20/3385/F & 20/3386/L Applicant: Spray Street

Total Page:16

File Type:pdf, Size:1020Kb

20/3385/F & 20/3386/L Applicant: Spray Street Planning Board Agenda Item: 4 25 May 2021 Reference: 20/3385/F & 20/3386/L Applicant: Spray Street Quarter LLP Agent: Lichfields Site Address: Ward: Woolwich Exchange, Land Bounded by Woolwich Riverside Plumstead Road, Burrage Road, Spray Street Application Type: and Woolwich New Road, Woolwich, Full Planning Permission & London, SE18 7BZ Listed Building Consent 1.0 Recommendation 1.1 The Planning Board is requested to GRANT Full Planning Permission (20/3385/F - Recommendation A) as outlined below: Demolition of existing buildings (excluding the Grade II listed Former Woolwich Covered Market and elements of 1a-c to 11 Woolwich New Road (odds)) and the construction of a mixed use development comprising residential dwellings (Class C3), commercial, business and service uses (Class E), community use (within Class E, Class F1(f) and/or F2(b)), drinking establishment(s) (sui generis) and a cinema (sui generis), new public square and new public realm with hard and soft landscaping, highways works, parking, access and servicing arrangements, plant, infrastructure and associated works. Internal and external alterations to the Former Woolwich Covered Market. SUBJECT TO: i. Referral of the application to the Mayor of London as required under the terms of The Town and Country Planning (Mayor of London) Order 2008; ii. The land needs to be acquired through CPO if it cannot be acquired by agreement, however the Council estates department has entered into a conditional land sale agreement to sell the land to the applicant if the Council acquires the land. Therefore an agreement can be entered into between the LPA and the applicant pursuant to section 111 of the Local Government Act 1972 providing that the applicant will, simultaneously upon obtaining relevant interests enter into with the Council as local planning ITEM NO: 4 PAGE NO: 1 authority a section 106 agreement or a confirmatory deed by agreement requiring that the form of proposed section 106 obligations contained in the section 111 are binding on the applicant under section 106 of the Town and Country Planning Act 1990 (as amended). The form of the section 106 agreement and confirmatory deed will be appended to the section 111 agreement. The section 111 agreement itself will contain the proposed planning obligations as summarised in the heads of terms set out in this report (Section 31.0); iii. Conditions set out in Appendix 2 of this report; iv. To authorise the Assistant Director of Planning & Building Control to: a. make any minor changes to the detailed wording of the recommended conditions as set out in Appendix 2, its addendums and the minutes of this Planning Board meeting, where the Assistant Director of Planning & Building Control considers it appropriate, before issuing the final decision notice; and b. finalise the detailed terms of the section 111 agreement (including appended documents) and form of the planning obligations as set out in this report (Section 31.0), its addendums and the minutes of this Planning Board meeting v. Members confirming in their decision that account has been taken of environmental information, as required by Regulation 26 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017; vi. A statement being placed on the statutory register confirming the main reasons and consideration of which the Planning Board decision was based as required by Regulation 29 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017; vii. In the event that the Section 111 agreement is not completed within three (3) months of the date of this Planning Board meeting, to authorise the Assistant Director of Planning & Building Control to consider whether permission should be refused on the grounds that the proposals are unacceptable in the absence of the benefits which would have been secured, and if so, to determine the application with reasons for refusal which will include the following: a. In the absence of a legal agreement to secure a comprehensive redevelopment of the Spray Street site, improvements to ITEM NO: 4 PAGE NO: 2 Former Woolwich Covered Market, housing, affordable housing, health and education infrastructure, transport and highway works, public transport enhancements, public realm improvements, employment and training, the development would fail to mitigate its impact on local services, amenities and infrastructure, environmental sustainability and open space contrary to policies H3, H5, H(e), EA4, EA(c), OS1, E1, CH(a), IM1, IM4, IM(a) and IM(b) of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (Adopted July 2014),the Planning Obligations (s106) Guidance SPD (July 2015), Woolwich Town Centre Masterplan SPD (2012) and Spray Street Masterplan SPD (2015). 