .. Sunbury West Primary School-Physical 905 .. 905 .. Sunbury West Primary School-Physical 905 .. 905 .. Education, Music, General Purpose Education, Music, General Purpose Education, Music, General Purpose Classrooms, Toilets (Sunbury) Classrooms, Toilets (Sunbury) Classrooms, Toilets (Sunbury) Chatham Primary School-General 825 721 104 .. Chatham Primary School-General 825 721 104 .. Chatham Primary School-General 825 721 104 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Purpose Classrooms, Staff Administration facilities (Surrey Hills) Administration facilities (Surrey Hills) Administration facilities (Surrey Hills) Copperfield Secondary College-New 3 500 230 3 270 .. Copperfield Secondary College-New 3 500 230 3 270 .. Copperfield Secondary College-New 3 500 230 3 270 .. School-Stage 3 (Sydenham) School-Stage 3 (Sydenham) School-Stage 3 (Sydenham) Kiewa Valley Primary School -Technology 1 057 224 833 .. Kiewa Valley Primary School -Technology 1 057 224 833 .. Kiewa Valley Primary School -Technology 1 057 224 833 .. Enhanced Classrooms and Enhanced Classrooms and Enhanced Classrooms and Multi-Purpose facilities (Tangambalanga) Multi-Purpose facilities (Tangambalanga) Multi-Purpose facilities (Tangambalanga) Templestowe Park Primary 784 47 737 .. Templestowe Park Primary 784 47 737 .. Templestowe Park Primary 784 47 737 .. School-General Purpose Classrooms, School-General Purpose Classrooms, School-General Purpose Classrooms, Art/Craft, Multi-Purpose (Templestowe) Art/Craft, Multi-Purpose (Templestowe) Art/Craft, Multi-Purpose (Templestowe) Public Sector Asset Investment Program 2003-04 Education and Training 27 Public Sector Asset Investment Program 2003-04 Education and Training 27 Public Sector Asset Investment Program 2003-04 Education and Training 27

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 The Patch Primary School-General 676 170 506 .. The Patch Primary School-General 676 170 506 .. Purpose Classrooms (The Patch) Purpose Classrooms (The Patch) Tooradin Primary School-Stage 2-Five 1 053 432 621 .. Tooradin Primary School-Stage 2-Five 1 053 432 621 .. GPC`s, Multi-Purpose Room, Canteen, GPC`s, Multi-Purpose Room, Canteen, Student Toilets (Tooradin) Student Toilets (Tooradin) Tooradin Primary School-Permanent 825 736 89 .. Tooradin Primary School-Permanent 825 736 89 .. General Purpose Classrooms (Tooradin) General Purpose Classrooms (Tooradin) Trafalgar High School-Science, 1 143 108 1 035 .. Trafalgar High School-Science, 1 143 108 1 035 .. Technology (Trafalgar) Technology (Trafalgar) Trafalgar High School-Staff 1 685 .. 1 685 .. Trafalgar High School-Staff 1 685 .. 1 685 .. Administration, Arts, Personal Administration, Arts, Personal Development, Bus loop (Trafalgar) Development, Bus loop (Trafalgar) (Grey St) Primary 1 830 1 489 341 .. Traralgon (Grey St) Primary 1 830 1 489 341 .. School-Library, General Purpose School-Library, General Purpose Classrooms (Traralgon) Classrooms (Traralgon) Traralgon (Kosc. St) Primary 1 136 477 659 .. Traralgon (Kosc. St) Primary 1 136 477 659 .. School-General Purpose Classrooms, School-General Purpose Classrooms, Staff/Administration and Student Toilets Staff/Administration and Student Toilets (Traralgon) (Traralgon) Traralgon (Stockdale Rd) Primary 1 404 689 715 .. Traralgon (Stockdale Rd) Primary 1 404 689 715 .. School-General Purpose Classrooms, School-General Purpose Classrooms, Art/Craft, Staff Administration, Canteen, Art/Craft, Staff Administration, Canteen, Student Toilets (Traralgon) Student Toilets (Traralgon) Upper Ferntree Gully Primary School-Art, 603 529 74 .. Upper Ferntree Gully Primary School-Art, 603 529 74 .. Music, Toilets, Relocatable classrooms Music, Toilets, Relocatable classrooms (Upper Ferntree Gully) (Upper Ferntree Gully) Weeden Heights Primary School-General 1 215 1 116 99 .. Weeden Heights Primary School-General 1 215 1 116 99 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Administration facilities (Vermont South) Administration facilities (Vermont South) Wallington Primary School-General 1 201 427 774 .. Wallington Primary School-General 1 201 427 774 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Administration, Toilets (Wallington) Administration, Toilets (Wallington) Wangaratta Primary School-General 920 770 150 .. Wangaratta Primary School-General 920 770 150 .. Purpose Classrooms, Art/Craft, Library, Purpose Classrooms, Art/Craft, Library, Staff Administration facilities Staff Administration facilities (Wangaratta) (Wangaratta) Knox Gardens Primary School-General 504 185 319 .. Knox Gardens Primary School-General 504 185 319 .. Purpose Classrooms, Toilets (Wantirna Purpose Classrooms, Toilets (Wantirna South) South) Warragul Primary School-Albert 475 215 260 .. Warragul Primary School-Albert 475 215 260 .. St-General Purpose Classrooms, Staff St-General Purpose Classrooms, Staff work (Warragul) work (Warragul) Warragul RC-Technology Enhanced 899 294 605 .. Warragul RC-Technology Enhanced 899 294 605 .. Classrooms (Warragul) Classrooms (Warragul) Warragul RC-Technology facility 646 586 60 .. Warragul RC-Technology facility 646 586 60 .. (Warragul) (Warragul) Anderson`s Creek Primary 941 157 784 .. Anderson`s Creek Primary 941 157 784 .. School-General Purpose Classrooms School-General Purpose Classrooms (Warrandyte) (Warrandyte) 28 Education and Training Public Sector Asset Investment Program 2003-04 28 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Warrnambool Secondary College-Stage 1 995 1 585 410 .. Warrnambool Secondary College-Stage 1 995 1 585 410 .. Warrnambool Secondary College-Stage 1 995 1 585 410 .. 2-Science, Art facilities (Warrnambool) 2-Science, Art facilities (Warrnambool) 2-Science, Art facilities (Warrnambool) Wedderburn P-12 College-P-12 1 340 1 207 133 .. Wedderburn P-12 College-P-12 1 340 1 207 133 .. Wedderburn P-12 College-P-12 1 340 1 207 133 .. implementation (Wedderburn) implementation (Wedderburn) implementation (Wedderburn) Manorvale Primary School-Stage 1 100 999 101 .. Manorvale Primary School-Stage 1 100 999 101 .. Manorvale Primary School-Stage 1 100 999 101 .. 1-General Purpose Classroom x 10 1-General Purpose Classroom x 10 1-General Purpose Classroom x 10 Upgrade (Werribee) Upgrade (Werribee) Upgrade (Werribee) Sunshine Heights Primary School-General 722 238 484 .. Sunshine Heights Primary School-General 722 238 484 .. Sunshine Heights Primary School-General 722 238 484 .. Purpose Classrooms (West Sunshine) Purpose Classrooms (West Sunshine) Purpose Classrooms (West Sunshine) Wheelers Hill Secondary 1 683 1 007 676 .. Wheelers Hill Secondary 1 683 1 007 676 .. Wheelers Hill Secondary 1 683 1 007 676 .. College-Technology, Library (Wheelers College-Technology, Library (Wheelers College-Technology, Library (Wheelers Hill) Hill) Hill) Bayside Secondary College-Information 833 557 276 .. Bayside Secondary College-Information 833 557 276 .. Bayside Secondary College-Information 833 557 276 .. Technology, Food Technology, Science Technology, Food Technology, Science Technology, Food Technology, Science (Williamstown) (Williamstown) (Williamstown) Wodonga High School-Technology 2 158 614 1 544 .. Wodonga High School-Technology 2 158 614 1 544 .. Wodonga High School-Technology 2 158 614 1 544 .. (Wodonga) (Wodonga) (Wodonga) Yarra Glen Primary School-General 755 214 540 .. Yarra Glen Primary School-General 755 214 540 .. Yarra Glen Primary School-General 755 214 540 .. Purpose Classrooms, Art/Craft room, Purpose Classrooms, Art/Craft room, Purpose Classrooms, Art/Craft room, (Yarra Glen) (Yarra Glen) (Yarra Glen) Yarra Glen Primary School-Library (Yarra 199 122 77 .. Yarra Glen Primary School-Library (Yarra 199 122 77 .. Yarra Glen Primary School-Library (Yarra 199 122 77 .. Glen) Glen) Glen) Wembley Primary School-General 1 056 345 711 .. Wembley Primary School-General 1 056 345 711 .. Wembley Primary School-General 1 056 345 711 .. Purpose Classrooms, Staff Purpose Classrooms, Staff Purpose Classrooms, Staff Administration, Toilets, Canteen Administration, Toilets, Canteen Administration, Toilets, Canteen (Yarraville) (Yarraville) (Yarraville) Special/Other Special/Other Special/Other Better Learning 40 000 37 513 2 487 .. Better Learning 40 000 37 513 2 487 .. Better Learning 40 000 37 513 2 487 .. Environments-Modernisation of school Environments-Modernisation of school Environments-Modernisation of school facilities to incorporate ICT (Statewide) facilities to incorporate ICT (Statewide) facilities to incorporate ICT (Statewide) Bridging the Digital Divide-(Statewide) 23 000 19 924 3 076 .. Bridging the Digital Divide-(Statewide) 23 000 19 924 3 076 .. Bridging the Digital Divide-(Statewide) 23 000 19 924 3 076 .. Broadband ICT infrastructure for 19 000 18 936 64 .. Broadband ICT infrastructure for 19 000 18 936 64 .. Broadband ICT infrastructure for 19 000 18 936 64 .. TAFE-Upgrade of obsolete & deficient TAFE-Upgrade of obsolete & deficient TAFE-Upgrade of obsolete & deficient ICT (Statewide) ICT (Statewide) ICT (Statewide) Statewide-TAFE-Online information/help 800 451 349 .. Statewide-TAFE-Online information/help 800 451 349 .. Statewide-TAFE-Online information/help 800 451 349 .. facility `Pathways to TAFE` (Statewide) facility `Pathways to TAFE` (Statewide) facility `Pathways to TAFE` (Statewide) Various-TAFE-Replacement of obsolete 20 000 14 985 5 015 .. Various-TAFE-Replacement of obsolete 20 000 14 985 5 015 .. Various-TAFE-Replacement of obsolete 20 000 14 985 5 015 .. training equipment (Various) training equipment (Various) training equipment (Various) Various Schools-Expand and refresh 28 000 21 000 7 000 .. Various Schools-Expand and refresh 28 000 21 000 7 000 .. Various Schools-Expand and refresh 28 000 21 000 7 000 .. computers in schools (Various) computers in schools (Various) computers in schools (Various) Various TAFE Institutes-Communications 3 500 3 086 414 .. Various TAFE Institutes-Communications 3 500 3 086 414 .. Various TAFE Institutes-Communications 3 500 3 086 414 .. infrastructure (Various) infrastructure (Various) infrastructure (Various) Training and Further Education Training and Further Education Training and Further Education Australian College of Wine (Ararat) 7 400 5 096 2 304 .. Australian College of Wine (Ararat) 7 400 5 096 2 304 .. Australian College of Wine (Ararat) 7 400 5 096 2 304 .. Bacchus Marsh Science and Technology 4 000 216 3 784 .. Bacchus Marsh Science and Technology 4 000 216 3 784 .. Bacchus Marsh Science and Technology 4 000 216 3 784 .. Centre-Upgrade and Refurbish (Bacchus Centre-Upgrade and Refurbish (Bacchus Centre-Upgrade and Refurbish (Bacchus Marsh) Marsh) Marsh)

Public Sector Asset Investment Program 2003-04 Education and Training 29 Public Sector Asset Investment Program 2003-04 Education and Training 29 Public Sector Asset Investment Program 2003-04 Education and Training 29

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 East Gippsland Institute of 510 456 54 .. East Gippsland Institute of 510 456 54 .. TAFE-Refurbish Buildings (Bairnsdale) TAFE-Refurbish Buildings (Bairnsdale) Ballarat Vocational Education and 5 000 382 4 618 .. Ballarat Vocational Education and 5 000 382 4 618 .. Training Centre-Improved access to Training Centre-Improved access to training (Ballarat) training (Ballarat) Goulburn Ovens Institute of 2 000 272 1 728 .. Goulburn Ovens Institute of 2 000 272 1 728 .. TAFE-Auditorium, Classrooms and TAFE-Auditorium, Classrooms and Administration (Benalla) Administration (Benalla) Box Hill Institute of TAFE-Enhance 6 500 2 500 4 000 .. Box Hill Institute of TAFE-Enhance 6 500 2 500 4 000 .. learning environments (Box Hill) learning environments (Box Hill) Kangan Batman Institute of TAFE-Koorie 2 300 1 353 947 .. Kangan Batman Institute of TAFE-Koorie 2 300 1 353 947 .. Training Centre (Broadmeadows) Training Centre (Broadmeadows) Holmesglen Institute of TAFE-Enhance 3 800 3 000 .. 800 Holmesglen Institute of TAFE-Enhance 3 800 3 000 .. 800 learning environments (Chadstone) learning environments (Chadstone) Northern Melbourne Institute of 4 890 .. 4 890 .. Northern Melbourne Institute of 4 890 .. 4 890 .. TAFE-Stage 3 Primary Industries TAFE-Stage 3 Primary Industries Production and Training (Epping) Production and Training (Epping) Northern Metropolitan Institute of 21 500 11 248 10 252 .. Northern Metropolitan Institute of 21 500 11 248 10 252 .. TAFE-Relocation of Parkville & TAFE-Relocation of Parkville & Collingwood (Fairfield) Collingwood (Fairfield) Gordon Institute of TAFE-Modernise 12 700 .. 11 554 1 146 Gordon Institute of TAFE-Modernise 12 700 .. 11 554 1 146 facilities (Geelong) facilities (Geelong) Gordon Institute of TAFE-Refurbish 2 900 1 254 1 646 .. Gordon Institute of TAFE-Refurbish 2 900 1 254 1 646 .. buildings (Geelong) buildings (Geelong) East Gippsland Institute of 950 150 800 .. East Gippsland Institute of 950 150 800 .. TAFE-Forestech Stage 2 (Kalimna TAFE-Forestech Stage 2 (Kalimna West) West) East Gippsland TAFE/RMIT-Maritime 4 000 1 250 2 750 .. East Gippsland TAFE/RMIT-Maritime 4 000 1 250 2 750 .. Science/Eco-tourism and Marine Biology Science/Eco-tourism and Marine Biology (Lakes Entrance) (Lakes Entrance) Royal Melbourne Institute of Technology 4 980 3 476 1 504 .. Royal Melbourne Institute of Technology 4 980 3 476 1 504 .. (RMIT)-Refurbishment of Building 57 (RMIT)-Refurbishment of Building 57 (Melbourne) (Melbourne) Sunraysia Institute of TAFE-Enhanced 2 750 1 447 1 303 .. Sunraysia Institute of TAFE-Enhanced 2 750 1 447 1 303 .. learning environment (Mildura) learning environment (Mildura) Victoria University of 2 100 111 1 989 .. Victoria University of 2 100 111 1 989 .. Technology-Establishment of Technology-Establishment of Conservatorium of Music (Sunbury) Conservatorium of Music (Sunbury) Sunraysia Institute of TAFE-Enhanced 4 000 860 3 140 .. Sunraysia Institute of TAFE-Enhanced 4 000 860 3 140 .. learning facilities (Swan Hill) learning facilities (Swan Hill) Wodonga Institute of TAFE-Food 1 080 391 689 .. Wodonga Institute of TAFE-Food 1 080 391 689 .. Technology and Koori Education Centre Technology and Koori Education Centre (Wodonga) (Wodonga) Kangan Batman Institute of TAFE-Stage 10 400 109 5 491 4 800 Kangan Batman Institute of TAFE-Stage 10 400 109 5 491 4 800 1-Automotive Centre of Excellence 1-Automotive Centre of Excellence (Docklands Precinct) (Docklands Precinct)

30 Education and Training Public Sector Asset Investment Program 2003-04 30 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Commonwealth Supported Projects Commonwealth Supported Projects Commonwealth Supported Projects Chisholm Institute of TAFE-Replacement 9 500 169 2 100 7 231 Chisholm Institute of TAFE-Replacement 9 500 169 2 100 7 231 Chisholm Institute of TAFE-Replacement 9 500 169 2 100 7 231 of teaching facilities at Cleeland Tech. of teaching facilities at Cleeland Tech. of teaching facilities at Cleeland Tech. School with purpose built facilities School with purpose built facilities School with purpose built facilities (Dandenong) (Dandenong) (Dandenong) South Western Institute of TAFE-Stage 6 850 3 183 3 667 .. South Western Institute of TAFE-Stage 6 850 3 183 3 667 .. South Western Institute of TAFE-Stage 6 850 3 183 3 667 .. 2-Campus Redevelopment 2-Campus Redevelopment 2-Campus Redevelopment (Warrnambool) (Warrnambool) (Warrnambool) Total Existing Projects 541 234 287 239 240 017 13 977 Total Existing Projects 541 234 287 239 240 017 13 977 Total Existing Projects 541 234 287 239 240 017 13 977 Source: Department of Education and Training Source: Department of Education and Training Source: Department of Education and Training Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Education and Training 31 Public Sector Asset Investment Program 2003-04 Education and Training 31 Public Sector Asset Investment Program 2003-04 Education and Training 31

DEPARTMENT OF EDUCATION DEPARTMENT OF EDUCATION

New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 School Education School Education Solway Primary School-School 729 .. 300 429 Solway Primary School-School 729 .. 300 429 Modernisation-3 Gen Purp C/rms, Staff Modernisation-3 Gen Purp C/rms, Staff Work Space and Art-(Ashburton) Work Space and Art-(Ashburton) Ballan Primary School-School 884 .. 300 584 Ballan Primary School-School 884 .. 300 584 Modernisation-2 Gen Purp C/rms, Toilets Modernisation-2 Gen Purp C/rms, Toilets and Admin-(Ballan) and Admin-(Ballan) Ballarat High School-Facilities For 1 788 .. 894 894 Ballarat High School-Facilities For 1 788 .. 894 894 Excellence-Art/Craft, Toilets, Fabrics, Excellence-Art/Craft, Toilets, Fabrics, H/Eco and Tech Studies-(Ballarat) H/Eco and Tech Studies-(Ballarat) Bellarine Secondary College-New 2 750 .. 1 450 1 300 Bellarine Secondary College-New 2 750 .. 1 450 1 300 School-(Bellarine) School-(Bellarine) Boronia Primary School-Fire 1 769 .. 1 320 449 Boronia Primary School-Fire 1 769 .. 1 320 449 Reinstatement Program-5 Gen Purp Reinstatement Program-5 Gen Purp C/rms, Admin, First Aid , C/rms, Admin, First Aid , Toilets-(Boronia) Toilets-(Boronia) Sherbourne Primary School-School 1 607 .. 600 1 007 Sherbourne Primary School-School 1 607 .. 600 1 007 Modernisation-5 Gen Purp C/rms, Admin, Modernisation-5 Gen Purp C/rms, Admin, Lib, Music, Canteen, First Aid, Lib, Music, Canteen, First Aid, Toilet-(Briar Hill) Toilet-(Briar Hill) Broadford Secondary College-School 1 775 .. 700 1 075 Broadford Secondary College-School 1 775 .. 700 1 075 Modernisation-Stage 2-Music, Drama, Modernisation-Stage 2-Music, Drama, Art, Graph, Fabrics, P/E, Art, Graph, Fabrics, P/E, Canteen-(Broadford) Canteen-(Broadford) Concord School-School 542 .. 250 292 Concord School-School 542 .. 250 292 Modernisation-Homecraft, Lib and Multi Modernisation-Homecraft, Lib and Multi Purp Rm-(Bundoora) Purp Rm-(Bundoora) Buninyong Primary School-School 1 199 .. 450 749 Buninyong Primary School-School 1 199 .. 450 749 Modernisation-4 Gen Purp C/rms, Music, Modernisation-4 Gen Purp C/rms, Music, Admin, Change/Showers, Admin, Change/Showers, Toilets-(Buninyong) Toilets-(Buninyong) Princes Hill Secondary College-School 2 035 .. 750 1 285 Princes Hill Secondary College-School 2 035 .. 750 1 285 Modernisation-3 Gen Purp C/rms, 2 Modernisation-3 Gen Purp C/rms, 2 Music, Fabrics, H/Eco, Tech, Music, Fabrics, H/Eco, Tech, Toilets-(Carlton North) Toilets-(Carlton North) Caroline Springs P-8-New School 5 000 .. 2 000 3 000 Caroline Springs P-8-New School 5 000 .. 2 000 3 000 (Caroline Springs) (Caroline Springs) Carrum Downs Secondary College-New 5 300 .. 2 000 3 300 Carrum Downs Secondary College-New 5 300 .. 2 000 3 300 School-Stage 2-(Carrum Downs) School-Stage 2-(Carrum Downs) Gippsland Precinct-Precinct 2 000 .. 400 1 600 Gippsland Precinct-Precinct 2 000 .. 400 1 600 Development-(Churchill) Development-(Churchill)

32 Education and Training Public Sector Asset Investment Program 2003-04 32 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Coburg West Primary School-School 485 .. 200 285 Coburg West Primary School-School 485 .. 200 285 Coburg West Primary School-School 485 .. 200 285 Modernisation-Multi Purp Rm, Art/Craft, Modernisation-Multi Purp Rm, Art/Craft, Modernisation-Multi Purp Rm, Art/Craft, Staff Work Space-(Coburg) Staff Work Space-(Coburg) Staff Work Space-(Coburg) Coolaroo South Primary School-School 690 .. 200 490 Coolaroo South Primary School-School 690 .. 200 490 Coolaroo South Primary School-School 690 .. 200 490 Modernisation-Stage 1-6 Gen Purp Modernisation-Stage 1-6 Gen Purp Modernisation-Stage 1-6 Gen Purp C/rms-(Coolaroo) C/rms-(Coolaroo) C/rms-(Coolaroo) Lyndhurst Secondary College-School 3 290 .. 850 2 440 Lyndhurst Secondary College-School 3 290 .. 850 2 440 Lyndhurst Secondary College-School 3 290 .. 850 2 440 Modernisation-5 Gen Purp C/rms, Arts, Modernisation-5 Gen Purp C/rms, Arts, Modernisation-5 Gen Purp C/rms, Arts, Music, IT, Fabrics, H/Eco, Music, IT, Fabrics, H/Eco, Music, IT, Fabrics, H/Eco, Admin-(Cranbourne) Admin-(Cranbourne) Admin-(Cranbourne) Creswick Primary School-School 746 .. 200 546 Creswick Primary School-School 746 .. 200 546 Creswick Primary School-School 746 .. 200 546 Modernisation-Stage 1-4 Gen Purp Modernisation-Stage 1-4 Gen Purp Modernisation-Stage 1-4 Gen Purp C/rms, Staff Work Space-(Creswick) C/rms, Staff Work Space-(Creswick) C/rms, Staff Work Space-(Creswick) Delacombe Primary School-School 600 .. 200 400 Delacombe Primary School-School 600 .. 200 400 Delacombe Primary School-School 600 .. 200 400 Modernisation-4 Gen Purp C/rms and Modernisation-4 Gen Purp C/rms and Modernisation-4 Gen Purp C/rms and Staff Work Space-(Delacombe) Staff Work Space-(Delacombe) Staff Work Space-(Delacombe) Geelong High School-School 3 438 .. 800 2 638 Geelong High School-School 3 438 .. 800 2 638 Geelong High School-School 3 438 .. 800 2 638 Modernisation-Sci, Tech, P/E, Staff Work Modernisation-Sci, Tech, P/E, Staff Work Modernisation-Sci, Tech, P/E, Staff Work Space, Change/Showers-(East Geelong) Space, Change/Showers-(East Geelong) Space, Change/Showers-(East Geelong) Glen Katherine Primary School/St Helena 445 .. 250 195 Glen Katherine Primary School/St Helena 445 .. 250 195 Glen Katherine Primary School/St Helena 445 .. 250 195 Secondary College-School Secondary College-School Secondary College-School Modernisation-Stage 1-Traffic Modernisation-Stage 1-Traffic Modernisation-Stage 1-Traffic remediation-(Eltham North) remediation-(Eltham North) remediation-(Eltham North) Frankston High School-School 2 363 .. 600 1 763 Frankston High School-School 2 363 .. 600 1 763 Frankston High School-School 2 363 .. 600 1 763 Modernisation-Stage 2-6 Gen Purp Modernisation-Stage 2-6 Gen Purp Modernisation-Stage 2-6 Gen Purp C/rms, Fabrics, H/Eco, Tech Studies and C/rms, Fabrics, H/Eco, Tech Studies and C/rms, Fabrics, H/Eco, Tech Studies and Toilets-(Frankston) Toilets-(Frankston) Toilets-(Frankston) Mahogany Rise Primary School-School 726 .. 305 421 Mahogany Rise Primary School-School 726 .. 305 421 Mahogany Rise Primary School-School 726 .. 305 421 Modernisation-Facilites Modernisation-Facilites Modernisation-Facilites Upgrade-(Frankston North) Upgrade-(Frankston North) Upgrade-(Frankston North) Glen Iris Primary School-School 1 272 .. 500 772 Glen Iris Primary School-School 1 272 .. 500 772 Glen Iris Primary School-School 1 272 .. 500 772 Modernisation-Stage 1-4 Gen Purp Modernisation-Stage 1-4 Gen Purp Modernisation-Stage 1-4 Gen Purp C/rms, Lib, Staff Work Space and C/rms, Lib, Staff Work Space and C/rms, Lib, Staff Work Space and Toilets-(Glen Iris) Toilets-(Glen Iris) Toilets-(Glen Iris) Carronbank School-Replacement 1 036 .. 414 622 Carronbank School-Replacement 1 036 .. 414 622 Carronbank School-Replacement 1 036 .. 414 622 School-(Glen Waverley) School-(Glen Waverley) School-(Glen Waverley) Specimen Hill Primary School-School 2 360 .. 700 1 660 Specimen Hill Primary School-School 2 360 .. 700 1 660 Specimen Hill Primary School-School 2 360 .. 700 1 660 Modernisation-4 Gen Purp C/rms, Admin, Modernisation-4 Gen Purp C/rms, Admin, Modernisation-4 Gen Purp C/rms, Admin, Multi Purp Rm, Canteen, Lib, Multi Purp Rm, Canteen, Lib, Multi Purp Rm, Canteen, Lib, Art/Craft-(Golden Square) Art/Craft-(Golden Square) Art/Craft-(Golden Square) Hastings West Park Primary 1 359 .. 500 859 Hastings West Park Primary 1 359 .. 500 859 Hastings West Park Primary 1 359 .. 500 859 School-School Modernisation-10 Gen School-School Modernisation-10 Gen School-School Modernisation-10 Gen Purp C/rms and Staff Work Purp C/rms and Staff Work Purp C/rms and Staff Work Space-(Hastings West) Space-(Hastings West) Space-(Hastings West) Healesville Primary School-School 1 032 .. 400 632 Healesville Primary School-School 1 032 .. 400 632 Healesville Primary School-School 1 032 .. 400 632 Modernisation-Art/Craft, Music, Multi Modernisation-Art/Craft, Music, Multi Modernisation-Art/Craft, Music, Multi Purp Rm, Canteen and Purp Rm, Canteen and Purp Rm, Canteen and Toilets-(Healesville) Toilets-(Healesville) Toilets-(Healesville)

Public Sector Asset Investment Program 2003-04 Education and Training 33 Public Sector Asset Investment Program 2003-04 Education and Training 33 Public Sector Asset Investment Program 2003-04 Education and Training 33

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Cambridge Primary School-School 1 261 .. 400 861 Cambridge Primary School-School 1 261 .. 400 861 Modernisation-7 Gen Purp C/rms and Modernisation-7 Gen Purp C/rms and Staff Work Space-(Hoppers Crossing) Staff Work Space-(Hoppers Crossing) Hurstbridge Primary School-Fire 4 500 .. 3 250 1 250 Hurstbridge Primary School-Fire 4 500 .. 3 250 1 250 Reinstatement Program-(Hurstbridge) Reinstatement Program-(Hurstbridge) Lancefield Primary School-School 2 239 .. 900 1 339 Lancefield Primary School-School 2 239 .. 900 1 339 Modernisation-7 Gen Purp C/rms, Admin, Modernisation-7 Gen Purp C/rms, Admin, Multi Purp Rm, Canteen, Multi Purp Rm, Canteen, Toilets-(Lancefield) Toilets-(Lancefield) Lara Lake Primary School-School 1 773 .. 600 1 173 Lara Lake Primary School-School 1 773 .. 600 1 173 Modernisation-9 Gen Purp C/rms, Lib, Modernisation-9 Gen Purp C/rms, Lib, Toilets, Admin-(Lara Lake) Toilets, Admin-(Lara Lake) Lilydale High School-Facilities For 3 815 .. 1 914 1 901 Lilydale High School-Facilities For 3 815 .. 1 914 1 901 Excellence-Sci, Tech Studies, Staff Work Excellence-Sci, Tech Studies, Staff Work Space and Toilets-(Lilydale) Space and Toilets-(Lilydale) Lynbrook Primary School-New 5 000 .. 2 000 3 000 Lynbrook Primary School-New 5 000 .. 2 000 3 000 School-(Lynbrook) School-(Lynbrook) Maffra Primary School-School 1 489 .. 500 989 Maffra Primary School-School 1 489 .. 500 989 Modernisation-4 Gen Purp C/rms, Lib, Modernisation-4 Gen Purp C/rms, Lib, Staff Work Space, Toilets-(Maffra) Staff Work Space, Toilets-(Maffra) Maryborough Precinct-Precinct 3 500 .. 1 400 2 100 Maryborough Precinct-Precinct 3 500 .. 1 400 2 100 Development-(Maryborough) Development-(Maryborough) Antonio Park Primary School-School 950 .. 300 650 Antonio Park Primary School-School 950 .. 300 650 Modernisation-4 Gen Purp C/rms, Multi Modernisation-4 Gen Purp C/rms, Multi Purp Rm, Canteen and Toilets-(Mitcham) Purp Rm, Canteen and Toilets-(Mitcham) Mount Waverley Secondary College-Fire 5 000 .. 3 620 1 380 Mount Waverley Secondary College-Fire 5 000 .. 3 620 1 380 Reinstatement Program-(Mount Reinstatement Program-(Mount Waverley) Waverley) Murrumbeena Primary School-School 1 380 .. 450 930 Murrumbeena Primary School-School 1 380 .. 450 930 Modernisation-12 Gen Purp C/rms- Modernisation-12 Gen Purp C/rms- (Murrumbeena) (Murrumbeena) Strathaird Primary School-New 5 000 .. 2 000 3 000 Strathaird Primary School-New 5 000 .. 2 000 3 000 School-(Narre Warren) School-(Narre Warren) Oak Park Primary School-School 1 260 .. 450 810 Oak Park Primary School-School 1 260 .. 450 810 Modernisation-4 Gen Purp C/rms, Admin, Modernisation-4 Gen Purp C/rms, Admin, First Aid, Toilets-(Oak Park) First Aid, Toilets-(Oak Park) Rochester Secondary College-Facilities 1 332 .. 666 666 Rochester Secondary College-Facilities 1 332 .. 666 666 For Excellence-Tech, Toilets-(Rochester) For Excellence-Tech, Toilets-(Rochester) Rockbank Primary School-Replacement 726 .. 290 436 Rockbank Primary School-Replacement 726 .. 290 436 School-(Rockbank) School-(Rockbank) Rosanna Golf Links Primary 1 337 .. 538 799 Rosanna Golf Links Primary 1 337 .. 538 799 School-School Modernisation-Gen Purp School-School Modernisation-Gen Purp C/rms, Lib, Admin, Canteen-(Rosanna) C/rms, Lib, Admin, Canteen-(Rosanna) Roxburgh College-New School-(Roxburgh 5 000 .. 2 000 3 000 Roxburgh College-New School-(Roxburgh 5 000 .. 2 000 3 000 Park) Park) Roxburgh Park North Primary School-New 5 000 .. 2 000 3 000 Roxburgh Park North Primary School-New 5 000 .. 2 000 3 000 School-(Roxburgh Park) School-(Roxburgh Park) Mount Erin Secondary College (7-10)-New 5 000 .. 2 000 3 000 Mount Erin Secondary College (7-10)-New 5 000 .. 2 000 3 000 School-(Somerville) School-(Somerville) 34 Education and Training Public Sector Asset Investment Program 2003-04 34 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Springvale Primary School-School 987 .. 300 687 Springvale Primary School-School 987 .. 300 687 Springvale Primary School-School 987 .. 300 687 Modernisation-2 Gen Purp C/rms, Modernisation-2 Gen Purp C/rms, Modernisation-2 Gen Purp C/rms, Art/Craft, Multi Purp Rm, Staff Work Art/Craft, Multi Purp Rm, Staff Work Art/Craft, Multi Purp Rm, Staff Work Space, Canteen-(Springvale) Space, Canteen-(Springvale) Space, Canteen-(Springvale) Kings Park Primary School-School 1 165 .. 400 765 Kings Park Primary School-School 1 165 .. 400 765 Kings Park Primary School-School 1 165 .. 400 765 Modernisation-Stage 1-8 Gen Purp Modernisation-Stage 1-8 Gen Purp Modernisation-Stage 1-8 Gen Purp C/rms, Staff Work Space, Toilets-(St C/rms, Staff Work Space, Toilets-(St C/rms, Staff Work Space, Toilets-(St Albans) Albans) Albans) St Albans Secondary College-School 585 .. 200 385 St Albans Secondary College-School 585 .. 200 385 St Albans Secondary College-School 585 .. 200 385 Modernisation-Stage 2-Admin, 2 Gen Modernisation-Stage 2-Admin, 2 Gen Modernisation-Stage 2-Admin, 2 Gen Purp C/rms, Amenities-(St Albans) Purp C/rms, Amenities-(St Albans) Purp C/rms, Amenities-(St Albans) Sunbury Heights Primary School-School 1 208 .. 400 808 Sunbury Heights Primary School-School 1 208 .. 400 808 Sunbury Heights Primary School-School 1 208 .. 400 808 Modernisation-6 Gen Purp C/rms and Modernisation-6 Gen Purp C/rms and Modernisation-6 Gen Purp C/rms and Staff Work Space-(Sunbury) Staff Work Space-(Sunbury) Staff Work Space-(Sunbury) Traralgon Secondary 3 338 .. 1 371 1 967 Traralgon Secondary 3 338 .. 1 371 1 967 Traralgon Secondary 3 338 .. 1 371 1 967 School-Replacement School-(Traralgon) School-Replacement School-(Traralgon) School-Replacement School-(Traralgon) Various Schools-Planning 2 000 .. 2 000 .. Various Schools-Planning 2 000 .. 2 000 .. Various Schools-Planning 2 000 .. 2 000 .. Projects-(Various) Projects-(Various) Projects-(Various) Vermont Secondary College-Facilities For 3 152 .. 1 576 1 576 Vermont Secondary College-Facilities For 3 152 .. 1 576 1 576 Vermont Secondary College-Facilities For 3 152 .. 1 576 1 576 Excellence-Music, Art, Graphics, H/Eco, Excellence-Music, Art, Graphics, H/Eco, Excellence-Music, Art, Graphics, H/Eco, Tech, Canteen-(Vermont) Tech, Canteen-(Vermont) Tech, Canteen-(Vermont) Werribee Primary School-School 1 011 .. 400 611 Werribee Primary School-School 1 011 .. 400 611 Werribee Primary School-School 1 011 .. 400 611 Modernisation-6 Gen Purp C/rms, Staff Modernisation-6 Gen Purp C/rms, Staff Modernisation-6 Gen Purp C/rms, Staff Work Space-(Werribee) Work Space-(Werribee) Work Space-(Werribee) Westgrove Primary School-School 1 044 .. 350 694 Westgrove Primary School-School 1 044 .. 350 694 Westgrove Primary School-School 1 044 .. 350 694 Modernisation-4 Gen Purp C/rms, Lib Modernisation-4 Gen Purp C/rms, Lib Modernisation-4 Gen Purp C/rms, Lib and Toilets-(Werribee) and Toilets-(Werribee) and Toilets-(Werribee) Westmeadows Primary School-School 1 450 .. 400 1 050 Westmeadows Primary School-School 1 450 .. 400 1 050 Westmeadows Primary School-School 1 450 .. 400 1 050 Modernisation-10 Gen Purp C/rms, Staff Modernisation-10 Gen Purp C/rms, Staff Modernisation-10 Gen Purp C/rms, Staff Work Space-(West Meadows) Work Space-(West Meadows) Work Space-(West Meadows) Williamstown Primary School-School 1 562 .. 500 1 062 Williamstown Primary School-School 1 562 .. 500 1 062 Williamstown Primary School-School 1 562 .. 500 1 062 Modernisation-Art/Craft, Music, Multi Modernisation-Art/Craft, Music, Multi Modernisation-Art/Craft, Music, Multi Purp Rm, Canteen, Lib, Purp Rm, Canteen, Lib, Purp Rm, Canteen, Lib, Toilets-(Williamstown) Toilets-(Williamstown) Toilets-(Williamstown) Wodonga High School (Flying Fruit Fly 800 .. 600 200 Wodonga High School (Flying Fruit Fly 800 .. 600 200 Wodonga High School (Flying Fruit Fly 800 .. 600 200 Circus Campus)-Fire Reinstatement Circus Campus)-Fire Reinstatement Circus Campus)-Fire Reinstatement Program-(Wodonga) Program-(Wodonga) Program-(Wodonga) Wodonga High School-School 1 655 .. 400 1 255 Wodonga High School-School 1 655 .. 400 1 255 Wodonga High School-School 1 655 .. 400 1 255 Modernisation-Arts, Personal Dev, Modernisation-Arts, Personal Dev, Modernisation-Arts, Personal Dev, Canteen, Lockers-(Wodonga) Canteen, Lockers-(Wodonga) Canteen, Lockers-(Wodonga) Upper Yarra Secondary College-School 1 821 .. 600 1 221 Upper Yarra Secondary College-School 1 821 .. 600 1 221 Upper Yarra Secondary College-School 1 821 .. 600 1 221 Modernisation-Stage 2-12 Gen Purp Modernisation-Stage 2-12 Gen Purp Modernisation-Stage 2-12 Gen Purp C/rms, Staff Work Space, Lounge-(Yarra C/rms, Staff Work Space, Lounge-(Yarra C/rms, Staff Work Space, Lounge-(Yarra Junction) Junction) Junction) Special/Other Special/Other Special/Other Linking Schools with the 500 .. 500 .. Linking Schools with the 500 .. 500 .. Linking Schools with the 500 .. 500 .. Community-Community Facilities Fund Community-Community Facilities Fund Community-Community Facilities Fund

Public Sector Asset Investment Program 2003-04 Education and Training 35 Public Sector Asset Investment Program 2003-04 Education and Training 35 Public Sector Asset Investment Program 2003-04 Education and Training 35

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 TAFE Teaching 12 000 .. 12 000 .. TAFE Teaching 12 000 .. 12 000 .. Equipment-Maintaining/Upgrading Equipment-Maintaining/Upgrading Teaching Equipment-Replacement Teaching Equipment-Replacement Equipment-(Various) Equipment-(Various) Commonwealth Supported Projects Commonwealth Supported Projects Driver Education Centre of Aust 3 050 .. 3 050 .. Driver Education Centre of Aust 3 050 .. 3 050 .. Ltd-Commonwealth Supported Ltd-Commonwealth Supported Project-Replace Facility-(Altona) Project-Replace Facility-(Altona) Box Hill Institute of TAFE-Commonwealth 6 100 495 5 605 .. Box Hill Institute of TAFE-Commonwealth 6 100 495 5 605 .. Supported Project-Multi-Storey Supported Project-Multi-Storey Building-Elgar Campus-(Box Hill) Building-Elgar Campus-(Box Hill) Box Hill Institute of TAFE-Commonwealth 570 .. 570 .. Box Hill Institute of TAFE-Commonwealth 570 .. 570 .. Supported Projects-Disabled Lift- (Box Supported Projects-Disabled Lift- (Box Hill) Hill) Kangan Batman Institute of 3 800 3 800 .. .. Kangan Batman Institute of 3 800 3 800 .. .. TAFE-Commonwealth Supported TAFE-Commonwealth Supported Project-Learning Project-Learning Centre-(Broadmeadows) Centre-(Broadmeadows) Royal Melbourne Institute of 5 670 5 260 410 .. Royal Melbourne Institute of 5 670 5 260 410 .. Technology-Commonwealth Supported Technology-Commonwealth Supported Project-Dental Hospital-(Carlton) Project-Dental Hospital-(Carlton) Chisholm Institute of 5 200 145 2 055 3 000 Chisholm Institute of 5 200 145 2 055 3 000 TAFE-Commonwealth Supported TAFE-Commonwealth Supported Project-Replace Business Service Project-Replace Business Service Centre-(Frankston) Centre-(Frankston) William Angliss Institute of 850 .. 850 .. William Angliss Institute of 850 .. 850 .. TAFE-Commonwealth Supported TAFE-Commonwealth Supported Project-Food Science-(Melbourne) Project-Food Science-(Melbourne) Royal Melbourne Institute of 4 606 50 4 556 .. Royal Melbourne Institute of 4 606 50 4 556 .. Technology-Commonwealth Supported Technology-Commonwealth Supported Projects-Stage 2-Building 57 (Melbourne) Projects-Stage 2-Building 57 (Melbourne) Holmesglen Institute of 5 500 2 705 2 795 .. Holmesglen Institute of 5 500 2 705 2 795 .. TAFE-Commonwealth Supported TAFE-Commonwealth Supported Project-Campus Project-Campus Refurbishment-(Moorabbin) Refurbishment-(Moorabbin) Kangan Batman Institute of 3 605 .. 1 605 2 000 Kangan Batman Institute of 3 605 .. 1 605 2 000 TAFE-Commonwealth Supported TAFE-Commonwealth Supported Project-Fashion Program-(Richmond) Project-Fashion Program-(Richmond) Goulburn Ovens Institute of 495 .. 495 .. Goulburn Ovens Institute of 495 .. 495 .. TAFE-Commonwealth Supported TAFE-Commonwealth Supported Project-Multicultural Centre-(Shepparton) Project-Multicultural Centre-(Shepparton) General Equipment-Commonwealth 14 800 .. 14 800 .. General Equipment-Commonwealth 14 800 .. 14 800 .. Supported Project-General Equipment Supported Project-General Equipment (Various) (Various) Planning Funds-Commonwealth 995 .. 995 .. Planning Funds-Commonwealth 995 .. 995 .. Supported Project-Planning Supported Project-Planning Funds-(Various) Funds-(Various)

36 Education and Training Public Sector Asset Investment Program 2003-04 36 Education and Training Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Swinburne University of 800 40 760 .. Swinburne University of 800 40 760 .. Swinburne University of 800 40 760 .. Technology-Commonwealth Supported Technology-Commonwealth Supported Technology-Commonwealth Supported Project-Horticulture Workshop-(Wantirna) Project-Horticulture Workshop-(Wantirna) Project-Horticulture Workshop-(Wantirna) Central Gippsland Institute of 1 000 110 890 .. Central Gippsland Institute of 1 000 110 890 .. Central Gippsland Institute of 1 000 110 890 .. TAFE-Commonwealth Supported TAFE-Commonwealth Supported TAFE-Commonwealth Supported Project-Flexible Delivery Project-Flexible Delivery Project-Flexible Delivery Classrooms-(Warragul) Classrooms-(Warragul) Classrooms-(Warragul) South West Institute of 7 520 7 080 440 .. South West Institute of 7 520 7 080 440 .. South West Institute of 7 520 7 080 440 .. TAFE-Commonwealth Supported TAFE-Commonwealth Supported TAFE-Commonwealth Supported Project-Warrnambool Stage Project-Warrnambool Stage Project-Warrnambool Stage 1-(Warrnambool) 1-(Warrnambool) 1-(Warrnambool) Gordon Institute of TAFE-Commonwealth 1 400 .. 1 400 .. Gordon Institute of TAFE-Commonwealth 1 400 .. 1 400 .. Gordon Institute of TAFE-Commonwealth 1 400 .. 1 400 .. Supported Projects-Horticulture and Supported Projects-Horticulture and Supported Projects-Horticulture and Wool Studies-(Waurn Ponds) Wool Studies-(Waurn Ponds) Wool Studies-(Waurn Ponds) Victoria University of 7 500 100 3 400 4 000 Victoria University of 7 500 100 3 400 4 000 Victoria University of 7 500 100 3 400 4 000 Technology-Commonwealth Supported Technology-Commonwealth Supported Technology-Commonwealth Supported Project-Science and Project-Science and Project-Science and Technology-(Werribee) Technology-(Werribee) Technology-(Werribee) Total New Projects 210 521 19 785 109 485 81 251 Total New Projects 210 521 19 785 109 485 81 251 Total New Projects 210 521 19 785 109 485 81 251 Total Education Projects 751 755 307 024 349 502 95 228 Total Education Projects 751 755 307 024 349 502 95 228 Total Education Projects 751 755 307 024 349 502 95 228 Source: Department of Education and Training Source: Department of Education and Training Source: Department of Education and Training Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Education and Training 37 Public Sector Asset Investment Program 2003-04 Education and Training 37 Public Sector Asset Investment Program 2003-04 Education and Training 37

DEPARTMENT OF HUMAN SERVICES DEPARTMENT OF HUMAN SERVICES

Existing Projects Existing Projects ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Ararat Hospital-Redevelopment (Ararat) 7 300 5 128 2 172 .. Ararat Hospital-Redevelopment (Ararat) 7 300 5 128 2 172 .. Royal Women`s Hospital-Development 15 613 13 801 800 1 012 Royal Women`s Hospital-Development 15 613 13 801 800 1 012 Stage 2 (Carlton) Stage 2 (Carlton) Colac Hospital-Redevelopment of facilities 13 500 13 046 454 .. Colac Hospital-Redevelopment of facilities 13 500 13 046 454 .. (Colac) (Colac) Dandenong Hospital-Redevelopment 10 000 4 149 5 000 851 Dandenong Hospital-Redevelopment 10 000 4 149 5 000 851 (Dandenong) (Dandenong) Northern Hospital-Redevelopment 12 000 11 820 180 .. Northern Hospital-Redevelopment 12 000 11 820 180 .. (Epping) (Epping) Royal Melbourne Hospital-Redevelopment 32 000 16 034 15 966 .. Royal Melbourne Hospital-Redevelopment 32 000 16 034 15 966 .. (Flemington) (Flemington) Frankston Hospital-Redevelopment 12 000 11 856 144 .. Frankston Hospital-Redevelopment 12 000 11 856 144 .. (Frankston) (Frankston) Grace McKellar Centre-Redevelopment 19 000 6 371 9 500 3 129 Grace McKellar Centre-Redevelopment 19 000 6 371 9 500 3 129 (Geelong) (Geelong) Austin and Repatriation Medical Centre 352 600 92 230 105 600 154 770 Austin and Repatriation Medical Centre 352 600 92 230 105 600 154 770 redevelopment and Mercy Hospital for redevelopment and Mercy Hospital for Women relocation (Heidelberg) Women relocation (Heidelberg) Lorne Community 9 000 721 1 000 7 279 Lorne Community 9 000 721 1 000 7 279 Hospital-Redevelopment (Lorne) Hospital-Redevelopment (Lorne) Juvenile Justice Facility Redevelopment 17 603 5 462 3 800 8 341 Juvenile Justice Facility Redevelopment 17 603 5 462 3 800 8 341 (Malmsbury, Parkville) (Malmsbury, Parkville) Residential Aged Care strategy (Non 25 000 11 627 9 000 4 373 Residential Aged Care strategy (Non 25 000 11 627 9 000 4 373 metro various) metro various) Rural ambulance facilities development 2 200 1 427 773 .. Rural ambulance facilities development 2 200 1 427 773 .. (Non metro various) (Non metro various) Nursing Homes-Upgrades (Rural) 47 500 41 606 5 894 .. Nursing Homes-Upgrades (Rural) 47 500 41 606 5 894 .. Outer east service expansion and 18 500 14 212 4 288 .. Outer east service expansion and 18 500 14 212 4 288 .. redevelopment (South East Melbourne) redevelopment (South East Melbourne) Ambulance services facilities development 3 400 1 200 300 1 900 Ambulance services facilities development 3 400 1 200 300 1 900 (Statewide) (Statewide) Community Disability Services (Statewide) 10 000 4 267 1 900 3 833 Community Disability Services (Statewide) 10 000 4 267 1 900 3 833 Equipment Upgrade Program (Statewide) 45 000 44 526 474 .. Equipment Upgrade Program (Statewide) 45 000 44 526 474 .. Fire Risk Management Strategy 10 000 9 387 613 .. Fire Risk Management Strategy 10 000 9 387 613 .. (Statewide) (Statewide) Hospital IT systems replacement 1 000 344 656 .. Hospital IT systems replacement 1 000 344 656 .. (Statewide) (Statewide) Information and communication 30 000 16 194 11 800 2 006 Information and communication 30 000 16 194 11 800 2 006 technology (ICT) strategy for healthcare technology (ICT) strategy for healthcare (Statewide) (Statewide) Infrastructure Upgrade Program 20 133 17 704 2 429 .. Infrastructure Upgrade Program 20 133 17 704 2 429 .. (Statewide) (Statewide)

38 Human Services Public Sector Asset Investment Program 2003-04 38 Human Services Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Infrastructure upgrade program-Nursing 28 893 28 428 465 .. Infrastructure upgrade program-Nursing 28 893 28 428 465 .. Infrastructure upgrade program-Nursing 28 893 28 428 465 .. home and acute facilities (Statewide) home and acute facilities (Statewide) home and acute facilities (Statewide) Juvenile Justice-Purchase four 2 200 1 267 400 533 Juvenile Justice-Purchase four 2 200 1 267 400 533 Juvenile Justice-Purchase four 2 200 1 267 400 533 Community Houses (Statewide) Community Houses (Statewide) Community Houses (Statewide) Residential Aged Care and Rural health 40 000 6 820 9 500 23 680 Residential Aged Care and Rural health 40 000 6 820 9 500 23 680 Residential Aged Care and Rural health 40 000 6 820 9 500 23 680 Redevelopment and Upgrade (Statewide Redevelopment and Upgrade (Statewide Redevelopment and Upgrade (Statewide (most works are in regional Victoria)) (most works are in regional Victoria)) (most works are in regional Victoria)) Rural Ambulance co-locations (Statewide) 1 500 141 850 509 Rural Ambulance co-locations (Statewide) 1 500 141 850 509 Rural Ambulance co-locations (Statewide) 1 500 141 850 509 Upgrade of Residential Care facilities for 5 000 1 942 3 058 .. Upgrade of Residential Care facilities for 5 000 1 942 3 058 .. Upgrade of Residential Care facilities for 5 000 1 942 3 058 .. placement and support program placement and support program placement and support program (Statewide) (Statewide) (Statewide) Upgrade of placement and support, 12 800 9 932 2 868 .. Upgrade of placement and support, 12 800 9 932 2 868 .. Upgrade of placement and support, 12 800 9 932 2 868 .. residential care facilities (Statewide) residential care facilities (Statewide) residential care facilities (Statewide) Stawell District Hospital-Redevelopment 3 208 2 646 562 .. Stawell District Hospital-Redevelopment 3 208 2 646 562 .. Stawell District Hospital-Redevelopment 3 208 2 646 562 .. Stage 1 (Stawell) Stage 1 (Stawell) Stage 1 (Stawell) Stawell District Hospital-Redevelopment 3 000 500 1 900 600 Stawell District Hospital-Redevelopment 3 000 500 1 900 600 Stawell District Hospital-Redevelopment 3 000 500 1 900 600 Stage 2 (Stawell) Stage 2 (Stawell) Stage 2 (Stawell) Angliss Hospital-Redevelopment (Upper 18 500 2 313 11 000 5 187 Angliss Hospital-Redevelopment (Upper 18 500 2 313 11 000 5 187 Angliss Hospital-Redevelopment (Upper 18 500 2 313 11 000 5 187 Ferntree Gully) Ferntree Gully) Ferntree Gully) Aged Care Residential institutions to meet 18 600 16 857 1 743 .. Aged Care Residential institutions to meet 18 600 16 857 1 743 .. Aged Care Residential institutions to meet 18 600 16 857 1 743 .. Commonwealth standards-Update Commonwealth standards-Update Commonwealth standards-Update (Various (Various (Various Decommissioning 4 420 3 864 420 136 Decommissioning 4 420 3 864 420 136 Decommissioning 4 420 3 864 420 136 (sites)-Decommissioning (Various) (sites)-Decommissioning (Various) (sites)-Decommissioning (Various) Futures for Young Adults-New sites 5 532 5 345 187 .. Futures for Young Adults-New sites 5 532 5 345 187 .. Futures for Young Adults-New sites 5 532 5 345 187 .. (Various) (Various) (Various) Peninsula HC Network-Geriatric Palliative 12 750 12 352 398 .. Peninsula HC Network-Geriatric Palliative 12 750 12 352 398 .. Peninsula HC Network-Geriatric Palliative 12 750 12 352 398 .. Care and Aged Care and Aged Care and Aged Rehabilitation-Redevelopment of sites Rehabilitation-Redevelopment of sites Rehabilitation-Redevelopment of sites (Various) (Various) (Various) Southern Health Care Network CRC East 3 500 1 469 400 1 631 Southern Health Care Network CRC East 3 500 1 469 400 1 631 Southern Health Care Network CRC East 3 500 1 469 400 1 631 Bentleigh Mordialloc-Redevelopment Bentleigh Mordialloc-Redevelopment Bentleigh Mordialloc-Redevelopment (Various) (Various) (Various) Wyndham Community Health Service 10 200 10 139 61 .. Wyndham Community Health Service 10 200 10 139 61 .. Wyndham Community Health Service 10 200 10 139 61 .. (Wyndham) (Wyndham) (Wyndham) Total Existing Projects 883 452 447 128 216 557 219 767 Total Existing Projects 883 452 447 128 216 557 219 767 Total Existing Projects 883 452 447 128 216 557 219 767 Source: Department of Human Services Source: Department of Human Services Source: Department of Human Services Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. September 2003. Includes preliminary unaudited information for 2002-03 financial year. September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Human Services 39 Public Sector Asset Investment Program 2003-04 Human Services 39 Public Sector Asset Investment Program 2003-04 Human Services 39

DEPARTMENT OF HUMAN SERVICES DEPARTMENT OF HUMAN SERVICES

New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Brunswick Health Services Precinct Stage 5 000 .. 1 000 4 000 Brunswick Health Services Precinct Stage 5 000 .. 1 000 4 000 2-Victorian Foundation for Survivors of 2-Victorian Foundation for Survivors of Torture Relocation (Brunswick) Torture Relocation (Brunswick) Dandenong Hospital 9 000 .. 1 000 8 000 Dandenong Hospital 9 000 .. 1 000 8 000 Redevelopment-Stage 2 (Dandenong) Redevelopment-Stage 2 (Dandenong) Mental Health Services for Kids and 7 000 .. 2 000 5 000 Mental Health Services for Kids and 7 000 .. 2 000 5 000 Youth-Development Stage 2 (Footscray) Youth-Development Stage 2 (Footscray) Departmental City Office Accommodation 51 800 .. .. 51 800 Departmental City Office Accommodation 51 800 .. .. 51 800 (Melbourne) (Melbourne) Radiotherapy Equipment Replacement 10 000 .. 1 000 9 000 Radiotherapy Equipment Replacement 10 000 .. 1 000 9 000 Strategy-Stage 1 (Metro) Strategy-Stage 1 (Metro) Monash Medical Centre Upgrade of 3 000 .. 2 000 1 000 Monash Medical Centre Upgrade of 3 000 .. 2 000 1 000 Operating Theatres (Moorabbin) Operating Theatres (Moorabbin) Monash Medical Centre, Moorabbin 19 000 .. 3 000 16 000 Monash Medical Centre, Moorabbin 19 000 .. 3 000 16 000 Campus-Expansion of Radiotherapy Campus-Expansion of Radiotherapy Services (Moorabbin) Services (Moorabbin) West Wimmera Health Service-Nhill 8 500 .. 2 000 6 500 West Wimmera Health Service-Nhill 8 500 .. 2 000 6 500 Hospital Redevelopment (Nhill) Hospital Redevelopment (Nhill) Rural Ambulance Victoria-Service 400 .. 400 .. Rural Ambulance Victoria-Service 400 .. 400 .. Expansion (Rural) Expansion (Rural) Medical Equipment Program-Routine 22 000 .. 20 000 2 000 Medical Equipment Program-Routine 22 000 .. 20 000 2 000 Replacement, Catch-Up and Additional Replacement, Catch-Up and Additional Equipment (Statewide) Equipment (Statewide) Fire Risk Management Strategy 2003/04 10 000 .. 10 000 .. Fire Risk Management Strategy 2003/04 10 000 .. 10 000 .. (Statewide) (Statewide) Health Information & Communication 138 500 .. 18 500 120 000 Health Information & Communication 138 500 .. 18 500 120 000 Technology (ICT) Strategy (Statewide) Technology (ICT) Strategy (Statewide) Electronic Prescribing in Key Victorian 21 000 .. 4 000 17 000 Electronic Prescribing in Key Victorian 21 000 .. 4 000 17 000 Hospitals (Statewide) Hospitals (Statewide) Infrastructure Renewal Strategy 16 000 .. 16 000 .. Infrastructure Renewal Strategy 16 000 .. 16 000 .. (Statewide) (Statewide) Residential Aged Care Strategy 2003/04 25 500 .. 4 500 21 000 Residential Aged Care Strategy 2003/04 25 500 .. 4 500 21 000 (Statewide) (Statewide) Werribee Mercy Hospital Redevelopment 10 000 .. 2 000 8 000 Werribee Mercy Hospital Redevelopment 10 000 .. 2 000 8 000 (Werribee) (Werribee) Total New Projects 356 700 .. 87 400 269 300 Total New Projects 356 700 .. 87 400 269 300 Total Human Services Projects 1240 152 447 128 303 957 489 067 Total Human Services Projects 1240 152 447 128 303 957 489 067 Source: Department of Human Services Source: Department of Human Services Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. September 2003. Includes preliminary unaudited information for 2002-03 financial year.

