Community Agricultural Resource Management and Competitiveness Project Ii

Total Page:16

File Type:pdf, Size:1020Kb

Community Agricultural Resource Management and Competitiveness Project Ii AGRICULTURAL PROJECT IMPLEMENTATION UNIT COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT PLAN RENOVATION OF PASTURES WATERING NETWORK IN SARUKHAN COMMUNITY OF THE RA GEGHARKUNIK MARZ May 2015 A. GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL AND ADMINISTRATIVE Country Republic of Armenia Name of the Project Community Agro Resource Management and Competitiveness Subproject Title Renovation of pastures watering network in Sarukhan community of Gegharkunik marz Institutional Project Team Project Local Arrangements Leader (WB) Management Counterpart and/or Recipient (Name and contacts) Bekzod Shamsiev Gagik Khachatryan, PIU Director Vahan Gevorgyan Head of Sarukhan Community Implementation Safeguard Safeguard Contractor Arrangements Supervision (WB) Supervision (PIU) (Name and contacts) Darejan Karen Torosyan ……. Kapanadze Alice Savadyan PROJECT NAME AND SITE DESCRIPTION Description of the Project The main purpose of the sub-project is the improvement of pastures watering network in Sarukhan community providing sufficient water supply for 1624 bovine cattle and 726 small cattle directly in the pasture. The following construction activities will be implemented under the proposed sub-project: Construction of water collection chamber Installation of 12 403 m length (D= 63x4 mm) water way, connected to water main, operated by Sarukhan community Installation of 484 m length (D= 50x3.7mm, P=1.25 m ) pipeline for connection to metallic troughs Construction of semi-pipes three metallic troughs 30 m length each, installed on concrete - cobblestone platform. Installation of 4 regulation and 9 pressure braking chambers The design for pastures watering network has been developed by the ANUSHIK JRER design company under the contract concluded with Agricultural Project Implementation Unit. Project implementation area, community Republic of Armenia, Gegharkunik marz, Sarukhan community Project site location Project implementation area is located at a distance of 127 km from Yerevan city, and in 12 km from Sarukhan Community Agricultural Resource Management and Competitiveness Project II Environmental Management Plan 2 community. Waterway will be connected to Spitakasar natural water source located in Lanjaghbyur Community, for which Sarukhan, Lanjaghbyur and Karmir Commuities Heads signed trilateral Agreement on use of the community lands within their administrative area for the construction of pasture stock-watering systems in Karmir and Sarukhan communities under the Project Land ownership Land required for the project implementation belongs to community. Letter on land ownership from the Sarukhan community Head is attached. Description of geographic, physical, The sub-project site is located in Gegharkunik marz, in biological, geological, hydrographic and Sarukhan community area. Sarukhan is located on eastern socio-economic context part of Sevan lake, located on Gegahama mountain chain, summer pastures are located on 2406-2850 m, above sea level and winter pastures 1965-2075 m above sea level. Climatic conditions of the Sarukhan possesses is mild mountainous. The winter is cold, snowy. The summer is warm, few clouds, comparatively humid weather. The Sevan Lake mitigates the winter frost and summer heat. Because of the lake, the average temperature in January is almost the same as in Yerevan. Precipitation is not abundant, 400- 450mm on the lake surface, up to 1000 in the mountains. Locations and distance for material Water for construction works will be provided by water sourcing, especially aggregates, water, cistern track. Aggregates and machinery will be obtained stones from the licensed providers within the project area. Contractor may choose to extract equipment himself, in which case contractor must obtain an extraction license prior to commencement of extraction. Metallic and PE pipes as well as all fittings will be purchased from an official supplier. LEGISLATION Indentify national and local legislation Permits required for accomplishing the works envisaged by and permits that apply to project activity the project: Construction license to be possessed