1.2 The Planning Board is requested to GRANT Listed Building Consent (20/3386/L - Recommendation B), as outlined below: Internal and external alterations, repair and refurbishment works to the Grade II listed Former Woolwich Covered Market to facilitate the change of use of the building to a cinema (sui generis), together with food and beverage and retail uses (class E/sui generis) at the ground floor and mezzanine levels. SUBJECT TO: i. Conditions set out in Appendix 3 of this report ii. To authorise the Assistant Director of Planning & Building Control to: a. make any minor changes to the detailed wording of the recommended conditions as set out in Appendix 3, its addendums and the minutes of this Planning Board meeting, where the Assistant Director of Planning & Building Control considers it appropriate, before issuing the final decision notice 2.0 Summary 2.1 Detailed below is a summary of the application: The Site Site Area (m²) 2.30 hectares (23,000 m²) ITEM NO: 4 PAGE NO: 3 Local Plan Allocation • Woolwich Strategic Development Location • Woolwich Town Centre Masterplan SPD • Spray Street Masterplan SPD • Site Allocations (W11) • Contains Secondary Shop Frontage Heritage Assets One statutory listed building (Grade II) known as the Former Greenwich Covered Market (date listed 16.10.2018 - full details of the listing Appendix 6 of the report). The application is subject to listed building consent (20/1661/L). The site is within the Woolwich Town Centre Conservation Area and adjacent to the Royal Arsenal Conservation Area (north of the site). The Application site is within 500m of the setting of 37 statutory listed buildings – full list Appendix 5. Three Locally Listed Buildings designated within the Application site. • 1a-c Woolwich New Road • 3 Woolwich New Road • 2 Plumstead Road The site also includes a number of agreed non-designated heritage assets: • 5-13 Woolwich New Road, including their rears which incorporates 13a and 13c Spray Street • 9 and 20 Plumstead Road • the Employment Exchange on Spray Street Tree Preservation Order None Flood Risk Zone Flood Zone 1 ITEM NO: 4 PAGE NO: 4 Building Building height No. of storeys (metres) West Site 17.52 - 80.56 3 - 23 (Blocks AN, AW, AS, BN, BE, CW, CE, CS, DS) East Site 20.25 - 81.63 4 - 23 (Blocks EW, EE, FW, FE) Total Floor area (GIA m²) 78,307 m² 14,821 m² (Residential) (Non-Residential) Residential Uses Existing Class C3 Residential 1,677 m² (24 dwellings) Proposed Dwelling Mix Unit Type No. % Studio 29 4% 1-bed 278 35% 2-bed 370 46% 3-bed 119 15% 4-bed 5 1% TOTAL 801 100% Affordable London 112 (71%) 20% of total no. Housing / Tenure Affordable Rent of units. Split Shared 46 (29%) Ownership Overall 158 Affordable Housing Private 643 80% of total no. of units. By habitable room the Affordable Housing offer equates to 25%. Housing All units comply with internal space requirements in line Standards with Policy D6 of the London Plan (2021), with the exception of two units. These exceptions are modest ITEM NO: 4 PAGE NO: 5 with justification as detailed within section 20.0 of the report. Non-Residential Uses Existing Uses Use (Class) m² Class E Retail 7,002 m² Financial and Professional Services Restaurants & Cafes Workspace Dental Practice Light industrial Class E Vacant Covered 1,365 m² Market Class B8 Industrial Storage/ 799 m² Warehouse Class F.1 Churches 2,698 m² Sui Takeaways 1,015 m² Generis Drinking 113 m² Establishment Unknown Sui Generis 83 m² Total 13,075 m² Proposed Uses Use (Class) m² Class E shops, financial or 6,478 m²* professional services or restaurants / cafes or gym workspace 1,923 m² nursery 614 m² sui generis drinking 1,446 m² establishment uses cinema 4,124 m² *F1(f) Community floor Up to 500 m² and/or space Class F2(b) Total 14,584 m² Employment Existing Number of Jobs 423 Full Time Employment (FTE) on Site gross direct jobs ITEM NO: 4 PAGE NO: 6 Existing Site Net Local Impact Area: 396 FTE Employment Wider Impact Area: 460 FTE Proposed