2019-004406Crv Memo to the Planning Commission HEARING DATE: APRIL 4, 2019 Date: March 28, 2019 Project: Office Development Annual Limit Program – Update Staff Contact: Corey Teague – (415) 575‐9081 [email protected] Recommendation: None – Informational Item Only BACKGROUND San Francisco’s Office Development Annual Limit Program (“Program”) was initially created in 1985 as part of the Downtown Plan. It limited the amount of large office development (projects containing at least 50,000 square feet of office space) that could be permitted each year in the City (the “Large Cap”). The passage of Proposition M the following year amended the Program in various ways, including the addition of a new and separate annual limit for smaller office development (projects containing between 25,000 to 49,999 square feet), which is commonly known as the “Small Cap.” The Planning Commission cannot allocate office space to any development beyond what is available in the relevant cap at any given time. However, it is not a use‐or‐lose program, and unallocated office space in one year rolls over to the next year. There are currently 2,892,466 square feet available for allocation in the Large Cap. However, there are currently numerous large office development proposals on file with the Department that represent approximately 6.6 million square feet. Of these, the majority of square footage proposed (5,160,819 square feet) is in Central SOMA. While the Large Cap receives an annual allotment of 875,000 square feet each October, and many of the office projects on file may eventually change and/or take multiple years to fully mature, it is likely that the Large Cap will be depleted at some point within the next two years if the typical project‐by‐project review process continues. The Planning Commission has sole authority to grant office space allocation under Prop M (although such allocations are appealable to the Board of Appeals). The Commission may choose the process for allocating space for situations where there are more applications for space than square footage available. Planning Department staff will give an informational presentation on the background, mechanics, and current status of the Program. Additionally, the Department will present information regarding several large office projects within Central SoMa that may soon come before the Planning Commission. Because the Central SOMA projects were being planned and designed during the preparation of the Central SOMA Plan, these projects all provide public benefits at levels consistent with the plan. Staff will present the various projects to the Commission, and currently believes that the first phases of most large Central SOMA projects can be allocated within the current Large Cap, generally in the order that the projects are otherwise ready for Commission action. www.sfplanning.org Memo to Planning Commission Office Development Annual Limit Program Hearing Date: April 4, 2019 Informational Presentation REQUIRED COMMISSION ACTION This item will be presented for informational purposes only. No formal action by the Planning Commission will be required. RECOMMENDATION: None – Informational Item Only Attachments: Current Office Development Annual Limit Program Figures 2 Office Development Annual Limitation ("Annual Limit") Program The Office Development Annual Limit (Annual Limit) Program became effective in 1985 with the adoption of the Downtown Plan Amendments to the Planning Code (Sections 320–325) and was subsequently amended by Propositions M (1986) and C (1987). The Program defines and regulates the allocation of any office development project that exceeds 25,000 gross square feet (gsf) in area. However, pursuant to Proposition O (2016), office development within the Hunters Point Shipyard Phase 2 and Candlestick Point areas is not subject to this Program. A total of 950,000 gsf of office development potential becomes available for allocation in each approval period, which begins on October 17th every year. Of the total new available space, 75,000 gsf is reserved for Small Allocation projects (projects with between 25,000 and 49,999 gsf of office space), and the remaining 875,000 gsf is available for Large Allocation projects (projects with at least 50,000 gsf of office space). Any available office space not allocated in a given year is carried over to subsequent years. This document reflects the status of the Annual Limit Program, including current availability and summaries of previously approved and pending projects. Information in this document was last updated on October 19, 2018. Inquiries should be directed to Corey Teague at (415) 575-9081 or [email protected]. Summary of Key Figures Current Availability 904,637 gsf Pending Availability 630,458 gsf Pipeline Availability 513,567 gsf Small Allocation Projects Current total square footage available for Currently available square footage less 274,179 Currently available square footage less 274,179 (<50,000 gsf of office space) allocation. gsf of pending* projects. gsf of pending* projects and 116,891 gsf of pre- application** projects. Current Availability 2,892,466 gsf Pending Availability -6,013,699 gsf Pipeline Availability -6,604,054 gsf Large Allocation Projects Current total square footage available for Currently available square footage less Currently available square footage less (>50,000 gsf of office space) allocation. 