40 Human Services Public Sector Asset Investment Program 2003-04 40 Human Services Public Sector Asset Investment Program 2003-04

DEPARTMENT OF INFRASTRUCTURE DEPARTMENT OF INFRASTRUCTURE DEPARTMENT OF INFRASTRUCTURE

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Lascelles Wharf Rail Connection 5 100 71 1 100 3 929 Lascelles Wharf Rail Connection 5 100 71 1 100 3 929 Lascelles Wharf Rail Connection 5 100 71 1 100 3 929 (Corio/North Geelong) (Corio/North Geelong) (Corio/North Geelong) Linking the Suburbs (Knox)-Tram 30 500 747 5 800 23 953 Linking the Suburbs (Knox)-Tram 30 500 747 5 800 23 953 Linking the Suburbs (Knox)-Tram 30 500 747 5 800 23 953 extension from Blackburn Road to extension from Blackburn Road to extension from Blackburn Road to Vermont South (Forest Hill/Vermont Vermont South (Forest Hill/Vermont Vermont South (Forest Hill/Vermont South) South) South) Fast Rail links to regional centres 556 920 114 459 296 000 146 461 Fast Rail links to regional centres 556 920 114 459 296 000 146 461 Fast Rail links to regional centres 556 920 114 459 296 000 146 461 (Geelong, Bendigo, Ballarat, Traralgon) (Geelong, Bendigo, Ballarat, Traralgon) (Geelong, Bendigo, Ballarat, Traralgon) Linking the Suburbs-Craigieburn Rail 98 000 773 7 400 89 827 Linking the Suburbs-Craigieburn Rail 98 000 773 7 400 89 827 Linking the Suburbs-Craigieburn Rail 98 000 773 7 400 89 827 Electrification (Meadow Electrification (Meadow Electrification (Meadow Heights/Somerton/Roxburgh Park) Heights/Somerton/Roxburgh Park) Heights/Somerton/Roxburgh Park) Public transport information system 14 900 7 109 4 061 3 730 Public transport information system 14 900 7 109 4 061 3 730 Public transport information system 14 900 7 109 4 061 3 730 upgrades (Melbourne) upgrades (Melbourne) upgrades (Melbourne) Telecommunications Purchasing and 47 700 4 859 24 641 18 200 Telecommunications Purchasing and 47 700 4 859 24 641 18 200 Telecommunications Purchasing and 47 700 4 859 24 641 18 200 Management Strategy (Melbourne) Management Strategy (Melbourne) Management Strategy (Melbourne) Standardisation of regional freight lines 67 500 13 350 1 000 53 150 Standardisation of regional freight lines 67 500 13 350 1 000 53 150 Standardisation of regional freight lines 67 500 13 350 1 000 53 150 (Non metro various) (Non metro various) (Non metro various) Motorcycle Safety (Statewide) 10 200 725 3 400 6 075 Motorcycle Safety (Statewide) 10 200 725 3 400 6 075 Motorcycle Safety (Statewide) 10 200 725 3 400 6 075 Redevelopment of vic.gov.au portal to 4 000 2 691 1 309 .. Redevelopment of vic.gov.au portal to 4 000 2 691 1 309 .. Redevelopment of vic.gov.au portal to 4 000 2 691 1 309 .. enhance e-Government enhance e-Government enhance e-Government (Statewide-Various) (Statewide-Various) (Statewide-Various) Connecting Transport Services (Rural 10 000 8 010 1 990 .. Connecting Transport Services (Rural 10 000 8 010 1 990 .. Connecting Transport Services (Rural 10 000 8 010 1 990 .. Modal Interchanges)-amenities Modal Interchanges)-amenities Modal Interchanges)-amenities improvement (Various) improvement (Various) improvement (Various) Mitcham-Frankston Freeway (Various) tbd tbd tbd tbd Mitcham-Frankston Freeway (Various) tbd tbd tbd tbd Mitcham-Frankston Freeway (Various) tbd tbd tbd tbd Restoration of Country Passenger Rail 32 700 21 991 6 709 4 000 Restoration of Country Passenger Rail 32 700 21 991 6 709 4 000 Restoration of Country Passenger Rail 32 700 21 991 6 709 4 000 Services (Various) Services (Various) Services (Various) Rural School Bus Safety-improving bus 10 000 9 085 915 .. Rural School Bus Safety-improving bus 10 000 9 085 915 .. Rural School Bus Safety-improving bus 10 000 9 085 915 .. bays, shelters, paving (Various) bays, shelters, paving (Various) bays, shelters, paving (Various) Wodonga Rail Freight and Urban 30 000 1 628 1 000 27 372 Wodonga Rail Freight and Urban 30 000 1 628 1 000 27 372 Wodonga Rail Freight and Urban 30 000 1 628 1 000 27 372 Redevelopment (Wodonga) Redevelopment (Wodonga) Redevelopment (Wodonga) Better Roads-Rural Arterial Road Projects Better Roads-Rural Arterial Road Projects Better Roads-Rural Arterial Road Projects Princes Highway East (Via Bruthen) 7 100 6 609 491 .. Princes Highway East (Via Bruthen) 7 100 6 609 491 .. Princes Highway East (Via Bruthen) 7 100 6 609 491 .. (39.7km to 46.1km)-Road (39.7km to 46.1km)-Road (39.7km to 46.1km)-Road Realignment-Stage 4: Resheet, Realignment-Stage 4: Resheet, Realignment-Stage 4: Resheet, widening, realignment and regrading widening, realignment and regrading widening, realignment and regrading (Bruthen) (Bruthen) (Bruthen) Linking Rural Economies-Roads-Bayside 4 200 218 3 982 .. Linking Rural Economies-Roads-Bayside 4 200 218 3 982 .. Linking Rural Economies-Roads-Bayside 4 200 218 3 982 .. Road (Corio/North Geelong) Road (Corio/North Geelong) Road (Corio/North Geelong) Linking Rural 2 000 191 1 809 .. Linking Rural 2 000 191 1 809 .. Linking Rural 2 000 191 1 809 .. Economies-Roads-Maroondah Highway Economies-Roads-Maroondah Highway Economies-Roads-Maroondah Highway (Healesville) (Healesville) (Healesville)

Public Sector Asset Investment Program 2003-04 Infrastructure 41 Public Sector Asset Investment Program 2003-04 Infrastructure 41 Public Sector Asset Investment Program 2003-04 Infrastructure 41

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Linking Rural Economies-Roads-Henty 5 600 1 897 2 148 1 555 Linking Rural Economies-Roads-Henty 5 600 1 897 2 148 1 555 Highway (Heywood, Branxholm, Highway (Heywood, Branxholm, Cavendish, Cherrypool, Wallacedale, Cavendish, Cherrypool, Wallacedale, Hensley Park) Hensley Park) Linking Rural Economies-Roads-Henty 3 000 1 653 1 347 .. Linking Rural Economies-Roads-Henty 3 000 1 653 1 347 .. Highway Section 3 (Horsham, Highway Section 3 (Horsham, Cherrypool) Cherrypool) Calder Highway Upgrade-Kyneton to 70 000 16 015 34 400 19 585 Calder Highway Upgrade-Kyneton to 70 000 16 015 34 400 19 585 Faraday-State Contribution 50% Faraday-State Contribution 50% (Kyneton/Malmsbury/Taradale/Elphingsto (Kyneton/Malmsbury/Taradale/Elphingsto ne) (b) ne) (b) South Gippsland Highway Sec 5 (287.4km 250 216 34 .. South Gippsland Highway Sec 5 (287.4km 250 216 34 .. to 289.9km)-Road Planning to 289.9km)-Road Planning Studies-Cox`s Bridge replacement-Stage Studies-Cox`s Bridge replacement-Stage 3 (Longford) 3 (Longford) Better Roads-Metro Major Improvement Projects Better Roads-Metro Major Improvement Projects Eastern Freeway-Road Construction 100 000 75 751 15 000 9 249 Eastern Freeway-Road Construction 100 000 75 751 15 000 9 249 (Springvale Road to Park Road, bridges (Springvale Road to Park Road, bridges and other works) (Mitcham, Park and other works) (Mitcham, Park Orchards) Orchards) Better Roads-Outer Metropolitan Better Roads-Outer Metropolitan Princes Highway East (34.1km to 165 000 155 785 3 800 5 415 Princes Highway East (34.1km to 165 000 155 785 3 800 5 415 44.1km)-Hallam Bypass-Road 44.1km)-Hallam Bypass-Road Construction (Hallam) Construction (Hallam) Cooper St-Yale Drive to Hume 29 300 21 781 7 419 100 Cooper St-Yale Drive to Hume 29 300 21 781 7 419 100 Highway-Road Widening (Whittlesea Highway-Road Widening (Whittlesea City) City) National Highways (Commonwealth funded) National Highways (Commonwealth funded) Hume Highway (0.0km to 306 000 90 142 94 000 121 858 Hume Highway (0.0km to 306 000 90 142 94 000 121 858 13.0km)-Bypass/New Road-Hume 13.0km)-Bypass/New Road-Hume Freeway link-Planning/Construction WRR Freeway link-Planning/Construction WRR to Craigieburn (Broadmeadows, to Craigieburn (Broadmeadows, Craigieburn) Craigieburn) Murray River Bridge 44 000 236 4 736 39 028 Murray River Bridge 44 000 236 4 736 39 028 Replacements-Crossings (Corowa, Replacements-Crossings (Corowa, Echuca and Robinvale) Echuca and Robinvale) Goulburn Valley Highway Sec 3 (116.0km 2 300 2 055 245 .. Goulburn Valley Highway Sec 3 (116.0km 2 300 2 055 245 .. to 131.0km)-Bypass/New to 131.0km)-Bypass/New Road-Nagambie Bypass-Planning Study Road-Nagambie Bypass-Planning Study (Nagambie) (Nagambie)

42 Infrastructure Public Sector Asset Investment Program 2003-04 42 Infrastructure Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 State Funded Metropolitan Arterial Road Projects State Funded Metropolitan Arterial Road Projects State Funded Metropolitan Arterial Road Projects Calder Freeway-Melton Highway to 350 319 31 .. Calder Freeway-Melton Highway to 350 319 31 .. Calder Freeway-Melton Highway to 350 319 31 .. Diggers Rest-Planning and Investigations Diggers Rest-Planning and Investigations Diggers Rest-Planning and Investigations (Brimbank City, Hume City, Melton Shire) (Brimbank City, Hume City, Melton Shire) (Brimbank City, Hume City, Melton Shire) Linking the Suburbs-Major Road 11 600 2 160 5 627 3 813 Linking the Suburbs-Major Road 11 600 2 160 5 627 3 813 Linking the Suburbs-Major Road 11 600 2 160 5 627 3 813 Improvements-Edgars Road, Epping Improvements-Edgars Road, Epping Improvements-Edgars Road, Epping (Epping) (Epping) (Epping) Eltham-Yarra Glen Rd (13.4km to 4 270 785 2 265 1 220 Eltham-Yarra Glen Rd (13.4km to 4 270 785 2 265 1 220 Eltham-Yarra Glen Rd (13.4km to 4 270 785 2 265 1 220 15.7km)-Road Realignment-Kangaroo 15.7km)-Road Realignment-Kangaroo 15.7km)-Road Realignment-Kangaroo Ground Cemetery Rd to Alma Ground Cemetery Rd to Alma Ground Cemetery Rd to Alma Rd-widening and realignment (Kangaroo Rd-widening and realignment (Kangaroo Rd-widening and realignment (Kangaroo Ground) Ground) Ground) High Street Rd (18.0km to 13 800 9 692 4 108 .. High Street Rd (18.0km to 13 800 9 692 4 108 .. High Street Rd (18.0km to 13 800 9 692 4 108 .. 20.9km)-Mimosa St to Cathies 20.9km)-Mimosa St to Cathies 20.9km)-Mimosa St to Cathies Lane-duplication (Knox City, Monash Lane-duplication (Knox City, Monash Lane-duplication (Knox City, Monash City) City) City) Linking the Suburbs-Major Road 11 700 3 390 6 420 1 890 Linking the Suburbs-Major Road 11 700 3 390 6 420 1 890 Linking the Suburbs-Major Road 11 700 3 390 6 420 1 890 Improvements-Frankston-Cranbourne Improvements-Frankston-Cranbourne Improvements-Frankston-Cranbourne Road (Langwarrin) Road (Langwarrin) Road (Langwarrin) Linking the Suburbs-Major Road 14 300 667 8 830 4 803 Linking the Suburbs-Major Road 14 300 667 8 830 4 803 Linking the Suburbs-Major Road 14 300 667 8 830 4 803 Improvements-Fitzgerald Road Improvements-Fitzgerald Road Improvements-Fitzgerald Road (Laverton) (Laverton) (Laverton) Melba Highway-Planning and 1 499 1 322 177 .. Melba Highway-Planning and 1 499 1 322 177 .. Melba Highway-Planning and 1 499 1 322 177 .. Investigations (Melba) Investigations (Melba) Investigations (Melba) Linking the Suburbs-Major Road 22 000 1 315 13 400 7 285 Linking the Suburbs-Major Road 22 000 1 315 13 400 7 285 Linking the Suburbs-Major Road 22 000 1 315 13 400 7 285 Improvements-Narre Warren Cranbourne Improvements-Narre Warren Cranbourne Improvements-Narre Warren Cranbourne Road (Narre Warren) Road (Narre Warren) Road (Narre Warren) Regional Arterial Road and Bridge Links 40 100 13 103 8 713 18 284 Regional Arterial Road and Bridge Links 40 100 13 103 8 713 18 284 Regional Arterial Road and Bridge Links 40 100 13 103 8 713 18 284 (Non metro various) (Non metro various) (Non metro various) Linking the Suburbs-Major Road 3 390 864 2 087 439 Linking the Suburbs-Major Road 3 390 864 2 087 439 Linking the Suburbs-Major Road 3 390 864 2 087 439 Improvements-Macedon Street Bridge Improvements-Macedon Street Bridge Improvements-Macedon Street Bridge (Sunbury) (Sunbury) (Sunbury) Princes Highway East Sec 4 (155.0km to 1 000 908 92 .. Princes Highway East Sec 4 (155.0km to 1 000 908 92 .. Princes Highway East Sec 4 (155.0km to 1 000 908 92 .. 174.0km)-Road Planning 174.0km)-Road Planning 174.0km)-Road Planning Studies-Traralgon Bypass-Investigation Studies-Traralgon Bypass-Investigation Studies-Traralgon Bypass-Investigation of alignment options and road reservation of alignment options and road reservation of alignment options and road reservation requirements (Traralgon) requirements (Traralgon) requirements (Traralgon) Princes Highway East Sec 4 (166.0km to 720 632 88 .. Princes Highway East Sec 4 (166.0km to 720 632 88 .. Princes Highway East Sec 4 (166.0km to 720 632 88 .. 212.0km)-Road Planning 212.0km)-Road Planning 212.0km)-Road Planning Studies-Duplication from Traralgon to Studies-Duplication from Traralgon to Studies-Duplication from Traralgon to Sale-Investigation of alignment options Sale-Investigation of alignment options Sale-Investigation of alignment options and road reservation requirements and road reservation requirements and road reservation requirements (Traralgon, Rosedale, Sale) (Traralgon, Rosedale, Sale) (Traralgon, Rosedale, Sale) State (Bell/Springvale) Highway (10.2km 247 203 44 .. State (Bell/Springvale) Highway (10.2km 247 203 44 .. State (Bell/Springvale) Highway (10.2km 247 203 44 .. to 10.9km)-Road Planning Studies-Bell to 10.9km)-Road Planning Studies-Bell to 10.9km)-Road Planning Studies-Bell St Corridor Strategy (Various) St Corridor Strategy (Various) St Corridor Strategy (Various)

Public Sector Asset Investment Program 2003-04 Infrastructure 43 Public Sector Asset Investment Program 2003-04 Infrastructure 43 Public Sector Asset Investment Program 2003-04 Infrastructure 43

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 South Gippsland Highway Sec 5 (283.8km 13 835 11 732 189 1 914 South Gippsland Highway Sec 5 (283.8km 13 835 11 732 189 1 914 to 286.6km)-Swing Bridge Project (Sale to 286.6km)-Swing Bridge Project (Sale to Longford)-Stage 1-Road Realignment to Longford)-Stage 1-Road Realignment and New Bridge (historic bridge and New Bridge (historic bridge remaining) (Wellington Shire) remaining) (Wellington Shire) Total Existing Projects 1795 081 605 139 576 807 613 135 Total Existing Projects 1795 081 605 139 576 807 613 135 Source: Department of Infrastructure Source: Department of Infrastructure Notes: Notes: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. (b) The level of Government contribution will be determined following the completion of the tender (b) The level of Government contribution will be determined following the completion of the tender process. process. (c) As this is a Road of National Importance, Victoria will be seeking matching funding from the (c) As this is a Road of National Importance, Victoria will be seeking matching funding from the Commonwealth Government. Commonwealth Government.

44 Infrastructure Public Sector Asset Investment Program 2003-04 44 Infrastructure Public Sector Asset Investment Program 2003-04

DEPARTMENT OF INFRASTRUCTURE DEPARTMENT OF INFRASTRUCTURE DEPARTMENT OF INFRASTRUCTURE

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Corio Independent Goods Line-Construction 13 500 .. 2 100 11 400 Corio Independent Goods Line-Construction 13 500 .. 2 100 11 400 Corio Independent Goods Line-Construction 13 500 .. 2 100 11 400 (Corio) (Corio) (Corio) Grovedale Station-Construction (Grovedale) 5 000 .. 4 000 1 000 Grovedale Station-Construction (Grovedale) 5 000 .. 4 000 1 000 Grovedale Station-Construction (Grovedale) 5 000 .. 4 000 1 000 Birrarung Marr Pedestrian 27 800 .. 6 200 21 600 Birrarung Marr Pedestrian 27 800 .. 6 200 21 600 Birrarung Marr Pedestrian 27 800 .. 6 200 21 600 Bridge-Construction (Melbourne) Bridge-Construction (Melbourne) Bridge-Construction (Melbourne) Flinders Street Station Concourse-Deck 7 200 .. 7 200 .. Flinders Street Station Concourse-Deck 7 200 .. 7 200 .. Flinders Street Station Concourse-Deck 7 200 .. 7 200 .. Remediation (Melbourne) Remediation (Melbourne) Remediation (Melbourne) Flinders Street West Precinct-Urban 18 000 .. 1 300 16 700 Flinders Street West Precinct-Urban 18 000 .. 1 300 16 700 Flinders Street West Precinct-Urban 18 000 .. 1 300 16 700 Development Works (Melbourne) Development Works (Melbourne) Development Works (Melbourne) Jolimont Station-Minor works (Melbourne) 1 300 .. 900 400 Jolimont Station-Minor works (Melbourne) 1 300 .. 900 400 Jolimont Station-Minor works (Melbourne) 1 300 .. 900 400 Smart Freight-Information Technology and 2 000 .. .. 2 000 Smart Freight-Information Technology and 2 000 .. .. 2 000 Smart Freight-Information Technology and 2 000 .. .. 2 000 E-commerce Works (Melbourne) E-commerce Works (Melbourne) E-commerce Works (Melbourne) Yarra Precinct Lighting-Public Works 2 000 .. 250 1 750 Yarra Precinct Lighting-Public Works 2 000 .. 250 1 750 Yarra Precinct Lighting-Public Works 2 000 .. 250 1 750 (Melbourne) (Melbourne) (Melbourne) Cliff Street Overpass-Project Development 15 000 .. 2 000 13 000 Cliff Street Overpass-Project Development 15 000 .. 2 000 13 000 Cliff Street Overpass-Project Development 15 000 .. 2 000 13 000 (Portland) (Portland) (Portland) Smart Bus, Warrigal Road Red Route 2 600 .. 2 600 .. Smart Bus, Warrigal Road Red Route 2 600 .. 2 600 .. Smart Bus, Warrigal Road Red Route 2 600 .. 2 600 .. 700-Public Works (Various) 700-Public Works (Various) 700-Public Works (Various) Better Roads-Rural Arterial Road Projects Better Roads-Rural Arterial Road Projects Better Roads-Rural Arterial Road Projects Metropolitan Level Crossing-Middleborough 1 000 .. 1 000 .. Metropolitan Level Crossing-Middleborough 1 000 .. 1 000 .. Metropolitan Level Crossing-Middleborough 1 000 .. 1 000 .. Road-Grade Separation Planning Studies Road-Grade Separation Planning Studies Road-Grade Separation Planning Studies (Box Hill) (Box Hill) (Box Hill) Geelong Western Bypass-Design Works 4 100 .. 4 100 .. Geelong Western Bypass-Design Works 4 100 .. 4 100 .. Geelong Western Bypass-Design Works 4 100 .. 4 100 .. (Geelong) (Geelong) (Geelong) Pyalong Bypass-Road Alignment (Pyalong) 5 000 .. 400 4 600 Pyalong Bypass-Road Alignment (Pyalong) 5 000 .. 400 4 600 Pyalong Bypass-Road Alignment (Pyalong) 5 000 .. 400 4 600 Arrive Alive-Road Safety Infrastructure 11 500 .. 11 500 .. Arrive Alive-Road Safety Infrastructure 11 500 .. 11 500 .. Arrive Alive-Road Safety Infrastructure 11 500 .. 11 500 .. Improvements (Rural) Improvements (Rural) Improvements (Rural) Better Roads Outer Metropolitan Better Roads Outer Metropolitan Better Roads Outer Metropolitan Thompsons Road-Dandenong Valley 4 000 .. 3 000 1 000 Thompsons Road-Dandenong Valley 4 000 .. 3 000 1 000 Thompsons Road-Dandenong Valley 4 000 .. 3 000 1 000 Highway to Western Port Highway-Road Highway to Western Port Highway-Road Highway to Western Port Highway-Road Widening (Carrum Downs) Widening (Carrum Downs) Widening (Carrum Downs) Moorooduc Highway-Towerhill Road to 6 800 .. 3 000 3 800 Moorooduc Highway-Towerhill Road to 6 800 .. 3 000 3 800 Moorooduc Highway-Towerhill Road to 6 800 .. 3 000 3 800 Frankston/Flinders Road-Road Widening Frankston/Flinders Road-Road Widening Frankston/Flinders Road-Road Widening (Frankston) (Frankston) (Frankston) Greensborough Highway-Plenty 17 200 .. 3 000 14 200 Greensborough Highway-Plenty 17 200 .. 3 000 14 200 Greensborough Highway-Plenty 17 200 .. 3 000 14 200 Road-Bridgeworks (Greensborough) Road-Bridgeworks (Greensborough) Road-Bridgeworks (Greensborough) Pakenham Bypass-New Road/Bypass 121 200 .. 20 000 101 200 Pakenham Bypass-New Road/Bypass 121 200 .. 20 000 101 200 Pakenham Bypass-New Road/Bypass 121 200 .. 20 000 101 200 (Pakenham) (Pakenham) (Pakenham)

Public Sector Asset Investment Program 2003-04 Infrastructure 45 Public Sector Asset Investment Program 2003-04 Infrastructure 45 Public Sector Asset Investment Program 2003-04 Infrastructure 45

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Federal Roads of National Importance (Commonwealth funded) Federal Roads of National Importance (Commonwealth funded) Pakenham Bypass-Bypass/New Road 100 000 .. 20 000 80 000 Pakenham Bypass-Bypass/New Road 100 000 .. 20 000 80 000 (Pakenham) (Pakenham) National Highways (Commonwealth funded) National Highways (Commonwealth funded) /Wodonga Bypass-New Road/Bypass 106 000 .. 16 395 89 605 Albury/Wodonga Bypass-New Road/Bypass 106 000 .. 16 395 89 605 (Wodonga) (Wodonga) Total New Projects 471 200 .. 108 945 362 255 Total New Projects 471 200 .. 108 945 362 255 Total Infrastructure Projects 2.266 281 605 139 685 752 975 390 Total Infrastructure Projects 2.266 281 605 139 685 752 975 390 Source: Department of Infrastructure Source: Department of Infrastructure Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. (b) As this is a Road of National Importance, Victoria will be seeking matching funding of $121.2 million (b) As this is a Road of National Importance, Victoria will be seeking matching funding of $121.2 million from the Commonwealth Government. from the Commonwealth Government.

46 Infrastructure Public Sector Asset Investment Program 2003-04 46 Infrastructure Public Sector Asset Investment Program 2003-04

DEPARTMENT OF INNOVATION, INDUSTRY AND REGIONAL DEPARTMENT OF INNOVATION, INDUSTRY AND REGIONAL DEPARTMENT OF INNOVATION, INDUSTRY AND REGIONAL DEVELOPMENT DEVELOPMENT DEVELOPMENT

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Project Description Total Expected Estimated Remaining Project Description Total Expected Estimated Remaining Project Description Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Investment 30.6.2003(a) 2003-04 Investment 30.6.2003(a) 2003-04 Investment 30.6.2003(a) 2003-04 Australian Synchrotron Project 157 200 2 174 47 226 107 800 Australian Synchrotron Project 157 200 2 174 47 226 107 800 Australian Synchrotron Project 157 200 2 174 47 226 107 800 -Construction (Clayton) -Construction (Clayton) -Construction (Clayton) Film and Television Studio -Construction 40 000 21 470 18 530 .. Film and Television Studio -Construction 40 000 21 470 18 530 .. Film and Television Studio -Construction 40 000 21 470 18 530 .. (Docklands) (Docklands) (Docklands) Total Existing Projects 197 200 23 644 65 756 107 800 Total Existing Projects 197 200 23 644 65 756 107 800 Total Existing Projects 197 200 23 644 65 756 107 800 Source: Department of Innovation, Industry and Regional Development Source: Department of Innovation, Industry and Regional Development Source: Department of Innovation, Industry and Regional Development Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 2003-04 Project Description Investment 30.6.2003 2003-04 Project Description Investment 30.6.2003 2003-04 City Office Accommodation-Construction 21 860 .. 7 170 14 690 City Office Accommodation-Construction 21 860 .. 7 170 14 690 City Office Accommodation-Construction 21 860 .. 7 170 14 690 (Melbourne) (Melbourne) (Melbourne) Total New Projects 21 860 .. 7 170 14 690 Total New Projects 21 860 .. 7 170 14 690 Total New Projects 21 860 .. 7 170 14 690 Total Innovation Projects 219 060 23 644 72 926 122 490 Total Innovation Projects 219 060 23 644 72 926 122 490 Total Innovation Projects 219 060 23 644 72 926 122 490 Source: Department of Innovation, Industry and Regional Development Source: Department of Innovation, Industry and Regional Development Source: Department of Innovation, Industry and Regional Development Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 DIIRD 47 Public Sector Asset Investment Program 2003-04 DIIRD 47 Public Sector Asset Investment Program 2003-04 DIIRD 47

DEPARTMENT OF JUSTICE DEPARTMENT OF JUSTICE

Existing Projects Existing Projects ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 10 Year Cell Safety Project-Upgrade 50 750 9 567 5 190 35 993 10 Year Cell Safety Project-Upgrade 50 750 9 567 5 190 35 993 safety of cells and buildings Statewide) safety of cells and buildings Statewide) Bacchus Marsh Police Station 4 250 3 889 361 .. Bacchus Marsh Police Station 4 250 3 889 361 .. Construction (Bacchus Marsh) Construction (Bacchus Marsh) Barwon Prison Expansion (75 Beds) 11 949 11 945 4 .. Barwon Prison Expansion (75 Beds) 11 949 11 945 4 .. Construction Lara) Construction Lara) Rural Police Station Replacement 630 19 611 .. Rural Police Station Replacement 630 19 611 .. Program Stage 5 (Beaufort) Program Stage 5 (Beaufort) Bellarine Police Station -Replacement 5 000 4 180 820 .. Bellarine Police Station -Replacement 5 000 4 180 820 .. (Ocean Grove) (Ocean Grove) Rural Police Station-Replacement 280 .. 280 .. Rural Police Station-Replacement 280 .. 280 .. Program Stage 5 (Bendoc) Program Stage 5 (Bendoc) Rural Police Station-Replacement 600 .. 600 .. Rural Police Station-Replacement 600 .. 600 .. Program Stage 5 (Bunyip) Program Stage 5 (Bunyip) Coburg Police Station -Construction 9 000 1 300 2 000 5 700 Coburg Police Station -Construction 9 000 1 300 2 000 5 700 (Coburg) (Coburg) Consolidated Logistics Facility 14 900 2 200 9 000 3 700 Consolidated Logistics Facility 14 900 2 200 9 000 3 700 (OSCA)Construction (Ravenhall (OSCA)Construction (Ravenhall Melbourne Western) Melbourne Western) Correctional Services Prisoner Information 3 770 3 400 370 .. Correctional Services Prisoner Information 3 770 3 400 370 .. System (PIMS) -Software (Statewide) System (PIMS) -Software (Statewide) Rural Police Station Replacement 280 12 268 .. Rural Police Station Replacement 280 12 268 .. Program Stage 5 (Cressy) Program Stage 5 (Cressy) CrimTrac-Commonwealth Criminal 3 086 1 000 2 086 .. CrimTrac-Commonwealth Criminal 3 086 1 000 2 086 .. Intelligence Data Base System Intelligence Data Base System (Melbourne) (Melbourne) Croydon Police Station -Replacement 5 100 4 057 1 043 .. Croydon Police Station -Replacement 5 100 4 057 1 043 .. (Croydon) (Croydon) Diamond Creek Police Station 6 250 2 608 3 392 250 Diamond Creek Police Station 6 250 2 608 3 392 250 Replacement (Diamond Creek) Replacement (Diamond Creek) Diversionary Program for Adult Aboriginal 1 750 173 1 577 .. Diversionary Program for Adult Aboriginal 1 750 173 1 577 .. Offenders -Construction (Statewide) Offenders -Construction (Statewide) Eltham Police Station -Construction 5 100 4 222 878 .. Eltham Police Station -Construction 5 100 4 222 878 .. (Eltham) (Eltham) Endeavour Hills Police 4 417 786 2 000 1 631 Endeavour Hills Police 4 417 786 2 000 1 631 Station-Construction (Endeavour Hills) Station-Construction (Endeavour Hills) Footscray Police Station-Construction 12 100 2 400 5 000 4 700 Footscray Police Station-Construction 12 100 2 400 5 000 4 700 (Footscray) (Footscray) Gisborne Police Station-Replacement 5 000 3 409 1 591 .. Gisborne Police Station-Replacement 5 000 3 409 1 591 .. (Gisborne) (Gisborne) Rural Police Station-Replacement 280 .. 280 .. Rural Police Station-Replacement 280 .. 280 .. Program Stage 5 (Gordon) Program Stage 5 (Gordon)

48 Justice Public Sector Asset Investment Program 2003-04 48 Justice Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Heidelberg Police Station/Court House 13 200 10 429 2 771 .. Heidelberg Police Station/Court House 13 200 10 429 2 771 .. Heidelberg Police Station/Court House 13 200 10 429 2 771 .. Refurbishment/Extension (Heidelberg) Refurbishment/Extension (Heidelberg) Refurbishment/Extension (Heidelberg) Improved Emergency Services-Computer 25 860 19 680 6 060 120 Improved Emergency Services-Computer 25 860 19 680 6 060 120 Improved Emergency Services-Computer 25 860 19 680 6 060 120 Aided Dispatch (Melbourne) Aided Dispatch (Melbourne) Aided Dispatch (Melbourne) Rural Police Station-Replacement 600 540 60 .. Rural Police Station-Replacement 600 540 60 .. Rural Police Station-Replacement 600 540 60 .. Program Stage 5 (Inglewood) Program Stage 5 (Inglewood) Program Stage 5 (Inglewood) Integrated Road safety campaign-Road 12 230 9 687 2 543 .. Integrated Road safety campaign-Road 12 230 9 687 2 543 .. Integrated Road safety campaign-Road 12 230 9 687 2 543 .. Safety Measures (Statewide) Safety Measures (Statewide) Safety Measures (Statewide) Kew/Hawthorn Police Station Construction 8 200 7 126 1 074 .. Kew/Hawthorn Police Station Construction 8 200 7 126 1 074 .. Kew/Hawthorn Police Station Construction 8 200 7 126 1 074 .. (Kew/Hawthorn) (Kew/Hawthorn) (Kew/Hawthorn) Kilmore Police Station -Replacement 4 500 3 279 1 221 .. Kilmore Police Station -Replacement 4 500 3 279 1 221 .. Kilmore Police Station -Replacement 4 500 3 279 1 221 .. (Kilmore) (Kilmore) (Kilmore) Loddon Prison Expansion -Construction 9 225 9 047 178 .. Loddon Prison Expansion -Construction 9 225 9 047 178 .. Loddon Prison Expansion -Construction 9 225 9 047 178 .. (Castlemaine) (Castlemaine) (Castlemaine) Rural Police Station -Replacement 310 .. 310 .. Rural Police Station -Replacement 310 .. 310 .. Rural Police Station -Replacement 310 .. 310 .. Program Stage 5 (Macarthur) Program Stage 5 (Macarthur) Program Stage 5 (Macarthur) Maryborough Police Station Replacement 4 740 1 087 1 756 1 897 Maryborough Police Station Replacement 4 740 1 087 1 756 1 897 Maryborough Police Station Replacement 4 740 1 087 1 756 1 897 (Maryborough) (Maryborough) (Maryborough) Melbourne Women's Correctional Centre 10 763 10 202 187 374 Melbourne Women's Correctional Centre 10 763 10 202 187 374 Melbourne Women's Correctional Centre 10 763 10 202 187 374 Construction (Deer Park) Construction (Deer Park) Construction (Deer Park) Rural Police Station -Replacement 630 .. 630 .. Rural Police Station -Replacement 630 .. 630 .. Rural Police Station -Replacement 630 .. 630 .. Program Stage 5 (Merbein) Program Stage 5 (Merbein) Program Stage 5 (Merbein) Metropolitan Mobile Radio -Equipment tbd tbd tbd tbd Metropolitan Mobile Radio -Equipment tbd tbd tbd tbd Metropolitan Mobile Radio -Equipment tbd tbd tbd tbd (Melbourne) (Melbourne) (Melbourne) Mildura Court House -Construction 9 700 4 214 5 486 .. Mildura Court House -Construction 9 700 4 214 5 486 .. Mildura Court House -Construction 9 700 4 214 5 486 .. (Mildura) (g) (Mildura) (g) (Mildura) (g) Moe Police Station -Construction (Moe) 4 300 3 807 493 .. Moe Police Station -Construction (Moe) 4 300 3 807 493 .. Moe Police Station -Construction (Moe) 4 300 3 807 493 .. Northcote Police Station -Construction 6 342 1 790 4 552 .. Northcote Police Station -Construction 6 342 1 790 4 552 .. Northcote Police Station -Construction 6 342 1 790 4 552 .. (Northcote) (Northcote) (Northcote) Police Operational Safety and Tactics 8 500 7 653 847 .. Police Operational Safety and Tactics 8 500 7 653 847 .. Police Operational Safety and Tactics 8 500 7 653 847 .. Training Facility Construction (Glen Training Facility Construction (Glen Training Facility Construction (Glen Waverley) Waverley) Waverley) Police Station and Courthouse 27 500 3 085 15 942 8 473 Police Station and Courthouse 27 500 3 085 15 942 8 473 Police Station and Courthouse 27 500 3 085 15 942 8 473 Replacement Program Replacement Program Replacement Program Upgrade/Replacement () Upgrade/Replacement (LaTrobe Valley) Upgrade/Replacement (LaTrobe Valley) Preston Police Station -Construction 8 000 6 883 1 117 .. Preston Police Station -Construction 8 000 6 883 1 117 .. Preston Police Station -Construction 8 000 6 883 1 117 .. (Preston) (Preston) (Preston) Prison Capacity Expansion Program 166 164 43 802 17 800 104 562 Prison Capacity Expansion Program 166 164 43 802 17 800 104 562 Prison Capacity Expansion Program 166 164 43 802 17 800 104 562 Construction (Statewide) Construction (Statewide) Construction (Statewide) Rural Police Station -Replacement 280 .. 280 .. Rural Police Station -Replacement 280 .. 280 .. Rural Police Station -Replacement 280 .. 280 .. Program Stage 5 (Pyramid Hill) Program Stage 5 (Pyramid Hill) Program Stage 5 (Pyramid Hill) Richmond Police Station -Construction 7 730 7 702 28 .. Richmond Police Station -Construction 7 730 7 702 28 .. Richmond Police Station -Construction 7 730 7 702 28 .. (Richmond) (Richmond) (Richmond) Road Safety Investment -Digital Red Light 6 500 4 100 2 400 .. Road Safety Investment -Digital Red Light 6 500 4 100 2 400 .. Road Safety Investment -Digital Red Light 6 500 4 100 2 400 .. Camera's (Statewide) Camera's (Statewide) Camera's (Statewide) Romsey Police Station -Upgrade 545 536 9 .. Romsey Police Station -Upgrade 545 536 9 .. Romsey Police Station -Upgrade 545 536 9 .. Replacement Program -(Romsey) Replacement Program -(Romsey) Replacement Program -(Romsey)

Public Sector Asset Investment Program 2003-04 Justice 49 Public Sector Asset Investment Program 2003-04 Justice 49 Public Sector Asset Investment Program 2003-04 Justice 49

($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Rowville Police Station -Construction 4 500 500 4 000 .. Rowville Police Station -Construction 4 500 500 4 000 .. (Rowville) (Rowville) Seymour Police Station -Construction 7 000 5 148 1 852 .. Seymour Police Station -Construction 7 000 5 148 1 852 .. (Seymour) (Seymour) Rural Police Station -Replacement 280 .. 280 .. Rural Police Station -Replacement 280 .. 280 .. Program Stage 5 (Smythedale) Program Stage 5 (Smythedale) Rural Police Station-Replacement 550 22 528 .. Rural Police Station-Replacement 550 22 528 .. Program Stage 5 (Tarnagulla) Program Stage 5 (Tarnagulla) VicSES annual provisions -Equipment 7 480 5 540 1 940 .. VicSES annual provisions -Equipment 7 480 5 540 1 940 .. Replacement -(Statewide) Replacement -(Statewide) Warrnambool Court House Construction 8 800 3 915 4 885 .. Warrnambool Court House Construction 8 800 3 915 4 885 .. (Warrnambool) (Warrnambool) Rural Police Station -Replacement 280 .. 280 .. Rural Police Station -Replacement 280 .. 280 .. Program Stage 5 (Whitfield) Program Stage 5 (Whitfield) Community Based Corrections Facilities 13 500 8 171 5 329 .. Community Based Corrections Facilities 13 500 8 171 5 329 .. -Construction -(Melbourne) -Construction -(Melbourne) Yea Police Station -Upgrade/Replacement 545 139 406 .. Yea Police Station -Upgrade/Replacement 545 139 406 .. Program -(Yea) Program -(Yea) Total Existing Projects 523 246 233 250 122 596 167 400 Total Existing Projects 523 246 233 250 122 596 167 400 Source: Department of Justice Source: Department of Justice Notes: Notes: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. (b) Partnerships Victoria project. Specific project cost information will be published following tender (b) Partnerships Victoria project. Specific project cost information will be published following tender process. process.

50 Justice Public Sector Asset Investment Program 2003-04 50 Justice Public Sector Asset Investment Program 2003-04

DEPARTMENT OF JUSTICE DEPARTMENT OF JUSTICE DEPARTMENT OF JUSTICE

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Bairnsdale Police Station -Construction 7 500 .. 1 000 6 500 Bairnsdale Police Station -Construction 7 500 .. 1 000 6 500 Bairnsdale Police Station -Construction 7 500 .. 1 000 6 500 (Bairnsdale) (Bairnsdale) (Bairnsdale) Bendigo Police Station -Construction 19 700 .. 1 600 18 100 Bendigo Police Station -Construction 19 700 .. 1 600 18 100 Bendigo Police Station -Construction 19 700 .. 1 600 18 100 (Bendigo) (Bendigo) (Bendigo) Brunswick Police Station -Construction 12 000 .. 600 11 400 Brunswick Police Station -Construction 12 000 .. 600 11 400 Brunswick Police Station -Construction 12 000 .. 600 11 400 (Brunswick) (Brunswick) (Brunswick) Caroline Springs Police Station 5 500 .. 220 5 280 Caroline Springs Police Station 5 500 .. 220 5 280 Caroline Springs Police Station 5 500 .. 220 5 280 Construction -Caroline Springs) Construction -Caroline Springs) Construction -Caroline Springs) Counter Terrorism -Equipment (Statewide) 3 970 .. 3 910 60 Counter Terrorism -Equipment (Statewide) 3 970 .. 3 910 60 Counter Terrorism -Equipment (Statewide) 3 970 .. 3 910 60 Handgun Buyback -IT System-(Statewide) 3 640 .. 3 640 .. Handgun Buyback -IT System-(Statewide) 3 640 .. 3 640 .. Handgun Buyback -IT System-(Statewide) 3 640 .. 3 640 .. Interrogation of Existing Legacy 5 000 .. 5 000 .. Interrogation of Existing Legacy 5 000 .. 5 000 .. Interrogation of Existing Legacy 5 000 .. 5 000 .. Applications Software (Statewide) Applications Software (Statewide) Applications Software (Statewide) Moorabbin Court Complex Construction 18 000 .. 100 17 900 Moorabbin Court Complex Construction 18 000 .. 100 17 900 Moorabbin Court Complex Construction 18 000 .. 100 17 900 (Moorabbin) (Moorabbin) (Moorabbin) Pakenham Police and Emergency 9 500 .. 800 8 700 Pakenham Police and Emergency 9 500 .. 800 8 700 Pakenham Police and Emergency 9 500 .. 800 8 700 Services Complex-Construction Services Complex-Construction Services Complex-Construction (Pakenham) (Pakenham) (Pakenham) Police Forensic Laboratories-Construction 6 000 .. 1 680 4 320 Police Forensic Laboratories-Construction 6 000 .. 1 680 4 320 Police Forensic Laboratories-Construction 6 000 .. 1 680 4 320 (Macleod) (Macleod) (Macleod) Rural Police Station Replacement 6 000 .. 4 000 2 000 Rural Police Station Replacement 6 000 .. 4 000 2 000 Rural Police Station Replacement 6 000 .. 4 000 2 000 Program Stage 6-Construction Statewide Program Stage 6-Construction Statewide Program Stage 6-Construction Statewide City Office Accommodation (Southern 22 000 .. 7 170 14 830 City Office Accommodation (Southern 22 000 .. 7 170 14 830 City Office Accommodation (Southern 22 000 .. 7 170 14 830 Cross Development)-Construction Cross Development)-Construction Cross Development)-Construction (Melbourne) (Melbourne) (Melbourne) Warragul Police Station-Construction 5 500 .. 500 5 000 Warragul Police Station-Construction 5 500 .. 500 5 000 Warragul Police Station-Construction 5 500 .. 500 5 000 (Warragul) (Warragul) (Warragul) Total New Projects 124 310 .. 30 220 94 090 Total New Projects 124 310 .. 30 220 94 090 Total New Projects 124 310 .. 30 220 94 090 Total Justice Projects 647 556 233 250 152 816 261 490 Total Justice Projects 647 556 233 250 152 816 261 490 Total Justice Projects 647 556 233 250 152 816 261 490 Source: Department of Justice Source: Department of Justice Source: Department of Justice Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Justice 51 Public Sector Asset Investment Program 2003-04 Justice 51 Public Sector Asset Investment Program 2003-04 Justice 51

DEPARTMENT OF PREMIER AND CABINET DEPARTMENT OF PREMIER AND CABINET

Existing Projects Existing Projects ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Business System -Redevelopment 4 000 1 070 2 930 .. Business System -Redevelopment 4 000 1 070 2 930 .. (Melbourne) (Melbourne) Federation Square (Melbourne) 436 400 413 231 23 169 .. Federation Square (Melbourne) 436 400 413 231 23 169 .. Victorian Arts Centre Trust -Legislative 486 357 129 .. Victorian Arts Centre Trust -Legislative 486 357 129 .. compliance program for State owned compliance program for State owned assets (Melbourne) assets (Melbourne) Construction of a State Crisis Centre 6 000 .. 3 000 3 000 Construction of a State Crisis Centre 6 000 .. 3 000 3 000 (Melbourne) (Melbourne) State Library of Victoria -Redevelopment 91 400 50 131 41 269 .. State Library of Victoria -Redevelopment 91 400 50 131 41 269 .. Phase 4 (Melbourne) Phase 4 (Melbourne) Victorian Arts Centre -Asset Management 8 400 2 100 2 100 4 200 Victorian Arts Centre -Asset Management 8 400 2 100 2 100 4 200 Plan (Melbourne) Plan (Melbourne) Victorian Arts Centre -Asset Management 5 400 4 315 1 085 .. Victorian Arts Centre -Asset Management 5 400 4 315 1 085 .. (Melbourne) (Melbourne) Museum Victoria -Exhibition 2 690 1 270 1 420 .. Museum Victoria -Exhibition 2 690 1 270 1 420 .. Redevelopment (Newport) Redevelopment (Newport) Meat Market Craft Centre -Asset 3 260 424 2 836 .. Meat Market Craft Centre -Asset 3 260 424 2 836 .. Management (North Melbourne) Management (North Melbourne) National Gallery of Victoria -Building 127 283 123 133 4 150 .. National Gallery of Victoria -Building 127 283 123 133 4 150 .. Redevelopment/Upgrade (South Redevelopment/Upgrade (South Melbourne) Melbourne) Yarra Precinct Arts Integration Project 61 000 202 10 498 50 300 Yarra Precinct Arts Integration Project 61 000 202 10 498 50 300 (Southbank) (Southbank) Scienceworks -Legislative compliance 995 905 90 .. Scienceworks -Legislative compliance 995 905 90 .. program for State owned assets program for State owned assets (Spotswood) (Spotswood) Developing Library and Community 1 600 800 400 400 Developing Library and Community 1 600 800 400 400 Networks (Statewide) Networks (Statewide) Total Existing Projects 748 914 597 938 93 076 57 900 Total Existing Projects 748 914 597 938 93 076 57 900 Source: Department of Premier and Cabinet Source: Department of Premier and Cabinet Notes: Notes: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. (b) Partnerships Victoria project. Specific project cost information will be published following tender (b) Partnerships Victoria project. Specific project cost information will be published following tender process. process.

52 Premier and Cabinet Public Sector Asset Investment Program 2003-04 52 Premier and Cabinet Public Sector Asset Investment Program 2003-04

DEPARTMENT OF PREMIER AND CABINET DEPARTMENT OF PREMIER AND CABINET DEPARTMENT OF PREMIER AND CABINET

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 2003-04 Project Description Investment 30.6.2003 2003-04 Project Description Investment 30.6.2003 2003-04 Museum Victoria -Exhibition Renewal 2 545 .. 2 545 .. Museum Victoria -Exhibition Renewal 2 545 .. 2 545 .. Museum Victoria -Exhibition Renewal 2 545 .. 2 545 .. (Carlton) (Carlton) (Carlton) Victorian Arts Centre Trust -Asset 2 500 .. 2 500 .. Victorian Arts Centre Trust -Asset 2 500 .. 2 500 .. Victorian Arts Centre Trust -Asset 2 500 .. 2 500 .. Renewal (Melbourne) Renewal (Melbourne) Renewal (Melbourne) National Gallery of Victoria -Public 1 148 .. 1 148 .. National Gallery of Victoria -Public 1 148 .. 1 148 .. National Gallery of Victoria -Public 1 148 .. 1 148 .. Records Office of Victoria -Refit (North Records Office of Victoria -Refit (North Records Office of Victoria -Refit (North Melbourne) Melbourne) Melbourne) Total New Projects 6 193 .. 6 193 .. Total New Projects 6 193 .. 6 193 .. Total New Projects 6 193 .. 6 193 .. Total Premier and Cabinet Projects 755 107 597 938 99 269 57 900 Total Premier and Cabinet Projects 755 107 597 938 99 269 57 900 Total Premier and Cabinet Projects 755 107 597 938 99 269 57 900 Source: Department of Premier and Cabinet Source: Department of Premier and Cabinet Source: Department of Premier and Cabinet Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Premier and Cabinet 53 Public Sector Asset Investment Program 2003-04 Premier and Cabinet 53 Public Sector Asset Investment Program 2003-04 Premier and Cabinet 53

DEPARTMENT OF PRIMARY INDUSTRIES DEPARTMENT OF PRIMARY INDUSTRIES

Existing Projects Existing Projects ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Centre for Land Protection Research, 2 500 2 024 476 .. Centre for Land Protection Research, 2 500 2 024 476 .. Bendigo -Modernise facilities (Bendigo) Bendigo -Modernise facilities (Bendigo) Agriculture Victoria Ellinbank-Modernise 11 500 2 620 8 880 .. Agriculture Victoria Ellinbank-Modernise 11 500 2 620 8 880 .. facilities (Ellinbank) facilities (Ellinbank) Agriculture Victoria Horsham-Modernise 9 000 4 990 4 010 .. Agriculture Victoria Horsham-Modernise 9 000 4 990 4 010 .. facilities (Horsham) facilities (Horsham) Co-operative Research Centre for Clean 2 800 700 700 1 400 Co-operative Research Centre for Clean 2 800 700 700 1 400 Power from Lignite (Latrobe Power from Lignite (Latrobe Valley/Gippsland) Valley/Gippsland) Lysterfield Lake Park-Land Purchase 3 000 1 140 60 1 800 Lysterfield Lake Park-Land Purchase 3 000 1 140 60 1 800 (Lysterfield) (Lysterfield) Showgrounds -Redevelopment 100 700 4 021 71 479 25 200 Showgrounds -Redevelopment 100 700 4 021 71 479 25 200 (Melbourne) (Melbourne) Sunraysia Horticulture Centre Modernise 3 500 3 280 220 .. Sunraysia Horticulture Centre Modernise 3 500 3 280 220 .. facilities (Mildura) facilities (Mildura) Marine and Freshwater Resources 20 000 8 980 11 020 .. Marine and Freshwater Resources 20 000 8 980 11 020 .. Institute (MAFRI) -Redevelopment Institute (MAFRI) -Redevelopment (Queenscliff) (Queenscliff) Minerals and Petroleum -Development 4 000 2 000 1 000 1 000 Minerals and Petroleum -Development 4 000 2 000 1 000 1 000 Initiative (Statewide) Initiative (Statewide) Institute of Sustainable Irrigated 6 000 5 070 930 .. Institute of Sustainable Irrigated 6 000 5 070 930 .. Agriculture, Tatura -Modernise facilities Agriculture, Tatura -Modernise facilities (Tatura) (Tatura) Victoria's Research Equipment-Acquisition 13 900 5 410 8 490 .. Victoria's Research Equipment-Acquisition 13 900 5 410 8 490 .. (Various) (Various) IT and Document Management Centre 4 100 .. 4 100 .. IT and Document Management Centre 4 100 .. 4 100 .. Libraries Redevelopment (Werribee) Libraries Redevelopment (Werribee) Total Existing Projects 181 000 40 235 111 365 29 400 Total Existing Projects 181 000 40 235 111 365 29 400 Source: Department of Primary Industries Source: Department of Primary Industries Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

54 Primary Industries Public Sector Asset Investment Program 2003-04 54 Primary Industries Public Sector Asset Investment Program 2003-04

DEPARTMENT OF PRIMARY INDUSTRIES DEPARTMENT OF PRIMARY INDUSTRIES DEPARTMENT OF PRIMARY INDUSTRIES

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Nil Nil Nil Total New Projects ...... Total New Projects ...... Total New Projects ...... Total Primary Industries Projects 181 000 40 235 111 365 29 400 Total Primary Industries Projects 181 000 40 235 111 365 29 400 Total Primary Industries Projects 181 000 40 235 111 365 29 400 Source: Department of Primary Industries Source: Department of Primary Industries Source: Department of Primary Industries Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Primary Industries 55 Public Sector Asset Investment Program 2003-04 Primary Industries 55 Public Sector Asset Investment Program 2003-04 Primary Industries 55

DEPARTMENT OF SUSTAINABILITY AND ENVIRONMENT DEPARTMENT OF SUSTAINABILITY AND ENVIRONMENT

Existing Projects Existing Projects ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Bairnsdale Replacement-facilities upgrade 7 150 248 6 500 402 Bairnsdale Replacement-facilities upgrade 7 150 248 6 500 402 (Bairnsdale) (Bairnsdale) Piping the System-Commonwealth 7 500 .. 7 500 .. Piping the System-Commonwealth 7 500 .. 7 500 .. Component Construction Component Construction (Mallee/Wimmera) (Mallee/Wimmera) Piping the System-State 76 780 4 862 10 568 61 350 Piping the System-State 76 780 4 862 10 568 61 350 Component-Construction Component-Construction (Mallee/Wimmera) (Mallee/Wimmera) CBD Accommodation Consolidation-fitout 17 500 3 245 14 255 .. CBD Accommodation Consolidation-fitout 17 500 3 245 14 255 .. (Melbourne) (Melbourne) Yarra Precinct-Queensbridge Square 7 800 5 665 2 135 .. Yarra Precinct-Queensbridge Square 7 800 5 665 2 135 .. (Melbourne, Southbank) (Melbourne, Southbank) Yarra Precinct-Sandridge 8 000 5 258 2 742 .. Yarra Precinct-Sandridge 8 000 5 258 2 742 .. Bridge-Redevelopment (Melbourne, Bridge-Redevelopment (Melbourne, Southbank) Southbank) Fire Infrastructure and Equipment 6 000 5 753 .. 247 Fire Infrastructure and Equipment 6 000 5 753 .. 247 Replacement-Equipment Upgrades Replacement-Equipment Upgrades (Statewide) (Statewide) Improving Quality and Access to Victoria`s 3 980 542 1 500 1 938 Improving Quality and Access to Victoria`s 3 980 542 1 500 1 938 Parks-Upgrades (Statewide) Parks-Upgrades (Statewide) Land Exchange-Systems Development 24 000 4 192 17 308 2 500 Land Exchange-Systems Development 24 000 4 192 17 308 2 500 (Statewide) (Statewide) Marine Parks-Accomodation (Statewide) 145 132 13 .. Marine Parks-Accomodation (Statewide) 145 132 13 .. Marine Parks-Vessels (Statewide) 180 143 37 .. Marine Parks-Vessels (Statewide) 180 143 37 .. Regional telecommunciations 3 000 2 700 300 .. Regional telecommunciations 3 000 2 700 300 .. infrastructure installed-Upgrade infrastructure installed-Upgrade (Statewide) (Statewide) IT and Document Management 10 330 7 979 2 351 .. IT and Document Management 10 330 7 979 2 351 .. Centre-Facilities Upgrade (Various) Centre-Facilities Upgrade (Various) Parks Asset Base-Renew/Upgrade Visitor 5 335 2 472 1 863 1 000 Parks Asset Base-Renew/Upgrade Visitor 5 335 2 472 1 863 1 000 facilities in National Parks and upgrade facilities in National Parks and upgrade boating access in the Bay (Various) boating access in the Bay (Various) Sunraysia Salt Interception 1 700 1 200 500 .. Sunraysia Salt Interception 1 700 1 200 500 .. Scheme-construction (Various) Scheme-construction (Various) Transit Cities-Dandenong (Dandenong, 3 500 500 2 000 1 000 Transit Cities-Dandenong (Dandenong, 3 500 500 2 000 1 000 Dandenong South, Keysborough, Dandenong South, Keysborough, Doveton, Noble Park, Hallam, Endeavour Doveton, Noble Park, Hallam, Endeavour Hills) Hills)