by Construction Contractor, Construction permit to be obtained by the Construction Contractor from Sarukhan municipality, Reference to water pipeline connection from Sarukhan Lanjaghbyur and Karmir Commuities Heads and signed trilateral Agreement Written consent for disposal of construction waste to be obtained by Construction Contractor from the Head of Sarukhan Community, Land ownership letter possessed by the Sarukhan Community PUBLIC CONSULTATION Identify when/where the public Public consultations on the sub-project have been carried out consultation took place in Sarukhan community. Minutes of meeting as well as list of participants are attached to the EMP. ATTACHMENTS Community Agricultural Resource Management and Competitiveness Project II Environmental Management Plan 3 1. Site plan 2. Letter from Sarukhan community head on the land plot ownership 3. Minutes of public consultation meeting 4. Construction permit 5. Reference to water pipeline connection from Sarukhan Lanjaghbyur and Karmir Commuities Heads and signed trilateral Agreement 6. Agreement for construction waste disposal, obtained from Sarukhan community Head Community Agricultural Resource Management and Competitiveness Project II Environmental Management Plan 4 B. SAFEGUARDS INFORMATION ENVIRONMENTAL/SOCIAL SCREENING Will the site activity include any of the following? Activity/Issue Status Triggered Actions A. Infrastructure rehabilitation [x] Yes [ ] No Section C Part A B. New construction [x] Yes [ ] No Section C Part A C. Individual wastewater treatment system [ ] Yes [x] No Section C Part B D. Historic building(s) and districts [ ] Yes [x] No Section C Part C E. Acquisition of land [ ] Yes [x] No Section C Part D F. Hazardous or toxic materials [ ] Yes [x] No Section C Part E G. Impacts on forests and/or protected areas [ ] Yes [x] No Section C Part F H. Handling/management of medical waste [ ] Yes [x] No Section C Part G I. Traffic and Pedestrian Safety [ ] Yes [x] No Section C Part H Community Agricultural Resource Management and Competitiveness Project II Environmental Management Plan 5 C.MITIGATION MEASURES ACTIVITY PARAMETER MITIGATION MEASURES CHECKLIST 0. General conditions Notification and Worker Safety (a) The local construction and environment inspectorates and communities have been notified of upcoming activities (b) The public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works) (c) All legally required permits have been acquired for construction and/or rehabilitation (d) The Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment. (e) Workers’ PPE will comply with international good practice (hardhats, as needed masks and safety glasses, harnesses and safety boots). (f) Appropriate signposting of the sites will inform workers of key rules and regulations to follow. A. General Rehabilitation and / or Air Quality (a) The surrounding environment shall be kept free of debris Construction Activities (b) There will be no open burning of construction / waste material at the site (c) There will be no excessive idling of construction vehicles at sites Noise (a) Construction noise will be limited to day-time hours (b) During operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible Waste management (a) Waste collection and disposal pathways and sites will be identified for all major waste types expected from construction activities. (b) Construction waste will be collected and disposed at the agreed site (c) Whenever feasible the contractor will reuse and recycle appropriate and viable materials (except asbestos) Community Agricultural Resource Management and Competitiveness Project II Environmental Management Plan 6 D. MONITORING PLAN Activity What Where How When Why Who (is the parameter to be monitored?) (is the parameter to be (is the parameter to (define the frequency or (is the parameter to (is responsible for monitored?) be monitored?) continuous?) be monitored?) monitoring?) CONSTRUCTION PHASE Community Community has been notified on Sarukhan settlement Interviews with First month of Ensure community PIU notification upcoming activities local residents construction works awareness and consent Clearly established grievance Sarukhan settlement Interviews with Monthly Ensure that local PIU redress mechanism is in place and municipal community can