8,906,165 gsf of pending* projects. 8,906,165 gsf of pending* projects and 590,355 gsf of pre-application** projects. *A "pending project" is one for which an office allocation application has been submitted but not yet acted upon. ** A "pre-application" project is one for which an environmental review application, preliminary project assessment application, or other similar application has been submitted but for which no office allocation application has yet been submitted. 1 PENDING OFFICE PROJECTS* *Projects that have submitted an application (B or OFA) pursuant to Planning Code Section 321 (Office Development Annual Limit) but on which no Commission action has yet ocurred. Small Office Cap Case No. Address Sq. Ft. Status Staff Comments Kimberly 2009.0065 3433 Third Street 49,229 B filed 1/27/09 Durandet New 5-story office building for Carpenter's Union on vacant lot. Esmeralda 5-story addition to existing 1-story building. (Central SoMa 2015-010219 462 Bryant Street 49,990 OFA filed on 12/20/16 Jardines Project) Demo existing commercial building and construct new 65-ft, six- story office and retail sales/food service building. (Central 2016-004392 531-535 Bryant Street 47,810 OFA filed on 3/2/17 Doug Vu SoMa Project) Veritical addition to existing 3-story office building via new Linda Ajello construciton of a 5-story; new addition will be constructed over 2016-010589 2300 Harrison Street 27,152 OFA filed on 12/4/17 Hoagland existing surface parking lot. Claudine 2018-007267 865 Market Street 49,999 OFA filed on 5/17/18. Asbagh Conversion of existing retail on floors 7-8 (Westfield) to office. Claudine 2018-007289 233 Geary Street 49,999 OFA filed on 5/18/18. Asbagh Conversion of existing retail on floors 5-7 (Macy's) to office. Project would expand office use of existing five-story office/retail building and add a residential tower; project would amend Zoning Map and Code to increase permitted height to 520' and 2017-008051 30 Van Ness Avenue 49,999 OFA filed on 9/26/18 Alana Callagy permit general office use above the 4th floor. Subtotal 274,179 Large Office Cap Case No. Address Sq. Ft. Status Staff Comments SF Port project. Office allocation will be provided Pier 70 (Forest City Planning Commission automatically on a per-permit basis, at the time of issuance 2014-001272 Only) 1,810,000 approvals on 8/24/17 Rich Sucre of each building permit. SF Port project. Office allocation will be provided SWL 337 ("Mission Planning Commission automatically on a per-permit basis, at the time of issuance 2013.0208 Rock") 1,300,000 approvals on 10/5/17 Rich Sucre of each building permit. Demo of 2 industrial buildings; 2 new office buildings (Central 2012.0640 598 Brannan Street 922,291 B filed on 10/24/12 Doug Vu SoMa Project). 2 Owner-initiated Article 10 Landmark designation and an Office 2013.1593 2 Henry Adams 245,697 B filed on 2/6/14 Rich Sucre Allocation. Eligible area limited by recent legislation. Natalia 2014.0154 1800 Mission Street 119,599 OFA filed on 1/27/15 Kwiatkowska Conversion in the Armory. Proposed 350' office building within a three-building project including a 325' residential building and 200' tall hotel. (Central 2012.1384 400 2nd Street 421,000 OFA filed on 4/29/16 Doug Vu SoMa Project) Demo existing Flower Mart warehouse buildings and replace 610-698 Brannan Ella with new development, including a new Flower Mart (Central 2017-000663 Street 2,030,560 OFA filed on 1/17/17 Samonsky SoMa Project). Demolition of existing SF Tennis Club building. Construction of new office space, with publically-accessible fitness club, retail Linda Ajello space and underground parking / loading. (Central SoMa 2015-012490 88 Bluxome Street 833,040 OFA filed on 2/6/18. Hoagland Project) New 61-story, approximately 800-ft mixed-use tower with 10 542-550 Howard hotel floors containing approximately 220 guest rooms, 16 floors Street - Transbay of office, 26 residential floors with 175 units, seven floors of 2016-013312 Parcel F 288,677 OFA filed on 3/14/17 Nick Foster shared amenity space. "Phase II" addition (165', 11 stories) of office space onto an approved 85' "Phase I" office building approved by the Planning Commission on 12/11/14. With this newly planned addition, total building height would now be 250' and contain a total of approx. 2015-009704 505 Brannan Street 165,000 OFA filed on 3/6/18.