56 Sustainability and Environment Public Sector Asset Investment Program 2003-04 56 Sustainability and Environment Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Transit Cities-Frankston (Frankston, 2 000 1 701 299 .. Transit Cities-Frankston (Frankston, 2 000 1 701 299 .. Transit Cities-Frankston (Frankston, 2 000 1 701 299 .. Frankston North, Seaford, Mt Eliza, Frankston North, Seaford, Mt Eliza, Frankston North, Seaford, Mt Eliza, Langwarrin, Baxter) Langwarrin, Baxter) Langwarrin, Baxter) Transit Cities-Ringwood (Ringwood, 1 000 701 299 .. Transit Cities-Ringwood (Ringwood, 1 000 701 299 .. Transit Cities-Ringwood (Ringwood, 1 000 701 299 .. Mitcham, Donvale, Ringwood East) Mitcham, Donvale, Ringwood East) Mitcham, Donvale, Ringwood East) Total Existing Projects 185 900 47 293 70 170 68 437 Total Existing Projects 185 900 47 293 70 170 68 437 Total Existing Projects 185 900 47 293 70 170 68 437 Source: Department of Sustainability and Environment Source: Department of Sustainability and Environment Source: Department of Sustainability and Environment Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Sustainability and Environment 57 Public Sector Asset Investment Program 2003-04 Sustainability and Environment 57 Public Sector Asset Investment Program 2003-04 Sustainability and Environment 57

DEPARTMENT OF SUSTAINABILITY AND ENVIRONMENT DEPARTMENT OF SUSTAINABILITY AND ENVIRONMENT

New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Bushfire Recovery 31 800 2 700 22 200 6 900 Bushfire Recovery 31 800 2 700 22 200 6 900 Strategy-Restoration-(Various) Strategy-Restoration-(Various) Long-Term Zoo 32 000 .. .. 32 000 Long-Term Zoo 32 000 .. .. 32 000 Strategy-Upgrade-(Various) Strategy-Upgrade-(Various) Victorian Water Trust 52 500 .. 7 500 45 000 Victorian Water Trust 52 500 .. 7 500 45 000 Assets-Upgrades-(Various) Assets-Upgrades-(Various) Total New Projects 116 300 2 700 29 700 83 900 Total New Projects 116 300 2 700 29 700 83 900 Total Sustainability and Environment 302 200 49 993 99 870 152 337 Total Sustainability and Environment 302 200 49 993 99 870 152 337 Projects Projects Source: Department of Sustainability and Environment Source: Department of Sustainability and Environment Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

58 Sustainability and Environment Public Sector Asset Investment Program 2003-04 58 Sustainability and Environment Public Sector Asset Investment Program 2003-04

DEPARTMENT OF TREASURY AND FINANCE DEPARTMENT OF TREASURY AND FINANCE DEPARTMENT OF TREASURY AND FINANCE

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Refurbishment/Fitout of 3 Treasury Place 500 460 40 .. Refurbishment/Fitout of 3 Treasury Place 500 460 40 .. Refurbishment/Fitout of 3 Treasury Place 500 460 40 .. -Upgrade (East Melbourne) -Upgrade (East Melbourne) -Upgrade (East Melbourne) 3 Treasury Place -Refurbishment of 9 000 734 4 542 3 724 3 Treasury Place -Refurbishment of 9 000 734 4 542 3 724 3 Treasury Place -Refurbishment of 9 000 734 4 542 3 724 offices (Melbourne) offices (Melbourne) offices (Melbourne) DTF Infrastructure -Cyclical and Strategic 5 171 3 183 1 988 .. DTF Infrastructure -Cyclical and Strategic 5 171 3 183 1 988 .. DTF Infrastructure -Cyclical and Strategic 5 171 3 183 1 988 .. Replacement of IT Networks Replacement of IT Networks Replacement of IT Networks -Replacement (Melbourne) -Replacement (Melbourne) -Replacement (Melbourne) Refurbishment of Transport House -589 2 000 658 1 342 .. Refurbishment of Transport House -589 2 000 658 1 342 .. Refurbishment of Transport House -589 2 000 658 1 342 .. Collins Street -Upgrade (Melbourne) Collins Street -Upgrade (Melbourne) Collins Street -Upgrade (Melbourne) State Revenue Office IT Strategic 28 798 27 825 973 .. State Revenue Office IT Strategic 28 798 27 825 973 .. State Revenue Office IT Strategic 28 798 27 825 973 .. Plan/E-Business -Systems Upgrade Plan/E-Business -Systems Upgrade Plan/E-Business -Systems Upgrade (Melbourne) (Melbourne) (Melbourne) Government Office Accommodation -City 97 731 95 524 2 207 .. Government Office Accommodation -City 97 731 95 524 2 207 .. Government Office Accommodation -City 97 731 95 524 2 207 .. Precinct Strategic Plan -Upgrade Precinct Strategic Plan -Upgrade Precinct Strategic Plan -Upgrade (Various) (Various) (Various) Total Existing Projects 143 200 128 384 11 092 3 724 Total Existing Projects 143 200 128 384 11 092 3 724 Total Existing Projects 143 200 128 384 11 092 3 724 Source: Department of Treasury and Finance Source: Department of Treasury and Finance Source: Department of Treasury and Finance Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 City Office Accommodation -Refit 6 280 300 1 960 4 020 City Office Accommodation -Refit 6 280 300 1 960 4 020 City Office Accommodation -Refit 6 280 300 1 960 4 020 (Southern Cross Site) (Southern Cross Site) (Southern Cross Site) Total New Projects 6 280 300 1 960 4 020 Total New Projects 6 280 300 1 960 4 020 Total New Projects 6 280 300 1 960 4 020 Total Treasury and Finance Projects 149 480 128 684 13 052 7 744 Total Treasury and Finance Projects 149 480 128 684 13 052 7 744 Total Treasury and Finance Projects 149 480 128 684 13 052 7 744 Source: Department of Treasury and Finance Source: Department of Treasury and Finance Source: Department of Treasury and Finance Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Treasury and Finance 59 Public Sector Asset Investment Program 2003-04 Treasury and Finance 59 Public Sector Asset Investment Program 2003-04 Treasury and Finance 59

DEPARTMENT FOR VICTORIAN COMMUNITIES DEPARTMENT FOR VICTORIAN COMMUNITIES

Existing Projects Existing Projects ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 2003-04 Project Description Investment 30.6.2003 2003-04 Melbourne Sports and Aquatic Centre 50 000 2 019 26 981 21 000 Melbourne Sports and Aquatic Centre 50 000 2 019 26 981 21 000 -Redevelopment (Albert Park) -Redevelopment (Albert Park) Victorian Electronic Records Strategy 5 500 241 5 259 .. Victorian Electronic Records Strategy 5 500 241 5 259 .. -Repository (North Melbourne) -Repository (North Melbourne) Sport and Recreation Victoria (SRV) 4 050 2 300 1 250 500 Sport and Recreation Victoria (SRV) 4 050 2 300 1 250 500 Camps -Upgrade (Anglesea, Rowsley, Camps -Upgrade (Anglesea, Rowsley, Falls Creek, Mt Eliza, Mt Evelyn) Falls Creek, Mt Eliza, Mt Evelyn) Total Existing Projects 59 550 4 560 33 490 21 500 Total Existing Projects 59 550 4 560 33 490 21 500 Source: Department for Victorian Communities Source: Department for Victorian Communities Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Commonwealth Games Olympic Park 2 700 .. 200 2 500 Commonwealth Games Olympic Park 2 700 .. 200 2 500 Athletics Track -replacement (Melbourne) Athletics Track -replacement (Melbourne) Commonwealth Games State Mountain 3 000 .. 300 2 700 Commonwealth Games State Mountain 3 000 .. 300 2 700 Bike Centre -construction (Melbourne) Bike Centre -construction (Melbourne) Commonwealth Games State Netball and 800 .. 100 700 Commonwealth Games State Netball and 800 .. 100 700 Hockey Centre -replacement (Melbourne) Hockey Centre -replacement (Melbourne) Commonwealth Games Village 35 100 .. 9 000 26 100 Commonwealth Games Village 35 100 .. 9 000 26 100 -construction (Melbourne) -construction (Melbourne) Enhancement of policy and risk 12 350 1 100 11 250 .. Enhancement of policy and risk 12 350 1 100 11 250 .. management capacity -refurbishment management capacity -refurbishment (Melbourne) (Melbourne) Commonwealth Games Athletics Track 18 500 .. 2 000 16 500 Commonwealth Games Athletics Track 18 500 .. 2 000 16 500 -development (Melbourne Cricket -development (Melbourne Cricket Ground) Ground) Residential Camps -Asset Compliance 3 600 .. 3 600 .. Residential Camps -Asset Compliance 3 600 .. 3 600 .. and Risk Management Program and Risk Management Program (Various) (Various) Total New Projects 76 050 1 100 26 450 48 500 Total New Projects 76 050 1 100 26 450 48 500 Total Victorian Communities Projects 135 600 5 660 59 940 70 000 Total Victorian Communities Projects 135 600 5 660 59 940 70 000 Source: Department for Victorian Communities Source: Department for Victorian Communities Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 60 Victorian Communities Public Sector Asset Investment Program 2003-04 60 Victorian Communities Public Sector Asset Investment Program 2003-04

PARLIAMENT PARLIAMENT PARLIAMENT

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Victorian Auditor General's Office 1 300 997 303 .. Victorian Auditor General's Office 1 300 997 303 .. Victorian Auditor General's Office 1 300 997 303 .. -Information Technology Projects -Information Technology Projects -Information Technology Projects (Melbourne) (Melbourne) (Melbourne) Total Existing Projects 1 300 997 303 .. Total Existing Projects 1 300 997 303 .. Total Existing Projects 1 300 997 303 .. Source: Parliament Source: Parliament Source: Parliament Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year.

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Expected Estimated Remaining Total Expected Estimated Remaining Total Expected Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Project Description Investment 30.6.2003(a) 2003-04 Nil Nil Nil Total New Projects ...... Total New Projects ...... Total New Projects ...... Total Parliament Projects 1 300 997 303 .. Total Parliament Projects 1 300 997 303 .. Total Parliament Projects 1 300 997 303 .. Source: Parliament Source: Parliament Source: Parliament Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 4 September 2003. Includes preliminary unaudited information for 2002-03 financial year. 44 Septeptemmbbeerr 2003. Inc Inclludeudess pr preelimliminarinaryy unaudite unaudited inford informmation foration for 2002-03 financialfinanc yial yeeaarr.. 4September 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Parliament 61 Public Sector Asset Investment Program 2003-04 Parliament 61 Public Sector Asset Investment Program 2003-04 Parliament 61

COUNTRY FIRE AUTHORITY COUNTRY FIRE AUTHORITY

Existing Projects Existing Projects ($ thousand) ($ thousand) Total Expenditure to Estimated Remaining Total Expenditure to Estimated Remaining Estimated 30.6.2003 (a) Expenditure Expenditure Estimated 30.6.2003 (a) Expenditure Expenditure Project Description Investment 2003-04 Project Description Investment 2003-04 Vehicle -Purchase (Ballarat) 240 30 210 .. Vehicle -Purchase (Ballarat) 240 30 210 .. Vehicles -Purchase (Ballarat) 240 31 209 .. Vehicles -Purchase (Ballarat) 240 31 209 .. Vehicles -Purchase (Bendigo /Ballarat) 2 300 2 118 182 .. Vehicles -Purchase (Bendigo /Ballarat) 2 300 2 118 182 .. Fire Station Stage 2 Modifications -Fitout 180 121 59 .. Fire Station Stage 2 Modifications -Fitout 180 121 59 .. (Caroline Springs) (Caroline Springs) Fire Station (Special Resource Initiative) 380 30 350 .. Fire Station (Special Resource Initiative) 380 30 350 .. -Construction (Chirnside Park) -Construction (Chirnside Park) Fire Station -Fitout (Craigeburn) 200 3 197 .. Fire Station -Fitout (Craigeburn) 200 3 197 .. Fire Station -Fitout (Cranbourne) 1 400 70 1 330 .. Fire Station -Fitout (Cranbourne) 1 400 70 1 330 .. Fire Station (Special Resource Initiative) 200 19 181 .. Fire Station (Special Resource Initiative) 200 19 181 .. -Construction (Creswick) -Construction (Creswick) Firestation -Construction (Diamond Creek) 800 800 .. .. Firestation -Construction (Diamond Creek) 800 800 .. .. Fire Station -Construction 1 850 85 1 765 .. Fire Station -Construction 1 850 85 1 765 .. (Doveton/Hallam) (Doveton/Hallam) Fire Station -Construction (Drouin) 860 59 801 .. Fire Station -Construction (Drouin) 860 59 801 .. Fire Station (Special Resource Initiative) 815 815 .. .. Fire Station (Special Resource Initiative) 815 815 .. .. -Construction (Eaglehawk) -Construction (Eaglehawk) Special Resource Initiative -Land 80 40 40 .. Special Resource Initiative -Land 80 40 40 .. Purchase and Refurbish Existing Station Purchase and Refurbish Existing Station (Echuca) (Echuca) Fire Station (Special Resource Initiative) 1 500 103 1 397 .. Fire Station (Special Resource Initiative) 1 500 103 1 397 .. -Construction (Greenvale) -Construction (Greenvale) Fire Station -Fitout (Hawkesdale) 30 15 15 .. Fire Station -Fitout (Hawkesdale) 30 15 15 .. Fire Station (Special Resource Initiative) 1 010 504 .. 506 Fire Station (Special Resource Initiative) 1 010 504 .. 506 -Construction Stage 2 (Hoppers -Construction Stage 2 (Hoppers Crossing) Crossing) Fire Station -Land Purchase (Hurstbridge) 410 410 .. .. Fire Station -Land Purchase (Hurstbridge) 410 410 .. .. Fire Station -Fitout (Kiewa) 50 .. 50 .. Fire Station -Fitout (Kiewa) 50 .. 50 .. Fire Station (Special Resource Initiative) 1 350 308 1 042 .. Fire Station (Special Resource Initiative) 1 350 308 1 042 .. -Construction () -Construction (Morwell) Fire Station (Special Resource Initiative) 1 740 408 1 332 .. Fire Station (Special Resource Initiative) 1 740 408 1 332 .. -Construction (Point Cook) -Construction (Point Cook) Fire Station (Special Resource Initiative) 1 700 1 074 626 .. Fire Station (Special Resource Initiative) 1 700 1 074 626 .. -Construction (South Morang) -Construction (South Morang) Fire Station (Special Resource Initiative) 500 .. .. 500 Fire Station (Special Resource Initiative) 500 .. .. 500 -Land Purchase (St. Helena) -Land Purchase (St. Helena) Fire Station -Fitout (Sunbury) 495 20 475 .. Fire Station -Fitout (Sunbury) 495 20 475 .. Fire Station (Special Resource Initiative) 1 200 990 210 .. Fire Station (Special Resource Initiative) 1 200 990 210 .. -Construction (Torquay) -Construction (Torquay) Rural Fire Station Enhancement Program 3 000 2 789 211 .. Rural Fire Station Enhancement Program 3 000 2 789 211 .. -Construction (Various) -Construction (Various) Vehicles -Purchase (Various) 2 315 2 315 .. .. Vehicles -Purchase (Various) 2 315 2 315 .. ..

62 Country Fire Authority Public Sector Asset Investment Program 2003-04 62 Country Fire Authority Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Expenditure to Estimated Remaining Total Expenditure to Estimated Remaining Total Expenditure to Estimated Remaining Estimated 30.6.2003 (a) Expenditure Expenditure Estimated 30.6.2003 (a) Expenditure Expenditure Estimated 30.6.2003 (a) Expenditure Expenditure Project Description Investment 2003-04 Project Description Investment 2003-04 Project Description Investment 2003-04 Vehicles -Purchase (Various) 1 884 1 774 110 .. Vehicles -Purchase (Various) 1 884 1 774 110 .. Vehicles -Purchase (Various) 1 884 1 774 110 .. Vehicles (Special Resource Initiative) 2 689 2 569 120 .. Vehicles (Special Resource Initiative) 2 689 2 569 120 .. Vehicles (Special Resource Initiative) 2 689 2 569 120 .. -Purchase (Various) -Purchase (Various) -Purchase (Various) Vehicles -Purchase (Various) 4 455 4 455 .. .. Vehicles -Purchase (Various) 4 455 4 455 .. .. Vehicles -Purchase (Various) 4 455 4 455 .. .. Vehicles -Purchase (Various) 2 377 2 377 .. .. Vehicles -Purchase (Various) 2 377 2 377 .. .. Vehicles -Purchase (Various) 2 377 2 377 .. .. Vehicles -Purchase (Various) 1 535 54 1 481 .. Vehicles -Purchase (Various) 1 535 54 1 481 .. Vehicles -Purchase (Various) 1 535 54 1 481 .. Firestation -Fitout (Various) 400 273 127 .. Firestation -Fitout (Various) 400 273 127 .. Firestation -Fitout (Various) 400 273 127 .. Training Ground Props -Construction 196 196 .. .. Training Ground Props -Construction 196 196 .. .. Training Ground Props -Construction 196 196 .. .. (Wangaratta) (Wangaratta) (Wangaratta) Total Existing Projects 38 381 24 855 12 520 1 006 Total Existing Projects 38 381 24 855 12 520 1 006 Total Existing Projects 38 381 24 855 12 520 1 006 Source: Country Fire Authority Source: Country Fire Authority Source: Country Fire Authority Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Country Fire Authority 63 Public Sector Asset Investment Program 2003-04 Country Fire Authority 63 Public Sector Asset Investment Program 2003-04 Country Fire Authority 63

COUNTRY FIRE AUTHORITY COUNTRY FIRE AUTHORITY

New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) Total Expenditure to Estimated Remaining Total Expenditure to Estimated Remaining Estimated 30.6.2003 (a) Expenditure Expenditure Estimated 30.6.2003 (a) Expenditure Expenditure Project Description Investment 2003-04 Project Description Investment 2003-04 Fire Station -Construction (Bamawm 80 .. 80 .. Fire Station -Construction (Bamawm 80 .. 80 .. Extension) Extension) Fire Station -Construction 80 .. 80 .. Fire Station -Construction 80 .. 80 .. (Bochara/Wannon) (Bochara/Wannon) Fire Station -Construction (Brim) 80 .. 80 .. Fire Station -Construction (Brim) 80 .. 80 .. Fire Station -Construction (Carrum) 2 000 .. 300 1 700 Fire Station -Construction (Carrum) 2 000 .. 300 1 700 Fire Station -Land Purchase (Corryong) 35 .. 35 .. Fire Station -Land Purchase (Corryong) 35 .. 35 .. Fire Station -Construction (Corryong) 120 .. 60 60 Fire Station -Construction (Corryong) 120 .. 60 60 Vehicle -Purchase (Dandenong) 280 .. 280 .. Vehicle -Purchase (Dandenong) 280 .. 280 .. Fire Station -Land Purchase (Darley) 50 .. 50 .. Fire Station -Land Purchase (Darley) 50 .. 50 .. Fire Station -Construction (Darley) 200 .. 55 145 Fire Station -Construction (Darley) 200 .. 55 145 Training Grounds -Roadworks (Fiskville) 1 500 .. 150 1 350 Training Grounds -Roadworks (Fiskville) 1 500 .. 150 1 350 Fire Station -Construction (Hurstbridge) 550 .. 250 300 Fire Station -Construction (Hurstbridge) 550 .. 250 300 Fire Station -Construction (Kilmore) 500 .. 200 300 Fire Station -Construction (Kilmore) 500 .. 200 300 Fire Station -Construction (Nhill) 730 .. 630 100 Fire Station -Construction (Nhill) 730 .. 630 100 Fire Station -Land Purchase (Omeo) 30 .. 30 .. Fire Station -Land Purchase (Omeo) 30 .. 30 .. Fire Station -Construction (Rokewood) 225 .. 225 .. Fire Station -Construction (Rokewood) 225 .. 225 .. Fire Station -Construction (Somers) 400 .. 200 200 Fire Station -Construction (Somers) 400 .. 200 200 Fire Station -Construction (Traralgon 100 .. 100 .. Fire Station -Construction (Traralgon 100 .. 100 .. West) West) Fire Station -Land Purchase (Various) 60 .. 60 .. Fire Station -Land Purchase (Various) 60 .. 60 .. Fire Station -Construction (Various) 50 .. 50 .. Fire Station -Construction (Various) 50 .. 50 .. Vehicles -Purchase (Various) 405 .. 405 .. Vehicles -Purchase (Various) 405 .. 405 .. Vehicles -Purchase (Various) 4 300 .. 4 300 .. Vehicles -Purchase (Various) 4 300 .. 4 300 .. Vehicles -Purchase (Various) 4 980 .. 4 980 .. Vehicles -Purchase (Various) 4 980 .. 4 980 .. Vehicles -Purchase (Various) 560 .. 560 .. Vehicles -Purchase (Various) 560 .. 560 .. Vehicles -Retro Fit (Various) 380 80 300 .. Vehicles -Retro Fit (Various) 380 80 300 .. Fire Station -Construction (Wangaratta 160 .. 160 .. Fire Station -Construction (Wangaratta 160 .. 160 .. South) South) Total New Projects 17 855 80 13 620 4 155 Total New Projects 17 855 80 13 620 4 155 Total Country Fire Authority Projects 56 236 24 935 26 140 5 161 Total Country Fire Authority Projects 56 236 24 935 26 140 5 161 Source: Country Fire Authority Source: Country Fire Authority Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments a (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments a 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

64 Country Fire Authority Public Sector Asset Investment Program 2003-04 64 Country Fire Authority Public Sector Asset Investment Program 2003-04

METROPOLITAN FIRE AND EMERGENCY SERVICES BOARD METROPOLITAN FIRE AND EMERGENCY SERVICES BOARD METROPOLITAN FIRE AND EMERGENCY SERVICES BOARD

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Hot Fire Training Ground 657 9 448 200 Hot Fire Training Ground 657 9 448 200 Hot Fire Training Ground 657 9 448 200 -Additions/Upgrade (Carrum Downs) -Additions/Upgrade (Carrum Downs) -Additions/Upgrade (Carrum Downs) Computers Software 17 167 5 594 7 938 3 635 Computers Software 17 167 5 594 7 938 3 635 Computers Software 17 167 5 594 7 938 3 635 -Upgrade/Replacement (Metropolitan -Upgrade/Replacement (Metropolitan -Upgrade/Replacement (Metropolitan Areas) Areas) Areas) Stations -Alterations and Major 7 641 1 836 3 091 2 714 Stations -Alterations and Major 7 641 1 836 3 091 2 714 Stations -Alterations and Major 7 641 1 836 3 091 2 714 Maintenance (Metropolitan Areas) Maintenance (Metropolitan Areas) Maintenance (Metropolitan Areas) Plant & Equipment -Replacement 9 973 685 7 068 2 220 Plant & Equipment -Replacement 9 973 685 7 068 2 220 Plant & Equipment -Replacement 9 973 685 7 068 2 220 (Metropolitan Areas) (Metropolitan Areas) (Metropolitan Areas) Fire Fighting Appliances 20 520 5 665 9 215 5 640 Fire Fighting Appliances 20 520 5 665 9 215 5 640 Fire Fighting Appliances 20 520 5 665 9 215 5 640 -Upgrade/Replacement (Metropolitan -Upgrade/Replacement (Metropolitan -Upgrade/Replacement (Metropolitan Areas) Areas) Areas) Car & Light Truck -Replacement 5 807 1 948 1 859 2 000 Car & Light Truck -Replacement 5 807 1 948 1 859 2 000 Car & Light Truck -Replacement 5 807 1 948 1 859 2 000 (Metropolitan Areas) (Metropolitan Areas) (Metropolitan Areas) Land & Building -Construction of New 28 759 2 328 8 036 18 395 Land & Building -Construction of New 28 759 2 328 8 036 18 395 Land & Building -Construction of New 28 759 2 328 8 036 18 395 Station (Metropolitan Areas) Station (Metropolitan Areas) Station (Metropolitan Areas) Total Existing Projects 90 524 18 065 37 655 34 804 Total Existing Projects 90 524 18 065 37 655 34 804 Total Existing Projects 90 524 18 065 37 655 34 804 Source: Metropolitan Fire and Emergency Services Board Source: Metropolitan Fire and Emergency Services Board Source: Metropolitan Fire and Emergency Services Board Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Nil Nil Nil Total New Projects ...... Total New Projects ...... Total New Projects ...... Total Metropolitan Fire & Emergency 90 524 18 065 37 655 34 804 Total Metropolitan Fire & Emergency 90 524 18 065 37 655 34 804 Total Metropolitan Fire & Emergency 90 524 18 065 37 655 34 804 Services Board Projects Services Board Projects Services Board Projects Source: Metropolitan Fire and Emergency Services Board Source: Metropolitan Fire and Emergency Services Board Source: Metropolitan Fire and Emergency Services Board Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by departments as at 29 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. August 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 MFESB 65 Public Sector Asset Investment Program 2003-04 MFESB 65 Public Sector Asset Investment Program 2003-04 MFESB 65

66 MFESB Public Sector Asset Investment Program 2003-04 66 MFESB Public Sector Asset Investment Program 2003-04

CHAPTER THREE: MAJOR PUBLIC NON-FINANCIAL CHAPTER THREE: MAJOR PUBLIC NON-FINANCIAL CHAPTER THREE: MAJOR PUBLIC NON-FINANCIAL CORPORATIONS ASSET INVESTMENT PROGRAM 2003-04 CORPORATIONS ASSET INVESTMENT PROGRAM 2003-04 CORPORATIONS ASSET INVESTMENT PROGRAM 2003-04 BY AGENCY BY AGENCY BY AGENCY

GIPPSLAND AND SOUTHERN RURAL WATER AUTHORITY GIPPSLAND AND SOUTHERN RURAL WATER AUTHORITY GIPPSLAND AND SOUTHERN RURAL WATER AUTHORITY

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Picnic Shelter-Rehabilitation (Blue Rock) 55 52 .. 3 Picnic Shelter-Rehabilitation (Blue Rock) 55 52 .. 3 Picnic Shelter-Rehabilitation (Blue Rock) 55 52 .. 3 Public Toilets at Cowwarr 67 3 .. 64 Public Toilets at Cowwarr 67 3 .. 64 Public Toilets at Cowwarr 67 3 .. 64 Weir-Rehabilitation (Cowwarr) Weir-Rehabilitation (Cowwarr) Weir-Rehabilitation (Cowwarr) Maffra & Cowwarr Weir Automatic Control 276 216 .. 60 Maffra & Cowwarr Weir Automatic Control 276 216 .. 60 Maffra & Cowwarr Weir Automatic Control 276 216 .. 60 -Replacement (East Gippsland) -Replacement (East Gippsland) -Replacement (East Gippsland) Dam outlet valves –Rehabilitation 1 015 978 37 .. Dam outlet valves –Rehabilitation 1 015 978 37 .. Dam outlet valves –Rehabilitation 1 015 978 37 .. (Glenmaggie) (Glenmaggie) (Glenmaggie) Northern Outlet Penstock -Rehabilitation 70 32 .. 38 Northern Outlet Penstock -Rehabilitation 70 32 .. 38 Northern Outlet Penstock -Rehabilitation 70 32 .. 38 (Glenmaggie) (Glenmaggie) (Glenmaggie) Southern Conduit Vibration 195 6 189 .. Southern Conduit Vibration 195 6 189 .. Southern Conduit Vibration 195 6 189 .. Control-Rehabilitation (Glenmaggie) Control-Rehabilitation (Glenmaggie) Control-Rehabilitation (Glenmaggie) Southern Outlet Bulkhead 67 5 62 .. Southern Outlet Bulkhead 67 5 62 .. Southern Outlet Bulkhead 67 5 62 .. Gates-Rehabilitation (Glenmaggie) Gates-Rehabilitation (Glenmaggie) Gates-Rehabilitation (Glenmaggie) Channel Fences-Replacement 245 48 47 150 Channel Fences-Replacement 245 48 47 150 Channel Fences-Replacement 245 48 47 150 (Macalister) (Macalister) (Macalister) Channel Service 200 164 36 .. Channel Service 200 164 36 .. Channel Service 200 164 36 .. Improvement-Rehabilitation (Macalister) Improvement-Rehabilitation (Macalister) Improvement-Rehabilitation (Macalister) Drain Structure 201 1 50 150 Drain Structure 201 1 50 150 Drain Structure 201 1 50 150 Replacement-Reconstruction Replacement-Reconstruction Replacement-Reconstruction (Macalister) (Macalister) (Macalister) Critical Assets Program-Rehabilitation 226 34 48 144 Critical Assets Program-Rehabilitation 226 34 48 144 Critical Assets Program-Rehabilitation 226 34 48 144 (Macalister) (Macalister) (Macalister) Main Eastern Carp Barrier -Construction 64 4 60 .. Main Eastern Carp Barrier -Construction 64 4 60 .. Main Eastern Carp Barrier -Construction 64 4 60 .. (Macalister) (Macalister) (Macalister) Main Northern Channel -Little Weir 1 679 1 656 23 .. Main Northern Channel -Little Weir 1 679 1 656 23 .. Main Northern Channel -Little Weir 1 679 1 656 23 .. -Reconstruction (Macalister) -Reconstruction (Macalister) -Reconstruction (Macalister) Meter Replacements in Macalister 208 8 50 150 Meter Replacements in Macalister 208 8 50 150 Meter Replacements in Macalister 208 8 50 150 Irrigation District -Replacement Irrigation District -Replacement Irrigation District -Replacement (Macalister) (Macalister) (Macalister) Nuntin Channel -Rehabilitation 4 401 3 221 1 180 .. Nuntin Channel -Rehabilitation 4 401 3 221 1 180 .. Nuntin Channel -Rehabilitation 4 401 3 221 1 180 .. (Macalister) (Macalister) (Macalister)

Public Sector Asset Investment Program 2003-04 Gippsland & Southern Rural Water 67 Public Sector Asset Investment Program 2003-04 Gippsland & Southern Rural Water 67 Public Sector Asset Investment Program 2003-04 Gippsland & Southern Rural Water 67

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Regulator Auto Doors-Upgrade 401 312 .. 89 Regulator Auto Doors-Upgrade 401 312 .. 89 (Macalister) (Macalister) Main Northern Channel Environmental 152 72 80 .. Main Northern Channel Environmental 152 72 80 .. Flow Culvert -Construction (Macalister) Flow Culvert -Construction (Macalister) Main Northern Channel No. 141 6 135 .. Main Northern Channel No. 141 6 135 .. 4-Rehabilitation (Macalister Irrigation) 4-Rehabilitation (Macalister Irrigation) Geographic Information System 256 256 .. .. Geographic Information System 256 256 .. .. (GIS)-Upgrade (Maffra) (GIS)-Upgrade (Maffra) Groundwater and Surface Water 112 54 58 .. Groundwater and Surface Water 112 54 58 .. Licensing System -Development (Maffra) Licensing System -Development (Maffra) Repaint Maffra Weir Gates with Protective 91 83 8 .. Repaint Maffra Weir Gates with Protective 91 83 8 .. Coating -Rehabilitation (Maffra Weir) Coating -Rehabilitation (Maffra Weir) Lerderderg Remote 46 46 .. .. Lerderderg Remote 46 46 .. .. Monitoring-Construction (Merrimu) Monitoring-Construction (Merrimu) Catchment Erosion-Rehabilitation 108 4 50 54 Catchment Erosion-Rehabilitation 108 4 50 54 (Merrimu) (Merrimu) Dam Gate Flap-Investigation (Narracan) 70 70 .. .. Dam Gate Flap-Investigation (Narracan) 70 70 .. .. Design Anchors-Design (Narracan) 35 18 .. 17 Design Anchors-Design (Narracan) 35 18 .. 17 Channel System -Review (Newry) 60 15 .. 45 Channel System -Review (Newry) 60 15 .. 45 Access across the Highway-Construction 50 50 .. .. Access across the Highway-Construction 50 50 .. .. (Pykes Creek) (Pykes Creek) Erosion of Foreshore -Rehabilitation 156 93 .. 63 Erosion of Foreshore -Rehabilitation 156 93 .. 63 (Pykes Creek) (Pykes Creek) Outlet Tower-Rehabilitation (Pykes Creek) 1 000 86 650 264 Outlet Tower-Rehabilitation (Pykes Creek) 1 000 86 650 264 Reseal Recreation Area 40 38 .. 2 Reseal Recreation Area 40 38 .. 2 Road-Rehabilitation (Pykes Creek) Road-Rehabilitation (Pykes Creek) 1/3 Drain Crossing -Rehabilitation (Sale) 260 260 .. .. 1/3 Drain Crossing -Rehabilitation (Sale) 260 260 .. .. Sale Outfall Siphons -Rehabilitation (Sale) 120 10 110 .. Sale Outfall Siphons -Rehabilitation (Sale) 120 10 110 .. Computer Replacement 75 35 40 .. Computer Replacement 75 35 40 .. Program-Upgrade (Various) Program-Upgrade (Various) Replace 4/1 Channel upstream of Maltby 1 221 1 221 .. .. Replace 4/1 Channel upstream of Maltby 1 221 1 221 .. .. Bypass with Pipeline -Reconstruction Bypass with Pipeline -Reconstruction (Werribee) (Werribee) Replace Main Channel from Maltby 1 075 579 496 .. Replace Main Channel from Maltby 1 075 579 496 .. Bypass to 3/4/1-Reconstruction Bypass to 3/4/1-Reconstruction (Werribee) (Werribee) WID Piping Feasibility Study -Review 171 151 20 .. WID Piping Feasibility Study -Review 171 151 20 .. (Werribee) (Werribee) Weir Upgrade-Investigation () 165 44 .. 121 Weir Upgrade-Investigation (Yallourn) 165 44 .. 121 Dam Gate Strengthening -Rehabilition 805 478 327 .. Dam Gate Strengthening -Rehabilition 805 478 327 .. (Yallourn) (Yallourn) Dam Install Anchors-Installation (Yallourn) 3 760 3 352 408 .. Dam Install Anchors-Installation (Yallourn) 3 760 3 352 408 .. Total Existing Projects 19 339 13 761 4 164 1 414 Total Existing Projects 19 339 13 761 4 164 1 414 Source: Gippsland and Southern Rural Water Authority Source: Gippsland and Southern Rural Water Authority Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

68 Gippsland & Southern Rural Water Public Sector Asset Investment Program 2003-04 68 Gippsland & Southern Rural Water Public Sector Asset Investment Program 2003-04

GIPPSLAND AND SOUTHERN RURAL WATER AUTHORITY GIPPSLAND AND SOUTHERN RURAL WATER AUTHORITY GIPPSLAND AND SOUTHERN RURAL WATER AUTHORITY

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Investment 30.6.2003 (a) 2003-04 Investment 30.6.2003 (a) 2003-04 Investment 30.6.2003 (a) 2003-04 Project Description Project Description Project Description Blueprint for Irrigation District 60 .. .. 60 Blueprint for Irrigation District 60 .. .. 60 Blueprint for Irrigation District 60 .. .. 60 Infrastructure-Design (Bacchus Marsh) Infrastructure-Design (Bacchus Marsh) Infrastructure-Design (Bacchus Marsh) Main Channel Flume-Replacement 320 .. 80 240 Main Channel Flume-Replacement 320 .. 80 240 Main Channel Flume-Replacement 320 .. 80 240 (Bacchus Marsh) (Bacchus Marsh) (Bacchus Marsh) Siphon -Construction (Bundalaguah) 95 .. 15 80 Siphon -Construction (Bundalaguah) 95 .. 15 80 Siphon -Construction (Bundalaguah) 95 .. 15 80 Bypass Gate Installation -Construction 60 .. 60 .. Bypass Gate Installation -Construction 60 .. 60 .. Bypass Gate Installation -Construction 60 .. 60 .. (Cowwarr) (Cowwarr) (Cowwarr) Weir Spillway Gate 120 .. .. 120 Weir Spillway Gate 120 .. .. 120 Weir Spillway Gate 120 .. .. 120 Re-Coating-Rehabilitation (Cowwarr Re-Coating-Rehabilitation (Cowwarr Re-Coating-Rehabilitation (Cowwarr Weir) Weir) Weir) Catwalk Replacement at Maintenance 60 .. .. 60 Catwalk Replacement at Maintenance 60 .. .. 60 Catwalk Replacement at Maintenance 60 .. .. 60 Deck-Replacement (Glenmaggie) Deck-Replacement (Glenmaggie) Deck-Replacement (Glenmaggie) Southern Outlet Conduit 55 .. 55 .. Southern Outlet Conduit 55 .. 55 .. Southern Outlet Conduit 55 .. 55 .. Recoating-Rehabilitation (Glenmaggie) Recoating-Rehabilitation (Glenmaggie) Recoating-Rehabilitation (Glenmaggie) Lifting Gear -Replacement (Glenmaggie) 110 .. .. 110 Lifting Gear -Replacement (Glenmaggie) 110 .. .. 110 Lifting Gear -Replacement (Glenmaggie) 110 .. .. 110 Gantry Crane Hoist-Replacement 80 .. .. 80 Gantry Crane Hoist-Replacement 80 .. .. 80 Gantry Crane Hoist-Replacement 80 .. .. 80 (Glenmaggie) (Glenmaggie) (Glenmaggie) Road -Reseal (Glenmaggie) 40 .. .. 40 Road -Reseal (Glenmaggie) 40 .. .. 40 Road -Reseal (Glenmaggie) 40 .. .. 40 Nine Remaining Old 150 .. .. 150 Nine Remaining Old 150 .. .. 150 Nine Remaining Old 150 .. .. 150 Piezometers-Replacement (Glenmaggie) Piezometers-Replacement (Glenmaggie) Piezometers-Replacement (Glenmaggie) Spillway Gate Painting-Rehabilitation 200 .. 90 110 Spillway Gate Painting-Rehabilitation 200 .. 90 110 Spillway Gate Painting-Rehabilitation 200 .. 90 110 (Glenmaggie) (Glenmaggie) (Glenmaggie) On-going Replacements of Assets in the 1 150 .. .. 1 150 On-going Replacements of Assets in the 1 150 .. .. 1 150 On-going Replacements of Assets in the 1 150 .. .. 1 150 Macalister Irrigation Macalister Irrigation Macalister Irrigation District-Rehabilitation (Macalister) District-Rehabilitation (Macalister) District-Rehabilitation (Macalister) Service Improvement Program in the 210 .. 60 150 Service Improvement Program in the 210 .. 60 150 Service Improvement Program in the 210 .. 60 150 Macalister Irrigation Macalister Irrigation Macalister Irrigation District-Rehabilitation (Macalister) District-Rehabilitation (Macalister) District-Rehabilitation (Macalister) Main Northern Siphon No. 8-Construction 80 .. 80 .. Main Northern Siphon No. 8-Construction 80 .. 80 .. Main Northern Siphon No. 8-Construction 80 .. 80 .. (Macalister) (Macalister) (Macalister) Main Southern Thompson River 100 .. 100 .. Main Southern Thompson River 100 .. 100 .. Main Southern Thompson River 100 .. 100 .. Siphon-Construction (Macalister Siphon-Construction (Macalister Siphon-Construction (Macalister Irrigation) Irrigation) Irrigation) Information Technology 97 .. 52 45 Information Technology 97 .. 52 45 Information Technology 97 .. 52 45 Software-Purchase (Maffra) Software-Purchase (Maffra) Software-Purchase (Maffra) Replacement of Finance System 180 .. 180 .. Replacement of Finance System 180 .. 180 .. Replacement of Finance System 180 .. 180 .. -Purchase (Maffra) -Purchase (Maffra) -Purchase (Maffra) Left Abutment Strengthening in 50 .. 50 .. Left Abutment Strengthening in 50 .. 50 .. Left Abutment Strengthening in 50 .. 50 .. Dam-Design (Melton) Dam-Design (Melton) Dam-Design (Melton) Right Abutment Protection -Design 55 .. 55 .. Right Abutment Protection -Design 55 .. 55 .. Right Abutment Protection -Design 55 .. 55 .. (Melton) (Melton) (Melton) Piezometers and 200 .. .. 200 Piezometers and 200 .. .. 200 Piezometers and 200 .. .. 200 instrumentation-Replacement (Merrimu) instrumentation-Replacement (Merrimu) instrumentation-Replacement (Merrimu) Public Sector Asset Investment Program 2003-04 Gippsland & Southern Rural Water 69 Public Sector Asset Investment Program 2003-04 Gippsland & Southern Rural Water 69 Public Sector Asset Investment Program 2003-04 Gippsland & Southern Rural Water 69

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Investment 30.6.2003 (a) 2003-04 Investment 30.6.2003 (a) 2003-04 Project Description Project Description 3 Channel and Extension-Rehabilitation 200 .. 200 .. 3 Channel and Extension-Rehabilitation 200 .. 200 .. (Newry) (Newry) 4 Channel -Rehabilitation (Newry) 100 .. 100 .. 4 Channel -Rehabilitation (Newry) 100 .. 100 .. Embankment Instrumentation 150 .. .. 150 Embankment Instrumentation 150 .. .. 150 (Piezometers)-Replacement (Rosslynne) (Piezometers)-Replacement (Rosslynne) Channel Fill Bank-Construction (Stratford) 2 550 .. 50 2 500 Channel Fill Bank-Construction (Stratford) 2 550 .. 50 2 500 Dam Remedial Works 1 200 .. 1 200 Dam Remedial Works 1 200 .. 1 200 Program-Rehabilitation (Various) Program-Rehabilitation (Various) Groundwater Pump-Installation (Various) 440 .. 140 300 Groundwater Pump-Installation (Various) 440 .. 140 300 KooWeeRup Meter 315 .. 60 255 KooWeeRup Meter 315 .. 60 255 Replacements-Replacements (Various) Replacements-Replacements (Various) Minor Asset Failures-Rehabilitation 250 .. 50 200 Minor Asset Failures-Rehabilitation 250 .. 50 200 (Various) (Various) Stream Gauging Stations -Construction 55 .. 55 .. Stream Gauging Stations -Construction 55 .. 55 .. (Various) (Various) Surface Water Meter 190 .. 50 140 Surface Water Meter 190 .. 50 140 Renewals-Rehabilitation (Various) Renewals-Rehabilitation (Various) Water Management Plan Meter 345 .. 220 125 Water Management Plan Meter 345 .. 220 125 Installations-Construction (Various) Installations-Construction (Various) Werribee Channel Renewals 1 000 .. .. 1 000 Werribee Channel Renewals 1 000 .. .. 1 000 -Rehabilitation (Various) -Rehabilitation (Various) 2/5/1 Channel Conversion to 15 .. 15 .. 2/5/1 Channel Conversion to 15 .. 15 .. Pipeline-Rehabilitation (Werribee) Pipeline-Rehabilitation (Werribee) Main Channel Conversion to Pipeline for 1 650 .. 50 1 600 Main Channel Conversion to Pipeline for 1 650 .. 50 1 600 3/4/1 to 7/1 offtake -Rehabilitation 3/4/1 to 7/1 offtake -Rehabilitation (Werribee) (Werribee) Main Channel Conversion to Pipeline to 285 .. 285 .. Main Channel Conversion to Pipeline to 285 .. 285 .. Tarneit Road -Rehabilitation (Werribee) Tarneit Road -Rehabilitation (Werribee) Replace 5/1 Channel with Pipeline 50 .. 50 .. Replace 5/1 Channel with Pipeline 50 .. 50 .. -Reconstruction (Werribee) -Reconstruction (Werribee) Dam Gate Lifting Gear -Upgrage 880 .. 880 .. Dam Gate Lifting Gear -Upgrage 880 .. 880 .. (Yallourn) (Yallourn) Dam Gate Painting-Rehabilitation 575 .. 575 .. Dam Gate Painting-Rehabilitation 575 .. 575 .. (Yallourn) (Yallourn) Dam Rehabilitate Trash Screens and 200 .. .. 200 Dam Rehabilitate Trash Screens and 200 .. .. 200 Valves-Rehabilitation (Yallourn) Valves-Rehabilitation (Yallourn) Implement Fixed Crest Weir-Construction 1 400 .. 1 055 345 Implement Fixed Crest Weir-Construction 1 400 .. 1 055 345 (Yallourn) (Yallourn) Total New Projects 15 322 .. 4 712 10 610 Total New Projects 15 322 .. 4 712 10 610 Total Gippsland and Southern Rural 34 661 13 761 8 876 12 024 Total Gippsland and Southern Rural 34 661 13 761 8 876 12 024 Water Authority Projects Water Authority Projects Source: Gippsland and Southern Rural Water Authority Source: Gippsland and Southern Rural Water Authority Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

70 Gippsland & Southern Rural Water Public Sector Asset Investment Program 2003-04 70 Gippsland & Southern Rural Water Public Sector Asset Investment Program 2003-04

GOULBURN-MURRAY RURAL WATER AUTHORITY GOULBURN-MURRAY RURAL WATER AUTHORITY GOULBURN-MURRAY RURAL WATER AUTHORITY

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Central Goulburn 14/6/4 -Channel 750 290 100 360 Central Goulburn 14/6/4 -Channel 750 290 100 360 Central Goulburn 14/6/4 -Channel 750 290 100 360 Remodelling (Ardmona) Remodelling (Ardmona) Remodelling (Ardmona) Eppalock Dam Safety Works -Storage 8 552 2 424 .. 6 128 Eppalock Dam Safety Works -Storage 8 552 2 424 .. 6 128 Eppalock Dam Safety Works -Storage 8 552 2 424 .. 6 128 Safety Compliance (Axedale) Safety Compliance (Axedale) Safety Compliance (Axedale) Channel 20 -Channel Remodelling 834 110 80 644 Channel 20 -Channel Remodelling 834 110 80 644 Channel 20 -Channel Remodelling 834 110 80 644 (Bamawm) (Bamawm) (Bamawm) Mokoan Storage Basin 747 463 68 216 Mokoan Storage Basin 747 463 68 216 Mokoan Storage Basin 747 463 68 216 Reclamation-Catchment Renewal Reclamation-Catchment Renewal Reclamation-Catchment Renewal (Benalla) (Benalla) (Benalla) Eustace Creek Boat Ramp-Construction 250 3 .. 247 Eustace Creek Boat Ramp-Construction 250 3 .. 247 Eustace Creek Boat Ramp-Construction 250 3 .. 247 (Benambra) (Benambra) (Benambra) Community Drains-Drain Construction 210 70 50 90 Community Drains-Drain Construction 210 70 50 90 Community Drains-Drain Construction 210 70 50 90 (Boort) (Boort) (Boort) Normanville Pipeline System-Pipeline 5 500 2 400 3 100 .. Normanville Pipeline System-Pipeline 5 500 2 400 3 100 .. Normanville Pipeline System-Pipeline 5 500 2 400 3 100 .. Replacement (Boort) Replacement (Boort) Replacement (Boort) Waranga West Channel -Upgrade (Boort) 5 400 2 700 2 700 .. Waranga West Channel -Upgrade (Boort) 5 400 2 700 2 700 .. Waranga West Channel -Upgrade (Boort) 5 400 2 700 2 700 .. East Goulburn 12 -Channel Remodelling 350 112 238 .. East Goulburn 12 -Channel Remodelling 350 112 238 .. East Goulburn 12 -Channel Remodelling 350 112 238 .. (Bunbartha) (Bunbartha) (Bunbartha) Yarrawonga Main Channel -Channel 100 50 .. 50 Yarrawonga Main Channel -Channel 100 50 .. 50 Yarrawonga Main Channel -Channel 100 50 .. 50 Remodelling (Burramine) Remodelling (Burramine) Remodelling (Burramine) Main Town Number 1 560 200 .. 360 Main Town Number 1 560 200 .. 360 Main Town Number 1 560 200 .. 360 Syphon-Investigation (Cobram) Syphon-Investigation (Cobram) Syphon-Investigation (Cobram) Murray Valley Drain 11 Stage 1-Drain 2 200 350 50 1 800 Murray Valley Drain 11 Stage 1-Drain 2 200 350 50 1 800 Murray Valley Drain 11 Stage 1-Drain 2 200 350 50 1 800 Construction (Cobram) Construction (Cobram) Construction (Cobram) Murray Valley Drain 11 Stage 2-Drain 2 200 10 12 2 178 Murray Valley Drain 11 Stage 2-Drain 2 200 10 12 2 178 Murray Valley Drain 11 Stage 2-Drain 2 200 10 12 2 178 Construction (Cobram) Construction (Cobram) Construction (Cobram) Murray Valley Drain 11 Stage 3-Drain 2 000 22 22 1 956 Murray Valley Drain 11 Stage 3-Drain 2 000 22 22 1 956 Murray Valley Drain 11 Stage 3-Drain 2 000 22 22 1 956 Construction (Cobram) Construction (Cobram) Construction (Cobram) Murray Valley Drain 11 Stage 4-Drain 800 21 21 758 Murray Valley Drain 11 Stage 4-Drain 800 21 21 758 Murray Valley Drain 11 Stage 4-Drain 800 21 21 758 Construction (Cobram) Construction (Cobram) Construction (Cobram) Murray Valley Drain 3/7/3 Extension-Drain 800 340 135 325 Murray Valley Drain 3/7/3 Extension-Drain 800 340 135 325 Murray Valley Drain 3/7/3 Extension-Drain 800 340 135 325 Construction (Cobram) Construction (Cobram) Construction (Cobram) Central Goulburn 4/8 & 2/4/8 -Channel 2 009 200 300 1 509 Central Goulburn 4/8 & 2/4/8 -Channel 2 009 200 300 1 509 Central Goulburn 4/8 & 2/4/8 -Channel 2 009 200 300 1 509 Remodelling (Cooma) Remodelling (Cooma) Remodelling (Cooma) Central Goulburn 25/4-Channel 240 4 200 36 Central Goulburn 25/4-Channel 240 4 200 36 Central Goulburn 25/4-Channel 240 4 200 36 Remodelling (Coomboona) Remodelling (Coomboona) Remodelling (Coomboona) Central Goulburn 25/4 -Channel 240 20 200 20 Central Goulburn 25/4 -Channel 240 20 200 20 Central Goulburn 25/4 -Channel 240 20 200 20 Remodelling (Coomboona) Remodelling (Coomboona) Remodelling (Coomboona) Central Goulburn 27/4 -Channel 300 51 .. 249 Central Goulburn 27/4 -Channel 300 51 .. 249 Central Goulburn 27/4 -Channel 300 51 .. 249 Remodelling (Coomboona) Remodelling (Coomboona) Remodelling (Coomboona) Central Goulburn 16 -Channel 501 105 50 346 Central Goulburn 16 -Channel 501 105 50 346 Central Goulburn 16 -Channel 501 105 50 346 Remodelling (Corop) Remodelling (Corop) Remodelling (Corop)

Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 71 Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 71 Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 71

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Mosquito Dhurringile Drain -Drain 540 85 85 370 Mosquito Dhurringile Drain -Drain 540 85 85 370 Construction (Dhurringile) Construction (Dhurringile) Bendigo Creek Subway System -3 sites 997 555 232 210 Bendigo Creek Subway System -3 sites 997 555 232 210 -Subway Replacement (Dingee) -Subway Replacement (Dingee) Campaspe Drain 3A -Drain Construction 450 417 20 13 Campaspe Drain 3A -Drain Construction 450 417 20 13 (Echuca) (Echuca) Dam Safety Works-Storage Safety 34 500 1 500 5 000 28 000 Dam Safety Works-Storage Safety 34 500 1 500 5 000 28 000 Compliance (Eildon) Compliance (Eildon) Irrigation Conduit-Stiffening Ring Support 1 075 2 1 025 48 Irrigation Conduit-Stiffening Ring Support 1 075 2 1 025 48 (Eildon) (Eildon) Revegetation -Replacement (Eildon) 220 40 40 140 Revegetation -Replacement (Eildon) 220 40 40 140 Financial Maintenance Management 150 50 50 50 Financial Maintenance Management 150 50 50 50 System-Implementation (Eildon) System-Implementation (Eildon) Central Goulburn 8 -Girgarre East 150 85 65 .. Central Goulburn 8 -Girgarre East 150 85 65 .. Road-Bridge Construction (Girgarre Road-Bridge Construction (Girgarre East) East) Drain 16 Extension, Stage 1 -Drain 1 200 25 25 1 150 Drain 16 Extension, Stage 1 -Drain 1 200 25 25 1 150 Construction (Harston) Construction (Harston) Deakin Drain 16 Extension, Stage 2 900 20 20 860 Deakin Drain 16 Extension, Stage 2 900 20 20 860 -Drain Construction (Harston) -Drain Construction (Harston) East Goulburn 2/24 -Channel 405 200 .. 205 East Goulburn 2/24 -Channel 405 200 .. 205 Remodelling (Katandra) Remodelling (Katandra) East Goulburn 24 -Channel Remodelling 480 220 260 .. East Goulburn 24 -Channel Remodelling 480 220 260 .. (Katandra) (Katandra) Bears Lagoon -Replacement (Kerang) 220 10 .. 210 Bears Lagoon -Replacement (Kerang) 220 10 .. 210 Tragowel (East of Loddon) Community 4 000 50 150 3 800 Tragowel (East of Loddon) Community 4 000 50 150 3 800 Surface Drains -Drain Construction Surface Drains -Drain Construction (Kerang) (Kerang) Central Goulburn 26/9-Pipeline (Kyabram) 150 115 35 .. Central Goulburn 26/9-Pipeline (Kyabram) 150 115 35 .. No. 3 & 4 Valves-Structures Replacement 150 20 10 120 No. 3 & 4 Valves-Structures Replacement 150 20 10 120 (Laanecoorie) (Laanecoorie) Operating Deck Pedestals and Monorail 100 23 50 27 Operating Deck Pedestals and Monorail 100 23 50 27 -Structure Replacement (Laanecoorie) -Structure Replacement (Laanecoorie) DCD-Construction (Lockington) 500 35 30 435 DCD-Construction (Lockington) 500 35 30 435 Tullaroop Butterfly Valve-Structure 560 25 500 35 Tullaroop Butterfly Valve-Structure 560 25 500 35 Replacement (Majorca) Replacement (Majorca) Cairn Curran Dam Safety Works-Safety 20 070 4 620 3 910 11 540 Cairn Curran Dam Safety Works-Safety 20 070 4 620 3 910 11 540 Compliance (Maldon) Compliance (Maldon) Central Goulburn 12A/8 Switching 135 15 65 55 Central Goulburn 12A/8 Switching 135 15 65 55 Panels-Replacement (Merrigum) Panels-Replacement (Merrigum) Central Goulburn 7 -Channel Remodelling 1 087 180 .. 907 Central Goulburn 7 -Channel Remodelling 1 087 180 .. 907 (Merrigum) (Merrigum) Central Goulburn 1/2-Pipelining 252 22 228 2 Central Goulburn 1/2-Pipelining 252 22 228 2 (Murchison) (Murchison) Buffalo Dam Safety Works-Safety 20 291 5 191 100 15 000 Buffalo Dam Safety Works-Safety 20 291 5 191 100 15 000 Compliance (Myrtleford) Compliance (Myrtleford) Goulburn Weir Safety Works-Safety 800 300 500 .. Goulburn Weir Safety Works-Safety 800 300 500 .. Compliance (Nagambie) Compliance (Nagambie)