accessible for local community authorities and voice concerns and local residents ask questions Legal compliance All required permits and Sarukhan Review of files Before and during Comply with legal PIU agreements are acquired municipality and first month of requirements Contractor’s construction works administration Provision of Personal safety gear is provided to Construction site Inspection monthly Prevent trauma and PIU workers’ health and used by workers casualty among and safety workers Operation of The surrounding environment is Construction site Inspection monthly visits during Minimize dust PIU construction kept free of debris to minimize construction emission machinery dust There is no open burning
Recommended publications
  • Հհ Գեղարքունիքի Մարզ Ra Gegharkunik Marz
    ՀՀ ԳԵՂԱՐՔՈՒՆԻՔԻ ՄԱՐԶ RA GEGHARKUNIK MARZ Մարզկենտրոնը` Marz centre ք. Գավառ Gavar town Տարածաշրջանները` Territoires Գավառ, Gavar, Ճամբարակ, Tchambarak, Մարտունի, Martuni, Սևան, Sevan, Վարդենիս Vardenis Քաղաքները` Towns Գավառ, Gavar, Ճամբարակ, Tchambarak, Մարտունի, Martuni, ք.Գավառ Սևան, Sevan, s.Gavar Վարդենիս Vardenis Տարածքը 5348 քառ. կմ/ Territory sq. km ՀՀ տարածքում մարզի տարածքի տեսակարար կշիռը 18 % Territory share of the marz in the territory of RA Քաղաքային համայնքներ 5 Urban communities Գյուղական համայնքներ 87 Rural communities Քաղաքներ 5 Towns Գյուղեր 93 Villages Բնակչության թվաքանակը 2010թ. հունվարի 1-ի դրությամբ 241.5 հազ. մարդ/ Population number as of January 1, 2010 ths. persons քաղաքային 79.6 հազ. մարդ/ urban ths. persons գյուղական 161.9 հազ. մարդ/ rural ths. persons Քաղաքային բնակչության թվաքանակի տեսակարար կշիռը 33 % Share of urban population size ՀՀ բնակչության ընդհանուր թվաքանակում մարզի բնակչության թվաքանակի տեսակարար կշիռը, 2009թ. 7.4% Share of marz population size in RA population size, 2009 Գյուղատնտեսական նշանակության հողեր 348700 հա / Agricultural land ha այդ թվում` վարելահողեր 95148. հա/ including: arable land ha ՀԱՅԱՍՏԱՆԻ ՀԱՆՐԱՊԵՏՈՒԹՅԱՆ ՄԱՐԶԵՐԸ ԵՎ ԵՐԵՎԱՆ ՔԱՂԱՔԸ ԹՎԵՐՈՎ, 2010 239 MARZES OF THE REPUBLIC OF ARMENIA AND YEREVAN CITY IN FIGURES, 2010 ՀՀ Գեղարքունիքի մարզը գտնվում է Հայաստանի RA Gegharkunik marz is situated in the East of the Հանրապետության տարածքի արևելքում` շրջա- territory of the Republic of Armenia, surrounding the Lake պատելով Սևանա լիճը: Sevan. Մարզը հյուսիսից սահմանակից է ՀՀ Լոռու և Տավուշի It borders RA Lori and Tavush marzes from the North, մարզերին, արևելքից` պետական սահմանով, from the East it borders the state border of Azerbaijan, սահմանակից է Ադրբեջանին, հարավից` ՀՀ Վայոց ձորի from the South – RA Vayots Dzor marz, from South-West – մարզին, հարավ-արևմուտքից` ՀՀ Արարատի մարզին և RA Ararat marz and from the West – RA Kotayk marz.
    [Show full text]
  • Genocide and Deportation of Azerbaijanis
    GENOCIDE AND DEPORTATION OF AZERBAIJANIS C O N T E N T S General information........................................................................................................................... 3 Resettlement of Armenians to Azerbaijani lands and its grave consequences ................................ 5 Resettlement of Armenians from Iran ........................................................................................ 5 Resettlement of Armenians from Turkey ................................................................................... 8 Massacre and deportation of Azerbaijanis at the beginning of the 20th century .......................... 10 The massacres of 1905-1906. ..................................................................................................... 10 General information ................................................................................................................... 10 Genocide of Moslem Turks through 1905-1906 in Karabagh ...................................................... 13 Genocide of 1918-1920 ............................................................................................................... 15 Genocide over Azerbaijani nation in March of 1918 ................................................................... 15 Massacres in Baku. March 1918................................................................................................. 20 Massacres in Erivan Province (1918-1920) ...............................................................................