Recommended publications
  • SAN FRANCISCO 2Nd Quarter 2014 Office Market Report
    SAN FRANCISCO 2nd Quarter 2014 Office Market Report Historical Asking Rental Rates (Direct, FSG) SF MARKET OVERVIEW $60.00 $57.00 $55.00 $53.50 $52.50 $53.00 $52.00 $50.50 $52.00 Prepared by Kathryn Driver, Market Researcher $49.00 $49.00 $50.00 $50.00 $47.50 $48.50 $48.50 $47.00 $46.00 $44.50 $43.00 Approaching the second half of 2014, the job market in San Francisco is $40.00 continuing to grow. With over 465,000 city residents employed, the San $30.00 Francisco unemployment rate dropped to 4.4%, the lowest the county has witnessed since 2008 and the third-lowest in California. The two counties with $20.00 lower unemployment rates are neighboring San Mateo and Marin counties, $10.00 a mark of the success of the region. The technology sector has been and continues to be a large contributor to this success, accounting for 30% of job $0.00 growth since 2010 and accounting for over 1.5 million sf of leased office space Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 2012 2012 2012 2013 2013 2013 2013 2014 2014 this quarter. Class A Class B Pre-leasing large blocks of space remains a prime option for large tech Historical Vacancy Rates companies looking to grow within the city. Three of the top 5 deals involved 16.0% pre-leasing, including Salesforce who took over half of the Transbay Tower 14.0% (delivering Q1 2017) with a 713,727 sf lease. Other pre-leases included two 12.0% full buildings: LinkedIn signed a deal for all 450,000 sf at 222 2nd Street as well 10.0% as Splunk, who grabbed all 182,000 sf at 270 Brannan Street.
    [Show full text]
  • 2020-008009Oth
    MEMO TO THE PLANNING COMMISSION HEARING DATE: October 1, 2020 September 24, 2020 Record No.: 2020-008009OTH Subject: Planning Commission Policy: Implementing Proposition E Staff Contact: Corey Teague, Zoning Administrator – (628) 652-7328 [email protected] Recommendation: Adopt the Proposed Resolution Office Development Annual Limit Program San Francisco’s Office Development Annual Limit Program (“Program”) was initially created in 1985 as part of the Downtown Plan. It limited the amount of large office development (projects containing at least 50,000 square feet of office space) that could be permitted each year in the City (the “Large Cap”). The passage of Proposition M the following year amended the Program in various ways, including the addition of a new and separate annual limit for smaller office development (projects containing between 25,000 square feet to 49,999 square feet), which is commonly known as the “Small Cap.” Each October 17th the Program receives an allotment of 875,000 square feet for the Large Cap, and allotment of 75,000 square feet for the Small Cap. Under the original Program, the Planning Commission could not allocate office space to any development in excess of what was available in the relevant cap at that time. Additionally, unallocated office space in one year rolls over to the next year, and unused office space may be revoked and returned to the relevant cap. A net total of more than 12 Million square feet of office was allocated from the Large Cap in the last 10 years, with the most recent allocations for projects within Central SoMa.