72 Goulburn-Murray Rural Water Public Sector Asset Investment Program 2003-04 72 Goulburn-Murray Rural Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Stuart Murray Canal Channels-Bank and 1 510 506 500 504 Stuart Murray Canal Channels-Bank and 1 510 506 500 504 Stuart Murray Canal Channels-Bank and 1 510 506 500 504 Offtake Replacement (Nagambie) Offtake Replacement (Nagambie) Offtake Replacement (Nagambie) Cornellia Creek Drain-Drain Construction 750 518 27 205 Cornellia Creek Drain-Drain Construction 750 518 27 205 Cornellia Creek Drain-Drain Construction 750 518 27 205 (Nanneella) (Nanneella) (Nanneella) Timmering Drain Stage 2 -Drain 2 200 634 20 1 546 Timmering Drain Stage 2 -Drain 2 200 634 20 1 546 Timmering Drain Stage 2 -Drain 2 200 634 20 1 546 Construction (Nanneella) Construction (Nanneella) Construction (Nanneella) Timmering Drainage Course 800 68 30 702 Timmering Drainage Course 800 68 30 702 Timmering Drainage Course 800 68 30 702 Declaration-Drain New (Nanneella) Declaration-Drain New (Nanneella) Declaration-Drain New (Nanneella) East Goulburn 32/12 -Channel 311 2 .. 309 East Goulburn 32/12 -Channel 311 2 .. 309 East Goulburn 32/12 -Channel 311 2 .. 309 Remodelling (Nathalia) Remodelling (Nathalia) Remodelling (Nathalia) Muckatah Arterial Drain 8 -Drain 1 100 245 155 700 Muckatah Arterial Drain 8 -Drain 1 100 245 155 700 Muckatah Arterial Drain 8 -Drain 1 100 245 155 700 Construction (Numurkah) Construction (Numurkah) Construction (Numurkah) Muckatah Arterial Drain Stage 1B-Drain 1 100 30 30 1 040 Muckatah Arterial Drain Stage 1B-Drain 1 100 30 30 1 040 Muckatah Arterial Drain Stage 1B-Drain 1 100 30 30 1 040 Construction (Numurkah) Construction (Numurkah) Construction (Numurkah) Muckatah Arterial Drain Stage 2 -Drain 1 900 650 50 1 200 Muckatah Arterial Drain Stage 2 -Drain 1 900 650 50 1 200 Muckatah Arterial Drain Stage 2 -Drain 1 900 650 50 1 200 Construction (Numurkah) Construction (Numurkah) Construction (Numurkah) Muckatah Drain 3 -Drain Construction 500 45 455 .. Muckatah Drain 3 -Drain Construction 500 45 455 .. Muckatah Drain 3 -Drain Construction 500 45 455 .. (Numurkah) (Numurkah) (Numurkah) Tragowel Plains Community Surface 430 10 10 410 Tragowel Plains Community Surface 430 10 10 410 Tragowel Plains Community Surface 430 10 10 410 Drains-Drain Construction (Pyramid Hill) Drains-Drain Construction (Pyramid Hill) Drains-Drain Construction (Pyramid Hill) Campaspe Pipeline-Pump Upgrade 200 70 30 100 Campaspe Pipeline-Pump Upgrade 200 70 30 100 Campaspe Pipeline-Pump Upgrade 200 70 30 100 (Rochester) (Rochester) (Rochester) Supervisory Control and Data 100 20 10 70 Supervisory Control and Data 100 20 10 70 Supervisory Control and Data 100 20 10 70 Acquisition-System Installation Acquisition-System Installation Acquisition-System Installation (Rochester) (Rochester) (Rochester) Supervisory Control and Data Acquisition 270 100 .. 170 Supervisory Control and Data Acquisition 270 100 .. 170 Supervisory Control and Data Acquisition 270 100 .. 170 (Waranga Major Offtake)-Construction (Waranga Major Offtake)-Construction (Waranga Major Offtake)-Construction (Rushworth) (Rushworth) (Rushworth) Drain 2/11 Stage 2-Upgrade (Shepparton) 1 500 90 50 1 360 Drain 2/11 Stage 2-Upgrade (Shepparton) 1 500 90 50 1 360 Drain 2/11 Stage 2-Upgrade (Shepparton) 1 500 90 50 1 360 Drain Discharge Project-Drain Installation 320 40 40 240 Drain Discharge Project-Drain Installation 320 40 40 240 Drain Discharge Project-Drain Installation 320 40 40 240 (Shepparton) (Shepparton) (Shepparton) East Goulburn 11 -Channel Remodelling 100 18 .. 82 East Goulburn 11 -Channel Remodelling 100 18 .. 82 East Goulburn 11 -Channel Remodelling 100 18 .. 82 (Shepparton) (Shepparton) (Shepparton) East Goulburn 14-Channel Remodelling 130 2 113 15 East Goulburn 14-Channel Remodelling 130 2 113 15 East Goulburn 14-Channel Remodelling 130 2 113 15 (Shepparton) (Shepparton) (Shepparton) East Goulburn 4/8 -Channel Remodelling 100 5 80 15 East Goulburn 4/8 -Channel Remodelling 100 5 80 15 East Goulburn 4/8 -Channel Remodelling 100 5 80 15 (Shepparton) (Shepparton) (Shepparton) East Goulburn Main Syphon (Pine Lodge) 245 50 195 .. East Goulburn Main Syphon (Pine Lodge) 245 50 195 .. East Goulburn Main Syphon (Pine Lodge) 245 50 195 .. -Rehabilitation (Shepparton) -Rehabilitation (Shepparton) -Rehabilitation (Shepparton) Shepparton Drain 2/11, Stage 1-Drain 650 50 400 200 Shepparton Drain 2/11, Stage 1-Drain 650 50 400 200 Shepparton Drain 2/11, Stage 1-Drain 650 50 400 200 Remodelling (Shepparton) Remodelling (Shepparton) Remodelling (Shepparton) Central Goulburn 10/7/9-Channel 510 172 .. 338 Central Goulburn 10/7/9-Channel 510 172 .. 338 Central Goulburn 10/7/9-Channel 510 172 .. 338 Remodelling (Stanhope) Remodelling (Stanhope) Remodelling (Stanhope) DCD Construction Stanhope 350 15 215 120 DCD Construction Stanhope 350 15 215 120 DCD Construction Stanhope 350 15 215 120 Depression-Drain Construction Depression-Drain Construction Depression-Drain Construction (Stanhope) (Stanhope) (Stanhope) Deakin Drain 16 -Remodelling (Stanhope) 551 350 30 171 Deakin Drain 16 -Remodelling (Stanhope) 551 350 30 171 Deakin Drain 16 -Remodelling (Stanhope) 551 350 30 171

Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 73 Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 73 Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 73

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Drain Stage 1-Drain Construction 1 315 450 350 515 Drain Stage 1-Drain Construction 1 315 450 350 515 (Stanhope) (Stanhope) Drain Stage 2-Drain Construction 1 315 30 30 1 255 Drain Stage 2-Drain Construction 1 315 30 30 1 255 (Stanhope) (Stanhope) Channel 10 System-Meter Outlets 172 132 .. 40 Channel 10 System-Meter Outlets 172 132 .. 40 Replacement (Swan Hill) Replacement (Swan Hill) Concrete Lined Channels-Channels 23 600 19 600 4 000 .. Concrete Lined Channels-Channels 23 600 19 600 4 000 .. Replacement (Swan Hill) Replacement (Swan Hill) Little Murray Weir Doors-Weir Installation 1 200 80 202 918 Little Murray Weir Doors-Weir Installation 1 200 80 202 918 (Swan Hill) (Swan Hill) Mosquito Drain Stage 10-Drain 815 230 330 255 Mosquito Drain Stage 10-Drain 815 230 330 255 Construction (Tatura) Construction (Tatura) Mosquito Drain Tatura Bypass-Drain 2 425 450 50 1 925 Mosquito Drain Tatura Bypass-Drain 2 425 450 50 1 925 Construction (Tatura) Construction (Tatura) Water Management System -Irrigation 500 300 200 .. Water Management System -Irrigation 500 300 200 .. Planning Module-System Development Planning Module-System Development (Tatura) (Tatura) Water Management System-System 710 195 40 475 Water Management System-System 710 195 40 475 Planning Module-System Development Planning Module-System Development (Tatura) (Tatura) Central Goulburn 1/9/3-Channel 350 302 48 .. Central Goulburn 1/9/3-Channel 350 302 48 .. Remodelling (Toolamba) Remodelling (Toolamba) Central Goulburn 1/19/6 -Channel 750 250 500 .. Central Goulburn 1/19/6 -Channel 750 250 500 .. Remodelling (Undera) Remodelling (Undera) Central Goulburn 7/19/6 -Channel 1 661 1 100 10 551 Central Goulburn 7/19/6 -Channel 1 661 1 100 10 551 Remodelling (Undera) Remodelling (Undera) Murray Valley 8/6 -Channel Construction 250 57 60 133 Murray Valley 8/6 -Channel Construction 250 57 60 133 (Waaia) (Waaia) Murray Valley Channel 8/6 -Channel 250 20 60 170 Murray Valley Channel 8/6 -Channel 250 20 60 170 Remodelling (Waaia) Remodelling (Waaia) Central Goulburn 5/34/9 -Pipeline 540 9 290 241 Central Goulburn 5/34/9 -Pipeline 540 9 290 241 (Wyuna) (Wyuna) Total Existing Projects 175 405 50 645 28 336 96 424 Total Existing Projects 175 405 50 645 28 336 96 424 Source: Goulburn-Murray Rural Water Authority Source: Goulburn-Murray Rural Water Authority Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

74 Goulburn-Murray Rural Water Public Sector Asset Investment Program 2003-04 74 Goulburn-Murray Rural Water Public Sector Asset Investment Program 2003-04

GOULBURN-MURRAY RURAL WATER AUTHORITY GOULBURN-MURRAY RURAL WATER AUTHORITY GOULBURN-MURRAY RURAL WATER AUTHORITY

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Central Goulburn 11/4 and 3/11/4-Pipeline 330 .. 100 230 Central Goulburn 11/4 and 3/11/4-Pipeline 330 .. 100 230 Central Goulburn 11/4 and 3/11/4-Pipeline 330 .. 100 230 (Ardmona) (Ardmona) (Ardmona) Lake Leaghur Prime Development 200 .. .. 200 Lake Leaghur Prime Development 200 .. .. 200 Lake Leaghur Prime Development 200 .. .. 200 Zone-Environmental Study (Boort) Zone-Environmental Study (Boort) Zone-Environmental Study (Boort) Wycheproof Road Bridge-Replacement 200 .. .. 200 Wycheproof Road Bridge-Replacement 200 .. .. 200 Wycheproof Road Bridge-Replacement 200 .. .. 200 (Boort) (Boort) (Boort) Mosquito Community Surface Drain 1 900 .. 300 1 600 Mosquito Community Surface Drain 1 900 .. 300 1 600 Mosquito Community Surface Drain 1 900 .. 300 1 600 24/25-Drain Construction (Byrneside) 24/25-Drain Construction (Byrneside) 24/25-Drain Construction (Byrneside) Cohuna Weir-Replacement (Cohuna) 500 .. 100 400 Cohuna Weir-Replacement (Cohuna) 500 .. 100 400 Cohuna Weir-Replacement (Cohuna) 500 .. 100 400 Central Goulburn 11-Channel 500 .. .. 500 Central Goulburn 11-Channel 500 .. .. 500 Central Goulburn 11-Channel 500 .. .. 500 Remodelling (Corop) Remodelling (Corop) Remodelling (Corop) Central Goulburn 14-Channel 277 .. .. 277 Central Goulburn 14-Channel 277 .. .. 277 Central Goulburn 14-Channel 277 .. .. 277 Remodelling (Corop) Remodelling (Corop) Remodelling (Corop) Recreational Development 201 .. .. 201 Recreational Development 201 .. .. 201 Recreational Development 201 .. .. 201 Plan-Implementation (Eildon) Plan-Implementation (Eildon) Plan-Implementation (Eildon) Central Goulburn 8 Harston Road-Bridge 150 .. 100 50 Central Goulburn 8 Harston Road-Bridge 150 .. 100 50 Central Goulburn 8 Harston Road-Bridge 150 .. 100 50 Construction (Girgarre East) Construction (Girgarre East) Construction (Girgarre East) Central Goulburn 4/7-Channel 280 .. 250 30 Central Goulburn 4/7-Channel 280 .. 250 30 Central Goulburn 4/7-Channel 280 .. 250 30 Construction (Harston) Construction (Harston) Construction (Harston) East Goulburn 3/25-Channel Remodelling 240 .. 100 140 East Goulburn 3/25-Channel Remodelling 240 .. 100 140 East Goulburn 3/25-Channel Remodelling 240 .. 100 140 (Katandra) (Katandra) (Katandra) East Goulburn 3/5 (Crighton Rd)-Channel 240 .. 5 235 East Goulburn 3/5 (Crighton Rd)-Channel 240 .. 5 235 East Goulburn 3/5 (Crighton Rd)-Channel 240 .. 5 235 Remodelling (Katandra) Remodelling (Katandra) Remodelling (Katandra) Murray Valley Channel 2a/5 -Channel 132 .. 75 57 Murray Valley Channel 2a/5 -Channel 132 .. 75 57 Murray Valley Channel 2a/5 -Channel 132 .. 75 57 Remodelling (Katunga) Remodelling (Katunga) Remodelling (Katunga) Barr Creek-Drain Construction (Kerang) 2 500 .. 200 2 300 Barr Creek-Drain Construction (Kerang) 2 500 .. 200 2 300 Barr Creek-Drain Construction (Kerang) 2 500 .. 200 2 300 Benwell Drain 1-Drain Construction 3 500 .. 1 200 2 300 Benwell Drain 1-Drain Construction 3 500 .. 1 200 2 300 Benwell Drain 1-Drain Construction 3 500 .. 1 200 2 300 (Kerang) (Kerang) (Kerang) Kerang Office-Building Replacement 2 550 .. .. 2 550 Kerang Office-Building Replacement 2 550 .. .. 2 550 Kerang Office-Building Replacement 2 550 .. .. 2 550 (Kerang) (Kerang) (Kerang) Office-Building (Kerang) 3 651 .. 3 651 .. Office-Building (Kerang) 3 651 .. 3 651 .. Office-Building (Kerang) 3 651 .. 3 651 .. Supervisory Control and Data Acquisition 391 .. .. 391 Supervisory Control and Data Acquisition 391 .. .. 391 Supervisory Control and Data Acquisition 391 .. .. 391 (Channels)-System Installation (Kerang) (Channels)-System Installation (Kerang) (Channels)-System Installation (Kerang) Wandella Creek-Drain Construction 1 800 .. 200 1 600 Wandella Creek-Drain Construction 1 800 .. 200 1 600 Wandella Creek-Drain Construction 1 800 .. 200 1 600 (Kerang) (Kerang) (Kerang) No. 1 and 2 Valves -Structures 150 .. .. 150 No. 1 and 2 Valves -Structures 150 .. .. 150 No. 1 and 2 Valves -Structures 150 .. .. 150 Replacement (Laanecoorie) Replacement (Laanecoorie) Replacement (Laanecoorie) Central Goulburn 14/20-Pipeline 315 .. .. 315 Central Goulburn 14/20-Pipeline 315 .. .. 315 Central Goulburn 14/20-Pipeline 315 .. .. 315 (Lockington) (Lockington) (Lockington) Channel 23-Channel Remodelling 300 .. 100 200 Channel 23-Channel Remodelling 300 .. 100 200 Channel 23-Channel Remodelling 300 .. 100 200 (Lockington) (Lockington) (Lockington)

Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 75 Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 75 Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 75

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Cairn Curran Service Gate-Guide Rail 100 .. 100 .. Cairn Curran Service Gate-Guide Rail 100 .. 100 .. Replacement (Maldon) Replacement (Maldon) Central Goulburn 9/3/6-Channel 220 .. 220 .. Central Goulburn 9/3/6-Channel 220 .. 220 .. Remodelling (Merrigum) Remodelling (Merrigum) Central Goulburn 6/4 550 .. .. 550 Central Goulburn 6/4 550 .. .. 550 (Jensen)-Construction (Mooroopna) (Jensen)-Construction (Mooroopna) Central Goulburn 5/6-Pipeline (Nanneella) 110 .. .. 110 Central Goulburn 5/6-Pipeline (Nanneella) 110 .. .. 110 East Goulburn 12 (Blacksmith Road) 130 .. .. 130 East Goulburn 12 (Blacksmith Road) 130 .. .. 130 -Bridge Replacement (Nathalia) -Bridge Replacement (Nathalia) East Goulburn 12 Road Crossing 100 .. 100 .. East Goulburn 12 Road Crossing 100 .. 100 .. (Thompsons Rd)-Replacement (Nathalia) (Thompsons Rd)-Replacement (Nathalia) East Goulburn 12 Stage 2-Channel 207 .. 207 .. East Goulburn 12 Stage 2-Channel 207 .. 207 .. Remodelling (Nathalia) Remodelling (Nathalia) Muckatah Arterial Drain Stage 1A-Drain 1 100 .. 7 1 093 Muckatah Arterial Drain Stage 1A-Drain 1 100 .. 7 1 093 Construction (Numurkah) Construction (Numurkah) Muckatah Arterial Drain Stage 4-Drain 1 700 .. 90 1 610 Muckatah Arterial Drain Stage 4-Drain 1 700 .. 90 1 610 Construction (Numurkah) Construction (Numurkah) Muckatah Drain 1P-Drain Construction 200 .. .. 200 Muckatah Drain 1P-Drain Construction 200 .. .. 200 (Numurkah) (Numurkah) Muckatah Drain 2P-Drain Construction 300 .. .. 300 Muckatah Drain 2P-Drain Construction 300 .. .. 300 (Numurkah) (Numurkah) Relift Pumpstation-Pressure 390 .. 50 340 Relift Pumpstation-Pressure 390 .. 50 340 Improvements (Nyah) Improvements (Nyah) Supervisory Control and Data Acquisition 2 000 .. .. 2 000 Supervisory Control and Data Acquisition 2 000 .. .. 2 000 (Channels)-System Implementation (Channels)-System Implementation (Pyramid Hill) (Pyramid Hill) Channel 8/3-Channel Remodelling 200 .. 50 150 Channel 8/3-Channel Remodelling 200 .. 50 150 (Rochester) (Rochester) Cornelia Creek Community Surface 500 .. 210 290 Cornelia Creek Community Surface 500 .. 210 290 Drains-Drain Construction (Rochester) Drains-Drain Construction (Rochester) Drainage Subway Greens Lake-Pump 150 .. .. 150 Drainage Subway Greens Lake-Pump 150 .. .. 150 Upgrade (Rochester) Upgrade (Rochester) Drainage Subway Greens Lake-Subway 130 .. .. 130 Drainage Subway Greens Lake-Subway 130 .. .. 130 Replacement (Rochester) Replacement (Rochester) Greens Lake Pipeline-Refurbishment 140 .. .. 140 Greens Lake Pipeline-Refurbishment 140 .. .. 140 (Rochester) (Rochester) Greens Lake Pumps-Upgrade (Rochester) 120 .. .. 120 Greens Lake Pumps-Upgrade (Rochester) 120 .. .. 120 Supervisory Control and Data Acquisition 460 .. .. 460 Supervisory Control and Data Acquisition 460 .. .. 460 (Waranga West Channel)-System (Waranga West Channel)-System Installation (Rochester) Installation (Rochester) Wanalta and Colibinabbin 150 .. 20 130 Wanalta and Colibinabbin 150 .. 20 130 Regulator-Upgrade (Rochester) Regulator-Upgrade (Rochester) Waranga Dam Safety Works-Safety 5 760 .. .. 5 760 Waranga Dam Safety Works-Safety 5 760 .. .. 5 760 Compliance (Rushworth) Compliance (Rushworth) East Goulburn 1/10 -Channel Remodelling 350 .. .. 350 East Goulburn 1/10 -Channel Remodelling 350 .. .. 350 (Shepparton) (Shepparton) East Goulburn 12 Stage 3-Channel 250 .. 2 248 East Goulburn 12 Stage 3-Channel 250 .. 2 248 Remodelling (Shepparton) Remodelling (Shepparton)

76 Goulburn-Murray Rural Water Public Sector Asset Investment Program 2003-04 76 Goulburn-Murray Rural Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 East Goulburn 12 Stage 4-Channel 240 .. .. 240 East Goulburn 12 Stage 4-Channel 240 .. .. 240 East Goulburn 12 Stage 4-Channel 240 .. .. 240 Remodelling (Shepparton) Remodelling (Shepparton) Remodelling (Shepparton) East Goulburn 14 -Channel Remodelling 130 .. 113 17 East Goulburn 14 -Channel Remodelling 130 .. 113 17 East Goulburn 14 -Channel Remodelling 130 .. 113 17 (Shepparton) (Shepparton) (Shepparton) East Goulburn 2 -Channel Remodelling 210 .. 75 135 East Goulburn 2 -Channel Remodelling 210 .. 75 135 East Goulburn 2 -Channel Remodelling 210 .. 75 135 (Shepparton) (Shepparton) (Shepparton) Shepparton Drain 2/11, Stage 2-Drain 2 000 .. 45 1 955 Shepparton Drain 2/11, Stage 2-Drain 2 000 .. 45 1 955 Shepparton Drain 2/11, Stage 2-Drain 2 000 .. 45 1 955 Remodelling (Shepparton) Remodelling (Shepparton) Remodelling (Shepparton) Supervisory Control & Data Acquisition 186 .. 10 176 Supervisory Control & Data Acquisition 186 .. 10 176 Supervisory Control & Data Acquisition 186 .. 10 176 (Drains)-System Installation (Drains)-System Installation (Drains)-System Installation (Shepparton) (Shepparton) (Shepparton) Channel 6/7 Outfall Bridge-Bridge 200 .. 200 .. Channel 6/7 Outfall Bridge-Bridge 200 .. 200 .. Channel 6/7 Outfall Bridge-Bridge 200 .. 200 .. Replacement (Swan Hill) Replacement (Swan Hill) Replacement (Swan Hill) Lake Boga Outfall-Construction (Swan 2 500 .. .. 2 500 Lake Boga Outfall-Construction (Swan 2 500 .. .. 2 500 Lake Boga Outfall-Construction (Swan 2 500 .. .. 2 500 Hill) Hill) Hill) Shepparton Community Surface Drains 300 .. 300 .. Shepparton Community Surface Drains 300 .. 300 .. Shepparton Community Surface Drains 300 .. 300 .. 3A/11P-Drain Construction 3A/11P-Drain Construction 3A/11P-Drain Construction (Tallygaroopna) (Tallygaroopna) (Tallygaroopna) 40 Casey St Tatura-Office Extension 850 .. .. 850 40 Casey St Tatura-Office Extension 850 .. .. 850 40 Casey St Tatura-Office Extension 850 .. .. 850 (Tatura) (Tatura) (Tatura) Central Goulburn 4/5-Channel 500 .. 200 300 Central Goulburn 4/5-Channel 500 .. 200 300 Central Goulburn 4/5-Channel 500 .. 200 300 Remodelling (Tatura) Remodelling (Tatura) Remodelling (Tatura) Central Goulburn 5/3 -Channel 160 .. 30 130 Central Goulburn 5/3 -Channel 160 .. 30 130 Central Goulburn 5/3 -Channel 160 .. 30 130 Remodelling (Tatura) Remodelling (Tatura) Remodelling (Tatura) Electronic Administration of 125 .. 125 .. Electronic Administration of 125 .. 125 .. Electronic Administration of 125 .. 125 .. Forms-System Development (Tatura) Forms-System Development (Tatura) Forms-System Development (Tatura) Mosquito Drain Stage 1/36-Drain 700 .. 40 660 Mosquito Drain Stage 1/36-Drain 700 .. 40 660 Mosquito Drain Stage 1/36-Drain 700 .. 40 660 Construction (Tatura) Construction (Tatura) Construction (Tatura) Supervisory Control & Data Acquisition 995 .. .. 995 Supervisory Control & Data Acquisition 995 .. .. 995 Supervisory Control & Data Acquisition 995 .. .. 995 (Channels)-System Installation (Tatura) (Channels)-System Installation (Tatura) (Channels)-System Installation (Tatura) Supervisory Control & Data Acquisition 711 .. 2 709 Supervisory Control & Data Acquisition 711 .. 2 709 Supervisory Control & Data Acquisition 711 .. 2 709 (Drains)-Installation (Tatura) (Drains)-Installation (Tatura) (Drains)-Installation (Tatura) Central Goulburn 6/34/9-Channel 250 .. 50 200 Central Goulburn 6/34/9-Channel 250 .. 50 200 Central Goulburn 6/34/9-Channel 250 .. 50 200 Remodelling (Tongala) Remodelling (Tongala) Remodelling (Tongala) Deakin Community Surface Drain 330 .. 330 .. Deakin Community Surface Drain 330 .. 330 .. Deakin Community Surface Drain 330 .. 330 .. 2AP-Drain Construction (Tongala) 2AP-Drain Construction (Tongala) 2AP-Drain Construction (Tongala) Central Goulburn 9/3-Channel 340 .. 120 220 Central Goulburn 9/3-Channel 340 .. 120 220 Central Goulburn 9/3-Channel 340 .. 120 220 Remodelling (Toolamba) Remodelling (Toolamba) Remodelling (Toolamba) Tungamah -Pipelining (Tungamah) 11 000 .. 5 410 5 590 Tungamah -Pipelining (Tungamah) 11 000 .. 5 410 5 590 Tungamah -Pipelining (Tungamah) 11 000 .. 5 410 5 590 Central Goulburn 41/9-Channel 265 .. 140 125 Central Goulburn 41/9-Channel 265 .. 140 125 Central Goulburn 41/9-Channel 265 .. 140 125 Remodelling (Wyuna) Remodelling (Wyuna) Remodelling (Wyuna) Central Goulburn 5/27/6 (Stage 210 .. .. 210 Central Goulburn 5/27/6 (Stage 210 .. .. 210 Central Goulburn 5/27/6 (Stage 210 .. .. 210 2)-Channel Remodelling (Wyuna) 2)-Channel Remodelling (Wyuna) 2)-Channel Remodelling (Wyuna)

Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 77 Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 77 Public Sector Asset Investment Program 2003-04 Goulburn-Murray Rural Water 77

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Central Goulburn 8 and 24/8-Channel 1 145 .. 250 895 Central Goulburn 8 and 24/8-Channel 1 145 .. 250 895 Remodelling (Wyuna) Remodelling (Wyuna) 5/7P Community Surface Drain-Drain 510 .. .. 510 5/7P Community Surface Drain-Drain 510 .. .. 510 Construction (Wyuna) Construction (Wyuna) Total New Projects 59 481 .. 14 877 44 604 Total New Projects 59 481 .. 14 877 44 604 Total Goulburn-Murray Rural Water 234 886 50 645 43 213 141 028 Total Goulburn-Murray Rural Water 234 886 50 645 43 213 141 028 Authority Authority Source: Goulburn-Murray Rural Water Authority Source: Goulburn-Murray Rural Water Authority Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

78 Goulburn-Murray Rural Water Public Sector Asset Investment Program 2003-04 78 Goulburn-Murray Rural Water Public Sector Asset Investment Program 2003-04

OFFICE OF HOUSING OFFICE OF HOUSING OFFICE OF HOUSING

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Rental and Community Housing Acquisitions Rental and Community Housing Acquisitions Rental and Community Housing Acquisitions 24 Units/Sites-Acquisition (Barwon 3 357 695 2 662 .. 24 Units/Sites-Acquisition (Barwon 3 357 695 2 662 .. 24 Units/Sites-Acquisition (Barwon 3 357 695 2 662 .. SWest) SWest) SWest) 92 Units/Sites-Acquisition (Eastern Metro) 12 103 7 156 4 933 13 92 Units/Sites-Acquisition (Eastern Metro) 12 103 7 156 4 933 13 92 Units/Sites-Acquisition (Eastern Metro) 12 103 7 156 4 933 13 18 Units/Sites-Acquisition (Gippsland) 3 693 2 412 1 281 .. 18 Units/Sites-Acquisition (Gippsland) 3 693 2 412 1 281 .. 18 Units/Sites-Acquisition (Gippsland) 3 693 2 412 1 281 .. 29 Units/Sites-Acquisition (Grampians) 1 810 703 1 107 .. 29 Units/Sites-Acquisition (Grampians) 1 810 703 1 107 .. 29 Units/Sites-Acquisition (Grampians) 1 810 703 1 107 .. 18 Units/Sites-Acquisition (Hume) 3 050 1 363 1 687 .. 18 Units/Sites-Acquisition (Hume) 3 050 1 363 1 687 .. 18 Units/Sites-Acquisition (Hume) 3 050 1 363 1 687 .. 12 Units/Sites-Acquisition (Loddon 1 598 619 978 .. 12 Units/Sites-Acquisition (Loddon 1 598 619 978 .. 12 Units/Sites-Acquisition (Loddon 1 598 619 978 .. Mallee) Mallee) Mallee) 80 Units/Sites-Acquisition (Northern 11 426 2 533 8 440 454 80 Units/Sites-Acquisition (Northern 11 426 2 533 8 440 454 80 Units/Sites-Acquisition (Northern 11 426 2 533 8 440 454 Metro) Metro) Metro) 129 Units/Sites-Acquisition (Southern 25 095 8 719 15 491 885 129 Units/Sites-Acquisition (Southern 25 095 8 719 15 491 885 129 Units/Sites-Acquisition (Southern 25 095 8 719 15 491 885 Metro) Metro) Metro) 80 Units/Sites-Acquisition (Western 14 889 7 515 7 261 112 80 Units/Sites-Acquisition (Western 14 889 7 515 7 261 112 80 Units/Sites-Acquisition (Western 14 889 7 515 7 261 112 Metro) Metro) Metro) Improvements Improvements Improvements Units/Sites-Improvement (Barwon 8 620 5 870 2 750 .. Units/Sites-Improvement (Barwon 8 620 5 870 2 750 .. Units/Sites-Improvement (Barwon 8 620 5 870 2 750 .. S-West) S-West) S-West) Units/Sites-Improvement (Eastern Metro) 9 530 4 260 3 420 1 850 Units/Sites-Improvement (Eastern Metro) 9 530 4 260 3 420 1 850 Units/Sites-Improvement (Eastern Metro) 9 530 4 260 3 420 1 850 Units/Sites-Improvement (Gippsland) 11 220 10 030 1 030 160 Units/Sites-Improvement (Gippsland) 11 220 10 030 1 030 160 Units/Sites-Improvement (Gippsland) 11 220 10 030 1 030 160 Units/Sites-Improvement (Grampians) 3 600 1 980 1 620 .. Units/Sites-Improvement (Grampians) 3 600 1 980 1 620 .. Units/Sites-Improvement (Grampians) 3 600 1 980 1 620 .. Units/Sites-Improvement (Hume) 2 790 1 610 1 180 .. Units/Sites-Improvement (Hume) 2 790 1 610 1 180 .. Units/Sites-Improvement (Hume) 2 790 1 610 1 180 .. Units/Sites-Improvement (Loddon Mallee) 6 680 4 590 2 090 .. Units/Sites-Improvement (Loddon Mallee) 6 680 4 590 2 090 .. Units/Sites-Improvement (Loddon Mallee) 6 680 4 590 2 090 .. Units/Sites-Improvement (Northern Metro) 35 055 14 549 11 125 9 381 Units/Sites-Improvement (Northern Metro) 35 055 14 549 11 125 9 381 Units/Sites-Improvement (Northern Metro) 35 055 14 549 11 125 9 381 Units/Sites-Improvement (Southern Metro) 31 814 13 626 14 688 3 500 Units/Sites-Improvement (Southern Metro) 31 814 13 626 14 688 3 500 Units/Sites-Improvement (Southern Metro) 31 814 13 626 14 688 3 500 Units/Sites-Improvement (Various) 20 190 15 460 4 730 .. Units/Sites-Improvement (Various) 20 190 15 460 4 730 .. Units/Sites-Improvement (Various) 20 190 15 460 4 730 .. Units/Sites-Improvement (Western Metro) 57 985 34 312 17 568 6 105 Units/Sites-Improvement (Western Metro) 57 985 34 312 17 568 6 105 Units/Sites-Improvement (Western Metro) 57 985 34 312 17 568 6 105 Redevelopment Redevelopment Redevelopment 37 Units/Sites -Redevelopment (Eastern 5 637 2 256 3 380 .. 37 Units/Sites -Redevelopment (Eastern 5 637 2 256 3 380 .. 37 Units/Sites -Redevelopment (Eastern 5 637 2 256 3 380 .. Metro) Metro) Metro) 52 Units/Sites-Redevelopment (Loddon 6 461 4 133 2 327 .. 52 Units/Sites-Redevelopment (Loddon 6 461 4 133 2 327 .. 52 Units/Sites-Redevelopment (Loddon 6 461 4 133 2 327 .. Mallee) Mallee) Mallee) 1 Units/Sites-Redevelopment (Northern 202 145 56 .. 1 Units/Sites-Redevelopment (Northern 202 145 56 .. 1 Units/Sites-Redevelopment (Northern 202 145 56 .. Metro) Metro) Metro)

Public Sector Asset Investment Program 2003-04 Office of Housing 79 Public Sector Asset Investment Program 2003-04 Office of Housing 79 Public Sector Asset Investment Program 2003-04 Office of Housing 79

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 64 Units/Sites-Redevelopment (Southern 18 278 2 358 14 909 1 011 64 Units/Sites-Redevelopment (Southern 18 278 2 358 14 909 1 011 Metro) Metro) 151 Units/Sites-Redevelopment (Western 20 406 2 983 6 979 10 445 151 Units/Sites-Redevelopment (Western 20 406 2 983 6 979 10 445 Metro) Metro) Total existing projects 315 488 149 879 131 694 33 915 Total existing projects 315 488 149 879 131 694 33 915 Source: Office of Housing Source: Office of Housing Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

80 Office of Housing Public Sector Asset Investment Program 2003-04 80 Office of Housing Public Sector Asset Investment Program 2003-04

OFFICE OF HOUSING OFFICE OF HOUSING OFFICE OF HOUSING

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure Expenditure Expenditure Estimated Expenditure Expenditure Expenditure Estimated Expenditure Expenditure Expenditure Investment to 30.6.2003 2003-04 Investment to 30.6.2003 2003-04 Investment to 30.6.2003 2003-04 Project Description (a) Project Description (a) Project Description (a) Rental and Community Housing Acquisitions Rental and Community Housing Acquisitions Rental and Community Housing Acquisitions 26 Units/Sites-Acquisition (Barwon South 1 070 .. 1 040 30 26 Units/Sites-Acquisition (Barwon South 1 070 .. 1 040 30 26 Units/Sites-Acquisition (Barwon South 1 070 .. 1 040 30 West) West) West) 92 Units/Sites-Acquisition (Eastern Metro) 3 130 .. 215 2 915 92 Units/Sites-Acquisition (Eastern Metro) 3 130 .. 215 2 915 92 Units/Sites-Acquisition (Eastern Metro) 3 130 .. 215 2 915 18 Units/Sites-Acquisition (Gippsland) 860 .. 640 220 18 Units/Sites-Acquisition (Gippsland) 860 .. 640 220 18 Units/Sites-Acquisition (Gippsland) 860 .. 640 220 29 Units/Sites-Acquisition (Grampians) 1 490 .. 1 490 .. 29 Units/Sites-Acquisition (Grampians) 1 490 .. 1 490 .. 29 Units/Sites-Acquisition (Grampians) 1 490 .. 1 490 .. 18 Units/Sites-Acquisition (Hume) 840 .. 785 55 18 Units/Sites-Acquisition (Hume) 840 .. 785 55 18 Units/Sites-Acquisition (Hume) 840 .. 785 55 12 Units/Sites-Acquisition (Loddon Mallee) 3 682 .. 3 682 .. 12 Units/Sites-Acquisition (Loddon Mallee) 3 682 .. 3 682 .. 12 Units/Sites-Acquisition (Loddon Mallee) 3 682 .. 3 682 .. 80 Units/Sites-Acquisition (Northern Metro) 8 030 .. 5 492 2 538 80 Units/Sites-Acquisition (Northern Metro) 8 030 .. 5 492 2 538 80 Units/Sites-Acquisition (Northern Metro) 8 030 .. 5 492 2 538 129 Units/Sites-Acquisition (Southern Metro) 30 320 .. 2 254 28 066 129 Units/Sites-Acquisition (Southern Metro) 30 320 .. 2 254 28 066 129 Units/Sites-Acquisition (Southern Metro) 30 320 .. 2 254 28 066 80 Units/Sites-Acquisition (Western Metro) 14 160 .. 1 317 12 843 80 Units/Sites-Acquisition (Western Metro) 14 160 .. 1 317 12 843 80 Units/Sites-Acquisition (Western Metro) 14 160 .. 1 317 12 843 Improvements Improvements Improvements Units/Sites-Improvement (Barwon S-West) 4 210 .. 4 210 .. Units/Sites-Improvement (Barwon S-West) 4 210 .. 4 210 .. Units/Sites-Improvement (Barwon S-West) 4 210 .. 4 210 .. Units/Sites-Improvement (Eastern Metro) 1 962 .. 1 962 .. Units/Sites-Improvement (Eastern Metro) 1 962 .. 1 962 .. Units/Sites-Improvement (Eastern Metro) 1 962 .. 1 962 .. Units/Sites-Improvement (Gippsland) 3 900 .. 3 900 .. Units/Sites-Improvement (Gippsland) 3 900 .. 3 900 .. Units/Sites-Improvement (Gippsland) 3 900 .. 3 900 .. Units/Sites-Improvement (Grampians) 1 910 .. 1 910 .. Units/Sites-Improvement (Grampians) 1 910 .. 1 910 .. Units/Sites-Improvement (Grampians) 1 910 .. 1 910 .. Units/Sites-Improvement (Hume) 1 890 .. 1 890 .. Units/Sites-Improvement (Hume) 1 890 .. 1 890 .. Units/Sites-Improvement (Hume) 1 890 .. 1 890 .. Units/Sites-Improvement (Loddon Mallee) 1 430 .. 1 430 .. Units/Sites-Improvement (Loddon Mallee) 1 430 .. 1 430 .. Units/Sites-Improvement (Loddon Mallee) 1 430 .. 1 430 .. Units/Sites – Improvement (Northern Metro) 24 865 .. 24 325 540 Units/Sites – Improvement (Northern Metro) 24 865 .. 24 325 540 Units/Sites – Improvement (Northern Metro) 24 865 .. 24 325 540 Units/Sites-Improvement (Southern Metro) 13 926 .. 10 966 2 960 Units/Sites-Improvement (Southern Metro) 13 926 .. 10 966 2 960 Units/Sites-Improvement (Southern Metro) 13 926 .. 10 966 2 960 Units/Sites-Improvement (Statewide) 4 082 .. 4 082 .. Units/Sites-Improvement (Statewide) 4 082 .. 4 082 .. Units/Sites-Improvement (Statewide) 4 082 .. 4 082 .. Units/Sites-Improvement (Western Metro) 27 500 .. 22 832 4 668 Units/Sites-Improvement (Western Metro) 27 500 .. 22 832 4 668 Units/Sites-Improvement (Western Metro) 27 500 .. 22 832 4 668 Redevelopment Redevelopment Redevelopment 20 Units/Sites-Redevelopment (Hume) 3 000 .. 300 2 700 20 Units/Sites-Redevelopment (Hume) 3 000 .. 300 2 700 20 Units/Sites-Redevelopment (Hume) 3 000 .. 300 2 700 19 Units/Sites-Redevelopment (Loddon 3 000 .. 2 522 478 19 Units/Sites-Redevelopment (Loddon 3 000 .. 2 522 478 19 Units/Sites-Redevelopment (Loddon 3 000 .. 2 522 478 Mallee) Mallee) Mallee) 26 Units/Sites-Redevelopment (Northern 9 300 .. .. 9 300 26 Units/Sites-Redevelopment (Northern 9 300 .. .. 9 300 26 Units/Sites-Redevelopment (Northern 9 300 .. .. 9 300 Metro) Metro) Metro) 32 Units/Sites-Redevelopment (Western 3 810 .. 1 933 1 877 32 Units/Sites-Redevelopment (Western 3 810 .. 1 933 1 877 32 Units/Sites-Redevelopment (Western 3 810 .. 1 933 1 877 Metro) Metro) Metro) Total new projects 168 367 .. 99 177 69 190 Total new projects 168 367 .. 99 177 69 190 Total new projects 168 367 .. 99 177 69 190 Total Office of Housing projects 483 855 149 879 230 871 103 105 Total Office of Housing projects 483 855 149 879 230 871 103 105 Total Office of Housing projects 483 855 149 879 230 871 103 105 Source: Office of Housing Source: Office of Housing Source: Office of Housing Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Office of Housing 81 Public Sector Asset Investment Program 2003-04 Office of Housing 81 Public Sector Asset Investment Program 2003-04 Office of Housing 81

REGIONAL URBAN WATER AUTHORITIES REGIONAL URBAN WATER AUTHORITIES

Existing Projects Existing Projects ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Barwon Region Water Authority Barwon Region Water Authority Painkalac Reservoir Spillway-Headworks 200 100 100 .. Painkalac Reservoir Spillway-Headworks 200 100 100 .. (Aireys Inlet) (Aireys Inlet) Water Treatment Plant -Raw Water Pump 110 50 .. 60 Water Treatment Plant -Raw Water Pump 110 50 .. 60 Station-Upgrade (Aireys Inlet) Station-Upgrade (Aireys Inlet) Upper Stony Creek No 2 Embankment 330 280 50 .. Upper Stony Creek No 2 Embankment 330 280 50 .. -Headworks (Anakie) -Headworks (Anakie) High Level Pump Station -Replacement 190 10 30 150 High Level Pump Station -Replacement 190 10 30 150 (Anglesea) (Anglesea) Apollo Bay/Skenes Creek Bulk Water 3 379 390 26 2 963 Apollo Bay/Skenes Creek Bulk Water 3 379 390 26 2 963 Supply -Headworks (Apollo Bay) Supply -Headworks (Apollo Bay) Channel Curries Syphon -Headworks 101 50 51 .. Channel Curries Syphon -Headworks 101 50 51 .. (Ballan) (Ballan) Tank and Pump Station -Transfer and 1 570 25 180 1 365 Tank and Pump Station -Transfer and 1 570 25 180 1 365 Distribution (Bannockburn) Distribution (Bannockburn) Irrigation System/Sewerage Scheme 594 279 311 4 Irrigation System/Sewerage Scheme 594 279 311 4 -Treatment and Disposal (Bannockburn) -Treatment and Disposal (Bannockburn) Boundary Creek Baseflow Supplementary 200 20 85 95 Boundary Creek Baseflow Supplementary 200 20 85 95 Works-Headworks (Barwon Downs) Works-Headworks (Barwon Downs) Groundwater Augmentation -Lagoon 4 067 2 733 .. 1 334 Groundwater Augmentation -Lagoon 4 067 2 733 .. 1 334 Works-Headworks (Barwon Downs) Works-Headworks (Barwon Downs) No. 1 Rising Main-Replacement (Barwon 243 30 206 7 No. 1 Rising Main-Replacement (Barwon 243 30 206 7 Heads) Heads) Reticulation-Improvements (Batesford) 477 65 247 165 Reticulation-Improvements (Batesford) 477 65 247 165 Water Treatment Plant-Upgrade 348 53 250 45 Water Treatment Plant-Upgrade 348 53 250 45 (Birregurra) (Birregurra) Pipeline (Stages 4, 5, 6 & 7)-Replacement 11 150 20 300 10 830 Pipeline (Stages 4, 5, 6 & 7)-Replacement 11 150 20 300 10 830 (Colac) (Colac) Pipeline Access Track -Construction 161 120 41 .. Pipeline Access Track -Construction 161 120 41 .. (Colac) (Colac) Water Supply Storage Basin 5-Headworks 2 498 50 98 2 350 Water Supply Storage Basin 5-Headworks 2 498 50 98 2 350 (Colac) (Colac) Water Treatment Plant -Improvements 264 40 .. 224 Water Treatment Plant -Improvements 264 40 .. 224 (Colac) (Colac) Reticulation System Stage 1 (Alvie Tank) 1 201 91 90 1 020 Reticulation System Stage 1 (Alvie Tank) 1 201 91 90 1 020 -Improvements (Colac) -Improvements (Colac) Reticulation System Stages 2 and 3 871 4 .. 867 Reticulation System Stages 2 and 3 871 4 .. 867 -Improvements (Colac) -Improvements (Colac) Sewerage Treatment Plant -Upgrade 11 103 6 137 4 866 100 Sewerage Treatment Plant -Upgrade 11 103 6 137 4 866 100 (Colac) (Colac) Oxygen Dissolver -Treatment & Disposal 348 58 285 5 Oxygen Dissolver -Treatment & Disposal 348 58 285 5 (Corio) (Corio)

82 Regional Urban Water Public Sector Asset Investment Program 2003-04 82 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Treatment Plant -Improvements 128 10 5 113 Water Treatment Plant -Improvements 128 10 5 113 Water Treatment Plant -Improvements 128 10 5 113 (Forrest) (Forrest) (Forrest) McIntyre Bridge Oxygen Dissolver 557 45 41 471 McIntyre Bridge Oxygen Dissolver 557 45 41 471 McIntyre Bridge Oxygen Dissolver 557 45 41 471 -Treatment and Disposal (Geelong) -Treatment and Disposal (Geelong) -Treatment and Disposal (Geelong) Southern Ovoid Sewer Stage 2 6 514 6 394 120 .. Southern Ovoid Sewer Stage 2 6 514 6 394 120 .. Southern Ovoid Sewer Stage 2 6 514 6 394 120 .. -Replacement (Geelong) -Replacement (Geelong) -Replacement (Geelong) Lining of Main Sewers -Improvements 10 348 3 493 .. 6 855 Lining of Main Sewers -Improvements 10 348 3 493 .. 6 855 Lining of Main Sewers -Improvements 10 348 3 493 .. 6 855 (Geelong) (Geelong) (Geelong) Outfall to Ovoid Sewer Connection -Main 4 410 200 4 200 10 Outfall to Ovoid Sewer Connection -Main 4 410 200 4 200 10 Outfall to Ovoid Sewer Connection -Main 4 410 200 4 200 10 Sewer (Geelong) Sewer (Geelong) Sewer (Geelong) Ryrie St Refurbishment-(Geelong) 350 100 100 150 Ryrie St Refurbishment-(Geelong) 350 100 100 150 Ryrie St Refurbishment-(Geelong) 350 100 100 150 Water Treatment Plant -Improvements 109 27 21 61 Water Treatment Plant -Improvements 109 27 21 61 Water Treatment Plant -Improvements 109 27 21 61 (Gellibrand) (Gellibrand) (Gellibrand) South Highton Feeder Main -Transfer and 518 20 .. 498 South Highton Feeder Main -Transfer and 518 20 .. 498 South Highton Feeder Main -Transfer and 518 20 .. 498 Distribution (Highton) Distribution (Highton) Distribution (Highton) High Level -Improvements (Jan Juc) 300 126 10 164 High Level -Improvements (Jan Juc) 300 126 10 164 High Level -Improvements (Jan Juc) 300 126 10 164 Bungal -Headworks (Lal Lal) 100 25 55 20 Bungal -Headworks (Lal Lal) 100 25 55 20 Bungal -Headworks (Lal Lal) 100 25 55 20 Booster Pump Station -Reticulation 186 76 110 .. Booster Pump Station -Reticulation 186 76 110 .. Booster Pump Station -Reticulation 186 76 110 .. System (Lara) System (Lara) System (Lara) Supply Main -Stage 3 -Replacement 1 070 250 800 20 Supply Main -Stage 3 -Replacement 1 070 250 800 20 Supply Main -Stage 3 -Replacement 1 070 250 800 20 (Lorne) (Lorne) (Lorne) Retarding Tank at PS1 -Replacement 575 40 30 505 Retarding Tank at PS1 -Replacement 575 40 30 505 Retarding Tank at PS1 -Replacement 575 40 30 505 (Lorne) (Lorne) (Lorne) Marengo Basin Embankment -Headworks 200 150 50 .. Marengo Basin Embankment -Headworks 200 150 50 .. Marengo Basin Embankment -Headworks 200 150 50 .. (Marengo) (Marengo) (Marengo) Treatment Plant (30 + 35 ML/day) 12 719 12 697 22 .. Treatment Plant (30 + 35 ML/day) 12 719 12 697 22 .. Treatment Plant (30 + 35 ML/day) 12 719 12 697 22 .. -Treatment (Moorabool) -Treatment (Moorabool) -Treatment (Moorabool) Tank -Transfer and Distribution (Ocean 3 068 379 344 2 345 Tank -Transfer and Distribution (Ocean 3 068 379 344 2 345 Tank -Transfer and Distribution (Ocean 3 068 379 344 2 345 Grove) Grove) Grove) Stage 2 700m at Black Rock -Main Sewer 5 990 80 900 5 010 Stage 2 700m at Black Rock -Main Sewer 5 990 80 900 5 010 Stage 2 700m at Black Rock -Main Sewer 5 990 80 900 5 010 (Ocean Grove) (Ocean Grove) (Ocean Grove) PS 4 -Retarding Facility (No. 4 Load 862 250 612 .. PS 4 -Retarding Facility (No. 4 Load 862 250 612 .. PS 4 -Retarding Facility (No. 4 Load 862 250 612 .. Levelling) -Replacement (Ocean Grove) Levelling) -Replacement (Ocean Grove) Levelling) -Replacement (Ocean Grove) Sewerage Scheme -Reticulation (Skenes 3 670 300 798 2 572 Sewerage Scheme -Reticulation (Skenes 3 670 300 798 2 572 Sewerage Scheme -Reticulation (Skenes 3 670 300 798 2 572 Creek) Creek) Creek) Tank -Transfer and Distribution (Torquay) 3 232 342 2 860 30 Tank -Transfer and Distribution (Torquay) 3 232 342 2 860 30 Tank -Transfer and Distribution (Torquay) 3 232 342 2 860 30 High Level Tank -Transfer and Distribution 4 150 180 20 3 950 High Level Tank -Transfer and Distribution 4 150 180 20 3 950 High Level Tank -Transfer and Distribution 4 150 180 20 3 950 (Torquay) (Torquay) (Torquay) Torquay to Black Rock Transfer Sewer 7 900 150 150 7 600 Torquay to Black Rock Transfer Sewer 7 900 150 150 7 600 Torquay to Black Rock Transfer Sewer 7 900 150 150 7 600 -Replacement (Torquay) -Replacement (Torquay) -Replacement (Torquay) PS No. 1 -Replacement (Torquay) 1 450 100 100 1 250 PS No. 1 -Replacement (Torquay) 1 450 100 100 1 250 PS No. 1 -Replacement (Torquay) 1 450 100 100 1 250 Inlet Channel -Refurbishment (Various) 346 197 69 80 Inlet Channel -Refurbishment (Various) 346 197 69 80 Inlet Channel -Refurbishment (Various) 346 197 69 80 Minor Headworks -Improvements 762 65 59 638 Minor Headworks -Improvements 762 65 59 638 Minor Headworks -Improvements 762 65 59 638 (Various) (Various) (Various) Miscellaneous Asset Creation and 519 69 40 410 Miscellaneous Asset Creation and 519 69 40 410 Miscellaneous Asset Creation and 519 69 40 410 Replacement -Distribution Improvements Replacement -Distribution Improvements Replacement -Distribution Improvements (Various) (Various) (Various) Mains -Replacements (Various) 16 820 1 545 1 000 14 275 Mains -Replacements (Various) 16 820 1 545 1 000 14 275 Mains -Replacements (Various) 16 820 1 545 1 000 14 275 Public Sector Asset Investment Program 2003-04 Regional Urban Water 83 Public Sector Asset Investment Program 2003-04 Regional Urban Water 83 Public Sector Asset Investment Program 2003-04 Regional Urban Water 83

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Minor Reticulation -Improvements 1 658 125 120 1 413 Minor Reticulation -Improvements 1 658 125 120 1 413 (Various) (Various) Monitoring Installations-Water Quality 348 198 51 99 Monitoring Installations-Water Quality 348 198 51 99 (including Telemetry) -Headworks (including Telemetry) -Headworks (Various) (Various) Disinfection Plants -Duty/Standby 754 188 88 478 Disinfection Plants -Duty/Standby 754 188 88 478 Systems -Treatment (Various) Systems -Treatment (Various) Transfer System Monitoring and Control 1 038 33 .. 1 005 Transfer System Monitoring and Control 1 038 33 .. 1 005 -Transfer and Distribution (Various) -Transfer and Distribution (Various) Flow Metering -Reticulation System 162 96 66 .. Flow Metering -Reticulation System 162 96 66 .. (Various) (Various) Reticulation System -Systems 111 66 45 .. Reticulation System -Systems 111 66 45 .. Performance Monitoring (Various) Performance Monitoring (Various) Computer Network Modelling -Reticulation 290 140 30 120 Computer Network Modelling -Reticulation 290 140 30 120 System (Various) System (Various) Water Leakage Reduction -Improvements 200 50 50 100 Water Leakage Reduction -Improvements 200 50 50 100 (Various) (Various) Plant Items -Replacement (Various) 3 656 310 300 3 046 Plant Items -Replacement (Various) 3 656 310 300 3 046 Regional Treatment Plants -Minor 734 174 65 495 Regional Treatment Plants -Minor 734 174 65 495 Improvements (Various) Improvements (Various) Flow Monitoring -Data Collection (Various) 553 243 31 279 Flow Monitoring -Data Collection (Various) 553 243 31 279 Pump (Geelong and Otway) 2 020 180 184 1 656 Pump (Geelong and Otway) 2 020 180 184 1 656 -Replacements (Various) -Replacements (Various) Occupational Health and Safety 560 50 51 459 Occupational Health and Safety 560 50 51 459 -Improvements (Various) -Improvements (Various) Control Systems (Telemetry) -Reticulation 428 38 39 351 Control Systems (Telemetry) -Reticulation 428 38 39 351 (Various) (Various) Switchboard -Replacements (Various) 1 010 90 92 828 Switchboard -Replacements (Various) 1 010 90 92 828 Mixers and Flush Valves -Reticulation 450 40 41 369 Mixers and Flush Valves -Reticulation 450 40 41 369 (Various) (Various) Sewer Mains Replacement/Rehabilitation 8 202 600 665 6 937 Sewer Mains Replacement/Rehabilitation 8 202 600 665 6 937 Programme and Minor Systems Programme and Minor Systems Improvements-(Various) Improvements-(Various) Odour and Corrosion Programs 830 50 150 630 Odour and Corrosion Programs 830 50 150 630 -Treatment & Disposal (Various) -Treatment & Disposal (Various) Reclaimed Water Project -Treatment and 2 505 1 460 1 040 5 Reclaimed Water Project -Treatment and 2 505 1 460 1 040 5 Disposal (Various) Disposal (Various) Office Building Mechanical Services 180 20 20 140 Office Building Mechanical Services 180 20 20 140 -Buildings (Various) -Buildings (Various) Office Furniture and Equipment 310 50 50 210 Office Furniture and Equipment 310 50 50 210 -Replacement (Various) -Replacement (Various) Systems Maintenance -Facility 66 21 45 .. Systems Maintenance -Facility 66 21 45 .. Improvements (Various) Improvements (Various) New, Replacements & Conversions 3 060 280 280 2 500 New, Replacements & Conversions 3 060 280 280 2 500 -Other Corp. Works (Various) -Other Corp. Works (Various) Meter Replacement 1 700 200 200 1 300 Meter Replacement 1 700 200 200 1 300 Program-Replacement (Various) Program-Replacement (Various) Vehicles-Replacements (Various) 25 904 2 616 2 588 20 700 Vehicles-Replacements (Various) 25 904 2 616 2 588 20 700

84 Regional Urban Water Public Sector Asset Investment Program 2003-04 84 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Plant and Machinery -Other Corporate 4 109 501 188 3 420 Plant and Machinery -Other Corporate 4 109 501 188 3 420 Plant and Machinery -Other Corporate 4 109 501 188 3 420 Works (Various) Works (Various) Works (Various) Land Information Equipment -Other 300 70 20 210 Land Information Equipment -Other 300 70 20 210 Land Information Equipment -Other 300 70 20 210 Corporate Works (Various) Corporate Works (Various) Corporate Works (Various) Printing and Photographic Equipment 140 20 20 100 Printing and Photographic Equipment 140 20 20 100 Printing and Photographic Equipment 140 20 20 100 -Other Corporate Works (Various) -Other Corporate Works (Various) -Other Corporate Works (Various) Miscellaneous Land Purchases -Other 275 25 25 225 Miscellaneous Land Purchases -Other 275 25 25 225 Miscellaneous Land Purchases -Other 275 25 25 225 Corporate Works (Various) Corporate Works (Various) Corporate Works (Various) Backflow Prevention -Barwon Water 325 160 15 150 Backflow Prevention -Barwon Water 325 160 15 150 Backflow Prevention -Barwon Water 325 160 15 150 Assets -Other Corporate Works (Various) Assets -Other Corporate Works (Various) Assets -Other Corporate Works (Various) Occupational Health and Safety 880 80 80 720 Occupational Health and Safety 880 80 80 720 Occupational Health and Safety 880 80 80 720 Items-Other Corporate Works (Various) Items-Other Corporate Works (Various) Items-Other Corporate Works (Various) Treatment Plant -Augmentation of 226 161 .. 65 Treatment Plant -Augmentation of 226 161 .. 65 Treatment Plant -Augmentation of 226 161 .. 65 Irrigation System (Winchelsea) Irrigation System (Winchelsea) Irrigation System (Winchelsea) Whoorel Syphon-Headworks (Wurdee 4 025 2 615 1 410 .. Whoorel Syphon-Headworks (Wurdee 4 025 2 615 1 410 .. Whoorel Syphon-Headworks (Wurdee 4 025 2 615 1 410 .. Boluc) Boluc) Boluc) Water Quality Risk Assessment (Process 57 496 296 50 57 150 Water Quality Risk Assessment (Process 57 496 296 50 57 150 Water Quality Risk Assessment (Process 57 496 296 50 57 150 Enhancement) -Treatment (Wurdee Enhancement) -Treatment (Wurdee Enhancement) -Treatment (Wurdee Boluc) Boluc) Boluc) Water Treatment Plant -Improvements 2 140 675 210 1 255 Water Treatment Plant -Improvements 2 140 675 210 1 255 Water Treatment Plant -Improvements 2 140 675 210 1 255 (Wurdee Buloc) (Wurdee Buloc) (Wurdee Buloc) Central Gippsland Region Water Authority Central Gippsland Region Water Authority Central Gippsland Region Water Authority Sewerage, Hopetoun Rd SPS-Upgrade 811 11 24 776 Sewerage, Hopetoun Rd SPS-Upgrade 811 11 24 776 Sewerage, Hopetoun Rd SPS-Upgrade 811 11 24 776 (Drouin) (Drouin) (Drouin) Wastewater Treatment Plant-Upgrade 2 668 168 605 1 895 Wastewater Treatment Plant-Upgrade 2 668 168 605 1 895 Wastewater Treatment Plant-Upgrade 2 668 168 605 1 895 (Drouin) (Drouin) (Drouin) Cardboard Pond-Upgrade (Dutson 3 051 1 750 2 300 Cardboard Pond-Upgrade (Dutson 3 051 1 750 2 300 Cardboard Pond-Upgrade (Dutson 3 051 1 750 2 300 Downs) Downs) Downs) Expanded Resource Recovery Project 148 128 20 .. Expanded Resource Recovery Project 148 128 20 .. Expanded Resource Recovery Project 148 128 20 .. -Hazardous Waste-Upgrade (Dutson -Hazardous Waste-Upgrade (Dutson -Hazardous Waste-Upgrade (Dutson Downs) Downs) Downs) McAdams Tank and Ring Main -Upgrade 896 246 300 350 McAdams Tank and Ring Main -Upgrade 896 246 300 350 McAdams Tank and Ring Main -Upgrade 896 246 300 350 (Maffra) (Maffra) (Maffra) Maffra Nestles Waste Water Retic 193 21 32 140 Maffra Nestles Waste Water Retic 193 21 32 140 Maffra Nestles Waste Water Retic 193 21 32 140 Catchment -Upgrade (Maffra) Catchment -Upgrade (Maffra) Catchment -Upgrade (Maffra) Moe/Newborough Sewer Reticulation 832 2 80 750 Moe/Newborough Sewer Reticulation 832 2 80 750 Moe/Newborough Sewer Reticulation 832 2 80 750 Augmentation -Upgrade (Moe) Augmentation -Upgrade (Moe) Augmentation -Upgrade (Moe) Inlet/outlet Pipe -Upgrade (Morwell) 364 284 80 .. Inlet/outlet Pipe -Upgrade (Morwell) 364 284 80 .. Inlet/outlet Pipe -Upgrade (Morwell) 364 284 80 .. Outfall Main (East) Augmentation 755 5 20 730 Outfall Main (East) Augmentation 755 5 20 730 Outfall Main (East) Augmentation 755 5 20 730 -Upgrade (Morwell) -Upgrade (Morwell) -Upgrade (Morwell) Erica / Rawson Treatment -Construction 628 28 200 400 Erica / Rawson Treatment -Construction 628 28 200 400 Erica / Rawson Treatment -Construction 628 28 200 400 (Rawson) (Rawson) (Rawson) New Tank -Upgrade (Seaspray) 344 4 320 20 New Tank -Upgrade (Seaspray) 344 4 320 20 New Tank -Upgrade (Seaspray) 344 4 320 20 Sewerage Collection System 1 814 164 1 100 550 Sewerage Collection System 1 814 164 1 100 550 Sewerage Collection System 1 814 164 1 100 550 -Construction (Seaspray) -Construction (Seaspray) -Construction (Seaspray) Wastewater Treatment and Disposal 2 861 11 1 000 1 850 Wastewater Treatment and Disposal 2 861 11 1 000 1 850 Wastewater Treatment and Disposal 2 861 11 1 000 1 850 -Construction (Seaspray) -Construction (Seaspray) -Construction (Seaspray)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 85 Public Sector Asset Investment Program 2003-04 Regional Urban Water 85 Public Sector Asset Investment Program 2003-04 Regional Urban Water 85