    [Show full text]
  • Armenian Tourist Attraction
    Armenian Tourist Attractions: Rediscover Armenia Guide http://mapy.mk.cvut.cz/data/Armenie-Armenia/all/Rediscover%20Arme... rediscover armenia guide armenia > tourism > rediscover armenia guide about cilicia | feedback | chat | © REDISCOVERING ARMENIA An Archaeological/Touristic Gazetteer and Map Set for the Historical Monuments of Armenia Brady Kiesling July 1999 Yerevan This document is for the benefit of all persons interested in Armenia; no restriction is placed on duplication for personal or professional use. The author would appreciate acknowledgment of the source of any substantial quotations from this work. 1 von 71 13.01.2009 23:05 Armenian Tourist Attractions: Rediscover Armenia Guide http://mapy.mk.cvut.cz/data/Armenie-Armenia/all/Rediscover%20Arme... REDISCOVERING ARMENIA Author’s Preface Sources and Methods Armenian Terms Useful for Getting Lost With Note on Monasteries (Vank) Bibliography EXPLORING ARAGATSOTN MARZ South from Ashtarak (Maps A, D) The South Slopes of Aragats (Map A) Climbing Mt. Aragats (Map A) North and West Around Aragats (Maps A, B) West/South from Talin (Map B) North from Ashtarak (Map A) EXPLORING ARARAT MARZ West of Yerevan (Maps C, D) South from Yerevan (Map C) To Ancient Dvin (Map C) Khor Virap and Artaxiasata (Map C Vedi and Eastward (Map C, inset) East from Yeraskh (Map C inset) St. Karapet Monastery* (Map C inset) EXPLORING ARMAVIR MARZ Echmiatsin and Environs (Map D) The Northeast Corner (Map D) Metsamor and Environs (Map D) Sardarapat and Ancient Armavir (Map D) Southwestern Armavir (advance permission
    [Show full text]
  • RA Gegharkunik Marz
    RA Gegharkunik Marz 199 RA GEGHARKUNIK MARZ Marz centr –Gavar town Territory 5348 square km Agricultural land 240033 ha including arable land 95148 ha Urban communities 5 Rural communities 87 Rural settlements 93 Population as of January 1, 2003 238.0 ths. persons including urban 79.6 ths. persons rural 158.4 ths. persons RA Gegharkunik marz is situated in the East of the territory of the Republic of Armenia, surrounding the Lake Sevan. It borders Azerbaijan from the East and occupies the 18% of RA territory (the largest marz by its territory). The marz includes the territories of Gavar, Tchambarak (former Krasnoselsk), Martuni, Sevan and Vardenis. The population of the marz comprised the 7.4% of total population of the republic as of January 1, 2003. The 66.6% of population resides in the rural settlements. The marz includes 5 towns such as Gavar, Tchambarak, Martuni, Sevan, Vardenis and 93 rural settlements. The longest extension of the marz from the North-West to the South-East comprised 115 km, from the West to the East - 85 km, the deepest landslide is the canyon of the Getik river (village of Dsoravank) (1325 m), the highest peak – Ajdahak mountain (3598 m). Spitakasar (3555 m), Vardenis (3522 m) and Geghasar (3446 m) are the highest mountains. Argichi (51 km), Gavaraget (47 km) and Masrik (45 km) are the longest rivers. Marzes of the Republic of Armenia in Figures, 1998-2002 201 Sevan is the largest lake (1260 km2, the height above sea-level is 1898m); the crater lakes of Ajdahak and Aghmaghani are comparatively small lakes - up to 50 m in diameter and at a depth of 15 m.