    [Show full text]
  • BART Market Street Canopies and Escalators Modernization Project
    Draft Initial Study/Mitigated Negative Declaration BART Market Street Canopies and Escalators Modernization Project San Francisco Bay Area Rapid Transit District April 30, 2018 Draft Initial Study/Mitigated Negative Declaration BART Market Street Canopies and Escalators Modernization Project Prepared for San Francisco Bay Area Rapid Transit District 300 Lakeside Drive, 21st floor Oakland, CA 94612 Prepared by 300 Lakeside Drive, Suite 400 Oakland, CA 94612 April 30, 2018 DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION Date of Publication of Draft Initial Study/Mitigated Negative Declaration: April 30, 2018 Project Title: BART Market Street Canopies and Escalators Modernization Project Sponsor and Lead Agency: San Francisco Bay Area Rapid Transit District Contact Person and Phone Number: Janie Layton, (510) 874-7423 Project Location: Downtown San Francisco BART Stations (Embarcadero, Montgomery Street, Powell Street, and Civic Center/UN Plaza). Project Description: The San Francisco Bay Area Rapid Transit District (BART), in cooperation with the City and County of San Francisco, is working to improve escalator durability and security at station entrances/exits along Market Street leading to the underground Embarcadero, Montgomery Street, Powell Street, and Civic Center/UN Plaza station concourses. The existing entrances/exits consist of variations of side-by-side stairs and escalators leading down to the underground concourse level, and are currently uncovered and exposed to inclement weather and discarded trash leading to frequent breakdowns of the existing escalators. The proposed improvements would include the installation of canopy covers over the entrances/exits, as well as replacement and refurbishment of existing street-level escalators. Each protective canopy would also be equipped with a motorized security grille that would lock at the sidewalk level of the station entrance/exit when the stations are closed.
    [Show full text]
  • The Route for the San Francisco Popos Hike (Privately Owned Public Open Spaces) February15, 2018 Dave Weinstein Copyright 2018 El Cerrito Trail Trekkers
    The Route for the San Francisco Popos hike (Privately Owned Public Open Spaces) February15, 2018 Dave Weinstein Copyright 2018 El Cerrito Trail Trekkers. No reproduction without express permission Intro: Mandated by 1985 the city’s downtown plan for new office developments in downtown, these are private spaces are required to be open to the public. Many are open only during business hours but others are public plazas open all the time. Some were created earlier, by developers seeking density bonuses in exchange, or the like. Problem is, people don’t know about many of these open spaces. (Sort of like the trails in El Cerrito.) In 2013 Chronicle urban writer John King wrote a series critiquing the way come owners made their spaces known, and how poorly the city enforced the rules. Since then thanks to John and increased public interest, things have improved. This tour is an update of a tour Trekkers gave in 2013. We will tour not just POPOS spaces but some other plazas and lobbies that are also open to the public, but without the POPOS mandate. We will note how many of these spaces contain excellent art, making downtown very much an open air and lobby museum that itself is too little known. Note: As performed on February 15, we did not get to all of these sites due to time constraints. We got to most, though! Crown Zellerbach 1 One. Meet at 1 Bush Street, Crown-Zellerbach Building. 1959, Hertzka and Knowles, SOM. (Hertzka, Wayne, Knowles, William Howard. 16 and 24th street BART stations, 100 Pine St., at least portions of Lawrence Berkeley Lab) First glass walled tower in city.
    [Show full text]
  • $42,435,000 City and County of San Francisco Finance Corporation Lease Revenue Bonds, Series 2007 (Open Space Fund - Various Park Projects)
    NEW ISSUE-BOOK-ENTRY ONLY Ratings: Moody’s S&P Fitch MBIA Insured Ratings: Aaa AAA AAA Underlying Ratings: A1 AA- AA- (See “Ratings” herein) In the opinion of Hawkins Delafietd & Wood LLP, San Francisco, California, and Lofton & Jennings, San Francisco, California, Co-Bond Counsel to the City, under existing statutes and court decisions and assuming continuing compliance with certain tax covenants described herein, <i) interest on the Series 2007 Bonds is excluded from gross income for Federal income tax purposes pursuant to Section 103 of the Internal Revenue Code of 1986, as amended (the "Code"), and (ii) interest on the Series 2007 Bonds is not treated as a preference item in calculating the alternative minimum tax imposed on individuals and corporations under the Code; such interest, however, is included in the adjusted current earnings of certain corporations for purposes of calculating the alternative minimum tax imposed on such corporations. In addition, in the opinion of Co-Bond Counsel to the City, under existing statutes, interest on the Series 2007 Bonds is exempt from personal income taxes imposed by the State of California. See “Tax Matters." $42,435,000 CITY AND COUNTY OF SAN FRANCISCO FINANCE CORPORATION LEASE REVENUE BONDS, SERIES 2007 (OPEN SPACE FUND - VARIOUS PARK PROJECTS) Dated: Date of Delivery Due: July 1, as shown on inside cover The City and County of San Francisco Finance Corporation Lease Revenue Bonds, Series 2007 (Open Space Fund - Various Park Projects) (the “Series 2007 Bonds”), are issued pursuant to a Master Trust Agreement, dated as of October 1, 2006 (the “Master Trust Agreement”), as amended by the First Supplemental Trust Agreement, dated as of October 1, 2007 (the “Supplemental Trust Agreement” and together with the Master Trust Agreement, the “Trust Agreement”), each by and between the City and County of San Francisco Finance Corporation (the “Corporation”) and U.S.