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Treatment Plant -Upgrade 104 22 82 .. Water Treatment Plant -Upgrade 104 22 82 .. (Thorpdale) (Thorpdale) Water Treatment Plant Additional CWS, 521 21 180 320 Water Treatment Plant Additional CWS, 521 21 180 320 Blacks -Upgrade (Traralgon) Blacks -Upgrade (Traralgon) Water Treatment Plant and Toongabbie 1 115 15 113 987 Water Treatment Plant and Toongabbie 1 115 15 113 987 System Review -Upgrade (Tyers) System Review -Upgrade (Tyers) Buildings and Fencing -Upgrade (Various) 808 598 95 115 Buildings and Fencing -Upgrade (Various) 808 598 95 115 Cathodic Protection of Water Assets 459 59 80 320 Cathodic Protection of Water Assets 459 59 80 320 -Upgrade (Various) -Upgrade (Various) Component Maintenance Tracking and 98 33 65 .. Component Maintenance Tracking and 98 33 65 .. Geographic Information Systems Geographic Information Systems -Upgrade (Various) -Upgrade (Various) Customer Information and Billing System 690 53 637 .. Customer Information and Billing System 690 53 637 .. -Upgrade (Various) -Upgrade (Various) Customer Meter Replacements 1 978 528 250 1 200 Customer Meter Replacements 1 978 528 250 1 200 -Replacement (Various) -Replacement (Various) Engineering Site Drawings -Upgrade 55 5 10 40 Engineering Site Drawings -Upgrade 55 5 10 40 (Various) (Various) Financial Management Systems -Upgrade 186 106 80 .. Financial Management Systems -Upgrade 186 106 80 .. (Various) (Various) Fleet Changeover Costs -Replacement 8 156 1 406 1 350 5 400 Fleet Changeover Costs -Replacement 8 156 1 406 1 350 5 400 (Various) (Various) Hardware -Upgrade (Various) 2 074 139 285 1 650 Hardware -Upgrade (Various) 2 074 139 285 1 650 Internet/Intranet -Upgrade (Various) 47 22 25 .. Internet/Intranet -Upgrade (Various) 47 22 25 .. Lining and Covering -Upgrade (Various) 1 021 681 320 20 Lining and Covering -Upgrade (Various) 1 021 681 320 20 Moondarra Reservoir -Upgrade (Various) 732 147 105 480 Moondarra Reservoir -Upgrade (Various) 732 147 105 480 Water Treatment Plants -Improvement 423 309 114 .. Water Treatment Plants -Improvement 423 309 114 .. (Various) (Various) Regional Wastewater -Upgrade (Various) 2 680 1 860 20 800 Regional Wastewater -Upgrade (Various) 2 680 1 860 20 800 Sale Water Treatment Plant -Upgrade 588 58 145 385 Sale Water Treatment Plant -Upgrade 588 58 145 385 (Various) (Various) Security of Water Supply and Distribution 1 273 788 .. 485 Security of Water Supply and Distribution 1 273 788 .. 485 -Upgrade (Various) -Upgrade (Various) Sewer Pump Station Improvements 2 485 40 420 2 025 Sewer Pump Station Improvements 2 485 40 420 2 025 -Upgrade (Various) -Upgrade (Various) Telemetry and Instrumentation -Water and 1 081 556 375 150 Telemetry and Instrumentation -Water and 1 081 556 375 150 Waste -Upgrade (Various) Waste -Upgrade (Various) Water Treatment Plant Enhancement 1 067 882 .. 185 Water Treatment Plant Enhancement 1 067 882 .. 185 Projects -Upgrade (Various) Projects -Upgrade (Various) Wastem Water Collection Sewer and 441 256 .. 185 Wastem Water Collection Sewer and 441 256 .. 185 Pump Station -Improvements (Various) Pump Station -Improvements (Various) Waste Water Treatment and Disposal 1 786 1 601 .. 185 Waste Water Treatment and Disposal 1 786 1 601 .. 185 -Improvements (Various) -Improvements (Various) Water Quality Improvement Works not 763 283 60 420 Water Quality Improvement Works not 763 283 60 420 Treatment -Improvements (Various) Treatment -Improvements (Various) Water Resource Systems Upgrade 207 2 .. 205 Water Resource Systems Upgrade 207 2 .. 205 -Upgrade (Various) -Upgrade (Various)

86 Regional Urban Water Public Sector Asset Investment Program 2003-04 86 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Supply Reticulation Pipe, Pump 1 414 440 439 535 Water Supply Reticulation Pipe, Pump 1 414 440 439 535 Water Supply Reticulation Pipe, Pump 1 414 440 439 535 and Tank -Upgrade (Various) and Tank -Upgrade (Various) and Tank -Upgrade (Various) Sewer Reticulation -Upgrade (Warragul) 7 7 .. .. Sewer Reticulation -Upgrade (Warragul) 7 7 .. .. Sewer Reticulation -Upgrade (Warragul) 7 7 .. .. Waste Water Treatment Plant -Upgrade 4 236 106 850 3 280 Waste Water Treatment Plant -Upgrade 4 236 106 850 3 280 Waste Water Treatment Plant -Upgrade 4 236 106 850 3 280 (Warragul) (Warragul) (Warragul) Central Highlands Region Water Authority Central Highlands Region Water Authority Central Highlands Region Water Authority Sewerage Treatment Plant -Lagoon 100 20 80 .. Sewerage Treatment Plant -Lagoon 100 20 80 .. Sewerage Treatment Plant -Lagoon 100 20 80 .. -Refurbishment (Ballan) -Refurbishment (Ballan) -Refurbishment (Ballan) Water Supply Reservoirs -Improvement 4 500 900 500 3 100 Water Supply Reservoirs -Improvement 4 500 900 500 3 100 Water Supply Reservoirs -Improvement 4 500 900 500 3 100 (Ballarat) (Ballarat) (Ballarat) Water Source -Bulk Metering -Installation 376 214 70 92 Water Source -Bulk Metering -Installation 376 214 70 92 Water Source -Bulk Metering -Installation 376 214 70 92 (Ballarat) (Ballarat) (Ballarat) Water And Sewerage Reticulation 750 390 90 270 Water And Sewerage Reticulation 750 390 90 270 Water And Sewerage Reticulation 750 390 90 270 -Development (Ballarat) -Development (Ballarat) -Development (Ballarat) Environmental Management System 670 370 200 100 Environmental Management System 670 370 200 100 Environmental Management System 670 370 200 100 -Implementation (Ballarat) -Implementation (Ballarat) -Implementation (Ballarat) Plant And Equipment -Purchase 9 000 2 900 1 300 4 800 Plant And Equipment -Purchase 9 000 2 900 1 300 4 800 Plant And Equipment -Purchase 9 000 2 900 1 300 4 800 (Ballarat) (Ballarat) (Ballarat) Information Technology Infrastructure 1 782 382 350 1 050 Information Technology Infrastructure 1 782 382 350 1 050 Information Technology Infrastructure 1 782 382 350 1 050 -Renewal (Ballarat) -Renewal (Ballarat) -Renewal (Ballarat) Water Reticulation -Replacement 10 842 2 342 500 8 000 Water Reticulation -Replacement 10 842 2 342 500 8 000 Water Reticulation -Replacement 10 842 2 342 500 8 000 (Ballarat) (Ballarat) (Ballarat) Sewerage Treatment Plant -Compliance 600 400 200 .. Sewerage Treatment Plant -Compliance 600 400 200 .. Sewerage Treatment Plant -Compliance 600 400 200 .. -Upgrade (Ballarat) -Upgrade (Ballarat) -Upgrade (Ballarat) Sewerage Collection System -Upgrade 8 000 500 1 000 6 500 Sewerage Collection System -Upgrade 8 000 500 1 000 6 500 Sewerage Collection System -Upgrade 8 000 500 1 000 6 500 (Ballarat) (Ballarat) (Ballarat) Water Resources -Planning (Ballarat) 185 85 100 .. Water Resources -Planning (Ballarat) 185 85 100 .. Water Resources -Planning (Ballarat) 185 85 100 .. Finance Systems -Upgrade (Ballarat) 100 20 20 60 Finance Systems -Upgrade (Ballarat) 100 20 20 60 Finance Systems -Upgrade (Ballarat) 100 20 20 60 Information Management -Implementation 175 50 125 .. Information Management -Implementation 175 50 125 .. Information Management -Implementation 175 50 125 .. (Ballarat) (Ballarat) (Ballarat) Offices -Upgrade (Ballarat) 210 10 50 150 Offices -Upgrade (Ballarat) 210 10 50 150 Offices -Upgrade (Ballarat) 210 10 50 150 Asset Management Systems 1 650 200 650 800 Asset Management Systems 1 650 200 650 800 Asset Management Systems 1 650 200 650 800 -Implementation (Ballarat) -Implementation (Ballarat) -Implementation (Ballarat) Water Distribution Main From Lal Lal 155 155 .. .. Water Distribution Main From Lal Lal 155 155 .. .. Water Distribution Main From Lal Lal 155 155 .. .. -Improvement (Ballarat) -Improvement (Ballarat) -Improvement (Ballarat) Sewerage Treatment Plant -Biosolids 120 120 .. .. Sewerage Treatment Plant -Biosolids 120 120 .. .. Sewerage Treatment Plant -Biosolids 120 120 .. .. -Management (Ballarat) -Management (Ballarat) -Management (Ballarat) Water Treatment Plant -Construction 2 125 1 075 1 050 .. Water Treatment Plant -Construction 2 125 1 075 1 050 .. Water Treatment Plant -Construction 2 125 1 075 1 050 .. (Beaufort) (Beaufort) (Beaufort) Water Treatment Plant -Construction 775 375 400 .. Water Treatment Plant -Construction 775 375 400 .. Water Treatment Plant -Construction 775 375 400 .. (Blackwood) (Blackwood) (Blackwood) Sewerage Scheme -Construction 3 300 600 2 700 .. Sewerage Scheme -Construction 3 300 600 2 700 .. Sewerage Scheme -Construction 3 300 600 2 700 .. (Carisbrook) (Carisbrook) (Carisbrook) Water Supply -Upgrade (Clunes) 2 995 350 1 500 1 145 Water Supply -Upgrade (Clunes) 2 995 350 1 500 1 145 Water Supply -Upgrade (Clunes) 2 995 350 1 500 1 145 Sewerage Treatment Plant -Upgrade 1 640 340 700 600 Sewerage Treatment Plant -Upgrade 1 640 340 700 600 Sewerage Treatment Plant -Upgrade 1 640 340 700 600 (Daylesford) (Daylesford) (Daylesford) Sewerage Treatment Plant -Land 100 50 50 .. Sewerage Treatment Plant -Land 100 50 50 .. Sewerage Treatment Plant -Land 100 50 50 .. -Purchase (Daylesford) -Purchase (Daylesford) -Purchase (Daylesford) Public Sector Asset Investment Program 2003-04 Regional Urban Water 87 Public Sector Asset Investment Program 2003-04 Regional Urban Water 87 Public Sector Asset Investment Program 2003-04 Regional Urban Water 87

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Supply Demand -Management 300 300 .. .. Water Supply Demand -Management 300 300 .. .. (Daylesford) (Daylesford) Water Supply -Creswick -Augmentation 180 50 30 100 Water Supply -Creswick -Augmentation 180 50 30 100 (Dean) (Dean) Water Treatment Plant -Construction 835 175 660 .. Water Treatment Plant -Construction 835 175 660 .. (Forest Hill) (Forest Hill) Sewerage Treatment Plant -Reclaimed 3 040 540 500 2 000 Sewerage Treatment Plant -Reclaimed 3 040 540 500 2 000 Water -Disposal (Maryborough) Water -Disposal (Maryborough) Water Treatment Plant -Filter -Upgrade 120 60 60 .. Water Treatment Plant -Filter -Upgrade 120 60 60 .. (Maryborough) (Maryborough) Sewerage Treatment Plant -Inlet Works 1 364 1 264 100 .. Sewerage Treatment Plant -Inlet Works 1 364 1 264 100 .. -Upgrade (Sebastopol) -Upgrade (Sebastopol) Sewerage System -Construction 3 180 620 2 400 160 Sewerage System -Construction 3 180 620 2 400 160 (Skipton) (Skipton) Reservoirs -Investigation (Various) 150 150 .. .. Reservoirs -Investigation (Various) 150 150 .. .. Water Supply Renewal Projects 17 649 1 699 2 450 13 500 Water Supply Renewal Projects 17 649 1 699 2 450 13 500 -Construction (Various) -Construction (Various) Sewers -Rehabilitation (Various) 890 240 200 450 Sewers -Rehabilitation (Various) 890 240 200 450 Water Supply Tanks -Ladders -Installation 100 100 .. .. Water Supply Tanks -Ladders -Installation 100 100 .. .. (Various) (Various) Bulk Flow Water Meters -Installation 376 214 70 92 Bulk Flow Water Meters -Installation 376 214 70 92 (Various) (Various) Dams -Emergency Management Plans 159 92 67 .. Dams -Emergency Management Plans 159 92 67 .. -Implementation (Various) -Implementation (Various) Water Meters -Purchase (Various) 304 104 50 150 Water Meters -Purchase (Various) 304 104 50 150 Water Meters -Replacement (Various) 346 106 60 180 Water Meters -Replacement (Various) 346 106 60 180 Sewage Pump Stations -Upgrade 500 50 .. 450 Sewage Pump Stations -Upgrade 500 50 .. 450 (Various) (Various) Treatment Plant -Replacement (Various) 1 000 200 200 600 Treatment Plant -Replacement (Various) 1 000 200 200 600 Plant and Equipment -Minor -Purchase 500 100 100 300 Plant and Equipment -Minor -Purchase 500 100 100 300 (Various) (Various) Water Treatment Plant -Minor Works 500 100 100 300 Water Treatment Plant -Minor Works 500 100 100 300 -Replacement (Various) -Replacement (Various) Water Supply Tanks -Control Valves 150 50 50 50 Water Supply Tanks -Control Valves 150 50 50 50 -Renew (Various) -Renew (Various) Sewerage Treatment Plant -Upgrade 800 600 200 .. Sewerage Treatment Plant -Upgrade 800 600 200 .. (Wendouree) (Wendouree) Coliban Region Water Authority Coliban Region Water Authority Sewerage Scheme -Construction 1 570 135 1 435 .. Sewerage Scheme -Construction 1 570 135 1 435 .. (Axedale) (Axedale) Sewerage Treatment Plant -Construction 1 090 115 975 .. Sewerage Treatment Plant -Construction 1 090 115 975 .. (Axedale) (Axedale) Water Main -Construction (Axedale) 619 19 600 .. Water Main -Construction (Axedale) 619 19 600 .. Water Treatment -Improvement (Bealiba) 150 22 128 .. Water Treatment -Improvement (Bealiba) 150 22 128 .. Office Equipment -Improvement 2 924 47 986 1 891 Office Equipment -Improvement 2 924 47 986 1 891 (Bendigo) (Bendigo) Office Equipment -Replacement 6 777 3 170 719 2 888 Office Equipment -Replacement 6 777 3 170 719 2 888 (Bendigo) (Bendigo) 88 Regional Urban Water Public Sector Asset Investment Program 2003-04 88 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sewage Pumping -Replacement 328 83 50 195 Sewage Pumping -Replacement 328 83 50 195 Sewage Pumping -Replacement 328 83 50 195 (Bendigo) (Bendigo) (Bendigo) Sewer Main -Construct (Bendigo) 10 746 146 .. 10 600 Sewer Main -Construct (Bendigo) 10 746 146 .. 10 600 Sewer Main -Construct (Bendigo) 10 746 146 .. 10 600 Sewer Main -Improvement (Bendigo) 947 774 173 .. Sewer Main -Improvement (Bendigo) 947 774 173 .. Sewer Main -Improvement (Bendigo) 947 774 173 .. Sewerage Treatment Plant -Improvement 4 800 4 700 100 .. Sewerage Treatment Plant -Improvement 4 800 4 700 100 .. Sewerage Treatment Plant -Improvement 4 800 4 700 100 .. (Bendigo) (Bendigo) (Bendigo) Sewerage Treatment Plant -Replacement 1 633 88 40 1 505 Sewerage Treatment Plant -Replacement 1 633 88 40 1 505 Sewerage Treatment Plant -Replacement 1 633 88 40 1 505 (Bendigo) (Bendigo) (Bendigo) Water Distribution -Construction 145 35 110 .. Water Distribution -Construction 145 35 110 .. Water Distribution -Construction 145 35 110 .. (Bendigo) (Bendigo) (Bendigo) Water Main -Construction (Bendigo) 608 469 30 109 Water Main -Construction (Bendigo) 608 469 30 109 Water Main -Construction (Bendigo) 608 469 30 109 Water Main -Improvement (Bendigo) 4 860 30 25 4 805 Water Main -Improvement (Bendigo) 4 860 30 25 4 805 Water Main -Improvement (Bendigo) 4 860 30 25 4 805 Water Main -Improvement (Bendigo) 3 830 1 010 500 2 320 Water Main -Improvement (Bendigo) 3 830 1 010 500 2 320 Water Main -Improvement (Bendigo) 3 830 1 010 500 2 320 Water Main -Replacement (Bendigo) 172 26 72 74 Water Main -Replacement (Bendigo) 172 26 72 74 Water Main -Replacement (Bendigo) 172 26 72 74 Water Pump Station -Replacement 315 80 40 195 Water Pump Station -Replacement 315 80 40 195 Water Pump Station -Replacement 315 80 40 195 (Bendigo) (Bendigo) (Bendigo) Water Reservoir -Improvement (Bendigo) 87 15 5 67 Water Reservoir -Improvement (Bendigo) 87 15 5 67 Water Reservoir -Improvement (Bendigo) 87 15 5 67 Water Reservoir -Improvement (Bendigo) 3 361 1 241 1 900 220 Water Reservoir -Improvement (Bendigo) 3 361 1 241 1 900 220 Water Reservoir -Improvement (Bendigo) 3 361 1 241 1 900 220 Water Reservoir -Improvement (Bendigo) 3 850 1 250 2 600 .. Water Reservoir -Improvement (Bendigo) 3 850 1 250 2 600 .. Water Reservoir -Improvement (Bendigo) 3 850 1 250 2 600 .. Water Tanks -Improvement (Bendigo) 258 10 20 228 Water Tanks -Improvement (Bendigo) 258 10 20 228 Water Tanks -Improvement (Bendigo) 258 10 20 228 Water Treatment -Improvement 57 12 5 40 Water Treatment -Improvement 57 12 5 40 Water Treatment -Improvement 57 12 5 40 (Bendigo) (Bendigo) (Bendigo) Water Treatment -Replacement 170 30 20 120 Water Treatment -Replacement 170 30 20 120 Water Treatment -Replacement 170 30 20 120 (Bendigo) (Bendigo) (Bendigo) Water Treatment -Improvement (Boort) 1 771 1 354 417 .. Water Treatment -Improvement (Boort) 1 771 1 354 417 .. Water Treatment -Improvement (Boort) 1 771 1 354 417 .. Water Treatment -Improvement 211 181 30 .. Water Treatment -Improvement 211 181 30 .. Water Treatment -Improvement 211 181 30 .. (Bridgewater) (Bridgewater) (Bridgewater) Water Main -Replacement (Castlemaine) 80 30 50 .. Water Main -Replacement (Castlemaine) 80 30 50 .. Water Main -Replacement (Castlemaine) 80 30 50 .. Water Main -Replacement (Cohuna) 92 52 40 .. Water Main -Replacement (Cohuna) 92 52 40 .. Water Main -Replacement (Cohuna) 92 52 40 .. Water Treatment -Improvement (Cohuna) 2 645 1 888 757 .. Water Treatment -Improvement (Cohuna) 2 645 1 888 757 .. Water Treatment -Improvement (Cohuna) 2 645 1 888 757 .. Water Treatment -Replacement (Cohuna) 49 10 39 .. Water Treatment -Replacement (Cohuna) 49 10 39 .. Water Treatment -Replacement (Cohuna) 49 10 39 .. Sewerage Scheme -Construction 3 015 215 2 800 .. Sewerage Scheme -Construction 3 015 215 2 800 .. Sewerage Scheme -Construction 3 015 215 2 800 .. (Dunolly) (Dunolly) (Dunolly) Sewerage Treatment Plant -Construction 1 200 185 815 200 Sewerage Treatment Plant -Construction 1 200 185 815 200 Sewerage Treatment Plant -Construction 1 200 185 815 200 (Dunolly) (Dunolly) (Dunolly) Wastewater Main -Replacement (Echuca) 1 455 1 355 100 .. Wastewater Main -Replacement (Echuca) 1 455 1 355 100 .. Wastewater Main -Replacement (Echuca) 1 455 1 355 100 .. Wastewater Pumping -Improvement 836 145 46 645 Wastewater Pumping -Improvement 836 145 46 645 Wastewater Pumping -Improvement 836 145 46 645 (Echuca) (Echuca) (Echuca) Wastewater Scheme -Construction 446 16 430 .. Wastewater Scheme -Construction 446 16 430 .. Wastewater Scheme -Construction 446 16 430 .. (Echuca) (Echuca) (Echuca) Water Main -Construction (Echuca) 12 265 275 .. 11 990 Water Main -Construction (Echuca) 12 265 275 .. 11 990 Water Main -Construction (Echuca) 12 265 275 .. 11 990 Water Treatment -Improvement (Echuca) 3 331 3 281 50 .. Water Treatment -Improvement (Echuca) 3 331 3 281 50 .. Water Treatment -Improvement (Echuca) 3 331 3 281 50 .. Water Reservoir -Improvement (Harcourt) 3 345 472 2 873 .. Water Reservoir -Improvement (Harcourt) 3 345 472 2 873 .. Water Reservoir -Improvement (Harcourt) 3 345 472 2 873 .. Water Reservoir -Improvement 1 741 11 470 1 260 Water Reservoir -Improvement 1 741 11 470 1 260 Water Reservoir -Improvement 1 741 11 470 1 260 (Heathcote) (Heathcote) (Heathcote) Sewerage Treatment Plant -Improvement 1 852 1 377 75 400 Sewerage Treatment Plant -Improvement 1 852 1 377 75 400 Sewerage Treatment Plant -Improvement 1 852 1 377 75 400 (Kyneton) (Kyneton) (Kyneton)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 89 Public Sector Asset Investment Program 2003-04 Regional Urban Water 89 Public Sector Asset Investment Program 2003-04 Regional Urban Water 89

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sewerage Scheme -Construction 2 888 1 728 1 160 .. Sewerage Scheme -Construction 2 888 1 728 1 160 .. (Leitchville) (Leitchville) Sewerage Treatment Plant -Construction 515 215 300 .. Sewerage Treatment Plant -Construction 515 215 300 .. (Leitchville) (Leitchville) Water Main -Replacement (Leitchville) 124 24 .. 100 Water Main -Replacement (Leitchville) 124 24 .. 100 Water Treatment -Improvement 295 95 .. 200 Water Treatment -Improvement 295 95 .. 200 (Leitchville) (Leitchville) Water Main -Replacement (Lockington) 180 30 50 100 Water Main -Replacement (Lockington) 180 30 50 100 Water Treatment -Construction 1 503 1 117 386 .. Water Treatment -Construction 1 503 1 117 386 .. (Lockington) (Lockington) Sewage Pumping -Improvement 580 355 225 .. Sewage Pumping -Improvement 580 355 225 .. (Malmsbury) (Malmsbury) Water Distribution -Replace (Malmsbury) 2 906 46 245 2 615 Water Distribution -Replace (Malmsbury) 2 906 46 245 2 615 Water Reservoir -Improvement 525 63 41 421 Water Reservoir -Improvement 525 63 41 421 (Malmsbury) (Malmsbury) Water Reservoir -Replacement 925 370 85 470 Water Reservoir -Replacement 925 370 85 470 (Malmsbury) (Malmsbury) Sewerage Scheme -Construction 3 838 438 3 400 .. Sewerage Scheme -Construction 3 838 438 3 400 .. (Newstead) (Newstead) Water Main -Construction (Raywood) 1 120 20 .. 1 100 Water Main -Construction (Raywood) 1 120 20 .. 1 100 Water Treatment -Improvement 3 975 2 832 1 143 .. Water Treatment -Improvement 3 975 2 832 1 143 .. (Rochester) (Rochester) Water Main -Construction (Tooborac) 1 110 130 980 .. Water Main -Construction (Tooborac) 1 110 130 980 .. Water Reservoir -Improvement 2 731 111 1 050 1 570 Water Reservoir -Improvement 2 731 111 1 050 1 570 (Trentham) (Trentham) Water Reservoir -Improvement (Tylden) 2 113 13 .. 2 100 Water Reservoir -Improvement (Tylden) 2 113 13 .. 2 100 Wastewater Pumping -Improvement 279 79 40 160 Wastewater Pumping -Improvement 279 79 40 160 (Various) (Various) Water Distribution -Improvement 129 36 15 78 Water Distribution -Improvement 129 36 15 78 (Various) (Various) Sewerage Scheme -Construction 3 099 230 2 869 .. Sewerage Scheme -Construction 3 099 230 2 869 .. (Wedderburn) (Wedderburn) Sewerage Treatment Plant -Construction 1 165 115 1 050 .. Sewerage Treatment Plant -Construction 1 165 115 1 050 .. (Wedderburn) (Wedderburn) East Gippsland Region Water Authority East Gippsland Region Water Authority Calvert Street Site -Development 389 4 .. 385 Calvert Street Site -Development 389 4 .. 385 (Bairnsdale) (Bairnsdale) Depot Building Development (Bairnsdale) 40 10 30 .. Depot Building Development (Bairnsdale) 40 10 30 .. Disfinection Improvement System 70 35 35 .. Disfinection Improvement System 70 35 35 .. -Development (Bairnsdale) -Development (Bairnsdale) Regional Water Treatment Plant 9 925 77 .. 9 848 Regional Water Treatment Plant 9 925 77 .. 9 848 -Construction (Bairnsdale) -Construction (Bairnsdale) Water Mains -Replacement (Bairnsdale) 108 40 68 .. Water Mains -Replacement (Bairnsdale) 108 40 68 .. Sewerage Scheme -Construction 2 433 2 182 251 .. Sewerage Scheme -Construction 2 433 2 182 251 .. (Bruthen) (Bruthen) Sewerage Scheme -Construction (Cann 2 200 101 2 099 .. Sewerage Scheme -Construction (Cann 2 200 101 2 099 .. River) River)

90 Regional Urban Water Public Sector Asset Investment Program 2003-04 90 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Supply -High Level Pump System 500 30 470 .. Water Supply -High Level Pump System 500 30 470 .. Water Supply -High Level Pump System 500 30 470 .. -Augmentation (Eagle Point) -Augmentation (Eagle Point) -Augmentation (Eagle Point) Bruce's Track Irrigation System -Purchase 103 50 53 .. Bruce's Track Irrigation System -Purchase 103 50 53 .. Bruce's Track Irrigation System -Purchase 103 50 53 .. (Lakes Entrance) (Lakes Entrance) (Lakes Entrance) New VSD Pump Station including 300 30 270 .. New VSD Pump Station including 300 30 270 .. New VSD Pump Station including 300 30 270 .. Disinfection Plant -Development (Lakes Disinfection Plant -Development (Lakes Disinfection Plant -Development (Lakes Entrance) Entrance) Entrance) Sewerage Treatment Plant (Bruces Track) 1 300 20 100 1 180 Sewerage Treatment Plant (Bruces Track) 1 300 20 100 1 180 Sewerage Treatment Plant (Bruces Track) 1 300 20 100 1 180 -Land -Purchase (Lakes Entrance) -Land -Purchase (Lakes Entrance) -Land -Purchase (Lakes Entrance) Water Supply Bore And Pumps 166 121 45 .. Water Supply Bore And Pumps 166 121 45 .. Water Supply Bore And Pumps 166 121 45 .. -Construction (Mallacoota) -Construction (Mallacoota) -Construction (Mallacoota) Sewage Effluent Disposal -Reynolds 152 52 .. 100 Sewage Effluent Disposal -Reynolds 152 52 .. 100 Sewage Effluent Disposal -Reynolds 152 52 .. 100 Road -Installation (Metung) Road -Installation (Metung) Road -Installation (Metung) Tambo Bluff Sewerage Scheme 3 090 35 100 2 955 Tambo Bluff Sewerage Scheme 3 090 35 100 2 955 Tambo Bluff Sewerage Scheme 3 090 35 100 2 955 -Development (Metung) -Development (Metung) -Development (Metung) Water Supply -High Level -Augmentation 441 31 30 380 Water Supply -High Level -Augmentation 441 31 30 380 Water Supply -High Level -Augmentation 441 31 30 380 (Metung) (Metung) (Metung) Water Treatment Plant -Augmentation 149 112 .. 37 Water Treatment Plant -Augmentation 149 112 .. 37 Water Treatment Plant -Augmentation 149 112 .. 37 (Omeo) (Omeo) (Omeo) Irrigation System -Upgrade (Orbost) 105 20 85 .. Irrigation System -Upgrade (Orbost) 105 20 85 .. Irrigation System -Upgrade (Orbost) 105 20 85 .. Sewer Infiltration -Remediation 1 000 200 200 600 Sewer Infiltration -Remediation 1 000 200 200 600 Sewer Infiltration -Remediation 1 000 200 200 600 (Paynesville) (Paynesville) (Paynesville) Water Supply Basin -Cover and Fence 111 4 .. 107 Water Supply Basin -Cover and Fence 111 4 .. 107 Water Supply Basin -Cover and Fence 111 4 .. 107 -Construction (Swifts Creek) -Construction (Swifts Creek) -Construction (Swifts Creek) Tambo Bluff Water Retic System 500 35 465 .. Tambo Bluff Water Retic System 500 35 465 .. Tambo Bluff Water Retic System 500 35 465 .. -Development (Tambo Bluff) -Development (Tambo Bluff) -Development (Tambo Bluff) Plant, Vehicles And Equipment 6 100 2 256 1 000 2 844 Plant, Vehicles And Equipment 6 100 2 256 1 000 2 844 Plant, Vehicles And Equipment 6 100 2 256 1 000 2 844 -Replacement (Various) -Replacement (Various) -Replacement (Various) Glenelg Region Water Authority Glenelg Region Water Authority Glenelg Region Water Authority Water Reticulation -Construction 600 15 585 .. Water Reticulation -Construction 600 15 585 .. Water Reticulation -Construction 600 15 585 .. (Branxholme) (Branxholme) (Branxholme) Clear Water Storage -Construction 713 13 .. 700 Clear Water Storage -Construction 713 13 .. 700 Clear Water Storage -Construction 713 13 .. 700 (Casterton) (Casterton) (Casterton) Meter Install -Construction (Casterton) 16 11 5 .. Meter Install -Construction (Casterton) 16 11 5 .. Meter Install -Construction (Casterton) 16 11 5 .. Outfall Sewer Remedial Works 80 50 30 .. Outfall Sewer Remedial Works 80 50 30 .. Outfall Sewer Remedial Works 80 50 30 .. -Construction (Casterton) -Construction (Casterton) -Construction (Casterton) Tullich Water Supply Bore -Western Zone 1 205 30 460 715 Tullich Water Supply Bore -Western Zone 1 205 30 460 715 Tullich Water Supply Bore -Western Zone 1 205 30 460 715 -Construction (Casterton) -Construction (Casterton) -Construction (Casterton) Water Mains -Replacement (Casterton) 734 74 50 610 Water Mains -Replacement (Casterton) 734 74 50 610 Water Mains -Replacement (Casterton) 734 74 50 610 Water Transfer System -Construction 600 210 240 150 Water Transfer System -Construction 600 210 240 150 Water Transfer System -Construction 600 210 240 150 (Casterton) (Casterton) (Casterton) Water Transfer System -Western Zone 229 4 .. 225 Water Transfer System -Western Zone 229 4 .. 225 Water Transfer System -Western Zone 229 4 .. 225 -Construction (Casterton) -Construction (Casterton) -Construction (Casterton) Water Treatment Plant -Western Zone 2 569 69 75 2 425 Water Treatment Plant -Western Zone 2 569 69 75 2 425 Water Treatment Plant -Western Zone 2 569 69 75 2 425 -Construction (Casterton) -Construction (Casterton) -Construction (Casterton) Transfer System -Construction (Coleraine) 3 155 5 .. 3 150 Transfer System -Construction (Coleraine) 3 155 5 .. 3 150 Transfer System -Construction (Coleraine) 3 155 5 .. 3 150 Water Mains -Replacement (Coleraine) 480 69 60 351 Water Mains -Replacement (Coleraine) 480 69 60 351 Water Mains -Replacement (Coleraine) 480 69 60 351

Public Sector Asset Investment Program 2003-04 Regional Urban Water 91 Public Sector Asset Investment Program 2003-04 Regional Urban Water 91 Public Sector Asset Investment Program 2003-04 Regional Urban Water 91

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sewerage Scheme -Construction 3 572 3 447 25 100 Sewerage Scheme -Construction 3 572 3 447 25 100 (Dunkeld) (Dunkeld) Advanced Trees -Construction (Hamilton) 55 10 5 40 Advanced Trees -Construction (Hamilton) 55 10 5 40 Feeder Main Duplication -Construction 1 354 54 .. 1 300 Feeder Main Duplication -Construction 1 354 54 .. 1 300 (Hamilton) (Hamilton) Meter Install -Construction (Hamilton) 14 4 10 .. Meter Install -Construction (Hamilton) 14 4 10 .. Sewerage Treatment Plant -Irrigation 726 646 80 .. Sewerage Treatment Plant -Irrigation 726 646 80 .. -Construction (Hamilton) -Construction (Hamilton) Sewerage Treatment Plant -Tertiary 1 540 40 150 1 350 Sewerage Treatment Plant -Tertiary 1 540 40 150 1 350 Treatment -Construction (Hamilton) Treatment -Construction (Hamilton) Treatment Plant Improvements 170 50 120 .. Treatment Plant Improvements 170 50 120 .. -Construction (Hamilton) -Construction (Hamilton) Water Mains -Replacement (Hamilton) 1 263 120 63 1 080 Water Mains -Replacement (Hamilton) 1 263 120 63 1 080 Watering System -Construction (Hamilton) 21 16 5 .. Watering System -Construction (Hamilton) 21 16 5 .. Water Treatment Stage 2 -Construction 327 2 .. 325 Water Treatment Stage 2 -Construction 327 2 .. 325 (Macarthur) (Macarthur) Water Transfer System -Construction 1 200 25 1 175 .. Water Transfer System -Construction 1 200 25 1 175 .. (Merino) (Merino) Reitculation Improvements -Construction 27 27 .. .. Reitculation Improvements -Construction 27 27 .. .. (Tarrington) (Tarrington) Buildings -Construction (Various) 678 15 663 .. Buildings -Construction (Various) 678 15 663 .. Vehicles -Purchase (Various) 3 873 380 332 3 161 Vehicles -Purchase (Various) 3 873 380 332 3 161 Goulburn Valley Region Water Authority Goulburn Valley Region Water Authority Water Treatment Plant -Improvement 1 270 40 100 1 130 Water Treatment Plant -Improvement 1 270 40 100 1 130 (Alexandra) (Alexandra) Sewerage Scheme -Construction (Avenel) 3 280 3 160 .. 120 Sewerage Scheme -Construction (Avenel) 3 280 3 160 .. 120 Pump Access and Electrics -Upgrade 90 10 80 .. Pump Access and Electrics -Upgrade 90 10 80 .. (Bonnie Doon) (Bonnie Doon) Goulburn River to Broadford Pipeline 6 450 100 200 6 150 Goulburn River to Broadford Pipeline 6 450 100 200 6 150 -Construction (Broadford) -Construction (Broadford) WMF and Discharge -Improvement 1 240 820 420 .. WMF and Discharge -Improvement 1 240 820 420 .. (Broadford) (Broadford) Raw Water Offtake -Replacement 200 100 100 .. Raw Water Offtake -Replacement 200 100 100 .. (Cobram) (Cobram) Strathmerton Water Pipeline -Construction 3 450 180 3 270 .. Strathmerton Water Pipeline -Construction 3 450 180 3 270 .. (Cobram) (Cobram) WMF -Improvement (Cobram) 1 545 750 795 .. WMF -Improvement (Cobram) 1 545 750 795 .. Water Treatment Plant Augmentation 4 300 200 3 400 700 Water Treatment Plant Augmentation 4 300 200 3 400 700 Stage 1 -Augmentation (Cobram) Stage 1 -Augmentation (Cobram) Water Treatment Plant Clear Water 1 750 50 1 500 200 Water Treatment Plant Clear Water 1 750 50 1 500 200 Storage -Augmentation (Cobram) Storage -Augmentation (Cobram) Water Treatment Plant Raw Water Pump 250 50 100 100 Water Treatment Plant Raw Water Pump 250 50 100 100 Station and Pipeline -Augmentation Station and Pipeline -Augmentation (Cobram) (Cobram) Hollowback to Kilmore Water Treatment 1 000 40 960 .. Hollowback to Kilmore Water Treatment 1 000 40 960 .. Plant Pipeline Augmentation -Growth Plant Pipeline Augmentation -Growth (Kilmore) (Kilmore)

92 Regional Urban Water Public Sector Asset Investment Program 2003-04 92 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sunday Creek to Hollowback Pump 1 000 80 920 .. Sunday Creek to Hollowback Pump 1 000 80 920 .. Sunday Creek to Hollowback Pump 1 000 80 920 .. Station -Growth (Kilmore) Station -Growth (Kilmore) Station -Growth (Kilmore) Wandong to Kilmore Pipeline 2 245 40 60 2 145 Wandong to Kilmore Pipeline 2 245 40 60 2 145 Wandong to Kilmore Pipeline 2 245 40 60 2 145 Augmentation -Growth (Kilmore) Augmentation -Growth (Kilmore) Augmentation -Growth (Kilmore) WMF Stage 1 Irrigation -Improvement 720 630 90 .. WMF Stage 1 Irrigation -Improvement 720 630 90 .. WMF Stage 1 Irrigation -Improvement 720 630 90 .. (Kilmore) (Kilmore) (Kilmore) WMF Winter Storage, Land Purchase and 4 190 3 395 795 .. WMF Winter Storage, Land Purchase and 4 190 3 395 795 .. WMF Winter Storage, Land Purchase and 4 190 3 395 795 .. Associated Works -Improvement Associated Works -Improvement Associated Works -Improvement (Kilmore) (Kilmore) (Kilmore) Water Treatment Plant to Junction 195 30 165 .. Water Treatment Plant to Junction 195 30 165 .. Water Treatment Plant to Junction 195 30 165 .. Pipeline -Growth (Kilmore) Pipeline -Growth (Kilmore) Pipeline -Growth (Kilmore) Raw Water Storage Augmentation 200 50 150 .. Raw Water Storage Augmentation 200 50 150 .. Raw Water Storage Augmentation 200 50 150 .. -Improvement (Kyabram ) -Improvement (Kyabram ) -Improvement (Kyabram ) WMF and Discharge -Improvement 1 865 1 500 365 .. WMF and Discharge -Improvement 1 865 1 500 365 .. WMF and Discharge -Improvement 1 865 1 500 365 .. (Mansfield) (Mansfield) (Mansfield) Distribution Works Main Supply 365 40 .. 325 Distribution Works Main Supply 365 40 .. 325 Distribution Works Main Supply 365 40 .. 325 -Replacement (Marysville ) -Replacement (Marysville ) -Replacement (Marysville ) WMF Augmentation -Augmentation 1 420 50 400 970 WMF Augmentation -Augmentation 1 420 50 400 970 WMF Augmentation -Augmentation 1 420 50 400 970 (Marysville ) (Marysville ) (Marysville ) Water Treatment Plant -Improvement 135 75 60 .. Water Treatment Plant -Improvement 135 75 60 .. Water Treatment Plant -Improvement 135 75 60 .. (Nagambie) (Nagambie) (Nagambie) WMF -Improvement (Nathalia) 1 255 255 1 000 .. WMF -Improvement (Nathalia) 1 255 255 1 000 .. WMF -Improvement (Nathalia) 1 255 255 1 000 .. Water Treatment Plant -Upgrade 460 60 400 .. Water Treatment Plant -Upgrade 460 60 400 .. Water Treatment Plant -Upgrade 460 60 400 .. (Nathalia) (Nathalia) (Nathalia) Sewerage Scheme -Construction 5 450 5 220 .. 230 Sewerage Scheme -Construction 5 450 5 220 .. 230 Sewerage Scheme -Construction 5 450 5 220 .. 230 (Rushworth) (Rushworth) (Rushworth) Clear Water Storage Roof -Improvement 310 30 280 .. Clear Water Storage Roof -Improvement 310 30 280 .. Clear Water Storage Roof -Improvement 310 30 280 .. (Seymour) (Seymour) (Seymour) Sewage Pump Station -Upgrade 540 10 530 .. Sewage Pump Station -Upgrade 540 10 530 .. Sewage Pump Station -Upgrade 540 10 530 .. (Shepparton ) (Shepparton ) (Shepparton ) Biosolids Management Facility 2 630 20 250 2 360 Biosolids Management Facility 2 630 20 250 2 360 Biosolids Management Facility 2 630 20 250 2 360 -Improvement (Shepparton ) -Improvement (Shepparton ) -Improvement (Shepparton ) Boulevard Main -Construction 870 40 .. 830 Boulevard Main -Construction 870 40 .. 830 Boulevard Main -Construction 870 40 .. 830 (Shepparton ) (Shepparton ) (Shepparton ) Kialla Lakes Treated Water Storage, 2 840 50 480 2 310 Kialla Lakes Treated Water Storage, 2 840 50 480 2 310 Kialla Lakes Treated Water Storage, 2 840 50 480 2 310 Pumps & Associated Works -Growth Pumps & Associated Works -Growth Pumps & Associated Works -Growth (Shepparton) (Shepparton) (Shepparton) Land Development and Tertiary 5 855 5 665 190 .. Land Development and Tertiary 5 855 5 665 190 .. Land Development and Tertiary 5 855 5 665 190 .. Treatment -Improvement (Shepparton) Treatment -Improvement (Shepparton) Treatment -Improvement (Shepparton) Maculata Drive Treated Water Storage, 2 840 40 100 2 700 Maculata Drive Treated Water Storage, 2 840 40 100 2 700 Maculata Drive Treated Water Storage, 2 840 40 100 2 700 Pumps & Associated Works -Growth Pumps & Associated Works -Growth Pumps & Associated Works -Growth (Shepparton ) (Shepparton ) (Shepparton ) McGill Street Pump Station -Upgrade 565 10 .. 555 McGill Street Pump Station -Upgrade 565 10 .. 555 McGill Street Pump Station -Upgrade 565 10 .. 555 (Shepparton ) (Shepparton ) (Shepparton ) Outfall Rising Main to Daldy Rd 4 275 105 .. 4 170 Outfall Rising Main to Daldy Rd 4 275 105 .. 4 170 Outfall Rising Main to Daldy Rd 4 275 105 .. 4 170 -Replacement (Shepparton) -Replacement (Shepparton) -Replacement (Shepparton) Water Treatment Plant Pumped Sludge 1 900 75 1 825 .. Water Treatment Plant Pumped Sludge 1 900 75 1 825 .. Water Treatment Plant Pumped Sludge 1 900 75 1 825 .. Outfall -Improvement (Shepparton ) Outfall -Improvement (Shepparton ) Outfall -Improvement (Shepparton )

Public Sector Asset Investment Program 2003-04 Regional Urban Water 93 Public Sector Asset Investment Program 2003-04 Regional Urban Water 93 Public Sector Asset Investment Program 2003-04 Regional Urban Water 93

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 WMF HRAL and Aeration -Improvement 16 890 8 000 7 890 1 000 WMF HRAL and Aeration -Improvement 16 890 8 000 7 890 1 000 (Shepparton ) (Shepparton ) Sewerage Scheme -Construction 3 360 3 210 .. 150 Sewerage Scheme -Construction 3 360 3 210 .. 150 (Stanhope) (Stanhope) Raw Water Storage -Growth (Tatura ) 1 825 590 55 1 180 Raw Water Storage -Growth (Tatura ) 1 825 590 55 1 180 Backwash Recovery System 220 25 .. 195 Backwash Recovery System 220 25 .. 195 -Improvement (Tongala) -Improvement (Tongala) WMF Augmentation -Improvement 2 140 90 550 1 500 WMF Augmentation -Improvement 2 140 90 550 1 500 (Tongala) (Tongala) Water Treatment Plant -Construction 1 300 50 .. 1 250 Water Treatment Plant -Construction 1 300 50 .. 1 250 (Upper Delatite) (Upper Delatite) Chlorine Monitoring -Improvement 315 250 65 .. Chlorine Monitoring -Improvement 315 250 65 .. (Various) (Various) Installation of Bulk Supply Flow Metering 280 110 65 105 Installation of Bulk Supply Flow Metering 280 110 65 105 -Improvement (Various) -Improvement (Various) Water Meters -Replacement (Various) 2 549 519 230 1 800 Water Meters -Replacement (Various) 2 549 519 230 1 800 Asset Acquisitions -Replacement 23 898 2 737 3 161 18 000 Asset Acquisitions -Replacement 23 898 2 737 3 161 18 000 (Various) (Various) Contingency Item -Sewer -Contingency 2 900 400 250 2 250 Contingency Item -Sewer -Contingency 2 900 400 250 2 250 (Various) (Various) Contingency Item -Water -Contingency 1 800 300 150 1 350 Contingency Item -Water -Contingency 1 800 300 150 1 350 (Various) (Various) Hydraulic Modelling -Major Systems 775 410 230 135 Hydraulic Modelling -Major Systems 775 410 230 135 -Growth (Various) -Growth (Various) Landowner Reticulation Works -Sewer 23 300 3 300 2 000 18 000 Landowner Reticulation Works -Sewer 23 300 3 300 2 000 18 000 -Growth (Various) -Growth (Various) Landowner Reticulation Works -Water 14 521 2 521 1 200 10 800 Landowner Reticulation Works -Water 14 521 2 521 1 200 10 800 -Growth (Various) -Growth (Various) Sewers -Relining/Replacement (Various) 6 222 982 500 4 740 Sewers -Relining/Replacement (Various) 6 222 982 500 4 740 Southern Region -SCADA -Improvement 2 190 1 800 390 .. Southern Region -SCADA -Improvement 2 190 1 800 390 .. (Various) (Various) Water Mains Replacement -Replacement 6 051 811 500 4 740 Water Mains Replacement -Replacement 6 051 811 500 4 740 (Various) (Various) Honeysuckle Creek Reservoir 380 40 340 .. Honeysuckle Creek Reservoir 380 40 340 .. Decommissioning -Decommissioning Decommissioning -Decommissioning (Violet Town) (Violet Town) Sewerage Scheme -Construction (Violet 3 350 3 100 .. 250 Sewerage Scheme -Construction (Violet 3 350 3 100 .. 250 Town) Town) South Mountain Road to Wallan Water 1 005 940 65 .. South Mountain Road to Wallan Water 1 005 940 65 .. Main -Replacement (Wallan) Main -Replacement (Wallan) Stage 1 Winter Storage, Land Purchase 4 120 250 1 200 2 670 Stage 1 Winter Storage, Land Purchase 4 120 250 1 200 2 670 and Irrigation -Improvement (Wallan) and Irrigation -Improvement (Wallan) Supply Main Augmentation -Improvement 515 40 475 .. Supply Main Augmentation -Improvement 515 40 475 .. (Wallan) (Wallan) Transfer Pumps and Pipeline 980 10 400 570 Transfer Pumps and Pipeline 980 10 400 570 -Improvement (Wallan) -Improvement (Wallan) SAIF-T Replacement Program 3 500 400 450 2 650 SAIF-T Replacement Program 3 500 400 450 2 650 -Replacement (Wandong) -Replacement (Wandong)

94 Regional Urban Water Public Sector Asset Investment Program 2003-04 94 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Grampians Region Water Authority Grampians Region Water Authority Grampians Region Water Authority Water Disinfection Plant -Construction 136 14 122 .. Water Disinfection Plant -Construction 136 14 122 .. Water Disinfection Plant -Construction 136 14 122 .. (Apsley) (Apsley) (Apsley) Sewerage Treatment Plant -Effluent 1 356 1 356 .. .. Sewerage Treatment Plant -Effluent 1 356 1 356 .. .. Sewerage Treatment Plant -Effluent 1 356 1 356 .. .. Storage and Irrigation -Upgrade (Ararat) Storage and Irrigation -Upgrade (Ararat) Storage and Irrigation -Upgrade (Ararat) Mount Cole/Langhi Ghiran Water Supply 1 231 94 .. 1 137 Mount Cole/Langhi Ghiran Water Supply 1 231 94 .. 1 137 Mount Cole/Langhi Ghiran Water Supply 1 231 94 .. 1 137 -Assessment/Remediation (Ararat) -Assessment/Remediation (Ararat) -Assessment/Remediation (Ararat) Olivers Gully Water Pump Station and 191 191 .. .. Olivers Gully Water Pump Station and 191 191 .. .. Olivers Gully Water Pump Station and 191 191 .. .. Pipeline -Upgrade (Ararat) Pipeline -Upgrade (Ararat) Pipeline -Upgrade (Ararat) Water Disinfection Plant -Construction 105 3 .. 102 Water Disinfection Plant -Construction 105 3 .. 102 Water Disinfection Plant -Construction 105 3 .. 102 (Berriwillock) (Berriwillock) (Berriwillock) Water Disinfection -Construction 125 8 .. 117 Water Disinfection -Construction 125 8 .. 117 Water Disinfection -Construction 125 8 .. 117 (Buangor) (Buangor) (Buangor) Water Disinfection Plant -Construction 124 17 .. 107 Water Disinfection Plant -Construction 124 17 .. 107 Water Disinfection Plant -Construction 124 17 .. 107 (Culgoa) (Culgoa) (Culgoa) Sewerage Treatment Plant -Effluent 541 16 36 489 Sewerage Treatment Plant -Effluent 541 16 36 489 Sewerage Treatment Plant -Effluent 541 16 36 489 Storage and Land Disposal -Upgrade Storage and Land Disposal -Upgrade Storage and Land Disposal -Upgrade (Dimboola) (Dimboola) (Dimboola) Sewerage Treatment Plant -Effluent 590 590 .. .. Sewerage Treatment Plant -Effluent 590 590 .. .. Sewerage Treatment Plant -Effluent 590 590 .. .. Storage and Land Disposal Construction Storage and Land Disposal Construction Storage and Land Disposal Construction (Edenhope) (Edenhope) (Edenhope) Water Disinfection Plant -Construction 193 3 190 .. Water Disinfection Plant -Construction 193 3 190 .. Water Disinfection Plant -Construction 193 3 190 .. (Goroke) (Goroke) (Goroke) Water Supply Headworks Capacity 360 360 .. .. Water Supply Headworks Capacity 360 360 .. .. Water Supply Headworks Capacity 360 360 .. .. -Augmentation (Halls Gap) -Augmentation (Halls Gap) -Augmentation (Halls Gap) Sewerage Treatment Plant -Effluent 879 14 .. 865 Sewerage Treatment Plant -Effluent 879 14 .. 865 Sewerage Treatment Plant -Effluent 879 14 .. 865 Storage and Land Disposal -Construction Storage and Land Disposal -Construction Storage and Land Disposal -Construction (Halls Gap) (Halls Gap) (Halls Gap) Water Supply -Disinfection (Harrow) 169 5 .. 164 Water Supply -Disinfection (Harrow) 169 5 .. 164 Water Supply -Disinfection (Harrow) 169 5 .. 164 Sewerage Scheme -Construction 3 278 2 238 1 040 .. Sewerage Scheme -Construction 3 278 2 238 1 040 .. Sewerage Scheme -Construction 3 278 2 238 1 040 .. (Hopetoun) (Hopetoun) (Hopetoun) Water Pump Station -Morson -Upgrade 389 389 .. .. Water Pump Station -Morson -Upgrade 389 389 .. .. Water Pump Station -Morson -Upgrade 389 389 .. .. (Horsham) (Horsham) (Horsham) Water Distribution Main -Bennett Rd And 330 330 .. .. Water Distribution Main -Bennett Rd And 330 330 .. .. Water Distribution Main -Bennett Rd And 330 330 .. .. Natimuk Rd -Replacement (Horsham) Natimuk Rd -Replacement (Horsham) Natimuk Rd -Replacement (Horsham) Sewer Reticulation -Stawell Rd And 1 369 1 1 1 367 Sewer Reticulation -Stawell Rd And 1 369 1 1 1 367 Sewer Reticulation -Stawell Rd And 1 369 1 1 1 367 Haven -Construction (Horsham) Haven -Construction (Horsham) Haven -Construction (Horsham) Water Disinfection Plant -Construction 184 12 172 .. Water Disinfection Plant -Construction 184 12 172 .. Water Disinfection Plant -Construction 184 12 172 .. (Jeparit) (Jeparit) (Jeparit) Water Treatment Plant -Construction 2 668 6 .. 2 662 Water Treatment Plant -Construction 2 668 6 .. 2 662 Water Treatment Plant -Construction 2 668 6 .. 2 662 (Kaniva) (Kaniva) (Kaniva) Sewerage Scheme -Construction (Minyip) 2 744 2 744 .. .. Sewerage Scheme -Construction (Minyip) 2 744 2 744 .. .. Sewerage Scheme -Construction (Minyip) 2 744 2 744 .. .. Sewerage Treatment Plant -Effluent 781 781 .. .. Sewerage Treatment Plant -Effluent 781 781 .. .. Sewerage Treatment Plant -Effluent 781 781 .. .. Storage And Land Disposal -Upgrade Storage And Land Disposal -Upgrade Storage And Land Disposal -Upgrade (Nhill) (Nhill) (Nhill) Water Supply Desalination Pilot Plant 315 212 103 .. Water Supply Desalination Pilot Plant 315 212 103 .. Water Supply Desalination Pilot Plant 315 212 103 .. -Construction (Nhill) -Construction (Nhill) -Construction (Nhill)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 95 Public Sector Asset Investment Program 2003-04 Regional Urban Water 95 Public Sector Asset Investment Program 2003-04 Regional Urban Water 95