    [Show full text]
  • Report SEIA Final with Annexes Zip.Indd
    SOCIO-ECONOMIC IMPACT ASSESSMENT OF THE COVID-19 OUTBREAK IN ARMENIAN COMMUNITIES ARMENIA 2020 2020 SEIA REPORT TABLE OF CONTENTS Executive summary ......................................................................................................................................................................8 SEIA Results at a Glance ............................................................................................................................................................10 Impact of COVID-19 on Armenia’s marzes and communities ...........................................................................................12 Introduction ....................................................................................................................................................................................14 Background ...............................................................................................................................................................................14 SEIA objectives and approach .............................................................................................................................................16 Methodology .............................................................................................................................................................................18 Part 1. Key Socio-Economic Development Trends in Armenia Prior to the COVID-19 Outbreak ............................20 Part 2. Assessment of COVID-19’s Immediate Impact
    [Show full text]
  • Completion Report Armenia: Water Supply and Sanitation Sector Project
    Completion Report Project Numbers: 40296-013 and 45299-001 Loan Numbers: 2363 and 2860 September 2018 Armenia: Water Supply and Sanitation Sector Project This document is being disclosed to the public in accordance with ADB’s Public Communications Policy 2011. CURRENCY EQUIVALENTS Currency unit – dram (AMD) L2363 At Appraisal At Project Completion (29 August 2007) (31 December 2012) AMD1.00 = $0.00297 $0.00248 $1.00 = AMD336.50 AMD403.58 L2860 At Appraisal At Project Completion (16 January 2012) (30 April 2017) AMD1.00 = $0.00257 $0.00206 $1.00 = AMD389.00 AMD484.68 ABBREVIATIONS ADB – Asian Development Bank AWSC – Armenia Water and Sewerage Company DMF – design and monitoring framework EIRR – economic internal rate of return EMP – environment management plan FIRR – financial internal rate of return GAP – gender action plan IEE – initial environmental examination ICB – international competitive bidding km – kilometers NCB – national competitive bidding O&M – operation and maintenance PCR – project completion report PCU – project coordination unit PGC – project governing council PMU – project management unit PPMS – project performance management system PPP – public–private partnership SAUR – Société d'Aménagement Urbain et Rural SCWE – State Committee for Water Economy SDR – special drawing right WACC – weighted average cost of capital WSPIU – Water Sector Project Implementation Unit WSS – water supply and sanitation NOTES (i) The fiscal year (FY) of the Government of Armenia and its agencies ends on 31 December. (ii) In this report, “$”
    [Show full text]
  • Government of the Republic of Armenia
    E2203 Public Disclosure Authorized Government of the Republic of Armenia MCA-Armenia Team Proposal for Public Disclosure Authorized Millennium Challenge Account Assistance Public Disclosure Authorized Environmental Impact Assessment of the Concept Paper Public Disclosure Authorized September 2005 Government of the Republic of Armenia Proposal for Millennium Challenge Account Assistance Environmental Impact Assessment CONTENTS 1. INTRODUCTION........................................................................................3 2. DESCRIPTION OF THE PROPOSAL ..........................................................4 2.1. Proposed Investment Areas.......................................................................4 2.2. Current Situation of Irrigation Infrastructure and Proposed Investments...4 2.3. Current Situation of Rural Roads and Proposed Investments.................36 3. ENVIRONMENTAL MANAGEMENT SYSTEM IN ARMENIA...................50 3.1. Legal Framework......................................................................................50 3.2. International Agreements .........................................................................53 3.3. Institutional Framework ............................................................................57 4. ENVIRONMENTAL IMPACTS....................................................................60 4.1. “No Action” Alternative .............................................................................61 4.2. Potential Positive Impacts ........................................................................62