number of 872 FTE gross direct theoretical jobs construction 656 FTE gross direct jobs Net Total Employment Local Impact Area: 615 FTE Wider Impact Area: 713 FTE Net Employment Local Impact Area: +219 FTE Difference between the Wider Impact Area: +254 FTE Proposed Development and Existing Site Transportation Car No. existing car parking Pay and Display 23 Parking and servicing spaces Single Yellow Lines 61 Loading 5 Total 89 No. Proposed Car Club Total 2 Spaces No. Proposed Car Parking East – Accessible 48 Spaces West - Accessible 20 Street Level 4 Total – Standard 4 Total - Accessible 68 Proposed Parking Ratio 0.08 Cycle No. Proposed Cycle Residential East: 866 Parking Parking West: 571 Residential 21 Visitor Non-residential 169 Visitor Total 1,625 Public PTAL Rating 6b (Excellent) Transport Education – Nursery No. of Pupils 59 (est.) No. of Staff 40 FTE Floor space (m²) 741m2 Outdoor space 240 ITEM NO: 4 PAGE NO: 7 Sustainability / Energy BREEAM Rating Workspace and Cinema: BREEAM ‘Excellent’.
Recommended publications
  • Woolwich History Walks
    ROYAL GREENWICH HERITAGE Woolwich TRUST History Walks trails start here discover woolwich The Royal Arsenal and Woolwich is imbued with history, much of which is linked with the British military. The former was responsible for the vast majority of developing, testing and processing weapons of war for the British Army and Navy for over 300 years, employing more than 80,000 at its peak and making it one of the most significant manufacturing sites in the UK. Until recently, much of what went on inside the walls of the Royal Arsenal was kept secret. Today, as a result of its decommission in the 1990s and subsequent revival and redevelopment, much of it is open for the public to experience and explore. These military roots have extended throughout Woolwich, the remnants of which are still present today. WHICH TRAIL WOULD YOU LIKE TO FOLLOW? Royal Arsenal Walk The Royal Arsenal Walk highlights a selection of the most impressive foundries, factories and warehouses in the compound, that were integral to the production of British weapons. Wider Woolwich Walk The Wider Woolwich Walk explores the historical and present military services in the area, as well as offering a glimpse of life in Woolwich today. additional loop including the Barracks & Mallet’s Mortar additional loop including the Barracks & the Rotunda l! al or do it 1 The Guardhouses These Grade II Listed guardhouses were built in 1814. They flank the river entrance to the Royal Arsenal, originally its main entrance. Assembly by Peter Burke The 16 cast-iron figures, entitled Assembly by Peter Burke, were installed in 2005 and aim to depict a collective human presence.
    [Show full text]
  • A Social Sustainability Report Commissioned by the Berkeley Group Foreword
    Living at the Royal Arsenal A social sustainability report commissioned by the Berkeley Group Foreword The importance of place-making is now You have to deliver on both to create widely acknowledged by the house- a strong new community. building industry. It wasn’t always this In practice, this means looking at way. But the quality of housing design estate management in an increasingly has improved significantly and people sophisticated way. It involves recognise you have to address social developers working in partnership and economic issues, as well as the with housing associations and local buildings and spaces, if you want to authorities to put in place the right create fantastic places. funding and structures. It means The idea of place-keeping, however, finding new ways to bring people often remains an after-thought. together and actively involving We have focused much less on how residents in decisions about how these new communities are going places are managed in the long-term. to be managed and maintained What this research at the Royal Arsenal and how residents should be involved shows is that the same care, attention if these places are going to thrive. and investment now given to place- The last time Britain built more making needs to be brought to thinking than 200,000 homes a year back about the idea of place-keeping. in the Sixties and Seventies, these communities ultimately failed because of management and maintenance, as much as design. So we need to start thinking about place-making and place-keeping Tony Pidgley, CBE as two elements of the same process.