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sewerage Treatment Plant -Irrigation 500 3 164 333 Sewerage Treatment Plant -Irrigation 500 3 164 333 -Construction (Nhill) -Construction (Nhill) Sewerage Scheme -Construction 4 664 4 664 .. .. Sewerage Scheme -Construction 4 664 4 664 .. .. (Ouyen) (Ouyen) Water Supply Pump From Storage No 2 118 117 .. 1 Water Supply Pump From Storage No 2 118 117 .. 1 -Upgrade (Quambatook) -Upgrade (Quambatook) Sewage Effluent Reuse -Construction (St 1 518 1 518 .. .. Sewage Effluent Reuse -Construction (St 1 518 1 518 .. .. Arnaud) Arnaud) Water Storages 4 and 6 -Relocation 145 34 .. 111 Water Storages 4 and 6 -Relocation 145 34 .. 111 (Stawell) (Stawell) Sewage Effluent Reuse -Wineries 348 15 55 278 Sewage Effluent Reuse -Wineries 348 15 55 278 -Construction (Stawell) -Construction (Stawell) Water Trunk Main -Main and Seaby 311 311 .. .. Water Trunk Main -Main and Seaby 311 311 .. .. Streets -Replacement (Stawell) Streets -Replacement (Stawell) Sewage Pump Station -Upgrade (Stawell) 1 221 313 908 .. Sewage Pump Station -Upgrade (Stawell) 1 221 313 908 .. Sewerage Treatment Plant -Effluent 336 143 193 .. Sewerage Treatment Plant -Effluent 336 143 193 .. Storage -Remediation (Stawell) Storage -Remediation (Stawell) Water Storage -Upgrade (Underbool) 314 19 44 251 Water Storage -Upgrade (Underbool) 314 19 44 251 Water Mains -Replacement (Various) 186 186 .. .. Water Mains -Replacement (Various) 186 186 .. .. Sundry Equipment -Replacement 492 42 109 341 Sundry Equipment -Replacement 492 42 109 341 (Various) (Various) Motor Vehicles -Replacement (Various) 16 907 6 156 1 166 9 585 Motor Vehicles -Replacement (Various) 16 907 6 156 1 166 9 585 Insurance Contract Works -Purchase 460 90 44 326 Insurance Contract Works -Purchase 460 90 44 326 (Various) (Various) Plant And Machinery -Purchase (Various) 1 449 445 109 895 Plant And Machinery -Purchase (Various) 1 449 445 109 895 Computer Hardware -Purchase (Various) 1 519 596 109 814 Computer Hardware -Purchase (Various) 1 519 596 109 814 Computer Software -Purchase (Various) 816 354 55 407 Computer Software -Purchase (Various) 816 354 55 407 Office Equipment -Purchase (Various) 356 172 22 162 Office Equipment -Purchase (Various) 356 172 22 162 Asset Management Systems -Purchase 697 697 .. .. Asset Management Systems -Purchase 697 697 .. .. (Various) (Various) Water Meters -Installation (Various) 2 547 1 072 175 1 300 Water Meters -Installation (Various) 2 547 1 072 175 1 300 Mapping Systems -Purchase (Various) 148 5 142 1 Mapping Systems -Purchase (Various) 148 5 142 1 Lake Fyans Water Pump Station 200 200 .. .. Lake Fyans Water Pump Station 200 200 .. .. -Switchboard -Replacement (Various) -Switchboard -Replacement (Various) Telemetry -Alarms -Installation (Various) 610 610 .. .. Telemetry -Alarms -Installation (Various) 610 610 .. .. OH&S Review and Priority Works 977 143 88 746 OH&S Review and Priority Works 977 143 88 746 -Construction (Various) -Construction (Various) Water Mains -Northern District 137 15 122 .. Water Mains -Northern District 137 15 122 .. -Replacement (Various) -Replacement (Various) Wet Weather Storages -Construction 573 573 .. .. Wet Weather Storages -Construction 573 573 .. .. (Various) (Various) Water Mains -Southern District 229 229 .. .. Water Mains -Southern District 229 229 .. .. -Construction (Various) -Construction (Various) Future Projects -Investigation (Various) 1 083 100 103 880 Future Projects -Investigation (Various) 1 083 100 103 880 Telemetry Electricals -Upgrade (Various) 163 163 .. .. Telemetry Electricals -Upgrade (Various) 163 163 .. .. Water Treatment Plant -Construction 2 669 2 669 .. .. Water Treatment Plant -Construction 2 669 2 669 .. .. (Warracknabeal) (Warracknabeal) Disinfection -Construction (Watchem) 146 146 .. .. Disinfection -Construction (Watchem) 146 146 .. .. 96 Regional Urban Water Public Sector Asset Investment Program 2003-04 96 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Wickliffe Disinfection -Construction 119 3 .. 116 Wickliffe Disinfection -Construction 119 3 .. 116 Wickliffe Disinfection -Construction 119 3 .. 116 (Wickliffe) (Wickliffe) (Wickliffe) Water Treatment Plant -Construction 2 747 495 2 251 1 Water Treatment Plant -Construction 2 747 495 2 251 1 Water Treatment Plant -Construction 2 747 495 2 251 1 (Willaura) (Willaura) (Willaura) Sewerage Treatment Plant -Effluent 524 28 49 447 Sewerage Treatment Plant -Effluent 524 28 49 447 Sewerage Treatment Plant -Effluent 524 28 49 447 Storage and Land Disposal -Construction Storage and Land Disposal -Construction Storage and Land Disposal -Construction (Willaura) (Willaura) (Willaura) Water Supply Telemetry (Including 204 204 .. .. Water Supply Telemetry (Including 204 204 .. .. Water Supply Telemetry (Including 204 204 .. .. Moyston) -Construction (Willaura) Moyston) -Construction (Willaura) Moyston) -Construction (Willaura) Water Storage Basin, Valves and 499 499 .. .. Water Storage Basin, Valves and 499 499 .. .. Water Storage Basin, Valves and 499 499 .. .. Beaching -Upgrade (Willaura) Beaching -Upgrade (Willaura) Beaching -Upgrade (Willaura) Water Pipeline to Mount Pleasant 640 640 .. .. Water Pipeline to Mount Pleasant 640 640 .. .. Water Pipeline to Mount Pleasant 640 640 .. .. -Construction (Willaura) -Construction (Willaura) -Construction (Willaura) Lower Murray Region Water Authority Lower Murray Region Water Authority Lower Murray Region Water Authority Sewerage Scheme -Construction (Lake 3 419 1 669 1 750 .. Sewerage Scheme -Construction (Lake 3 419 1 669 1 750 .. Sewerage Scheme -Construction (Lake 3 419 1 669 1 750 .. Boga) Boga) Boga) Pump Stations -Construction (Mildura) 2 465 15 2 450 .. Pump Stations -Construction (Mildura) 2 465 15 2 450 .. Pump Stations -Construction (Mildura) 2 465 15 2 450 .. Pump Stations -Construction (Mildura) 2 465 15 2 450 .. Pump Stations -Construction (Mildura) 2 465 15 2 450 .. Pump Stations -Construction (Mildura) 2 465 15 2 450 .. Sewerage Catchment -Development 3 247 147 1 600 1 500 Sewerage Catchment -Development 3 247 147 1 600 1 500 Sewerage Catchment -Development 3 247 147 1 600 1 500 (Mildura) (Mildura) (Mildura) Water Supply Trunk Mains -Construction 4 050 237 3 813 Water Supply Trunk Mains -Construction 4 050 237 3 813 Water Supply Trunk Mains -Construction 4 050 237 3 813 (Mildura) (Mildura) (Mildura) Water Supply Trunk Mains -Construction 4 050 237 3 813 Water Supply Trunk Mains -Construction 4 050 237 3 813 Water Supply Trunk Mains -Construction 4 050 237 3 813 (Mildura) (Mildura) (Mildura) Water Treatment Plant Clarifiers -Upgrade 595 175 420 .. Water Treatment Plant Clarifiers -Upgrade 595 175 420 .. Water Treatment Plant Clarifiers -Upgrade 595 175 420 .. (Mildura) (Mildura) (Mildura) Water Treatment Plant Clarifiers -Upgrade 595 175 420 .. Water Treatment Plant Clarifiers -Upgrade 595 175 420 .. Water Treatment Plant Clarifiers -Upgrade 595 175 420 .. (Mildura) (Mildura) (Mildura) Water Treatment Plant -Construction 7 261 261 7 000 .. Water Treatment Plant -Construction 7 261 261 7 000 .. Water Treatment Plant -Construction 7 261 261 7 000 .. (Mildura) (Mildura) (Mildura) Sewer Pump Stations -Upgrade (Swan 384 21 188 175 Sewer Pump Stations -Upgrade (Swan 384 21 188 175 Sewer Pump Stations -Upgrade (Swan 384 21 188 175 Hill) Hill) Hill) Sewer Pump Stations -Upgrade (Swan 384 21 188 175 Sewer Pump Stations -Upgrade (Swan 384 21 188 175 Sewer Pump Stations -Upgrade (Swan 384 21 188 175 Hill) Hill) Hill) Sewerage Treatment Plant Aerators 121 11 110 .. Sewerage Treatment Plant Aerators 121 11 110 .. Sewerage Treatment Plant Aerators 121 11 110 .. -Construction (Swan Hill) -Construction (Swan Hill) -Construction (Swan Hill) Plant And Equipment -Purchase 4 457 2 857 400 1 200 Plant And Equipment -Purchase 4 457 2 857 400 1 200 Plant And Equipment -Purchase 4 457 2 857 400 1 200 (Various) (Various) (Various) Sewerage Minor Works -Construction 301 99 95 107 Sewerage Minor Works -Construction 301 99 95 107 Sewerage Minor Works -Construction 301 99 95 107 (Various) (Various) (Various) Sewerage Minor Works -Replacement 953 211 176 566 Sewerage Minor Works -Replacement 953 211 176 566 Sewerage Minor Works -Replacement 953 211 176 566 (Various) (Various) (Various) Sewerage Infrastructure -Rehabilitation 4 015 365 615 3 035 Sewerage Infrastructure -Rehabilitation 4 015 365 615 3 035 Sewerage Infrastructure -Rehabilitation 4 015 365 615 3 035 (Various) (Various) (Various) Sewerage Works -Development (Various) 410 168 100 142 Sewerage Works -Development (Various) 410 168 100 142 Sewerage Works -Development (Various) 410 168 100 142 Water Meters -Replacement (Various) 380 155 55 170 Water Meters -Replacement (Various) 380 155 55 170 Water Meters -Replacement (Various) 380 155 55 170 Water Supply Minor Works -Construction 489 178 111 200 Water Supply Minor Works -Construction 489 178 111 200 Water Supply Minor Works -Construction 489 178 111 200 (Various) (Various) (Various) Public Sector Asset Investment Program 2003-04 Regional Urban Water 97 Public Sector Asset Investment Program 2003-04 Regional Urban Water 97 Public Sector Asset Investment Program 2003-04 Regional Urban Water 97

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Supply Minor Works -Replacement 815 193 202 420 Water Supply Minor Works -Replacement 815 193 202 420 (Various) (Various) Water Supply Infrastructure 3 366 366 400 2 600 Water Supply Infrastructure 3 366 366 400 2 600 -Rehabilitation (Various) -Rehabilitation (Various) Water Supply Works -Development 213 23 20 170 Water Supply Works -Development 213 23 20 170 (Various) (Various) Sewerage Treatment Plant -Upgrade 17 086 16 753 .. 333 Sewerage Treatment Plant -Upgrade 17 086 16 753 .. 333 (Wodonga) (Wodonga) North East Region Water Authority North East Region Water Authority Water Treatment Plant and Clearwater 2 488 88 2 200 200 Water Treatment Plant and Clearwater 2 488 88 2 200 200 Storage -Upgrade (Beechworth) Storage -Upgrade (Beechworth) Sewerage Treatment Plant -Winter 4 024 185 229 3 610 Sewerage Treatment Plant -Winter 4 024 185 229 3 610 Storage and Associated Works Storage and Associated Works -Construction & Reuse Development -Construction & Reuse Development (Benalla) (Benalla) Sewage Effluent Reuse -Construction 2 746 165 381 2 200 Sewage Effluent Reuse -Construction 2 746 165 381 2 200 (Bright) (Bright) Sewerage Treatment Plant -Improvement 468 369 99 .. Sewerage Treatment Plant -Improvement 468 369 99 .. (Myrtleford) (Myrtleford) Water Treatment Plant -Upgrade (Oxley) 79 49 30 .. Water Treatment Plant -Upgrade (Oxley) 79 49 30 .. Sewerage Scheme -Construction 2 637 75 2 562 .. Sewerage Scheme -Construction 2 637 75 2 562 .. (Porepunkah) (Porepunkah) Minor Assets and Plant -Improvement 655 155 50 450 Minor Assets and Plant -Improvement 655 155 50 450 (Various) (Various) Water Quality -Improvement (Various) 1 183 233 150 800 Water Quality -Improvement (Various) 1 183 233 150 800 Drinking Water Quality Management 122 87 35 .. Drinking Water Quality Management 122 87 35 .. System -Implementation (Various) System -Implementation (Various) Water Distribution -Improvement (Various) 1 182 282 100 800 Water Distribution -Improvement (Various) 1 182 282 100 800 Water Mains -Replacement (Various) 9 012 1 012 785 7 215 Water Mains -Replacement (Various) 9 012 1 012 785 7 215 Vehicles -Replacement (Various) 4 220 698 372 3 150 Vehicles -Replacement (Various) 4 220 698 372 3 150 Emergency Management System and 480 107 193 180 Emergency Management System and 480 107 193 180 OH&S -Implementation (Various) OH&S -Implementation (Various) Instrumentation and Control Equipment 490 181 109 200 Instrumentation and Control Equipment 490 181 109 200 -Upgrade (Various) -Upgrade (Various) Technology -Development (Various) 1 227 227 100 900 Technology -Development (Various) 1 227 227 100 900 Telemetry -Upgrade (Various) 1 557 1 476 81 .. Telemetry -Upgrade (Various) 1 557 1 476 81 .. Sewer -Rehabilitation (Various) 13 051 1 201 920 10 930 Sewer -Rehabilitation (Various) 13 051 1 201 920 10 930 Sewerage Infrastructure -Replacement 4 946 417 509 4 020 Sewerage Infrastructure -Replacement 4 946 417 509 4 020 (Various) (Various) Sewer Spills -Containment (Various) 1 095 97 198 800 Sewer Spills -Containment (Various) 1 095 97 198 800 Water Supply Infrastructure 4 796 416 420 3 960 Water Supply Infrastructure 4 796 416 420 3 960 -Replacement (Various) -Replacement (Various) Geographic Information System 86 26 60 .. Geographic Information System 86 26 60 .. -Implementation (Various) -Implementation (Various) Sewer Pump Station -Pumps -Conversion 599 146 153 300 Sewer Pump Station -Pumps -Conversion 599 146 153 300 (Various) (Various) Reuse -Development (Various) 404 316 58 30 Reuse -Development (Various) 404 316 58 30

98 Regional Urban Water Public Sector Asset Investment Program 2003-04 98 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sewerage Treatment Plant -Lagoons 309 59 250 .. Sewerage Treatment Plant -Lagoons 309 59 250 .. Sewerage Treatment Plant -Lagoons 309 59 250 .. -Beaching (Wangaratta) -Beaching (Wangaratta) -Beaching (Wangaratta) Transfer Water Treatment Sludge to 897 20 877 .. Transfer Water Treatment Sludge to 897 20 877 .. Transfer Water Treatment Sludge to 897 20 877 .. Sewerage Treatment Plant -Construction Sewerage Treatment Plant -Construction Sewerage Treatment Plant -Construction (Wangaratta) (Wangaratta) (Wangaratta) Computer and Office Equipment 563 248 45 270 Computer and Office Equipment 563 248 45 270 Computer and Office Equipment 563 248 45 270 -Purchase (Wodonga) -Purchase (Wodonga) -Purchase (Wodonga) Internet/Intranet -Development (Wodonga) 226 88 138 .. Internet/Intranet -Development (Wodonga) 226 88 138 .. Internet/Intranet -Development (Wodonga) 226 88 138 .. Sewerage Treatment Plant (West 16 575 15 986 589 .. Sewerage Treatment Plant (West 16 575 15 986 589 .. Sewerage Treatment Plant (West 16 575 15 986 589 .. Wodonga) -Upgrade (Wodonga) Wodonga) -Upgrade (Wodonga) Wodonga) -Upgrade (Wodonga) Portland Coast Region Water Authority Portland Coast Region Water Authority Portland Coast Region Water Authority Water Supply -Construction (Dartmoor) 797 197 600 .. Water Supply -Construction (Dartmoor) 797 197 600 .. Water Supply -Construction (Dartmoor) 797 197 600 .. Sewerage Treatment Plant -Stage 3 118 8 110 .. Sewerage Treatment Plant -Stage 3 118 8 110 .. Sewerage Treatment Plant -Stage 3 118 8 110 .. Design, Construction (Port Fairy) Design, Construction (Port Fairy) Design, Construction (Port Fairy) Sewerage Treatment Plant -Improvement 1 100 40 560 500 Sewerage Treatment Plant -Improvement 1 100 40 560 500 Sewerage Treatment Plant -Improvement 1 100 40 560 500 (Port Fairy) (Port Fairy) (Port Fairy) Water Mains -Replacement (Various) 220 135 85 .. Water Mains -Replacement (Various) 220 135 85 .. Water Mains -Replacement (Various) 220 135 85 .. Water Supply Bore No.1 -Replacement 685 202 483 .. Water Supply Bore No.1 -Replacement 685 202 483 .. Water Supply Bore No.1 -Replacement 685 202 483 .. (Port Fairy) (Port Fairy) (Port Fairy) Office Furniture And Equipment 352 33 199 120 Office Furniture And Equipment 352 33 199 120 Office Furniture And Equipment 352 33 199 120 -Improvement (Portland) -Improvement (Portland) -Improvement (Portland) Sewerage Assets -Improvements and 197 31 166 .. Sewerage Assets -Improvements and 197 31 166 .. Sewerage Assets -Improvements and 197 31 166 .. Replacement (Various) Replacement (Various) Replacement (Various) Electrical Plans -Improvement (Various) 99 38 61 .. Electrical Plans -Improvement (Various) 99 38 61 .. Electrical Plans -Improvement (Various) 99 38 61 .. Water Meters -Replacement (Various) 287 55 64 168 Water Meters -Replacement (Various) 287 55 64 168 Water Meters -Replacement (Various) 287 55 64 168 Water Assets -Improvements and 268 72 196 .. Water Assets -Improvements and 268 72 196 .. Water Assets -Improvements and 268 72 196 .. Replacement (Various) Replacement (Various) Replacement (Various) South Gippsland Region Water Authority South Gippsland Region Water Authority South Gippsland Region Water Authority Water Tower -Rehabilitation (Cape 224 109 115 .. Water Tower -Rehabilitation (Cape 224 109 115 .. Water Tower -Rehabilitation (Cape 224 109 115 .. Paterson) Paterson) Paterson) Computers -Upgrade (Foster) 808 54 259 495 Computers -Upgrade (Foster) 808 54 259 495 Computers -Upgrade (Foster) 808 54 259 495 Office Equipment -Upgrade (Foster) 306 86 40 180 Office Equipment -Upgrade (Foster) 306 86 40 180 Office Equipment -Upgrade (Foster) 306 86 40 180 Water Filtration Plant -Upgrade (Foster) 187 87 .. 100 Water Filtration Plant -Upgrade (Foster) 187 87 .. 100 Water Filtration Plant -Upgrade (Foster) 187 87 .. 100 Trade Waste Treatment Plant 4 464 64 100 4 300 Trade Waste Treatment Plant 4 464 64 100 4 300 Trade Waste Treatment Plant 4 464 64 100 4 300 -Construction (Koonwarra) -Construction (Koonwarra) -Construction (Koonwarra) Water Filtration Plant -Upgrade 137 37 .. 100 Water Filtration Plant -Upgrade 137 37 .. 100 Water Filtration Plant -Upgrade 137 37 .. 100 (Korumburra) (Korumburra) (Korumburra) Sewerage Treatment Plant -Upgrade 3 881 14 2 680 1 187 Sewerage Treatment Plant -Upgrade 3 881 14 2 680 1 187 Sewerage Treatment Plant -Upgrade 3 881 14 2 680 1 187 (Korumburra) (Korumburra) (Korumburra) Sewerage Treatment Plant -Upgrade 5 035 12 3 610 1 413 Sewerage Treatment Plant -Upgrade 5 035 12 3 610 1 413 Sewerage Treatment Plant -Upgrade 5 035 12 3 610 1 413 (Leongatha) (Leongatha) (Leongatha) Water Filtration Plant -Upgrade 236 136 .. 100 Water Filtration Plant -Upgrade 236 136 .. 100 Water Filtration Plant -Upgrade 236 136 .. 100 (Leongatha) (Leongatha) (Leongatha) Sewage Rising Main and Pump Station 1 003 653 350 .. Sewage Rising Main and Pump Station 1 003 653 350 .. Sewage Rising Main and Pump Station 1 003 653 350 .. -Construction (Leongatha) -Construction (Leongatha) -Construction (Leongatha) Water Treatment Plant -Solids Diposal 310 5 195 110 Water Treatment Plant -Solids Diposal 310 5 195 110 Water Treatment Plant -Solids Diposal 310 5 195 110 -Construction (Leongatha) -Construction (Leongatha) -Construction (Leongatha)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 99 Public Sector Asset Investment Program 2003-04 Regional Urban Water 99 Public Sector Asset Investment Program 2003-04 Regional Urban Water 99

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Treatment Plant and Pumps 1 060 916 144 .. Water Treatment Plant and Pumps 1 060 916 144 .. -Upgrade (Poowong) -Upgrade (Poowong) Water Treatment Plant -Sludge Facilities 244 84 160 .. Water Treatment Plant -Sludge Facilities 244 84 160 .. -Construction (Toora) -Construction (Toora) Water Pump Station -Switchboards 432 27 55 350 Water Pump Station -Switchboards 432 27 55 350 -Refurbishment (Various) -Refurbishment (Various) Sewer Pump Station -Switchboards 278 33 45 200 Sewer Pump Station -Switchboards 278 33 45 200 -Refurbishment (Various) -Refurbishment (Various) Telemetry -Development (Various) 646 46 200 400 Telemetry -Development (Various) 646 46 200 400 Audit Operations -Improvement (Various) 1 200 120 150 930 Audit Operations -Improvement (Various) 1 200 120 150 930 Water Mains -Rehabilitation (Various) 1 808 158 300 1 350 Water Mains -Rehabilitation (Various) 1 808 158 300 1 350 Water Meters -Replacement (Various) 1 725 173 161 1 391 Water Meters -Replacement (Various) 1 725 173 161 1 391 Asset Management (Water) 586 346 200 40 Asset Management (Water) 586 346 200 40 -Implementation (Various) -Implementation (Various) Plant And Equipment -Replacement 868 368 50 450 Plant And Equipment -Replacement 868 368 50 450 (Various) (Various) Vehicles -Replacement (Various) 8 256 1 256 700 6 300 Vehicles -Replacement (Various) 8 256 1 256 700 6 300 Asset Management (Sewer) 499 219 200 80 Asset Management (Sewer) 499 219 200 80 -Implementation (Various) -Implementation (Various) Sewerage Systems and Sewerage 340 40 .. 300 Sewerage Systems and Sewerage 340 40 .. 300 Treatment Plants -Upgrades (Various) Treatment Plants -Upgrades (Various) Dams Risk Reduction Works -Upgrades 10 483 483 800 9 200 Dams Risk Reduction Works -Upgrades 10 483 483 800 9 200 (Various) (Various) Sewer Outfall Structure -Upgrade (Venus 5 549 49 .. 5 500 Sewer Outfall Structure -Upgrade (Venus 5 549 49 .. 5 500 Bay) Bay) Sewerage Scheme -Construction 2 016 1 023 993 .. Sewerage Scheme -Construction 2 016 1 023 993 .. (Waratah Bay) (Waratah Bay) Mine Water Mains -Replacement 311 111 .. 200 Mine Water Mains -Replacement 311 111 .. 200 (Wonthaggi) (Wonthaggi) Sewer Outfall -Baxters Beach 240 120 120 .. Sewer Outfall -Baxters Beach 240 120 120 .. -Rehabilitation (Wonthaggi) -Rehabilitation (Wonthaggi) Water Treatment Plant -Construction 2 889 534 2 355 .. Water Treatment Plant -Construction 2 889 534 2 355 .. (Yarram) (Yarram) South West Water Authority South West Water Authority Water Mains -Replacement (Allansford) 251 25 216 10 Water Mains -Replacement (Allansford) 251 25 216 10 Water Supply System -Upgrade 1 517 141 1 371 5 Water Supply System -Upgrade 1 517 141 1 371 5 (Allansford) (Allansford) Depot -Refurbishment (Camperdown) 410 1 409 .. Depot -Refurbishment (Camperdown) 410 1 409 .. Water Meters -Replacement 129 2 2 125 Water Meters -Replacement 129 2 2 125 (Camperdown) (Camperdown) Sewer Reticulation -Rehabilitation 200 3 12 185 Sewer Reticulation -Rehabilitation 200 3 12 185 (Camperdown) (Camperdown) Trade Waste Treatment Plant -Biosolids 565 322 75 168 Trade Waste Treatment Plant -Biosolids 565 322 75 168 Reuse -Installation (Camperdown) Reuse -Installation (Camperdown) Donald's Hill Water Reservoir 547 544 3 .. Donald's Hill Water Reservoir 547 544 3 .. Embankment -Remediation Embankment -Remediation (Camperdown) (Camperdown)

100 Regional Urban Water Public Sector Asset Investment Program 2003-04 100 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sewerage Treatment Plant -Upgrade 1 035 1 017 18 .. Sewerage Treatment Plant -Upgrade 1 035 1 017 18 .. Sewerage Treatment Plant -Upgrade 1 035 1 017 18 .. (Camperdown) (Camperdown) (Camperdown) Sewer Reticulation 1 746 1 677 69 .. Sewer Reticulation 1 746 1 677 69 .. Sewer Reticulation 1 746 1 677 69 .. -Rehabilitation/Replacement -Rehabilitation/Replacement -Rehabilitation/Replacement (Camperdown) (Camperdown) (Camperdown) Groundwater -Investigation (Carlisle 900 7 43 850 Groundwater -Investigation (Carlisle 900 7 43 850 Groundwater -Investigation (Carlisle 900 7 43 850 River) River) River) Water Main -Replacement (Cobden) 115 2 .. 113 Water Main -Replacement (Cobden) 115 2 .. 113 Water Main -Replacement (Cobden) 115 2 .. 113 Water Treatment Plant -Contribution 390 40 350 .. Water Treatment Plant -Contribution 390 40 350 .. Water Treatment Plant -Contribution 390 40 350 .. (Koroit) (Koroit) (Koroit) Groundwater Resource -Development 530 11 49 470 Groundwater Resource -Development 530 11 49 470 Groundwater Resource -Development 530 11 49 470 (Lismore) (Lismore) (Lismore) Sewerage Treatment Plant 2 405 2 010 393 2 Sewerage Treatment Plant 2 405 2 010 393 2 Sewerage Treatment Plant 2 405 2 010 393 2 Process/Irrigation -Upgrade (Mortlake) Process/Irrigation -Upgrade (Mortlake) Process/Irrigation -Upgrade (Mortlake) Water Supply Tank -Repaint (Noorat) 111 6 105 .. Water Supply Tank -Repaint (Noorat) 111 6 105 .. Water Supply Tank -Repaint (Noorat) 111 6 105 .. Sewer Reticulation -Construction 3 771 51 220 3 500 Sewer Reticulation -Construction 3 771 51 220 3 500 Sewer Reticulation -Construction 3 771 51 220 3 500 (Peterborough) (Peterborough) (Peterborough) Sewer Reticulation -Switchboard 132 3 129 .. Sewer Reticulation -Switchboard 132 3 129 .. Sewer Reticulation -Switchboard 132 3 129 .. Replacement (Port Campbell) Replacement (Port Campbell) Replacement (Port Campbell) Sewer Treatment Plant -Improvement 1 390 7 113 1 270 Sewer Treatment Plant -Improvement 1 390 7 113 1 270 Sewer Treatment Plant -Improvement 1 390 7 113 1 270 (Port Campbell) (Port Campbell) (Port Campbell) Water Treatment Plant Stage 1 -Upgrade 2 007 1 540 467 .. Water Treatment Plant Stage 1 -Upgrade 2 007 1 540 467 .. Water Treatment Plant Stage 1 -Upgrade 2 007 1 540 467 .. (Port Campbell) (Port Campbell) (Port Campbell) Sewerage Reticulation Study 187 17 170 .. Sewerage Reticulation Study 187 17 170 .. Sewerage Reticulation Study 187 17 170 .. -Rehabilitation (Simpson) -Rehabilitation (Simpson) -Rehabilitation (Simpson) Water Treatment Plant -Construction 1 387 18 274 1 095 Water Treatment Plant -Construction 1 387 18 274 1 095 Water Treatment Plant -Construction 1 387 18 274 1 095 (Simpson) (Simpson) (Simpson) Sewerage Treatment Plant Effluent 851 90 61 700 Sewerage Treatment Plant Effluent 851 90 61 700 Sewerage Treatment Plant Effluent 851 90 61 700 Storage and Irrigation -Construction Storage and Irrigation -Construction Storage and Irrigation -Construction (Simpson) (Simpson) (Simpson) Depot -Relocation (Terang) 152 2 1 149 Depot -Relocation (Terang) 152 2 1 149 Depot -Relocation (Terang) 152 2 1 149 Sewerage Treatment Plant Biosolids 394 257 7 130 Sewerage Treatment Plant Biosolids 394 257 7 130 Sewerage Treatment Plant Biosolids 394 257 7 130 Transfer -Upgrade (Terang) Transfer -Upgrade (Terang) Transfer -Upgrade (Terang) Minor Plant -Replacement (Various) 115 35 20 60 Minor Plant -Replacement (Various) 115 35 20 60 Minor Plant -Replacement (Various) 115 35 20 60 Computer Link to Camperdown 145 38 107 .. Computer Link to Camperdown 145 38 107 .. Computer Link to Camperdown 145 38 107 .. -Connection (Various) -Connection (Various) -Connection (Various) Asset and Risk Management 196 92 79 25 Asset and Risk Management 196 92 79 25 Asset and Risk Management 196 92 79 25 -Development (Various) -Development (Various) -Development (Various) Telemetry Master Plan -Installation 1 148 107 828 213 Telemetry Master Plan -Installation 1 148 107 828 213 Telemetry Master Plan -Installation 1 148 107 828 213 (Various) (Various) (Various) Information Technology Systems 1 550 240 312 998 Information Technology Systems 1 550 240 312 998 Information Technology Systems 1 550 240 312 998 -Improvement (Various) -Improvement (Various) -Improvement (Various) Customer Billing System -Development 453 433 20 .. Customer Billing System -Development 453 433 20 .. Customer Billing System -Development 453 433 20 .. (Various) (Various) (Various) Major Plant -Replacement (Various) 1 623 576 177 870 Major Plant -Replacement (Various) 1 623 576 177 870 Major Plant -Replacement (Various) 1 623 576 177 870 Telemetry Installation -Improvement 4 823 135 2 974 1 714 Telemetry Installation -Improvement 4 823 135 2 974 1 714 Telemetry Installation -Improvement 4 823 135 2 974 1 714 (Various) (Various) (Various)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 101 Public Sector Asset Investment Program 2003-04 Regional Urban Water 101 Public Sector Asset Investment Program 2003-04 Regional Urban Water 101

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Tank Hill Water Reservoir Inlet -Upgrade 75 1 74 .. Tank Hill Water Reservoir Inlet -Upgrade 75 1 74 .. (Warrnambool) (Warrnambool) Dual Reticulation -Trials (Warrnambool) 172 7 .. 165 Dual Reticulation -Trials (Warrnambool) 172 7 .. 165 Water Reticulation -Extension 160 10 15 135 Water Reticulation -Extension 160 10 15 135 (Warrnambool) (Warrnambool) Brierly Station Water Pumps 86 15 70 1 Brierly Station Water Pumps 86 15 70 1 -Replacement (Warrnambool) -Replacement (Warrnambool) Water Treatment Plant -Contribution 250 26 224 .. Water Treatment Plant -Contribution 250 26 224 .. (Warrnambool) (Warrnambool) Office and Land -Purchase 1 400 33 547 820 Office and Land -Purchase 1 400 33 547 820 (Warrnambool) (Warrnambool) Sewer Reticulation Wangoom Road 389 37 .. 352 Sewer Reticulation Wangoom Road 389 37 .. 352 -Construction (Warrnambool) -Construction (Warrnambool) Tank Hill Water Reservoir Embankment 579 43 533 3 Tank Hill Water Reservoir Embankment 579 43 533 3 -Upgrade (Warrnambool) -Upgrade (Warrnambool) Sewerage Treatment Plant Inflow Screens 713 60 646 7 Sewerage Treatment Plant Inflow Screens 713 60 646 7 -Installation (Warrnambool) -Installation (Warrnambool) Golf Course Sewage Effluent Reuse 961 63 895 3 Golf Course Sewage Effluent Reuse 961 63 895 3 -Irrigation (Warrnambool) -Irrigation (Warrnambool) Sewer Reticulation -Modelling 157 66 73 18 Sewer Reticulation -Modelling 157 66 73 18 (Warrnambool) (Warrnambool) Sewer Reticulation -Rehabilitation 1 698 68 100 1 530 Sewer Reticulation -Rehabilitation 1 698 68 100 1 530 (Warrnambool) (Warrnambool) Sewerage Treatment Plant Blower 864 78 36 750 Sewerage Treatment Plant Blower 864 78 36 750 -Refurbishment (Warrnambool) -Refurbishment (Warrnambool) Water Treatment Plant Minor Components 290 95 25 170 Water Treatment Plant Minor Components 290 95 25 170 -Replacement (Warrnambool) -Replacement (Warrnambool) Water Meters -Replacement 628 129 29 470 Water Meters -Replacement 628 129 29 470 (Warrnambool) (Warrnambool) Ocean Monitoring -Investigation 366 141 10 215 Ocean Monitoring -Investigation 366 141 10 215 (Warrnambool) (Warrnambool) Sewerage Treatment Plant Diffuser 1 528 482 41 1 005 Sewerage Treatment Plant Diffuser 1 528 482 41 1 005 -Replacement (Warrnambool) -Replacement (Warrnambool) South Otway Pipeline -Refurbish Pumps 77 6 70 1 South Otway Pipeline -Refurbish Pumps 77 6 70 1 (Warrnambool) (Warrnambool) Wastewater Treatment Plant -Outfall 128 8 120 .. Wastewater Treatment Plant -Outfall 128 8 120 .. Evaluation (Warrnambool) Evaluation (Warrnambool) Sewerage Treatment Plant Biosolids 4 326 2 720 87 1 519 Sewerage Treatment Plant Biosolids 4 326 2 720 87 1 519 -Disposal (Warrnambool) -Disposal (Warrnambool) Westernport Region Water Authority Westernport Region Water Authority Sewerage Treatment Plant (King Road) 220 20 50 150 Sewerage Treatment Plant (King Road) 220 20 50 150 -Review/Upgrade (Coronet Bay) -Review/Upgrade (Coronet Bay) Assets -Management (Cowes) 504 29 275 200 Assets -Management (Cowes) 504 29 275 200 Office Equipment -Purchase (Cowes) 150 40 20 90 Office Equipment -Purchase (Cowes) 150 40 20 90 Information Technology -Purchase 1 225 290 150 785 Information Technology -Purchase 1 225 290 150 785 (Cowes) (Cowes) Sewerage Treatment Plant (Phillip Island) 3 262 769 940 1 553 Sewerage Treatment Plant (Phillip Island) 3 262 769 940 1 553 -Upgrade (Cowes) -Upgrade (Cowes) 102 Regional Urban Water Public Sector Asset Investment Program 2003-04 102 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Reservoir Water -Improvement (Glen 150 7 143 .. Reservoir Water -Improvement (Glen 150 7 143 .. Reservoir Water -Improvement (Glen 150 7 143 .. Forbes) Forbes) Forbes) Water Reservoir Wetland -Development 250 9 11 230 Water Reservoir Wetland -Development 250 9 11 230 Water Reservoir Wetland -Development 250 9 11 230 (Glen Forbes) (Glen Forbes) (Glen Forbes) Water Treatment Plant -Treatment 3 760 40 40 3 680 Water Treatment Plant -Treatment 3 760 40 40 3 680 Water Treatment Plant -Treatment 3 760 40 40 3 680 Process Upgrade (Glen Forbes) Process Upgrade (Glen Forbes) Process Upgrade (Glen Forbes) Augmentation of Supply -Raising 5 022 122 30 4 870 Augmentation of Supply -Raising 5 022 122 30 4 870 Augmentation of Supply -Raising 5 022 122 30 4 870 Embankment -Upgrade (Glen Forbes) Embankment -Upgrade (Glen Forbes) Embankment -Upgrade (Glen Forbes) Water Treatment Plant -Sludge Handling 1 248 83 30 1 135 Water Treatment Plant -Sludge Handling 1 248 83 30 1 135 Water Treatment Plant -Sludge Handling 1 248 83 30 1 135 Upgrade (Glen Forbes) Upgrade (Glen Forbes) Upgrade (Glen Forbes) Office and Depot Accommodation 4 136 2 636 1 500 .. Office and Depot Accommodation 4 136 2 636 1 500 .. Office and Depot Accommodation 4 136 2 636 1 500 .. -Construction (Newhaven) -Construction (Newhaven) -Construction (Newhaven) Zone Metering -Construct (Various) 110 10 .. 100 Zone Metering -Construct (Various) 110 10 .. 100 Zone Metering -Construct (Various) 110 10 .. 100 Water Meters -Replacement (Various) 120 20 20 80 Water Meters -Replacement (Various) 120 20 20 80 Water Meters -Replacement (Various) 120 20 20 80 Site Security and Facilities -Upgrade 70 30 .. 40 Site Security and Facilities -Upgrade 70 30 .. 40 Site Security and Facilities -Upgrade 70 30 .. 40 (Various) (Various) (Various) Sewage Pump Stations -Upgrade 894 49 165 680 Sewage Pump Stations -Upgrade 894 49 165 680 Sewage Pump Stations -Upgrade 894 49 165 680 (Various) (Various) (Various) Sewer Reticulation Augmentations 4 710 50 185 4 475 Sewer Reticulation Augmentations 4 710 50 185 4 475 Sewer Reticulation Augmentations 4 710 50 185 4 475 (Various) (Various) (Various) Telemetry -Improvement (Various) 165 80 40 45 Telemetry -Improvement (Various) 165 80 40 45 Telemetry -Improvement (Various) 165 80 40 45 Water Distribution Mains and Tanks 348 98 50 200 Water Distribution Mains and Tanks 348 98 50 200 Water Distribution Mains and Tanks 348 98 50 200 -Upgrade (Various) -Upgrade (Various) -Upgrade (Various) Chlorination Facilities -Improvement 242 192 50 .. Chlorination Facilities -Improvement 242 192 50 .. Chlorination Facilities -Improvement 242 192 50 .. (Various) (Various) (Various) Vehicles and Plant -Purchase (Various) 2 505 545 360 1 600 Vehicles and Plant -Purchase (Various) 2 505 545 360 1 600 Vehicles and Plant -Purchase (Various) 2 505 545 360 1 600 Lance Creek Water Pipeline and Standby 533 10 523 .. Lance Creek Water Pipeline and Standby 533 10 523 .. Lance Creek Water Pipeline and Standby 533 10 523 .. Pump -Renewal (Wonthaggi) Pump -Renewal (Wonthaggi) Pump -Renewal (Wonthaggi) Western Region Water Authority Western Region Water Authority Western Region Water Authority Outfall Sewer -Construction (Bacchus 282 42 90 150 Outfall Sewer -Construction (Bacchus 282 42 90 150 Outfall Sewer -Construction (Bacchus 282 42 90 150 Marsh) Marsh) Marsh) Sewage Pump Station -Avenue of Honour 124 24 .. 100 Sewage Pump Station -Avenue of Honour 124 24 .. 100 Sewage Pump Station -Avenue of Honour 124 24 .. 100 -Replacement (Bacchus Marsh) -Replacement (Bacchus Marsh) -Replacement (Bacchus Marsh) Parwan Sewerage Treatment Plant 300 30 30 240 Parwan Sewerage Treatment Plant 300 30 30 240 Parwan Sewerage Treatment Plant 300 30 30 240 -Renewal (Bacchus Marsh) -Renewal (Bacchus Marsh) -Renewal (Bacchus Marsh) Water Reticulation System -Modelling 76 16 60 .. Water Reticulation System -Modelling 76 16 60 .. Water Reticulation System -Modelling 76 16 60 .. (Bacchus Marsh) (Bacchus Marsh) (Bacchus Marsh) Rosslynne Water Treatment Plant 560 498 .. 62 Rosslynne Water Treatment Plant 560 498 .. 62 Rosslynne Water Treatment Plant 560 498 .. 62 -Upgrade (Gisborne) -Upgrade (Gisborne) -Upgrade (Gisborne) Sewage Effluent Reuse Stage 1 318 68 250 .. Sewage Effluent Reuse Stage 1 318 68 250 .. Sewage Effluent Reuse Stage 1 318 68 250 .. -Construction (Gisborne) -Construction (Gisborne) -Construction (Gisborne) Sewer Reticulation -Upgrade (Gisborne) 8 749 356 100 8 293 Sewer Reticulation -Upgrade (Gisborne) 8 749 356 100 8 293 Sewer Reticulation -Upgrade (Gisborne) 8 749 356 100 8 293 Sewerage Treatment Plant -Augmentation 1 330 180 500 650 Sewerage Treatment Plant -Augmentation 1 330 180 500 650 Sewerage Treatment Plant -Augmentation 1 330 180 500 650 (Gisborne) (Gisborne) (Gisborne) Sewerage Treatment Plant -Renewal 510 40 20 450 Sewerage Treatment Plant -Renewal 510 40 20 450 Sewerage Treatment Plant -Renewal 510 40 20 450 (Gisborne) (Gisborne) (Gisborne) Sewerage Scheme -Construction 7 320 4 470 2 850 .. Sewerage Scheme -Construction 7 320 4 470 2 850 .. Sewerage Scheme -Construction 7 320 4 470 2 850 .. (Lancefield) (Lancefield) (Lancefield) Public Sector Asset Investment Program 2003-04 Regional Urban Water 103 Public Sector Asset Investment Program 2003-04 Regional Urban Water 103 Public Sector Asset Investment Program 2003-04 Regional Urban Water 103

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sewerage Scheme -Construction 7 187 211 2 200 4 776 Sewerage Scheme -Construction 7 187 211 2 200 4 776 (Macedon) (Macedon) Blamey Drive Outfall Sewers 5 032 125 100 4 807 Blamey Drive Outfall Sewers 5 032 125 100 4 807 -Construction (Melton) -Construction (Melton) Boundary Relocations and Upgrade Mains 17 140 509 10 773 5 858 Boundary Relocations and Upgrade Mains 17 140 509 10 773 5 858 -Relocate and Upgrade (Melton) -Relocate and Upgrade (Melton) Sewerage Treatment Plant -Improvement 23 691 272 860 22 559 Sewerage Treatment Plant -Improvement 23 691 272 860 22 559 (Melton) (Melton) Merrimu Water Treatment Plant 3 190 30 160 3 000 Merrimu Water Treatment Plant 3 190 30 160 3 000 -Improvement (Melton) -Improvement (Melton) Sewer -Coburns Rd -Extension (Melton) 609 180 90 339 Sewer -Coburns Rd -Extension (Melton) 609 180 90 339 Water Treatment Plant -Upgrade 576 36 10 530 Water Treatment Plant -Upgrade 576 36 10 530 (Myrniong) (Myrniong) Woodend Sewage Effluent Reuse Stage 1 365 65 300 .. Woodend Sewage Effluent Reuse Stage 1 365 65 300 .. -Implementation (Riddells Creek) -Implementation (Riddells Creek) Sewage Effluent Reuse -Stage 1 615 45 100 470 Sewage Effluent Reuse -Stage 1 615 45 100 470 -Construction (Riddells Creek) -Construction (Riddells Creek) Water Distribution Works -Augmentation 370 170 .. 200 Water Distribution Works -Augmentation 370 170 .. 200 (Riddells Creek) (Riddells Creek) Water Treatment Plant -Augmentation 1 260 960 300 .. Water Treatment Plant -Augmentation 1 260 960 300 .. (Romsey) (Romsey) Northern Water Tank -Construction 1 409 60 1 008 341 Northern Water Tank -Construction 1 409 60 1 008 341 (Sunbury) (Sunbury) Sewage Effluent Reuse -Construction 5 790 2 068 315 3 407 Sewage Effluent Reuse -Construction 5 790 2 068 315 3 407 (Sunbury) (Sunbury) Sewer Outfall -Augmentation (Sunbury) 375 245 130 .. Sewer Outfall -Augmentation (Sunbury) 375 245 130 .. Sewerage Treatment Plant -Improvement 17 931 575 1 020 16 336 Sewerage Treatment Plant -Improvement 17 931 575 1 020 16 336 (Sunbury) (Sunbury) Water Reticulation System -Modelling 220 40 .. 180 Water Reticulation System -Modelling 220 40 .. 180 (Sunbury) (Sunbury) Telemetry -Installation (Various) 1 443 566 277 600 Telemetry -Installation (Various) 1 443 566 277 600 Geographic Information System 2 803 803 250 1 750 Geographic Information System 2 803 803 250 1 750 -Implementation (Various) -Implementation (Various) Sewerage Business -Development 2 100 300 100 1 700 Sewerage Business -Development 2 100 300 100 1 700 (Various) (Various) Water Reticulation Systems -Renewal 6 419 979 300 5 140 Water Reticulation Systems -Renewal 6 419 979 300 5 140 (Various) (Various) Major Water Pipelines -Upsize (Various) 2 056 256 100 1 700 Major Water Pipelines -Upsize (Various) 2 056 256 100 1 700 Sewer Reticulation -Modelling (Various) 205 105 50 50 Sewer Reticulation -Modelling (Various) 205 105 50 50 Long Term Water and Sewerage 1 100 150 50 900 Long Term Water and Sewerage 1 100 150 50 900 Strategies -Development (Various) Strategies -Development (Various) Water Business -Development (Various) 1 653 153 100 1 400 Water Business -Development (Various) 1 653 153 100 1 400 Sewerage Assets -Renewal (Various) 1 001 101 50 850 Sewerage Assets -Renewal (Various) 1 001 101 50 850 Sewerage Trunk Mains -Development 2 134 174 260 1 700 Sewerage Trunk Mains -Development 2 134 174 260 1 700 (Various) (Various) Plant and Equipment -Purchase (Various) 5 270 770 250 4 250 Plant and Equipment -Purchase (Various) 5 270 770 250 4 250 Information Technology Operations 11 540 2 458 1 325 7 757 Information Technology Operations 11 540 2 458 1 325 7 757 -Development (Various) -Development (Various) 104 Regional Urban Water Public Sector Asset Investment Program 2003-04 104 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Meters -Installation (Various) 1 200 190 150 860 Water Meters -Installation (Various) 1 200 190 150 860 Water Meters -Installation (Various) 1 200 190 150 860 Vehicles -Purchase (Various) 9 395 1 337 1 245 6 813 Vehicles -Purchase (Various) 9 395 1 337 1 245 6 813 Vehicles -Purchase (Various) 9 395 1 337 1 245 6 813 Marriages Rd Water Treatment Plant 3 968 749 2 880 339 Marriages Rd Water Treatment Plant 3 968 749 2 880 339 Marriages Rd Water Treatment Plant 3 968 749 2 880 339 -Augmentation (Woodend) -Augmentation (Woodend) -Augmentation (Woodend) Reservoir C -Improvement (Woodend) 350 81 .. 269 Reservoir C -Improvement (Woodend) 350 81 .. 269 Reservoir C -Improvement (Woodend) 350 81 .. 269 Total Existing Projects 1 242 730 306 822 239 179 696 730 Total Existing Projects 1 242 730 306 822 239 179 696 730 Total Existing Projects 1 242 730 306 822 239 179 696 730 Source: Regional Urban Water Authorities Source: Regional Urban Water Authorities Source: Regional Urban Water Authorities Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Regional Urban Water 105 Public Sector Asset Investment Program 2003-04 Regional Urban Water 105 Public Sector Asset Investment Program 2003-04 Regional Urban Water 105

REGIONAL URBAN WATHER AUTHORITIES REGIONAL URBAN WATHER AUTHORITIES

New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Barwon Region Water Authority Barwon Region Water Authority Painkalac Reservoir -Embankment 200 .. 100 100 Painkalac Reservoir -Embankment 200 .. 100 100 -Headworks (Aireys Inlet) -Headworks (Aireys Inlet) Water Treatment Plant -Improvements 100 .. 47 53 Water Treatment Plant -Improvements 100 .. 47 53 (Aireys Inlet) (Aireys Inlet) Water Treatment Plant -Access Road 117 .. 60 57 Water Treatment Plant -Access Road 117 .. 60 57 Upgrade (Aireys Inlet) Upgrade (Aireys Inlet) Irrigation Works -Treatment and Disposal 500 .. 40 460 Irrigation Works -Treatment and Disposal 500 .. 40 460 (Aireys Inlet) (Aireys Inlet) Water Treatment Plant -Improvements 100 .. 39 61 Water Treatment Plant -Improvements 100 .. 39 61 (Apollo Bay) (Apollo Bay) Reticulation Improvements -Stages 2, 3 & 1 010 .. 40 970 Reticulation Improvements -Stages 2, 3 & 1 010 .. 40 970 4 -Improvements (Apollo Bay) 4 -Improvements (Apollo Bay) STP and Outfall -Treatment & Disposal 815 .. 80 735 STP and Outfall -Treatment & Disposal 815 .. 80 735 (Apollo Bay) (Apollo Bay) High Level Water Supply -Improvements 730 .. 30 700 High Level Water Supply -Improvements 730 .. 30 700 (Fairhaven) (Fairhaven) Southern Retarding Tank -Main Sewer 4 000 .. 30 3 970 Southern Retarding Tank -Main Sewer 4 000 .. 30 3 970 (Geelong) (Geelong) Raw Water Pump Station -Improvements 62 .. 62 .. Raw Water Pump Station -Improvements 62 .. 62 .. (Gellibrand) (Gellibrand) Replacement of Montpellier Inlet Control 50 .. 50 .. Replacement of Montpellier Inlet Control 50 .. 50 .. Valve -No. 4 -Transfer and Distribution Valve -No. 4 -Transfer and Distribution (Highton) (Highton) Noise Control -Montpellier and Highton 79 .. 79 .. Noise Control -Montpellier and Highton 79 .. 79 .. -Transfer and Distribution (Highton) -Transfer and Distribution (Highton) Belle Vue Ave Sewer -Augmentation 85 .. 80 5 Belle Vue Ave Sewer -Augmentation 85 .. 80 5 (Highton) (Highton) High Level Water Supply System 540 .. 20 520 High Level Water Supply System 540 .. 20 520 -Reticulation (Jan Juc) -Reticulation (Jan Juc) Rising Main -Improvements (Leopold) 250 .. 240 10 Rising Main -Improvements (Leopold) 250 .. 240 10 Water Treatment Plant -Improvements 139 .. 36 103 Water Treatment Plant -Improvements 139 .. 36 103 (Lorne) (Lorne) No. 2 Rising Main -Replacement (Lorne) 50 .. 50 .. No. 2 Rising Main -Replacement (Lorne) 50 .. 50 .. Water Treatment Plant -Improvements 93 .. 30 63 Water Treatment Plant -Improvements 93 .. 30 63 (Meredith) (Meredith) Water Treatment Plant -Improvements 315 .. 84 231 Water Treatment Plant -Improvements 315 .. 84 231 (Moorabool) (Moorabool) Church St Sewer Augmentation 400 .. 390 10 Church St Sewer Augmentation 400 .. 390 10 -Augmentation (North Geelong) -Augmentation (North Geelong) Marriner's Lookout Land Purchases 250 .. 250 .. Marriner's Lookout Land Purchases 250 .. 250 .. -Other Corp. Works (Ocean Grove) -Other Corp. Works (Ocean Grove)

106 Regional Urban Water Public Sector Asset Investment Program 2003-04 106 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Land Development Smithton Grove -Other 100 .. 100 .. Land Development Smithton Grove -Other 100 .. 100 .. Land Development Smithton Grove -Other 100 .. 100 .. Corp. Works (Ocean Grove) Corp. Works (Ocean Grove) Corp. Works (Ocean Grove) Office Air Conditioning -Replacement 220 .. 110 110 Office Air Conditioning -Replacement 220 .. 110 110 Office Air Conditioning -Replacement 220 .. 110 110 (South Geelong) (South Geelong) (South Geelong) PS No. 4 Replacement -Main Sewer 550 .. 40 510 PS No. 4 Replacement -Main Sewer 550 .. 40 510 PS No. 4 Replacement -Main Sewer 550 .. 40 510 (Torquay) (Torquay) (Torquay) Water Treatment Plant Roof Access 35 .. 35 .. Water Treatment Plant Roof Access 35 .. 35 .. Water Treatment Plant Roof Access 35 .. 35 .. Systems -Treatment (Various) Systems -Treatment (Various) Systems -Treatment (Various) Industrial On-line Monitoring -Treatment 50 .. 50 .. Industrial On-line Monitoring -Treatment 50 .. 50 .. Industrial On-line Monitoring -Treatment 50 .. 50 .. and Disposal (Various) and Disposal (Various) and Disposal (Various) Telemetry Base Station -Upgrade 30 .. 30 .. Telemetry Base Station -Upgrade 30 .. 30 .. Telemetry Base Station -Upgrade 30 .. 30 .. (Various) (Various) (Various) Stores -Facility Improvements (Various) 40 .. 40 .. Stores -Facility Improvements (Various) 40 .. 40 .. Stores -Facility Improvements (Various) 40 .. 40 .. Telemetry System -Improvements 100 .. 20 80 Telemetry System -Improvements 100 .. 20 80 Telemetry System -Improvements 100 .. 20 80 (Various) (Various) (Various) Bellarine Transfer Main Duplication 10 905 .. 130 10 775 Bellarine Transfer Main Duplication 10 905 .. 130 10 775 Bellarine Transfer Main Duplication 10 905 .. 130 10 775 (Stages 3 & 4) -Transfer and Distribution (Stages 3 & 4) -Transfer and Distribution (Stages 3 & 4) -Transfer and Distribution (Wallington) (Wallington) (Wallington) Wurdee Boluc Water Treatment Plant 95 .. 95 .. Wurdee Boluc Water Treatment Plant 95 .. 95 .. Wurdee Boluc Water Treatment Plant 95 .. 95 .. -Environmental Compliance Works -Environmental Compliance Works -Environmental Compliance Works (Wurdee Buloc) (Wurdee Buloc) (Wurdee Buloc) Transfer System Operations Model 150 .. 150 .. Transfer System Operations Model 150 .. 150 .. Transfer System Operations Model 150 .. 150 .. -Transfer and Distribution -Transfer and Distribution -Transfer and Distribution Central Gippsland Region Water Authority Central Gippsland Region Water Authority Central Gippsland Region Water Authority Water Treatment Plants -Upgrade 8.... 8 Water Treatment Plants -Upgrade 8.... 8 Water Treatment Plants -Upgrade 8.... 8 (Boolarra) (Boolarra) (Boolarra) Dosing at Water Treatment Plant 150 .. .. 150 Dosing at Water Treatment Plant 150 .. .. 150 Dosing at Water Treatment Plant 150 .. .. 150 -Upgrade (Drouin) -Upgrade (Drouin) -Upgrade (Drouin) Composting Facility Project (Biosolids 50 .. 50 .. Composting Facility Project (Biosolids 50 .. 50 .. Composting Facility Project (Biosolids 50 .. 50 .. including Dredging) -Upgrade (Dutson including Dredging) -Upgrade (Dutson including Dredging) -Upgrade (Dutson Downs) Downs) Downs) Contaminated Soil Treatment and Recycle 2 010 .. 1 460 550 Contaminated Soil Treatment and Recycle 2 010 .. 1 460 550 Contaminated Soil Treatment and Recycle 2 010 .. 1 460 550 Plant -Construction (Dutson Downs) Plant -Construction (Dutson Downs) Plant -Construction (Dutson Downs) Develop Site Services and Drainage for 1 050 .. 750 300 Develop Site Services and Drainage for 1 050 .. 750 300 Develop Site Services and Drainage for 1 050 .. 750 300 RRF -Upgrade (Dutson Downs) RRF -Upgrade (Dutson Downs) RRF -Upgrade (Dutson Downs) Environment Park -Interpretative Centre 300 .. 250 50 Environment Park -Interpretative Centre 300 .. 250 50 Environment Park -Interpretative Centre 300 .. 250 50 -Enhancement (Dutson Downs) -Enhancement (Dutson Downs) -Enhancement (Dutson Downs) Inlet to ESSO Pond Odour Control 150 .. .. 150 Inlet to ESSO Pond Odour Control 150 .. .. 150 Inlet to ESSO Pond Odour Control 150 .. .. 150 -Upgrade (Dutson Downs) -Upgrade (Dutson Downs) -Upgrade (Dutson Downs) Environmental Park Project 250 .. 200 50 Environmental Park Project 250 .. 200 50 Environmental Park Project 250 .. 200 50 -Enhancement (Dutson Downs) -Enhancement (Dutson Downs) -Enhancement (Dutson Downs) Communication Data Links -Upgrade 50 .. 50 .. Communication Data Links -Upgrade 50 .. 50 .. Communication Data Links -Upgrade 50 .. 50 .. (Dutson Downs) (Dutson Downs) (Dutson Downs) Sewerage Collection System and Waste 5 200 .. .. 5 200 Sewerage Collection System and Waste 5 200 .. .. 5 200 Sewerage Collection System and Waste 5 200 .. .. 5 200 Water Treatment and Disposal Water Treatment and Disposal Water Treatment and Disposal -Construction (Loch Sport) -Construction (Loch Sport) -Construction (Loch Sport) Loch Sport Water Supply Reticulation 6 000 .. .. 6 000 Loch Sport Water Supply Reticulation 6 000 .. .. 6 000 Loch Sport Water Supply Reticulation 6 000 .. .. 6 000 -Construction (Loch Sport) -Construction (Loch Sport) -Construction (Loch Sport)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 107 Public Sector Asset Investment Program 2003-04 Regional Urban Water 107 Public Sector Asset Investment Program 2003-04 Regional Urban Water 107