    [Show full text]
  • Probabilistic Seismic Hazard Assessment for the Republic of Armenia
    Probabilistic Seismic Hazard Assessment for the Republic of Armenia EXPLANATORY NOTE for the Seismic Zonation Map at the Scale of 1:500,000 Based on the Probabilistic Seismic Hazard Assessment for the Republic of Armenia PROJECT# 7179350 Probabilistic Seismic Hazard Assessment for the Republic of Armenia EXPLANATORY NOTE FOR The Seismic Zonation Map at the Scale of 1:500,000 Based on the Probabilistic Seismic Hazard Assessment for the Republic of Armenia 2018 1 PROJECT# 7179350 Table of Contents Probabilistic Seismic Hazard Assessment for the Republic of Armenia .............................................................................. 1 Introduction .......................................................................................................................................................................... 3 Sources and Methodology .................................................................................................................................................... 4 1. Active fault Analysis ................................................................................................................................... 4 2. Map of earthquake source zones with maximum magnitude of seismogenic zones and earthquake recurrence intervals ................................................................................................................................... 15 3. Different seismo-tectonic models considered and the selected seismo-tectonic model............................. 16 4. List of materials and
    [Show full text]
  • World Bank Document
    The World Bank Report No: ISR13455 Implementation Status & Results Armenia Health System Modernization Project (APL2) in Support of the Second Phase of the Health Sector Reform Program (P104467) Operation Name: Health System Modernization Project (APL2) in Support of Project Stage: Implementation Seq.No: 14 Status: ARCHIVED Archive Date: 30-Mar-2014 the Second Phase of the Health Sector Reform Program (P104467) Public Disclosure Authorized Country: Armenia Approval FY: 2007 Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Public Disclosure Copy Key Dates Board Approval Date 08-Mar-2007 Original Closing Date 31-Dec-2012 Planned Mid Term Review Date Last Archived ISR Date 06-Jul-2013 Effectiveness Date 06-Jun-2007 Revised Closing Date 31-Dec-2014 Actual Mid Term Review Date 17-May-2010 Project Development Objectives Project Development Objective (from Project Appraisal Document) The overall objective of the HSRP Program remains unchanged: to improve the organization of the health care system in order to provide more accessible, quality and sustainable health care services to the population, in particular to the most vulnerable groups, and to better manage public health threats. This Project aims at: (i) scaling up family medicine based primary health care reform by expanding the renovation of primary health care facilities and upgrading of the medical equipment in the Public Disclosure Authorized remaining marzes; (ii) optimizing and upgrading hospital networks in the remaining marzes; (iii) strengthening Government's capacity to develop and monitor effective health sector policies in the area of health financing, resource allocation and provider payments; and (iii) expanding investment in human resources to include formal and continuous education in health (medical, nursing, auxiliary health professionals).
    [Show full text]
  • Report on the Survey on the Efficiency of the Delivery of Services Through the Municipal Management Information System (Mmis)