    [Show full text]
  • WOOLWICH DESTINATION MANAGEMENT PLAN an Emerging
    WOOLWICH DESTINATION MANAGEMENT PLAN An Emerging Cultural Destination 2018 - 2022 (v4) Prepared for Visit Greenwich by Jan 2018 73 Morningside Park EDINBURGH EH10 5EZ Scotland UK Tel: +44 (0)131 447 1721 [email protected] www.yellowrailroad.com Established 2000 Yellow Railroad Limited Company number: SC 441131 CONTENTS SECTION 1: EXECUTIVE SUMMARY ..................................................................... 4 SECTION 2: INTRODUCTION AND BACKGROUND ............................................... 9 2.1 Culture as a Driver of Regeneration................................................................... 9 2.2 Destination Management Plan ........................................................................ 10 2.4 Destination and Cultural Asset Audit ............................................................... 11 SECTION 3: THE OPPORTUNITY FOR TRANSFORMATION ................................. 13 3.1 Where is Woolwich Now? ............................................................................... 13 3.2 Summary of Strengths and Opportunities ....................................................... 16 3.3 A New Economic Base .................................................................................... 17 3.4 Creative District and Culture as Drivers of Transformation .............................. 18 3.5 Potential Economic Impact .............................................................................. 20 SECTION 4: MAIN CHALLENGES ........................................................................ 24
    [Show full text]
  • Platform for Design
    Platform for Design Hugh Pearman Platform for Design This edition published in the United Kingdom in 2016 by Crossrail Limited: 25 Canada Square, Canary Wharf, London, E14 5LQ. Text © Crossrail Limited 2016 Design & Layout © Crossrail Limited 2016 ISBN 978-0-9933433-1-5 Writer: Hugh Pearman Editor: Sarah Allen Art Direction & Design: Andrew Briffett Design: Chris Hanham Contributions from Crossrail staff and its partners All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission of the copyright holder. Crossrail Limited is registered in England and Wales No. 4212657. Registered Office: 25 Canada Square, Canary Wharf, London, E14 5LQ. 2 Platform for Design Hugh Pearman Platform for Design Platform for Design 5 Forewords 8 Chapter 1 The history 16 Chapter 2 Design approach 24 Chapter 3 The well-tempered environment 38 Chapter 4 The stations 140 Chapter 5 The new trains 144 Chapter 6 The culture line 4 Platform for Design Foreword from Andrew Wolstenholme OBE Chief Executive Officer, Crossrail By 2030 the capital’s population is set to reach ten million and its transport system must be ready to meet this demand. The railway that Crossrail is building – to be known as the Elizabeth line from 2018 – is part of the UK’s plan to maintain London’s place as a world city. The new railway will be a high frequency, high capacity service “The railway has been planned linking 40 stations over 100 kilometres, from Reading in the west to to deliver a well-integrated Shenfield and Abbey Wood in the east.