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Wastewater Treatment Plant -Upgrade 100 .. 100 .. Wastewater Treatment Plant -Upgrade 100 .. 100 .. (Moe) (Moe) Bulk Water -Improvement (Moondarra) 60 .. 50 10 Bulk Water -Improvement (Moondarra) 60 .. 50 10 Outfall Main (West) Reconnection 750 .. .. 750 Outfall Main (West) Reconnection 750 .. .. 750 -Upgrade (Morwell) -Upgrade (Morwell) Water Supply Main to International Power 1 500 .. 1 200 300 Water Supply Main to International Power 1 500 .. 1 200 300 Hazelwood -Replacement (Morwell) Hazelwood -Replacement (Morwell) High Level Pump and Water Treatment 370 .. 20 350 High Level Pump and Water Treatment 370 .. 20 350 Plant -Upgrade (Sale) Plant -Upgrade (Sale) Sewerage Pump Station 1 Inlet Work 370 .. 50 320 Sewerage Pump Station 1 Inlet Work 370 .. 50 320 -Upgrade (Sale) -Upgrade (Sale) Pump Station -Upgrade (Tanjil River) 320 .. .. 320 Pump Station -Upgrade (Tanjil River) 320 .. .. 320 Office Airconditioning Unit -Replacement 300 .. 300 .. Office Airconditioning Unit -Replacement 300 .. 300 .. (Traralgon) (Traralgon) Catchment Trunk Sewer -Upgrade 390 .. 40 350 Catchment Trunk Sewer -Upgrade 390 .. 40 350 (Traralgon) (Traralgon) Water Treatment Plant -Covering 350 .. .. 350 Water Treatment Plant -Covering 350 .. .. 350 Secondary Filters -Upgrade (Traralgon) Secondary Filters -Upgrade (Traralgon) Water Treatment Plant Primary Treatment 722 .. 202 520 Water Treatment Plant Primary Treatment 722 .. 202 520 -Upgrade (Traralgon) -Upgrade (Traralgon) Access Tracks and Paths for Various 71 .. .. 71 Access Tracks and Paths for Various 71 .. .. 71 Water Treatment Plants -Upgrade Water Treatment Plants -Upgrade (Various) (Various) ADWG, Bacteriological Driven Initiatives 350 .. 70 280 ADWG, Bacteriological Driven Initiatives 350 .. 70 280 -Upgrade (Various) -Upgrade (Various) Cathodic Protection -Waste -Upgrade 350 .. 70 280 Cathodic Protection -Waste -Upgrade 350 .. 70 280 (Various) (Various) Chemical Dosing Lime and PFS dosing at 115 .. 115 .. Chemical Dosing Lime and PFS dosing at 115 .. 115 .. Waste Water Treatment Plant -Upgrade Waste Water Treatment Plant -Upgrade (Various) (Various) CMMS Project -Upgrade (Various) 150 .. 150 .. CMMS Project -Upgrade (Various) 150 .. 150 .. Phone System -Replace (Various) 250 .. 250 .. Phone System -Replace (Various) 250 .. 250 .. Customer Charter Waste Water 500 .. 100 400 Customer Charter Waste Water 500 .. 100 400 Treatment and Outfall Initiatives Treatment and Outfall Initiatives -Upgrade (Various) -Upgrade (Various) EES Preparation -Development (Various) 20 .. 20 .. EES Preparation -Development (Various) 20 .. 20 .. Emerging Backlog Waste Water Schemes 240 .. 40 200 Emerging Backlog Waste Water Schemes 240 .. 40 200 -Upgrade (Various) -Upgrade (Various) Emerging Backlog Water Schemes 240 .. 40 200 Emerging Backlog Water Schemes 240 .. 40 200 -Upgrade (Various) -Upgrade (Various) Waste Water Treatment Plant -Upgrade 20 .. 20 .. Waste Water Treatment Plant -Upgrade 20 .. 20 .. (Various) (Various) Increase Number and Location of Sluice 250 .. .. 250 Increase Number and Location of Sluice 250 .. .. 250 Valves -Upgrade (Various) Valves -Upgrade (Various) Initiatives / Contingencies Waste Water 1 000 .. 200 800 Initiatives / Contingencies Waste Water 1 000 .. 200 800 Treatment -Upgrade (Various) Treatment -Upgrade (Various) Initiatives Contingencies Water Supply All 1 000 .. 200 800 Initiatives Contingencies Water Supply All 1 000 .. 200 800 Systems -Upgrade (Various) Systems -Upgrade (Various)

108 Regional Urban Water Public Sector Asset Investment Program 2003-04 108 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Installing Sewer Inspection Openings for 375 .. 75 300 Installing Sewer Inspection Openings for 375 .. 75 300 Installing Sewer Inspection Openings for 375 .. 75 300 Maintenance -Upgrade (Various) Maintenance -Upgrade (Various) Maintenance -Upgrade (Various) Integration Project -Upgrade (Various) 100 .. .. 100 Integration Project -Upgrade (Various) 100 .. .. 100 Integration Project -Upgrade (Various) 100 .. .. 100 Labelling of Above Ground Assets 200 .. 40 160 Labelling of Above Ground Assets 200 .. 40 160 Labelling of Above Ground Assets 200 .. 40 160 -Upgrade (Various) -Upgrade (Various) -Upgrade (Various) New Microwave Tower -Construction 25 .. 25 .. New Microwave Tower -Construction 25 .. 25 .. New Microwave Tower -Construction 25 .. 25 .. (Various) (Various) (Various) Oxygen Dissolvers -Upgrade (Various) 250 .. 50 200 Oxygen Dissolvers -Upgrade (Various) 250 .. 50 200 Oxygen Dissolvers -Upgrade (Various) 250 .. 50 200 Physical / Chemical ADWG, Compliance 350 .. 70 280 Physical / Chemical ADWG, Compliance 350 .. 70 280 Physical / Chemical ADWG, Compliance 350 .. 70 280 Initiatives -Upgrade (Various) Initiatives -Upgrade (Various) Initiatives -Upgrade (Various) Plant and Equipment Items -Replace 130 .. 50 80 Plant and Equipment Items -Replace 130 .. 50 80 Plant and Equipment Items -Replace 130 .. 50 80 (Various) (Various) (Various) Unlined Water Main Fittings and Pipe 425 .. 85 340 Unlined Water Main Fittings and Pipe 425 .. 85 340 Unlined Water Main Fittings and Pipe 425 .. 85 340 -Upgrade (Various) -Upgrade (Various) -Upgrade (Various) Detailed Engineering Study on ROS 1 250 .. 250 1 000 Detailed Engineering Study on ROS 1 250 .. 250 1 000 Detailed Engineering Study on ROS 1 250 .. 250 1 000 Redevelopment -Upgrade (Various) Redevelopment -Upgrade (Various) Redevelopment -Upgrade (Various) Replacement Water Factory -Construction 109 500 .. .. 109 500 Replacement Water Factory -Construction 109 500 .. .. 109 500 Replacement Water Factory -Construction 109 500 .. .. 109 500 (Various) (Various) (Various) Sewer Reticulation Customer Charter 500 .. 100 400 Sewer Reticulation Customer Charter 500 .. 100 400 Sewer Reticulation Customer Charter 500 .. 100 400 Initiatives -Upgrade (Various) Initiatives -Upgrade (Various) Initiatives -Upgrade (Various) Software -Upgrade (Various) 50 .. 50 .. Software -Upgrade (Various) 50 .. 50 .. Software -Upgrade (Various) 50 .. 50 .. Square Light Weight Gatic Type Sewer 185 .. 85 100 Square Light Weight Gatic Type Sewer 185 .. 85 100 Square Light Weight Gatic Type Sewer 185 .. 85 100 Lids -Upgrade (Various) Lids -Upgrade (Various) Lids -Upgrade (Various) Water Reticulation Network 2003 -2004 2 600 .. 400 2 200 Water Reticulation Network 2003 -2004 2 600 .. 400 2 200 Water Reticulation Network 2003 -2004 2 600 .. 400 2 200 for WQ and Meet Customer Charter for WQ and Meet Customer Charter for WQ and Meet Customer Charter -Upgrade (Various) -Upgrade (Various) -Upgrade (Various) Switchboard at Water Sites as per Safety 75 .. 75 .. Switchboard at Water Sites as per Safety 75 .. 75 .. Switchboard at Water Sites as per Safety 75 .. 75 .. Audit -Upgrade (Various) Audit -Upgrade (Various) Audit -Upgrade (Various) Water Storage for Water Treatment 181 .. 81 100 Water Storage for Water Treatment 181 .. 81 100 Water Storage for Water Treatment 181 .. 81 100 -Upgrade (Various) -Upgrade (Various) -Upgrade (Various) Waste Water Treatment Plant -Upgrade 1 131 .. 911 220 Waste Water Treatment Plant -Upgrade 1 131 .. 911 220 Waste Water Treatment Plant -Upgrade 1 131 .. 911 220 (Various) (Various) (Various) Water Supply Distribution Bulk Metering 4 000 .. .. 4 000 Water Supply Distribution Bulk Metering 4 000 .. .. 4 000 Water Supply Distribution Bulk Metering 4 000 .. .. 4 000 -Upgrade (Various) -Upgrade (Various) -Upgrade (Various) Water Treatment Initiatives / 1 000 .. 200 800 Water Treatment Initiatives / 1 000 .. 200 800 Water Treatment Initiatives / 1 000 .. 200 800 Contingencies -Upgrade (Various) Contingencies -Upgrade (Various) Contingencies -Upgrade (Various) Raw Water Supply Augmentation 1 300 .. 80 1 220 Raw Water Supply Augmentation 1 300 .. 80 1 220 Raw Water Supply Augmentation 1 300 .. 80 1 220 -Upgrade (Warragul) -Upgrade (Warragul) -Upgrade (Warragul) Industrial Estate Mains 1 & 10 -Upgrade 330 .. 80 250 Industrial Estate Mains 1 & 10 -Upgrade 330 .. 80 250 Industrial Estate Mains 1 & 10 -Upgrade 330 .. 80 250 (Yallourn) (Yallourn) (Yallourn) Coliban Region Water Authority Coliban Region Water Authority Coliban Region Water Authority Water Channels -Construction (Bendigo) 280 .. .. 280 Water Channels -Construction (Bendigo) 280 .. .. 280 Water Channels -Construction (Bendigo) 280 .. .. 280 Water Channels -Improvement (Bendigo) 100 .. .. 100 Water Channels -Improvement (Bendigo) 100 .. .. 100 Water Channels -Improvement (Bendigo) 100 .. .. 100 Water Distribution -Construction 150 .. .. 150 Water Distribution -Construction 150 .. .. 150 Water Distribution -Construction 150 .. .. 150 (Bendigo) (Bendigo) (Bendigo) Water Main -Construction (Bridgewater) 1 000 .. .. 1 000 Water Main -Construction (Bridgewater) 1 000 .. .. 1 000 Water Main -Construction (Bridgewater) 1 000 .. .. 1 000 Sewerage Treatment Plant -Construction 600 .. .. 600 Sewerage Treatment Plant -Construction 600 .. .. 600 Sewerage Treatment Plant -Construction 600 .. .. 600 -(Castlemaine) -(Castlemaine) -(Castlemaine) Public Sector Asset Investment Program 2003-04 Regional Urban Water 109 Public Sector Asset Investment Program 2003-04 Regional Urban Water 109 Public Sector Asset Investment Program 2003-04 Regional Urban Water 109

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Main -Improvement (Castlemaine) 50 .. 50 .. Water Main -Improvement (Castlemaine) 50 .. 50 .. Wastewater Pumping -Construction 170 .. .. 170 Wastewater Pumping -Construction 170 .. .. 170 (Echuca) (Echuca) Water Treatment -Improvement (Elmore) 100 .. 100 .. Water Treatment -Improvement (Elmore) 100 .. 100 .. Water Main -Construction (Goornong) 850 .. .. 850 Water Main -Construction (Goornong) 850 .. .. 850 Water Main -Construction (Gunbower) 520 .. .. 520 Water Main -Construction (Gunbower) 520 .. .. 520 Water Treatment -Improvement 100 .. .. 100 Water Treatment -Improvement 100 .. .. 100 (Heathcote) (Heathcote) Water Main -Replacement (Inglewood) 75 .. 75 .. Water Main -Replacement (Inglewood) 75 .. 75 .. Water Treatment -Improvement (Korong 60 .. .. 60 Water Treatment -Improvement (Korong 60 .. .. 60 Vale) Vale) Sewerage Treatment Plant -Construction 3 400 .. 400 3 000 Sewerage Treatment Plant -Construction 3 400 .. 400 3 000 (Kyneton) (Kyneton) Water Treatment -Improvement 50 .. .. 50 Water Treatment -Improvement 50 .. .. 50 (Laanecoorie) (Laanecoorie) Water Main -Replacement (Mitiamo) 50 .. .. 50 Water Main -Replacement (Mitiamo) 50 .. .. 50 Water Treatment -Improvement (Pyramid 80 .. .. 80 Water Treatment -Improvement (Pyramid 80 .. .. 80 Hill) Hill) Sewerage Pumping -Improvement 270 .. 15 255 Sewerage Pumping -Improvement 270 .. 15 255 (Rochester) (Rochester) Sewerage Treatment Plant -Improvement 200 .. 200 .. Sewerage Treatment Plant -Improvement 200 .. 200 .. (Rochester) (Rochester) Water Tank -Construction (Sebastian) 200 .. .. 200 Water Tank -Construction (Sebastian) 200 .. .. 200 Water Tank -Replacement (Serpentine) 80 .. 80 .. Water Tank -Replacement (Serpentine) 80 .. 80 .. Water Treatment -Improvement 40 .. 40 .. Water Treatment -Improvement 40 .. 40 .. (Serpentine) (Serpentine) Water Tank -Construction (Tooborac) 180 .. 180 .. Water Tank -Construction (Tooborac) 180 .. 180 .. Sewer Main -Replacement (Various) 4 419 .. .. 4 419 Sewer Main -Replacement (Various) 4 419 .. .. 4 419 Water Main -Replacement (Various) 5 078 .. .. 5 078 Water Main -Replacement (Various) 5 078 .. .. 5 078 Water Treatment -Construction 100 .. 100 .. Water Treatment -Construction 100 .. 100 .. (Wedderburn) (Wedderburn) East Gippsland Region Water Authority East Gippsland Region Water Authority Head Office Extensions (Bairnsdale) 800 .. 800 .. Head Office Extensions (Bairnsdale) 800 .. 800 .. Booster Pump Murphy Street (Bairnsdale) 300 .. 25 275 Booster Pump Murphy Street (Bairnsdale) 300 .. 25 275 Septic Tipping Station -Development 37 .. 37 .. Septic Tipping Station -Development 37 .. 37 .. (Bairnsdale) (Bairnsdale) Inlet Works Pipeworks -Upgrade 40 .. 40 .. Inlet Works Pipeworks -Upgrade 40 .. 40 .. (Bairnsdale) (Bairnsdale) Handrails and Waste Water Treatment 40 .. 40 .. Handrails and Waste Water Treatment 40 .. 40 .. Plant -Upgrade (Bairnsdale) Plant -Upgrade (Bairnsdale) Pump -Balfours Road (Bairnsdale) 350 35 315 Pump -Balfours Road (Bairnsdale) 350 35 315 Bemm River Treatment Plant 550 .. .. 550 Bemm River Treatment Plant 550 .. .. 550 -Development (Bemm River) -Development (Bemm River) Buchan Water Treatment Plant 500 .. .. 500 Buchan Water Treatment Plant 500 .. .. 500 -Development (Buchan) -Development (Buchan) Cann River Treatment Plant 800 .. .. 800 Cann River Treatment Plant 800 .. .. 800 -Development (Cann River) -Development (Cann River)

110 Regional Urban Water Public Sector Asset Investment Program 2003-04 110 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 UV filteration Lights -Upgrade (Dinner 35 .. .. 35 UV filteration Lights -Upgrade (Dinner 35 .. .. 35 UV filteration Lights -Upgrade (Dinner 35 .. .. 35 Plain) Plain) Plain) Install Additional Bore Pump -Upgrade 100 .. .. 100 Install Additional Bore Pump -Upgrade 100 .. .. 100 Install Additional Bore Pump -Upgrade 100 .. .. 100 (Dinner Plain) (Dinner Plain) (Dinner Plain) Aerators -Purchase (Dinner Plain) 80 .. .. 80 Aerators -Purchase (Dinner Plain) 80 .. .. 80 Aerators -Purchase (Dinner Plain) 80 .. .. 80 Irrigation Pumps Power Supply 100 .. .. 100 Irrigation Pumps Power Supply 100 .. .. 100 Irrigation Pumps Power Supply 100 .. .. 100 -Development (Dinner Plain) -Development (Dinner Plain) -Development (Dinner Plain) Irrigation Pumps Capacity Augmentation 30 .. .. 30 Irrigation Pumps Capacity Augmentation 30 .. .. 30 Irrigation Pumps Capacity Augmentation 30 .. .. 30 -Upgrade (Dinner Plain) -Upgrade (Dinner Plain) -Upgrade (Dinner Plain) Upgrade Existing Irrigation System 100 .. .. 100 Upgrade Existing Irrigation System 100 .. .. 100 Upgrade Existing Irrigation System 100 .. .. 100 -Upgrade (Dinner Plain) -Upgrade (Dinner Plain) -Upgrade (Dinner Plain) Pond No 4 -Development (Dinner Plain) 400 .. .. 400 Pond No 4 -Development (Dinner Plain) 400 .. .. 400 Pond No 4 -Development (Dinner Plain) 400 .. .. 400 Additional Irrigation Area -Purchase 60 .. .. 60 Additional Irrigation Area -Purchase 60 .. .. 60 Additional Irrigation Area -Purchase 60 .. .. 60 (Dinner Plain) (Dinner Plain) (Dinner Plain) Pump -Replacement (Glenaladale) 125 .. .. 125 Pump -Replacement (Glenaladale) 125 .. .. 125 Pump -Replacement (Glenaladale) 125 .. .. 125 Kalimna West Alternative Water Supply 370 .. .. 370 Kalimna West Alternative Water Supply 370 .. .. 370 Kalimna West Alternative Water Supply 370 .. .. 370 -Upgrade (Kalimna) -Upgrade (Kalimna) -Upgrade (Kalimna) 450 Dia Pipeline Sarsfield to Mbung Drive 383 .. .. 383 450 Dia Pipeline Sarsfield to Mbung Drive 383 .. .. 383 450 Dia Pipeline Sarsfield to Mbung Drive 383 .. .. 383 -Upgrade (Lakes Entrance) -Upgrade (Lakes Entrance) -Upgrade (Lakes Entrance) Sterling Howitt & David Streets -Upgrade 35 .. .. 35 Sterling Howitt & David Streets -Upgrade 35 .. .. 35 Sterling Howitt & David Streets -Upgrade 35 .. .. 35 (Lakes Entrance) (Lakes Entrance) (Lakes Entrance) Mains Replacement Gladstone St 75 .. .. 75 Mains Replacement Gladstone St 75 .. .. 75 Mains Replacement Gladstone St 75 .. .. 75 -Replacement (Lakes Entrance) -Replacement (Lakes Entrance) -Replacement (Lakes Entrance) 13ML Storage Basin -Development 100 .. .. 100 13ML Storage Basin -Development 100 .. .. 100 13ML Storage Basin -Development 100 .. .. 100 (Lindenow) (Lindenow) (Lindenow) Main Pipe -Upgrade (Lindenow) 145 .. 145 .. Main Pipe -Upgrade (Lindenow) 145 .. 145 .. Main Pipe -Upgrade (Lindenow) 145 .. 145 .. Wastewater Reuse -Development 30 .. .. 30 Wastewater Reuse -Development 30 .. .. 30 Wastewater Reuse -Development 30 .. .. 30 (Lindenow) (Lindenow) (Lindenow) Wastewater Treatment Lagoon Aerators 75 .. .. 75 Wastewater Treatment Lagoon Aerators 75 .. .. 75 Wastewater Treatment Lagoon Aerators 75 .. .. 75 -Development (Metung) -Development (Metung) -Development (Metung) Nowa Nowa Water Treatment Plant 650 .. .. 650 Nowa Nowa Water Treatment Plant 650 .. .. 650 Nowa Nowa Water Treatment Plant 650 .. .. 650 -Development (Nowa Nowa) -Development (Nowa Nowa) -Development (Nowa Nowa) Basin Cover 5 ML -Development (Omeo) 90 .. 90 .. Basin Cover 5 ML -Development (Omeo) 90 .. 90 .. Basin Cover 5 ML -Development (Omeo) 90 .. 90 .. Pump Station -Purchase (Paynesville) 30 .. 30 .. Pump Station -Purchase (Paynesville) 30 .. 30 .. Pump Station -Purchase (Paynesville) 30 .. 30 .. Banksia Peninsular Sewerage Scheme 705 .. 50 655 Banksia Peninsular Sewerage Scheme 705 .. 50 655 Banksia Peninsular Sewerage Scheme 705 .. 50 655 -Development (Paynesville) -Development (Paynesville) -Development (Paynesville) Sarsfield Pump Station -Upgrade 55 .. .. 55 Sarsfield Pump Station -Upgrade 55 .. .. 55 Sarsfield Pump Station -Upgrade 55 .. .. 55 (Sarsfield) (Sarsfield) (Sarsfield) PH control -Purchase (Swifts Creek) 38 .. .. 38 PH control -Purchase (Swifts Creek) 38 .. .. 38 PH control -Purchase (Swifts Creek) 38 .. .. 38 Water Treatment Plant -Development 600 .. .. 600 Water Treatment Plant -Development 600 .. .. 600 Water Treatment Plant -Development 600 .. .. 600 (Swifts Creek) (Swifts Creek) (Swifts Creek) Sewer Reticulation -Development 1 018 .. .. 1 018 Sewer Reticulation -Development 1 018 .. .. 1 018 Sewer Reticulation -Development 1 018 .. .. 1 018 (Various) (Various) (Various) SCADA implementation -Development 3 000 .. .. 3 000 SCADA implementation -Development 3 000 .. .. 3 000 SCADA implementation -Development 3 000 .. .. 3 000 (Various) (Various) (Various) SCADA Implementation -Purchase 1 200 .. .. 1 200 SCADA Implementation -Purchase 1 200 .. .. 1 200 SCADA Implementation -Purchase 1 200 .. .. 1 200 (Various) (Various) (Various)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 111 Public Sector Asset Investment Program 2003-04 Regional Urban Water 111 Public Sector Asset Investment Program 2003-04 Regional Urban Water 111

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Glenelg Region Water Authority Glenelg Region Water Authority Roof & Line Service Basin -Construction 100 .. .. 100 Roof & Line Service Basin -Construction 100 .. .. 100 (Balmoral) (Balmoral) Water Treatment -Construction (Balmoral) 530 .. .. 530 Water Treatment -Construction (Balmoral) 530 .. .. 530 Irrigation Improvements -Construction 29 .. 29 .. Irrigation Improvements -Construction 29 .. 29 .. (Casterton) (Casterton) Jackson St Aerator -Construction 10 .. 10 .. Jackson St Aerator -Construction 10 .. 10 .. (Casterton) (Casterton) Main Replace -Construction (Casterton) 400 .. .. 400 Main Replace -Construction (Casterton) 400 .. .. 400 Booster Pump -Construction (Cavendish) 40 .. .. 40 Booster Pump -Construction (Cavendish) 40 .. .. 40 Clear Water Storage -Construction 510 .. .. 510 Clear Water Storage -Construction 510 .. .. 510 (Coleraine) (Coleraine) Main Replacements -Construction 200 .. .. 200 Main Replacements -Construction 200 .. .. 200 (Coleraine) (Coleraine) Reticulaion Improvements -Construction 28 .. 28 .. Reticulaion Improvements -Construction 28 .. 28 .. (Dunkeld) (Dunkeld) Water Mains -Replacement (Dunkeld) 205 .. .. 205 Water Mains -Replacement (Dunkeld) 205 .. .. 205 Mains Replace -Construction 150 .. .. 150 Mains Replace -Construction 150 .. .. 150 (Glenthompson) (Glenthompson) Railway Res -Construction 25 .. .. 25 Railway Res -Construction 25 .. .. 25 (Glenthompson) (Glenthompson) Alkalinity -Construction (Hamilton) 650 .. .. 650 Alkalinity -Construction (Hamilton) 650 .. .. 650 Cruckoor Branchline -Construction 215 .. .. 215 Cruckoor Branchline -Construction 215 .. .. 215 (Hamilton) (Hamilton) Drainage -Construction (Hamilton) 80 .. 80 .. Drainage -Construction (Hamilton) 80 .. 80 .. Eastern Zone Water Pressure 450 .. .. 450 Eastern Zone Water Pressure 450 .. .. 450 -Improvement (Hamilton) -Improvement (Hamilton) Feeder Mains -Construction (Hamilton) 660 .. .. 660 Feeder Mains -Construction (Hamilton) 660 .. .. 660 Gap Creek Replacement -Construction 700 .. .. 700 Gap Creek Replacement -Construction 700 .. .. 700 (Hamilton) (Hamilton) Homestead -Construction (Hamilton) 22 .. 22 .. Homestead -Construction (Hamilton) 22 .. 22 .. Inlet Step Screen -Construction (Hamilton) 137 .. 137 .. Inlet Step Screen -Construction (Hamilton) 137 .. 137 .. Retic Improvements -Construction 53 .. 53 .. Retic Improvements -Construction 53 .. 53 .. (Hamilton) (Hamilton) Retic Replace -Construction (Hamilton) 200 .. .. 200 Retic Replace -Construction (Hamilton) 200 .. .. 200 Sewer Overload -Construction (Hamilton) 25 .. 25 .. Sewer Overload -Construction (Hamilton) 25 .. 25 .. Sewerage Treatment Plant -Biosolids 620 .. .. 620 Sewerage Treatment Plant -Biosolids 620 .. .. 620 Digester -Construction (Hamilton) Digester -Construction (Hamilton) Upgrade Pump Stations -Construction 200 .. .. 200 Upgrade Pump Stations -Construction 200 .. .. 200 (Hamilton) (Hamilton) Clear Water Storage -Construction 220 .. .. 220 Clear Water Storage -Construction 220 .. .. 220 (Merino) (Merino) Water Mains -Replacement (Merino) 120 .. .. 120 Water Mains -Replacement (Merino) 120 .. .. 120 Water Mains -Replacement (Penshurst) 265 .. 60 205 Water Mains -Replacement (Penshurst) 265 .. 60 205 Clear Water Storage -Construction 120 .. 120 .. Clear Water Storage -Construction 120 .. 120 .. (Sandford) (Sandford) Transfer System -Construction (Sandford) 60 .. 60 .. Transfer System -Construction (Sandford) 60 .. 60 ..

112 Regional Urban Water Public Sector Asset Investment Program 2003-04 112 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Computers -Purchase (Various) 224 .. 59 165 Computers -Purchase (Various) 224 .. 59 165 Computers -Purchase (Various) 224 .. 59 165 Goulburn Valley Region Water Authority Goulburn Valley Region Water Authority Goulburn Valley Region Water Authority Basin Offtake Works -Replacement 95 .. .. 95 Basin Offtake Works -Replacement 95 .. .. 95 Basin Offtake Works -Replacement 95 .. .. 95 (Alexandra) (Alexandra) (Alexandra) River Pump Station Additional Pump 70 .. .. 70 River Pump Station Additional Pump 70 .. .. 70 River Pump Station Additional Pump 70 .. .. 70 -Improvement (Alexandra) -Improvement (Alexandra) -Improvement (Alexandra) WMF Septage Receival Facilities 370 .. 30 340 WMF Septage Receival Facilities 370 .. 30 340 WMF Septage Receival Facilities 370 .. 30 340 -Replacement (Alexandra and Mansfield) -Replacement (Alexandra and Mansfield) -Replacement (Alexandra and Mansfield) Water Treatment Plant -Upgrade 25 .. .. 25 Water Treatment Plant -Upgrade 25 .. .. 25 Water Treatment Plant -Upgrade 25 .. .. 25 (Barmah) (Barmah) (Barmah) Distribution Main to Mount Piper Estate 290 .. .. 290 Distribution Main to Mount Piper Estate 290 .. .. 290 Distribution Main to Mount Piper Estate 290 .. .. 290 -Construction (Broadford) -Construction (Broadford) -Construction (Broadford) Govett and Hamilton Streets Water Main 205 .. .. 205 Govett and Hamilton Streets Water Main 205 .. .. 205 Govett and Hamilton Streets Water Main 205 .. .. 205 -Replacement (Broadford) -Replacement (Broadford) -Replacement (Broadford) Reservoir No.3 -Upgrade (Broadford) 410 .. .. 410 Reservoir No.3 -Upgrade (Broadford) 410 .. .. 410 Reservoir No.3 -Upgrade (Broadford) 410 .. .. 410 Sunday Creek Tower Stair -Replacement 165 .. 165 .. Sunday Creek Tower Stair -Replacement 165 .. 165 .. Sunday Creek Tower Stair -Replacement 165 .. 165 .. (Broadford) (Broadford) (Broadford) Water Treatment Plant Augmentation 2 290 .. .. 2 290 Water Treatment Plant Augmentation 2 290 .. .. 2 290 Water Treatment Plant Augmentation 2 290 .. .. 2 290 Stage 2 -Augmentation (Cobram) Stage 2 -Augmentation (Cobram) Stage 2 -Augmentation (Cobram) Rising Main Replacement -Replacement 205 .. .. 205 Rising Main Replacement -Replacement 205 .. .. 205 Rising Main Replacement -Replacement 205 .. .. 205 (Eildon) (Eildon) (Eildon) Anderson Street No. 2 P.S. Pump 55 .. .. 55 Anderson Street No. 2 P.S. Pump 55 .. .. 55 Anderson Street No. 2 P.S. Pump 55 .. .. 55 Replacement -Replacement () Replacement -Replacement (Euroa) Replacement -Replacement (Euroa) Anderson Street Water Main 325 .. .. 325 Anderson Street Water Main 325 .. .. 325 Anderson Street Water Main 325 .. .. 325 -Replacement (Euroa) -Replacement (Euroa) -Replacement (Euroa) Booster Pumps -Replacement 50 .. .. 50 Booster Pumps -Replacement 50 .. .. 50 Booster Pumps -Replacement 50 .. .. 50 (Katamatite) (Katamatite) (Katamatite) Water Treatment Plant -Upgrade 170 .. .. 170 Water Treatment Plant -Upgrade 170 .. .. 170 Water Treatment Plant -Upgrade 170 .. .. 170 (Katamatite) (Katamatite) (Katamatite) Raw Water Basin -Improvement 160 .. .. 160 Raw Water Basin -Improvement 160 .. .. 160 Raw Water Basin -Improvement 160 .. .. 160 (Katandra) (Katandra) (Katandra) Sunday Creek Reservoir -Upgrade 4 300 .. .. 4 300 Sunday Creek Reservoir -Upgrade 4 300 .. .. 4 300 Sunday Creek Reservoir -Upgrade 4 300 .. .. 4 300 (Kilmore) (Kilmore) (Kilmore) Sunday Creek to Hollowback Pipeline 1 000 .. .. 1 000 Sunday Creek to Hollowback Pipeline 1 000 .. .. 1 000 Sunday Creek to Hollowback Pipeline 1 000 .. .. 1 000 Duplication -Growth (Kilmore) Duplication -Growth (Kilmore) Duplication -Growth (Kilmore) WMF Augmentation -Augmentation 440 .. .. 440 WMF Augmentation -Augmentation 440 .. .. 440 WMF Augmentation -Augmentation 440 .. .. 440 (Kilmore) (Kilmore) (Kilmore) WMF Stage 2 Irrigation -Improvement 375 .. .. 375 WMF Stage 2 Irrigation -Improvement 375 .. .. 375 WMF Stage 2 Irrigation -Improvement 375 .. .. 375 (Kilmore) (Kilmore) (Kilmore) Water Treatment Plant Stage 2 4 050 .. .. 4 050 Water Treatment Plant Stage 2 4 050 .. .. 4 050 Water Treatment Plant Stage 2 4 050 .. .. 4 050 -Augmentation (Kilmore) -Augmentation (Kilmore) -Augmentation (Kilmore) Sewer Pump Station Switchboards 50 .. .. 50 Sewer Pump Station Switchboards 50 .. .. 50 Sewer Pump Station Switchboards 50 .. .. 50 -Upgrade (Kyabram ) -Upgrade (Kyabram ) -Upgrade (Kyabram ) WMF Augmentation Stage 2 2 000 .. 200 1 800 WMF Augmentation Stage 2 2 000 .. 200 1 800 WMF Augmentation Stage 2 2 000 .. 200 1 800 -Augmentation (Kyabram ) -Augmentation (Kyabram ) -Augmentation (Kyabram ) Reclaimed Water Pipeline to Golf Course 100 .. 100 .. Reclaimed Water Pipeline to Golf Course 100 .. 100 .. Reclaimed Water Pipeline to Golf Course 100 .. 100 .. -Improvement (Mansfield) -Improvement (Mansfield) -Improvement (Mansfield)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 113 Public Sector Asset Investment Program 2003-04 Regional Urban Water 113 Public Sector Asset Investment Program 2003-04 Regional Urban Water 113

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Ritchies Reservoir Pump -Upgrade 100 .. .. 100 Ritchies Reservoir Pump -Upgrade 100 .. .. 100 (Mansfield) (Mansfield) Benalla Road Pump Station -Upgrade 120 .. 120 .. Benalla Road Pump Station -Upgrade 120 .. 120 .. (Mansfield) (Mansfield) No. 1 Pump Station Generator 35 .. .. 35 No. 1 Pump Station Generator 35 .. .. 35 -Improvement (Marysville ) -Improvement (Marysville ) Demolition of Old Water Treatment Plant 150 .. .. 150 Demolition of Old Water Treatment Plant 150 .. .. 150 -Decommissioning (Mooroopna ) -Decommissioning (Mooroopna ) WMF Chemical Dosing -Improvement 395 .. .. 395 WMF Chemical Dosing -Improvement 395 .. .. 395 (Mooroopna ) (Mooroopna ) High Lift Pumps -Replacement 245 .. .. 245 High Lift Pumps -Replacement 245 .. .. 245 (Numurkah) (Numurkah) Raw Water Inlet -Upgrade (Numurkah) 55 .. .. 55 Raw Water Inlet -Upgrade (Numurkah) 55 .. .. 55 Water Treatment Plant Sedimentation 125 .. .. 125 Water Treatment Plant Sedimentation 125 .. .. 125 Tank -Upgrade (Numurkah) Tank -Upgrade (Numurkah) Water Treatment Plant -Improvement 70 .. .. 70 Water Treatment Plant -Improvement 70 .. .. 70 (Picola) (Picola) Water Reticulation -Upgrade (Seymour) 330 .. .. 330 Water Reticulation -Upgrade (Seymour) 330 .. .. 330 Water Treatment Plant Switchboard 140 .. .. 140 Water Treatment Plant Switchboard 140 .. .. 140 -Replacement (Seymour) -Replacement (Seymour) New High Level System -Replacement 135 .. .. 135 New High Level System -Replacement 135 .. .. 135 (Seymour/Tallarook ) (Seymour/Tallarook ) Byham Park Pump Station Stage 2 170 .. .. 170 Byham Park Pump Station Stage 2 170 .. .. 170 -Improvement (Shepparton ) -Improvement (Shepparton ) Citect Control of Water Treatment Plant 130 .. .. 130 Citect Control of Water Treatment Plant 130 .. .. 130 -Improvement (Shepparton ) -Improvement (Shepparton ) Gravity Sewer Wanganui Rd 915 .. .. 915 Gravity Sewer Wanganui Rd 915 .. .. 915 -Replacement (Shepparton ) -Replacement (Shepparton ) Office Accommodation -Construction 410 .. 410 .. Office Accommodation -Construction 410 .. 410 .. (Shepparton ) (Shepparton ) Maculata Drive Tower -Replacement 475 .. .. 475 Maculata Drive Tower -Replacement 475 .. .. 475 (Shepparton ) (Shepparton ) Mason Street No. 1 Pump Station 135 .. .. 135 Mason Street No. 1 Pump Station 135 .. .. 135 -Upgrade (Shepparton ) -Upgrade (Shepparton ) Numurkah Rd & Wanganui Rd Trunk 885 .. .. 885 Numurkah Rd & Wanganui Rd Trunk 885 .. .. 885 Mains -Improvement (Shepparton ) Mains -Improvement (Shepparton ) Water Treatment Plant Capacity -Upgrade 12 750 .. .. 12 750 Water Treatment Plant Capacity -Upgrade 12 750 .. .. 12 750 (Shepparton ) (Shepparton ) Water Supply Distribution (Kingfisher 300 .. 90 210 Water Supply Distribution (Kingfisher 300 .. 90 210 Drive) -Growth (Shepparton ) Drive) -Growth (Shepparton ) Welsford St Water Treatment Plant 365 .. 135 230 Welsford St Water Treatment Plant 365 .. 135 230 Electrics -Upgrade (Shepparton ) Electrics -Upgrade (Shepparton ) WMF Entrance Reconstruction 35 .. 35 .. WMF Entrance Reconstruction 35 .. 35 .. -Improvement (Shepparton ) -Improvement (Shepparton ) WMF Lagoon Beaching -Improvement 550 .. 550 .. WMF Lagoon Beaching -Improvement 550 .. 550 .. (Shepparton ) (Shepparton ) WMF Septage Receival -Improvement 125 .. 125 .. WMF Septage Receival -Improvement 125 .. 125 .. (Shepparton ) (Shepparton )

114 Regional Urban Water Public Sector Asset Investment Program 2003-04 114 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Water Treatment Plant Plant Alarms to 60 .. 60 .. Water Treatment Plant Plant Alarms to 60 .. 60 .. Water Treatment Plant Plant Alarms to 60 .. 60 .. SCADA -Improvement (Shepparton ) SCADA -Improvement (Shepparton ) SCADA -Improvement (Shepparton ) Water Pump Station -Upgrade (Stanhope) 360 .. 360 .. Water Pump Station -Upgrade (Stanhope) 360 .. 360 .. Water Pump Station -Upgrade (Stanhope) 360 .. 360 .. Water Supply Masterplan -Growth 40 .. 40 .. Water Supply Masterplan -Growth 40 .. 40 .. Water Supply Masterplan -Growth 40 .. 40 .. (Tatura ) (Tatura ) (Tatura ) High Lift Pumps -Replacement (Tongala) 90 .. .. 90 High Lift Pumps -Replacement (Tongala) 90 .. .. 90 High Lift Pumps -Replacement (Tongala) 90 .. .. 90 Treated Water Storage -Improvement 420 .. .. 420 Treated Water Storage -Improvement 420 .. .. 420 Treated Water Storage -Improvement 420 .. .. 420 (Tongala) (Tongala) (Tongala) Alpine Ridge Water Pump Station 55 .. .. 55 Alpine Ridge Water Pump Station 55 .. .. 55 Alpine Ridge Water Pump Station 55 .. .. 55 -Upgrade (Upper Delatite) -Upgrade (Upper Delatite) -Upgrade (Upper Delatite) WMF Irrigation Meters -Improvement 125 .. .. 125 WMF Irrigation Meters -Improvement 125 .. .. 125 WMF Irrigation Meters -Improvement 125 .. .. 125 (Various) (Various) (Various) Emergency Switchboard and Pump 100 .. .. 100 Emergency Switchboard and Pump 100 .. .. 100 Emergency Switchboard and Pump 100 .. .. 100 -Improvement (Various) -Improvement (Various) -Improvement (Various) Removal of Old Water Tower Tanks 20 .. .. 20 Removal of Old Water Tower Tanks 20 .. .. 20 Removal of Old Water Tower Tanks 20 .. .. 20 -Decommissioning (Various) -Decommissioning (Various) -Decommissioning (Various) Southern Areas Water Supply Masterplan 90 .. 90 .. Southern Areas Water Supply Masterplan 90 .. 90 .. Southern Areas Water Supply Masterplan 90 .. 90 .. -Growth (Various) -Growth (Various) -Growth (Various) Standby Disinfection -Improvement 310 .. 310 .. Standby Disinfection -Improvement 310 .. 310 .. Standby Disinfection -Improvement 310 .. 310 .. (Various) (Various) (Various) Standby Generators -Improvement 280 .. .. 280 Standby Generators -Improvement 280 .. .. 280 Standby Generators -Improvement 280 .. .. 280 (Various) (Various) (Various) Standby Power -Water Disinfection 105 .. 105 .. Standby Power -Water Disinfection 105 .. 105 .. Standby Power -Water Disinfection 105 .. 105 .. -Improvement (Various) -Improvement (Various) -Improvement (Various) Water Meters Stock Increase 1 300 .. 130 1 170 Water Meters Stock Increase 1 300 .. 130 1 170 Water Meters Stock Increase 1 300 .. 130 1 170 -Replacement (Various) -Replacement (Various) -Replacement (Various) Water Tower Ladder -Replacement 175 .. 175 .. Water Tower Ladder -Replacement 175 .. 175 .. Water Tower Ladder -Replacement 175 .. 175 .. (Various) (Various) (Various) Water Treatment Plant SCADA Crash 210 .. .. 210 Water Treatment Plant SCADA Crash 210 .. .. 210 Water Treatment Plant SCADA Crash 210 .. .. 210 Stops -Improvement (Various) Stops -Improvement (Various) Stops -Improvement (Various) Stage 2 High Level System -Improvement 300 .. .. 300 Stage 2 High Level System -Improvement 300 .. .. 300 Stage 2 High Level System -Improvement 300 .. .. 300 (Wallan) (Wallan) (Wallan) Stage 2 Irrigation -Improvement (Wallan) 570 .. .. 570 Stage 2 Irrigation -Improvement (Wallan) 570 .. .. 570 Stage 2 Irrigation -Improvement (Wallan) 570 .. .. 570 Stage 2 Winter Storage -Improvement 640 .. .. 640 Stage 2 Winter Storage -Improvement 640 .. .. 640 Stage 2 Winter Storage -Improvement 640 .. .. 640 (Wallan) (Wallan) (Wallan) WMF Treatment -Upgrade (Wallan) 235 .. 140 95 WMF Treatment -Upgrade (Wallan) 235 .. 140 95 WMF Treatment -Upgrade (Wallan) 235 .. 140 95 Raw Water Pumps -Replacement (Yea) 20 .. .. 20 Raw Water Pumps -Replacement (Yea) 20 .. .. 20 Raw Water Pumps -Replacement (Yea) 20 .. .. 20 Lower Murray Region Water Authority Lower Murray Region Water Authority Lower Murray Region Water Authority Sewerage Treatment Plant -Augmentation 10 380 .. 130 10 250 Sewerage Treatment Plant -Augmentation 10 380 .. 130 10 250 Sewerage Treatment Plant -Augmentation 10 380 .. 130 10 250 (Koorlong) (Koorlong) (Koorlong) Water Storage -Construction (Mildura) 1 900 .. 1 900 .. Water Storage -Construction (Mildura) 1 900 .. 1 900 .. Water Storage -Construction (Mildura) 1 900 .. 1 900 .. Water Storage -Construction (Mildura) 1 900 .. 1 900 .. Water Storage -Construction (Mildura) 1 900 .. 1 900 .. Water Storage -Construction (Mildura) 1 900 .. 1 900 .. Water Treatment Plant Process -Upgrade 2 000 .. 2 000 .. Water Treatment Plant Process -Upgrade 2 000 .. 2 000 .. Water Treatment Plant Process -Upgrade 2 000 .. 2 000 .. (Mildura) (Mildura) (Mildura) Water Treatment Plant -Upgrade 400 .. .. 400 Water Treatment Plant -Upgrade 400 .. .. 400 Water Treatment Plant -Upgrade 400 .. .. 400 (Robinvale) (Robinvale) (Robinvale)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 115 Public Sector Asset Investment Program 2003-04 Regional Urban Water 115 Public Sector Asset Investment Program 2003-04 Regional Urban Water 115

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 North East Region Water Authority North East Region Water Authority Barambogie Reservior Embankment 50 .. 50 .. Barambogie Reservior Embankment 50 .. 50 .. Stability -Improvement (Chiltern) Stability -Improvement (Chiltern) Sewerage Treatment Plant -Improvement 50 .. 50 .. Sewerage Treatment Plant -Improvement 50 .. 50 .. (Dartmouth) (Dartmouth) Waste Water Treatment Plant Inlet Works 100 .. 100 .. Waste Water Treatment Plant Inlet Works 100 .. 100 .. -Construction (Myrtleford) -Construction (Myrtleford) Knowledge Management System 172 .. 172 .. Knowledge Management System 172 .. 172 .. -Development (Various) -Development (Various) Portland Coast Region Water Authority Portland Coast Region Water Authority Water Supply Bores (Beavis St New Bore) 350 .. 350 .. Water Supply Bores (Beavis St New Bore) 350 .. 350 .. -Improvement (Heywood) -Improvement (Heywood) Tractor at Waste Water Treatment Plant 79 .. 79 .. Tractor at Waste Water Treatment Plant 79 .. 79 .. -Replacement (Port Fairy) -Replacement (Port Fairy) Telemetry -Implementation (Various) 235 .. 15 220 Telemetry -Implementation (Various) 235 .. 15 220 South Gippsland Region Water Authority South Gippsland Region Water Authority Water Treatment Plant -Improvement 40 .. 40 .. Water Treatment Plant -Improvement 40 .. 40 .. (Fish Creek) (Fish Creek) Water Treatment Plant -Upgrade (Foster) 90 .. 90 .. Water Treatment Plant -Upgrade (Foster) 90 .. 90 .. Water Treatment Plant -Upgrade (Foster) 40 .. 40 .. Water Treatment Plant -Upgrade (Foster) 40 .. 40 .. Sewerage Treatment Plant -Lagoons 30 .. 30 .. Sewerage Treatment Plant -Lagoons 30 .. 30 .. -Upgrade (Inverloch) -Upgrade (Inverloch) Sewer Outfall -Upgrade (Korumburra) 1 000 .. .. 1 000 Sewer Outfall -Upgrade (Korumburra) 1 000 .. .. 1 000 Reservoir -Pumps and Pump Station 50 .. 50 .. Reservoir -Pumps and Pump Station 50 .. 50 .. -Upgrade (Korumburra) -Upgrade (Korumburra) Reservoir -Destratification (Lance Creek) 105 .. 105 .. Reservoir -Destratification (Lance Creek) 105 .. 105 .. Sewer Outfall -Upgrade (Leongatha) 1 400 .. .. 1 400 Sewer Outfall -Upgrade (Leongatha) 1 400 .. .. 1 400 Water Filtration Plant -Upgrade (Toora) 125 .. 125 .. Water Filtration Plant -Upgrade (Toora) 125 .. 125 .. Radio Communications Umbrella Network 390 .. 300 90 Radio Communications Umbrella Network 390 .. 300 90 -Upgrade (Various) -Upgrade (Various) Office and Depot -Improvements (Various) 40 .. 40 .. Office and Depot -Improvements (Various) 40 .. 40 .. Sewerage Treatment Plant -Upgrade 50 .. 50 .. Sewerage Treatment Plant -Upgrade 50 .. 50 .. (Wonthaggi) (Wonthaggi) South West Water Authority South West Water Authority Water Treatment Plant Acidity/Alkalinity 185 .. .. 185 Water Treatment Plant Acidity/Alkalinity 185 .. .. 185 -Investigation (Camperdown) -Investigation (Camperdown) Water Pumps -Refurbishment (Gellibrand 160 .. .. 160 Water Pumps -Refurbishment (Gellibrand 160 .. .. 160 River) River) Sewer Reticulation -Improvement (Koroit) 90 .. 90 .. Sewer Reticulation -Improvement (Koroit) 90 .. 90 .. Water Disinfection Equipment -Installation 110 .. 110 .. Water Disinfection Equipment -Installation 110 .. 110 .. (Lismore) (Lismore) Water Pipeline to Timboon -Upgrade 730 .. .. 730 Water Pipeline to Timboon -Upgrade 730 .. .. 730 (Port Campbell) (Port Campbell) Water Reticulation -Port Campbell 125 .. 125 .. Water Reticulation -Port Campbell 125 .. 125 .. Timboon Road -Extension (Port Timboon Road -Extension (Port Campbell) Campbell) Water Treatment Plant -Construction ...... Water Treatment Plant -Construction ...... (Purnim) (Purnim) 116 Regional Urban Water Public Sector Asset Investment Program 2003-04 116 Regional Urban Water Public Sector Asset Investment Program 2003-04

($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Sewer Reticulation -Replace 500m 50 .. 50 .. Sewer Reticulation -Replace 500m 50 .. 50 .. Sewer Reticulation -Replace 500m 50 .. 50 .. feeding Waste Water Treatment Plant feeding Waste Water Treatment Plant feeding Waste Water Treatment Plant (Simpson) (Simpson) (Simpson) Water Reticulation -Improve Safety 60 .. 60 .. Water Reticulation -Improve Safety 60 .. 60 .. Water Reticulation -Improve Safety 60 .. 60 .. Access for Chemicals (Tank Hill) Access for Chemicals (Tank Hill) Access for Chemicals (Tank Hill) Additional Groundwater Supplies ...... Additional Groundwater Supplies ...... Additional Groundwater Supplies ...... -Investigation (Various) -Investigation (Various) -Investigation (Various) Water Reticulation Leakage -Investigation 100 .. 50 50 Water Reticulation Leakage -Investigation 100 .. 50 50 Water Reticulation Leakage -Investigation 100 .. 50 50 (Warrnambool) (Warrnambool) (Warrnambool) Corroded Sewers -Rehabilitation 150 .. 30 120 Corroded Sewers -Rehabilitation 150 .. 30 120 Corroded Sewers -Rehabilitation 150 .. 30 120 (Warrnambool) (Warrnambool) (Warrnambool) Water Reticulation -Augmentation 156 .. 20 136 Water Reticulation -Augmentation 156 .. 20 136 Water Reticulation -Augmentation 156 .. 20 136 (Warrnambool) (Warrnambool) (Warrnambool) Brierly Water Basin Overflow -Diversion 50 .. .. 50 Brierly Water Basin Overflow -Diversion 50 .. .. 50 Brierly Water Basin Overflow -Diversion 50 .. .. 50 (Warrnambool) (Warrnambool) (Warrnambool) Sewerage Treatment Plant Blower 150 .. 120 30 Sewerage Treatment Plant Blower 150 .. 120 30 Sewerage Treatment Plant Blower 150 .. 120 30 Controls -Improvement (Warrnambool) Controls -Improvement (Warrnambool) Controls -Improvement (Warrnambool) Water Treatment Standby Chlorinator 120 .. 120 .. Water Treatment Standby Chlorinator 120 .. 120 .. Water Treatment Standby Chlorinator 120 .. 120 .. -Improvement (Warrnambool) -Improvement (Warrnambool) -Improvement (Warrnambool) Sewer Reticulation -Second Pipeline from 3 870 .. 470 3 400 Sewer Reticulation -Second Pipeline from 3 870 .. 470 3 400 Sewer Reticulation -Second Pipeline from 3 870 .. 470 3 400 Nestle (Warrnambool) Nestle (Warrnambool) Nestle (Warrnambool) Information Technology Systems 134 .. 134 .. Information Technology Systems 134 .. 134 .. Information Technology Systems 134 .. 134 .. -Windows Upgrades (Warrnambool) -Windows Upgrades (Warrnambool) -Windows Upgrades (Warrnambool) Information Technology Systems -Data 187 .. 187 .. Information Technology Systems -Data 187 .. 187 .. Information Technology Systems -Data 187 .. 187 .. Storage Equipment (Warrnambool) Storage Equipment (Warrnambool) Storage Equipment (Warrnambool) Westernport Region Water Authority Westernport Region Water Authority Westernport Region Water Authority Sewerage Treatment Plant (King Road) 215 .. 25 190 Sewerage Treatment Plant (King Road) 215 .. 25 190 Sewerage Treatment Plant (King Road) 215 .. 25 190 -Small Lagoon Upgrade (Coronet Bay) -Small Lagoon Upgrade (Coronet Bay) -Small Lagoon Upgrade (Coronet Bay) Sewerage Treatment Plant (King Road) 100 .. 100 .. Sewerage Treatment Plant (King Road) 100 .. 100 .. Sewerage Treatment Plant (King Road) 100 .. 100 .. -Upgrade Lagoon Bypass (Coronet Bay) -Upgrade Lagoon Bypass (Coronet Bay) -Upgrade Lagoon Bypass (Coronet Bay) Sewerage Treatment Plant (King Road) 105 .. 105 .. Sewerage Treatment Plant (King Road) 105 .. 105 .. Sewerage Treatment Plant (King Road) 105 .. 105 .. -Farm Program (Coronet Bay) -Farm Program (Coronet Bay) -Farm Program (Coronet Bay) Strategic Land Purchase -Wastewater 2 911 .. 721 2 190 Strategic Land Purchase -Wastewater 2 911 .. 721 2 190 Strategic Land Purchase -Wastewater 2 911 .. 721 2 190 (Coronet Bay) (Coronet Bay) (Coronet Bay) Water Reservoir -Spillway and Capacity 50 .. 50 .. Water Reservoir -Spillway and Capacity 50 .. 50 .. Water Reservoir -Spillway and Capacity 50 .. 50 .. -Upgrade (Glen Forbes) -Upgrade (Glen Forbes) -Upgrade (Glen Forbes) Water Reservoir Catchment -Water 120 .. 20 100 Water Reservoir Catchment -Water 120 .. 20 100 Water Reservoir Catchment -Water 120 .. 20 100 Quality Improvement (Glen Forbes) Quality Improvement (Glen Forbes) Quality Improvement (Glen Forbes) Sewer Reticulation -Extension (Various) 160 .. 10 150 Sewer Reticulation -Extension (Various) 160 .. 10 150 Sewer Reticulation -Extension (Various) 160 .. 10 150 Augmentation of Supply -Melbourne 8 300 .. 300 8 000 Augmentation of Supply -Melbourne 8 300 .. 300 8 000 Augmentation of Supply -Melbourne 8 300 .. 300 8 000 Pipeline (Various) Pipeline (Various) Pipeline (Various) Sewage Pump Stations -Pump Upgrades 100 .. 50 50 Sewage Pump Stations -Pump Upgrades 100 .. 50 50 Sewage Pump Stations -Pump Upgrades 100 .. 50 50 (Various) (Various) (Various) Sewage Pump Stations -Electrical 165 .. 100 65 Sewage Pump Stations -Electrical 165 .. 100 65 Sewage Pump Stations -Electrical 165 .. 100 65 Switchboard Upgrades (Various) Switchboard Upgrades (Various) Switchboard Upgrades (Various) Western Region Water Authority Western Region Water Authority Western Region Water Authority Water Treatment Plant -Decommissioning 265 .. .. 265 Water Treatment Plant -Decommissioning 265 .. .. 265 Water Treatment Plant -Decommissioning 265 .. .. 265 (Bacchus Marsh) (Bacchus Marsh) (Bacchus Marsh)

Public Sector Asset Investment Program 2003-04 Regional Urban Water 117 Public Sector Asset Investment Program 2003-04 Regional Urban Water 117 Public Sector Asset Investment Program 2003-04 Regional Urban Water 117