    [Show full text]
  • Transit Center District Plan and Transit Tower
    COMMENTS AND RESPONSES ON DRAFT EIR Transit Center District Plan and Transit Tower PLANNING DEPARTMENT CASE NO. 2007.0558E and 2008.0789E STATE CLEARINGHOUSE NO. 2008072073 Draft EIR Publication Date: SEPTEMBER 28, 2011 Draft EIR Public Hearing Date: NOVEMBER 3, 2011 Draft EIR Public Comment Period: SEPTEMBER 28 THROUGH NOVEMBER 28, 2011 Final EIR Certication Date: MAY 24, 2012 May 10, 2012 To: Members of the Planning Commission and Interested Parties From: Bill Wycko, Environmental Review Officer Re: Attached Comments and Responses on Draft Environmental Impact Report Case No. 2007.0558E: Transit Center District Plan and Case No. 2008.0789 Transit Tower Attached for your review please find a copy of the Comments and Responses document for the Draft Environmental Impact Report (EIR) for the above‐referenced project. This document, along with the Draft EIR, will be before the Planning Commission for Final EIR certification on May 24, 2012. Please note that the public review period ended on November 28, 2011. The Planning Commission does not conduct a hearing to receive comments on the Comments and Responses document, and no such hearing is required by the California Environmental Quality Act. Interested parties, however, may always write to Commission members or to the President of the Commission at 1650 Mission Street and express an opinion on the Comments and Responses document, or the Commission’s decision to certify the completion of the Final EIR for this project. Please note that if you receive the Comments and Responses document in addition to the Draft EIR, you technically have the Final EIR. If you have any questions concerning the Comments and Responses document or the environmental review process, please contact Sarah B.
    [Show full text]
  • Responses to Comments on Draft Environmental Impact Report Case No
    7 HISTORIC AND EXISTING IMAGES DATE: March 7, 2013 TO: Members of the Planning Commission and Interested Parties FROM: Sarah Jones, Acting Environmental Review Officer Re: Attached Responses to Comments on Draft Environmental Impact Report Case No. 2008.1084E, 706 Mission Street – The Mexican Museum and Residential Tower Project Attached for your review please find a copy of the Responses to Comments document for the Draft Environmental Impact Report (EIR) for the above-referenced project. This document is also available from the Planning Department website, at http://tinyurl.com/sfceqadocs. This document, along with the Draft EIR, will be before the Planning Commission for Final EIR certification on March 21, 2013. Please note that the public review period ended on August 13, 2012. The Planning Commission does not conduct a hearing to receive comments on the Responses to Comments document, and no such hearing is required by the California Environmental Quality Act. Interested parties, however, may always write to Commission members or to the President of the Commission at 1650 Mission Street and express an opinion on the Responses to Comments document, or the Commission’s decision to certify the completion of the Final EIR for this project. Please note that if you receive the Responses to Comments document in addition to the Draft EIR, you technically have the Final EIR. If you have any questions concerning the Responses to Comments document or the environmental review process, please contact the EIR Coordinator, Debra Dwyer at 415-575-9031. Thank you for your interest in this project and your consideration of this matter.