    [Show full text]
  • Chapter 1: Central Riverside Area
    CHAPTER 1 Central Riverside Area The riverside between the former naval dockyard and the the 1830s with Beresford Street, where there has been a Arsenal stretching back to the High Street is where settle- peculiar mix of buildings. Notable among these are three ment began more than 2,000 years ago, on firm and fer- that have gone – Holy Trinity Church, the Empire Theatre tile Thanet-sand beds along the edge of the Thames and and the Autostacker. between expanses of marshland. Here was the Iron Age fort or oppidum. On a spur of higher ground immediately to the south-west perched the medieval parish church. Its Early industry and institutions successor of the 1730s is slightly further inland – a retreat from erosion, yet still prominent. Below, where the early town stood, antiquity is absent and even remnants of the The military-industrial sites that preceded and stood area’s eighteenth- and nineteenth-century faces are scarce. between the naval dockyard and the Arsenal have received Old Woolwich has been blasted. This is partly because little attention, though lands here were in state use from industry has been a major presence, and at a large scale, the sixteenth to the nineteenth century. On the riverside, since at least the sixteenth century. A single wharf, just east immediately east of Bell Water Gate, was Gun Wharf of Bell Water Gate and lately a car park, saw the origins of and, to its south-east along the line that is now Beresford both the naval dockyard and the Arsenal in the sixteenth Street, was the Woolwich Ropeyard.
    [Show full text]
  • Woolwich Crossrail and the Regeneration Effect 2–3
    Woolwich Crossrail and the regeneration effect 2–3 Woolwich Equitable pub Famous Bhurtpoor historic cannon, on display outside Woolwich Barracks, London Woolwich Barracks gates Woolwich 4–5 London SE18 Coat of Arms of the Metropolitan Welcome to Woolwich Borough of Woolwich The regeneration of Woolwich and Royal Arsenal Riverside district is one of the most exciting projects this generation will witness. Developing this previously under-loved and unappreciated area of London will create a whole new vibrant destination. With Crossrail, a new Woolwich is being The dramatic redevelopment of Royal Creating London’s newest cultural hub generated, and is set to become one of Arsenal Riverside has created a public Woolwich Tall Ships Festival London’s most sought after cultural hubs. square and heritage centre, improvements to Woolwich is establishing itself as a cultural Like all of London, Woolwich’s history is one the Thames Path and a new park. Over the and creative hub. In the new Cultural of change and development, closely next 12 years, High Street and Spray Street Quarter (due to open in December 2018 to associated with the Royal Artillery and will be revitalised with pedestrianised areas coincide with Crossrail) Dash Arts will Engineering Corps. In Woolwich’s and parks as well as new retail and become the resident artistic and acting dockyards, Henry VIIIs flagship and later commercial spaces. group, while younger generations of dancers Charles Darwin’s Beagle were built. After the and actors are created at the Academy of closure of the docks, Woolwich was Woolwich’s transport infrastructure will Performing Arts.
    [Show full text]
  • Royal Arsenal
    Living at the Royal Arsenal A social sustainability report commissioned by the Berkeley Group Foreword The importance of place-making is now You have to deliver on both to create widely acknowledged by the house- a strong new community. building industry. It wasn’t always this In practice, this means looking at way. But the quality of housing design estate management in an increasingly has improved significantly and people sophisticated way. It involves recognise you have to address social developers working in partnership and economic issues, as well as the with housing associations and local buildings and spaces, if you want to authorities to put in place the right create fantastic places. funding and structures. It means The idea of place-keeping, however, finding new ways to bring people often remains an after-thought. together and actively involving We have focused much less on how residents in decisions about how these new communities are going places are managed in the long-term. to be managed and maintained What this research at the Royal Arsenal and how residents should be involved shows is that the same care, attention if these places are going to thrive. and investment now given to place- The last time Britain built more making needs to be brought to thinking than 200,000 homes a year back about the idea of place-keeping. in the Sixties and Seventies, these communities ultimately failed because of management and maintenance, as much as design. So we need to start thinking about place-making and place-keeping Tony Pidgley, CBE as two elements of the same process.