($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Mains -Upsizing (Bacchus Marsh) 50 .. .. 50 Mains -Upsizing (Bacchus Marsh) 50 .. .. 50 Parwan Waste Water Treatment Plant 719 .. 55 664 Parwan Waste Water Treatment Plant 719 .. 55 664 -Upgrade (Bacchus Marsh) -Upgrade (Bacchus Marsh) Distribution Pipelines -Construction (Bulla) 460 .. .. 460 Distribution Pipelines -Construction (Bulla) 460 .. .. 460 Collection -Replacement (Diggers Rest) 150 .. 50 100 Collection -Replacement (Diggers Rest) 150 .. 50 100 Distribution Pipeline -Construction 2 550 .. .. 2 550 Distribution Pipeline -Construction 2 550 .. .. 2 550 (Gisborne) (Gisborne) Gisborne Pump Station Renewals 150 .. 150 .. Gisborne Pump Station Renewals 150 .. 150 .. -Replacement (Gisborne) -Replacement (Gisborne) Water Treatment Plant -Augmentation 2 500 .. 50 2 450 Water Treatment Plant -Augmentation 2 500 .. 50 2 450 Stage 2 (Lancefield) Stage 2 (Lancefield) Distribution Tanks and Pumps 1 760 .. 45 1 715 Distribution Tanks and Pumps 1 760 .. 45 1 715 -Construction (Macedon) -Construction (Macedon) Water Storage -Taylors Rd -Replacement 1 760 .. 145 1 615 Water Storage -Taylors Rd -Replacement 1 760 .. 145 1 615 (Macedon) (Macedon) Pump Stations -Upgrade (Melton) 550 .. 20 530 Pump Stations -Upgrade (Melton) 550 .. 20 530 Pipelines -Construction (Melton) 1 508 .. .. 1 508 Pipelines -Construction (Melton) 1 508 .. .. 1 508 Business Development -Upgrade (Region) 1 828 .. 80 1 748 Business Development -Upgrade (Region) 1 828 .. 80 1 748 Waste Water Treatment Plant Site 1 026 .. 64 962 Waste Water Treatment Plant Site 1 026 .. 64 962 Improvement -Biodiversity (Region) Improvement -Biodiversity (Region) Waste Water Treatment Plant -Upgrade 2 575 .. 100 2 475 Waste Water Treatment Plant -Upgrade 2 575 .. 100 2 475 (Riddels Creek) (Riddels Creek) Pump Station -Replacement (Riddels 175 .. .. 175 Pump Station -Replacement (Riddels 175 .. .. 175 Creek) Creek) Distribution Pipelines -Construction 1 270 .. .. 1 270 Distribution Pipelines -Construction 1 270 .. .. 1 270 (Rockbank) (Rockbank) Pump Station Renewal -Replacement 40 .. .. 40 Pump Station Renewal -Replacement 40 .. .. 40 (Romsey) (Romsey) Pump Replacement -Replacement 120 .. .. 120 Pump Replacement -Replacement 120 .. .. 120 (Romsey) (Romsey) Other-(Various) 30 .. 30 .. Other-(Various) 30 .. 30 .. Occupational Health and Safety-(Various) 350 .. 50 300 Occupational Health and Safety-(Various) 350 .. 50 300 Res C Water Treatment Plant Renewals 350 .. .. 350 Res C Water Treatment Plant Renewals 350 .. .. 350 -Upgrade (Woodend) -Upgrade (Woodend) Reservoir B Aeration -Installation 70 .. .. 70 Reservoir B Aeration -Installation 70 .. .. 70 (Woodend) (Woodend) Recycled Water -Construction (Woodend) 1 815 .. 50 1 765 Recycled Water -Construction (Woodend) 1 815 .. 50 1 765 Sewer Realignment-(Woodend) 40 .. 40 .. Sewer Realignment-(Woodend) 40 .. 40 .. Total New Projects 313 209 .. 29 518 283 691 Total New Projects 313 209 .. 29 518 283 691 Total Regional Urban Water Authorities 1 555 938 306 822 268 696 980 421 Total Regional Urban Water Authorities 1 555 938 306 822 268 696 980 421 Projects Projects Source: Regional Urban Water Authorities Source: Regional Urban Water Authorities Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

118 Regional Urban Water Public Sector Asset Investment Program 2003-04 118 Regional Urban Water Public Sector Asset Investment Program 2003-04

SUNRAYSIA RURAL WATER AUTHORITY SUNRAYSIA RURAL WATER AUTHORITY SUNRAYSIA RURAL WATER AUTHORITY

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Pump and Channel -Upgrade 551 110 103 338 Pump and Channel -Upgrade 551 110 103 338 Pump and Channel -Upgrade 551 110 103 338 (Cullulleraine) (Cullulleraine) (Cullulleraine) Computer Systems -Replacement 450 43 243 164 Computer Systems -Replacement 450 43 243 164 Computer Systems -Replacement 450 43 243 164 (Irymple) (Irymple) (Irymple) Vehicles -Replacement (Irymple) 2 086 426 381 1 279 Vehicles -Replacement (Irymple) 2 086 426 381 1 279 Vehicles -Replacement (Irymple) 2 086 426 381 1 279 Suction Pipes -Replacement (Merbein) 165 59 .. 106 Suction Pipes -Replacement (Merbein) 165 59 .. 106 Suction Pipes -Replacement (Merbein) 165 59 .. 106 Drain Lambert Swamp -Construction 390 132 258 .. Drain Lambert Swamp -Construction 390 132 258 .. Drain Lambert Swamp -Construction 390 132 258 .. (Merbein) (Merbein) (Merbein) Outlets -Replacement (Merbein) 809 157 155 497 Outlets -Replacement (Merbein) 809 157 155 497 Outlets -Replacement (Merbein) 809 157 155 497 Drains -Replacement (Merbein) 840 346 494 .. Drains -Replacement (Merbein) 840 346 494 .. Drains -Replacement (Merbein) 840 346 494 .. Employee Accommodation -Replacement 155 5 150 .. Employee Accommodation -Replacement 155 5 150 .. Employee Accommodation -Replacement 155 5 150 .. (Millewa) (Millewa) (Millewa) Fence -Millewa Channel -Construction 41 41 .. .. Fence -Millewa Channel -Construction 41 41 .. .. Fence -Millewa Channel -Construction 41 41 .. .. (Millewa) (Millewa) (Millewa) Pipeline -Construction (Millewa) 205 205 .. .. Pipeline -Construction (Millewa) 205 205 .. .. Pipeline -Construction (Millewa) 205 205 .. .. Drains -Replacement (Red Cliffs) 117 7 .. 110 Drains -Replacement (Red Cliffs) 117 7 .. 110 Drains -Replacement (Red Cliffs) 117 7 .. 110 Pipeline -Replacement (Red Cliffs) 132 22 21 89 Pipeline -Replacement (Red Cliffs) 132 22 21 89 Pipeline -Replacement (Red Cliffs) 132 22 21 89 Outlets -Replacement (Red Cliffs) 1 006 185 155 666 Outlets -Replacement (Red Cliffs) 1 006 185 155 666 Outlets -Replacement (Red Cliffs) 1 006 185 155 666 Rising Main -Replacement (Red Cliffs) 3 365 3 159 206 .. Rising Main -Replacement (Red Cliffs) 3 365 3 159 206 .. Rising Main -Replacement (Red Cliffs) 3 365 3 159 206 .. Outlets -Replacement (Robinvale) 283 41 20 222 Outlets -Replacement (Robinvale) 283 41 20 222 Outlets -Replacement (Robinvale) 283 41 20 222 Pipeline -Replacement (Robinvale) 1 185 78 206 901 Pipeline -Replacement (Robinvale) 1 185 78 206 901 Pipeline -Replacement (Robinvale) 1 185 78 206 901 Pipeline -# 4 -Replacement (Robinvale) 79 79 .. .. Pipeline -# 4 -Replacement (Robinvale) 79 79 .. .. Pipeline -# 4 -Replacement (Robinvale) 79 79 .. .. Pump -'A', 'B', 'C' Relift (Robinvale) 296 89 72 135 Pump -'A', 'B', 'C' Relift (Robinvale) 296 89 72 135 Pump -'A', 'B', 'C' Relift (Robinvale) 296 89 72 135 River Diverters -Construction (Tol Tol) 580 446 134 .. River Diverters -Construction (Tol Tol) 580 446 134 .. River Diverters -Construction (Tol Tol) 580 446 134 .. Meters -Replacement (Various) 3 261 47 618 2 596 Meters -Replacement (Various) 3 261 47 618 2 596 Meters -Replacement (Various) 3 261 47 618 2 596 Total Existing Projects 15 996 5 677 3 216 7 103 Total Existing Projects 15 996 5 677 3 216 7 103 Total Existing Projects 15 996 5 677 3 216 7 103 Source: Sunraysia Rural Water Authority Source: Sunraysia Rural Water Authority Source: Sunraysia Rural Water Authority Note: Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

Public Sector Asset Investment Program 2003-04 Sunraysia Rural Water 119 Public Sector Asset Investment Program 2003-04 Sunraysia Rural Water 119 Public Sector Asset Investment Program 2003-04 Sunraysia Rural Water 119

SUNRAYSIA RURAL WATER AUTHORITY SUNRAYSIA RURAL WATER AUTHORITY

New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Mobile Plant -Replacement (Irymple) 611 .. 138 473 Mobile Plant -Replacement (Irymple) 611 .. 138 473 Drains -Pit Lids -Replacement (Merbein) 547 .. 103 444 Drains -Pit Lids -Replacement (Merbein) 547 .. 103 444 Pipeline -Replacement (Merbein) 110 .. 21 89 Pipeline -Replacement (Merbein) 110 .. 21 89 Rising Main -Reconstruction (Merbein) 209 .. 103 106 Rising Main -Reconstruction (Merbein) 209 .. 103 106 Pipeline -Construction (Merbein) 212 .. .. 212 Pipeline -Construction (Merbein) 212 .. .. 212 Drainage Bores -Construction (Merbein) 690 .. .. 690 Drainage Bores -Construction (Merbein) 690 .. .. 690 Filter, Lake Pumps -Replacement 103 .. 103 .. Filter, Lake Pumps -Replacement 103 .. 103 .. (Millewa) (Millewa) Drains -Construction (Nangiloc) 297 .. .. 297 Drains -Construction (Nangiloc) 297 .. .. 297 Isolation Valves -Replacement (Red Cliffs) 137 .. 26 111 Isolation Valves -Replacement (Red Cliffs) 137 .. 26 111 Meter Testing Site -Construction (Red 189 .. 82 107 Meter Testing Site -Construction (Red 189 .. 82 107 Cliffs) Cliffs) Drains -Pit Lids -Replacement (Red Cliffs) 656 .. 124 532 Drains -Pit Lids -Replacement (Red Cliffs) 656 .. 124 532 Fence -Replacement (Red Cliffs) 209 .. 103 106 Fence -Replacement (Red Cliffs) 209 .. 103 106 Pump Station Floor -Replacement (Red 86 .. 42 44 Pump Station Floor -Replacement (Red 86 .. 42 44 Cliffs) Cliffs) Isolation Valves -Replacement 110 .. 21 89 Isolation Valves -Replacement 110 .. 21 89 (Robinvale) (Robinvale) Drainage Pipelines -Replacement 165 .. 31 134 Drainage Pipelines -Replacement 165 .. 31 134 (Robinvale) (Robinvale) Pressure Pits -Replacement (Robinvale) 110 .. 21 89 Pressure Pits -Replacement (Robinvale) 110 .. 21 89 Water for the Future -Replacement 12 928 .. 3 090 9 838 Water for the Future -Replacement 12 928 .. 3 090 9 838 (Various) (Various) Total New Projects 17 369 .. 4 008 13 361 Total New Projects 17 369 .. 4 008 13 361 Total Sunraysia Rural Water Authority 33 365 5 677 7 224 20 464 Total Sunraysia Rural Water Authority 33 365 5 677 7 224 20 464 Projects Projects Source: Sunraysia Rural Water Authority Source: Sunraysia Rural Water Authority Note: Note: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year.

120 Sunraysia Rural Water Public Sector Asset Investment Program 2003-04 120 Sunraysia Rural Water Public Sector Asset Investment Program 2003-04

WIMMERA MALLEE WATER AUTHORITY WIMMERA MALLEE WATER AUTHORITY WIMMERA MALLEE WATER AUTHORITY

Existing Projects Existing Projects Existing Projects ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Project Description Investment 30.6.2003 (a) 2003-04 Lake Bellfield Bulkhead -Rehabilitation, 422 22 400 .. Lake Bellfield Bulkhead -Rehabilitation, 422 22 400 .. Lake Bellfield Bulkhead -Rehabilitation, 422 22 400 .. Water Supply Works (Halls Gap) Water Supply Works (Halls Gap) Water Supply Works (Halls Gap) Lake Bellfield Spillway -Rehabilitation, 2830 2830 .. .. Lake Bellfield Spillway -Rehabilitation, 2830 2830 .. .. Lake Bellfield Spillway -Rehabilitation, 2830 2830 .. .. Water Supply Works (Halls Gap) Water Supply Works (Halls Gap) Water Supply Works (Halls Gap) Dam Recording and Irrigation Planning 160 160 .. .. Dam Recording and Irrigation Planning 160 160 .. .. Dam Recording and Irrigation Planning 160 160 .. .. -System Development, Water Supply -System Development, Water Supply -System Development, Water Supply Works (Horsham) Works (Horsham) Works (Horsham) Taylors Lake Embankment 4 229 100 500 3 629 Taylors Lake Embankment 4 229 100 500 3 629 Taylors Lake Embankment 4 229 100 500 3 629 -Rehabilitation, Water Supply Works -Rehabilitation, Water Supply Works -Rehabilitation, Water Supply Works (Horsham) (Horsham) (Horsham) Northern Mallee Pipeline -Construction, 40 348 40 348 .. .. Northern Mallee Pipeline -Construction, 40 348 40 348 .. .. Northern Mallee Pipeline -Construction, 40 348 40 348 .. .. Water Supply Works (Ouyen) Water Supply Works (Ouyen) Water Supply Works (Ouyen) Wimmera Mallee Pipeline (Various) (b) 300 000 15 250 15 000 269 750 Wimmera Mallee Pipeline (Various) (b) 300 000 15 250 15 000 269 750 Wimmera Mallee Pipeline (Various) (b) 300 000 15 250 15 000 269 750 Communication Equipment -SCADA 630 480 10 140 Communication Equipment -SCADA 630 480 10 140 Communication Equipment -SCADA 630 480 10 140 Equipment, Water Supply Works Equipment, Water Supply Works Equipment, Water Supply Works (Various) (Various) (Various) Total Existing Projects 348 619 59 190 15 910 273 519 Total Existing Projects 348 619 59 190 15 910 273 519 Total Existing Projects 348 619 59 190 15 910 273 519 Source: Wimmera Mallee Water Authority Source: Wimmera Mallee Water Authority Source: Wimmera Mallee Water Authority Notes: Notes: Notes: (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at (a) Actual estimated expenditure to 30 June 2003 based on information provided by agencies as at 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. 29 August 2003. Includes preliminary unaudited information for 2002-03 financial year. (b) Includes the State, Commonwealth and Landholder components. (b) Includes the State, Commonwealth and Landholder components. (b) Includes the State, Commonwealth and Landholder components.

New projects for commencement in 2003-04 New projects for commencement in 2003-04 New projects for commencement in 2003-04 ($ thousand) ($ thousand) ($ thousand) Total Estimated Estimated Remaining Total Estimated Estimated Remaining Total Estimated Estimated Remaining Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Estimated Expenditure to Expenditure Expenditure Project Description Investment 30.6.2003 2003-04 Project Description Investment 30.6.2003 2003-04 Project Description Investment 30.6.2003 2003-04 Nil Nil Nil

Total New Projects ...... Total New Projects ...... Total New Projects ...... Total Wimmera Mallee Water Authority 348 619 59 190 15 910 273 519 Total Wimmera Mallee Water Authority 348 619 59 190 15 910 273 519 Total Wimmera Mallee Water Authority 348 619 59 190 15 910 273 519 Projects Projects Projects Source: Wimmera Mallee Water Authority Source: Wimmera Mallee Water Authority Source: Wimmera Mallee Water Authority

Public Sector Asset Investment Program 2003-04 Wimmera Mallee Water 121 Public Sector Asset Investment Program 2003-04 Wimmera Mallee Water 121 Public Sector Asset Investment Program 2003-04 Wimmera Mallee Water 121

122 Wimmera Mallee Water Public Sector Asset Investment Program 2003-04 122 Wimmera Mallee Water Public Sector Asset Investment Program 2003-04

APPENDIX A: CONTACT ADDRESSES AND TELEPHONE APPENDIX A: CONTACT ADDRESSES AND TELEPHONE APPENDIX A: CONTACT ADDRESSES AND TELEPHONE NUMBERS NUMBERS NUMBERS

GENERAL GOVERNMENT SECTOR GENERAL GOVERNMENT SECTOR GENERAL GOVERNMENT SECTOR

Budget sector Budget sector Budget sector Education and Training 2 Treasury Place Education and Training 2 Treasury Place Education and Training 2 Treasury Place EAST MELBOURNE 3002 EAST MELBOURNE 3002 EAST MELBOURNE 3002 Telephone: 9637 2000 Telephone: 9637 2000 Telephone: 9637 2000 Human Services 555 Collins Street Human Services 555 Collins Street Human Services 555 Collins Street MELBOURNE 3000 MELBOURNE 3000 MELBOURNE 3000 Telephone: 9616 7777 Telephone: 9616 7777 Telephone: 9616 7777 Infrastructure Infrastructure Infrastructure Department Nauru House Department Nauru House Department Nauru House 80 Collins Street 80 Collins Street 80 Collins Street MELBOURNE 3000 MELBOURNE 3000 MELBOURNE 3000 Telephone: 9655 6666 Telephone: 9655 6666 Telephone: 9655 6666 Roads Corporation 60 Denmark Street Roads Corporation 60 Denmark Street Roads Corporation 60 Denmark Street KEW 3101 KEW 3101 KEW 3101 Telephone: 9854 2666 Telephone: 9854 2666 Telephone: 9854 2666 Innovation, Industry and Regional Development 55 Collins Street Innovation, Industry and Regional Development 55 Collins Street Innovation, Industry and Regional Development 55 Collins Street MELBOURNE 3000 MELBOURNE 3000 MELBOURNE 3000 Telephone: 9651 9999 Telephone: 9651 9999 Telephone: 9651 9999 Justice 55 St Andrews Place Justice 55 St Andrews Place Justice 55 St Andrews Place EAST MELBOURNE 3002 EAST MELBOURNE 3002 EAST MELBOURNE 3002 Telephone: 9651 0333 Telephone: 9651 0333 Telephone: 9651 0333 Premier and Cabinet 1 Treasury Place Premier and Cabinet 1 Treasury Place Premier and Cabinet 1 Treasury Place EAST MELBOURNE 3002 EAST MELBOURNE 3002 EAST MELBOURNE 3002 Telephone: 9651 5111 Telephone: 9651 5111 Telephone: 9651 5111

Public Sector Asset Investment Program 2003-04 Appendix A 123 Public Sector Asset Investment Program 2003-04 Appendix A 123 Public Sector Asset Investment Program 2003-04 Appendix A 123

Primary Industries 8 Nicholson Street Primary Industries 8 Nicholson Street EAST MELBOURNE 3002 EAST MELBOURNE 3002 Telephone: 9412 4011 Telephone: 9412 4011 Sustainability and Environment 8 Nicholson Street Sustainability and Environment 8 Nicholson Street EAST MELBOURNE 3002 EAST MELBOURNE 3002 Telephone: 9637 8000 Telephone: 9637 8000 Treasury and Finance 1 Treasury Place Treasury and Finance 1 Treasury Place EAST MELBOURNE 3002 EAST MELBOURNE 3002 Telephone: 9651 5111 Telephone: 9651 5111 Victorian Communities Nauru House Victorian Communities Nauru House 80 Collins Street 80 Collins Street MELBOURNE 3000 MELBOURNE 3000 Telephone: 9666 4200 Telephone: 9666 4200 Parliament Parliament House Parliament Parliament House EAST MELBOURNE 3002 EAST MELBOURNE 3002 Telephone: 9651 8911 Telephone: 9651 8911

Non budget sector Non budget sector Country Fire Authority 8 Lakeside Drive Country Fire Authority 8 Lakeside Drive BURWOOD EAST 3151 BURWOOD EAST 3151 Telephone: 9262 8444 Telephone: 9262 8444

Metropolitan Fire and Emergency 456 Albert Street Metropolitan Fire and Emergency 456 Albert Street Services Board EAST MELBOURNE 3002 Services Board EAST MELBOURNE 3002 Telephone: 9662 2311 Telephone: 9662 2311

PUBLIC TRADING ENTERPRISES PUBLIC TRADING ENTERPRISES

Barwon Region Water Authority 61-67 Ryrie Street Barwon Region Water Authority 61-67 Ryrie Street GEELONG 3213 GEELONG 3213 Telephone: (03) 5226 2500 Telephone: (03) 5226 2500 Central Gippsland Region Water Authority Hazelwood Road Central Gippsland Region Water Authority Hazelwood Road TRARALGON 3844 TRARALGON 3844 Telephone: (03) 5177 4600 Telephone: (03) 5177 4600

124 Appendix A Public Sector Asset Investment Program 2003-04 124 Appendix A Public Sector Asset Investment Program 2003-04

Central Highlands Region Water Authority 7 Learmonth Road Central Highlands Region Water Authority 7 Learmonth Road Central Highlands Region Water Authority 7 Learmonth Road WENDOUREE 3353 WENDOUREE 3353 WENDOUREE 3353 Telephone: (03) 5320 3100 Telephone: (03) 5320 3100 Telephone: (03) 5320 3100 Coliban Region Water Authority 37-45 Bridge Street Coliban Region Water Authority 37-45 Bridge Street Coliban Region Water Authority 37-45 Bridge Street Bendigo 3554 Bendigo 3554 Bendigo 3554 Telephone: (03) 5434 1222 Telephone: (03) 5434 1222 Telephone: (03) 5434 1222 East Gippsland Region Water Authority 133 McLeod Street East Gippsland Region Water Authority 133 McLeod Street East Gippsland Region Water Authority 133 McLeod Street BAIRNSDALE 3875 BAIRNSDALE 3875 BAIRNSDALE 3875 Telephone: (03) 5150 4444 Telephone: (03) 5150 4444 Telephone: (03) 5150 4444 Gippsland and Southern Rural Water Authority 88 Johnson Street Gippsland and Southern Rural Water Authority 88 Johnson Street Gippsland and Southern Rural Water Authority 88 Johnson Street MAFFRA 3860 MAFFRA 3860 MAFFRA 3860 Telephone: (03) 5139 3100 Telephone: (03) 5139 3100 Telephone: (03) 5139 3100 Glenelg Region Water Authority 66 Gray Street Glenelg Region Water Authority 66 Gray Street Glenelg Region Water Authority 66 Gray Street HAMILTON 3300 HAMILTON 3300 HAMILTON 3300 Telephone: (03) 5551 0400 Telephone: (03) 5551 0400 Telephone: (03) 5551 0400 Goulburn Valley Region Water Authority 104-110 Fryers Street Goulburn Valley Region Water Authority 104-110 Fryers Street Goulburn Valley Region Water Authority 104-110 Fryers Street SHEPPARTON 3632 SHEPPARTON 3632 SHEPPARTON 3632 Telephone: (03) 5832 0400 Telephone: (03) 5832 0400 Telephone: (03) 5832 0400 Goulburn-Murray Rural Water Authority 40 Casey Street Goulburn-Murray Rural Water Authority 40 Casey Street Goulburn-Murray Rural Water Authority 40 Casey Street TATURA 3616 TATURA 3616 TATURA 3616 Telephone: (03) 5833 5500 Telephone: (03) 5833 5500 Telephone: (03) 5833 5500 Grampians Region Water Authority 11 McLachlan Street Grampians Region Water Authority 11 McLachlan Street Grampians Region Water Authority 11 McLachlan Street HORSHAM 3402 HORSHAM 3402 HORSHAM 3402 Telephone: (03) 5382 4611 Telephone: (03) 5382 4611 Telephone: (03) 5382 4611 Lower Murray Region Water Authority Fourteenth Street Lower Murray Region Water Authority Fourteenth Street Lower Murray Region Water Authority Fourteenth Street MILDURA 3500 MILDURA 3500 MILDURA 3500 Telephone: (03) 5051 3400 Telephone: (03) 5051 3400 Telephone: (03) 5051 3400 North East Region Water Authority Level 1 Hovell Street North East Region Water Authority Level 1 Hovell Street North East Region Water Authority Level 1 Hovell Street WODONGA 3689 WODONGA 3689 WODONGA 3689 Telephone: 1300 361 622 Telephone: 1300 361 622 Telephone: 1300 361 622 Office of Housing 555 Collins Street Office of Housing 555 Collins Street Office of Housing 555 Collins Street MELBOURNE 3000 MELBOURNE 3000 MELBOURNE 3000 Telephone: 9616 7777 Telephone: 9616 7777 Telephone: 9616 7777 Portland Coast Region Water Authority 15 Townsend Street Portland Coast Region Water Authority 15 Townsend Street Portland Coast Region Water Authority 15 Townsend Street PORTLAND 3305 PORTLAND 3305 PORTLAND 3305 Telephone: (03) 5523 6244 Telephone: (03) 5523 6244 Telephone: (03) 5523 6244

Public Sector Asset Investment Program 2003-04 Appendix A 125 Public Sector Asset Investment Program 2003-04 Appendix A 125 Public Sector Asset Investment Program 2003-04 Appendix A 125

South Gippsland Region Water Authority 14-18 Pioneer Street South Gippsland Region Water Authority 14-18 Pioneer Street FOSTER 3960 FOSTER 3960 Telephone: (03) 5682 1222 Telephone: (03) 5682 1222 South West Water Authority 99 Fairy Street South West Water Authority 99 Fairy Street WARRNAMBOOL 3280 WARRNAMBOOL 3280 Telephone: (03) 5564 7600 Telephone: (03) 5564 7600 Sunraysia Rural Water Authority 2115-2117 Fifteenth Street Sunraysia Rural Water Authority 2115-2117 Fifteenth Street IRYMPLE 3498 IRYMPLE 3498 Telephone: (03) 5021 9777 Telephone: (03) 5021 9777 Western Region Water Authority Robertson Street Western Region Water Authority Robertson Street GISBORNE 3437 GISBORNE 3437 Telephone: (03) 5421 9400 Telephone: (03) 5421 9400 Westernport Region Water Authority 91-97 Thompson Avenue Westernport Region Water Authority 91-97 Thompson Avenue COWES 3922 COWES 3922 Telephone: (03) 5952 2393 Telephone: (03) 5952 2393 Wimmera Mallee Rural Water Authority 24 Darlot Street Wimmera Mallee Rural Water Authority 24 Darlot Street HORSHAM 3400 HORSHAM 3400 Telephone: (03) 5382 1244 Telephone: (03) 5382 1244

126 Appendix A Public Sector Asset Investment Program 2003-04 126 Appendix A Public Sector Asset Investment Program 2003-04

APPENDIX B: LOCATION INDEX APPENDIX B: LOCATION INDEX APPENDIX B: LOCATION INDEX

Berriwillock, 123 Berriwillock, 123 Berriwillock, 123 A A A Berwick, 20, 21 Berwick, 20, 21 Berwick, 20, 21 Aireys Inlet, 108, 135 Birregurra, 108 Aireys Inlet, 108, 135 Birregurra, 108 Aireys Inlet, 108, 135 Birregurra, 108 Albert Park, 76 Blackburn, 21 Albert Park, 76 Blackburn, 21 Albert Park, 76 Blackburn, 21 Alexandra, 19, 120, 142 Blackwood, 115 Alexandra, 19, 120, 142 Blackwood, 115 Alexandra, 19, 120, 142 Blackwood, 115 Allansford, 129 Boisdale, 21 Allansford, 129 Boisdale, 21 Allansford, 129 Boisdale, 21 Altona, 19, 43 Boolarra, 136 Altona, 19, 43 Boolarra, 136 Altona, 19, 43 Boolarra, 136 Anglesea, 108 Boort, 92, 98, 117 Anglesea, 108 Boort, 92, 98, 117 Anglesea, 108 Boort, 92, 98, 117 Apollo Bay, 108, 135 Boronia, 38 Apollo Bay, 108, 135 Boronia, 38 Apollo Bay, 108, 135 Boronia, 38 Apsley, 123 Box Hill, 35, 43, 56 Apsley, 123 Box Hill, 35, 43, 56 Apsley, 123 Box Hill, 35, 43, 56 Ararat, 19, 35, 46, 123 Box Hill North, 21 Ararat, 19, 35, 46, 123 Box Hill North, 21 Ararat, 19, 35, 46, 123 Box Hill North, 21 Ardmona, 92, 98 Branxholme, 119 Ardmona, 92, 98 Branxholme, 119 Ardmona, 92, 98 Branxholme, 119 Ascot Vale, 19 Bridgewater, 117, 139 Ascot Vale, 19 Bridgewater, 117, 139 Ascot Vale, 19 Bridgewater, 117, 139 Avenel, 120 Bright, 21, 127 Avenel, 120 Bright, 21, 127 Avenel, 120 Bright, 21, 127 Axedale, 92, 116 Brighton, 21 Axedale, 92, 116 Brighton, 21 Axedale, 92, 116 Brighton, 21 Broadford, 38, 120, 142, 143 Broadford, 38, 120, 142, 143 Broadford, 38, 120, 142, 143 B Broadmeadows, 35, 44 B Broadmeadows, 35, 44 B Broadmeadows, 35, 44 Brunswick, 49, 63 Brunswick, 49, 63 Brunswick, 49, 63 Bacchus Marsh, 35, 59, 88, 132, 133, 148 Bruthen, 52, 118 Bacchus Marsh, 35, 59, 88, 132, 133, 148 Bruthen, 52, 118 Bacchus Marsh, 35, 59, 88, 132, 133, 148 Bruthen, 52, 118 Bairnsdale, 20, 35, 63, 71, 118, 140 Buangor, 123 Bairnsdale, 20, 35, 63, 71, 118, 140 Buangor, 123 Bairnsdale, 20, 35, 63, 71, 118, 140 Buangor, 123 Ballan, 38, 108, 114 Bunbartha, 92 Ballan, 38, 108, 114 Bunbartha, 92 Ballan, 38, 108, 114 Bunbartha, 92 Ballarat, 35, 38, 79, 114, 115 Bundoora, 38 Ballarat, 35, 38, 79, 114, 115 Bundoora, 38 Ballarat, 35, 38, 79, 114, 115 Bundoora, 38 Balwyn North, 20 Buninyong, 21, 38 Balwyn North, 20 Buninyong, 21, 38 Balwyn North, 20 Buninyong, 21, 38 Bamawm, 92 Bunyip, 59 Bamawm, 92 Bunyip, 59 Bamawm, 92 Bunyip, 59 Bannockburn, 108 Burramine, 92 Bannockburn, 108 Burramine, 92 Bannockburn, 108 Burramine, 92 Baranduda, 20 Byrneside, 98 Baranduda, 20 Byrneside, 98 Baranduda, 20 Byrneside, 98 Barwon Heads, 20, 108 Barwon Heads, 20, 108 Barwon Heads, 20, 108 Barwon South-West, 104, 106 Barwon South-West, 104, 106 Barwon South-West, 104, 106 Batesford, 108 Batesford, 108 Batesford, 108 C C C Baxter, 72 Baxter, 72 Baxter, 72 Bayswater, 20 Camperdown, 129, 130, 146 Bayswater, 20 Camperdown, 129, 130, 146 Bayswater, 20 Camperdown, 129, 130, 146 Beaufort, 59, 115 Cann River, 118, 140 Beaufort, 59, 115 Cann River, 118, 140 Beaufort, 59, 115 Cann River, 118, 140 Beechworth, 127 Canterbury, 21 Beechworth, 127 Canterbury, 21 Beechworth, 127 Canterbury, 21 Bellarine, 20, 38 Cape Paterson, 128 Bellarine, 20, 38 Cape Paterson, 128 Bellarine, 20, 38 Cape Paterson, 128 Belmont, 20 Carisbrook, 115 Belmont, 20 Carisbrook, 115 Belmont, 20 Carisbrook, 115 Benalla, 20, 35, 92, 127 Benalla, 20, 35, 92, 127 Benalla, 20, 35, 92, 127 Carlisle River, 130 Carlisle River, 130 Carlisle River, 130 Benambra, 92 Benambra, 92 Benambra, 92 Carlton, 44, 46, 67 Carlton, 44, 46, 67 Carlton, 44, 46, 67 Bendigo, 63, 68, 116, 117, 139 Bendigo, 63, 68, 116, 117, 139 Bendigo, 63, 68, 116, 117, 139 Caroline Springs, 39, 63, 79 Caroline Springs, 39, 63, 79 Caroline Springs, 39, 63, 79 Bendoc, 59 Bendoc, 59 Bendoc, 59 Carrum, 81 Carrum, 81 Carrum, 81 Public Sector Asset Investment Program 2003-04 Appendix B 127 Public Sector Asset Investment Program 2003-04 Appendix B 127 Public Sector Asset Investment Program 2003-04 Appendix B 127

Carrum Downs, 21, 39, 57, 83 Doncaster, 23 Carrum Downs, 21, 39, 57, 83 Doncaster, 23 Casterton, 119, 141 Dromana, 23 Casterton, 119, 141 Dromana, 23 Castlemaine, 60, 117, 139 Drouin, 23, 79, 112, 136 Castlemaine, 60, 117, 139 Drouin, 23, 79, 112, 136 Cavendish, 141 Dunkeld, 120, 141 Cavendish, 141 Dunkeld, 120, 141 Ceres, 22 Dunolly, 117 Ceres, 22 Dunolly, 117 Chadstone, 35 Chadstone, 35 Chelsea Heights, 22 E Chelsea Heights, 22 E Cheltenham, 22 Cheltenham, 22 Cherrypool, 52 Eagle Point, 118 Cherrypool, 52 Eagle Point, 118 Chirnside Park, 79 Eaglehawk, 79 Chirnside Park, 79 Eaglehawk, 79 Churchill, 22, 39 East Melbourne, 74 Churchill, 22, 39 East Melbourne, 74 Clayton, 58 Eastern Metro, 104, 105, 106 Clayton, 58 Eastern Metro, 104, 105, 106 Clunes, 115 Echuca, 79, 93, 117, 139 Clunes, 115 Echuca, 79, 93, 117, 139 Cobden, 130 Edenhope, 23, 123 Cobden, 130 Edenhope, 23, 123 Cobram, 92, 93, 120, 121, 143 Eildon, 93, 98, 143 Cobram, 92, 93, 120, 121, 143 Eildon, 93, 98, 143 Coburg, 39, 59 Ellinbank, 68 Coburg, 39, 59 Ellinbank, 68 Cohuna, 22, 98, 117 Elmore, 139 Cohuna, 22, 98, 117 Elmore, 139 Colac, 22, 46, 109 Elphingstone, 52 Colac, 22, 46, 109 Elphingstone, 52 Coleraine, 120, 141 Eltham, 23, 60 Coleraine, 120, 141 Eltham, 23, 60 Coomboona, 93 Eltham North, 23, 39 Coomboona, 93 Eltham North, 23, 39 Corio, 56, 109 Endeavour Hills, 60, 72 Corio, 56, 109 Endeavour Hills, 60, 72 Corio Bay, 22 Epping, 23, 24, 35, 46, 53 Corio Bay, 22 Epping, 23, 24, 35, 46, 53 Coronet Bay, 132, 147 Essendon, 24 Coronet Bay, 132, 147 Essendon, 24 Corop, 93, 98 Euroa, 143 Corop, 93, 98 Euroa, 143 Corryong, 81 Corryong, 81 Cowes, 132 Cowes, 132 Cowwarr Weir, 88 F Cowwarr Weir, 88 F Craigieburn, 53 Fairfield, 36 Craigieburn, 53 Fairfield, 36 Cranbourne, 22, 39, 79 Fairhaven, 135 Cranbourne, 22, 39, 79 Fairhaven, 135 Cressy, 59 Ferntree Gully, 24 Cressy, 59 Ferntree Gully, 24 Creswick, 39, 79 Fiskville, 81 Creswick, 39, 79 Fiskville, 81 Croydon, 60 Fitzroy, 24 Croydon, 60 Fitzroy, 24 Croydon Hills, 22 Flemington, 46 Croydon Hills, 22 Flemington, 46 Culgoa, 123 Footscray, 24, 49, 60 Culgoa, 123 Footscray, 24, 49, 60 Cullulleraine, 150 Forest Hill, 115 Cullulleraine, 150 Forest Hill, 115 Foster, 128, 146 Foster, 128, 146 D Frankston, 24, 39, 44, 46, 57 D Frankston, 24, 39, 44, 46, 57 Dandenong, 36, 46, 49, 81 Frankston North, 40 Dandenong, 36, 46, 49, 81 Frankston North, 40 Dartmoor, 128 Dartmoor, 128 Daylesford, 115 G Daylesford, 115 G Dean, 115 Geelong, 24, 36, 39, 46, 56, 109, 135, 136 Dean, 115 Geelong, 24, 36, 39, 46, 56, 109, 135, 136 Deer Park, 22, 61 Geelong East, 24, 25 Deer Park, 22, 61 Geelong East, 24, 25 Dhurringile, 93 Geelong North, 25, 51, 52, 135 Dhurringile, 93 Geelong North, 25, 51, 52, 135 Diamond Creek, 22, 60, 79 Gellibrand River, 146 Diamond Creek, 22, 60, 79 Gellibrand River, 146 Dimboola, 123 Gippsland, 68, 85, 104, 106 Dimboola, 123 Gippsland, 68, 85, 104, 106 Dingee, 23, 93 Girgarre East, 94, 99 Dingee, 23, 93 Girgarre East, 94, 99 Dinner Plain, 140 Gisborne, 25, 60, 133, 148 Dinner Plain, 140 Gisborne, 25, 60, 133, 148 Docklands, 58 Glen Forbes, 132, 147, 148 Docklands, 58 Glen Forbes, 132, 147, 148 128 Appendix B Public Sector Asset Investment Program 2003-04 128 Appendix B Public Sector Asset Investment Program 2003-04

Glen Iris, 25, 40 Kaniva, 124 Glen Iris, 25, 40 Kaniva, 124 Glen Iris, 25, 40 Kaniva, 124 Glen Waverley, 25, 40, 61 Katandra, 94, 99, 143 Glen Waverley, 25, 40, 61 Katandra, 94, 99, 143 Glen Waverley, 25, 40, 61 Katandra, 94, 99, 143 Glenmaggie, 85, 88 Kerang, 94, 99 Glenmaggie, 85, 88 Kerang, 94, 99 Glenmaggie, 85, 88 Kerang, 94, 99 Glenroy, 25 Kiewa, 80 Glenroy, 25 Kiewa, 80 Glenroy, 25 Kiewa, 80 Golden Square, 25, 40 Kilmore, 60, 81, 121, 143 Golden Square, 25, 40 Kilmore, 60, 81, 121, 143 Golden Square, 25, 40 Kilmore, 60, 81, 121, 143 Gordon, 60 Kings Park, 26 Gordon, 60 Kings Park, 26 Gordon, 60 Kings Park, 26 Goroke, 123 Kingsbury, 26 Goroke, 123 Kingsbury, 26 Goroke, 123 Kingsbury, 26 Grampians, 104, 106 Koonwarra, 128 Grampians, 104, 106 Koonwarra, 128 Grampians, 104, 106 Koonwarra, 128 Greensborough, 25, 57 Koorlong, 145 Greensborough, 25, 57 Koorlong, 145 Greensborough, 25, 57 Koorlong, 145 Greenvale, 79 Koroit, 130, 146 Greenvale, 79 Koroit, 130, 146 Greenvale, 79 Koroit, 130, 146 Grovedale, 26, 56 Korumburra, 128, 146 Grovedale, 26, 56 Korumburra, 128, 146 Grovedale, 26, 56 Korumburra, 128, 146 Kyabram, 94 Kyabram, 94 Kyabram, 94 H Kyneton, 117, 139 H Kyneton, 117, 139 H Kyneton, 117, 139

Hallam, 53, 79 Hallam, 53, 79 Hallam, 53, 79 Halls Gap, 123, 152 Halls Gap, 123, 152 Halls Gap, 123, 152 L L L Hamilton, 120, 142 Hamilton, 120, 142 Hamilton, 120, 142 Harcourt, 117 Laanecoorie, 94, 99, 139 Harcourt, 117 Laanecoorie, 94, 99, 139 Harcourt, 117 Laanecoorie, 94, 99, 139 Harrow, 124 Lake Boga, 126 Harrow, 124 Lake Boga, 126 Harrow, 124 Lake Boga, 126 Harston, 94, 99 Lakes Entrance, 36, 119, 140 Harston, 94, 99 Lakes Entrance, 36, 119, 140 Harston, 94, 99 Lakes Entrance, 36, 119, 140 Hawkesdale, 79 Lalor, 26 Hawkesdale, 79 Lalor, 26 Hawkesdale, 79 Lalor, 26 Hawthorn, 60 Lancefield, 40, 133, 148 Hawthorn, 60 Lancefield, 40, 133, 148 Hawthorn, 60 Lancefield, 40, 133, 148 Healesville, 40, 52 Langwarrin, 54 Healesville, 40, 52 Langwarrin, 54 Healesville, 40, 52 Langwarrin, 54 Heathcote, 26, 117, 139 Lara, 27, 59, 109 Heathcote, 26, 117, 139 Lara, 27, 59, 109 Heathcote, 26, 117, 139 Lara, 27, 59, 109 Heathmont, 26 Laverton, 27, 54 Heathmont, 26 Laverton, 27, 54 Heathmont, 26 Laverton, 27, 54 Heidelberg, 26, 46, 60 Leitchville, 117 Heidelberg, 26, 46, 60 Leitchville, 117 Heidelberg, 26, 46, 60 Leitchville, 117 Hensley Park, 52 Leongatha, 128, 146 Hensley Park, 52 Leongatha, 128, 146 Hensley Park, 52 Leongatha, 128, 146 Heywood, 146 Leopold, 27, 135 Heywood, 146 Leopold, 27, 135 Heywood, 146 Leopold, 27, 135 Hillside, 26 Lilydale, 27, 41 Hillside, 26 Lilydale, 27, 41 Hillside, 26 Lilydale, 27, 41 Hopetoun, 124 Lindenow, 140, 141 Hopetoun, 124 Lindenow, 140, 141 Hopetoun, 124 Lindenow, 140, 141 Hoppers Crossing, 40, 80 Lismore, 130, 146 Hoppers Crossing, 40, 80 Lismore, 130, 146 Hoppers Crossing, 40, 80 Lismore, 130, 146 Horsham, 26, 68, 124, 152 Lockington, 94, 99, 117, 118 Horsham, 26, 68, 124, 152 Lockington, 94, 99, 117, 118 Horsham, 26, 68, 124, 152 Lockington, 94, 99, 117, 118 Hume, 104, 106, 107 Loddon Mallee, 104, 105, 106, 107 Hume, 104, 106, 107 Loddon Mallee, 104, 105, 106, 107 Hume, 104, 106, 107 Loddon Mallee, 104, 105, 106, 107 Hurstbridge, 40, 80, 81 Longford, 52, 55 Hurstbridge, 40, 80, 81 Longford, 52, 55 Hurstbridge, 40, 80, 81 Longford, 52, 55 Lorne, 46, 110, 135 Lorne, 46, 110, 135 Lorne, 46, 110, 135 Lysterfield, 68 Lysterfield, 68 Lysterfield, 68 I I I M M M Inglewood, 60, 139 Inglewood, 60, 139 Inglewood, 60, 139 Irymple, 150, 151 Macalister, 85, 86, 88, 89 Irymple, 150, 151 Macalister, 85, 86, 88, 89 Irymple, 150, 151 Macalister, 85, 86, 88, 89 Ivanhoe East, 26 Macarthur, 61, 120 Ivanhoe East, 26 Macarthur, 61, 120 Ivanhoe East, 26 Macarthur, 61, 120 Macedon, 27, 54, 133, 148 Macedon, 27, 54, 133, 148 Macedon, 27, 54, 133, 148 J Macleod, 27, 63 J Macleod, 27, 63 J Macleod, 27, 63 Maffra, 41, 86, 89, 112 Maffra, 41, 86, 89, 112 Maffra, 41, 86, 89, 112 Jan Juc, 109, 135 Maffra Weir, 86 Jan Juc, 109, 135 Maffra Weir, 86 Jan Juc, 109, 135 Maffra Weir, 86 Jeparit, 124 Majorca, 94 Jeparit, 124 Majorca, 94 Jeparit, 124 Majorca, 94 Maldon, 94, 99 Maldon, 94, 99 Maldon, 94, 99 K Mallacoota, 119 K Mallacoota, 119 K Mallacoota, 119 Kangaroo Ground, 53 Malmsbury, 118 Kangaroo Ground, 53 Malmsbury, 118 Kangaroo Ground, 53 Malmsbury, 118 Malvern, 27 Malvern, 27 Malvern, 27 Public Sector Asset Investment Program 2003-04 Appendix B 129 Public Sector Asset Investment Program 2003-04 Appendix B 129 Public Sector Asset Investment Program 2003-04 Appendix B 129

Mansfield, 121, 142, 143 Nathalia, 95, 100, 121 Mansfield, 121, 142, 143 Nathalia, 95, 100, 121 Maryborough, 27, 41, 61, 115 Newhaven, 132 Maryborough, 27, 41, 61, 115 Newhaven, 132 Newport, 65 Newport, 65 McKinnon, 27 McKinnon, 27 Newry, 86, 89 Newry, 86, 89 Melba, 54 Melba, 54 Newstead, 118 Newstead, 118 Melbourne, 36, 44, 49, 51, 56, 58, 59, 60, Melbourne, 36, 44, 49, 51, 56, 58, 59, 60, Newtown, 29 Newtown, 29 61, 62, 63, 65, 67, 68, 71, 74, 76, 77, 78 61, 62, 63, 65, 67, 68, 71, 74, 76, 77, 78 Nhill, 29, 49, 81, 124 Nhill, 29, 49, 81, 124 Melton, 27, 89, 133, 148 Melton, 27, 89, 133, 148 Niddrie, 29 Niddrie, 29 Melton East, 28 Melton East, 28 Non metro various, 46, 51, 54 Non metro various, 46, 51, 54 Melton Shire, 53 Melton Shire, 53 Noorat, 130 Noorat, 130 Melton South, 28 Melton South, 28 North Melbourne, 65, 67, 76 North Melbourne, 65, 67, 76 Mentone, 28 Mentone, 28 Northcote, 61 Northcote, 61 Merbein, 61, 150, 151 Merbein, 61, 150, 151 Northern Metro, 104, 105, 106, 107 Northern Metro, 104, 105, 106, 107 Merino, 120, 142 Merino, 120, 142 Numurkah, 95, 100, 144 Numurkah, 95, 100, 144 Merrigum, 94, 95, 99 Merrigum, 94, 95, 99 Nunawading, 29 Nunawading, 29 Merrimu, 86, 89 Merrimu, 86, 89 Nyah, 100 Nyah, 100 Metropolitan Areas, 83 Metropolitan Areas, 83 Metung, 119, 141 Metung, 119, 141 O O Middle Park, 28 Middle Park, 28 Mildura, 28, 36, 61, 68, 126, 145 Ocean Grove, 59, 110, 135 Mildura, 28, 36, 61, 68, 126, 145 Ocean Grove, 59, 110, 135 Millewa, 150, 151 Omeo, 82, 119, 141 Millewa, 150, 151 Omeo, 82, 119, 141 Minyip, 124 Orbost, 119 Minyip, 124 Orbost, 119 Mitcham, 41 Ouyen, 124, 152 Mitcham, 41 Ouyen, 124, 152 Mitiamo, 139 Oxley, 127 Mitiamo, 139 Oxley, 127 Moe, 61, 112, 137 Moe, 61, 112, 137 Monash City, 53 P Monash City, 53 P Montmorency, 28 Montmorency, 28 Moondarra, 137 Pakenham, 30, 57, 63 Moondarra, 137 Pakenham, 30, 57, 63 Moorabool, 110, 135 Parkville, 30, 46 Moorabool, 110, 135 Parkville, 30, 46 Mooroolbark, 28 Paynesville, 119, 141 Mooroolbark, 28 Paynesville, 119, 141 Mooroopna, 28, 100 Penshurst, 142 Mooroopna, 28, 100 Penshurst, 142 Moreland, 28 Peterborough, 130 Moreland, 28 Peterborough, 130 Mortlake, 130 Point Cook, 80 Mortlake, 130 Point Cook, 80 Morwell, 80, 112, 113, 137 Poowong, 129 Morwell, 80, 112, 113, 137 Poowong, 129 Mount Eliza, 29 Porepunkah, 127 Mount Eliza, 29 Porepunkah, 127 Mount Evelyn, 76 Port Campbell, 130, 147 Mount Evelyn, 76 Port Campbell, 130, 147 Mount Waverley, 41 Port Fairy, 128, 146 Mount Waverley, 41 Port Fairy, 128, 146 Murrumbeena, 29, 41 Portland, 56, 128 Murrumbeena, 29, 41 Portland, 56, 128 Murtoa, 29 Preston, 30, 61 Murtoa, 29 Preston, 30, 61 Myrniong, 133 Preston East, 30 Myrniong, 133 Preston East, 30 Myrtleford, 95, 127, 146 Purnim, 147 Myrtleford, 95, 127, 146 Purnim, 147 Pykes Creek, 86, 87 Pykes Creek, 86, 87 Pyramid Hill, 61, 95, 100, 139 Pyramid Hill, 61, 95, 100, 139 N N Q Q Nagambie, 53, 95, 121 Nagambie, 53, 95, 121 Nanneella, 95, 100 Quambatook, 124 Nanneella, 95, 100 Quambatook, 124 Napoleons, 29 Queenscliff, 68 Napoleons, 29 Queenscliff, 68 Narre Warren, 41, 54 Narre Warren, 41, 54 Narre Warren South, 29 Narre Warren South, 29 130 Appendix B Public Sector Asset Investment Program 2003-04 130 Appendix B Public Sector Asset Investment Program 2003-04

R T R T Rawson, 113 Tallygaroopna, 101 Rawson, 113 Tallygaroopna, 101 Raywood, 118 Tangambalanga, 32 Raywood, 118 Tangambalanga, 32 Red Cliffs, 30, 150, 151 Tarnagulla, 62 Red Cliffs, 30, 150, 151 Tarnagulla, 62 Riddells Creek, 133 Tatura, 68, 97, 101, 102 Riddells Creek, 133 Tatura, 68, 97, 101, 102 Ringwood, 30 Templestowe, 32 Ringwood, 30 Templestowe, 32 Ringwood East, 72 Terang, 130 Ringwood East, 72 Terang, 130 Robinvale, 53, 145, 150, 151 The Patch, 32 Robinvale, 53, 145, 150, 151 The Patch, 32 Romsey, 62, 133, 148 Thorpdale, 113 Romsey, 62, 133, 148 Thorpdale, 113 Rosanna, 30, 31, 41 Tol Tol, 150 Rosanna, 30, 31, 41 Tol Tol, 150 Rosebud, 31 Tongala, 102, 122, 145 Rosebud, 31 Tongala, 102, 122, 145 Rowville, 62 Tooborac, 118, 139 Rowville, 62 Tooborac, 118, 139 Roxburgh Park, 31, 42, 51 Toolamba, 97, 102 Roxburgh Park, 31, 42, 51 Toolamba, 97, 102 Rural, 47, 50, 56 Toora, 129, 146 Rural, 47, 50, 56 Toora, 129, 146 Rushworth, 96, 101, 121 Tooradin, 32 Rushworth, 96, 101, 121 Tooradin, 32 Rutherglen, 31 Torquay, 80, 110, 136 Rutherglen, 31 Torquay, 80, 110, 136 Trafalgar, 32 Trafalgar, 32 Traralgon, 32, 33, 42, 51, 54, 113, 137 Traralgon, 32, 33, 42, 51, 54, 113, 137 S S Trentham, 118 Trentham, 118 Sale, 31, 54, 87, 137 Tyers, 113 Sale, 31, 54, 87, 137 Tyers, 113 Seaspray, 113 Tylden, 118 Seaspray, 113 Tylden, 118 Sebastopol, 31, 115 Sebastopol, 31, 115 Seymour, 62, 121, 144 U Seymour, 62, 121, 144 U Shepparton, 44, 96, 101, 121, 122 Shepparton, 44, 96, 101, 121, 122 Undera, 97 Undera, 97 Simpson, 130, 147 Simpson, 130, 147 Underbool, 124 Underbool, 124 Skenes Creek, 110 Skenes Creek, 110 Upper Ferntree Gully, 33, 48 Upper Ferntree Gully, 33, 48 Skipton, 115 Skipton, 115 Smythedale, 62 Smythedale, 62 Somerville, 42 V Somerville, 42 V South East Melbourne, 47 Various, 35, 42, 43, 44, 48, 49, 51, 52, 54, South East Melbourne, 47 Various, 35, 42, 43, 44, 48, 49, 51, 52, 54, South Melbourne, 65 56, 68, 72, 74, 77, 80, 81, 82, 87, 89, 90, South Melbourne, 65 56, 68, 72, 74, 77, 80, 81, 82, 87, 89, 90, South Morang, 80 105, 110, 111, 112, 113, 114, 115, 116, South Morang, 80 105, 110, 111, 112, 113, 114, 115, 116, Southbank, 65, 71 118, 119, 120, 122, 124, 125, 126, 127, Southbank, 65, 71 118, 119, 120, 122, 124, 125, 126, 127, Southern Metro, 104, 105, 106 128, 129, 130, 131, 132, 134, 136, 137, Southern Metro, 104, 105, 106 128, 129, 130, 131, 132, 134, 136, 137, Spotswood, 65 138, 139, 140, 141, 142, 145, 146, 147, Spotswood, 65 138, 139, 140, 141, 142, 145, 146, 147, Springvale, 42, 54 148, 149, 150, 151, 152 Springvale, 42, 54 148, 149, 150, 151, 152 St Arnaud, 124 Venus Bay, 129 St Arnaud, 124 Venus Bay, 129 St Helena, 80 Vermont South, 51 St Helena, 80 Vermont South, 51 Stanhope, 96, 122, 144 Violet Town, 123 Stanhope, 96, 122, 144 Violet Town, 123 Statewide, 34, 47, 50, 51, 59, 60, 61, 62, 63, Statewide, 34, 47, 50, 51, 59, 60, 61, 62, 63, 66, 68, 71, 107 66, 68, 71, 107 Stawell, 48, 124 W Stawell, 48, 124 W Strathmore, 31 Strathmore, 31 Sunbury, 31, 36, 42, 54, 80, 133, 134 Waaia, 98 Sunbury, 31, 36, 42, 54, 80, 133, 134 Waaia, 98 Sunshine West, 34 Wallan, 123, 145 Sunshine West, 34 Wallan, 123, 145 Swan Hill, 36, 97, 101, 126 Wallington, 33, 136 Swan Hill, 36, 97, 101, 126 Wallington, 33, 136 Swifts Creek, 119, 141 Wangaratta, 33, 81, 127 Swifts Creek, 119, 141 Wangaratta, 33, 81, 127 Sydenham, 32 Wantirna South, 33 Sydenham, 32 Wantirna South, 33 Public Sector Asset Investment Program 2003-04 Appendix B 131 Public Sector Asset Investment Program 2003-04 Appendix B 131

Waratah Bay, 129 Williamstown, 34, 43 Waratah Bay, 129 Williamstown, 34, 43 Warracknabeal, 125 Wimmera, 71 Warracknabeal, 125 Wimmera, 71 Warragul, 33, 44, 63, 114, 139 Winchelsea, 112 Warragul, 33, 44, 63, 114, 139 Winchelsea, 112 Warrandyte, 33 Wodonga, 34, 36, 43, 52, 57, 126, 128 Warrandyte, 33 Wodonga, 34, 36, 43, 52, 57, 126, 128 Warrnambool, 33, 37, 45, 62, 131, 132, 147 Wonthaggi, 129, 132, 146 Warrnambool, 33, 37, 45, 62, 131, 132, 147 Wonthaggi, 129, 132, 146 Watchem, 125 Woodend, 134, 149 Watchem, 125 Woodend, 134, 149 Wedderburn, 34, 118, 140 Wyndham, 49 Wedderburn, 34, 118, 140 Wyndham, 49 Wellington Shire, 55 Wyuna, 98, 102 Wellington Shire, 55 Wyuna, 98, 102 Wendouree, 116 Wendouree, 116 Werribee, 34, 42, 45, 50, 68, 87, 90 Y Werribee, 34, 42, 45, 50, 68, 87, 90 Y West Melbourne, 59 West Melbourne, 59 Western Metro, 104, 105, 106, 107 Yarra Glen, 34 Western Metro, 104, 105, 106, 107 Yarra Glen, 34 Wheelers Hill, 34 Yarra Junction, 43 Wheelers Hill, 34 Yarra Junction, 43 Whitfield, 62 Yarram, 129 Whitfield, 62 Yarram, 129 Whittlesea City, 53 Yarraville, 34 Whittlesea City, 53 Yarraville, 34 Wickliffe, 125 Yea, 62, 145 Wickliffe, 125 Yea, 62, 145 Willaura, 125 Willaura, 125

132 Appendix B Public Sector Asset Investment Program 2003-04 132 Appendix B Public Sector Asset Investment Program 2003-04

2003-04 Budget Update

Presented by John Lenders MP, Acting Treasurer of the State of Victoria. 2003-04 Public Sector Asset Investment Program Budget Information Paper No. 1 www.budget.vic.gov.au