    [Show full text]
  • Board of Appeals, City & County of San Francisco
    BOARD OF APPEALS, CITY & COUNTY OF SAN FRANCISCO Appeal No. 1S..187 Appellant(s) vs. Respondent NOTICE OF APPEAL NOTICE IS HEREBY GIVEN THAT on November 19, 2015, the above named appellant(s) filed an appeal with the Board of Appeals of the City and County of San Francisco from the decision or order of the above named department(s), commission, or officer. The substance or effect of the decision or order appealed from is the ISSUANCE on November 10, 2015 to GSW Arena, LLC , of a Place of Entertainment Permit (for a mixed use event center open seven days a week from 7:00 AM to 2:00 AM, with proposed entertainment to include family shows, professional basketball games, collegiate athletic events, and concerts, and with food and beverages served on-site, including alcoholic beverages) at Mission Bay South Blocks 29 & 31. PERMIT NO. EC-1352 FOR HEARING ON December 09, 2015 Address of Appellant(s): Address of Other Parties: Mission Bay Alliance , Appellant GSW Arena, LLC, Permit Holder c/o Thomas Lippe, Attorney for Appellant c/o Mary Murphy, Attorney for Permit Holder Law Offices of Thomas Lippe Gibson Dunn 201 Mission Street, 12th Floor 555 Mission Street, Suite 3000 San Francisco, CA 94105 San Francisco, CA 94105 BOARD ()F A.PPEALS Date Filed: OV 1 9 'ut:J CITY & COUNTY OF SAN FRANCISCO APPEAL# / ~~t n BOARD OF APPEALS PRELIMINARY STATEMENT OF APPEAL I I We, Mission Bay Alliance, hereby appeal the following departmental action: CONDITIONAL GRANT of a Place of Entertainment Permit by the Entertainment Commission which was issued or became effective on : November 10, 2015, to: GSW Arena, LLC , for the property located at: Mission Bay South Blocks 29 & 31.
    [Show full text]
  • San Francisco Ephemera Collection SF SUB COLL
    http://oac.cdlib.org/findaid/ark:/13030/kt2p30342b No online items Finding Aid to the San Francisco Ephemera Collection SF SUB COLL Finding aid prepared by David Krah, Stephanie Walls, and California Ephemera Project staff; updated by San Francisco History Center staff. The California Ephemera Project was funded by a Cataloging Hidden Special Collections and Archives grant from the Council on Library and Information Resources in 2009-2010. San Francisco History Center, San Francisco Public Library 100 Larkin Street San Francisco, CA 94102 [email protected] URL: http://www.sfpl.org/sfhistory 2010, revised January 2020 Finding Aid to the San Francisco SF SUB COLL 1 Ephemera Collection SF SUB COLL Title: San Francisco ephemera collection Date (inclusive): 1850-present Identifier/Call Number: SF SUB COLL Physical Description: 265.0 Linear feet(in 153 file drawers) Contributing Institution: San Francisco History Center, San Francisco Public Library 100 Larkin Street San Francisco, CA 94102 415-557-4567 [email protected] URL: http://sfpl.org/sfhistory Abstract: Consists of ephemeral materials, city records and clippings relating to the city of San Francisco and its citizens. Materials date from the 1850s to the present, the bulk from the 20th century. Subjects cover a diverse array of San Francisco history and primarily pertain to: municipal government; city planning; urban policy; environmental engineering; transportation; social history; labor history; community relations; notable events; public events, fairs and celebrations; and various aspects of local popular culture. Subjects also relate to specific local entities, such as: businesses; schools, colleges and universities; political parties; and associations, groups and clubs.