    [Show full text]
  • 1851 Census Index, for North West Kent
    NORTH WEST KENT FAMILY HISTORY SOCIETY 1851 CENSUS INDEX, FOR NORTH WEST KENT LEWTSHAM '. RD. DART FORD R.D. BROMLEY R.D. g SEVENOAKS R.D. Volume II Woolwich Parish Piece Nos. H.O.107/1588-89 ISBN 0 9513760 3 9 NORTH WEST KENT FAMILY HISTORY SOCIETY 1851 CENSUS INDEX FOR NORTH WEST KENT Volume II Woolwich Parish (Piece Numbers H.0.107/1588, H.O.107/1589) 1989 Contents > Introduction > ii. Location of Census Microfilms and Transcripts iii. Woolwich Parish in the 19th Century iv. Arrangement of the Woolwich 1851 Census Returns xii. Guide to Enumeration Districts and Folio Numbers xiv. Map of the area . xvii. Index of Streets INDEX OF NAMES 3—171. Index to Hebe, Wye and Unite Convict Hulks 172-73. Society Publications 174. (c) North West Kent Family History Society, October 1989 ISBN 0 9513760 3 9 H INTRODUCTION This volume is the second in the Society‘s series of indexes to the 1851 census of North West Kent, and was produced in co-operation with the Woolwich & District F.H.S., some of whose members have helped with the transcription and checking phases. In particular, I would like to record my thanks and those of the Society, to: — Guy Nevill who as Projects Organizer was instrumental in setting up the Society’s 1851 Census Project in 1980-81. - All the transcribers and checkers who have helped with Woolwich parish - Mary Mullett, Bill & Faith Keymer, Veronica Luke, John Nightingale, Edna Reynolds, Barbara Robinson, Fred Tutt, Fred & Priscilla Vernau, and Malcolm Youngs. — Members of the Society with BBC microcomputers for their work in entering the data into computer files - Ronald & Jackie Dixon, Sabina Doust, Judith Gilbert, Win Grimmette, Paul Homer, Norma Smith, Stuart Valentine, and Barbara Zissell.
    [Show full text]
  • Regeneration Through Heritage:Understanding Thedevelopmentpotentialofhistoriceuropean Arsenals
    Regeneration through Heritage: Understanding the Development Potential of Historic European Arsenals Heritage:UnderstandingtheDevelopmentPotentialofHistoricEuropean Regeneration through The Sustainable Historic Arsenals Regeneration Partnership (SHARP) was formed between the EU Regeneration through Heritage nations of England, Malta, Estonia and Spain to share lessons learned while seeking new futures for these culturally important but neglected former military sites. Understanding the Development As lead partner in the part EU-funded project, English Heritage reviewed the story of the rescue, conservation and re-use of the former Royal Arsenal, Woolwich – an example of the contribution that heritage can make to social, economic and cultural regeneration. This was followed by investigation of Potential of Historic European Arsenals the challenges and opportunities presented by comparable sites in Malta, Spain and Estonia. In Malta, the aim is to revitalise a succession of military sites adjoining the Grand Harbour; at Cadiz it is to bring back into public view the fortifications that repulsed Napoleon’s army; while at Tallinn it is to help the citizens of the young Republic of Estonia to understand their complex past under Russian Imperial, Soviet and Nazi rule. Each of these projects is providing fascinating lessons and outcomes. This is the story of that process and its resulting recommendations. ISBN 978 1 905624 57 7 With the support of Regeneration through Heritage Regeneration through Heritage Understanding the Development Potential
    [Show full text]
  • How to Get Involved What We Have Learned
    ROYAL BOROUGH OF GREENWICH A NEW VISION FOR WOOLWICH INTRODUCTION 1 ABOUT THE STRATEGY WHAT HAS HAPPENED SO FAR? The Royal Borough of Greenwich, with consultants The public consultation will run for 2 weeks, starting Woolwich is changing. Recent new developments and Urban Initiatives Studio (UIS), have responded to on 6th February and ending on 22nd February. the opportunities and issues in Woolwich and have This strategy will inform the preparation of the arrival of Crossrail are creating a huge opportunity for drawn up a vision for the town. This has been carried Supplementary Planning Guidance which will guide out in conjunction with local businesses, community tranformation in Woolwich. This strategy aims to ensure that new development and urban design interventions in groups and residents from Woolwich - ensuring that the town. everyone can benefit from the changes taking place, and that the strategy responds to what people really need. Woolwich changes for the better. This consultation is aimed at sharing our current proposals and receiving feedback and comments from the wider public. STUDY AREA Woolwich Ferry Woolwich Dockyards Royal Arsenal A206 Powis Street Beresford Square General Gordon Square A205 The area of interest for this study is Woolwich town centre and the Royal Arsenal. The Woowich Dockyards are also included within the study area as they are important for the context of the town centre. WHAT WE HAVE LEARNED 78 people were interviewed on the streets of travelled. Some of those people interviewed are Woolwich over two days in August 2018. They were pictured below. asked about what they liked and disliked about the The comments are summarised on the right.