    REPORT ON THE SURVEY ON THE EFFICIENCY OF THE DELIVERY OF SERVICES THROUGH THE MUNICIPAL MANAGEMENT INFORMATION SYSTEM (MMIS) LOCAL GOVERNANCE PROGRAMME SOUTH CAUCASUS September, 2016 Yerevan TABLE OF CONTENTS 1. INTRODUCTION ........................................................................................................................ 3 2. KEY FINDINGS AND PROPOSALS ........................................................................................... 3 3. METHOD OF SURVEY ............................................................................................................... 4 4. SURVEY SAMPLING .................................................................................................................. 5 5. GENERAL INFORMATION ABOUT THE STAFF USING MMIS ................................................. 5 6. EFFICIENCY OF SERVICE DELIVERY THROUGH MMIS ......................................................... 6 6.1. PROVISION OF REFERENCE NOTES ................................................................................ 6 6.2. PROVISION OF PERMITS ................................................................................................... 7 6.3. ONLINE DOCUMENT CIRCULATION .................................................................................. 7 6.4. MUNICIPAL PROPERTY MANAGEMENT ........................................................................... 8 6.5. INFORMATION ON THE RATES OF LOCAL DUTIES AND FEES ...................................... 8 6.6. MUNICIPAL BUDGET AND ITS PERFORMANCE
    [Show full text]
  • Water Supply and Sanitation Sector Project- Additional Financing Improvement of Gegharkunik Region Settlements Water Supply System
    Initial Environmental Examination July 2014 ARM: Water Supply and Sanitation Sector Project- Additional Financing Improvement of Gegharkunik Region Settlements Water Supply System Prepared by the State Committee Of Water System under the RA Ministry for Territorial Governance for the Asian Development Bank. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. HGSN Ltd. -JINJ Ltd. Water Supply and Sanitation Sector Project - Additional Financing STATE COMMITTEE OF WATER SYSTEM UNDER THE RA MINISTRY FOR TERRITORIAL GOVERNANCE “ARMWATERSEWERAGE” CJSC ASIAN DEVELOPMENT BANK FUNDED WATER SUPPLY AND SANITATION SECTOR PROJECT - ADDITIONAL FINANCING Date of preparation 06.08.2013 Date of revision 16.07.2014 VI SUBPROJECT L2860-ICB-1-06: IMPROVEMENT OF GEGHARKUNIK REGION SETTLEMENTS WATER SUPPLY SYSTEM INITIAL ENVIRONMENTAL EXAMINATION Yerevan, July, 2014 Subproject VI -Preliminary Design 3 HGSN Ltd. -JINJ Ltd. Water Supply and Sanitation Sector Project - Additional Financing STATE COMMITTEE OF WATER SYSTEM UNDER THE RA MINISTRY FOR TERRITORIAL GOVERNANCE “ARMWATERSEWERAGE” CJSC ASIAN DEVELOPMENT BANK FUNDED WATER SUPPLY AND SANITATION SECTOR PROJECT - ADDITIONAL FINANCING Subproject VI IMPROVEMENT OF GEGHARKUNIK REGION WATER SUPPLY SYSTEMS INITIAL ENVIRONMENTAL EXAMINATION (Gavar, Martuni towns and Noratus, Gandzak, Sarukhan, Karmirgyugh, Ltchashen, Chkalovka, Norashen, Ddmashen villages of Gegharkunik region, RA) HGSN Ltd, Director V.
    [Show full text]
  • Vishaps of the Geghama Mou
    _____________________ Association for Near Eastern and Caucasian Studies VISHAPS OF THE GEGHAMA MOUNTAINS. NEW DISCOVERIES AND PROPEDEUTICS TO A HISTORY OF RESEARCH Arsen Bobokhyan, Alessandra Gilibert, Pavol Hnila Introduction Vishaps (Armenian for “dragon”) are stelae carved with animal imagery found in the high-altitude summer pastures of modern Armenia and neighboring regions (particularly in the regions of Javakheti/Trialeti, Nakhijevan, and around Erzurum/ Kars). The vishaps are highly symbolic artifacts dating to the second millennium BC. They probably owe their name to local folk tales where dragons are monstrous giants living in the mountains or, perhaps, the name may be due to a misunderstanding of the and bovid hides). Vishaps are located between 2000 and 3000 m above sea level (asl). Overall, there are c.150 known examples of such monuments, of which c.90 are situated in the Republic of Armenia. Based on their shape and iconography, we can identify three main classes of vishaps, instances of which exist in varying heights (150-550 cm) and local materials piscis, comprises stones cut vellus, comprises stones carved as if the hide of a bovid had been draped or spread on them. The third typological class, the hybrid class, combines the iconographies of the Most vishaps still in situ lie collapsed or placed in a horizontal position on the ground. All three types of vishaps, however, are carved and polished on every face but the “tail”, which is invariably left uncarved. This fact indicates clearly that vishaps were originally standing stones. Vishaps have been discovered at the turn of the twentieth century and subsequently investigated by different scholars (Atrpet, N.
    [Show full text]