    [Show full text]
  • Forest City to Take Pier 70 Project Height Increase to Voters
    114th Year OFFICIAL PUBLICATION OF THE BUILDING AND CONSTRUCTION TRADES COUNCIL OF SAN FRANCISCO Volume 114, No. 7 July 2014 www.SFBuildingTradesCouncil.org Forest City to Take Pier 70 Project Height Increase to Voters ♦ The $242 Million Development Would Create 10,000 Construction Jobs By Paul Burton San Francisco Centre and de- City Development Image Courtesy Forest Contributing Writer veloped the Presidio Landmark apartment complex. he impact of The developer’s new pro- Proposition B is posal, the “Union Iron Works starting to be felt. Historic District Housing, Prop B, which Waterfront Parks, Jobs and passed last month, Preservation Initiative,” will Trestricts development along ask voters to restore the height San Francisco’s waterfront limit at the property from 40 by mandating voter approval feet to 90 feet, which is the of every project that exceeds height of the tallest existing height limits. historic structure on the site In response, representatives now. Forest City executive Jack of Forest City Development Sylvan said the ballot measure presented Pier 70 plans to to allow the 90-foot heights delegates of the San Francisco would be submitted to the City Building and Construction in July in order for the measure Trades Council at the council’s to be on the ballot this Novem- recent meeting. Forest City ber. Sylvan said the developer plans to place an initiative on decided to move forward with Forest City plans to develop a 25-acre portion of the Pier 70 Master Plan area. The site includes 2.5 million November’s ballot asking for (continued on page 6) square feet of new buildings, a major park and about 250,000 square feet of existing buildings.
    [Show full text]
  • Office Highlights Northern California
    Office Highlights Northern California . Q3 2013 NorCal claims three of the top Tour activity five rent growth markets in Q3 Leasing volume High-technology and health care are driving demand in Northern Rents California, helping to generate more than 4.0 million square feet of net absorption year-to-date and a decline in total vacancy of 80 basis Concessions points to 14.9 percent. Despite making up just 6.9 percent of U.S. inventory, Northern California accounted for 15.1 percent of total U.S. Sales volume net absorption in the first three quarters of 2013. Strong employment fundamentals in Northern California markets—which includes San Construction Francisco, the San Francisco Peninsula, Silicon Valley, the East Bay deliveries and Sacramento—will drive continued tenant expansions. Large Construction blocks are diminishing throughout the region, resulting in higher starts premiums for such space, but commodity space remains plentiful. Arrows represent change from prior quarter Landlords in San Francisco, the San Francisco Peninsula and Silicon Top tenants in the market Valley continue to push rents, placing all three of those markets in the • UCSF is in the San Francisco market for 100,000 to 300,000 top five rent growth markets in the nation for the third quarter. square feet. Sacramento and the East Bay are beginning to see more rapid rent • Law Firm Fenwick & West is rumored to be in the market for increases as well, in line with vacancy declines and strong gains in net 160,000 square feet in Palo Alto and Menlo Park. absorption since the beginning of this year.
    [Show full text]
  • 302061723.Pdf
    HinkinsREA analyzes market data obtained from third party sources and the accuracy thereof has not been independently verified. References and quotes are taken from online sources, San Francisco Business Times, CoStar, LoopNet, Company websites & Press Releases, and other third party sources. Reproduction of this report prohibited. Copyright HinkinsREA. September 2013. 2012, A year which exceeded expectations. Leasing Market Recap 50% of the 61 largest blocks of space where Historic Sales Volume absorbed towards the end of 2012 including 2007 - $8.5 billion traded hands making it the 305,000 square foot at 500 Terry Street Francois highest sales volume year in the history of San Blvd where Maraki leased 110,000 SF; 264,000 SF Francisco. at 360 Third Street where Square Trade took 55,000 SF and two other tenants took 125,000 2012 – Sale Volume & Investor Demand SF; 1155 Market Street where the City of San Building sales blasted towards $6.1 billion due to Francisco took 110,000 SF; 760 Market Street foreign investors and pension funds activity where Obvious took 75,000 SF and 101 Spear marking the second time in history that the sales Street where Salesforce took 100,000 SF. volume topped $6.0 billion. The opportunistic The year-end decision by Salesforce to prelease buyers of 2010 and 2011 were replaced by the entire 444,000 square foot tower planned for institutional investors looking for stable, income 350 Mission Street (developer, Kilroy Realty Corp) producing properties, seeking well-leased core spurred the stage for fast-growing tenants to assets. The real estate cycle moved from buying begin grabbing space early in other large leased buildings to rehabs to ground up downtown buildings coming out of the ground in development.
    [Show full text]