    [Show full text]
  • Leaving a Transport Legacy
    March 2012 Leaving a transport legacy Olympic and Paralympic Transport Legacy Action Plan Greater London Authority March 2012 Published by Greater London Authority City Hall The Queen’s Walk More London London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 Cover photograph © TfL Contents 5 Mayoral foreword 7 Chapter 1 – Introduction and policy context 9 1.1. About this document . 9 1.2. Mayor’s vision . .10 1.3. Background . 13 1.4. Planning policy context . 14 1.5. Responsibilities. .17 Chapter 2 – Physical legacy 19 2.1. Introduction. .19 2.2. Highway, water and rail infrastructure. .19 2.2.1. Rail infrastructure . 19 2.2.2. River and water services. .26 2.2.3. Highway improvements . 29 2.3. Walking and cycling infrastructure . 31 2.3.1. Walking and cycling Routes . 34 2.3.2. Better streets improvements . 36 2.4. Land use legacy . 39 2.4.1. Olympic Legacy Supplementary Planning Guidance. .40 Chapter 3 – Behavioural legacy 43 3.1. Introduction. .43 3.2. Active travel. .43 3.3. The Paralympic Games and a positive image of disabled people . 47 Contents 6 Contents Chapter 4 – Opportunities presented by the Games 49 4.1. Introduction. .49 4.2. Ticketing and journey planning . 49 4.3. Waste collection. .50 4.4. Traffic management . 50 4.5. Using volunteers for major events. .51 4.6. Spectator travel . 51 4.7. Avoiding busy stations . 53 4.8. Transport operations . 54 4.9. Delivery and servicing activity. .55 4.10. Managing road works . 56 4.11. Planning events .
    [Show full text]
  • 4 PLANNING BOARD 4 May 2021 Agenda Item: 4 Reference No: 19/2498/F Applicant
    PLANNING BOARD Agenda Item: 4 4 May 2021 Reference No: 19/2498/F Applicant: Legal & General Property Limited (C/O agent) Agent: Quod (Ben Ford) Site Address: Ward: Woolwich Riverside Land bound by Beresford Street and Macbean Street, Woolwich, SE18 6BG Application Type: Full Planning Permission 1. Recommendation 1.1 To grant planning permission for the following development: Residential led, mixed-use development comprising residential dwellings (Use Class C3) with ancillary residential facilities and flexible floorspace Use Classes E, F1, F2 and sui generis (market pound, public house, drinking establishment, hot food takeaway) [formerly Use Class A1-A5, B1, D1, D2 and sui generis (market pound)], new public realm with hard and soft landscaping, highway works, disabled car parking and cycle parking, access and servicing arrangements, mechanical plant and associated works. 1.2 Subject to the following: (i) Referral of the application to the Mayor of London as required under the terms of The Town and Country Planning (Mayor of London) Order 2008; (ii) Members confirming in their decision that account has been taken of environmental information, as required by Regulation 26 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017; (iii) A statement being placed on the statutory Register confirming the main reasons and consideration of which the Planning Board decision was based as required by Regulations 30 (I) (d) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017; ITEM NO: 4
    [Show full text]